MARIA CARRILLO HIGH SCHOOL
|
|
- Philip Fowler
- 7 years ago
- Views:
Transcription
1 SCHOOL DATA Address: 6975 Montecito Blvd. Santa Rosa, CA Established: 995 Permanent Classrooms: 55 Portable Classrooms: 0 Building Area: Site Area: 54,4 sq. ft acres Students in 205:,605 Students in 2020 (Projected):,770 Current Student Capacity:,540 v.0 Pending Board Approval April 27, 206
2 SUMMARY PROJECT COST BY IOQ SCORE RANGE IOQ SCORE RANGE LEVEL OF NEED ESTIMATED COST $80,000, LOW $40,965,245 $70,000, MEDIUM $6,74,50 $60,000, $50,000, HIGH $4,476,24 $40,000, HIGHEST $887,225 $0,000, TOTAL COST $92,06,85 $20,000, $0,000, $ MAJOR FACILITY NEEDS Additional classrooms and maker spaces to accommodate enrollment growth Synthetic turf football field, reconditioned ball fields, and repaired irrigation system Facilities have many electrical and mechanical items that continually break and need repair Insufficient covered outdoor lunch areas and restrooms Several classrooms (dance, computer labs, drafting) no longer used as originally intended and need renovation MCHS -- 2
3 SITE CONDITIONS RATINGS Code Compliance (Accessibility, Structural, Life Safety) Educational Appropriateness Technology Infrastructure Building Finish Materials Building Systems (Mechanical & Plumbing, Utilities) Lighting and Electrical Systems Environmental Quality (Indoor & Outdoor) 0 5 EXISTING CONDITIONS SUMMARY Covered Outdoor Eating Area CHALLENGES No cafeteria or indoor dining options Poor condition of irrigation system at fields makes maintenance a challenge Poor turf is cause for injuries during PE and athletics Lack of synthetic turf at stadium is viewed as a safety issue OPPORTUNITIES Space is available in the quad to expand covered eating areas Space available to provide additional restroom facilities at the stadium and ball fields The site has space available to accommodate increased enrollment Campus can be readily achievable Lack of restrooms at stadium and ball fields Press box at stadium and ball fields was constructed without state approvals Covered outdoor eating areas needed Existing quads and other outdoor areas in need of general paving repairs Clear sense of entry and school identity Interior Quad MCHS --
4 CLASSROOM BUILDINGS CONDITIONS RATINGS Code Compliance (Accessibility, Structural, Life Safety) Educational Appropriateness Technology Infrastructure Building Finish Materials Building Systems (Mechanical & Plumbing, Utilities) Lighting and Electrical Systems Environmental Quality (Indoor & Outdoor) 0 5 EXISTING CONDITIONS SUMMARY Classroom Interior CHALLENGES The school is over crowded - every space that can be used as a teaching space is being used Shortage of standard classroom space and science labs Facility modifications have not kept up with changing programs or new programs OPPORTUNITIES The site has space available to accommodate additional classrooms, large multi-purpose spaces, and maker labs Courtyards can be used for small group instruction, and flexible meeting spaces Programs are housed in facilities designed for different purposes Lack of flexible space to accommodate large groups for testing Mechanical and electrical issues throughout Space available between classrooms to develop additional collaboration spaces, restrooms, or outdoor gathing areas Many existing classroom configurations allow adaptation to include collaborative/shared spaces Classroom Exterior Courtyard MCHS -- 4
5 LIBRARY AND ADMINISTRATION CONDITIONS RATINGS 0 5 Code Compliance (Accessibility, Structural, Life Safety) EXISTING CONDITIONS SUMMARY Educational Appropriateness Technology Infrastructure Building Finish Materials Building Systems (Mechanical & Plumbing, Utilities) Lighting and Electrical Systems Environmental Quality (Indoor & Outdoor) Library Circulation Desk CHALLENGES Many areas in the library are being used as classrooms due to school overcrowding and lack of classroom space. Library lacks restroom facilities Circulation and reception desks not accessible OPPORTUNITIES Centrally located on Campus Access to outdoor areas Availability of natural light Availability of display areas for student work Interior garden courtyard at Administration Interior Courtyard MCHS -- 5
6 GYMNASIUM AND ATHLETIC FIELDS CONDITIONS RATINGS 0 5 Code Compliance (Accessibility, Structural, Life Safety) EXISTING CONDITIONS SUMMARY Educational Appropriateness Technology Infrastructure Building Finish Materials Building Systems (Mechanical & Plumbing, Utilities) Lighting and Electrical Systems Environmental Quality (Indoor & Outdoor) Gym Exterior CHALLENGES Roofing has been a problem since the school opened Roofing replacement or extensive repairs to address long term leaks reported by staff Evidence of moisture at exterior finishes Interior finishes are in poor condition Replacement or repair of bleachers OPPORTUNITIES Space available to consolidate sports related programs (Sports Medicine, Dance, etc.) adjacent to the gym and weighroom Space available to increase size of the weightroom Resurfacing of tennis courts, football field Restrooms can be used for students during school hours Gym Interior MCHS -- 6
7 PERFORMING ARTS & FINE ARTS CONDITIONS RATINGS 0 5 Code Compliance (Accessibility, Structural, Life Safety) EXISTING CONDITIONS SUMMARY Educational Appropriateness Technology Infrastructure Building Finish Materials Building Systems (Mechanical & Plumbing, Utilities) Lighting and Electrical Systems Environmental Quality (Indoor & Outdoor) Art Room Interior CHALLENGES Mechanical and electrical issues throughout Interior finishes are worn out -- building need minor modernization Poor lighting leveles and lack of lecture hall seating prohibits the theater to be used for large group testing Lighting at isles in not working OPPORTUNITIES Space available to have outdoor set building area share space with a new maker space The theater can be used for more than performances Open up and enliven lobby/exterior entry, stage opportunity at central courtyard Outdoor access from Art Classrooms Performing Arts Entry MCHS -- 7
