1 DESIGN CONSIDERATIONS AND ALTERNATIVES FOR EARTH RETAINING STRUCTURES WHERE TO CONSIDER AN EARTH RETAINING STRUCTURE Limited Right-of-Way EARTH RETAINING STRUCTURES ARE CLASSSIFIED INTO TWO GROUPS GROUP 1: Designer Must Provide Complete Design And Plan Details 1

2 GROUP 2: Designer Makes Only A Conceptual Application, And Reviews A Contractor- Chosen Proprietary Design After The Letting, Through Shop Plans And Computations EARTH RETAINING STRUCTURES IN FILL SECTIONS Used With Embankment Where Allowance For Side Slopes Is Limited TYPES OF EARTH RETAINING STRUCTURES IN FILL SECTIONS CONCRETE GRAVITY WALL GROUP 1 SYSTEMS H = 3 to 10 ft /1 to 3 m 0.5 to 0.7 of H Cost: $15 / ft2 or $150 / m2 2

3 Concrete Gravity Wall CONCRETE CANTILEVER WALL H = 5 to 30 ft /1.5 to 9 m 0.4 to 0.7 of H Cost: $50 / ft2 or $500 / m2 Reinforced Concrete Cantilever Wall CONCRETE COUNTERFORT WALL H = 30 to 60 ft / 9 to 18 m 0.4 to 0.7 of H Cost: $50 / ft2 or $500 / m2 3

4 GABIONS Gabion Wall Baskets H = 5 to 15 ft /1.5 to 5 m 0.5 to 0.7 of H Cost: $40 / ft2 or $400 / m2 Gabion Wall Gabion Wall REINFORCED SOIL SLOPES H = 10 to 100 It / 3 to 30 m Reinforced Soil Slopes (RSS) 0.5 to 1.0 of H Cost: $60 / ft2 or $600 / m2 May Also Be Used Temporarily. 4

5 RSS -- RSS -- RSS -- With Straight Reinforcement RSS -- With Bent Reinforcement CONCRETE CRIB WALL GROUP 2 SYSTEMS H = 5 to 35 ft /1.5 to 11 m 0.5 to 0.7 of H Cost: $30 / ft2 or $300 / m2 5

6 Concrete Crib Wall MECHANICALLY STABILIZED EARTH, PRECAST PANELS H = 10 to 65 ft/3 to 20 m 1.7 to 2.0 times H Cost: $50 / ft2 or $500 / m2 MSE Wall, Precast Panels - Steps and Walkway MSE Wall, Precast Panels - Railroad Overpass and Wing MSE Wall, Precast Panels - Roadway Overpass Abutment MSE Wall, Precast Panels 6

7 MSE Wall, Precast Panels Showing Forces MECHANICALLY STABILIZED EARTH, GEOGRID FACING H = 5 to 50 ft /1.5 to 15 m 0.7 to 1.0 of H Cost: $20 / ft2 or $200 / m2 MSE Wall, Geogrid Facing MSE Wall, Geogrid Facing MODULAR BLOCK WALL WITH REINFORCEMENT Modular Block Walls H = 3 to 10 ft /1 to 3 m R/W Required 0.7 to 1.0 of H Cost: $20 / ft2 or $200 / m2 7

8 Modular Block Wall With Reinforcement -- MODULAR BLOCK WALL WITHOUT REINFORCEMENT H = 2 to 5 ft/ 0.5 to 1.5 m R/W Required 0.5 to 0.7 of H Cost: $35 / ft2 or $350 / m2 Modular Block Wall Without Reinforcement Modular Block Wall Without Reinforcement -- Plan View Modular Block Wall Without Reinforcement -- BINWALL H = 5 to 35 ft /1.5 to 11 m 0.5 to 0.7 of H Cost: $30 / ft2 or $300 / m2 8

