1 SRS Multi-Role Shadow Robotic System for Independent Living Small or medium scale focused research project (STREP) DELIVERABLE D8.2 Quality Plan & Evaluation/Success Criteria Contract number : Project acronym : SRS Project title : Multi-Role Shadow Robotic System for Independent Living Deliverable number : D8.2 Nature : R Report Dissemination level : PU Public Delivery date : 27-May-2010 Author(s) : Partners contributed : Contact : Dr. Renxi Qiu CU, CLMI-BAS, FDCGO, Fraunhofer, HdM, HPIS, INGEMA, PROFACTOR, ROBOTNIK and BED Dr Renxi Qiu, MEC, Cardiff University, Queen s Buildings, Newport Road, Cardiff CF24 3AA, United Kingdom Tel: +44(0) ; Fax: +44(0) ; QiuR@cf.ac.uk The SRS project was funded by the European Commission under the 7 th Framework Programme (FP7) Challenges 7: Independent living, inclusion and Governance Coordinator: Cardiff University FP7 ICT Contract No February January 2013 Page 1 of 16

2 TABLE OF CONTENTS 1. DEFINITIONS INTRODUCTION QUALITY SYSTEMS REQUIREMENTS FOR SRS Management Responsibility Quality policy Organisation Responsibility and authority Resources Management representative Quality System General Quality system procedures Quality planning QUALITY PLAN...7 FP7 ICT Contract No February January 2013 Page 2 of 16

3 1. DEFINITIONS ISO 9000: defines Quality Assurance as related to a product or service: that part of quality management focused on providing confidence that quality requirements are fulfilled. In other words, all those planned or systematic actions necessary to provide adequate confidence that a product or service will satisfy its given requirements for quality. In this Quality Plan, Quality Assurance is the activity of providing the evidence needed to establish confidence, among all concerned, that the quality related activities are being performed effectively. Minutes shall be the minutes of the consortium meetings to be held in every six months during the project. 1 ISO 9000:2000, Quality management systems Fundamentals and Vocabulary, ISO (International Organization for Standardization), FP7 ICT Contract No February January 2013 Page 3 of 16

4 2. INTRODUCTION ISO 9000 is a generic name given to a family of standards developed to provide a framework around which a quality management system can effectively be implemented. It specifies requirements for a quality management system overseeing the production of a product or service. Quality assurance of organisations is based on the ISO 9000 standards and they are considered also for quality assurance of the SRS project. The ISO 9000 family of standards represents an international consensus on good management practices with the aim of ensuring that the organisation can consistently deliver the product or service that meets the client s quality requirements. These good practices have been distilled into a set of standardized requirements for a quality management system, regardless of what the organisation does, its size, or whether it is in the private, or public sector. To keep customers and to keep them satisfied the product (which may, in fact, be a service) needs to meet their requirements. ISO 9000 provides a tried and tested framework for taking a systematic approach to managing business processes (organisation s activities) so that they consistently produce product conforming to the customer s expectations. ISO 9000 lays down what requirements the quality system must meet, but does not dictate how they should be met in the organisation, which leaves great scope and flexibility for implementation in different business sectors and business cultures as well as in different national cultures. The ISO 9000 family includes standards that give organisations guidance and requirements on what constitutes an effective quality management system. ISO and the other parts of ISO 9004 are the standards giving guidelines on the elements of quality management and a quality system. The family also includes models against which this system can be audited to give the organisation and its clients assurance that the system is operating effectively. The three quality assurance models are ISO 9001, ISO 9002 and ISO Lastly, the family includes a standard terminology and other standards, which can be described as supporting tools that give guidance on specific aspects such as auditing quality systems. ISO 9001: has been selected as the model for the SRS project. It sets out the requirements for an organisation whose business processes range from design and development to production, installation, application, and servicing. 2 ISO 9001:2000, Quality management systems Requirements, ISO (International Organization for Standardization), FP7 ICT Contract No February January 2013 Page 4 of 16

5 3. QUALITY SYSTEMS REQUIREMENTS FOR SRS 3.1 Management Responsibility Quality policy Quality policy for the SRS project as defined in ISO 9001:2000 is described in the Contract and in the Consortium Agreement. The quality policy is relevant to the management structure and procedures (Section 2.1 of - Description of Work ), the S/T methodology and associated work plan (Section 1.3 of Annex I - Description of Work ) of the project. This Quality Plan has been prepared to ensure that this policy is understood, implemented and maintained at all levels of the project Organisation Responsibility and authority The responsibility, authority and the interrelation of the personnel who manage, perform and verify work affecting quality are defined in the Contract, in the Consortium Agreement, and in the Minutes of the first project meeting held in Cardiff on 09/10 February This Quality Plan has been prepared to define detailed procedures and delegate persons to: a. initiate action to prevent the occurrence of any non-conformity relating to the project; b. identify and record any problem relating to the project; c. initiate, recommend or provide solutions through designated channels; d. verify the implementations of the solutions; e. control further processing, delivery or installation of non-conformity until the deficiency or unsatisfactory condition has been corrected Resources The Contract identifies resource requirements and through Workpackage 8: Project Management ( - Description of Work ) provides adequate resources, including the assignment of trained personnel for management, performance of work and verification activities including internal quality audits. Quality audit is a systematic, independent examination and evaluation to determine whether quality activities and results comply with planned arrangements and whether these arrangements are implemented effectively and are suitable for achieving objectives; Or with a simple definition: quality audit is an independent review conducted to compare some aspect of quality performance with a standard for that performance. Internal quality audits The Quality Manager with executive responsibility shall review the quality assurance system at 6-month periods to ensure its continuing suitability and effectiveness in satisfying the requirements of ISO 9001:2000 and the stated quality policy of the project. Records of such reviews in the Minutes of the consortium meetings shall be maintained. External quality audits In case of the SRS project external quality audits will take place at Annual Reviews, at which external evaluators delegated by the Commission make an independent review of the project results possible. FP7 ICT Contract No February January 2013 Page 5 of 16

6 Management representative The consortium of the project with executive responsibility has appointed the MEC as Quality Manager, irrespective of other responsibilities, to have authority for: a. ensuring that the quality assurance system is established, implemented and maintained in accordance with this Quality Plan; b. reporting on the performance of the quality assurance system to the consortium for review and as basis for improvement of the quality system at general meetings every six months. 3.2 Quality System General The project shall establish, document and maintain a quality system as a means of ensuring that the project activities conform to the specified requirements Quality system procedures The SRS project shall effectively implement the quality system and its documented procedures. For the purpose of ISO 9001:2000 the range and detail of the procedures that form part of the quality system shall be dependent upon the complexity of the work, methods used, and the skills and training needed by the personnel involved in carrying out the activity Quality planning The SRS project shall define and document how the requirements for quality will be met. Quality planning shall be consistent with all other requirements of the project s quality system and shall be documented in a format to suit the project s method of operation. The project shall give consideration to the following activities: a. preparation of quality plans; b. ensuring the compatibility of the project activities and the applicable documentation including the Deliverables, Annual Reports and Final Report; c. overviewing and, as necessary, updating of the quality control techniques at the consortium meetings; FP7 ICT Contract No February January 2013 Page 6 of 16

