1 Proposed Zone 4 Solution Follow Up to Questions from the February 22 Competitive Retail Solution Task Team Meeting Competitive Retail Solution Task Team March 7, 2016

2 Response to 2.22 CRSTT Meeting Questions Bilateral Contracts o Under Exelon s proposal there is no change to the treatment of bilateral contracts Bilateral contracts can be offered into the Zone 4 forward auction as a price taker (offer at zero) and will be cleared just like any other zero price offer. They receive the forward auction price and are charged the forward auction price resulting in a net auction financial obligation of zero o Proposed 20% constraint on external resources: Bilateral contracts associated with external resources with a zero priced offer will automatically clear if total imports bidding as price-takers into Zone 4 are below the 20% constraint. If total imports bidding as price-takers are above the 20% constraint the price-taker bids will be prorated equal to the constraint LSEs will still own the MWs associated with the bilateral contract that did not clear due to the 20% constraint and can offer this into the PRA or sell bilaterally to a buyer outside of Zone 4. The risk of not being able to be fully hedged with bilateral contracts with resources external to Zone 4 exits under today s PRA rules due to the Capacity Import Limit and Local Clearing Requirement o Bilateral transaction prices are shaped by physical market outcomes therefore it is imperative to reform the Zone 4 market design to ensure resource adequacy through all types of transactions 2

3 Response to 2.22 CRSTT Meeting Questions Capacity Performance (CP) o A CP product is assurance that generators will be available and able to support the system during high load, high stress periods through adequate economic incentives o A capacity product without CP still allows a generator to be paid even if they do not perform/aren t available when needed o Under CP if a generator does not perform it will on average not get paid anything because its hourly performance charges will offset its capacity revenues o Energy prices in MISO during scarcity hours do not sufficiently reflect the full value of being available due to, price caps and reliability actions during scarcity conditions. Request for Unit Specific Costs o The purposes of the MISO CRSTT is not to determine the appropriate rate of return as is done in vertically integrated states. It is to determine a competitive market solution that produces a competitive price signal for non-rate based resources located in a restructured state in order to sustain and attract new needed investment to meet resource adequacy needs at the least cost to consumers 3

4 Response to 2.22 CRSTT Meeting Questions Long Term Commitment Guarantee from Resources in Zone 4 o A sufficiently designed competitive market will ensure efficient entry, retention, and exit of resources based on sound competitive market price signals. If the market is designed correctly resources will exit the market when they are no longer the least cost most reliable resource needed to meet demand, and will attract new investment when and where needed. Application of Forward Auction Transmission Impacts in Prompt Year PRA o MISO should treat forward auction transmission impacts similar to other issues that impact the transmission system today that must be accounted for when determining transmission capability for prompt year PRA purposes such as generation additions and retirements, transmission upgrades, and imports and exports out of MISO Minimum Offer Price Rule o Exelon is not proposing incorporation of a MOPR provision into the Zone 4 solution at this time 4

5 Response to 2.22 CRSTT Meeting Questions 5 Can a PJM RPM-CP design be filed by May 5 and implemented starting with the 2017/2018 Planning Year o A PJM RPM-CP style auction is the best and quickest path to success given it has been proven to be highly effective in maintaining resource adequacy by retaining and attracting new resources at reasonable costs. It has already been found just and reasonable by FERC for application in northern IL and therefore provides helpful precedent, minimizing regulatory timing hurdles. It will be critical that the current timing is adhered to so that such a construct can be implemented in time for the 17/18 planning year. In addition, anything short of this design likely will not result in adequate competitive market outcomes requiring timely and costly ongoing revisions. Will the enactment of a low carbon portfolio standard in Illinois eliminate or reduce the need for a MISO capacity market redesign for Zone 4 o No. Both are needed to address related but separate problems, the resolution of which will ensure existing, safe, emissions-free sources of base load generation remain operational. The proposed MISO capacity market reforms in Zone 4 are needed to fix the current market structure which fails to address resource adequacy in the competitive marketplace. The current Zone 4 capacity market fails to create a market signal that Zone 4 suppliers can utilize to drive investment. This flawed structure threatens reliability and ultimately raises costs for Illinois residents and businesses. Separately, Illinois legislation is necessary to recognize the value of nuclear facilities as a source of zero-emission electric generation. A low carbon portfolio standard will allow the State to transition to meet its carbon goals in a cost effective manner.

6 Proposed Zone 4 Resource Adequacy Solution Competitive Retail Solution Task Team February 22, 2016

7 Summary of Exelon s Proposed Southern IL Resource Adequacy Solution The overarching principal of Exelon s Southern IL (Zone 4) solution is to adapt PJM s Reliability Pricing Model (RPM)) to Zone 4, while integrating with the rest of MISO as seamlessly as possible RPM has proven to be highly successful at maintaining reliability at a reasonable cost to consumers using competition to determine market revenues Zone 4 resources rely on market revenues, not a state rate recovery mechanism for capacity costs, and proper price formation is critical to ensure Resource Adequacy (RA) IL will benefit from one RA design Northern IL is in PJM and Southern IL borders PJM, market structure parity is important in ensuring that additional MISO resources are not lost to PJM over time FERC has approved both PJM & ISONE s capacity performance proposals Given this, the key elements of Exelon s proposed solution for Zone 4 are: Three-year forward auction for Zone 4 only, for a one year commitment period Mandatory participation for all Zone 4 loads and internal supply; optional for all other supply New net Cost of New Entry (CONE) to be developed for Zone 4 auction and set at similar level to Western PJM Downward-sloping demand curve for Zone 4 forward auction Constraint on external resources ability to serve Zone 4 in forward auction Strong performance incentives for resources cleared in Zone 4 forward auction Bid safe harbor level of 85% of net CONE in forward auction for existing internal Zone 4 generation resources Existing MISO Planning Reserve Auction (PRA) to serve as reconfiguration auction for Zone 4 7

8 Forward Auction for Zone 4 Capacity sufficient to supply Zone 4 s Planning Reserve Margin Requirement ( PRMR ) should be procured three years forward for a one year commitment period For example, the auction for the 2020/21 commitment period should take place in Spring 2017 Transitional forward auctions for the 2017/18, 2018/19, and 2019/20 commitment periods for Zone 4 should be run in quick succession in early 2017 MISO will procure Forward Zonal Resource Credits ( FZRCs ) on behalf of Zone 4 loads and administer the FZRCs in the reconfiguration auction; all charges and payments for prompt planning year to occur after reconfiguration auction consistent with existing PRA process A forward auction is necessary because: Capacity with long-lead investment time horizons, such as new builds, environmental upgrades at coal plants, and nuclear fuel/capex requires a visible forward price signal to make efficient and rational investment and retirement decisions, without RMR contracts, in a competitive market environment Traditional cost of service regulation provides the certainty needed for these decisions in other parts of MISO, but does not exist in Zone 4. 8

