1 SECTION 70 GENERAL REQUIREMENTS FOR PILING Contents Page General Pile layout, design and construction Information to be supplied with the Tender Safety Forcible corrections to piles Piling on or in close proximity to the tracks Work Package Plan Piling programme Records Record drawings Nuisance and damage Supervision and control of the piling works 7 References 8 British Standards 8 Railway Group Standards 8 Model Clauses 8 Other Publications 8 Page 1 of 8
2 SECTION 70 GENERAL REQUIREMENTS FOR PILING General The whole of the piling work shall comply with the information shown on the Contract Drawings and shall be constructed in accordance with the relevant sections of the ICE Specification for piling and embedded retaining walls (2nd edition, 2007), hereinafter referred to as the ICE Specification, unless qualified or amended by the following Clauses. Clause numbers in parentheses within the heading margins refer to the corresponding clauses in the ICE Specification. Pile layout, design and construction (B1.4) Further to ICE Specification, clause B1.4, Option 2 shall apply unless otherwise specified in Appendix 70/1. Except where shown on the Contract Drawings, the pile type, pile size, and pile positions and spacing shall be selected and determined by the Contractor. The piles shall be designed in accordance with the recommendations of BS EN and the NA to BS EN ; Non-Contradictory Complementary Information (NCCI) in BS 8004; the requirements of Appendix 70/1; and the following: i) the permitted vertical and horizontal pile head deflections for the specified design verification loads shall be in accordance with Schedule 70/A, for the purposes of calculating horizontal deflections, the fixity of the pile heads shall be as shown on the Contract Drawings. In addition, for helical screwed piles: i) design shall be based on conventional soil mechanics, i iv) long-term tension loads in cohesive soils shall be checked using drained soil strength parameters, in the design of radio mast equipment support structures, the wind loading component on a pile shall not exceed 25% of the ultimate tensile resistance of that pile, the basis of the relationship between the pile capacity and measured values of torque shall be demonstrated in the design, Page 2 of 8
3 v) a minimum of two helices shall be provided on every pile, and a minimum of three helices where pile capacity is dependent on the strength of variable soils - such as non-engineered fill and inter-bedded soils, vi) creep of the piles shall be considered in the design. For the purposes of the Tender only, the soil parameters used for the design of the piles shall be those given in the Contract. Where Tenders propose alternative soil parameters for design they shall justify and gain the Engineer s approval prior to adopting these alternatives. The Employer s Representative shall be provided with drawings showing the pile design and the pile arrangement. The number of copies shall be as detailed in Appendix 70/1. A completed Certificate of Design and Checking shall be provided for the pile design in accordance with RT/CE/S/003. Information to be supplied with the Tender (B1.4, B1.10) In addition to the requirements of the ICE Specification, clauses B1.4 and B1.10, the following shall be supplied with the Tender: i) details of the type of pile offered, including any permanent casing, i iv) the method to be adopted for calculating and checking the load bearing capacity, pile settlement and horizontal pile head deflection, details of the tests proposed to be undertaken on the Site to prove the pile design, including any proposed trial drives or bores, and the name of the specialist contractor proposed for undertaking the non-destructive testing of the piles, where friction reduction is specified (but no particular method is detailed) or where friction reduction is required by the Contractor s design, the type and description of the method to be used to reduce friction on the piles, and the numbers and lengths of piles to be so treated, v) details of preboring or other methods of aiding pile driveability considered necessary by the Contractor, including the locations, diameters and depths below the commencing surface of any preboring, vi) the names of the organisations proposed for the design and design check, Page 3 of 8
4 v the name of the specialist contractor proposed for the piling work including details of the contractor s relevant experience and successful usage of the proposed piling system for the particular ground conditions at the Site. Safety (B1.6) Forcible corrections to piles (B1.8.2) Piling on or in close proximity to the tracks (B1.10) NR/GN/CPR/401 provides guidance on contractual health and safety requirements In addition to ICE Specification, clause B1.8.2, where the Contractor considers that forcible corrections to steel piles are required, full details of the Contractor s proposals to carry out such corrections shall be submitted to the Employer s Representative, and the Employer s Representative s acceptance of the method and agreement that forcible corrections are necessary shall be obtained before such work commences No excavation shall be permitted in the track formation to provide access for the piling hammer during driving, and accordingly an additional pile length or the use of a long dolly shall be allowed for to give the required penetration. Unless shown otherwise on the Contract Drawings, piles left protruding from the track formation shall not infringe standard clearance as defined in GC/RT5212. Any