7 4. QUALITY PLAN The Quality Plan of the SRS project is described in QUALITY ASSURANCE ACTIVITY SUMMARY SHEETS. This Quality Plan will be monitored by Dr Renxi Qiu, the Project Manager. Authorisation of the Quality Plan The Quality Plan is applicable to all the project s activities, and it is mandatory for all involved. It will be documented and authorised by the consortium. All subsequent changes will be approved by the Steering Committee (SC). The description of the quality system will focus on the prevention of deviations during each task of the project. Reviewing of deliverables All the project deliverables will be reviewed and approved by all the consortium members. Internal members will also be appointed by the Quality Manager for the purpose of reviewing specific deliverables and reports. They will be senior researchers of the project partners with extensive expertise on the subject of the specific deliverables, excluding of course the author(s). Moreover members of the different forums of the project will be used as reviewers especially for the public deliverables. External evaluations European specific public events or workshops will be organised to demonstrate the technology with selected applications within Months 36, with the participation of external experts/users, publics and consortium members ( - Description of Work, p55). One of the objectives of the events is to obtain feedback to guide the development of future commercial applications. One external evaluation on the SRS project will be done during the events and the report will be appended to the mid-term or the following project progress report. Two external reviewers will be appointed to evaluate the developed SRS technologies. Project meetings The SRS project plenary meeting will take place every six months to discuss and plan project process. Each meeting will comprise the contents of the minutes of the last meeting, matters arising, actions taken and subsequent actions. The venue is normally scheduled to rotate between the members home bases. The meeting chairperson is naturally the representative of the venue provider. The meeting agenda will be dispatched to all members from the appointed Chairperson four weeks in advance of the meeting. Meeting minutes will be prepared by the partner hosting the meeting and sent to all members within two weeks. At some special events members will be required to meet together, such as at the official review meetings arranged with the EC. Project reports The reports will be used to monitor and record the project progress. They will also be used to highlight deviations from planned project targets including delays or early finishes. The implications of all deviations on the overall progress will be evaluated, and any corrective FP7 ICT Contract No February January 2013 Page 7 of 16

8 actions that are necessary for implementation of the project objectives will be considered and taken as appropriate. Results and recommendations will be communicated among consortium members so that corrective actions can be taken in a timely manner in order to achieve optimum performance. Administrative quarterly reports will be mainly based on the progress reports from all consortium members. Annual reports will include the detailed reporting of progress achieved during project execution and any major deviations from planned project targets and corresponding correction actions. Function of Quality Plan This Quality Plan has been prepared to unambiguously define the personal responsibilities for the execution of the project tasks, for the management of the project tasks and for the documentation of the management. As the Quality Plan is regularly updated it will always give a clear and actual status of the project progress. FP7 ICT Contract No February January 2013 Page 8 of 16

9 QUALITY ASSURANCE ACTIVITY SUMMARY SHEET - Workpackage 1: Requirements Study, Technology Assessment and System Specification - WP Leader: INGEMA Deliverables Deadline Regulating procedure / Evaluation criteria Leader Manager From Quality check Record D1.1 Detailed user requirements, environment definition, general guidelines on ethical concerns and SRS scenario report 31/July/ INGEMA Mr. D Facal Task 1.1/1.2/1.5 In the Month 6 Quality D1.2 Report on Technology assessments 30/Apr/ FRAUNHOFE R Mr. G Arbeiter Task 1.3 In the Month 6 Quality D1.3 SRS Initial Knowledge-base and SRS hardware, software communication, and intelligence specification 31/July/ CU Dr. R Qiu Task 1.4 In the Month 6 Quality FP7 ICT Contract No February January 2013 Page 9 of 16

10 - Workpackage 2: User Interaction Study of Remotely-Controlled Service Robots - WP Leader: HdM Deliverables Deadline Regulating procedure / Evaluation criteria Leader Manager From Quality check Record D2.1 Definition of Privacy policy; requirements and usability study based on specific needs of elderly 31/July/2010 & 31/July/ INGEMA Mr. D Facal Task 2.1/2.2/2.7 In the Month 6/30 Quality Manager s Reports D2.2 HRI principles and interaction patterns for remotelycontrolled service robot 31/July/2011 & 31/Jan/ HdM Prof. M Burmester Task 2.3/2.4/2.6/2.8 In the Month 18/36 Quality Manager s Reports D2.3 Methodology of safe HRI and its application based on specific needs of elderly 31/July/2011 & 31/July/ PROFACTOR Dr. G Kronreif Task 2.5/2.7 In the Month 18/30 Quality Manager s Reports FP7 ICT Contract No February January 2013 Page 10 of 16

11 - Workpackage 3: Cognitive Capabilities of Remotely-Controlled Robots - WP Leader: FRAUNHOFER Deliverables Deadline Regulating procedure / Evaluation criteria Leader Manager From Quality check Record D3.1 Report on methodology of cognitive interpretation and information fusion 31/July/ FRAUNHOFE R Mr. G Arbeiter Task 3.1/3.2/3.3/3.4 In the Month 18 Quality D3.2 Report on advanced imitation learning and cognitive inference capability 31/July/ BED Dr. D Li Task 3.5/3.6 In the Month 18 Quality D3.3 Report on methodology for integrated decision making ability for remotely controlled robotic systems 31/Oct/ CU Dr. R QIU Task 3.7 In the Month 24 Quality FP7 ICT Contract No February January 2013 Page 11 of 16

12 - Workpackage 4: Technology Integration on Shadow Robotic System - WP Leader: CU Deliverables Deadline Regulating procedure / Evaluation criteria Leader Manager From Quality check Record D4.1 Report on SRS open interface development 31/Oct/ CLMI-BAS Prof. N Shivarov Task 4.6 In the Month 24 Quality D4.2 Report on SRS operation strategies in intelligent home environments 13/Jan/ HPIS Dr. L Castelli Task 4.7 In the Month 24 Quality D4.3 Report on SRS safety oriented motion control strategies 13/Jan/2012 & 13/Jan/ PROFACTOR Dr. G Kronreif Task 4.4/4.5 In the Month 24/36 Quality Manager s Reports D4.4 SRS intelligence and general software framework integration 13/Jan/2012 & 13/Jan/ CU Dr. R QIU Task 4.1/4.2/4.3/4.8 In the Month 24/36 Quality Manager s Reports FP7 ICT Contract No February January 2013 Page 12 of 16