9 Mandatory participation for Zone 4 loads and internal supply Participation in the Zone 4 forward auction mandatory for all Zone 4 loads and existing internal Zone 4 generation supply, but optional for all other supply. Load / Supply Category Current Non-FRAP Zone 4 Demand Current FRAP Zone 4 Demand Non-Zone 4 Demand Existing Internal Zone 4 Generation Supply Resources External MISO Generation Supply Resources External Non-MISO Generation Supply Resources Demand-Response Supply Resources (Internal or External) How to Participate in Zone 4 Forward Auction? Mandatory. Loads are incorporated into demand curve and charged clearing price Mandatory. FRAP option removed. Participation not allowed; supply procured according to existing framework (PRA, self-supply/bilaterals, FRAP) Mandatory. Must submit a offer in forward auction unless exempted by IMM. Subject to market power mitigation Optional; Subject to Zone 4 performance rules in forward auction and constraint on amount of non-internal supply that can supply Zone 4 loads Optional; Subject to Zone 4 performance rules in forward auction and constraint on amount of non-internal supply that can supply Zone 4 loads Optional; Subject to existing qualification rules 9

10 Zone 4 Net CONE Must be Set at Level Similar to Northern IL The Net Cost of New Entry ( Net CONE ) is a critical input to the Zone 4 Forward auction design Net CONE equal to Gross CONE minus Energy and Ancillary Services revenue Critical input for calibrating demand curve, sizing performance incentives, and establishing appropriate maximum bids for resources subject to mitigation MISO does not currently develop or have an accurate measure of Net CONE for Zone 4 MISO estimates a Gross CONE (i.e. with no energy offset) using data from the Energy Information Administration that has consistently lagged and underestimated the actual Cost of New Entry MISO Gross CONE is not used in developing price formation so not historically scrutinized MISO Gross CONE estimate for Zone 4 is about $259/MWD for 2016/17. This estimate is much too low, particularly given that it does not include an energy offset The MISO IMM has estimated that the Net CONE for a natural gas combined cycle in MISO Central is about $300/MWD (see e.g. MISO 2014 State of Market Analytic Appendix Figure A13) Similarly, PJM s highly robust methodology for determining Net CONE currently estimates a Net CONE for the ComEd region of Northern Illinois of $307/MWD MISO should adopt the estimate for Net CONE used in Northern Illinois for the initial set of Zone 4 forward auctions to take place in 2017, and should begin a more robust process to develop a Zone 4 specific Net CONE for use in later auctions (starting in 2021/22) Initial auctions should use a Net CONE of $307/MWD, based on PJM s estimate of Net CONE for the ComEd region for 2019/20. 10

11 Capacity Price ($/MWD) Downward-Sloping Demand Curve for Forward Auction The Zone 4 design must include a downward-sloping demand curve The downward-sloping demand curve recognizes that capacity procured in excess of the PRMR provides value and reduces year-to-year volatility in clearing prices caused by vertical curve At a minimum, the existing PJM demand curve should be considered. PJM has developed a well-vetted shape for the demand curve used in RPM for northern IL Illustrative Zone 4 Demand Curve Using PJM Shape (PRMR of 10,420 MW, Net CONE of $307/MWD) Price Cap of 1.5 x Net CONE built into demand curve Point A: P=1.5 x Net CONE, Q = x PRMR PRMR for Zone 4 Point B: P=0.75 x Net CONE, Q = x PRMR Point C: P=0, Q = x PRMR MW of UCAP 11

12 Capacity Price ($/MWD) Constraint on External Supply set to 20% An external supply constraint is necessary because (1) it strikes a balance by not precluding external supply thereby capturing benefits of the MISO pool (2) recognizes the other parts of MISO are building and recovering costs to serve regulated native load in their state and their long-term commitment is not to Zone 4, and (3) transmission limits into Zone 4 have not been stable over time. This limit should be implemented as a constraint in the Zone 4 forward auction that specifies cleared external resources (whether non-miso or MISO outside zone 4) may not comprise more than 20% of the PRMR. In 2015/16 the import limit into Zone 4 was about 15% of PRMR External Supply Bids 0 External Supply Constraint in Zone 4 Forward Auction External Clearing Price Demand Curve External Supply 20% of PRMR Zone 4 Internal Clearing Price MW of UCAP Zone 4 Internal Supply Bids PRMR Implemented as a vertical demand curve for external supply, with external supply receiving a separate, lower price if the constraint is binding There is no constraint in the prompt year reconfiguration auction 12

13 Resources Cleared in Zone 4 Forward Auction to be Subject to Strong Performance Incentives Supply resources that clear the Zone 4 forward auction should be subject to performance incentives modeled on PJM s Capacity Performance ( CP ) product Ensures long-term reliability of supply resources and incentivizes reliability-enhancing investments Economically enforces requirement that new entrants and external resources make a physical commitment to Zone 4 Core features of performance incentives should include: All supply resources of all types cleared in Zone 4 forward auction subject to performance incentives during hours of scarcity or near-scarcity Over or under-performance relative to capacity commitment charged at an hourly rate based on Net CONE spread over the expected hours of scarcity or near-scarcity such that a non-performing resource can expect to forfeit 100% of its capacity revenues Uncommitted resources internal to Zone 4 able to earn bonus performance revenues if they remain in market and produce during assessment hours No excuses for non-performance. More detail on implementation of performance incentives is provided in the appendix. 13

14 Market Power Mitigation for Zone 4 Forward Auction Supply Category Existing Zone 4 Generation Resources Must-Offer in Forward Auction? Yes (IMM may exempt if retiring) Supplier-Side Mitigation Safe harbor bid level of up to 0.85 times Net CONE (about $260/MWD with Net CONE of $307/MWD) allows the generator to develop a competitive offer; May bid above this level if Going-Forward Costs (less energy revenues) documented with IMM exceed 0.85 x Net CONE New Build Generation Resources (Internal or External) Existing External Generation Resources Demand Response Supply Resources No No No None (although demand curve caps price at 1.5 x Net CONE) None (although demand curve caps price at 1.5 x Net CONE) None (although demand curve caps price at 1.5 x Net CONE) 14

15 Safe Harbor Bid Level for Existing Zone 4 Resources is Supported by Performance Incentive Opportunity Cost The proposed bid safe harbor for Zone 4 existing resources of 0.85 times Net CONE is based on the expected net revenues associated with forgoing a capacity commitment and instead receiving performance incentive revenues Resources with no capacity commitment may earn performance incentive revenues by remaining in market and producing during periods of scarcity or near-scarcity The safe harbor represents the lost of opportunity cost of forgoing this opportunity when the resource accepts a capacity commitment A mathematical derivation of the opportunity cost basis for the safe harbor is provided in the appendix In addition to its opportunity cost basis, the bid safe harbor level has additional benefits Allows resources the ability to develop a competitive offer that includes hard-to-quantify but significant cost elements such as market risk, operational risk, and fuel security Reduces administrative burden on IMM in reviewing requested offer levels. 15

