1 UK COMPETITIVE TELECOMMUNICATIONS ASSOCIATION 10 Fitzroy Square London W1T 5HP W: E: T: F: Executive Summary Business connectivity inputs comprise an important part of the Electronic Communications supply chain. Their place in the market is highly complex and increasingly so. Yet BT s product set remains stuck in a one size fits all approach. BT s business connectivity provisioning and repair performance has been poor for a sustained period. As a result, end users of BCM services have been harmed. It is clear therefore that the current SLA/G regime is relatively ineffective in providing the appropriate incentives on BT to improve performance to an adequate standard. At a high level, weaknesses in the current SLA/G regime are common or similar in nature to most Openreach products not just BCM services such as inefficient resource allocation, insufficient financial incentives to improve performance, gaps and carve-outs such that poor performance is not always redressed through SLG payments and poor record-keeping. More specifically, UKCTA s members consider that Openreach s unchecked scope to change customer delivery dates ( CDDs ) with deemed consent means that often its poor performance does not trigger SLG payments and, as such, Openreach is incentivised to adopt this practice. In this response, UKCTA: provides evidence of Openreach s poor service quality; explains the harm caused to communications providers and their customers and the costs that result; highlights weaknesses in the current SLA/G regime; and proposes some solutions. UKCTA supports Ofcom s work in evaluating the case for passive infrastructure access. Passive infrastructure access would allow competition deeper in the value chain, allowing greater flexibility for CPs to innovate and configure their service to the needs of their customers. Passive remedies have proven successful in delivering competition in several member states. Fundamentally, passive infrastructure allows CPs to operate according to their own economic model, rather than BT s. In other words they would be able to address currently unserved markets (product and geographic) and price more flexibly and in more innovative ways. We do not agree with Ofcom s assessment of the impact of passive remedies on BT s pricing and cost recovery and have seen no evidence that BT would be prevented from recovering common costs were passive remedies to be introduced. The focus should not be specifically about leased lines, but rather, about the removal of a power currently afforded to BT, to restrict the provision of passive access depending on its end use. Leased lines does not adequately define the set of uses for which CPs are currently prevented from procuring passive access. CPs are prevented from using passive remedies for a wide variety of downstream uses.

2 Passive access remedies would allow CPs to expand their networks efficiently into entirely new areas, and to connect customers in near-net situations. Passive access is about providing on-net connectivity in situations where today, only off-net opportunities are available. Ofcom should avoid implementing restrictions on particular end uses for any passive remedies it may decide to implement. Charges for passive infrastructure should be cost based, recognising its natural monopoly characteristics and the low probability for replicability. A uniform charge would appear to be the most appropriate and pragmatic pricing structure to adopt. KCOM and Virgin are members of UKCTA and reflecting their particular interests, their views on some aspects of the business connectivity market review will differ from the views expressed in this response, particularly in relation to passive access and associated remedies. 2 Passive Remedies Business connectivity inputs comprise an important part of the Electronic Communications supply chain. Their place in the market is highly complex and increasingly so. They cover a range of purposes, from inputs to residential services, data-centre connectivity, and wide-area networking (with highly varying requirements). Forms of business connectivity can be distinguished across many dimensions including, but not limited to: geography, network topology, end use, position in the value chain (or positions in multiple value chains), features, technical characteristics, performance and SLAs. As the demands placed on electronic communications networks become more diverse, so does the set of requirements for different forms of connectivity. Gone are the days where we could say that a leased line is a single homogeneous product such that no circumstances exist where a user would require anything different from a single, standardised product. Yet BT s leased lines portfolio is just that, a one-size fits all solution structured around BT s requirements, network architecture and pricing model. The UK needs to encourage more variation in the types of business connectivity available to suit different purposes and commercial strategies. This is why UKCTA supports Ofcom s work in evaluating the case for passive infrastructure access. Passive infrastructure access would allow competition deeper in the value chain, allowing greater flexibility for CPs to innovate and configure their service to the needs of their customers. The need for investment and scope for differentiation is greater today than it has been in the past because of the increasing fragmentation in modes of usage. Specifically: The growth of many different variants of cloud computing and remote data services The increasing dispersal of business sites requiring integrated connectivity; The growth in demand for data transmission capacity, driven by the increase in access bandwidths delivered by FttX and 4G; and The growth in machine-to-machine (M2M) communications. These are all factors that place greater (and increasingly specific) demands on business connectivity. The challenge faced by CPs is how to configure their services to meet the requirements of their end-users when faced with the limited portfolio of products available from BT. Any service is only as strong as its weakest link (and cannot be cheaper than its most expensive component). Passive remedies have been implemented in a manner that does not limit their use to a particular downstream market in several EU member states. They work, are extensively used and have proven effective in delivering competition across a wide variety of downstream markets. The operational processes and economic models relating to passive access have matured over time, a process that has increased the effectiveness of the remedy in delivering competition. In at least one market (France), passive remedies have allowed the NRA to find certain 1

3 Market 6 sectors to be effectively competitive and therefore not in need of regulatory intervention: unlike BT, Orange is not required to provide active connections in the backhaul segment of its network. The problems with passive remedies that Ofcom has envisaged in the past (such as compatibility with price regulation of active remedies) have evidently been solved in other markets the coexistence of active and passive remedies operating in Market 6 does not appear to have caused any fundamental problems with arbitrage or cost recovery in practice. We understand one of the key reasons Ofcom has decided against passive remedies in the BCMR in the past, is a concern about the impact on BT's pricing and cost recovery. We understand Ofcom is concerned that it might force an inefficient pattern of cost recovery on active services and/or threaten BT's ability to recover its common costs. We disagree on the following grounds: forcing an inefficient structure of pricing would only be a concern if BT's pricing structure is already efficient (or at least, more efficient than it would be if passive remedies were to be applied). We have seen no evidence that BT's pricing is efficient and some evidence indeed that it is not. Furthermore, we do not see any strong arguments (even in theory) why in the absence of passive remedies, we should expect it to be efficient; we have seen no evidence or arguments that BT would be unable to recover its common costs in a world with passive remedies. The form of passive remedies that UKCTA proposes would include a fair contribution to common costs, as well as a fair return on capital deployed; In order to assess the concerns that have caused Ofcom to hesitate before applying passive remedies in the BCMR, we suggest that Ofcom identifies markets in which one might expect the same concerns to be apparent. Following this, we recommend that Ofcom studies these markets to ascertain whether the concerns about which it warns, are in fact justified. Such markets might include: other countries in which passive remedies exist; situations in the UK in which passive remedies already exist. LLU is one example. "Dark copper" can be (and is) used for multiple downstream purposes and has been successful in unlocking several innovations (EFM leased lines being an example). Another example is BT's Cablelink product. One might the negative outcomes that Ofcom fears, to be apparent in these cases if justified; other markets in the UK in which, while passive remedies have not been applied, the degree of infrastructure competition is such that similar concerns might be expected to materialise. Central London might be an example of such a market. 3 UKCTA responses to Ofcom s questions In UKCTA s view, the CFI appears to be asking broadly the right questions, so we structure our response around those questions. Our only real comment concerns Ofcom s use of the term leased lines market (paragraph 1.33 first bullet point). In our view, the term is increasingly out dated and meaningless. Respondents to this CFI do not generally speaking consider themselves as participants in the leased lines market because the term leased lines does not adequately describe the inputs they buy or the products they sell. Question 3: What is your experience of the quality of BT s provision and repair of wholesale leased line services? Are there any consistent trends? Can you provide evidence to support your views? BCM services have experienced similar issues of poor service quality as have occurred in fixed access market. Ethernet service provision for example has been inconsistent over a number of years, with problems first starting in 2010: Chart 1 below is taken from the OTA website and provides a view of the provisioning situation for the period up to early May 2014; 2