pile driven within the sleeper area of the track shall be cutoff at a minimum of 300 mm below the underside of sleeper level. Any such pile incompletely driven shall subsequently be driven to the correct depth after making a butt jointed connection that is acceptable to the Employer s Representative. For piles constructed within the ballasted area of the track, on completion of each absolute possession the track and ballast shall be reinstated to provide the track construction standards specified in RT/CE/S/102. Work Package Plan (B1.10) Further to ICE Specification, clause B1.10, a Work Package Plan for the piling works shall be submitted to the Employer s Representative for acceptance. The programme for submitting this Plan shall be as detailed in Appendix 70/2. The Plan shall include further details of the information submitted in accordance with ICE Specification clause B1.10 and the associated guidance in C1.10 and, as necessary, shall include the following: i) calculations, drawings and design and design check certification based on the analysis model, referred to in Clause , for all elements of the piling works including any associated Temporary Works, Page 4 of 8
5 i iv) the piling sequence - to demonstrate that the uplift and lateral displacement of driven piles or the integrity of cast-in-place piles will not be affected, details of the proposed piling plant and equipment - in sufficient detail to demonstrate the suitability of the plant for achieving the required penetration, and for working within the noise and vibration limits specified in the Contract - and the position of such plant relative to the tracks, setting out and means of achieving specified tolerances, v) the length of temporary casing or use of support fluids to maintain adequate support for the ground during pile construction, vi) v periods required for boring and concreting - so that the pile resistance that can be mobilised can be verified, the method and equipment for cleaning or forming the base of the pile where end bearing resistance is assumed to be developed in the design, vi the method proposed to be used by the Contractor to verify pile depth, bore stability, base cleanliness and compliance with the specified tolerances, ix) the method of placing concrete to check (a) that concrete is placed vertically down the bore without segregation, and (b) that a description of the method used to place concrete using a tremie is available where concrete is to be placed under water or support fluid, x) the frequency and means of testing concrete workability, concrete strength (where applicable), and compliance values for grout, xi) x the means of placing reinforcement including lapping of any cages, the method of maintaining concrete cover, cage verticality, and details of any additional reinforcement for lifting, handling and placing, details to show how casings, permanent or temporary, are to be maintained in position during concreting, xi full details of preboring or other methods of aiding pile driveability, and measures taken to minimise disturbance of the ground, Page 5 of 8
6 xiv) the level to which concrete is to be cast, and details of how completed piles will be protected against damage during subsequent works, xv) procedures for dealing with unplanned situations, such as loss of support fluid, obstructions, unexpected ground conditions, and piles out of tolerance, xvi) details of all instrumentation and monitoring equipment proposed to verify that the specified tolerances are being achieved. The piling works shall not commence until the Work Package Plan has been accepted by the Employer s Representative. Piling programme (B1.11) Records (B1.12) In ICE Specification, clause B1.11, delete 24 hours notice and insert the minimum period of notice specified in Appendix 70/3. In ICE Specification, clause B1.11, programme shall be deemed to include piling sequence and the timing for driving or boring piles having regard to the avoidance of damage to adjacent piles In addition to the records specified in ICE Specification, table B1.6, the following information shall be provided: i) All piles a) designed working load, b) where appropriate, levels and measurements to determine ground heave or movement of any pile resulting from the piling operation. i iv) Driven precast concrete, steel or timber piles a) details of type and positions of joints. Cast-in-place piles a) method used. Concrete piles a) concrete mix details - including concrete grade, nominal maximum aggregate size, cement content, water/cement ratio, details and quantity of any admixtures or cement replacement materials used, b) reinforcement details - including number, type and size of main reinforcement bars, type and size of helical or line bars, reinforced length of pile. v) Helical screwed piles a) torque installation records and torque monitoring calibration data. Page 6 of 8