8 COLORS DENOTE BUILDINGS OR AREAS WITHIN BUILDINGS NEW RUBBER TRACK AND TURF FIELD MODERNIZATION OF EXISTING NEW BUILDING PROGRAM / RECONFIGURATION OF SPACE NEW BUILDING NEW SITE STRUCTURES SITE IMPROVEMENTS L K D7 CHEM. LAB D8 TECH. LAB C5 O O MAINT. TECH. LAB C4 PHYSICS LAB. D9 BIOLOGY LAB D0 CLASS LAB D6 D5 D L2 K2 M8 M M7 M2 M6 M M5 M4 N8 N N7 N2 N6 N N5 N4 POTENTIAL SOLAR STRUCTURE COVERED WALKWAYS NEW CAFE D2 H5 D D4 E4 E F6 F E E2 F5 F2 G5 G G4 G2 WORLD ACTIVITIES H6 H4 H COMPUTER LAB I- H2 H NEW CLASSROOM BUILDING ST KITCHEN KITCH. B- SHOWERS CULINARY ARTS B-2 T T ST T I-5 STUDENT STORE MEN'S LOCKER EQUIP. T O EQUIP. T O STUDENT ACTIVITIES A LARGE GYMNASIUM MODERNIZE CLASSROOMS LOUNGE WRK. ATTND. WOMEN'S LOCKER STD. J- LOBBY VICE PRINC. ASST. PRINC. STD. J-2 RECEPT. SHOWERS WEIGHT RENOVATE FIELD LANDSCAPE T FOOD SERVICE SMALL GYMNASIUM HEALTH ADMIN. MODERNIZE CLASSROOM WINGS PERFORMANCE/ LECTURE PRINCIPAL STAGE WRKSHP. J- BAND J6 NEW CLASSROOM BUILDING CHORAL J5 DRAMA J4 MODERNIZE PERFORMING ARTS AND THEATER MODERNIZE LIBRARY AND SUPPORT ROOMS MODERNIZE ADMINISTRATION NEW DANCE STUDIO MODERNIZE GYMNASIUM EXPANSION TO WEIGHT ROOM FACILITIES MASTER PLAN MCHS -- 8
9 CAMPUS WIDE SAFETY AND SECURITY UPGRADES /20 CAMPUS WIDE TECHNOLOGY UPGRADES /20 $,59,248 Improvements across the campus to improve overall security and safety for students and staff. Improvements may include: New perimeter fencing enclosing the core of the campus New security locks for all classrooms Improve exterior lighting throughout of campus New security cameras $4,7,67 PERIMETER FENCE WITH ACCESS Perimeter fencing around campus and field Improvements across the campus to integrate technology into the educational environment to support students and staff. Improvements may include: Infrastructure upgrades Additional equipment such as projectors, laptops, and document cameras for teachers Wireless internet access in each building, outdoor courtyards and learning areas Improved AV systems MCHS -- 9
10 CAMPUS SITE IMPROVEMENTS Improvements across the campus to address site issues and improve outdoor areas for students, parents, and staff. Improvements may include: Resurface basketball courts Resurface tennis courts Repave parking lot Address flooding and drainage issues throughout field landscapes Providing more individual covered seating throughout quad areas Incorporate more outdoor learning areas between classroom wings $887,225 REPAVE BASKETBALL COURTS RESURFACE SOUTH PARKING LOT REPAVE TENNIS COURTS Basketball Courts and Tennis Courts /20 Parking Lot REVITALIZE FIELD LANDSCAPE IMPROVE OUTDOOR SPACES Play Fields Outdoor Learning Areas MCHS -- 0
11 MODERNIZATION OF LIBRARY AND SUPPORT SPACES /20 Modernize existing library and classrooms to Modernization may include: Repurpose exisitng library space into a Student Union assembly area Reprogram adjacent rooms into meeting spaces and study rooms Provide a second floor mezzazine for Student Activites and study rooms Provide sufficient storage for supplies Repair/refinish flooring and wall finishes Provide restroom facilities for Boys, Girls, and Staff Improve interior lighting MODERNIZATION OF DIGITAL MEDIA CLASSROOMS /20 $5,899,24 $2,607,584 Repurpose and modernize Rms. I-2 thru I-4 into a immersed digital media center and video distribution hub. Modernization may include: New central studio for common workspace Provide digital support and resource rooms adjacent to central workspace with connected thoroughway Remodel Rm. I-7 into a general classroom during new Dance studio construction Repair/refinish flooring and wall finishes Improve interior lighting Repair/Replace casework and storage Provide storage space for supplies Add new covered walkay MODERNIZE LIBRARY Library and Support Spaces MODERNIZE CLASSROOMS Classroom Building MCHS --
12 MODERNIZATION OF CENTRAL RESTROOMS /20 Modernize central restrooms and adjacent spaces to incorporate more efficient use of space and facilities. Modernization may include: Modernize existing restrooms to increase size of space Provide Staff restroom facilites Repurpose Rm. F-4 and F-5 into singular Resource room Repurpose Rm. G- and adjacent storage into singular Resource room Provide new drinking fountain with water bottle refill station Provide sufficient storage for supplies Repair/refinish flooring and wall finishes Improve interior lighting Replace window and door casings MODERNIZATION OF TECH. CLASSROOMS /20 $,67,78 $,754,254 Modernization of Rms. C- thru C- into CTE workspaces for additional vocational programs. Modernization may include: Provide new exterior roll-up door to Rm C- for outdoor lot connection Reprogram Rm. C- from Health and Training Center into CTE programming during new construction of weight room and training expansion Repair/refinish flooring and wall finishes Improve interior lighting Repair/Replace casework and storage Provide storage space for supplies MODERNIZE RESTROOMS Central restroom facilities TECH. CLASSROOMS CTE Classroom wing MCHS -- 2
13 NEW CAFE /20 NEW CAFE NEW DANCE STUDIO /20 $4,76,669 New 6200 sf student-run cafe and food service. New building may inlcude: () Seating area, approximately 4200 sf () Kitchen and food prep, approximately 2000 sf Provide restroom facilities for Boys, Girls, and Staff Dining furniture Provide storage space for supplies Optimal use of natural lighting Provide designated parking $,724,80 Provide a new dance studio adjacent to exisiting Gym. New construction may include: Provide a new 2800 sf. studio classroom Provide full interior wall mirrors Provide high-impact flooring Sufficient windows for natural lighting Provide overhead lights Provide storage space for supplies Add interior doors connecting to existing Gym Cafe and Food Service NEW DANCE STUDIO New Dance Studio MCHS --