16 MISO-wide Planning Reserve Auction ( PRA ) to serve as reconfiguration auction for Zone 4 forward auction 3 years, ~ 3 months prior to delivery year 3 years, ~ 1 month prior to delivery year 3 year period ~ 2 months prior to delivery year ~ 1 months prior to delivery year Delivery year March 2017 May 2017 May 17 May 20 March 2020 April 2020 MISO determines planning parameters for Zone 4 Forward Auction Zone 4 Forward Auction Runs MISO administers Zone 4 Forward Capacity Credits MISO determines planning parameters for MISO-Wide PRA PRA Runs MISO-Wide using existing rules, Including Zone 4 June 20 May 21 Delivery Year; All costs allocated to LSEs Based on load forecast and LOLE study looking out 3 years Procures GW of Forward ZRCs on behalf of Zone 4 load Mix of Zone 4 internal resources and non-zone 4 resources (80 / 20 if external resource constraint binds) MISO holds Forward ZRCs as passthrough entity on behalf of Zone 4 loads If cleared resources from forward auction drop out, they must buy out of commitment by paying MISO the highest of (1) 0.85 times Zone 4 Net CONE, (2) Zone 4 forward clearing price, (3) Zone 4 clearing price in PRA Determined according to existing methodology using most current LOLE study for delivery year Parameters include Zone 4 as normal PRA runs using current rules MISO enters FZRCs procured through Zone 4 forward auction into PRA as price-taking resources Uncleared Zone 4 resources may participate in PRA as normal PRA effectively serves as reconfiguration auction for Zone 4 Resources cleared in Zone 4 forward auction are paid price from forward auction Resources that clear in PRA only are paid PRA clearing price Zone 4 LSEs are charged cost of Zone 4 forward procurement, plus cost of supplying Zone 4 in PRA, less credit for Zone 4 forward ZRCs cleared in PRA Examples in appendix shows how resources and loads are paid and charged under this framework 16

17 APPENDIX 17

18 Specific Features of Performance Incentives, and Mathematical Basis for Safe Harbor Bid Level Specific features of performance incentives, as applied to Zone 4 All forward-cleared supply resources of all types subject to performance incentives during hours when performance assessment in effect, regardless of whether resource is in Zone 4 or not Resource performance assessed during periods of scarcity or near-scarcity, with assessment screen chosen to produce 30 performance assessment hours per year on average Performance assessment in effect during any hours in which the RTO or any region containing Zone 4 is subject to a Maximum Emergency Generation Alert, Warning, or Action Performance assessed by comparing actual hourly output of resource to its UCAP commitment multiplied by the balancing ratio in that hour (balancing ratio = hourly load / total cleared UCAP forward-committed to Zone 4). This comparison can result in either under- or over-performance. Over/under performance credited or charged at an hourly rate equal to Zone 4 Net CONE spread over 30 hours/year. If Net CONE = $307/MWD, the hourly rate is $3,735/MWh Credits to over-performing resources funded from charges paid by under-performing resources Uncommitted Zone 4 internal resources may receive over-performance credits Performance penalty annual stop-loss of 150% of Net CONE Bid safe harbor based of 0.85 times Net CONE based on opportunity cost of not accepting capacity commitment The bid safe harbor level is the difference between expected performance incentive revenues with and without a capacity commitment Expected Performance Incentive Revenues with a capacity commitment: (Net CONE / H) * H * (A B); where H = the expected annual number of performance assessment hours (30) A = the expected performance (capacity factor) of the resource during performance assessment hours B = the expected balancing ratio during performance assessment hours, where balancing ratio equals the hourly load divided by total committed UCAP. Historical balancing ratio in PJM has been 85%. This represents the resources capacity commitment Expected Performance Incentive Revenues without a capacity commitment: (Net CONE / H) * H * A The B term is missing because the resource lacks a capacity commitment Difference between the two = Net CONE x B = Net CONE x

19 Example of Resource Payments and Load Costs Under Proposed Zone 4 Solution Example 1: Zone 4 forward auction under-procures Assume: o 10 GW cleared in Zone 4 forward auction (8 GW internal, 2 GW elsewhere in MISO) o Zone 4 forward clearing prices of $200/MWD for internal resources, $100/MWD for external o 2 GW of internal Zone 4 resources do not clear forward auction and remain uncommitted o When PRA runs prior to delivery year, MISO North as a whole clears 105 GW of resources at a price of $250/MWD; all 10 GW of forward-procured resources clear because they are entered as price-takers o The Zone 4 PRMR in the PRA is 11 GW o The 2 GW of uncleared resources from Zone 4 also clear in the PRA How are resources paid and loads charged? (ignoring bilateral transactions and FRAPs) o Zone 4 forward-cleared resources are paid their original forward clearing price: 8 GW x $200/MWD + 2 GW x $100/MWD = $1.8 M / day o Resources that clear in PRA only are paid the PRA clearing price: 95 GW x $250/MWD = $23.75 M /day o Zone 4 loads are charged the cost of forward-procured resources plus the cost of serving Zone 4 load in the PRA less the value in the PRA of the forward procured resources 8 GW x $200/MWD + 2 GW x $100/MWD (cost of forward auction) + 11 GW x $250/MWD (cost of serving Zone 4 load in PRA) 10 GW x $250/MWD (value in PRA of forward-procured resources) = $1.8 M + $2.75 M - $2.5 M = $2.05 M / day (about $186/MWD) o o Non-Zone 4 loads are charged the cost of serving the load in the PRA: 94 GW x $250/MWD = $23.5 M / day ($250/MWD) Total revenues = = $25.55 M/day; Total costs = = $25.55 M/day 19

20 Example of Resource Payments and Load Costs Under Proposed Zone 4 Solution (cont.) Example 2: Zone 4 forward auction over-procures Assume: o 10 GW cleared in Zone 4 forward auction (8 GW internal, 2 GW elsewhere in MISO) o Zone 4 forward clearing prices of $200/MWD for internal resources, $100/MWD for external o 2 GW of internal Zone 4 resources do not clear forward auction and remain uncommitted o When PRA runs prior to delivery year, MISO North as a whole clears 100 GW of resources at a price of $50/MWD; all 10 GW of forward-procured resources clear because they are entered as price-takers o The Zone 4 PRMR in the PRA is 9 GW o The 2 GW of uncleared resources from Zone 4 do not clear in the PRA How are resources paid and loads charged? (ignoring bilateral transactions and FRAPs) o Zone 4 forward-cleared resources are paid their original forward clearing price: 8 GW x $200/MWD + 2 GW x $100/MWD = $1.8 M / day o Resources that clear in PRA only are paid the PRA clearing price: 90 GW x $50/MWD = $4.5 M /day o Zone 4 loads are charged the cost of forward procured resources plus the cost of serving Zone 4 load in the PRA less the value in the PRA of the forward procured resources 8 GW x $200/MWD + 2 GW x $100/MWD (cost of forward auction) + 9 GW x $50/MWD (cost of serving Zone 4 load in PRA) 10 GW x $50/MWD (value in PRA of forward-procured resources) = $1.8 M + $0.45 M - $0.5 M = $1.75 M / day (about $194/MWD) o Non-Zone 4 loads are charged the cost of serving the load in the PRA: 91 GW x $50/MWD = $4.55 M / day ($50/MWD) o Total revenues = = $6.30 M/day; Total costs = = $6.30 M/day 20

Workshop B. 11:15 a.m. to 12:30 p.m.