13 - Workpackage 5: Multi-Roles Operation strategies in Domestic Environment - WP Leader: ROBOTNIK Deliverables Deadline Regulating procedure / Evaluation criteria Leader Manager From Quality check Record D5.1 SRS user interface and core system implemented 31/Jan/ ROBOTNIK Mr. R Lopez Tarazon Task 5.1/5.2 In the Month 24 Quality D5.2 SRS prototype I 31/Jan/ FRAUNHOFE R Mr. G Arbeiter Task 5.3 In the final Quality D5.3 SRS prototype II 31/Jan/ ROBOTNIK Mr. R Lopez Tarazon Task 5.4 In the final Quality D5.4 SRS technology validation report 31/Jan/ CU Mr. A Noyvirt Task 5.3/5.4 In the final Quality FP7 ICT Contract No February January 2013 Page 13 of 16

14 - Workpackage 6: Proof of Concept and SRS User Evaluation - WP Leader: FDCGO Deliverables Deadline Regulating procedure / Evaluation criteria Leader Manager From Quality check Record D6.1 Validation of the concept, testing site preparation and protocol development 31/Jan/2011 & 31/Jan/ INGEMA Mr. D Facal Task 6.1/6.2 In the Month 12/24 Quality Manager s Reports D6.2 SRS user validation 31/Jan/ FDCGO Dr. R Andrich Task 6.3 In the final Quality D6.3 SRS Ethical and Costeffectiveness assessment 31/Jan/ FDCGO Dr. R Andrich Task 6.4/6.5 In the final Quality FP7 ICT Contract No February January 2013 Page 14 of 16

15 - Workpackage 7: Dissemination and Exploitation - WP Leader: PROFACTOR Deliverables Deadline Regulating procedure / Evaluation criteria Leader Manager From Quality check Record D7.1 Plan for using and disseminating knowledge 31/Jan/ PROFACTOR Dr. G Kronreif Task 7.1 In the Month 12 Quality D7.2 Report on raising public participation and awareness 13/Jan/2012 & 13/Jan/ PROFACTOR Dr. G Kronreif Task 7.1 In the Month 24 and 36 Quality Manager s Reports D7.3 Technology Exploitation Plan 13/Jan/ ROBOTNIK Mr. R Lopez Tarazon Task 7.2/7.3 In the final Quality FP7 ICT Contract No February January 2013 Page 15 of 16

16 SRS Deliverable 8.2 Due date: 30 April Workpackage 8: Project Management - WP Leader: CU Activity Deadline Regulating procedure / Evaluation criteria Leader Manager From Quality check Record Task 8.1 Project co-ordination and financial management 31/Jan/ CU Dr. R Qiu Checking of work planning, allocation of resources, communication / collaboration between partners, and deliverables In the Quality Manager s Reports of every six months Task 8.2 Management of RTD, dissemination and exploitation activities 31/Jan/ CU Dr. R Qiu / Annual Progress Reports In the Quality Manager s Reports of every six months Task 8.3 Management of intellectual assets 31/Jan/ CU/ FRAUNHOF ER Dr. B Graf Checking of IP Reports and D8.6 In the Quality Manager s Reports of every six months Task 8.4 Quality assurance / review & assessment 31/Jan/ CU Mr. A Noyvirt Checking of the Quality Plan In the Quality Manager s Reports of every six months FP7 ICT Contract No February January 2013 Page 16 of 16

PROJECT DELIVERABLE. Funding Scheme: Collaborative Project

PROJECT DELIVERABLE. Funding Scheme: Collaborative Project Grant Agreement number: 224216 Project acronym: HANDS Project title: Helping Autism-diagnosed teenagers Navigate and Develop Socially Funding Scheme: Collaborative Project PROJECT DELIVERABLE Deliverable

More information

D01.1 Project Management Plan

D01.1 Project Management Plan D01.1 Project Management Plan Document identification Related SP / WP SP0 / WP01 Reference SCR-WP01-D-THA-008 Related Deliverable D01.2 Dissemination Level CO Lead Participant THALES Lead Author Bruno

More information

Guidance notes and templates for Project Technical Review involving Independent Expert(s)

Guidance notes and templates for Project Technical Review involving Independent Expert(s) Guidance notes and templates for Project Technical Review involving Independent Expert(s) FP7 Collaborative Projects, Networks of Excellence, Coordination and Support Actions Version 18/12/2007 Disclaimer

More information

GUIDE FOR APPLICANTS

GUIDE FOR APPLICANTS European Commission THE SEVENTH FRAMEWORK PROGRAMME The Seventh Framework Programme focuses on Community activities in the field of research, technological development and demonstration (RTD) for the period

More information

ISO 9001:2008 Quality Management System Requirements (Third Revision)

ISO 9001:2008 Quality Management System Requirements (Third Revision) ISO 9001:2008 Quality Management System Requirements (Third Revision) Contents Page 1 Scope 1 1.1 General. 1 1.2 Application.. 1 2 Normative references.. 1 3 Terms and definitions. 1 4 Quality management

More information

Proposal Negotiation. a guide. Constantine Vaitsas, vaitsas@help-forward.gr

Proposal Negotiation. a guide. Constantine Vaitsas, vaitsas@help-forward.gr Proposal Negotiation a guide Constantine Vaitsas, vaitsas@help-forward.gr Presentation Outline Proposal Time Scale Negotiation Process Legal Negotiations Financial Negotiations Technical Negotiations NEF

More information

Guidance notes and templates for Project Technical Review involving Independent Expert(s)

Guidance notes and templates for Project Technical Review involving Independent Expert(s) Guidance notes and templates for Project Technical Review involving Independent Expert(s) FP7 Collaborative Projects (CP), Networks of Excellence, Coordination and Support Actions (CSA), CP-CSA, ERA-NET,

More information

D 1.1 Project Toolbox

D 1.1 Project Toolbox 1 D 1.1 Project Toolbox Union s Horizon 2020 research and innovation programme under grant agreement No 644367. 2 Project no. 644367 Project acronym: MY-WAY Project title: Strengthening the web entrepreneurship

More information

PROPOSAL ACRONYM - ETN / EID / EJD (delete as appropriate and include as header on each page) START PAGE MARIE SKŁODOWSKA-CURIE ACTIONS

PROPOSAL ACRONYM - ETN / EID / EJD (delete as appropriate and include as header on each page) START PAGE MARIE SKŁODOWSKA-CURIE ACTIONS START PAGE MARIE SKŁODOWSKA-CURIE ACTIONS Innovative Training Networks (ITN) Call: H2020-MSCA-ITN-2015 PART B PROPOSAL ACRONYM This proposal is to be evaluated as: [ETN] [EID] [EJD] [delete as appropriate]

More information

ISO 9001:2000 AUDIT CHECKLIST

ISO 9001:2000 AUDIT CHECKLIST ISO 9001:2000 AUDIT CHECKLIST No. Question Proc. Ref. Comments 4 Quality Management System 4.1 General Requirements 1 Has the organization established, documented, implemented and maintained a quality

More information

Project management in FP7. Gorgias Garofalakis ETAT S.A.