14 NEW EXPANSION TO EXISTING WEIGHT ROOM /20 Provide a new 500 sf. expansion of the existing weight room. New spaces may include: () Weight training room expansion, approximate 2,500 sf. () training center, approximately 700 sf. Provide restroom facilities for Boys, Girls, and Staff Sufficient storage () Office Spaces, each approximately 00 sf. Provide high-impact flooring Provide sufficient natural lighting Provide exterior doors for direct access from outdoor space /20 EXPANSION TO WEIGHT ROOM TRAINER S CENTER NEW TRACK AND FIELD $2,55,475 $7,969,8 Weight Room and Trainer s Center Provide a new rubber track and turf field for field athletics. New construction may include: Regulation sized, all-weather track Artificial turf field Bleachers and lighting NEW RUBBER TRACK AND FIELD Field and Track MCHS -- 4
15 NEW CLASSROOM BUILDING /20 Provide a new, single-story classroom building of approximately 7,00 sf. to increase facility capacity for expected enrollment growth. New construction may include: (4) Classroom, approximately 960 sf () Lecture hall, approximately 460 sf Provide restroom facilities for Boys, Girls, and Staff Covered walkways Flexible furniture Provide storage space for supplies Cabinetry for storage in each classroom Adjacent to outdoor learning areas NEW CLASSROOM BUILDING NEW CLASSROOM BUILDING WITH MAKER SPACE /20 $4,495,704 $2,94,762 Provide a new, single-story classroom building of approximately 4,780 sf. to increase facility capacity for expected enrollment growth. New construction may include: () Classroom, approximately 960 sf () Maker spaces, each approximately 850 sf Provide restroom facilities for Boys, Girls, and Staff Covered walkways Flexible furniture Provide storage space for supplies Cabinetry for storage in each classroom Adjacent to outdoor learning areas New Classroom Building NEW CLASSROOM BUILDING New Classroom Building MCHS -- 5
16 MODERNIZATION OF CLASSROOM WINGS /20 MODERNIZE CLASSROOM WINGS MODERNIZATION OF GYM /20 $0,209,497 Modernize existing classrooms. Modernization of these spaces may include: Repair/replace existing wall, floor and hardware finishes Repair/replace roofing and plumbing systems as necessary Provide security locks to all classrooms Replace damaged acoustical ceiling tiles and casework Repair/Replace window and door openings $2,682,579 Provide modernization to Gym to provide sufficient space and use of the facility. Modernization may include: Replace all lockers with single-standing lockers Repair/Replace flooring and wall finishes Repair/Replace interior lighting Increase storage space Provide more sufficeint natural ventilation Replace HVAC with improved system Renovate showers into storage Provide attached shade structure for covered seating area Classroom Wings MODERNIZE GYM COVERED SEATING AREA Existing Gym MCHS -- 6
17 MODERNIZATION OF PERFORMING ARTS BUILDING /20 Modernize existing theater and adjacent classrooms. Modernization of these spaces may include: Repair/replace existing wall, floor and hardware finishes Repair/replace roofing and plumbing systems as necessary Provide security locks to all entrances Replace seating in auditorium Repair/Replace stage flooring Replace overhead lighting in auditorium Replace damaged acoustical ceiling tiles and casework Repair/Replace window and door openings MODERNIZATION OF ADMINISTRATION /20 $,8,55 $6,69,44 Modernize existing administration building to better serve administration and faculty and incoporate more efficient use of space. Modernization of these spaces may include: Repair/replace existing wall, floor and hardware finishes Provide security locks to entrances of wings Replace damaged acoustical ceiling tiles and casework Repair/Replace window and door openings MODERNIZE PERFORMINGA ARTS BUILDING Performing Arts Building MODERNIZE ADMINISTRATION BUILDING Administration Building MCHS -- 7
ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT
1. SAFETY, HEALTH, CODE 1.1 Structural Requirements, Seismic Stability 1.1.1 Primary Structure 1.1.2 Ceilings 1.1.2 Water damage in many classrooms. Replace tiles. 1.1.3 Cabinets, Equipment 1.1.4 Portables
More informationORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT
1. SAFETY, HEALTH, CODE 1.1 Structural Requirements, Seismic Stability 1.1.1 Primary Structure 1.1.2 Ceilings 1.1.3 Cabinets, Equipment 1.1.4 Portables 1.2 Fire / Life Safety 1.2.1 Corridor, Separation
More informationCentinela Valley Union High School District. Measure CV Masterplan Update June 2011
Centinela Valley Union High School District Measure CV Masterplan Update June 2011 Hawthorne High School (Phase 1) Hawthorne High School Phase 1: Science, Engineering, and Media Arts Center (Funded) 3
More informationCALLOWAY COUNTY SCHOOLS DISTRICT FACILITIES PLAN
DISTRICT "SHELL" SUBMISSION DATE: 4/17/13 (delete following Hearing) KDE "SHELL" RESUBMISSION DATE: 4/19/13 (delete following Hearing) KBE APPROVAL DATE: JUNE 2013 CALLOWAY COUNTY SCHOOLS DISTRICT FACILITIES
More informationSchematic Plan Submittal, 21 November, 2011 Roesling Nakamura Terada Architects
To r r e y P i n e s H i g h S c h o o l M a s t e r P l a n Schematic Plan Submittal, 21 November, 2011 Roesling Nakamura Terada Architects I n t r o d u c t i o n 1.0 INTRODUCTION The vision for the
More information1/9/2015 P:\130217-03\Project Management\Program\Ripon Space Program - 7 January 2015.xlsx
MIDDLE SCHOOL Administration Office Principal's Office 200 1 200 Desk, conference table for 4-6 Conference Room 250 1 250 Conference table for 12 Open Office Area 250 1 250 2 Workstations Mail / copier
More informationPLUMMER ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1959 BUILDING AREA 69,400 SF CURRENT PROGRAM CAPACITY 481 ENROLLMENT 2008 228 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan PLUMMER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationBUNKER HILL ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1970 BUILDING AREA 98,200 SF CURRENT PROGRAM CAPACITY 332 ENROLLMENT 2008 387 WARD 5 PROPOSED PROGRAM CAPACITY 750 Site Plan BUNKER HILL - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationNovember 3, 2015 Bond and District Additional Assistance Election Information