7 When any unexpected driving or boring conditions are encountered the Employer s Representative shall be informed. Details of all obstructions, delays and other interruptions, including the actual time spent in overcoming the unexpected conditions, shall be agreed with the Employer s Representative and recorded as the work proceeds. Record drawings In addition to the requirements specified in the Contract for record drawings for piles designed by the Contractor, on completion of the piling work, two copies of the drawings showing the piles as constructed shall be provided to the Engineer for approval. Upon approval, copies of these drawings shall be provided as specified in Appendix 70/4. Nuisance and damage (B1.13.1) Further to ICE Specification, clause B1.13.1, the piling shall be carried out within the noise limits specified in Section 10 (General). The Contract may specify requirements for carrying out piling works during absolute possessions, and place restrictions on permissible working hours. (B1.13.2) Supervision and control of the piling works (B1.15) Existing adjacent structures and services shall not be damaged during the execution of the piling works. The Contractor shall submit estimates of the vibration levels generated by the piling operations and whether it is proposed to monitor vibration levels during the works Further to ICE Specification, clause B1.15, Contractor s personnel whom the Contractor considers competent to supervise the piling shall be capable of recognising and assessing unexpected ground conditions, or any potential dangers (such as noxious or dangerous gases), as they might arise. The Contractor shall submit his Quality Plan in accordance with the programme requirements detailed in Appendix 70/5. Page 7 of 8
8 REFERENCES This is a list of publications referred to within this Section of the Model Clauses. British Standards Title Issue date BS 8004 Code of Practice for foundations BS EN Eurocode 7. Geotechnical design. General 2004 rules. NA to BS EN UK National Annex to Eurocode 7: Geotechnical design - Part 1: General rules Railway Group Standards Title GC/RT5212 Requirements for defining and maintaining clearances. Issue date 02/03 Network Rail standards Title Issue date NR/GN/CPR/401 Guidance on contractual health and safety 12/08 requirements. RT/CE/S/003 Technical approval of design, construction and 02/04 maintenance of civil engineering infrastructure. RT/CE/S/102 Track construction standards. 02/02 Model Clauses Title Issue date 10 General 08/08 Other Publications Title Issue date Thomas Telford Services ICE Specification for piling and embedded 2007 Ltd retaining walls. 2 nd edition. Page 8 of 8
BUILDING CONTROL (ACCREDITED CHECKERS AND ACCREDITED CHECKING ORGANISATIONS) (AMENDMENT NO. 2) REGULATIONS 2008
1 S 249/2008 First published in the Government Gazette, Electronic Edition, on 5th May 2008 at 5:00 pm. NO. S 249 BUILDING CONTROL ACT (CHAPTER 29) BUILDING CONTROL (ACCREDITED CHECKERS AND ACCREDITED
Ground-borne Vibrations and Ground Settlements Arising from Pile Driving and Similar Operations
Buildings Department Practice Note for Authorized Persons, Registered Structural Engineers and Registered Geotechnical Engineers APP-137 Ground-borne Vibrations and Ground Settlements Arising from Pile
Concrete Technology and Construction Practical Application
Concrete Technology and Construction Practical Application ICT STAGE 3 Practical Applications (CGLI) Page 1 of 8 CONCRETE TECHNOLOGY AND CONSTRUCTION PRACTICAL APPLICATION Reference should be made throughout
Local Authority Building Control Technical Information Note 3 Driven and In-situ Piled Foundations
Local Authority Building Control Technical Information Note 3 Driven and In-situ Piled Foundations Cambridge City Council - East Cambridgeshire District Council - Fenland District Council, Huntingdonshire
METHOD OF STATEMENT FOR STATIC LOADING TEST
Compression Test, METHOD OF STATEMENT FOR STATIC LOADING TEST Tension Test and Lateral Test According to the American Standards ASTM D1143 07, ASTM D3689 07, ASTM D3966 07 and Euro Codes EC7 Table of Contents
Introduction. Eurocodes. Specification. Cost
Introduction Eurocodes Specification Cost Structural Eurocodes BS EN 1990 (EC0): BS EN 1991 (EC1): Basis of structural design Actions on Structures BS EN 1992 (EC2): BS EN 1993 (EC3): BS EN 1994 (EC4):
Amendment to OPSS 415 (Nov 2008) Construction Specification for Pipeline and Utility Installation by Tunnelling
Engineering and Construction Services Division Standard Specifications for Sewers and Watermains TS 415 April 2013 Amendment to OPSS 415 (Nov 2008) Construction Specification for Pipeline and Utility Installation
Asset Data Dictionary Definition Document Continuous Flight Auger Piles (CFA) Uniclass Classification
Asset Data Dictionary Definition Document Continuous Flight Auger Piles (CFA) Uniclass Classification Contents Introduction... 3 Asset Details... 3 Description... 3 Asset Tagging... 3 Attributes... 4 Data
SECTION IX SLIP LINING PIPELINES
AN SECTION IX SLIP LINING PIPELINES February, 2008 TABLE OF CONTENTS SECTION IX - SLIP LINING PIPELINES 9.01.00 GENERAL...2 9.01.01 SCOPE... 2 9.02.00 MATERIAL...2 9.03.00 CONSTRUCTION...2 9.03.01 REQUIREMENTS...
Requirements on piling plan submission
Requirements on piling plan submission Under BC (Amendment) Act 2007 & Regulations 2008 Er Dr Yet Nai Song Building and Construction Authority 1 Types of piling submissions Barrettes Bored cast-in place
STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.
STRUCTURES 1. General. Critical structures may impact the integrity of a flood control project in several manners such as the excavation for construction of the structure, the type of foundation, backfill
TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE
TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE TECHNICAL SPECIFICATION PART 8000 - PRECAST CONCRETE TABLE OF CONTENTS Item Number Page 8100 PRECAST CONCRETE CONSTRUCTION - GENERAL 8-3 8101 General
EUROCODE 7 & POLISH PRACTICE
EUROCODE 7 & POLISH PRACTICE Implementation of Eurocode 7 in Poland Beata Gajewska Road and Bridge Research Institute In Poland the designing with limit states and partial factors was introduced in 1974.