Project management in FP7. Gorgias Garofalakis ETAT S.A. Project management in FP7 Gorgias Garofalakis ETAT S.A. The whole process EU FP7 Project Project idea Proposal writing Evaluation Negotiations Project implementation Contact with partners after the evaluation

More information

Guidelines for the Acceptance of Manufacturer's Quality Assurance Systems for Welding Consumables

Guidelines for the Acceptance of Manufacturer's Quality Assurance Systems for Welding Consumables (1987) Guidelines for the Acceptance of Manufacturer's Quality Assurance Systems for Welding Consumables 1. General 1.1 Introduction 1.1.1 The present guidelines are to serve as a supplement to the IACS

More information

Project reporting in FP6

Project reporting in FP6 Guidance notes for Integrated Projects, Networks of Excellence, Specific Targeted Research or Innovation Projects, Coordination Actions, Specific Support Actions, Co-operative Research Projects and Collective

More information

Administrative + Management Aspects. EU - Framework Programme 7. Grant Agreement: Acronym FMT-XCT Project Kick-off Meeting, 14.05.

Administrative + Management Aspects. EU - Framework Programme 7. Grant Agreement: Acronym FMT-XCT Project Kick-off Meeting, 14.05. Administrative + Management Aspects EU - Framework Programme 7 Grant Agreement: Acronym FMT-XCT Project Kick-off Meeting, 14.05.2008 Dr. Jürgen Ertel Department Program Planing and Management Head of Project

More information

Public Transportation - Accessibility for All

Public Transportation - Accessibility for All Deliverable 1.1 Project Management Plan & Schedule (incl. project management strategies, risk management plan, dissemination plan and a detailed project schedule) Grant agreement no.: 233701 Project acronym:

More information

D E F I N I T I O N O F Q U A L I T Y C O N T R O L P R O C E D U R E

D E F I N I T I O N O F Q U A L I T Y C O N T R O L P R O C E D U R E D E F I N I T I O N O F Q U A L I T Y C O N T R O L P R O C E D U R E D 1.1 Document identifier: V-Must.net - D1.1 Definition of quality control procedure V.1.1 Due Date of Delivery to EC End of Month

More information

ISO 9001 (2000) QUALITY MANAGEMENT SYSTEM ASSESSMENT REPORT SUPPLIER/ SUBCONTRACTOR

ISO 9001 (2000) QUALITY MANAGEMENT SYSTEM ASSESSMENT REPORT SUPPLIER/ SUBCONTRACTOR Page 1 of 20 ISO 9001 (2000) QUALITY MANAGEMENT SYSTEM ASSESSMENT REPORT SUPPLIER/ SUBCONTRACTOR SUPPLIER/ SUBCONTRACTOR NAME: ADDRESS: CITY AND STATE: ZIP CODE: SUPPLIER/MANUFACTURER NO PHONE: DIVISION:

More information

ARTEMIS-ED-21-09. Guidance notes and templates for Project Technical Review involving independent expert(s)

ARTEMIS-ED-21-09. Guidance notes and templates for Project Technical Review involving independent expert(s) Guidance notes and templates for Project Technical Review involving independent expert(s) 1 CONTENTS 1 INTRODUCTION... 3 2 THE PROJECT REVIEW PROCESS... 3 3 MANDATE OF THE INDEPENDENT EXPERT(S)... 5 3.1

More information

Technologies for PRS Receivers

Technologies for PRS Receivers Seventh Framework Programme of the European Community for Research, Technological Development and Demonstration Activities (2007 to 2013) 'Cooperation' Specific Programme Theme: Transport (including Aeronautics)

More information

ISO 9001 : 2008 QUALITY MANAGEMENT SYSTEM AUDIT CHECK LIST INTRODUCTION

ISO 9001 : 2008 QUALITY MANAGEMENT SYSTEM AUDIT CHECK LIST INTRODUCTION INTRODUCTION What auditors should look for: the items listed in these headings that the ISO requirement is met that the requirement is met in the manner described in the organization's documentation Page

More information

Pursuant to Convention No. 108 of the Council of Europe for the protection of persons with regard to the automated processing of personal data;

Pursuant to Convention No. 108 of the Council of Europe for the protection of persons with regard to the automated processing of personal data; Decision No. 2011-316 dated 6 October 2011 adopting a standard for delivering privacy seals in audit procedures covering the protection of persons with regard to the processing of personal data The French

More information

(Article 131(2) of the Financial Rules of the Innovative Medicines Initiative Joint Undertaking)

(Article 131(2) of the Financial Rules of the Innovative Medicines Initiative Joint Undertaking) Annual report of the Executive Director to the Discharge on measures taken in the light of the Discharge s recommendations of 2012 in respect of the implementation of the budget of 2010 (Article 131(2)

More information

ZEPHYR project Deliverable D1.1 QUALITY PLAN

ZEPHYR project Deliverable D1.1 QUALITY PLAN THEME [ENV.2012.6.3-1] Innovative resource efficient technologies, processes and services ZEPHYR project Deliverable D1.1 QUALITY PLAN Funding scheme: Collaborative Project Project Acronym: ZEPHYR Project

More information

Negotiations feedback for successful project preparation. ERANIS workshop, 27.11.2007, Minsk

Negotiations feedback for successful project preparation. ERANIS workshop, 27.11.2007, Minsk Negotiations feedback for successful project preparation Negotiations procedure Feedback from the Commission on the project plan issues that need to be explained in more detail Request to formulate Annex

More information

ISO 9001:2000 Gap Analysis Checklist

ISO 9001:2000 Gap Analysis Checklist ISO 9001:2000 Gap Analysis Checklist Type: Assessor: ISO 9001 REQUIREMENTS STATUS ACTION/COMMENTS 4 Quality Management System 4.1 General Requirements Processes needed for the quality management system

More information

Guidelines for reporting. for Accompanying Measures. implemented as. Specific Support Action

Guidelines for reporting. for Accompanying Measures. implemented as. Specific Support Action SIXTH FRAMEWORK PROGRAMME Research Infrastructures Action Guidelines for reporting for Accompanying Measures implemented as Specific Support Action This document can be found on the INTERNET at the following

More information

23. The quality management system

23. The quality management system 23. The quality management system Version 2.0 On this page: Mandatory requirements: Extracts from the HFE Act Extracts from licence conditions HFEA guidance: Definition of the quality management system

More information

Second Horizon 2020 Call Robotics ICT24

Second Horizon 2020 Call Robotics ICT24 Second Horizon 2020 Call Robotics ICT24 Juha Heikkilä, PhD Head of Unit Robotics Directorate-General for Communication Networks, Content and Technology European Commission Robotics Horizon 2020 ICT Call

More information

PREANNOUNCES RESEARCH WITHIN PRIORITY SECTORS CALL FOR PROPOSALS

PREANNOUNCES RESEARCH WITHIN PRIORITY SECTORS CALL FOR PROPOSALS THE GENERAL SECRETARIAT FOR RESEARCH AND TECHNOLOGY AS PROGRAMME OPERATOR OF THE GREEK-EEA RESEARCH PROGRAMME IMPLEMENTED UNDER THE GREEK FINANCIAL MECHANISM 2009-2014 PREANNOUNCES RESEARCH WITHIN PRIORITY