4 Chart 2 shows the situation for Ethernet repair. These clearly demonstrate that Openreach service levels are below customer requirements and expectations and that, while it has engaged in five separate programs aimed at improving performance to targets, it has failed to so. The prolonged failure to deliver upon the Confirmed Delivery Date (CDD) promise has had considerable knockon impact upon CPs processes and engagement with their own customers such that customer confidence that orders will be fulfilled on time or circuits repaired promptly is low. As a consequence UKCTA members customers require closer liaison during provisioning and repair processes which in turn increases the amount of operational overhead incurred by communications providers (both in dealing with its customers and with Openreach) in order to make up for service failings at Openreach. We discuss this in response to Q6. Chart 1 - Ethernet provisioning Last updated: Source: Openreach 3

5 Chart 2 - Ethernet repair Last updated: Source: Openreach Question 4: Do the KPIs that BT publishes / shares with industry give you sufficient visibility of its performance. If not explain what further information should be provided and why. As noted above, carve-outs and gaps in the SLA/G regime are such that BT s KPIs do not provide a complete picture of service performance and are likely overestimate BT s performance. UKCTA members are particularly concerned that BT is able to misuse the exercise of its right to put back the CDD due to the application of deemed consent. BT exercises this right too frequently often with cursory or with insufficient justification. Other weaknesses in the CDD process include: Insufficient KCI information outlining the basis for the changed date; Lack of information leading to additional calls/overhead for CPs in contacting Openreach to establish the facts; Incorrect reason codes given e.g. ascribing delays to third party parties when they are in fact Openreach s contractors; and Complex works only being started within 2 months of the customer requirement date even though orders are often placed up to 6 months in advance - which is often too late to identify any issues that need to be resolved prior to meeting that date. A lack of accurate information and an appropriate audit trail for when CDDs are moved by Openreach means that it could apply deemed consent to aid the statistics of meeting CDD by pushing out the CDD for some orders. Public reporting of deemed consent application is necessary. BT is able to waive SLGs when MBORC is called. CPs do not have visibility of BT s MBORC policy and the criteria which leads to the designation or removal of MBORC (for example, anecdotal evidence suggests that once 4

6 MBORC is in place, a review of its imposition is only considered twice a week). We consider that the criteria and application should be consulted upon and agreed with CPs. A better understanding of the policy and process enables us to have more informed engagement with our customers and importantly ensures that the policy is being appropriately adhered to within Openreach. Question 5: If there are quality or timeliness concerns, how do these affect your business and how do they affect your customers? Please provide evidence to support your views. UKCTA members will be able to provide specific examples within their individual responses. Generally the issues have led: customers requiring greater engagement during the provisioning process; customers now proactively chase updates on their orders; CPs therefore need more resource to deal with these calls; CPs need to make more calls into BT to obtain updates; greater engagement - identifying that Openreach often passes on incomplete and / or false information see response to Q4 & Q6 as to what information is required; customers perception however incorrect that may be - that they could obtain better services from BT Lines of Business downstream of Openreach who might have personal contacts or be better able to influence order progression; and instances of customers putting CPs on stop sell due to provisioning issues. 5

7 Question 6: Do BT s current provision and repair services for wholesale leased lines meet your customers needs, for example in relation to lead times, keeping appointments or adhering to agreed delivery dates. If not what changes should BT make to its provision and repair services. UKCTA supports the request for process change as proposed by Vodafone. The proposal introduces additional SLAs and attaches SLGs to numerous points in the delivery process moving away from a single SLG for failed CDD. The proposal represents the requirements of CPs due to the changed nature of customer engagement that the long term provisioning failure has encouraged. The latest version of the proposal ( ed by Mark Dalziel of the OTA 20 th May 2014) is set out below. Introduction The current Ethernet service crisis has created a request from the Ethernet CPs to review the current SLA /SLG arrangements for the Ethernet products. The industry view is that the current arrangement is not encouraging Openreach to consider problems in the lifecycle of the order as the SLG only applies at the end of the journey if the CDD is missed. The Ethernet CPs propose that the current provisioning process is retained, but that the SLAs from the product handbook that are in place are formalised within the contract and backed up with SLGs. The aim being to provide a more holistic treatment to the order and to give each order more focus at critical steps in the process. This is not a request to increase the current value of the SLG payment but a division of the value proportionally as set out below. The industry expectation is that this shouldn t increase the overall Openreach cost for SLG payments but it is accepted that if there is a particular element which is consistently failing that this might have an impact. The process today Today the process runs as follows: The proposed process We propose the following process with multiple SLA and SLG points. There is an established level of SLG payment. We do not propose an increase to the level of the SLG payable but a redistribution of the SLG payment, making smaller SLGs payable throughout the provisioning process. 6

8 Order Acknowledgement KCI 1 Order Category and Indicative ECCs Provided KCI 2 CDD Confirmed KCI 3 Progress Update Progress Update Progress Update Circuit completion measured against CDD Day 0 Day 8 Day 14 Regular progress updates preference to be at least every 5 days Completion KCI1 KCI2 KCI3 Order acknowledgement SLA 100% acceptance or rejection of order by 5pm of the next working day of order placement by the CP. SLG 10% of monthly rental per order which fails to meet the SLA, SLG reoccurs for every additional day late. Confirm order category and provide indicative ECCs SLA 100% confirmation of order category and any indicative ECCs over the flat rate allowance no later than 8 working days of order placement by CP SLG 10% of monthly rental per order which fails to meet the SLA. SLG reoccurs for every additional day late. Confirm CDD SLA 100% of orders to have CDD and ECCs confirmed by BT within 14 working days of order placement by the CP. SLG 25% of monthly rental per order which fails to meet the SLA. SLG reoccurs for every additional day late. Order Progress Update SLA Openreach to provide an update on every order 5 working days after KCI3 and every 5 working days thereafter. An update will provide information on the following categories of information: a) Clarity of latest situation of the order providing specific details of the issue and resolution plan b) Full breakdown of the issues and impact on the order c) ECD for the issue resolution if Openreach to resolve d) Extra detail info (e.g. names of road blockages located and parties involved) e) Details of who has been engaged to resolve f) Time/date stamp for when parties / customers engaged g) Next update due with date provided SLG 5% of monthly rental per order per update which fails to meet the SLA. CPs accept that this area is a difficult one to manage and would welcome a broader discussion around how best to tackle updates the work around Clarity and improved communication is a potential way forward Circuit complete 7

9 SLA every order completed no later than midnight on CDD SLG 50% of monthly rental per order which fails to meet SLA. 100% of monthly rental for each additional day of failed SLA. SLGs run until the circuit is provided. In relation to repair, UKCTA members consider that the SLA/Gs are too narrow and do not adequately capture all areas of poor performance. For example, there are no out of hours engineers for 10Gb/s services means that there are only 12 hour repair lead times for services which are often more important that 1Gb/s services which have a 5 hour repair target: there are only SLA/G for complete service failure and nothing for severe performance degradation which can cause similar levels of disruption and harm; insufficient reporting information; and no escalation routes should CPs disagree with Openreach s assessment of whether SLA/Gs have been met. Question 7: Do you consider BT has appropriate incentives to provide the quality of service which you and your customers require? If not, what changes do you think should be made to BT s incentives? The evidence shows that BT does not have sufficient incentive to provide the levels of service that CPs and their customers require. Service issues have persisted over a number of years, with BT having to make SLG payments in a significant portion of cases but performance has not improved and only incentivised BT to minimise the level of SLG payments it makes (through activities like MBORC or Deemed Consent), rather than fix the fundamental issues within the BT business which are the underlying cause of the service crisis. In order to address this issue: Ofcom should consider adopting a minimum service quality standard for Openreach BCM services in much the same way as it has done in the FAMR; and Ensure that the appropriate mechanisms are in place such that the OTA, CPs and BT are address the current weaknesses and gaps in the current SLA/G regime are appropriately addressed. Ofcom in this regard should give due regard to the asymmetry in negotiating power between the parties as a result of BT s significant market power. As such, any negotiations should be properly time-bounded such that, should the parties be unable to reach agreement, Ofcom would be required determine outstanding issues. Question 11: Do you have any comments about the scope of our planned work on passive remedies? UKCTA believes Ofcom s proposed scope of work is broadly correct. The more important question is how it assesses the case. UKCTA considers that the best approach is for Ofcom to consider the costs versus the benefits in a transparent manner, considering experience from other EU markets on the effective implementation of passive remedies. In particular, a line of reasoning that passive remedies should be rejected because it is incompatible with a particular form of price control would be inadequate because it fails to consider its compatibility with other forms of price control and there should be no presumption that a particular approach to common cost recovery should be preserved. Unless Ofcom can go further and demonstrate that the form of price control it has chosen is superior to any other form, and to a degree that exceeds any potential benefit of introducing passive access, incompatibility with a particular form of price control should not be a factor in Ofcom s analysis. 8