November 3, 2015 Bond and District Additional Assistance Election Information Proposition 432 - $22 million General Obligation Bond 150+ facility projects across all schools Building renovations and improvements
More informationDAVIESS COUNTY SCHOOLS DISTRICT FACILITIES PLAN
DISTRICT "SHELL" SUBMISSION DATE: 11/13/12 questions 11/26/12 (delete following Hearing) KDE "SHELL" RESUBMISSION DATE: 11/19/12 revised 11/26/12 (delete following Hearing) KBE APPROVAL DATE: FEBRUARY
More informationBond Referendum Presentation. Dr. Ralph P. Ferrie, Superintendent of Schools May 12, 2014
Bond Referendum Presentation Dr. Ralph P. Ferrie, Superintendent of Schools May 12, 2014 Mr. David Fowler President Floral Park- Bellerose Mr. David Del Santo Vice-President New Hyde Park Garden City Park
More informationCONSTRUCTION UPDATE. Thank you for your continued support! Noemi Avila-Zamudio Coordinator, Facilities Planning & Construction SEPTEMBER 2012
CONSTRUCTION UPDATE WWW.SVUSD.ORG SEPTEMBER 2012 The 2012-2013 school year is proving to be another year filled with exciting, much needed Measure B building projects. Facilities Planning & Construction
More informationMEASURE G-2010 EXHIBIT B FULL TEXT BALLOT PROPOSITION OF THE SAN JOSE EVERGREEN COMMUNITY COLLEGE DISTRICT BOND MEASURE ELECTION NOVEMBER 2, 2010
MEASURE G-2010 EXHIBIT B FULL TEXT BALLOT PROPOSITION OF THE SAN JOSE EVERGREEN COMMUNITY COLLEGE DISTRICT BOND MEASURE ELECTION NOVEMBER 2, 2010 To better prepare San Jose City College/ Evergreen Valley
More informationMURCH ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1929 BUILDING AREA 47,700 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 491 WARD 3 PROPOSED PROGRAM CAPACITY 500 Site Plan MURCH - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5
More informationNew Jersey City University Gilligan Student Union Center
New Jersey City University Gilligan Student Union Center The RBA Group worked with New Jersey City University in a major renovation of their Gilligan Student Union building. We were contracted to reassess,
More informationPerforming Arts Wing. Existing Auditorium. Library. Student Entry. Omni Room Athletics/JROTC. Dance Bus Drop
Choir Band Performing Arts Wing Arts Courtyard Drama Liberal Arts Wing Team Arts Prefunction Loading Area Team Existing Auditorium Heritage Hall Auditorium Lobby Administration Library Visitor Entry Team
More informationCherokee Trail High School 25901 East Arapahoe Road Aurora, Colorado 80016
Cherokee Trail High School 25901 East Arapahoe Road Aurora, Colorado 80016 Year Opened 2003 Current Square Footage 391,000 Site Acreage 86.22 cherokeetrail.cherrycreekschools.org $279,200 Asphalt and concrete
More informationFRANCIS L. CARDOZO HIGH SCHOOL 1200 CLIFTON STREET NW WASHINGTON, DC 20009
FRANCIS L. CARDOZO HIGH SCHOOL 1200 CLIFTON STREET NW WASHINGTON, DC 20009 FRANCIS L. CARDOZO HIGH SCHOOL SCHOOL HISTORY Francis L. Cardozo High School, located at 1200 Clifton Street and bounded by Florida
More informationSCHEMATIC DESIGN PRESENTATION NEW JOSHUA MIDDLE SCHOOL
June 15, 2015 SCHEMATIC DESIGN PRESENTATION NEW JOSHUA MIDDLE SCHOOL JOSHUA INDEPENDENT SCHOOL DISTRICT Acknowledgments 2 Narrative 3 The Process 4 Site Analysis 5 Independent School District Site Plan
More informationDRAPER ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1953 BUILDING AREA 54,000 SF CURRENT PROGRAM CAPACITY 250 ENROLLMENT 2008 84 WARD 8 PROPOSED PROGRAM CAPACITY 325 Site Plan DRAPER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5
More informationElection Type: Bond, BEST, Mill Levy District. Nov. 4: Pass/Fail. Bond, BEST, Mill Levy Override, Sales Tax. Comments (optional) Dollar Amount
Sources: School reports to CSFP, district websites and media reports BOND / BEST - CAPITAL OPERATIONS Adams 12 Five Star Bond Fail $220,000,000 Extending the useful life of existing school buildings, renovating
More informationFranklin Pierce School District. Capital Projects Journal
Franklin Pierce School District Capital Projects Journal Capital Projects Levy Capital Projects Levy Envisioned and defined by FPS 2030 committee Levy collections began in 2012 Provides $27,500,000 in
More informationChicago Public Schools
Ames Middle School 1920 N Hamlin Ave 1997 Completed The scope of this project is to construct a new school $16,913,379 2014 Construction The intent of this project is to expand existing Ames middle school
More informationHAMILTON SCHOOL. 1401 Brentwood Parkway, N.E., Washington, DC INITIAL YEAR BUILT 1968 BUILDING AREA
INITIAL YEAR BUILT 1968 BUILDING AREA 187,700 SF CURRENT PROGRAM CAPACITY N/A ENROLLMENT 2008 129 WARD 5 PROPOSED PROGRAM CAPACITY N/A Site Plan HAMILTON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationHOUSTON ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1962 BUILDING AREA 59,900 SF CURRENT PROGRAM CAPACITY 507 ENROLLMENT 2008 291 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan HOUSTON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationPAGE INTENTIONALLY LEFT BLANK
PAGE INTENTIONALLY LEFT BLANK TABLE OF CONTENTS I. Introduction 1 Page II. Documentation of Existing Educational Programs 1 and Instructional Space III. State Square Footage Standards 2 IV. Space Allocation
More informationMequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule
Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule Homestead HS Sept.'15 Oct'15 Nov'15 Dec'15 Jan'16 Feb'16 Repair Asphalt @ Main Garage Replace Exterior Hollow Metal
More informationDesign and Construction Planning Process Strongsville City Schools
Design and Construction Planning Process Strongsville City Schools THANK YOU. OUR TEAM 50+ years experience Headquartered in Akron, Ohio Full-service A&E firm Over 400 professionals Employee owned OUR
More informationBond Priorities. Repairs and Maintenance. School Safety. Capacity
Replace old windows, boilers, heating and air conditioning system. Improve accessibility for disabled persons. Keyless entry lock systems, redesign of school entrance, and wireless access throughout building.