More information

BS EN 16001 Energy Management Systems VICTORIA BARRON, PRODUCT MARKETING MANAGER, BSI

BS EN 16001 Energy Management Systems VICTORIA BARRON, PRODUCT MARKETING MANAGER, BSI BS EN 16001 Energy Management Systems VICTORIA BARRON, PRODUCT MARKETING MANAGER, BSI Agenda Energy Management in context Why Energy Management? Business Needs How BS EN 16001 helps organisations meet

More information

ISO 9001: 2008 Boosting quality to differentiate yourself from the competition. xxxx November 2008

ISO 9001: 2008 Boosting quality to differentiate yourself from the competition. xxxx November 2008 ISO 9001: 2008 Boosting quality to differentiate yourself from the competition xxxx November 2008 ISO 9001 - Periodic Review ISO 9001:2008 Periodic Review ISO 9001, like all standards is subject to periodic

More information

Proposal template and GUIDE FOR APPLICANTS (updated by FIspace)

Proposal template and GUIDE FOR APPLICANTS (updated by FIspace) European Commission THE SEVENTH FRAMEWORK PROGRAMME The Seventh Framework Programme focuses on Community activities in the field of research, technological development and demonstration (RTD) for the period

More information

Fast track to Innovation: a new instrument in Horizon 2020

Fast track to Innovation: a new instrument in Horizon 2020 Fast track to Innovation: a new instrument in Horizon 2020 29.01.2015 Webinar Ines Haberl Austrian Research Promotion Agency 29.01.2015 Webinar Fast track to Innovation in Horizon 2020 Content 1. Concept

More information

SABPP IT GOVERNANCE COMMITTEE TERMS OF REFERENCE

SABPP IT GOVERNANCE COMMITTEE TERMS OF REFERENCE SABPP IT GOVERNANCE COMMITTEE TERMS OF REFERENCE PREAMBLE The purpose of the IT Governance Committee is to ensure that IT is effectively governed at SABPP in accordance with the King III Code of Governance

More information

Preparing yourself for ISO/IEC 27001 2013

Preparing yourself for ISO/IEC 27001 2013 Preparing yourself for ISO/IEC 27001 2013 2013 a Vintage Year for Security Prof. Edward (Ted) Humphreys (edwardj7@msn.com) [Chair of the ISO/IEC and UK BSI Group responsible for the family of ISMS standards,

More information

IT Charter and IT Governance Framework

IT Charter and IT Governance Framework IT Charter and IT Governance Framework Status: Custodian: Approved Director: Information Technology Date approved: 2013-12-04 Implementation date: 2013-12-05 Decision number: SAQA 02102/13 Due for review:

More information

ISO/IEC 15504 Part 2 provides the following copyright release:

ISO/IEC 15504 Part 2 provides the following copyright release: Copyright Notice This document reproduces relevant material from ISO/IEC 15504:2003 Information Technology Process Assessment Part 2: Performing an assessment and ISO/IEC FCD 15504:2005 Information Technology

More information

Competency Unit: Exemplar Global AU Management Systems Auditing

Competency Unit: Exemplar Global AU Management Systems Auditing Please visit: www.exemplarglobal.org for your region s Principal Office contact details. Email: info@exemplarglobal.org Competency Unit: Exemplar Global AU Management Systems Auditing How to use this document

More information

Audit of the control body through the monitoring of compliance with control plan. Measures for the irregularities

Audit of the control body through the monitoring of compliance with control plan. Measures for the irregularities Workshop on verification of compliance with product specification for PDO, PGI and TSG Audit of the control body through the monitoring of compliance with control plan Measures for the irregularities Viktorija

More information

QUALITY MANAGEMENT PROCESS

QUALITY MANAGEMENT PROCESS QUALITY MANAGEMENT PROCESS The Quality Management Program s Process for Quality Assurance This Quality Management Process has been issued by authority of the CEO of Kforce Government Solutions, Inc. (KGS)

More information

IT Governance Charter

IT Governance Charter Version : 1.01 Date : 16 September 2009 IT Governance Network South Africa USA UK Switzerland www.itgovernance.co.za info@itgovernance.co.za 0825588732 IT Governance Network, Copyright 2009 Page 1 1 Terms

More information

Guillem Bernat (RAPITA) Communication, Deliverable, Dissemination, Publication, Reporting

Guillem Bernat (RAPITA) Communication, Deliverable, Dissemination, Publication, Reporting D5.2 Project Handbook Document Information Contract Number 249100 Project Website Contractual Deadline Dissemination Level Nature Author Contributors Reviewer Keywords www.proartis-project.eu PM04 Public

More information

Risk Management & Business Continuity Manual 2011-2014

Risk Management & Business Continuity Manual 2011-2014 ANNEX C Risk Management & Business Continuity Manual 2011-2014 Produced by the Risk Produced and by the Business Risk and Business Continuity Continuity Team Team February 2011 April 2011 Draft V.10 Page

More information

UoD IT Job Description

UoD IT Job Description UoD IT Job Description Role: Projects Portfolio Manager HERA Grade: 8 Responsible to: Director of IT Accountable for: Day to day leadership of team members and assigned workload Key Relationships: Management

More information

VICTORIAN GOVERNMENT DEPARTMENT ENVIRONMENTAL MANAGEMENT SYSTEM MODEL MANUAL

VICTORIAN GOVERNMENT DEPARTMENT ENVIRONMENTAL MANAGEMENT SYSTEM MODEL MANUAL MODEL FINAL VERSION 1, MARCH 2003 ACKNOWLEDGMENTS This Manual is based on Environment Australia s Model EMS 1 and has been adapted for use by Victorian Government agencies by Richard Oliver International.

More information

Health and Safety Policy and Procedures

Health and Safety Policy and Procedures Health and Safety Policy and Procedures Health & Safety Policy & Procedures Contents s REVISION AND AMENDMENT RECORD : Summary of Change Whole Policy 4.0 05 Nov 08 Complete re-issue Whole Policy 4.1 10

More information

IAF Informative Document. Transition Planning Guidance for ISO 9001:2015. Issue 1 (IAF ID 9:2015)

IAF Informative Document. Transition Planning Guidance for ISO 9001:2015. Issue 1 (IAF ID 9:2015) IAF Informative Document Transition Planning Guidance for ISO 9001:2015 Issue 1 (IAF ID 9:2015) Issue 1 Transition Planning Guidance for ISO 9001:2015 Page 2 of 10 The (IAF) facilitates trade and supports

More information

HERON (No: 649690): Deliverable D.2.6 DATA MANAGEMENT PLAN AUGUST 2015. Partners: Oxford Brookes University and Università Commerciale Luigi Bocconi