Design and Construction of Cantilevered Reinforced Concrete Structures
Buildings Department Practice Note for Authorized Persons, Registered Structural Engineers and Registered Geotechnical Engineers APP-68 Design and Construction of Cantilevered Reinforced Concrete Structures
High Strain Dynamic Load Testing of Drilled Shafts
Supplemental Technical Specification for High Strain Dynamic Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 3, 2015 1.0 GENERAL This work shall consist of performing high-strain
Cable usage designation. Number of ducts required Number of spare ducts to be provided < 3 4-10 > 11
EXTERNAL SERVICE DUCTS AND CABLE TROUGHING SECTION 190 Service ducts routes generally DUCTS 1 Except where shown otherwise on the Contract Drawings, the number, type and size of ducts shall be determined
SECTION 1 GENERAL REQUIREMENTS
Page 1 of 6 SECTION 1 GENERAL REQUIREMENTS 1. SCOPE OF WORK: The work to be performed under the provisions of these documents and the contract based thereon includes furnishing all labor, equipment, materials,
ICE Specification for piling and embedded retaining walls 2nd edition
ICE Specification for piling and embedded retaining walls 2nd edition Published by Thomas Telford Publishing, Thomas Telford Ltd, 1 Heron Quay, London E14 4JD. http://www.thomastelford.com Distributors
King Post Wall Information
King Post Wall Information DAWSON-WAM specialise in the installation of piled retaining wall systems including steel sheet piling, concrete piled walls and king post walls. This document is our guide to
New Approach for Tremie Concrete used for Deep Foundations
New Approach for Tremie Concrete used for Deep Foundations Dr. Karsten Beckhaus Technical Manager - Bauer Foundations Australia Martin Larisch Project Manager - Piling Contractors Pty Ltd Dr. Habib Alehossein
SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS
July 14, 2015 1.0 GENERAL BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS This work shall consist of furnishing all materials, equipment, labor, and incidentals necessary for conducting bi-directional
METHOD STATEMENT BORED PILES
METHOD STATEMENT for the construction of BORED PILES (General Use) METHOD STATEMENT FOR THE CONSTRUCTION OF BORED PILES A. Excavation of pile shaft - Before excavation of each bored pile, identify any
Communication Tower Foundation Selection Criteria
Communication Tower Foundation Selection Criteria Introduction This foundation selection criteria document has been prepared by the Engineering Specialties Group as a resource for public and private entities,
Tilt-up & Pre-cast Construction
Tilt-up & Pre-cast Construction Tilt-Up concrete construction is not new; it has been in use since the turn of the century. More recently it has been developed into a preferred method of construction for
ITEM #0702770 OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT
ITEM #0702770 OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT Description: This work shall consist of furnishing all materials, equipment and labor necessary for conducting an Osterberg Cell (O-Cell) Load
BORED PILES (WITHOUT PERMANENT CASING)
SPECIFICATION 812 BORED PILES (WITHOUT PERMANENT CASING) Copyright MAIN ROADS Western Australia MAIN ROADS Western Australia Specification 812 Bored Piles Page 1 of 19 SPECIFICATION 812 BORED PILES REVISION
HIGHWAYS ASSET MANAGEMENT STRUCTURES TEAM GUIDANCE NOTE SMT/GN/03/10 TECHNICAL APPROVAL
HIGHWAYS ASSET MANAGEMENT STRUCTURES TEAM GUIDANCE NOTE SMT/GN/03/10 TECHNICAL APPROVAL Rev Purpose of Issue Originated Reviewed Authorised Date 0 First issue Anil Kumar Ken Duguid Stephen Pottle 21-07-2010
Site Auditing for Building Works. This practice note provides details of the strategy on auditing building works by the Buildings Department (BD).
Buildings Department Practice te for Authorized Persons, Registered Structural Engineers and Registered Geotechnical Engineers ADM-18 Site Auditing for Building Works Introduction This practice note provides
GENERAL SPECIFICATION FOR CIVIL ENGINEERING WORKS SECTION 17 PRESTRESSING
GENERAL SPECIFICATION FOR CIVIL ENGINEERING WORKS SECTION 17 PRESTRESSING 17.1 17.2 2006 Edition SECTION 17 PRESTRESSING GENERAL Materials for grout 17.01 Materials for grout for prestressing systems shall
MODEL SPECIFICATION FOR HELICAL PILE FOUNDATIONS COMPRESSION APPLICATIONS
MODEL SPECIFICATION FOR HELICAL PILE FOUNDATIONS COMPRESSION APPLICATIONS 1. SCOPE A. The work consists of designing, furnishing, installing, loading and testing helical piles used to support compressive
HIGH TENSION LOAD TRANSFER USING BORED PILES FOR SOUL Apartments, Surfers Paradise ABSTRACT
HIGH TENSION LOAD TRANSFER USING BORED PILES FOR SOUL Apartments, Surfers Paradise Martin Larisch Piling Contractors Pty Ltd ABSTRACT This paper describes two different methodologies of transferring high
Helical Piles. A Practical Guide to Design and Installation
Brochure More information from http://www.researchandmarkets.com/reports/2216946/ Helical Piles. A Practical Guide to Design and Installation Description: An unbiased, comprehensive review of helical pile
PTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE
FORM A PTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE The following suggested specifications are written as a guide to assist the specifier in writing his own specifications. Specific circumstances
Eurocode 2: Design of concrete structures
Eurocode 2: Design of concrete structures Owen Brooker, The Concrete Centre Introduction The transition to using the Eurocodes is a daunting prospect for engineers, but this needn t be the case. Industry
SHAFT CONSTRUCTION IN TORONTO USING SLURRY WALLS
SHAFT CONSTRUCTION IN TORONTO USING SLURRY WALLS Vince Luongo Petrifond Foundation Co., Ltd. PROJECT DESCRIPTION The York Durham Sanitary System (YDSS) Interceptor in the Town of Richmond Hill located
SPECIFICATION FOR DYNAMIC CONSOLIDATION / DYNAMIC REPLACEMENT
SPECIFICATION FOR DYNAMIC CONSOLIDATION / DYNAMIC REPLACEMENT 1.0 SOIL IMPROVEMENT 1.1 General Soil Investigation Information are provided in Part B1 annex as a guide to the Contractor for his consideration
SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS
Page 1 of 9 SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS 1. GENERAL REQUIREMENTS 1. Description of Work: This work consists of furnishing all materials, equipment and
SPECIFICATIONS Rev:
SPECIFICATIONS Rev: 060209 Section Helical Steel Piles 1. General 1.1. Description 1.1.1. The work of this section consists of furnishing and installing steel helical piles manufactured by MacLean-Dixie
Design of pile foundations following Eurocode 7-Section 7
Brussels, 18-20 February 2008 Dissemination of information workshop 1 Workshop Eurocodes: background and applications Brussels, 18-20 Februray 2008 Design of pile foundations following Eurocode 7-Section
HOW TO DESIGN CONCRETE STRUCTURES Foundations
HOW TO DESIGN CONCRETE STRUCTURES Foundations Instructions for the Members of BIBM, CEMBUREAU, EFCA and ERMCO: It is the responsibility of the Members (national associations) of BIBM, CEMBUREAU, EFCA and
The Piling Specialists
The Piling Specialists About our company Rock & Alluvium - The Piling Specialists Our Company history Rock & Alluvium has been providing augured piling solutions to the civil engineering and building sectors
MODEL SPECIFICATION FOR HELICAL PILE FOUNDATIONS COMPRESSION APPLICATIONS
MODEL SPECIFICATION FOR HELICAL PILE FOUNDATIONS COMPRESSION APPLICATIONS Page 1 of 9 1. SCOPE A. The work consists of designing, furnishing, installing, loading and testing helical piles and any ancillary
Pro-Lift Steel Pile Foundation Repair
Pro-Lift Steel Pile Foundation Repair Pro-Lift Steel Pile Foundation Repair System Pro-lift steel piles are designed for the stresses of Texas soils. They can have multiple steel walls, depending on the
Helical Pile Application and Design
PDHonline Course C513 (1 PDH) Helical Pile Application and Design Instructor: Andrew P. Adams, PE 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone & Fax: 703-988-0088 www.pdhonline.org
CONTENTS 1. INTRODUCTION...1 2. METHODOLOGY...2 3. RESULTS & FINDINGS...9 APPENDIX
Load Testing of Balustrade Systems Test Report No. S365 CONTENTS 1. INTRODUCTION...1 2. METHODOLOGY...2 2.1 BALUSTRADE LOAD ASSESSMENTS... 2 2.2 TEST SYSTEMS... 3 2.3 TEST PROCEDURE... 8 3. RESULTS & FINDINGS...9
KINGSTONS HOUSE ENVISAGED BASEMENT CONSTRUCTION SEQUENCE
Intended for J Document type Kingstons House Envisaged Basement Construction Sequence Date August, 2015 KINGSTONS HOUSE ENVISAGED BASEMENT CONSTRUCTION SEQUENCE KINGSTONS HOUSE ENVISAGED BASEMENT CONSTRUCTION
Ground-Mount Solar Array Foundations
Ground-Mount Solar Array Foundations Thomas E. Billups, PE Principal, GZA GeoEnvironmental, Inc. Providence, RI Foundation Support Ground Mount Solar Systems Types of Foundations Used: Precast Concrete
DEPARTMENT of INFRASTRUCTURE, ENERGY and RESOURCES, TASMANIA ROADWORKS SPECIFICATION R36 - KERB AND GUTTER June 2004
DEPARTMENT of INFRASTRUCTURE, ENERGY and RESOURCES, TASMANIA ROADWORKS SPECIFICATION R36 - KERB AND GUTTER June 2004 Contents Page R36.1 SCOPE...2 R36.2 MATERIALS...2 R36.2.1 Concrete...2 R36.2.2 Pavement
System. Stability. Security. Integrity. 150 Helical Anchor
Model 150 HELICAL ANCHOR System PN #MBHAT Stability. Security. Integrity. 150 Helical Anchor System About Foundation Supportworks is a network of the most experienced and knowledgeable foundation repair
SECTION 02401 SHEETING, SHORING AND BRACING
SECTION 02401 SHEETING, SHORING AND BRACING This section should be edited to reflect soil conditions specific to the project site and the recommendations of a Geotechnical Engineer licensed in the State
Comprehensive Design Example 2: Foundations for Bulk Storage Facility
Comprehensive Design Example 2: Foundations for Bulk Storage Facility Problem The project consists of building several dry product storage silos near an existing rail siding in an open field presently
Foundation Supervision Guide
2012 Foundation Supervision Guide ACES/IES For Qualified Site Supervisors (QSS) 1 st Edition Sep 2012 Foundation Supervision Guide For Qualified Site Supervisors (QSS) Published by: ASSOCIATION OF CONSULTING
Design and Construction of Auger Cast Piles
Design and Construction of Auger Cast Piles 101 th Annual Road School 2015 3/11/2015 Malek Smadi, Ph.D., P.E. Principal Engineer - GEOTILL - Fishers, IN msmadi@geotill.com - www.geotill.com CONTENTS 1.