10 Question 12: Which of the following types of passive remedy might be technically feasible and suitable for leased lines? Physical Infrastructure Access (i.e. duct and pole sharing); Dark fibre; Wavelength unbundling Other passive remedies (please specify) We reiterate the caveat that this should not be specifically about leased lines, but rather, about the removal of a power currently afforded to BT, to restrict the provision of passive access depending on its end use. Leased lines does not adequately define the set of uses for which CPs are currently prevented from procuring passive access. CPs are prevented from using passive remedies for a wide variety of downstream uses including but not limited to leased lines. UKCTA argues that the most important forms of passive access are PIA and dark fibre. Typically, dark fibre is of greatest use in providing a point-to-point connection between two locations, where suitable infrastructure already exists. It is also typically a more efficient method of serving longer distance connections (such as a fibre ring inside a city and another fibre ring in a business park outside the city). Duct access is of the greatest use when a CP wishes to configure its own topology or route. CPs in other jurisdictions (where the applicable remedy is available for this purpose), use duct access to construct metropolitan fibre networks by linking duct segments that already exist. UKCTA members have yet to express any clear views on wavelength unbundling, so we would urge Ofcom to keep this under review. Initial indications are that it could provide a substitute for dark fibre in some situations (perhaps where no spare fibre is available) but it is unclear what the other costs and benefits might be when compared with dark fibre. A further application of wavelength unbundling might be to implement a network in such a way that its logical structure is different from its physical structure. For example, it might be of use in implementing a logical point-to-point network over a GPON network that is inherently point-to-multipoint in its physical structure. It is important to note, however, that wavelength unbundling can only be used where more than one CP wishes to transit data over the same route, and it will therefore be unsuitable for many routes. This means wavelength unbundling is unsuitable for many routes and would therefore not be a substitute for dark fibre in all cases. Open collocation is an important ancillary remedy necessary to ensure passive remedies work as intended. Equally important is that the applicable remedy does not allow the regulated entity to deny access to passive facilities depending on the segment of its network within which the facility resides. The obligation should be architecture agnostic, thereby allowing access seekers to construct networks that are not dependent or in any way based on, the pre-existing architecture of the access provider. This would not necessarily imply that the access provider would (by default) be required to provide access in which it does not hold SMP in the applicable downstream market. For example, it would be possible to define a cut off in such a way that the access provider is not obliged to provide duct or dark fibre over very long distances. How such an instrument would be defined is a matter for further discussion. The challenge would be to define it in a way that maintains the essentially architecture agnostic characteristics of passive access. Question 13: For what applications could communications providers use each of the types of passive remedy listed in question 12 above? Passive access is an efficient means to allow CPs to expand their network into new geographic areas, and to connect customers in near-net situations. We distinguish between types of deployment and types of application. Deployment refers to the way in which an instance of network roll-out is implemented in the network. Application refers to the purpose which the deployment serves. 9

11 Types of deployment include: The construction of alternative fibre networks, particularly metropolitan area networks Providing point-to-point connections between sites which may be network to end-user or network to network. Fundamentally, passive access is about providing on-net connectivity in situations where today, only offnet opportunities are available. Applications include: Differentiated services that are not constrained by BT s wholesale inputs (either pricing model or product features). These include higher performing business connectivity, such as higher availabilities, lower latencies, better SLAs and better performance against SLAs Addressing markets that are currently not served by any BT input. We refer here to the ability to address in-between markets that might be of interest to SMEs Replacing copper LLU where this is becoming obsolete. Since VULA is not (and never will be) a perfect substitute for dark copper in providing EFM leased lines, it is important that CPs have an adequate replacement if businesses are to receive the same grade of service in the future that they receive today As noted in the response to question 19, none of the passive remedies that Ofcom chooses to implement in the BCMR (if indeed it does) should be restricted to particular end uses. Question 14: How might passive remedies extend the geographic reach of infrastructure competition? As mentioned in Question 13 above, UKCTA members envisage using passive remedies to extend the geographic reach of their networks by allowing them to construct (for example) city fibre networks. Quite how individual CPs would implement this in practice is of course, not a matter for an UKCTA submission. Question 15: Would the presence of physical infrastructure belonging to other CPs affect usage of passive remedies? For example would you expect passive remedies to be used only or mainly in areas where only BT has passive infrastructure or would you also expect passive remedies to be used in areas where other CPs have passive infrastructure? UKCTA members can and do use each other s passive facilities. Examples include duct sharing, dark fibre access and fibre swaps. The presence of alternative infrastructure would undoubtedly be a factor in determining the demand for BT s passive infrastructure. Nevertheless, due to the ubiquity of BT s facilities we would expect BT to be the main provider, even in areas covered by alternative infrastructure. One important factor is the availability of information. In other countries, passive access is supported by an online ordering tool, populated with a database of existing facilities. We would expect an obligation to provide passive access to be accompanied by a requirement to develop such a tool. Since it is unlikely that a small provider of passive facilities would have the economies of scale to develop such a tool, the ready availability of information on BT s facilities may be a factor leading access seekers to choose BT even when alternatives are available. There may also be increased transaction costs in dealing with multiple infrastructure providers, which in some situations make it more efficient to have most or all passive infrastructure needs met by a single provider. BT s ubiquity provides it with a competitive advantage in such situations, even in areas where other providers are available. Question 16: what are the benefits that passive remedies might offer in comparison to active remedies? Please consider specifically: Service innovation benefits eg the ability to differentiate service features and functionality (such as fault finding, configuration options etc) 10

12 Network innovation benefits eg the ability to configure the network in a different way to BT s network configuration Technology innovation benefits eg the ability to adopt new technologies, or introduce new technologies earlier than they might otherwise have been introduced Avoiding duplication eg the ability to avoid the duplication of network elements for network monitoring purposes Other benefits (please specify) While it is difficult to quantify the benefits, the broad categories of benefit can certainly be identified. Essentially, the benefits of passive access amount to the ability to break free from artificial constraints imposed by BT. This includes the ability to break free of all the constraints that BT imposes on the rest of the industry in terms of its product specifications, service quality, features, functionality, market segmentation (geographic and product) and pricing model. One aspect of the benefits of passive infrastructure access is its ability to allow the CP to provide services on-net that would otherwise be provided off-net. The question then becomes about advantages that end-users derive from on-net service delivery. UKCTA members customers gain benefits from on-net service in terms of SLAs, lower latencies, innovative technologies, network performance monitoring equipment, better quality of supply and better availabilities. Passive remedies would widen access to on-net connectivity and hence, to the benefits it allows. However, this by no means captures the full list of benefits that passive remedies potentially offer.. Fundamentally, passive infrastructure allows CPs to operate according to their own economic model, rather than BT s. In other words they would be able to address currently unserved markets (product and geographic) and price more flexibly and in more innovative ways. They would also be able to realise a greater proportion of the option value of expansion, by lowering the cost of future customer acquisition leveraging off pre-existing network facilities. Currently, market incentives are highly distorted due to the fact that, when a CP acquires a new customer, all of the option value of that acquisition resides with BT. CPs will pay BT for new facilities (via Excess Construction Charges) and the CPE. Yet only BT benefits from the option value of that expenditure. Question 17: How valuable would the innovation benefits of passive remedies be? Would they be sufficient for you to choose passive remedies if there was no overall cost advantage compared with active remedies (ie if the price of the passive remedy was exactly equal to the price of the active remedy less the cost of the network components that you would need to provide? We understand the reason for the question, which is to understand whether passive infrastructure access is all about cost, or whether there are other benefits that would remain even in the absence of the cost advantage. In essence, this question is really about identifying the limiting case for choosing between different build-buy options. Unequivocally, the answer is yes, passive access would still be of interest in this scenario. UKCTA members customers sometimes pay their service provider to undertake significant new network construction, just for the benefit of receiving the service on-net. It stands to reason that if network construction were cheaper, more customers would find it worthwhile to ask their CPs to undertake it. This does not mean that UKCTA is in favour of a remedy applied in this manner, even though it would be an improvement compared with today. This is because it would effectively rule out a vast proportion of the potential dynamic benefits potentially on offer, particularly those that would result from CPs being able to sell in the market based on their own economic model rather than BT s. Question 18: what are the technical and operational challenges associated with deploying and using passive remedies and how might these be addressed? 11