HERON (No: 649690): Deliverable D.2.6 DATA MANAGEMENT PLAN AUGUST 2015. Partners: Oxford Brookes University and Università Commerciale Luigi Bocconi HERON (No: 649690): Deliverable D.2.6 DATA MANAGEMENT PLAN AUGUST 2015 Partners: Oxford Brookes University and Università Commerciale Luigi Bocconi Institutions: Low Carbon Building Group, Oxford Brookes

More information

BLOOM AND WAKE (ELECTRICAL CONTRACTORS) LIMITED QUALITY ASSURANCE MANUAL

BLOOM AND WAKE (ELECTRICAL CONTRACTORS) LIMITED QUALITY ASSURANCE MANUAL 130 Wisbech Road Outwell Wisbech Cambridgeshire PE14 8PF Tel: (01945) 772578 Fax: (01945) 773135 Copyright 2003. This Manual and the information contained herein are the property Bloom & Wake (Electrical

More information

ICH guideline Q10 on pharmaceutical quality system

ICH guideline Q10 on pharmaceutical quality system September 2015 EMA/CHMP/ICH/214732/2007 Committee for Human Medicinal Products Step 5 Transmission to CHMP May 2007 Transmission to interested parties May 2007 Deadline for comments November 2007 Final

More information

QUALITY MANAGEMENT SYSTEM MANUAL

QUALITY MANAGEMENT SYSTEM MANUAL The online version of this document is controlled. Therefore, all printed versions of this document are unofficial copies. QUALITY MANAGEMENT SYSTEM MANUAL 6901 Charles Street Towson, Maryland 21204 Manual

More information

HabEat - FP7-245012. HabEat

HabEat - FP7-245012. HabEat HabEat Determining factors and critical periods in food habit formation and breaking in early childhood: a multidisciplinary approach Grant agreement number: FP7-245012 Medium-scale Collaborative Project

More information

Preparing for Unannounced Inspections from Notified Bodies

Preparing for Unannounced Inspections from Notified Bodies Preparing for Unannounced Inspections from Notified Bodies Europe has introduced further measures for unannounced audits of manufacturers by notified bodies. With this in mind, James Pink, VP Europe-Health

More information

DNV GL Assessment Checklist ISO 9001:2015

DNV GL Assessment Checklist ISO 9001:2015 DNV GL Assessment Checklist ISO 9001:2015 Rev 0 - December 2015 4 Context of the Organization No. Question Proc. Ref. Comments 4.1 Understanding the Organization and its context 1 Has the organization

More information

E N T R E P R E N E U R I A L S K I L L S P A S S P R O J E C T Q U A L I T Y A S S U R A N C E P L A N

E N T R E P R E N E U R I A L S K I L L S P A S S P R O J E C T Q U A L I T Y A S S U R A N C E P L A N E N T R E P R E N E U R I A L S K I L L S P A S S P R O J E C T Q U A L I T Y A S S U R A N C E P L A N Version 6.0 24/05/2014 Entrepreneurial Skills Pass V E R S I O N H I S T O R Y Version # Date Author

More information

Translation Service Provider according to ISO 17100

Translation Service Provider according to ISO 17100 www.lics-certification.org Certification Scheme S06 Translation Service Provider according to ISO 17100 Date of issue: V2.0, 2015-11-15 Austrian Standards plus GmbH Dr. Peter Jonas Heinestraße 38 1020

More information

CCD MARINE LTD QUALITY MANUAL PROCEDURE Q0.000. Date: Title. Revision: QUALITY MANUAL PROCEDURE Q0.000. 29 September 2014

CCD MARINE LTD QUALITY MANUAL PROCEDURE Q0.000. Date: Title. Revision: QUALITY MANUAL PROCEDURE Q0.000. 29 September 2014 Title: Quality Manual Uncontrolled if Hardcopy CCD MARINE LTD th Date: 29 September 2014 Doc Ref: Q0.000 Issued By: Sarah Leighton Rev No: 2 Title Revision: Date: QUALITY MANUAL PROCEDURE Q0.000 2 29 September

More information

International Workshop Agreement 2 Quality Management Systems Guidelines for the application of ISO 9001:2000 on education.

International Workshop Agreement 2 Quality Management Systems Guidelines for the application of ISO 9001:2000 on education. ISO 2002 All rights reserved ISO / IWA 2 / WD1 N5 Date: 2002-10-25 Secretariat: SEP-MÉXICO International Workshop Agreement 2 Quality Management Systems Guidelines for the application of ISO 9001:2000

More information

European Forum for Good Clinical Practice Audit Working Party

European Forum for Good Clinical Practice Audit Working Party European Forum for Good Clinical Practice Audit Working Party REVISION OF THE ENGAGE 1 AUDITING GUIDELINE. AN OPTIONAL GUIDELINE FOR GCP COMPLIANCE AND QUALITY MANAGEMENT SYSTEMS AUDITING This document

More information

TR CMS 101:2011. Standard for Compliance Management Systems (CMS)

TR CMS 101:2011. Standard for Compliance Management Systems (CMS) TR CMS 101:2011 Standard for Compliance Management Systems (CMS) of TÜV Rheinland, Cologne Total scope: 22 pages Contents Foreword....- 3-0 Introduction... - 5-1 Field of application... - 5-2 Aims of the

More information

Smart Open Services for European Patients Open ehealth initiative for a European large scale pilot of patient summary and electronic prescription

Smart Open Services for European Patients Open ehealth initiative for a European large scale pilot of patient summary and electronic prescription Smart Open Services for European Patients Open ehealth initiative for a European large scale pilot of patient summary and electronic prescription Deliverable: Work Package Document WP3.7 D.3.7.2. FINAL

More information

Risk Management Strategy and Policy. The policy provides the framework for the management and control of risk within the GOC

Risk Management Strategy and Policy. The policy provides the framework for the management and control of risk within the GOC Annex 1 TITLE VERSION Version 2 Risk Management Strategy and Policy SUMMARY The policy provides the framework for the management and control of risk within the GOC DATE CREATED January 2013 REVIEW DATE

More information

Title: Rio Tinto management system

Title: Rio Tinto management system Standard Rio Tinto management system December 2014 Group Title: Rio Tinto management system Document No: HSEC-B-01 Standard Function: Health, Safety, Environment and Communities (HSEC) No. of pages: 23

More information

ISO 9001:2015 Overview of the Revised International Standard

ISO 9001:2015 Overview of the Revised International Standard ISO 9001:2015 Overview of the Revised International Standard Introduction This document provides: a summary of the new ISO 9001:2015 structure. an overview of the new and revised ISO 9001:2015 requirements

More information

Sensing, monitoring and actuating on the UNderwater world through a federated Research InfraStructure Extending the Future Internet SUNRISE

Sensing, monitoring and actuating on the UNderwater world through a federated Research InfraStructure Extending the Future Internet SUNRISE Sensing, monitoring and actuating on the UNderwater world through a federated Research InfraStructure Extending the Future Internet SUNRISE Grant Agreement number 611449 Announcement of the Second Competitive