More informationNumber Northern Arizona University Facility Services Section Page. Effective April 1, 2011
Facility Services Section Page Recharge Services, Maintenance and Construction PURPOSE 1 of 6 The purpose of this policy is to set forth standards for chargeable services for maintenance and construction
More informationSchematic Design Presentation S. Dallas Dance, Superintendent October 22, 2013 OVERLEA HIGH SCHOOL
Schematic Design Presentation S. Dallas Dance, Superintendent October 22, 2013 0 Overlea High School - Facility Summary Facility Opened: Auditorium Addition: Activity Room Addition: School Rated Capacity
More informationFuture youth provision in Twickenham. Option two. Front of Heatham House The Garage Rear of Heatham House
Future youth provision in Twickenham Front of Heatham House The Garage Rear of Heatham House Option two The current youth provision in Twickenham is delivered from Heatham House Youth Centre. Heatham House
More informationJMS Phone List. dial and small conference capability
JMS Phone List Main office desk multi line console console can view all lines Main office desk multi line Main office fax line? POTS as currently Principal's office desk multi line extension and private
More informationSchool Board Proposed Capital Improvements Program. Fiscal Years 2014-2023
School Board Proposed Capital Improvements Program Fiscal Years 2014-2023 TABLE OF CONTENTS Summary Page 1 Capital Projects Pages 2-6 Capital Projects Description Pages 7-14 SCHOOL BOARD PROPOSED CAPITAL
More informationDistrict Information
Bond 2010 District Information 95.5% College Bound 2009 College Readiness Award from Texas ACT Council #1 Ranked Traditional High School in San Antonio by Children at Risk 458 AP test takers/ 875 tests
More informationPATTERSON ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1945 BUILDING AREA 78,300 SF CURRENT PROGRAM CAPACITY 368 ENROLLMENT 2008 463 WARD 8 PROPOSED PROGRAM CAPACITY 500 Site Plan PATTERSON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
More informationCHAPTER 29 PLUMBING SYSTEMS
CHAPTER 29 SYSTEMS Note: The amendments to Chapter 29 are different than the 2009 Seattle Building Code and are not marked with margin bars or arrows. SECTION 2901 GENERAL [P] 2901.1 Scope. The provisions
More informationHAZELWOOD HIGH SCHOOLS SCHEMATIC DESIGN PRESENTATION
HAZELWOOD HIGH SCHOOLS SCHEMATIC DESIGN PRESENTATION 1 AGENDA Hazelwood 1 st Planning Process High School Program Schematic Designs Schedule 2 HAZELWOOD 1 ST GOALS Life, health and safety improvements
More informationGuideline for Square Footage Requirements for Educational Facilities. 160-5-4-.16 (a) 4. Educational Facility Site, Construction, and Reimbursement
Guideline for Square Footage Requirements for Educational Facilities 160-5-4-.16 (a) 4 Educational Facility Site, Construction, and Reimbursement Facilities Services Unit Effective Date: 05-30-12 Page
More informationCAPITAL EXPENDITURES
CAPITAL EXPENDITURES 1 CAPITAL EXPENDITURES CAPITAL EXPENDITURES PLANNING On March 1, 2010 the AmherstPelham Regional School committee adopted a policy for developing a formal capital needs planning process.
More informationEvents and Conferences AT THE COLLEGE OF SAINT BENEDICT. Facility Guide. Experience A Place...
Events and Conferences AT THE COLLEGE OF SAINT BENEDICT Facility Guide Experience A Place... 15 Minutes West of St. Cloud Contact Jessica Reiter at 320-363-5791 or email jreiter@csbsju.edu www.csbsju.edu/csb-events-and-conferences
More informationVan Vleck ISD Bond Election
Van Vleck ISD Bond Election November 4, 2014 The Van Vleck ISD School Board called a bond election at their meeting on August 18 for $42.7 million. 2 School districts must ask voters for permission to
More informationItems in red were complete 2-22-10. Items in green were complete on 8-2-11. Lined out items are Life Safety Codes.