13 Ofcom should be aware that the technical and operational challenges will be significant and we would urge it to be well prepared for them in advance of implementation. By the time the next BCMR remedies are adopted, there will be significant pent-up demand for passive remedies (as there already is today). Therefore, we would urge Ofcom to specify as much as possible within the remedies in order to avoid delays due to product development. However, other countries have proven that the challenges are not insurmountable. By a process of learning, processes have matured over time, such that service delivery via passive access is now very much business as usual. By learning from the experiences of other countries, Ofcom has a rare opportunity to obtain secondmover advantage. The precise dos and don ts are too detailed to discuss here at any great length. UKCTA members have varying degrees of experience of operating in other countries. Nonetheless, the following best/worst practice elements can be identified: The fewer restrictions the offer includes (especially in terms of network segments), the more workable the offer is and therefore the higher is the demand; The possibility of including different types of SLAs in the offer, both regarding delivery lead times and time to repair, is a driver of demand; The implementation of a well-defined and easy-to-use process by the provider in determining/surveying possible routes, is necessary to get a workable product and thus increases the demand; The presence or the initiative of implementing a tool, giving CPs the access to maps of the provider s passive network, facilitates take-up. Question 19: what are the strengths and weaknesses of different pricing structures that might be adopted for passive remedies, in particular: Uniform prices that do not vary either by geographic area or the use to which the passive remedy is put (eg residential NGA versus leased lines); and Prices that do vary according to geographic area or the use to which the passive remedy is put, and which reflect the value of the services provided or geographic differences in the intensity of passive infrastructure usage, more like the way BT prices active products now? It is not appropriate to link the charge for a raw wholesale input such as passive infrastructure, far upstream from its eventual end-use, to its intended use as this would potentially: remove the benefit from the access seeker of any innovation developed and delivered on top of the wholesale input; constrain the possible use or uses of the input; constrain the deployment of downstream technology and potentially freeze in time any technology first used; deny the access seeker the benefits of capturing the benefits of scope and scale; frustrate competition in the downstream markets; lead to inefficient use of the asset as the access seeker may be forced to purchase multiple inputs to meet various needs rather than re-use a single input for multiple uses; and over compensate the access provider who, while not investing in the downstream innovation or risk, captures any upside benefits while being sheltered from any downside losses. Charges for passive infrastructure should be cost based, recognising its natural monopoly characteristics and the low probability for replicability. 12

14 A uniform charge would appear to be the most appropriate and pragmatic pricing structure to adopt. However, if there are objective, evidence based, geographic differences to the underlying incremental costs, that can be unambiguously distinguished between practically defined areas, and that give rise to sufficiently material charges, then these might be considered to warrant varying the charge by region. 26 th May

Business Connectivity Market Review

Business Connectivity Market Review Business Connectivity Market Review Review of competition in the provision of leased lines Redacted for publication [ ] Consultation Publication date: 15 May 2015 Closing Date for Responses: 31 July 2015

More information

Regulatory Financial Reporting. Final Statement

Regulatory Financial Reporting. Final Statement Regulatory Financial Reporting Final Statement Statement Publication date: 20 May 2014 About this document This document sets out the changes that we have decided to make to BT s regulatory financial reporting

More information

The UK experience of functional separation, equivalence and NGA. Andrea Coscelli, Director of Competition Economics 3 October 2013

The UK experience of functional separation, equivalence and NGA. Andrea Coscelli, Director of Competition Economics 3 October 2013 The UK experience of functional separation, equivalence and NGA Andrea Coscelli, Director of Competition Economics 3 October 2013 Functional Separation: background and rationale In the 2005 Telecoms Strategic

More information

ECTA Response to European Regulators Group Consultation

ECTA Response to European Regulators Group Consultation ECTA Response to European Regulators Group Consultation Report on ERG Best Practices on Regulatory Regimes in Wholesale Unbundled Access and Bitstream Access ERG(07)53rev1 January 2008 1 1. Introduction

More information

Broadband v Ethernet

Broadband v Ethernet E DATA MOBILE VOICE DATA MOBILE Broadband v Ethernet the business buyer s guide Background: The importance of Internet for the SME Today, internet connectivity plays a pivotal role in the life of the typical

More information

Rule change request. 18 September 2013

Rule change request. 18 September 2013 Reform of the distribution network pricing arrangements under the National Electricity Rules to provide better guidance for setting, and consulting on, cost-reflective distribution network pricing structures

More information

Response to the ACCC discussion paper reviewing the declaration of the Domestic Transmission Capacity Service CTO NGA FTSG ACCC

Response to the ACCC discussion paper reviewing the declaration of the Domestic Transmission Capacity Service CTO NGA FTSG ACCC 20 th January 2010 Mr Grahame O Leary Director, Communications Group Australian Competition and Consumer Commission Email: grahame.o leary@accc.gov.au Mr Fadi Metanios Assistance Director, Communications

More information

The relationship between BT profitability and charge controls

The relationship between BT profitability and charge controls The relationship between BT profitability and charge controls A REPORT PREPARED FOR VODAFONE November 2014 Frontier Economics Ltd, London. March 2015 Frontier Economics i The relationship between BT profitability

More information

Business Connectivity Market Review Consultation on Data Analysis

Business Connectivity Market Review Consultation on Data Analysis Business Connectivity Market Review Consultation on Data Analysis Consultation Publication date: 8 October 2014 Closing Date for Responses: 19 November 2014 About this document This document is an interim

More information

Business Connectivity Market Review: Call for Inputs. UKCTA Response to Ofcom

Business Connectivity Market Review: Call for Inputs. UKCTA Response to Ofcom Business Connectivity Market Review: Call for Inputs UKCTA Response to Ofcom Submitted to Ofcom: 17th June 2011 1. Introduction UKCTA is a trade association promoting the interests of competitive fixed-line

More information

The Profitability of BT s Regulated Services

The Profitability of BT s Regulated Services The Profitability of BT s Regulated Services A REPORT PREPARED FOR VODAFONE November 2013 Frontier Economics Ltd, London. November 2013 Frontier Economics 1 Summary The analysis described below shows that

More information

Market Analysis: Leased Lines (04/59) (04/60) Submission to ComReg Consultation Process

Market Analysis: Leased Lines (04/59) (04/60) Submission to ComReg Consultation Process Market Analysis: Leased Lines (04/59) (04/60) Submission to ComReg Consultation Process 16 July 2004 Market Analysis: Leased Lines (Retail and Wholesale Markets) 1 Introduction In this paper we are responding

More information

Use Logics. The Customer Benefits of Separation. Nick WHITE INTUG

Use Logics. The Customer Benefits of Separation. Nick WHITE INTUG Use Logics The Customer Benefits of Separation Nick WHITE INTUG T he International Telecommunications Users Group (INTUG) was formed in 1974 to ensure that the voice of the user was heard wherever regulatory

More information

Market Definition and Analysis for SMP: A practical guide

Market Definition and Analysis for SMP: A practical guide Market Definition and Analysis for SMP: A practical guide David Rogerson Jim Holmes Incyte Consulting Ltd Incyte Consulting Pty Ltd United Kingdom Australia t/f +44 1324 870429 t/f +61 3 9752 7828 www.incyteconsulting.com