More information

Surgi Manufacturing Quality Manual

Surgi Manufacturing Quality Manual Surgi Manufacturing Page 1 of 18 Approvals: QA: Eng. Mgt. : A Date: 18Aug98 1. Introduction... 4 1.1 Scope... 4 1.2 Purpose... 4 1.3 Authority... 4 1.4 Issue of the Manual... 4 1.5 Amendments... 4 1.6

More information

Methodology: Agile development of safety critical systems Annex D1.1.d to deliverable D1.1

Methodology: Agile development of safety critical systems Annex D1.1.d to deliverable D1.1 Collaborative Large scale Integrating Project Open Platform for EvolutioNary Certification Of Safety critical Systems Methodology: Agile development of safety critical systems to deliverable D1.1 Work

More information

Overview of the involvement of local Research. Organisations, Enterprises, Universities in. national and international projects on Earth

Overview of the involvement of local Research. Organisations, Enterprises, Universities in. national and international projects on Earth Overview of the involvement of local Research Organisations, Enterprises, Universities in national and international projects on Earth Observation applications and services. ( Earth Observation, Satellite

More information

Guidelines for applicants for the 1 st Transnational Call for Proposals (pre-proposal phase)

Guidelines for applicants for the 1 st Transnational Call for Proposals (pre-proposal phase) SUSFOOD - An FP7 ERA-NET on Sustainable Food Production and Consumption Guidelines for applicants for the 1 st Transnational Call for Proposals (pre-proposal phase) Closing date for pre-proposals: 03 May

More information

Chapter 2 ISO 9001:2008 QMS

Chapter 2 ISO 9001:2008 QMS Chapter 2 ISO 9001:2008 QMS For internal use of BSNL only Page 1 ISO 9001:2008 QMS Introduction Everyone wants to achieve profits. Profits can come by more sales with some profit margin and also by cutting

More information

Ambient Assisted Living Joint Programme. Ambient Assisted Living Joint Programme

Ambient Assisted Living Joint Programme. Ambient Assisted Living Joint Programme Ambient Assisted Living Joint Programme Paweł Marć Narodowe Centrum Badań i Rozwoju http://www.aal-europe.eu/ Ambient Assisted Living Joint Programme New funding programme for Europe 2008 2013, total volume

More information

REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL. on the voluntary ecodesign scheme for games consoles

REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL. on the voluntary ecodesign scheme for games consoles EUROPEAN COMMISSION Brussels, 22.4.2015 COM(2015) 178 final REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL on the voluntary ecodesign scheme for games consoles {SWD(2015) 88 final}

More information

EUROPEAN COMMISSION ENTERPRISE AND INDUSTRY DIRECTORATE-GENERAL

EUROPEAN COMMISSION ENTERPRISE AND INDUSTRY DIRECTORATE-GENERAL EUROPEAN COMMISSION ENTERPRISE AND INDUSTRY DIRECTORATE-GENERAL Innovation policy Technology for innovation; ICT industries and E-business Brussels, 7 th December 2005 DG ENTR/D4 M 376 - EN STANDARDISATION

More information

PROJECT PROGRESS PERIODIC & MANAGEMENT REPORT

PROJECT PROGRESS PERIODIC & MANAGEMENT REPORT PROJECT PROGRESS PERIODIC & MANAGEMENT REPORT Grant Agreement number: 288094 Project acronym: ecompass Project title: eco-friendly urban Multi-modal route PlAnning Services for mobile users Funding Scheme:

More information

Disclosure to Promote the Right To Information

Disclosure to Promote the Right To Information इ टरन ट म नक Disclosure to Promote the Right To Information Whereas the Parliament of India has set out to provide a practical regime of right to information for citizens to secure access to information

More information

Free Download ISO/TS 16949:2009. Requirements Checklist. 29 of 57 pages (PDF) For additional information see www.rcglobal.com

Free Download ISO/TS 16949:2009. Requirements Checklist. 29 of 57 pages (PDF) For additional information see www.rcglobal.com RCGLOBAL.COM Free Download ISO/TS 16949:2009 Requirements Checklist 29 of 57 pages (PDF) For additional information see www.rcglobal.com RCGLOBAL(Canada), for internal use only. Page 1 of 57 Review performed

More information

EUROPEAN COMMISSION SERVICE SPECIFIC PRIVACY STATEMENT (SSPS) 1. Online services on the Participant Portal

EUROPEAN COMMISSION SERVICE SPECIFIC PRIVACY STATEMENT (SSPS) 1. Online services on the Participant Portal EUROPEAN COMMISSION SERVICE SPECIFIC PRIVACY STATEMENT (SSPS) PROCESSING OPERATIONS OF APPLICANTS DATA 1. Online services on the Participant Portal The Participant Portal offers online electronic services

More information

Erfahrungen bei der Antragstellung im 7. Forschungsrahmenprogramm

Erfahrungen bei der Antragstellung im 7. Forschungsrahmenprogramm Erfahrungen bei der Antragstellung im 7. Forschungsrahmenprogramm Dr. Andreas Lüdtke Dr. Andreas Lüdtke - OFFIS Why am I here? coordinator of two projects in FP7 one received 15 points out of 15 the other

More information

DELIVERABLE 7.5 Dissemination and communication plan I

DELIVERABLE 7.5 Dissemination and communication plan I ROBOTS IN ASSISTED LIVING ENVIRONMENTS UNOBTRUSIVE, EFFICIENT, RELIABLE AND MODULAR SOLUTIONS FOR INDEPENDENT AGEING Research Innovation Action Project Number: 643892 Start Date of Project: 01/04/2015

More information

JSP 886 THE DEFENCE LOGISTIC SUPPORT CHAIN MANUAL VOLUME 7 INTEGRATED LOGISTICS SUPPORT PART 8.11 QUALITY MANAGEMENT

JSP 886 THE DEFENCE LOGISTIC SUPPORT CHAIN MANUAL VOLUME 7 INTEGRATED LOGISTICS SUPPORT PART 8.11 QUALITY MANAGEMENT JSP 886 THE DEFENCE LOGISTIC SUPPORT CHAIN MANUAL VOLUME 7 INTEGRATED LOGISTICS SUPPORT PART 8.11 QUALITY MANAGEMENT THE MASTER VERSION OF JSP 886 IS PUBLISHED ON THE DEFENCE INTRANET. FOR TECHNICAL REASONS,

More information

RHONDDA CYNON TAF COUNTY BOROUGH COUNCIL MUNICIPAL YEAR 2015/16 REPORT OF THE DIRECTOR OF EDUCATION AND LIFELONG LEARNING

RHONDDA CYNON TAF COUNTY BOROUGH COUNCIL MUNICIPAL YEAR 2015/16 REPORT OF THE DIRECTOR OF EDUCATION AND LIFELONG LEARNING RHONDDA CYNON TAF COUNTY BOROUGH COUNCIL MUNICIPAL YEAR 2015/16 CHILDREN & YOUNG PEOPLE SCRUTINY COMMITTEE 16 th NOVEMBER 2015 AGENDA ITEM 4 THE GOVERNOR SUPPORT SERVICE IN RHONDDA CYNON TAF REPORT OF

More information

Information Governance Strategy and Policy. OFFICIAL Ownership: Information Governance Group Date Issued: 15/01/2015 Version: 2.