Office of Safe and Orderly Schools Facility Safety Assessment Dennis Meador, School Facilities Supervisor Mark Hobson, School Facilities Supervisor Division of School Building September 18 19, 2007 Items
More informationSELECTED SPECIAL EVENTS PROJECTS
1 5 SELECTED SPECIAL EVENTS PROJECTS 3 1 DONNA AND MARVIN SCHWATZ CENTER FOR PERFORMING ARTS, ATLANTA, GEORGIA, USA. COBB ENERGY PERFORMING ARTS CENTRE, COBB COUNTY, GEORGIA, USA. 3 OLYMPIC AQUATIC CENTER,
More informationCONSTRUCTION PROGRESS MONITORING REPORT
CONSTRUCTION PROGRESS MONITORING REPORT Windermere Memory Care 1060 Tomyn Boulevard Ocoee, FL 34787 Partner Project Number: 15-133494.16 Prepared for: ORIX USA Corporation 1717 Main Street, Suite 1100
More informationDESIGN DEVELOPMENT PRESENTATION
October 26, 2015 DESIGN DEVELOPMENT PRESENTATION NEW SHIRLEY HALL MIDDLE SCHOOL & JOE M. TISON MIDDLE SCHOOL ADDITIONS AND RENOVATION WEATHERFORD INDEPENDENT SCHOOL DISTRICT Acknowledgments 3 Narrative
More informationA001.01. Project Description/Project Title and Data: Building Area: (sf) Addition 28,142 Renovation 14,302. Cost per Square Foot: +/- $106.
Project Description/Project Title and Data: KEVIN I. SULLIVAN CAMPUS CENTER ADDITION & RENOVATION Medaille College - Buffalo, NY Functioning as Medaille College's campus heart, The Kevin I Sullivan Campus
More informationSQUARE FOOTAGE REQUIREMENTS FOR USE IN DEVELOPING THE LOCAL FACILITIES PLANS AND STATE CAPITAL OUTLAY APPLICATIONS FOR FUNDING
SQUARE FOOTAGE REQUIREMENTS FOR USE IN DEVELOPING THE LOCAL FACILITIES PLANS AND STATE CAPITAL OUTLAY APPLICATIONS FOR FUNDING GEORGIA DEPARTMENT OF EDUCATION FACILITIES SERVICES UNIT December 8, 2003
More information1. Background. 2. Why this is Relevant to the 2014 Bond. 3. Attachments
Issue Paper # 8: Modernization Renovation Projects 1. Background BSD s student population has grown since the last capital bond in 2006 and facilities have experienced normal wear and aging leading to
More informationstadium designs BLRB architects TACOMA // SPOKANE // PORTLAND // BEND
stadium designs TACOMA // SPOKANE // PORTLAND // BEND about blrb architects Founded in 1953, BLRB is a mid-size regional firm with offices throughout the Northwest in Tacoma, Spokane, (Washington) Portland
More informationOnce you see it, you get it! A quick overview of projects..
Once you see it, you get it! A quick overview of projects.. Bank of Arizona, Scottsdale We re used to building in 22 months; Modular Technology built our 3 branches in just 5 months! Their quality is superior
More informationDEARBORN HEIGHTS SCHOOL DISTRICT NO. 7 Sinking Fund Projects 10 Year Plan Proposal (2016 2025)
DEARBORN HEIGHTS SCHOOL DISTRICT NO. 7 Sinking Fund Projects 10 Year Plan Proposal (2016 2025) Year One $995,000.00 Polk electronic marquee Annapolis roof needs half of building replaced Phase One District
More informationSecondary Educational Visioning Meeting 1
Secondary Educational Visioning Meeting 1 SANTA BARBARA UNIFIED SCHOOL DISTRICT FACILITIES MASTER PLAN LPA PROJECT NO. 13200.10 DATE: April 1, 2014 TIME: 3:30-5:00 pm PLACE: District Office AGENDA Purpose
More informationBUILD NYC RESOURCE CORPORATION PROJECT COST/BENEFIT ANALYSIS January 7, 2016
BUILD NYC RESOURCE CORPORATION PROJECT COST/BENEFIT ANALYSIS January 7, 2016 APPLICANT The Chapin School, Ltd. 100 East End Avenue New York, New York 10028 PROJECT LOCATION 100 East End Avenue New York,
More informationFacility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components
Infrastructure Facility Condition Summary Weighted Avg Condition Score Facility Components Systems Surveyor/ Date Done Comments G Sitework.9 Site Improvements Parking Pedestrian Paving Site Development
More informationINDIVIDUAL CAMPUS PLAN ASSESSMENT. No. of Non- Non-Instructional Area. Size Sq. Ft.
ED. SPEC. ELEMENTARY SCHOOL SPACE BUDGET Program Menchaca ES Page 1 of 6 INDIVIDUAL CAMPUS PLAN ASSESSMENT al s Non- al s Size Pre-Kindergarten / Kindergarten - Classrooms 8 8 925 7,400 (minimum or 25
More informationCONSTRUCTION UPDATE November 6, 2015
CONSTRUCTION UPDATE November 6, 2015 Donaldsonville High School Athletic Addition East Ascension High School Athletic Addition St. Amant High School Athletic Addition St. Amant High School Freshman Academy
More informationFrequently Asked Questions
Byron Area Schools Frequently Asked Questions Bond Proposal How did this come about? For several years the Byron Area Schools Board of Education has included upgrading facilities as one of the district
More informationBuilding Description Project Description Estimated Cost Notes Total Deferred
Building Description Project Description Estimated Cost Notes Total Deferred Athletic Fields & Grounds Baseball dugouts 125,000 Surface level/inground? Relamp Baseball field 16,000 Relamp Softball field
More informationCAMPUS HIGH SCHOOL ADDITION AND RENOVATION
LEGEND RENOVATION ADDITION DRIVE IMPROVEMENTS WIDEN BUS LOOP ROAD TO WEST PROVIDE SECURE ADMINISTRATION ENTRANCE REPLACE AGING ELECTRICAL PANELS RENOVATE SPACE FOR FIVE (5) SCIENCE CLASSROOMS CONVERT EXISTING
More informationSODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST
SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST SODA SPRINGS HIGH SCHOOL REPAIRS AND UPGRADES SITE Construction Estimate = $100,000
More information21 st CENTURY HIGH SCHOOLS
21 st CENTURY HIGH SCHOOLS 1 CO-LABS & ACTIVITIES What is a Co-Lab? A collaborative workshop session with stakeholder groups. These sessions were designed to examine opportunities and define parameters
More informationRequested Increase SF. Current SF
Administration Increase Director/Associate Director Suite 1,145 300 1,445 Director Office, Associate Director Office, Administrative Support Office, Waiting Area, Director Storage Business Office 1,740
More informationStudents were surveyed by Brailsford & Dunlavey in the fall of 2000 to determine their priorities for Commons program spaces.