More information

Revised Current Cost Financial Statements 2015 including Openreach Undertakings

Revised Current Cost Financial Statements 2015 including Openreach Undertakings Revised Current Cost Financial Statements 2015 including Openreach Undertakings Ofcom Statement on BT s Current Cost Financial Statements 2015 Introduction BT published the 2014/15 regulatory financial

More information

COMMISSION RECOMMENDATION. of 9.10.2014. (Text with EEA relevance)

COMMISSION RECOMMENDATION. of 9.10.2014. (Text with EEA relevance) EUROPEAN COMMISSION Brussels, 9.10.2014 C(2014) 7174 final COMMISSION RECOMMENDATION of 9.10.2014 on relevant product and service markets within the electronic communications sector susceptible to ex ante

More information

Per-provider and per-customer line costs and charges for Carrier Pre-selection

Per-provider and per-customer line costs and charges for Carrier Pre-selection Per-provider and per-customer line costs and charges for Carrier Pre-selection A direction by Ofcom Statement Issued: 18 August 2005 Contents Section Page 1 Summary 2 2 Introduction and background 5 3

More information

Business Connectivity Market Review Review of retail leased lines, wholesale symmetric broadband origination and wholesale trunk segments

Business Connectivity Market Review Review of retail leased lines, wholesale symmetric broadband origination and wholesale trunk segments Business Connectivity Market Review Review of retail leased lines, wholesale symmetric broadband origination and wholesale trunk segments Annexes Redacted for publication Statement Publication date: 28

More information

Extraordinary UK Ethernet

Extraordinary UK Ethernet Extraordinary UK Ethernet Ethernet Guide. The world of 21CN Ethernet connectivity can be a daunting place. As one of the leading forces in Ethernet Aggregation in the UK, we've seen our fair share of poor

More information

Monetising FTTx Networks: FTTx rollouts give operators the opportunity to apply lessons learnt from earlier technology evolutions

Monetising FTTx Networks: FTTx rollouts give operators the opportunity to apply lessons learnt from earlier technology evolutions Monetising FTTx Networks: FTTx rollouts give operators the opportunity to apply lessons learnt from earlier technology evolutions clarity.com MONETISING FTTX NETWORKS FTTx rollouts give operators the opportunity

More information

COMMISSION RECOMMENDATION. of XXX

COMMISSION RECOMMENDATION. of XXX EUROPEAN COMMISSION Brussels, XXX [ ](2013) XXX draft COMMISSION RECOMMENDATION of XXX on relevant product and service markets within the electronic communications sector susceptible to ex ante regulation

More information

BoR (10) 46 Rev1. BEREC report on relevant market definition for business services

BoR (10) 46 Rev1. BEREC report on relevant market definition for business services BEREC report on relevant market definition for business services February 2011 1. Introduction 1. In December 2009 the European Regulators Group ( ERG ) published a report 1 for consultation on the issue

More information

Consultation. Ofcom Review of Consumer Complaints Procedures. Submission. Association for Interactive Media and Entertainment (AIME)

Consultation. Ofcom Review of Consumer Complaints Procedures. Submission. Association for Interactive Media and Entertainment (AIME) Jeff Loan Floor 6 Strategy & Market Developments Riverside House 2A Southwark Bridge Road London SE1 9HA jeff.loan@ofcom.org.uk 12 March 2010 Consultation Ofcom Review of Consumer Complaints Procedures

More information

1. What are your views on Ofcom s proposed priorities for 2007/2008?

1. What are your views on Ofcom s proposed priorities for 2007/2008? CWU Response to Ofcom s Draft Annual Plan 2007/2008 The Communication Workers Union (CWU) has over 70,000 members working in the UK telecommunications sector. Around three quarters are employed in BT,

More information

The BCMR Consultation - Current Conditions and Changes in Pricing

The BCMR Consultation - Current Conditions and Changes in Pricing Proposals for a new charge control framework for certain leased lines services Consultation Publication date: 5 July 2012 Closing date: 30 August 2012 Contents Section Page 1 Summary 1 2 Introduction

More information

Wholesale Line Rental: Reviewing and setting charge ceilings for WLR services

Wholesale Line Rental: Reviewing and setting charge ceilings for WLR services Wholesale Line Rental: Reviewing and setting charge ceilings for WLR services Cable & Wireless response to Ofcom consultation 9 th December 2005 1 Introduction Cable & Wireless welcome the opportunity

More information

A new regulatory focus: Regulated Access for Business Markets. Elaine Chow Head of Regulatory Affairs APAC BT Global Services elaine.chow@bt.

A new regulatory focus: Regulated Access for Business Markets. Elaine Chow Head of Regulatory Affairs APAC BT Global Services elaine.chow@bt. A new regulatory focus: Regulated Access for Business Markets Elaine Chow Head of Regulatory Affairs APAC BT Global Services elaine.chow@bt.com Setting the Scene A time of change: Global competition is

More information

Business Connectivity Market Review: Leased lines charge controls and dark fibre pricing. Redacted version

Business Connectivity Market Review: Leased lines charge controls and dark fibre pricing. Redacted version Business Connectivity Market Review: Leased lines charge controls and dark fibre pricing Redacted version Consultation Publication date: 12 June 2015 Closing date: 7 August 2015 0 About this document

More information

2.3 and 3.4 GHz spectrum award

2.3 and 3.4 GHz spectrum award BT s response to: 2.3 and 3.4 GHz spectrum award Consultation on a 3.4 GHz band plan, varying UK Broadband Limited s licence and a call for inputs on other aspects of the award Issued by Ofcom on 16 October

More information

PETER FREEMAN CBE QC (HON) (Chairman) CLARE POTTER JOANNE STUART OBE. Sitting as a Tribunal in England and Wales COLT TECHNOLOGY SERVICES

PETER FREEMAN CBE QC (HON) (Chairman) CLARE POTTER JOANNE STUART OBE. Sitting as a Tribunal in England and Wales COLT TECHNOLOGY SERVICES Neutral citation [2013] CAT 29 IN THE COMPETITION APPEAL TRIBUNAL Victoria House Bloomsbury Place London WC1A 2EB Before: Case No.: 1212/3/3/13 26 November 2013 BETWEEN: PETER FREEMAN CBE QC (HON) (Chairman)

More information

Ensuring effective competition following the introduction of spectrum trading

Ensuring effective competition following the introduction of spectrum trading Ensuring effective competition following the introduction of spectrum trading Statement Issued: 29 September 2004 Contents Section 1 Summary 1 2 Background 3 3 Responses to the consultation 6 4 Conclusion

More information

Response to Ofcom s consultation on price rises in fixed term contracts

Response to Ofcom s consultation on price rises in fixed term contracts Response to Ofcom s consultation on price rises in fixed term contracts 14 March 2013 Price rises in fixed term contracts Ombudsman Services consultation response 1 Summary 1.1 About Ombudsman Services

More information

REPORT BY THE COMPTROLLER AND AUDITOR GENERAL HC 535 SESSION 2013-14 5 JULY 2013. Department for Culture, Media & Sport. The rural broadband programme

REPORT BY THE COMPTROLLER AND AUDITOR GENERAL HC 535 SESSION 2013-14 5 JULY 2013. Department for Culture, Media & Sport. The rural broadband programme REPORT BY THE COMPTROLLER AND AUDITOR GENERAL HC 535 SESSION 2013-14 5 JULY 2013 Department for Culture, Media & Sport The rural broadband programme 4 Key facts The rural broadband programme Key facts

More information

Communications Consumer Panel and ACOD response to Ofcom s call for inputs on consumer switching

Communications Consumer Panel and ACOD response to Ofcom s call for inputs on consumer switching Communications Consumer Panel and ACOD response to Ofcom s call for inputs on consumer switching Introduction The Communications Consumer Panel and ACOD welcomes Ofcom s call for inputs on consumer switching

More information

Response to Consultation and Final Document. Information Technology and Communication Authority