Workshop B. 11:15 a.m. to 12:30 p.m. Workshop B Advanced Energy Management Tools: Benefitting from the Competitive Electricity Marketplace Beyond the Fixed Rate & Key Issues to Understand when Comparing Electricity Quotes 11:15 a.m. to 12:30

More information

2016/2017 RPM Base Residual Auction Results

2016/2017 RPM Base Residual Auction Results Executive Summary The 2016/2017 Reliability Pricing Model (RPM) Base Residual Auction (BRA) cleared 169,159.7 MW of unforced capacity in the RTO. Accounting for load and resource commitments under the

More information

Concepts and Experiences with Capacity Mechanisms

Concepts and Experiences with Capacity Mechanisms Concepts and Experiences with Capacity Mechanisms Manuel Baritaud, International Energy Agency Conference Capacity Mechanisms: Experiences in Various European Countries Bundesministerium fur Wirtschaft

More information

PJM Overview of Markets. Georgian Delegation PUCO Office April 11, 2013

PJM Overview of Markets. Georgian Delegation PUCO Office April 11, 2013 PJM Overview of Markets Georgian Delegation PUCO Office April 11, 2013 1 Agenda Introduction Energy Markets Locational Marginal Pricing - LMP Two Settlement - Day Ahead / Real time Ancillary Services Capacity

More information

The UK Electricity Market Reform and the Capacity Market

The UK Electricity Market Reform and the Capacity Market The UK Electricity Market Reform and the Capacity Market Neil Bush, Head Energy Economist University Paris-Dauphine Tuesday 16 th April, 2013 Overview 1 Rationale for Electricity Market Reform 2 Why have

More information

2019/2020 RPM Base Residual Auction Results

2019/2020 RPM Base Residual Auction Results Executive Summary The 2019/2020 Reliability Pricing Model (RPM) Base Residual Auction (BRA) cleared 167,305.9 MW of unforced capacity in the RTO. Accounting for load and resource commitments under the

More information

CALIFORNIA ISO. Pre-dispatch and Scheduling of RMR Energy in the Day Ahead Market

CALIFORNIA ISO. Pre-dispatch and Scheduling of RMR Energy in the Day Ahead Market CALIFORNIA ISO Pre-dispatch and Scheduling of RMR Energy in the Day Ahead Market Prepared by the Department of Market Analysis California Independent System Operator September 1999 Table of Contents Executive

More information

2015/2016 Planning Resource Auction Results. April 14, 2015

2015/2016 Planning Resource Auction Results. April 14, 2015 2015/2016 Planning Resource Auction Results April 14, 2015 Executive Summary MISO successfully completed its third annual Planning Resource Auction The MISO region has adequate resources to meet its Planning

More information

Impact of Coal Plant Retirements on the Capacity and Energy Market in PJM

Impact of Coal Plant Retirements on the Capacity and Energy Market in PJM Impact of Coal Plant Retirements on the Capacity and Energy Market in PJM by Neil Copeland Debashis Bose Black & Veatch INTRODUCTION It has recently been observed that U.S. electricity providers are announcing

More information

Reliability Options in Ireland and Northern Ireland Obligations and Penalties

Reliability Options in Ireland and Northern Ireland Obligations and Penalties Reliability Options in Ireland and Northern Ireland Obligations and Penalties European Commission Technical Working Group on Energy: Subgroup on generation adequacy 14 April, Brussels Background Single

More information

THE FERC STANDARD MARKET DESIGN GIGANOPR: RESEARCH NEEDS

THE FERC STANDARD MARKET DESIGN GIGANOPR: RESEARCH NEEDS THE FERC STANDARD MARKET DESIGN GIGANOPR: RESEARCH NEEDS Presentation by George Gross University of Illinois at Urbana-Champaign Modernizing the National Electric Power Grid NSF Workshop November 18-19,

More information

Evaluating Energy Offer Cap Policy Market Roadmap ID: 42 Issues List: MR042. Market Subcommittee (MSC) May 3, 2016

Evaluating Energy Offer Cap Policy Market Roadmap ID: 42 Issues List: MR042. Market Subcommittee (MSC) May 3, 2016 Evaluating Energy Offer Cap Policy Market Roadmap ID: 42 Issues List: MR042 Market Subcommittee (MSC) May 3, 2016 Purpose Purpose and Key Takeaways Review proposed FERC Energy Offer Cap rules, and potential

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) Coordination Between Natural Gas ) Docket No. AD12-12-000 And Electricity Markets ) ) COMMENTS OF DOMINION RESOURCES SERVICES,

More information

Electricity Market Reform - How government electricity market reform could impact supply companies

Electricity Market Reform - How government electricity market reform could impact supply companies Electricity Market Reform - How government electricity market reform could impact supply companies Robert Groves Chief Executive Officer SmartestEnergy Limited Suppliers Forum, London 12 th October 2011

More information

New England s Forward Capacity Auction

New England s Forward Capacity Auction New England s Forward Capacity Auction Peter Cramton 25 June 2006 This note provides a brief description of New England s Forward Capacity Auction (FCA) for the procurement of electricity capacity. The

More information

CABINET. 24 March 2015

CABINET. 24 March 2015 CABINET 24 March 2015 Title: Procurement of Electricity and Gas Supplies Report of the Cabinet Member for Finance Open Report with Exempt Appendix 4 Wards Affected: All Report Author: Andrew Sivess Group

More information

The Impact of Fuel Costs on Electric Power Prices

The Impact of Fuel Costs on Electric Power Prices The Impact of Fuel Costs on Electric Power Prices by Kenneth Rose 1 June 2007 1 Kenneth Rose is an independent consultant and a Senior Fellow with the Institute of Public Utilities (IPU) at Michigan State

More information

Introduction to Ontario's Physical Markets

Introduction to Ontario's Physical Markets Introduction to Ontario's Physical Markets Introduction to Ontario s Physical Markets AN IESO MARKETPLACE TRAINING PUBLICATION This document has been prepared to assist in the IESO training of market

More information

NYISO Tariffs: MST Section 5 Control Area Services: Rights and Obligations. NYISO Tariffs. New York Independent System Operator, Inc.

NYISO Tariffs: MST Section 5 Control Area Services: Rights and Obligations. NYISO Tariffs. New York Independent System Operator, Inc. NYISO Tariffs New York Independent System Operator, Inc. NYISO Tariffs Document Generated On: 10/14/2011 Page 1 5.10 NYCA Minimum Installed Capacity Requirement The NYCA Minimum Installed Capacity Requirement

More information

A new electricity market for Northern Ireland and Ireland from 2016 - Integrated Single Electricity Market (I-SEM)

A new electricity market for Northern Ireland and Ireland from 2016 - Integrated Single Electricity Market (I-SEM) A new electricity market for Northern Ireland and Ireland from 2016 - Integrated Single Electricity Market (I-SEM) Non-technical summary High level design Draft Decision Paper SEM -14-047 June 2014 1 INTRODUCTION

More information

PJM Overview and Wholesale Power Markets. John Gdowik PJM Member Relations

PJM Overview and Wholesale Power Markets. John Gdowik PJM Member Relations PJM Overview and Wholesale Power Markets John Gdowik PJM Member Relations PJM s Role Ensures the reliability of the high-voltage electric power system Coordinates and directs the operation of the region

More information

In the Supreme Court of the United States

In the Supreme Court of the United States NOS. 14-614, 14-623 In the Supreme Court of the United States W. KEVIN HUGHES, et al., Petitioners, v. TALEN ENERGY MARKETING, LLC (F/K/A PPL ENERGYPLUS, LLC), et al., Respondents. CPV MARYLAND, LLC, v.