Geotechnical Building Works (GBW) Submission Requirements
Building Control (Amendment) Act 2012 and Regulations 2012: Geotechnical Building Works (GBW) Submission Requirements Building Engineering Group Building and Construction Authority May 2015 Content : 1.
QUALIFICATION HANDBOOK
QUALIFICATION HANDBOOK Level 2 and 3 NVQs in Rail Engineering Track Maintenance (Permanent way) (7597) September 2011 Version 1.0 February 2012 Version 1.1 Qualification at a glance Subject area Rail Engineering
SECTION 02100 SITE PREPARATION
SECTION 02100 SITE PREPARATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and General Provisions of Contract, including General Conditions and Supplementary Conditions and Division 1 through Division
GUIDANCE NOTES FOR DEVELOPMENTS OR ENGINEERING WORKS IN THE VICINITY OF SPT SUBWAY INFRASTRUCTURE JULY 2005
GUIDANCE NOTES FOR DEVELOPMENTS OR ENGINEERING WORKS IN THE VICINITY OF SPT SUBWAY INFRASTRUCTURE JULY 2005 CONTENTS 1.0 INTRODUCTION 2.0 OVERVIEW OF SPT APPROACH TO DEVEOPMENTS/WORKS IN THE VICINITY OF
SECTION HELICAL SCREW FOUNDATIONS
SECTION 31 40 10 PART 1 - GENERAL 1.01 SUMMARY A. Provide helical screw foundation system, complete. Work consist of providing required engineering, supervision, labor, tools, materials, equipment, means
Federation of Piling Specialists Testing Datasheet No 1
Testing Datasheet No 1 Guidance for the Principal Contractor It is an essential requirement that the specialist testing contractor is allowed to work in a safe way and fully in accordance with their own
CROSSRAIL INFORMATION PAPER D23 SPRAYED CONCRETE LINING
CROSSRAIL INFORMATION PAPER SPRAYED CONCRETE LINING This paper sets out the proposals for the use of Sprayed Concrete Lining (SCL). It will be of particular relevance to those in the vicinity of the proposed
Section 3 Specification 3.2 Aggregate Production and Stockpiling TABLE OF CONTENTS
TABLE OF CONTENTS 3.2 AGGREGATE PRODUCTION AND STOCKPILING... 1 3.2.1 GENERAL... 1 3.2.2 MATERIALS... 1 3.2.3 PRODUCTION... 1 3.2.3.1 General... 1 3.2.3.2 Quality Control... 3 3.2.3.2.1 General... 3 3.2.3.2.2
TECHNICAL SPECIFICATIONS CEMENT-BENTONITE SLURRY TRENCH CUTOFF WALL
TECHNICAL SPECIFICATIONS CEMENT-BENTONITE SLURRY TRENCH CUTOFF WALL SCOPE This section of the specifications includes requirements for the Slurry Trench Cutoff Wall and related work as indicated on the
New construction Repairing failed or old foundations Retrofit foundations Permanent battered piers Machinery/equipment foundations
from New construction foundations don t have to be a headache. The CHANCE Helical Pier Foundation System gives you the performance of concrete without the drawbacks and liabilities of driven piles and
PILING IN IRELAND CURRENT PRACTICES
PILING IN IRELAND CURRENT PRACTICES INTRODUCTION Murphy International Ltd. have been operating in Ireland since 1968. We began constructing piles in 1973 using tri-pod bored piles. Since then we have evolved
CONCRETE AND JOINTS IN CONCRETE
GENERAL SPECIFICATION FOR CIVIL ENGINEERING WORKS SECTION 16 CONCRETE AND JOINTS IN CONCRETE 16.1 16.2 2006 Edition SECTION 16 CONCRETE AND JOINTS IN CONCRETE PART 1: CONCRETE WORKS GENERAL Sprayed concrete
MAIN DISTRIBUTOR. There are also approved specialist distributors throughout the UK. APPROVALS
Section Clay Heave Protection is an EPS compressible-fill material which can be used to prevent potential problems in foundations due to moisture movement in soils which contain a large proportion of mineral
SECTION TRENCHING AND BACKFILLING. 1. Section , Temporary Environmental Controls. 2. Section , Excavation and Fill.