Response to Consultation and Final Document. Information Technology and Communication Authority MARKET ANALYSES Retail Leased Lines Market (The Minimum Set of Leased Lines) Final Document Response to Consultation and Final Document Information Technology and Communication Authority Competition and

More information

Document management concerns the whole board. Implementing document management - recommended practices and lessons learned

Document management concerns the whole board. Implementing document management - recommended practices and lessons learned Document management concerns the whole board Implementing document management - recommended practices and lessons learned Contents Introduction 03 Introducing a document management solution 04 where one

More information

Gibtelecom response to Public Consultation 01/07

Gibtelecom response to Public Consultation 01/07 Gibtelecom response to Public Consultation 01/07 Retail Fixed Markets 8 June 2007 Gibtelecom Limited Suite 942 Europort Gibraltar Gibtelecom Response to GRA Market Review for Retail Fixed Markets In response

More information

Data Communications Company (DCC) price control guidance: process and procedures

Data Communications Company (DCC) price control guidance: process and procedures Guidance document Contact: Tricia Quinn, Senior Economist Publication date: 27 July 2015 Team: Smarter Metering Email: tricia.quinn@ofgem.gov.uk Overview: The Data and Communications Company (DCC) is required

More information

Broadband v Ethernet The business buyer s guide

Broadband v Ethernet The business buyer s guide DATA Broadband v Ethernet The business buyer s guide Background: The importance of Internet for the SME Today, internet connectivity plays a pivotal role in the life of the typical SME. Email has changed

More information

Broadband deployment and sharing other utilities infrastructure

Broadband deployment and sharing other utilities infrastructure Response to BIS discussion paper Broadband deployment and sharing other utilities infrastructure September 2010 BSG welcomes the government s discussion paper on infrastructure sharing. BSG has always

More information

Next Generation Access Glossary. 21CN: BT s upgrade of their core network (the backbone of the network).

Next Generation Access Glossary. 21CN: BT s upgrade of their core network (the backbone of the network). Next Generation Access Glossary 21CN: BT s upgrade of their core network (the backbone of the network). Access network: The part of the network that connects directly to customers from the local telephone

More information

Access network costing A REPORT PREPARED FOR VODAFONE GROUP. June 2011. Frontier Economics Ltd, London.

Access network costing A REPORT PREPARED FOR VODAFONE GROUP. June 2011. Frontier Economics Ltd, London. Access network costing A REPORT PREPARED FOR VODAFONE GROUP June 2011 Frontier Economics Ltd, London. Confidential June 2011 Frontier Economics i Access network costing 1 Introduction and summary 4 2

More information

DTI Consultation on Proposals for a Special Administrator Regime for Energy Network Companies Ofgem s Response

DTI Consultation on Proposals for a Special Administrator Regime for Energy Network Companies Ofgem s Response DTI Consultation on Proposals for a Special Administrator Regime for Energy Network Companies Ofgem s Response June 2003 Introduction Ofgem welcomes the DTI consultation on proposals for a special administrator

More information

BEREC Opinion on Phase II investigation pursuant to Article 7 (3) of Directive 2002/21/EC as amended by Directive 2009/140/EC:

BEREC Opinion on Phase II investigation pursuant to Article 7 (3) of Directive 2002/21/EC as amended by Directive 2009/140/EC: BoR (13) 73 BEREC Opinion on Phase II investigation pursuant to Article 7 (3) of Directive 2002/21/EC as amended by Directive 2009/140/EC: Case AT/2013/1442 Wholesale terminating segments of leased lines

More information

BRITISH TELECOMMUNICATIONS PLC V OFCOM (ETHERNET DETERMINATIONS) [2014] CAT 14

BRITISH TELECOMMUNICATIONS PLC V OFCOM (ETHERNET DETERMINATIONS) [2014] CAT 14 BRITISH TELECOMMUNICATIONS PLC V OFCOM (ETHERNET DETERMINATIONS) [2014] CAT 14 Ligia Osepciu Monckton Chambers August 2014 On 1 August 2014, the Competition Appeal Tribunal ( the Tribunal ) delivered its

More information

Business Connectivity Market Review Review of the retail leased lines, wholesale symmetric broadband origination and wholesale trunk segments markets

Business Connectivity Market Review Review of the retail leased lines, wholesale symmetric broadband origination and wholesale trunk segments markets Business Connectivity Market Review Review of the retail leased lines, wholesale symmetric broadband origination and wholesale trunk segments markets Statement Publication date: 13 February 2009 Contents

More information

Finnish Energy Industries draft answer to CEER public consultation The future role of DSOs

Finnish Energy Industries draft answer to CEER public consultation The future role of DSOs Finnish Energy Industries draft answer to CEER public consultation The future role of DSOs Respondents information Name Ina Lehto Name of organisation Finnish Energy Industries Type of organisation Other

More information

Scoping the market for business communications. Tanuja Randery President BTGS Strategy

Scoping the market for business communications. Tanuja Randery President BTGS Strategy Scoping the market for business communications Tanuja Randery President BTGS Strategy British Telecommunications plc 2 Business connectivity needs are truly pan European Flexible connectivity solutions

More information

Clarity Infrastructure Management helps network operators to plan and document the change to their networks

Clarity Infrastructure Management helps network operators to plan and document the change to their networks Clarity Infrastructure Management helps network operators to plan and document the change to their networks clarity.com 2 Clarity Simplifying Operations Cost effective and timely network rollouts or upgrades

More information

VIRGIN MEDIA S RESPONSE TO OFCOM S FIXED NARROWBAND MARKET REVIEW AND NETWORK CHARGE CONTOL CALL FOR INPUTS

VIRGIN MEDIA S RESPONSE TO OFCOM S FIXED NARROWBAND MARKET REVIEW AND NETWORK CHARGE CONTOL CALL FOR INPUTS VIRGIN MEDIA S RESPONSE TO OFCOM S FIXED NARROWBAND MARKET REVIEW AND NETWORK CHARGE CONTOL CALL FOR INPUTS Introduction Virgin Media is pleased to respond to Ofcom s Call for Inputs (CFI) in relation

More information

TELSTRACLEAR. Telecom s Assets-based Constraint on Unbundling

TELSTRACLEAR. Telecom s Assets-based Constraint on Unbundling TELSTRACLEAR Telecom s Assets-based Constraint on Unbundling Key points: Telecom is incorrect to allege that the Commission s approach to updn, which draws on international regulatory experience, is ultra

More information

Ofcom consultation: Regulation of VoIP services Issued on 22 February 2006. Response by the FCS VoIP Group- May 2006

Ofcom consultation: Regulation of VoIP services Issued on 22 February 2006. Response by the FCS VoIP Group- May 2006 Ofcom consultation: Regulation of VoIP services Issued on 22 February 2006 Response by the FCS VoIP Group- May 2006 Contact: Jacqui Brookes CEO Federation of Communication Services Burnhill Business Centre

More information

Spitfire Service Level Agreement (SLA)

Spitfire Service Level Agreement (SLA) Spitfire Service Level Agreement (SLA) Version 121113 Spitfire Network Services Limited SLA Page 1 of 13 v121113 - BTH Table of Contents 1. Overview... 3 2. Spitfire Telephone Line Rental (WLR) and Calls

More information

Telephone Numbering Safeguarding the Future of Numbers

Telephone Numbering Safeguarding the Future of Numbers 25 th May 2006 Telephone Numbering Safeguarding the Future of Numbers Introduction ITSPA welcomes the opportunity to comment on Ofcom s proposed numbering strategy. The safeguarding of the future of numbers

More information

COMMISSION STAFF WORKING DOCUMENT EXPLANATORY NOTE. Accompanying the document. Commission Recommendation

COMMISSION STAFF WORKING DOCUMENT EXPLANATORY NOTE. Accompanying the document. Commission Recommendation EUROPEAN COMMISSION Brussels, XXX [ ](2014) XXX COMMISSION STAFF WORKING DOCUMENT EXPLANATORY NOTE Accompanying the document Commission Recommendation on relevant product and service markets within the

More information

NEN Response to Ofcom: Business Connectivity Market Review July 2012

NEN Response to Ofcom: Business Connectivity Market Review July 2012 NEN Response to Ofcom: Business Connectivity Market Review July 2012 The National Education Network Over ten million pupils learn through fast, responsive and safe broadband services provided by the National

More information

Consultation paper on telecommunications market reviews and notification of the proposed determinations

Consultation paper on telecommunications market reviews and notification of the proposed determinations Consultation paper on telecommunications market reviews and notification of the proposed determinations June 2011 Contents 1. Foreword... 3 2. Executive summary... 4 3. Introduction... 6 3.1 Background...