I-1 2.0 INTRODUCTION 2.1 BACKGROUND Located in the rapidly growing Inland Empire area of Southern California (Riverside and San Bernardino Counties), the University of California, Riverside is well positioned
More informationPARKVILLE HIGH SCHOOL LIMITED RENOVATION
PARKVILLE HIGH SCHOOL LIMITED RENOVATION DESIGN BRIEFING For Dr. Joe A. Hairston BALTIMORE COUNTY PUBLIC SCHOOLS August 11, 2009 Smolen 3 Emr + Associates Architects 1355 Piccard Drive, Suite 200 Rockville,
More informationHigh School Bond Budget Summary Sheet
High School Bond Budget Summary Sheet Additional Funding Sources High School Budget Data Proposed Adjustments Potential Future Additions Bond Program Inf. Reserve Bond Program Contingency Other Comments
More informationH107 Video Conference Room
Capacity: 20 persons White Board (1) Document Camera (1) Door (1) Network connections possible Layout: Seminar style with chairs and tables (moveable) Podium (1) Media Cart (1) Windows (4) Meets all ADA
More informationPROPOSITION E. Associated General Contractors of America San Diego Chapter September 17, 2014
PROPOSITION E Associated General Contractors of America San Diego Chapter September 17, 2014 1 Facilities Centric Bond Aging Facilities Emphasis on Technology Infrastructure School Site Safety and Security
More informationDESIGN DEVELOPMENT PRESENTATION
June 16, 2015 DESIGN DEVELOPMENT PRESENTATION HIGH SCHOOL, JUNIOR HIGH SCHOOL & INTERMEDIATE SCHOOL ADDITIONS & RENOVATIONS KAUFMAN INDEPENDENT SCHOOL DISTRICT Acknowledgments 2 Kaufman HS & Norman JHS
More informationV I S I O N 2 0 2 0 REV. 1
V I S I O N 2 0 2 0 F A C I L I T I E S M A S T E R P L A N COAST COMMUNITY COLLEGE DISTRICT : CAMBRIDGE WEST PARTNERSHIP LLC : HPI ARCHITECTURE REV. 1 J u l y 2 0 1 5 T a b l e o f C o n t e n t s GOLDEN
More informationHoward D. Woodson STEM High School District of Columbia Public Schools
Howard D. Woodson STEM High School District of Columbia Public Schools Washington, DC AIA DC 2012 Chapter Awards The new Woodson weaves the [history of the] Tower of Power with a new breathtaking, contemporary-looking,
More informationAgriculture & Business Multipurpose Classroom Building Prairie View A&M University. 100% Design Development Review Meeting.
OVERLAND PARTNERS ARCHITECTS Agriculture & Business Multipurpose Classroom Building Prairie View A&M University 100% Design Development Review Meeting May 22, 2013 AGENDA 10:00 10:15 Introductions / Outline
More informationSchool Facilities Referendum Recommendations
Haddonfield Public School District LONG RANGE PLANNING COMMITTEE School Facilities Referendum Recommendations NOVEMBER 19, 2015 School Facilities Referendum Recommendations Tonight s goals Presentation
More informationResponsibilities The principal/administrator will be responsible for the total energy usage of her/his building.
6811P: Resource Conservation Management Program Introduction The focus of the Resource Conservation Management Program is long-term, sustainable measures, practices and procedures that reduce consumption
More informationVirginia. American Recovery and Reinvestment Act. 83 DoD Projects ($ 75.7M) Completed or Under Way by August 31, 2009
Virginia American Recovery and Reinvestment Act 83 DoD Projects ($ 75.7M) Completed or Under Way by August 31, 2009 Project Title Component Installation Repair/Replace Bathrooms in Wilcox Barracks Army
More informationCITY OF SANTA ROSA HIGH SCHOOL DISTRICT Sonoma County, State of California 2014-15 RESOLUTION NO. 2014/15-003
CITY OF SANTA ROSA HIGH SCHOOL DISTRICT Sonoma County, State of California 2014-15 RESOLUTION NO. 2014/15-003 RESOLUTION CALLING FOR AN ELECTION AUTHORIZING THE ISSUANCE OF GENERAL OBLIGATION BONDS OF
More informationA Self-Audit of Your Current Campus Security Systems
A Self-Audit of Your Current Campus Security Systems Security Solutions for Education, Business & Public Safety Free Consultations on ID Card Systems, Access Control, Call Recording, Video Surveillance,
More informationEvery Student I Every Day I Every Possibility
For the Facilities Master Plan March 4, 2015 1 Introduction This has been prepared to describe a proposed process to be implemented in order to develop comprehensive Facility Master Plans for all schools
More informationPublic Building Commission of Chicago. Board Meeting August 20, 2013
Public Building Commission of Chicago Board Meeting August 20, 2013 Board Meeting August 20, 2013 Recent Events Enrico Tonti Elementary School Kindergarten Modular Opening August 5, 2013 Board Meeting
More information62% 40% 96% 90% 77% 40%
Space Typologies 150 BACKGROUND BACKGROUND DATA + PROCESS The development of the Academic Building Components was an integrated and comprehensive process which gathered information from multiple users,
More information32284 ADOPTED BOARD OF TRUSTEES COMMUNITY COLLEGE DISTRICT NO. 508 MAY 1, 2014
32284 ADOPTED BOARD OF TRUSTEES COMMUNITY COLLEGE DISTRICT NO. 508 MAY 1, 2014 BOARD OF TRUSTEES OF COMMUNITY COLLEGE DISTRICT NO. 508 COUNTY OF COOK AND STATE OF ILLINOIS JOB ORDER CONTRACT (JOC) PROJECTS
More informationCalculating School Capacity:
Calculating School Capacity: presented by: Amy Yurko, AIA ayurko@brainspaces.com Peter Brown, AIA, LEED AP pbrown@brainspaces.com Mary Cary, AIA Anchorage School District Local, State & National Perspectives
More informationNew Hanover County Schools Middle School Educational Specifications Media Center. Overview. Spatial Relationships
Overview The will serve as the information hub of the school. The library and media program has as its major goal the physical and intellectual access to materials within and outside the physical facility.