More information

An Overview of the Midwest ISO Market Design. Michael Robinson 31 March 2009

An Overview of the Midwest ISO Market Design. Michael Robinson 31 March 2009 An Overview of the Midwest ISO Market Design Michael Robinson 31 March 2009 The Role of RTOs Monitor flow of power over the grid Schedule transmission service Perform transmission security analysis for

More information

Corporate Renewable Energy Procurement: Industry Insights

Corporate Renewable Energy Procurement: Industry Insights Corporate Renewable Energy Procurement: Industry Insights June 2016 AMERICAN COUNCIL ON RENEWABLE ENERGY ACORE is a national non profit organization dedicated to advancing the renewable energy sector through

More information

Single Electricity Market (SEM) and interaction with EMIR. Central Bank of Ireland

Single Electricity Market (SEM) and interaction with EMIR. Central Bank of Ireland Single Electricity Market (SEM) and interaction with EMIR Central Bank of Ireland 11 th July 2014 About EAI Overview of SEM and its Participants The market is a gross mandatory pool and consists of generators

More information

A Comparison of PJM s RPM with Alternative Energy and Capacity Market Designs

A Comparison of PJM s RPM with Alternative Energy and Capacity Market Designs A Comparison of PJM s RPM with Alternative Energy and Capacity Market Designs September 2009 Johannes Pfeifenberger Kathleen Spees Adam Schumacher Prepared for PJM Interconnection, L.L.C. TABLE OF CONTENTS

More information

The Materials Contained Are Property of GP Renewables & Trading, LLC and are considered proprietary. This is not for distribution.

The Materials Contained Are Property of GP Renewables & Trading, LLC and are considered proprietary. This is not for distribution. The Materials Contained Are Property of GP Renewables & Trading, LLC and are considered proprietary. This is not for distribution. 1 Wholesale Power 101 Maximizing Asset Value & Minimizing Risk 2 Facts

More information

How PURPA is driving utility scale solar in North Carolina By QF Solutions April 7, 2015

How PURPA is driving utility scale solar in North Carolina By QF Solutions April 7, 2015 How PURPA is driving utility scale solar in North Carolina By QF Solutions April 7, 2015 Overview 1. Utility Scale Solar in North Carolina 2. PURPA 101 What is PURPA? 3. How Avoided Costs are calculated

More information

Memo INTRODUCTION UNDER-SCHEDULING

Memo INTRODUCTION UNDER-SCHEDULING California Independent System Operator Memo To: ISO Board of Governors From: Greg Cook, Senior Policy Analyst/Market Surveillance Committee Liaison CC: ISO Officers Date: September 28, 2000 Re: Management

More information

The Power Market: E-Commerce for All Electricity Products By Edward G. Cazalet, Ph.D., and Ralph D. Samuelson, Ph.D.

The Power Market: E-Commerce for All Electricity Products By Edward G. Cazalet, Ph.D., and Ralph D. Samuelson, Ph.D. The Power Market: E-Commerce for All Electricity Products By Edward G. Cazalet, Ph.D., and Ralph D. Samuelson, Ph.D. Why not use the Web to buy and sell transmission rights at prices derived from bids

More information

Consumer Cost Effectiveness of CO 2 Mitigation Policies in Restructured Electricity Markets. Jared Moore and Jay Apt.

Consumer Cost Effectiveness of CO 2 Mitigation Policies in Restructured Electricity Markets. Jared Moore and Jay Apt. Consumer Cost Effectiveness of CO 2 Mitigation Policies in Restructured Electricity Markets Jared Moore and Jay Apt Supporting Data Consumer Cost Effectiveness of CO 2 Mitigation Policies in Restructured

More information

FERC Workshop on Price Formation: Scarcity and Shortage Pricing, Offer Mitigation, and Offer Caps in RTO and ISO Markets (Docket. No.

FERC Workshop on Price Formation: Scarcity and Shortage Pricing, Offer Mitigation, and Offer Caps in RTO and ISO Markets (Docket. No. FERC Workshop on Price Formation: Scarcity and Shortage Pricing, Offer Mitigation, and Offer Caps in RTO and ISO Markets (Docket. No. AD14-14-000) October 28, 2014 Market Presentation Design Title & Analysis

More information

IMPACT OF GB S ELECTRICITY MARKET REFORM ON INTERCONNECTIONS, CONSEQUENCES ON NORDIC MARKET Michel Martin, 3 April 2014

IMPACT OF GB S ELECTRICITY MARKET REFORM ON INTERCONNECTIONS, CONSEQUENCES ON NORDIC MARKET Michel Martin, 3 April 2014 IMPACT OF GB S ELECTRICITY MARKET REFORM ON INTERCONNECTIONS, CONSEQUENCES ON NORDIC MARKET Michel Martin, 3 April 2014 PÖYRY MANAGEMENT CONSULTING ENERGY Pöyry offices (c) grafikdienst.com Pöyry Management

More information

ELECTRICITY MARKET REFORM (EMR) & THE ENERGY BILL INENCO OVERVIEW

ELECTRICITY MARKET REFORM (EMR) & THE ENERGY BILL INENCO OVERVIEW ELECTRICITY MARKET REFORM (EMR) & THE ENERGY BILL INENCO OVERVIEW February 2014 ELECTRICITY MARKET REFORM (EMR) & THE ENERGY BILL The Energy Bill is the government s flagship energy policy. There have

More information

Quantifying the Amount and Economic Impacts of Missing Energy Efficiency in PJM s Load Forecast

Quantifying the Amount and Economic Impacts of Missing Energy Efficiency in PJM s Load Forecast Quantifying the Amount and Economic Impacts of Missing Energy Efficiency in PJM s Load Forecast PREPARED FOR The Sustainable FERC Project PREPARED BY Ahmad Faruqui, Ph.D. Sanem Sergici, Ph.D. Kathleen

More information

2010 STATE OF THE MARKET REPORT

2010 STATE OF THE MARKET REPORT 2010 STATE OF THE MARKET REPORT FOR THE ERCOT WHOLESALE ELECTRICITY MARKETS POTOMAC ECONOMICS, LTD. Independent Market Monitor for the ERCOT Wholesale Market August 2011 TABLE OF CONTENTS Executive Summary...

More information

ANCILLARY SERVICES. A Paper for PPC. Establishment Organisation and Pilot Operation of the HTSO. 21 September 2000

ANCILLARY SERVICES. A Paper for PPC. Establishment Organisation and Pilot Operation of the HTSO. 21 September 2000 ANCILLARY SERVICES A Paper for PPC Establishment Organisation and Pilot Operation of the HTSO 21 September 2000 TABLE OF CONTENTS 1. INTRODUCTION 1 2. SYSTEM TRADING ARRANGEMENTS 2 3. OPTIONS FOR PROCUREMENT

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. PJM Interconnection, L.L.C. ) Docket No. ER14-

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. PJM Interconnection, L.L.C. ) Docket No. ER14- UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION PJM Interconnection, L.L.C. ) Docket No. ER14- AFFIDAVIT OF DR. SAMUEL A. NEWELL AND MR. CHRISTOPHER D. UNGATE ON BEHALF OF PJM

More information

2. Executive Summary. Emissions Trading Systems in Europe and Elsewhere

2. Executive Summary. Emissions Trading Systems in Europe and Elsewhere 2. Executive Summary With the introduction of CO 2 emission constraints on power generators in the European Union, climate policy is starting to have notable effects on energy markets. This paper sheds

More information

ELECTRICITY PROCUREMENT PLAN

ELECTRICITY PROCUREMENT PLAN 2016 Anthony Star Director ELECTRICITY PROCUREMENT PLAN Draft PlanFiled for Public Comments August 14ICC Approval Draft 2016 Procurement Plan for Public Comments August 14, 2015 Illinois Power Agency 2016

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS 1. WHY 3DOM NOW? As leaders in the retail energy business, we are committed to being a category creator and innovator in the energy industry. We are always researching and tracking trends to develop product

More information

ICAP/UCAP Overview. Aaron Westcott Awestcott@nyiso.com 518 356 7657. If possible, Please mute your phones Please do not use the hold button.