More information

Pricing of Leased Lines and Ethernet Connections. Response to Consultation and Decision. August 2013. Date: 07/08/2013

Pricing of Leased Lines and Ethernet Connections. Response to Consultation and Decision. August 2013. Date: 07/08/2013 Pricing of Leased Lines and Ethernet Connections Response to Consultation and Decision August 2013 Document No: MCA/D/13-1612 Date: 07/08/2013 Malta Communications Authority Valletta Waterfront, Pinto

More information

Retail Leased Lines, Wholesale Terminating Segments and Wholesale Trunk Segments of Leased Lines

Retail Leased Lines, Wholesale Terminating Segments and Wholesale Trunk Segments of Leased Lines Retail Leased Lines, Wholesale Terminating Segments and Identification and Analysis of Markets, Determination of Market Power and Setting of Remedies Response to Consultation and Final Decision 16 th August

More information

ACS CLOUD COMPUTING CONSUMER PROTOCOL. Response from AIIA

ACS CLOUD COMPUTING CONSUMER PROTOCOL. Response from AIIA ACS CLOUD COMPUTING CONSUMER PROTOCOL Response from AIIA AUGUST 2013 INTRODUCTION The Australian Information Industry Association (AIIA) is the peak national body representing multinational and domestic

More information

BT Global Services. Access in EU. BT Connect. Networks that think

BT Global Services. Access in EU. BT Connect. Networks that think BT Global Services Access in EU BT Connect. Networks that think Mike Lloyd Career started in project management of complex IT & network solutions Product manager for international circuits BT lead for

More information

Procurement Programmes & Projects P3M3 v2.1 Self-Assessment Instructions and Questionnaire. P3M3 Project Management Self-Assessment

Procurement Programmes & Projects P3M3 v2.1 Self-Assessment Instructions and Questionnaire. P3M3 Project Management Self-Assessment Procurement Programmes & Projects P3M3 v2.1 Self-Assessment Instructions and Questionnaire P3M3 Project Management Self-Assessment Contents Introduction 3 User Guidance 4 P3M3 Self-Assessment Questionnaire

More information

P3M3 Portfolio Management Self-Assessment

P3M3 Portfolio Management Self-Assessment Procurement Programmes & Projects P3M3 v2.1 Self-Assessment Instructions and Questionnaire P3M3 Portfolio Management Self-Assessment P3M3 is a registered trade mark of AXELOS Limited Contents Introduction

More information

Review of Non-Price Terms for Wholesale Leased Line and Bitstream Products. Initial Notice Direction to JT (Jersey) Limited

Review of Non-Price Terms for Wholesale Leased Line and Bitstream Products. Initial Notice Direction to JT (Jersey) Limited Review of Non-Price Terms for Wholesale Leased Line and Bitstream Products Initial Notice Direction to JT (Jersey) Limited Document No: CICRA 12/43 September 2012 Jersey Competition Regulatory Authority,

More information

Industry Analysis - Electricity and Costs in Queensland

Industry Analysis - Electricity and Costs in Queensland CCIQ Submission to the QCA consultation paper Regulated Retail Electricity Prices 2013-14: Cost Components and Other Issues About the Submission CCIQ makes this submission in response to the QCAs consultation

More information

ITSPA response to Ofcom s strategic review of consumer switching

ITSPA response to Ofcom s strategic review of consumer switching ITSPA response to Ofcom s strategic review of consumer switching About ITSPA The Internet Telephony Services Providers Association (ITSPA) is the UK VoIP industry s trade body, representing 60 UK businesses

More information

Line Rental (WLR) A to Z Glossary

Line Rental (WLR) A to Z Glossary ADSL Aux Bearer BIS Block Terminal Care Level Agreement CDTA CLIP CLIR Channels Contact CPE Asymmetric Digital Subscriber Line. Commonly referred to as broadband, this is a type of broadband used to connect

More information

How To Make A Network Connection Cheaper For A New Entrant

How To Make A Network Connection Cheaper For A New Entrant Discussion note for: Pricing Shared Access in Sweden 12 October 2004 Final draft for public consultation Andersen Management International A/S A part of Ementor Danmark A/S Table of Contents 1 INTRODUCTION...1

More information

Broadband Symmetric Q&A

Broadband Symmetric Q&A Broadband Symmetric Q&A 1. What is SHDSL technology? SHDSL is the acronym for Symmetric High bit rate Digital Subscriber Line. SHDSL is one of a number of services that utilise digital subscriber line

More information

Financial Services Authority. FSA CP13/7: High-level proposals for an FCA regime for consumer credit. A Response by Credit Action

Financial Services Authority. FSA CP13/7: High-level proposals for an FCA regime for consumer credit. A Response by Credit Action Financial Services Authority FSA CP13/7: High-level proposals for an FCA regime for consumer credit A Response by Credit Action Background Credit Action is a national financial capability charity (registered

More information

SERVICES. Designing, deploying and supporting world class communications solutions.

SERVICES. Designing, deploying and supporting world class communications solutions. Designing, deploying and supporting world class communications solutions. DESIGN Expertise, technologies, tools and ideas Business environments, regulation, expansion and obsolescence are drivers that

More information

The minimum set of leased lines retail market

The minimum set of leased lines retail market The minimum set of leased lines retail market Identification of the relevant market, analysis of competition, designation of service provider(s) having significant market power, imposing obligation(s)

More information

THE DOMESTIC SURVEY AND THE CONSEQUENT RECOMMENDATIONS

THE DOMESTIC SURVEY AND THE CONSEQUENT RECOMMENDATIONS OVERSIGHT RECOMMENDATIONS ON BUSINESS CONTINUITY BACKGROUND OF THE DOMESTIC SURVEY Unexpected incidents worldwide have focused the attention of the financial sector, including the participants of the domestic

More information

Review of the wholesale broadband access markets Consultation on market definition, market power determinations and remedies

Review of the wholesale broadband access markets Consultation on market definition, market power determinations and remedies Review of the wholesale broadband access markets Consultation on market definition, market power determinations and remedies Consultation Publication date: 23 March 2010 Closing Date for Responses: 1 June

More information

Final Draft Guidelines

Final Draft Guidelines EBA/GL/2015/04 20 May 2015 Final Draft Guidelines on factual circumstances amounting to a material threat to financial stability and on the elements related to the effectiveness of the sale of business

More information

Defining Relevant Markets for Leased Lines: the Interface with Local Loop Unbundling

Defining Relevant Markets for Leased Lines: the Interface with Local Loop Unbundling Defining Relevant Markets for Leased Lines: the Interface with Local Loop Unbundling Professor Howard Williams University of Strathclyde Glasgow GI 5QE Paper presented to the EC Sector Inquiry on the Competitive

More information

Infasme Support. Incident Management Process. [Version 1.0]

Infasme Support. Incident Management Process. [Version 1.0] Infasme Support Incident Management Process [Version 1.0] Table of Contents About this document... 1 Who should use this document?... 1 Summary of changes... 1 Chapter 1. Incident Process... 3 1.1. Primary

More information

BT s response to Ofcom s consultation document. Business Connectivity Market Review

BT s response to Ofcom s consultation document. Business Connectivity Market Review BT s response to Ofcom s consultation document Business Connectivity Market Review Review of the retail leased lines, wholesale symmetric broadband origination and wholesale trunk segments markets 7 September