SECTION 31 23 33 TRENCHING AND BACKFILLING PART 1 GENERAL 1.01 SECTION INCLUDES A. This WORK shall consist of all labor, equipment, and materials necessary for excavation, trenching, and backfilling for
1 Mobilisation and demobilisation 1 Deep boring sum 2 Cone penetration tests sum 3 Miscellenous tests sum
Malaysian Civil Engineering Standard Method of Measurement (MyCESMM) CLASS D: SITE INVESTIGATION WORK Measurement covered under other classes: Excavation not carried out for the purpose of soil investigation
Chapter 2 Basis of design and materials
Chapter 2 Basis of design and materials 2.1 Structural action It is necessary to start a design by deciding on the type and layout of structure to be used. Tentative sizes must be allocated to each structural
Pipeline bridge crossing for mining trucks A geotechnical engineering design.
Pipeline bridge crossing for mining trucks A geotechnical engineering design. Bernard Shen Pells Sullivan Meynink, Sydney, Australia ABSTRACT The Donaldson open pit coal mine is located in Blackhill, New
SAFETY FENCES, SAFETY BARRIERS AND PEDESTRIAN GUARDRAILS
SERIES NG 400 SAFETY FENCES, SAFETY BARRIERS AND PEDESTRIAN GUARDRAILS Contents Clause Title Page NG 401 Performance Criteria for Safety Fences and Safety Barriers 2 NG 402 Components for Safety Fences
Greater Dublin Strategic Drainage Study Regional Drainage Policies - Volume 2 New Development
7 SPECIFICATIONS There is currently no Irish specification for construction of drainage works, or water supply works. There are several publications that give guidance on drainage works, such as the Building
PILE TESTING SPECIFICATION
PILE TESTING SPECIFICATION 1.0 GENERAL This specification deals with the testing of a pile by the application of an axial load or force. It covers vertical and raking piles tested in compression (i.e.
Lymon C. Reese & Associates LCR&A Consulting Services Tests of Piles Under Axial Load
Lymon C. Reese & Associates LCR&A Consulting Services Tests of Piles Under Axial Load Nature of Services The company has a long history of performance of tests of piles and pile groups under a variety
CAST IN-SITU CONCRETE WORKS TECHNICAL SPECIFICATION
CAST IN-SITU CONCRETE WORKS TECHNICAL SPECIFICATION TABLE OF CONTENTS CAST IN-SITU CONCRETE WORKS - TECHNICAL SPECIFICATION 1. GENERAL CONDITIONS 1.1 Extent of Work 1.2 Working Days and Hours 1.3 Responsibility
Method Statement for Static Load Testing (Compression) for Micropiles
Method Statement for Static Load Testing (Compression) for Micropiles 1. INTRODUCTION This vertical compression pile maintained load test is usually carried out to ensure the structural and geotechnical
Release: 1. CPCCBC4022A Supervise tilt-up work
Release: 1 CPCCBC4022A Supervise tilt-up work CPCCBC4022A Supervise tilt-up work Modification History Not Applicable Unit Descriptor Unit descriptor This unit of competency specifies the outcomes required
Professional Engineers Providing Structural Engineering Services In Buildings
GUIDELINE Professional Engineers Providing Structural Engineering Services In Buildings 1995 Published by Association of Professional Engineers of Ontario Revised 12/11/98 CONTENTS INTRODUCTION...3 PART
-SQA-SCOTTISH QUALIFICATIONS AUTHORITY HIGHER NATIONAL UNIT SPECIFICATION GENERAL INFORMATION
-SQA-SCOTTISH QUALIFICATIONS AUTHORITY HIGHER NATIONAL UNIT SPECIFICATION GENERAL INFORMATION -Unit number- 4420798 -Unit title- CONSTRUCTION TECHNOLOGY 2: SUBSTRUCTURE AND REMEDIAL WORKS -Superclass category-
HOW TO DESIGN CONCRETE STRUCTURES Beams
HOW TO DESIGN CONCRETE STRUCTURES Beams Instructions for the Members of BIBM, CEMBUREAU, EFCA and ERMCO: It is the responsibility of the Members (national associations) of BIBM, CEMBUREAU, EFCA and ERMCO
Integrated Manhole Ladder System
Application: This innovative product has been designed to provide safe access and egress to precast concrete manholes and inspection chambers. It can also be used within any other underground concrete
Statement of Special Inspections, 2013 CBC
BUILDING AND SAFETY DEPARTMENT Statement of Special Inspections, 2013 CBC PROJECT ADDRESS PERMIT NUMBER # Description of Work: This Statement of Special Inspections is submitted in fulfillment of the requirements
TECHNICAL NOTE: SI 01 SPECIFIC REQUIREMENTS FOR THE ACCREDITATION OF INSPECTION BODIES FOR SITE INVESTIGATION
ACCREDITATION SCHEME FOR INSPECTION BODIES TECHNICAL NOTE: SI 01 SPECIFIC REQUIREMENTS FOR THE ACCREDITATION OF INSPECTION BODIES FOR SITE INVESTIGATION Technical Note SI 01: 3 February 2016 The SAC Accreditation
ENGINEERED FOUNDATIONS. Department of Public Works Jeff Hill, PE