More informationThe Alameda/Rose Garden Neighborhood
FOR SALE > VICTORIAN OFFICE BUILDING The Alameda/Rose Garden Neighborhood 1065 ASBURY STREET, SAN JOSE, CA COLLIERS INTERNATIONAL 450 West Santa Clara Street San Jose, CA 95113 +1 408 282 3800 Main +1
More informationEdna Maguire Elementary School Mill Valley School District
Edna Maguire Elementary School Mill Valley School District What have we done so far Staff has been researching a comprehensive approach to our facility needs since 2004 initially in response to our enrollment
More informationINTRODUCTION COST AND FEASIBILITY OF RENOVATING OR REPLACING AN OLD SCHOOL BUILDING
INTRODUCTION COST AND FEASIBILITY OF RENOVATING OR REPLACING AN OLD SCHOOL BUILDING GS 521C-521 requires a local school board to submit its long-range plan for meeting school facility needs to the State
More informationSCHEMATIC DESIGN PRESENTATION ACTON ELEMENTARY SCHOOL
March 16, 2015 SCHEMATIC DESIGN PRESENTATION ACTON ELEMENTARY SCHOOL DUNCANVILLE INDEPENDENT SCHOOL DISTRICT Acknowledgments 2 Narrative 3 The Process 4 Site Analysis 6 Site Plan 7 ACTON ELEMENTARY SCHOOL
More informationBensalem High School Renovation 2014-2016
Bensalem High School Renovation 2014-2016 Design Problems Inability to close off sections of the building during evening and weekend events. Concerns about the efficiency of staffing and supplying three
More informationIMAGINE INDIANA LIFE SCIENCES ACADEMY WEST
2.21.107 Introduction Imagine Indiana Life Sciences Academy West (Imagine ILSA West) is a charter elementary and middle school located on the west side of Indianapolis, Indiana. The school is the second
More informationHow To Help Your School With A Health Care Program
Metropolitan Learning Center School Services MLC provides services to support the development of the whole child. In addition to academic services, MLC provides a full service guidance, counseling and
More informationNORTH PENN HIGH SCHOOL RENOVATIONS
NORTH PENN HIGH SCHOOL RENOVTIONS PRELIMINRY SCOPE, BUDGET & PHSING CONSIDERTIONS 401 EST HNCOCK STREET LNSDLE, P 19446 PREPRED BY BONNETT SSOCITES INCORPORTED 220 BLDWIN TOWER, 1510 CHESTER PIKE EDDYSTONE,
More informationDevelopment 2005-2016
Development 2005-2016 DUMPTON SCHOOL In the ever changing world in which we live, we can t afford to stand still. It was Charles Darwin who said It is not the strongest species that survives, nor the most
More informationOWASSO. Conference Center
OWASSO Conference Center The primary purpose of Tulsa Tech s Owasso Conference Center is to provide students in our hospitality programs with workplace experience. We also encourage the use of the facility
More informationData Center Due Diligence List
Data Center Due Diligence List Name and address of site facility Date constructed Building owner/date purchased by current owner Name of previous owner Adjacent Property Descriptions North South East West
More informationFacilities Operations Customer Service Standards WORK ORDER PRIORITIES
Facilities Operations Customer Service Standards WORK ORDER PRIORITIES In order to provide fair and consistent maintenance service to all University faculty, staff and students, a work priority system
More informationPrepared for Massachusetts School Building Authority
Prepared for Massachusetts School Building Authority 1 TURNER CONSTRUCTION COMPANY Firm Name: Turner Construction Company Principle Office: 375 Hudson Street New York, NY 10014 Contact Office: 2 Seaport
More informationFacilities Committee Michael S. Molina Vice Chancellor - Facilities Planning & Construction May 15, 2014
Facilities Committee Michael S. Molina Vice Chancellor - Facilities Planning & Construction May 15, 2014 Angelo State University Item 1 Approve the Five Year Capital Projects Plan and authorize submission
More informationDISTRICTWIDE FACILITIES MASTER PLAN. February 18, 2015 PLANNERS / ARCHITECTS / ENGINEERS
DISTRICTWIDE FACILITIES MASTER PLAN February 18, 2015 PLANNERS / ARCHITECTS / ENGINEERS Table of Contents Executive Summary. 2 Section 1: Bridgewater Elementary School. 4 Background Deferred Maintenance
More informationREQUEST FOR PROPOSALS
REQUEST FOR PROPOSALS Design Build Services for Information Technology/ Security for Achievement Prep Public Charter School - Wahler Campus Redevelopment Project Issued: Friday, December 19 th, 2014 IMPORTANT
More informationCHAPTER 29 PLUMBING SYSTEMS. [P] TABLE 2902.1 MINIMUM NUMBER OF REQUIRED PLUMBING FIXTURES a (See Sections 2902.2 and 2902.3) 1 per 40 for the
CHAPTER 29 PLUMBING SYSTEMS > SECTION 2901 GENERAL [P] 2901.1 Scope. The provisions of this chapter and the Phoenix Plumbing Code shall govern the erection, installation, alteration, repairs, relocation,
More information