More information

Wholesale Leased Lines: Review of Price Controls. Initial Notice Proposed directions to JT (Jersey) Limited

Wholesale Leased Lines: Review of Price Controls. Initial Notice Proposed directions to JT (Jersey) Limited Wholesale Leased Lines: Review of Price Controls Initial Notice Proposed directions to JT (Jersey) Limited Document No: CICRA 12/37 26 July 2012 Jersey Competition Regulatory Authority, 2 nd Floor, Salisbury

More information

TERMS AND CONDITIONS FOR THE ETHERNET SERVICE

TERMS AND CONDITIONS FOR THE ETHERNET SERVICE TERMS AND CONDITIONS FOR THE ETHERNET SERVICE The terms and conditions incorporated in this online order or attached order form ( the Order ) constitute an addendum to the Company s Supply Agreement (Electronic

More information

EUROPEAN COMMISSION Directorate-General Information Society and Media QUESTIONNAIRE

EUROPEAN COMMISSION Directorate-General Information Society and Media QUESTIONNAIRE EUROPEAN COMMISSION Directorate-General Information Society and Media Electronic Communications Policy QUESTIONNAIRE FOR THE PUBLIC CONSULTATION ON COSTING METHODOLOGIES FOR KEY WHOLESALE ACCESS PRICES

More information

Centre for Rural Economy Policy and Practice BRIEFING PAPERS: Rural Broadband

Centre for Rural Economy Policy and Practice BRIEFING PAPERS: Rural Broadband Centre for Rural Economy Policy and Practice BRIEFING PAPERS: www.newcastle.ac.uk/cre Hilary Talbot, Centre for Rural Economy How are rural areas disadvantaged? Many rural parts of Britain have an inadequate

More information

Written evidence for the Department of Business, Innovation and Skills: a small business commissioner

Written evidence for the Department of Business, Innovation and Skills: a small business commissioner Written evidence for the Department of Business, Innovation and Skills: a small business commissioner About ACCA ACCA is the global body for professional accountants. We aim to offer business-relevant,

More information

PwC study: The impact of the revision of the Insurance Mediation Directive. Background note

PwC study: The impact of the revision of the Insurance Mediation Directive. Background note 1 PwC study: The impact of the revision of the Insurance Mediation Directive Background note I. Background In the context of the review of the Insurance Mediation Directive (IMD), the European Commission

More information

Operationalizing Data Governance through Data Policy Management

Operationalizing Data Governance through Data Policy Management Operationalizing Data Governance through Data Policy Management Prepared for alido by: David Loshin nowledge Integrity, Inc. June, 2010 2010 nowledge Integrity, Inc. Page 1 Introduction The increasing

More information

Rate Regulation Mechanisms for Cable and MMDS Television Operators

Rate Regulation Mechanisms for Cable and MMDS Television Operators Rate Regulation Mechanisms for Cable and MMDS Television Operators Report on consultation process Document No. ODTR 00/56 August 2000 Oifig an Stiúrthóra Rialála Teileachumarsáide Office of the Director

More information

ISPA CONTRIBUTION ON THE PUBLIC CONSULTATION ON THE REVISION OF THE RECOMMENDATION ON RELEVANT MARKETS

ISPA CONTRIBUTION ON THE PUBLIC CONSULTATION ON THE REVISION OF THE RECOMMENDATION ON RELEVANT MARKETS Regulatory Coordination and Markets Unit (B3) BU33 6/26 DG Communications Networks Content and Technology European Commission B-1049 Brussels Belgium via e-mail cnect-relevant-markets@ec.europa.eu Vienna

More information

Predictive Straight- Through Processing

Predictive Straight- Through Processing Predictive Straight- Through Processing 2 TABLE OF CONTENTS 1 Introduction...3 2 The Benefits of Solving the STP Problem...7 3 How Can TIBCO Help?...7 4 How TIBCO s Solution Works...9 5 Summary...11 6

More information

BT and The Developing Optical Access Network Malcolm Campbell BT Design

BT and The Developing Optical Access Network Malcolm Campbell BT Design BT and The Developing Optical Access Network Malcolm Campbell BT Design Introduction FTTP Past, Present and Future The Past 1990 s system PON versus point-to-point TPON BPON GPON The Present BT and Openreach

More information

BRIDGE. the gaps between IT, cloud service providers, and the business. IT service management for the cloud. Business white paper

BRIDGE. the gaps between IT, cloud service providers, and the business. IT service management for the cloud. Business white paper BRIDGE the gaps between IT, cloud service providers, and the business. IT service management for the cloud Business white paper Executive summary Today, with more and more cloud services materializing,

More information

FBF position paper on the European Commission's proposal for a Directive on bank accounts ****

FBF position paper on the European Commission's proposal for a Directive on bank accounts **** Paris, June 2013 FBF position paper on the European Commission's proposal for a Directive on bank accounts The French Banking Federation (FBF) is the professional body that represents all banks operating

More information

Market Review: Wholesale. Response. and Decision. Network. to Document ) D05/10. Decision. No: Document 10/39. Date: 20 May 2010.

Market Review: Wholesale. Response. and Decision. Network. to Document ) D05/10. Decision. No: Document 10/39. Date: 20 May 2010. WPNIA Market Review/ /Response to Consultations and Decision Response to Consultations and Decision Market Review: Wholesale Infrastructure Access (Market 4) (Physical) Network Further Response to ComReg

More information

Technology: Evolving Your Business Telecom Dependencies and Network Capabilities Achieving Efficient, Cost effective, Connectivity

Technology: Evolving Your Business Telecom Dependencies and Network Capabilities Achieving Efficient, Cost effective, Connectivity Technology: Evolving Your Business Telecom Dependencies and Network Capabilities Achieving Efficient, Cost effective, Connectivity Ben Edmond, Chief Revenue Officer Global Capacity February 11 th, from

More information

Credit Card Market Study Interim Report: Annex 4 Switching Analysis

Credit Card Market Study Interim Report: Annex 4 Switching Analysis MS14/6.2: Annex 4 Market Study Interim Report: Annex 4 November 2015 This annex describes data analysis we carried out to improve our understanding of switching and shopping around behaviour in the UK

More information

How To Decide If There Is A Need For Regulatory Intervention In Relation To End To End-To-End Competition In The Postal Sector

How To Decide If There Is A Need For Regulatory Intervention In Relation To End To End-To-End Competition In The Postal Sector End-to-end competition in the postal sector Final guidance on Ofcom s approach to assessing the impact on the universal postal service Guidance Publication date: 27 March 2013 Contents Section Page 1

More information

Financial services mis-selling: regulation and redress

Financial services mis-selling: regulation and redress Report by the Comptroller and Auditor General Financial Conduct Authority and Financial Ombudsman Service Financial services mis-selling: regulation and redress HC 851 SESSION 2015-16 24 FEBRUARY 2016

More information

Revised discussion draft on Action 6 (Preventing Treaty Abuse)

Revised discussion draft on Action 6 (Preventing Treaty Abuse) Marlies de Ruiter Head Tax Treaties, Transfer Pricing and Financial Transactions Division OECD / CTPA By Email taxtreaties@oecd.org Our Ref 12 June 2015 GT / OL Dear Ms de Ruiter Revised discussion draft

More information

The Economics of the Cloud: A View from the Field

The Economics of the Cloud: A View from the Field The Economics of the Cloud: A View from the Field Executive summary By Paul Lidbetter Enterprise Architect Cloud computing is being hailed as the biggest change in business IT since client/server. But

More information

Specific amendments to the Capacity Allocation and Congestion Management Network Code

Specific amendments to the Capacity Allocation and Congestion Management Network Code Annex: Specific amendments to the Capacity Allocation and Congestion Management Network Code I. Amendments with respect to entry into force and application The Network Code defines deadlines for several

More information

Regulatory models for broadband in emerging markets

Regulatory models for broadband in emerging markets THINKING TELECOMS SERIES Sydney Auckland Singapore London May 2014 Regulatory models for broadband in emerging markets All governments want to promote broadband access. The key point here is that governments

More information