ICAP/UCAP Overview. Aaron Westcott Awestcott@nyiso.com 518 356 7657. If possible, Please mute your phones Please do not use the hold button. ICAP/UCAP Overview Aaron Westcott Awestcott@nyiso.com 518 356 7657 If possible, Please mute your phones Please do not use the hold button. Agenda What is ICAP/UCAP? How are ICAP and UCAP calculated? How

More information

Fiscal Year 2011 Resource Plan

Fiscal Year 2011 Resource Plan Salt River Project Fiscal Year 2011 Resource Plan Page 1 Last summer SRP hosted three resource planning workshops for a diverse group of stakeholders and customers to explain the planning process, discuss

More information

CAPACITY MECHANISMS IN EU POWER MARKETS

CAPACITY MECHANISMS IN EU POWER MARKETS CAPACITY MECHANISMS IN EU POWER MARKETS Can we progress to bilateral energy options? Simon Bradbury Ultimately, European renewable targets mean that prices and dispatch patterns will be dictated by wind

More information

ERCOT Analysis of the Impacts of the Clean Power Plan Final Rule Update

ERCOT Analysis of the Impacts of the Clean Power Plan Final Rule Update ERCOT Analysis of the Impacts of the Clean Power Plan Final Rule Update ERCOT Public October 16, 2015 ERCOT Analysis of the Impacts of the Clean Power Plan Final Rule Update In August 2015, the U.S. Environmental

More information

Learning Objectives. Chapter 6. Market Structures. Market Structures (cont.) The Two Extremes: Perfect Competition and Pure Monopoly

Learning Objectives. Chapter 6. Market Structures. Market Structures (cont.) The Two Extremes: Perfect Competition and Pure Monopoly Chapter 6 The Two Extremes: Perfect Competition and Pure Monopoly Learning Objectives List the four characteristics of a perfectly competitive market. Describe how a perfect competitor makes the decision

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) ) ) ) )

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) ) ) ) ) UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Independent Market Monitor for PJM v. PJM Interconnection, L.L.C. ) ) ) ) ) ) Docket No. EL14- -000 COMPLAINT AND MOTION TO CONSOLIDATE

More information

Wind Power and Electricity Markets

Wind Power and Electricity Markets PO Box 2787 Reston, VA 20195 Phone: 703-860-5160 Fax: 703-860-3089 E-mail: info@uwig.org Web: www.uwig.org Wind Power and Electricity Markets A living summary of markets and market rules for wind energy

More information

INDEPENDENT SYSTEM OPERATORS (VI + Access Rules vs. ISO vs. ITSO)

INDEPENDENT SYSTEM OPERATORS (VI + Access Rules vs. ISO vs. ITSO) INDEPENDENT SYSTEM OPERATORS (VI + Access Rules vs. ISO vs. ITSO) Paul L. Joskow September 28, 2007 ALTERNATIVE SYSTEM OPERATOR MODELS System operator (SO) is vertically integrated utility (G+T) Functional

More information

Bridging the Missing Money Gap Solutions for competitive power cash flow shortfalls

Bridging the Missing Money Gap Solutions for competitive power cash flow shortfalls IHS ENERGY Multiclient Study Bridging the Missing Money Gap Solutions for competitive power cash flow shortfalls This major research study identifies the causes of competitive power cash flow shortfalls,

More information

Polar Vortex Energy Pricing Implications Commercial Opportunities and System Reliability

Polar Vortex Energy Pricing Implications Commercial Opportunities and System Reliability % Increase on previous day W H I T E P A P E R Polar Vortex Energy Pricing Implications Commercial Opportunities and System Reliability By Judah Rose, Shanthi Muthiah, Frank Brock, John Karp, and Trishagni

More information

Monitoring Competitive Markets

Monitoring Competitive Markets Monitoring Competitive Markets Pennsylvania Public Utility Commission John A. Levin, Assistant Counsel Statutory Authority Pennsylvania Public Utility Commission Pennsylvania Public Utility Code Business

More information

[ELECTRICITY PROCUREMENT PLAN] Prepared in accordance with the Illinois Power Agency and Illinois Public Utilities Acts September 29, 2014

[ELECTRICITY PROCUREMENT PLAN] Prepared in accordance with the Illinois Power Agency and Illinois Public Utilities Acts September 29, 2014 2015 Anthony Star Director [ELECTRICITY PROCUREMENT PLAN] Prepared in accordance with the Illinois Power Agency and Illinois Public Utilities Acts September 29, 2014 Illinois Power Agency 2015 Electricity

More information

ESRI Research Note. The Irish Electricity Market: New Regulation to Preserve Competition Valeria di Cosmo and Muireann Á. Lynch

ESRI Research Note. The Irish Electricity Market: New Regulation to Preserve Competition Valeria di Cosmo and Muireann Á. Lynch ESRI Research Note The Irish Electricity Market: New Regulation to Preserve Competition Valeria di Cosmo and Muireann Á. Lynch Research Notes are short papers on focused research issues. They are subject

More information

ABOUT ELECTRICITY MARKETS. Power Markets and Trade in South Asia: Opportunities for Nepal

ABOUT ELECTRICITY MARKETS. Power Markets and Trade in South Asia: Opportunities for Nepal ABOUT ELECTRICITY MARKETS Power Markets and Trade in South Asia: Opportunities for Nepal February 14-15, 2011 Models can be classified based on different structural characteristics. Model 1 Model 2 Model

More information

Convergence Bidding Tutorial & Panel Discussion

Convergence Bidding Tutorial & Panel Discussion Convergence Bidding Tutorial & Panel Discussion CAISO June 13, 2006 Joe Bowring PJM Market Monitor www.pjm.com Convergence Basics Day-Ahead Market basics Day-Ahead and Real-Time Market interactions Increment

More information

Changes in regulated electricity prices from 1 July 2012

Changes in regulated electricity prices from 1 July 2012 Independent Pricing and Regulatory Tribunal FACT SHEET Changes in regulated electricity prices from 1 July 2012 Based on Final Determination, 13 June 2012 The Independent Pricing and Regulatory Tribunal

More information

Rules on Southern Companies Energy Auction Participation

Rules on Southern Companies Energy Auction Participation Southern Company Services, Inc. First Revised Sheet No. 20B Superseding Original Sheet No. 20B Rules on Southern Companies Energy Auction Participation 1.0 Participation; Definitions 1.1 Southern Companies

More information

Business Requirements Specification

Business Requirements Specification Business s Specification Capacity Procurement Mechanism Replacement Doc ID: GNFDMDEHU6BB-46-53 Page 1 of 18 Disclaimer All information contained in this draft Business s Specification (BRS) as provided

More information

Is It Possible to Charge Market-Based Pricing for Ancillary Services in a Non-ISO Market?

Is It Possible to Charge Market-Based Pricing for Ancillary Services in a Non-ISO Market? Is It Possible to Charge Market-Based Pricing for Ancillary Services in a Non-ISO Market? Regulation and Operating Reserves 33 rd Eastern Conference Center for Research in Regulated Industry Romkaew P.