ENGINEERED FOUNDATIONS Department of Public Works Jeff Hill, PE What is an engineered foundation. A Foundation Design Developed by a Trained Professional (Engineer) Types of Foundations (All of which can
Design of cross-girders and slabs in ladder deck bridges
130 Chris R Hendy Head of Bridge Design and Technology Highways & Transportation Atkins Jessica Sandberg Senior Engineer Highways & Transportation Atkins David Iles Steel Construction Institute Design
SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION
SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION 1. SCOPE Pipe subsoil drains shall be constructed in accordance with this specification and in conformity with the lines, grades and cross-sections shown
Buildings Department Practice Note for Registered Contractors 38. Registration of General Building Contractors and Specialist Contractors
Buildings Department Practice Note for Registered Contractors 38 Registration of General Building Contractors and Specialist Contractors This practice note covers solely the registration of general building
The International Workshop on Micropiles, 2007
MICROPILE FOUNDATION REPAIR AND UNDERPINNING, ARTS AND SCIENCE MUSEUM, UNIVERSITY OF PUERTO RICO, MAYAGUEZ Presented at: International Society of Micropiles (ISM) The International Workshop on Micropiles,
CODE OF PRACTICE FOR SITE SUPERVISION 2009
CODE OF PRACTICE FOR SITE SUPERVISION 2009 i FOREWORD The Supervision Plan System has been implemented since December 1997 with the issuance of the Technical Memorandum for Supervision Plans (the Technical
Requirements for an Excavation and Lateral Support Plan Building (Administration) Regulation 8(1)(bc)
Buildings Department Practice Note for Authorized Persons, Registered Structural Engineers and Registered Geotechnical Engineers APP-57 Requirements for an Excavation and Lateral Support Plan Building
TEST BORING, GROUND TEMPERATURE AND FORMATION THERMAL CONDUCTIVITY TESTING
TEST BORING, GROUND TEMPERATURE AND FORMATION THERMAL CONDUCTIVITY TESTING PART 1 GENERAL QUALITY ASSURANCE/ LOCATION OF WORK 1.1 SCOPE A. Local and State laws and ordinances as they pertain to geothermal
Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation
Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation Jeff R. Hill, P.E. Hayward Baker Inc. 111 W. Port Plaza Drive Suite 600 St. Louis, MO 63146 314-542-3040 JRHill@HaywardBaker.com
Dubai Municipality Standard DMS 1: Part 5: 2004
Specification for precast concrete blocks Part 5: Normal-weight concrete-polystyrene sandwich masonry blocks Issue Date Revision Revision Description Prepared by Approved by Authorized by 19/12/2004 Issue
RAILTRACK PLC MODEL CLAUSES FOR SPECIFYING CIVIL ENGINEERING WORKS. SECTION 230 General Requirements for Level Crossings. RT/CE/C/008/230N Page 1 of 8
RAILTRACK PLC MODEL CLAUSES FOR SPECIFYING CIVIL ENGINEERING WORKS General Requirements for Level Crossings ISSUE NO. 1 REVISION A RT/CE/C/008/230N Page 1 of 8 Date: 31 January 1997 Compiled by: Delro
A Case Study for Waterproofing Below Grade Walls Shored with Continuous Soil Mix Technology Using a Bentonite Waterproofing System
A Case Study for Waterproofing Below Grade Walls Shored with Continuous Soil Mix Technology Using a Bentonite Waterproofing System Amanda Prot Rodney Lock Stéphane Hoffman Outline Project Requirements
CW EXCAVATION BEDDING AND BACKFILL TABLE OF CONTENTS
February 2005 DIVISION 3 - CW 2030 R7 CW 2030 - EXCAVATION BEDDING AND BACKFILL TABLE OF CONTENTS 1. DESCRIPTION...1 1.1 General...1 1.2 Definitions...1 1.3 Referenced Standard Construction Specifications...1
Federation of Piling Specialists
Federation of Piling Specialists COMPANY NAME CONTRACT NAME TENDER REF SCHEDULE OF ATTENDANCES AND FACILITIES TO BE PROVIDED BY THE CLIENT TO A STEEL SHEET PILING SPECIALIST For the purposes of this document
Residential Statement of Special Inspections**
Residential Statement of Special Inspections** CNI-033R Name of Owner Address Permit Number Job Description This Statement of Special Inspections is submitted to outline the requirements of 2013 CBC Chapter
For the Design, Installation, Commissioning & Maintenance of Fixed Gaseous Fire Suppression Systems
BAFE Scheme: SP203-3 Version 1: July 2008 Amendment No: 1 Fire Protection Industry Scheme, Reference SP203 Part 3 For the Design, Installation, Commissioning & Maintenance of Fixed Gaseous Fire Suppression
DS/EN 13782 DK NA:2014
National Annex to Temporary structures Tents - Safety Foreword This National Annex (NA) is the first Danish NA to EN 13782. This NA enters into force on 2014-10-15 and shall be applied as from 2015-02-01.