Information Governance Strategy and Policy. OFFICIAL Ownership: Information Governance Group Date Issued: 15/01/2015 Version: 2. Information Governance Strategy and Policy Ownership: Information Governance Group Date Issued: 15/01/2015 Version: 2.0 Status: Final Revision and Signoff Sheet Change Record Date Author Version Comments

More information

Appendix 3 - Joint FRS Information Security & Assurance Sub Group Action Plan

Appendix 3 - Joint FRS Information Security & Assurance Sub Group Action Plan Appendix 3 - Joint FRS Information Security & Assurance Sub Group Action Plan HFR Version 2 5th Oct 2010 Objective 1 - Introduce mandatory requirements 11, 12, 14, 15, 16, 19, 21, 31, 32, 33, 34, 35, 36,

More information

Quality Management Systems Foundation Training Course

Quality Management Systems Foundation Training Course Certification criteria for Quality Management Systems Foundation Training Course CERTIFICATION CRITERIA FOR THE QUALITY MANAGEMENT SYSTEMS FOUNDATION TRAINING COURSE Please read this document conjunction

More information

QUALITY MANUAL ISO 9001:2015

QUALITY MANUAL ISO 9001:2015 Page 1 of 22 QUALITY MANUAL ISO 9001:2015 Quality Management System Page 1 of 22 Page 2 of 22 Sean Duclos Owner Revision History Date Change Notice Change Description 11/02/2015 1001 Original Release to

More information

Joint Master in Information Security and Data Management (ISDM)

Joint Master in Information Security and Data Management (ISDM) PROJECT CONCEPT PAPER Joint Master in Information Security and Data Management (ISDM) First draft: Dr. Derar Eleyan, Palestine Technical University-Palestine. Key Action 2: Capacity Building in the Field

More information

The Optima Building 58 Robertson Street Glasgow G2 8DU. Ironmills Road Dalkeith Midlothian EH22 1LE

The Optima Building 58 Robertson Street Glasgow G2 8DU. Ironmills Road Dalkeith Midlothian EH22 1LE SQA's Quality Framework: a guide for centres The Optima Building 58 Robertson Street Glasgow G2 8DU Ironmills Road Dalkeith Midlothian EH22 1LE Customer Contact Centre Tel: 0845 279 1000 Fax: 0845 213

More information

AUDIT CERTIFICATE GUIDANCE NOTES 6 TH FRAMEWORK PROGRAMME

AUDIT CERTIFICATE GUIDANCE NOTES 6 TH FRAMEWORK PROGRAMME AUDIT CERTIFICATE GUIDANCE NOTES 6 TH FRAMEWORK PROGRAMME GUIDANCE NOTES FOR CONTRACTORS AND CERTIFYING ENTITIES MATERIALS PREPARED BY INTERDEPARTMENTAL AUDIT CERTIFICATE WORKING GROUP VERSION 1 APPROVED

More information

Implementation of a Quality Management System for Aeronautical Information Services -1-

Implementation of a Quality Management System for Aeronautical Information Services -1- Implementation of a Quality Management System for Aeronautical Information Services -1- Implementation of a Quality Management System for Aeronautical Information Services Chapter IV, Quality Management

More information

GENERIC STANDARDS CUSTOMER RELATIONSHIPS FURTHER EXCELLENCE CUSTOMISED SOLUTIONS INDUSTRY STANDARDS TRAINING SERVICES THE ROUTE TO

GENERIC STANDARDS CUSTOMER RELATIONSHIPS FURTHER EXCELLENCE CUSTOMISED SOLUTIONS INDUSTRY STANDARDS TRAINING SERVICES THE ROUTE TO PROCESSES SUPPLY CHAIN SKILLED TALENT CUSTOMER RELATIONSHIPS FURTHER EXCELLENCE GENERIC STANDARDS INDUSTRY STANDARDS CUSTOMISED SOLUTIONS TRAINING SERVICES THE ROUTE TO ISO 9001:2015 FOREWORD The purpose

More information

QUALITY IN EVERYDAY WORK. Quality Guide for the Teacher Education College Version 2.7

QUALITY IN EVERYDAY WORK. Quality Guide for the Teacher Education College Version 2.7 QUALITY IN EVERYDAY WORK Quality Guide for the Teacher Education College Version 2.7 Updates: Organisational change 1.1.2009 JAMK s mission and vision 5.1.2010 Planning and development discussion practices

More information

South East Water Corporation Finance Assurance and Risk Management Committee Charter

South East Water Corporation Finance Assurance and Risk Management Committee Charter South East Water Corporation Finance Assurance and Risk Management Committee Charter Created: October 2012 Document number: BS 2359 Last reviewed: May 2015 1. Purpose The South East Water Corporation Board's

More information

UNCONTROLLED COPY FOR REFERENCE ONLY

UNCONTROLLED COPY FOR REFERENCE ONLY CLOVER MACHINE AND MFG. 800 MATHEW ST. #101 SANTA CLARA, CA 95050 727-3380 727-7015 fax REVISION: DATE: PAGE 1 OF 45 QUALITY POLICY MANUAL DISTRIBUTION LIST: President Purchasing Manager Vice President

More information

ICT Competency Profiles framework Job Stream Descriptions

ICT Competency Profiles framework Job Stream Descriptions ICT Competency Profiles framework Job Stream Descriptions Cluster: Software Products Analysis Design: In the field of analysis, you apply investigative skills to business, technical or organizational problems

More information

Guideline on good pharmacovigilance practices (GVP)

Guideline on good pharmacovigilance practices (GVP) 1 2 20 February 2012 EMA/541760/2011 3 4 Guideline on good pharmacovigilance practices (GVP) Module I Pharmacovigilance systems and their quality systems Draft finalised by the Agency in collaboration

More information

Guidelines for Applicants

Guidelines for Applicants Guidelines for Applicants CORNET 19 th Call for Proposals Opening National and Regional Programmes for transnational Collective Research between SME Associations and Research Organisations. Closing date:

More information

SESAR 2020 EXPLORATORY RESEARCH INFO DAY PROPOSALS SUBMISSION & EVALUATION & PROGRAMME MANAGEMENT REQUIREMENTS

SESAR 2020 EXPLORATORY RESEARCH INFO DAY PROPOSALS SUBMISSION & EVALUATION & PROGRAMME MANAGEMENT REQUIREMENTS SESAR 2020 EXPLORATORY RESEARCH INFO DAY PROPOSALS SUBMISSION & EVALUATION & PROGRAMME MANAGEMENT REQUIREMENTS ALESSANDRO PRISTER PROGRAMME MANAGER ER, SJU ER CALL COORDINATOR List of topics covered Call

More information