More information

ELECTRIC UTILITY INTEGRATED RESOURCE PLAN (IRP)

ELECTRIC UTILITY INTEGRATED RESOURCE PLAN (IRP) ELECTRIC UTILITY INTEGRATED RESOURCE PLAN (IRP) Demand-Side Resources PRESENTED TO THAI ENERGY REGULATORY COMMISSION, OERC, AND UTILITIES DELEGATION Boston, Massachusetts PRESENTED BY ROMKAEW BROEHM MARIKO

More information

Presentation for The National Commission for Energy State Regulation of Ukraine

Presentation for The National Commission for Energy State Regulation of Ukraine Presentation for The National Commission for Energy State Regulation of Ukraine Todd Keech Laura Walter PJM Interconnection June 17, 2014 What is PJM? 1 What is PJM? ISO RTO Map Part of Eastern Interconnection

More information

Natural Gas Pipeline Penalty Recovery Issue Paper

Natural Gas Pipeline Penalty Recovery Issue Paper Natural Gas Pipeline Penalty Recovery Issue Paper September 16, 2014 Table of Contents I. Introduction and Background... 3 II. Scope of Initiative and Plan for Stakeholder Engagement... 4 III. The Approved

More information

DECENTRALISED RELIABILITY OPTIONS Securing European electricity markets Florence Forum, 5 June 2014 Stephen Woodhouse, Director

DECENTRALISED RELIABILITY OPTIONS Securing European electricity markets Florence Forum, 5 June 2014 Stephen Woodhouse, Director DECENTRALISED RELIABILITY OPTIONS Securing European electricity markets Florence Forum, 5 June 2014 Stephen Woodhouse, Director ENERGY MARKETS ARE BEING CHALLENGED Increasing levels of weather variable

More information

ONTARIO REGULATION proposed to be made under the

ONTARIO REGULATION proposed to be made under the Caution: This draft regulation is provided solely to facilitate dialogue concerning its contents. Should the decision be made to proceed with the proposal, the comments received during consultation will

More information

Contracts for Difference - the new support regime for low carbon generation

Contracts for Difference - the new support regime for low carbon generation Contracts for Difference - the new support regime for low carbon generation James Taylor Raj Bavishi 11 November 2014 UK Incentive Regimes Small scale Feed in Tariffs and the Renewables Obligations have

More information

THE CURRENT BALANCE. The Role of Cost, Reliability, and Environmental Impact in the Massachusetts Electricity Market

THE CURRENT BALANCE. The Role of Cost, Reliability, and Environmental Impact in the Massachusetts Electricity Market THE CURRENT BALANCE The Role of Cost, Reliability, and Environmental Impact in the Massachusetts Electricity Market POLICY BRIEF MAY 2016 LETTER FROM THE PRESIDENT & CEO The Greater Boston Chamber of Commerce

More information

Role of Power Traders in enhancing market dynamics

Role of Power Traders in enhancing market dynamics Role of Power Traders in enhancing market dynamics Date: 08 th March 2011 Sunil Agrawal (Head GMR Energy Trading) & Tanmay Pramanik (Assoc. Mgr GMR Energy Trading) Evolution of Power Trading business Internationally

More information

The Role of the ISO in U.S. Electricity Markets: A Review of Restructuring in California and PJM

The Role of the ISO in U.S. Electricity Markets: A Review of Restructuring in California and PJM The Role of the ISO in U.S. Electricity Markets: A Review of Restructuring in California and PJM Lisa Cameron and Peter Cramton Electricity Journal, April 1999, 71-81 Several regions of the U.S. have sought

More information

Appendix A. Glossary. For. 2016 Request For Proposals For Long-Term Renewable Generation Resources for Entergy Louisiana, LLC

Appendix A. Glossary. For. 2016 Request For Proposals For Long-Term Renewable Generation Resources for Entergy Louisiana, LLC Appendix A Glossary For 2016 Request For Proposals For Long-Term Renewable Generation Resources for Entergy Louisiana, LLC Entergy Services, Inc. June 8, 2016 Website means the internet website https://spofossil.entergy.com/entrfp/send/2016ellrenewablerfp/index.htm.

More information

2014 EIA Energy Conference. Edward Randolph Director, Energy Division California Public Utilities Commission

2014 EIA Energy Conference. Edward Randolph Director, Energy Division California Public Utilities Commission 2014 EIA Energy Conference Edward Randolph Director, Energy Division California Public Utilities Commission July 14, 2014 Clean Electricity Policy Initiatives In California (Partial) Wholesale Renewables

More information

Key Take Away : There are 4 types of MISO transmission transactions : 1) Drive- In, 2) Drive-Within, 3) Drive-through, and 4) Drive-Out

Key Take Away : There are 4 types of MISO transmission transactions : 1) Drive- In, 2) Drive-Within, 3) Drive-through, and 4) Drive-Out 1 2 3 Key Take Away : There are 4 types of MISO transmission transactions : 1) Drive- In, 2) Drive-Within, 3) Drive-through, and 4) Drive-Out Speaker Notes: Drive-In refers to transactions that originate

More information

Energy Productivity & Pricing

Energy Productivity & Pricing Energy Productivity & Pricing Markets for energy, renewable energy and carbon Dr Jenny Riesz February 2014 2 Average electricity retail prices Electricity price rises CSIRO Future Grid (2013) Change and

More information

Addressing Barriers to Renewable Energy Procurement. In association with the EPA Green Power Partnership

Addressing Barriers to Renewable Energy Procurement. In association with the EPA Green Power Partnership Addressing Barriers to Renewable Energy Procurement In association with the EPA Green Power Partnership September 19, 2012 CORPORATE GOALS Corporations are increasingly interested renewable energy. The

More information

Doubts About State-Mandated Power Contracts

Doubts About State-Mandated Power Contracts Portfolio Media. Inc. 860 Broadway, 6th Floor New York, NY 10003 www.law360.com Phone: +1 646 783 7100 Fax: +1 646 783 7161 customerservice@law360.com Doubts About State-Mandated Power Contracts Law360,

More information

California Greenhouse Gas Cap and Generation Variable Costs

California Greenhouse Gas Cap and Generation Variable Costs California Greenhouse Gas Cap and Generation Variable Costs White Paper Department of Market Monitoring February 10, 2012 Copyright 2012 California ISO Contents Introduction... 3 California s greenhouse

More information

Gas pricing and network access

Gas pricing and network access OIL & GAS Gas pricing and network access Regional Gas Competence Seminar - Mozambique 22 September - 2015 Bert Kiewiet 1 DNV GL 2015 DNV GL - Bert Kiewiet 22 September, 2015 SAFER, SMARTER, GREENER About

More information

Demand Response and Energy Efficiency in the Midwest ISO. A Primer

Demand Response and Energy Efficiency in the Midwest ISO. A Primer Demand Response and Energy Efficiency in the Midwest ISO A Primer John Moore Bruce Campbell Kevin Murray September 28, 2010 1 Agenda Types of Midwest ISO Demand Response (DR). Products DR is eligible to

More information

EUROPEAN COMMISSION. Brussels, 23.7.2014 C (2014) 5083 final. State aid SA.35980 (2014/N-2) United Kingdom Electricity market reform Capacity market

EUROPEAN COMMISSION. Brussels, 23.7.2014 C (2014) 5083 final. State aid SA.35980 (2014/N-2) United Kingdom Electricity market reform Capacity market EUROPEAN COMMISSION Brussels, 23.7.2014 C (2014) 5083 final In the published version of this decision, some information has been omitted, pursuant to articles 24 and 25 of Council Regulation (EC) No 659/1999

More information

Options on Beans For People Who Don t Know Beans About Options

Options on Beans For People Who Don t Know Beans About Options Options on Beans For People Who Don t Know Beans About Options Remember when things were simple? When a call was something you got when you were in the bathtub? When premium was what you put in your car?

More information

Changes in FirstEnergy-Ohio Capacity Costs:

Changes in FirstEnergy-Ohio Capacity Costs: Changes in FirstEnergy-Ohio Capacity Costs: How Pricing, Contracting, and Consumption of Electricity Will Be Affected By Matt Brakey, President, Brakey Energy Now Updated with 2016/2017 Base Residual Auction

More information

Portfolio Manager and Green Power Tracking

Portfolio Manager and Green Power Tracking Building owners and operators can buy green power products as a way of reducing the environmental impacts associated with purchased electricity use in their facilities. The Environmental Protection Agency

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) ) PROTEST OF THE INDEPENDENT MARKET MONITOR FOR PJM

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) ) PROTEST OF THE INDEPENDENT MARKET MONITOR FOR PJM UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION CPV Maryland, LLC ) ) ) Docket No. ER14-2106-000 PROTEST OF THE INDEPENDENT MARKET MONITOR FOR PJM Pursuant to Rule 211 of the Commission

More information

Multi-Faceted Solution for Managing Flexibility with High Penetration of Renewable Resources

Multi-Faceted Solution for Managing Flexibility with High Penetration of Renewable Resources Multi-Faceted Solution for Managing Flexibility with High Penetration of Renewable Resources FERC Technical Conference Increasing RT & DA Market Efficiency Through Improved Software June 24 26, 2013 Nivad

More information

Price Responsive Demand for Operating Reserves in Co-Optimized Electricity Markets with Wind Power

Price Responsive Demand for Operating Reserves in Co-Optimized Electricity Markets with Wind Power Price Responsive Demand for Operating Reserves in Co-Optimized Electricity Markets with Wind Power Zhi Zhou, Audun Botterud Decision and Information Sciences Division Argonne National Laboratory zzhou@anl.gov,

More information

Measuring Unilateral Market Power in Wholesale Electricity Markets: The California Market, 1998 2000

Measuring Unilateral Market Power in Wholesale Electricity Markets: The California Market, 1998 2000 Measuring Unilateral Market Power in Wholesale Electricity Markets: The California Market, 1998 2000 By FRANK A. WOLAK* * Department of Economics, Stanford University, Stanford, CA 94305-6072, and NBER

More information

The Locational Based Marginal Prices ( LBMPs or prices ) for Suppliers and Loads in

The Locational Based Marginal Prices ( LBMPs or prices ) for Suppliers and Loads in 17.1 LBMP Calculation Method The Locational Based Marginal Prices ( LBMPs or prices ) for Suppliers and Loads in the Real-Time Market will be based on the system marginal costs produced by either the Real-

More information

The participation of non-generation activities in the GB Capacity Market. Department for Energy & Climate Change

The participation of non-generation activities in the GB Capacity Market. Department for Energy & Climate Change The participation of non-generation activities in the GB Capacity Market Department for Energy & Climate Change 22 January 2015 Presentation today 1 Environmental & Energy Aid Guidelines and nongeneration

More information

Markets for Power in the United States: An Interim Assessment

Markets for Power in the United States: An Interim Assessment The Energy Journal, forthcoming 2006 Markets for Power in the United States: An Interim Assessment Paul L. Joskow* The transition to competitive wholesale and retail markets for electricity in the U.S.

More information

Understanding the Capacity Market

Understanding the Capacity Market Understanding the Capacity Market The Capacity Market What is The Capacity Market? The Capacity Market is a mechanism introduced by the Government to ensure that electricity supply continues to meet demand

More information

So, What Exactly is Risk Management?

So, What Exactly is Risk Management? So, What Exactly is Risk Management? By Paul Wielgus, Managing Director, GDS Associates, Inc. Buyers, sellers, and others in the energy business need to understand the risks in this very uncertain environment

More information

Levelized Cost of New Electricity Generating Technologies

Levelized Cost of New Electricity Generating Technologies Levelized Cost of New Electricity Generating Technologies The Energy Information Administration (EIA) produces forecasts of energy supply and demand for the next 20 years using the National Energy Modeling

More information

Ensuring a Continued Policy for Promoting Renewable Energy U.S. Carbon Cap-And-Trade and Renewable Energy Certificates: A Preliminary Discussion

Ensuring a Continued Policy for Promoting Renewable Energy U.S. Carbon Cap-And-Trade and Renewable Energy Certificates: A Preliminary Discussion saines & jacobson 31 Ensuring a Continued Policy for Promoting Renewable Energy U.S. Carbon Cap-And-Trade and Renewable Energy Certificates: A Preliminary Discussion Richard Saines, Baker & McKenzie; REIL

More information

City Council Briefing. June 16, 2010

City Council Briefing. June 16, 2010 City Council Briefing June 16, 2010 1 Review the City s electricity procurement program and upcoming contract for the period beginning January 1, 2011. How we buy electricity How well we did on our last

More information

Performance Metrics. For Independent System Operators And Regional Transmission Organizations

Performance Metrics. For Independent System Operators And Regional Transmission Organizations Performance Metrics For Independent System Operators And Regional Transmission Organizations A Report to Congress In Response to Recommendations of the United States Government Accountability Office April

More information

BUSINESS RULES GOVERNING CONTINGENCY RESERVE PROVIDED BY BATCH-LOAD DEMAND RESPONSE

BUSINESS RULES GOVERNING CONTINGENCY RESERVE PROVIDED BY BATCH-LOAD DEMAND RESPONSE BUSINESS RULES GOVERNING CONTINGENCY RESERVE PROVIDED BY BATCH-LOAD DEMAND RESPONSE This paper describes the issues associated with using Batch-Load Demand Response i resources to provide Contingency Reserve

More information

Two Settlement - Virtual Bidding and Transactions

Two Settlement - Virtual Bidding and Transactions Two Settlement - Virtual Bidding and Transactions (Fall 2009) PJM 2009 2009 PJM 1 Agenda Two-Settlement Overview Two-Settlement Features & System Two-Settlement Business Rules Two-Settlement Data Requirements

More information

Austin Energy Resource, Generation and Climate Protection Plan to 2025: An Update of the 2020 Plan

Austin Energy Resource, Generation and Climate Protection Plan to 2025: An Update of the 2020 Plan Austin Energy Resource, Generation and Climate Protection Plan to 2025: An Update of the 2020 Plan INTRODUCTION The Austin City Council adopted the Austin Climate Protection Plan (ACPP) in 2007 to build

More information

Revenue from contracts with customers The standard is final A comprehensive look at the new revenue model

Revenue from contracts with customers The standard is final A comprehensive look at the new revenue model Note: Since issuing the new revenue standard in May 2014, the FASB and IASB have proposed various amendments to the guidance. This In depth supplement has not been updated to reflect all of the proposed

More information

Ohio s Energy Efficiency Resource Standard: Impacts on the Ohio Wholesale Electricity Market and Benefits to the State

Ohio s Energy Efficiency Resource Standard: Impacts on the Ohio Wholesale Electricity Market and Benefits to the State Ohio s Energy Efficiency Resource Standard: Impacts on the Ohio Wholesale Electricity Market and Benefits to the State Max Neubauer, Ben Foster, R. Neal Elliott, David White, and Rick Hornby April 2013

More information