9 EARTH RETAINING STRUCTURES IN CUT SECTIONS Used In Cut Sections Where Extensive Backslopes Are Impractical, Or Soil To Be Retained Is Of Poor Quality CUT-SECTION SYSTEM TYPES OF EARTH RETAINING STRUCTURES IN CUT SECTIONS GROUP 1 SYSTEMS ONLY 9

10 SHEET PILING H = 0 to 15 It / 0 to 5 m Sheet Piling at Bridge Abutment -- Elevation View None Cost: $100 / ft2 or $1000 / m2 May Also Be Used Temporarily Sheet Piling Wings at Box Culvert -- Plan View Sheet Piling Wings D and A at Box Culvert -- Elevation View Sheet Piling Wings B and C at Box Culvert -- Elevation View SOLDIER PILING OR TIEBACK WALL H = 0 to 15 ft / 0 to 5 m None Cost: $25 / ft2 or $250 / m2 May Also Be Used Temporarily. 10

11 Soldier Pile Tieback Wall ANCHORED WALL H = 15 to 65 ft / 5 to 20 m Anchored Wall 0.5 of H, plus anchor bond length Cost: $60 / ft2 or $600 / m2 May Also Be Used Temporarily. SOIL NAILING H = 10 to 65 ft / 3 to 20 m Soil Nailing Work In Progress 0.6 to 1.0 of H Cost: $45 / ft2 or $450 / m2 May Also Be Used Temporarily. 1

12 Soil Nailing First Soil Nail in Place All Soil Nails in Place - Front View All Soil Nails and Wall in Place -- All Soil Nails, Wall, and Final Grade in Place -- GEOTECHNICAL CONSIDERATIONS Most Foundations Are Shallow, Without Piles, On Dense Sand Or Silty Clay, And Not On Soft Soils Such As Peat, Marl, Or Silt. GEOTECHNICAL CONSIDERATIONS Reinforced Concrete Cast-In Place Group 1 Walls In Fill Sections May Be Founded On Piles, So As To Get Through Soft Soils. 1 2

13 SYSTEM SELECTION CONSIDERATIONS Future Uses Of The Site Differential Deflection Or Settlement Of Wall Sections Project-Specific Special Features SYSTEM SELECTION CONSIDERATIONS Long- And Short-Term System Stability Comparable Degree Of Safety Accessibility To Construction Site SYSTEM SELECTION CONSIDERATIONS Staged-Construction Limitations Right-Of-Way Limits Site-Imposed Physical Limitations SYSTEM SELECTION CONSIDERATIONS Seismic Activity Wall Inundation Aesthetics SYSTEM SELECTION CONSIDERATIONS Environment Sensitivity Construction Time Restraints Economics ECONOMIC CONSIDERATIONS WHEN SELECTING A GROUP 2 SYSTEM Fill Section Or Cut Section? Wall Area Average Wall Height 1 3

14 ECONOMIC CONSIDERATIONS WHEN SELECTING A GROUP 2 SYSTEM Foundation Conditions Availability And Cost Of Select Backfill Availability And Cost Of Right Of Way ECONOMIC CONSIDERATIONS WHEN SELECTING A GROUP 2 SYSTEM Complex Horizontal And Vertical Alignment Changes Need For Temporary Excavation Support Systems Maintenance Of Traffic During Construction GEOTECHNICAL INFORMATION REQUEST Field Check Plans Stage: System s Beginning And Ending Stations Top And Bottom Elevations Locations Of Steps DESIGN GUIDELINES Earth Retaining Systems Are To Be Designed In Accordance With AASHTO Standard Specifications For Highway Bridges. In The Current Edition, This Information Is Mostly In Part I, Section 5. DESIGN GUIDELINES Chapter 68 of The Indiana Design Manual s New Part VI, Structures, Is Forthcoming This Year, And Will Include Everything We ve Discussed Today In More Detail. HEIGHT RANGE R / W COST PER Meiers Feet REQD. nr ft2 WALL TYPE SPECS COMMENTS FILL, GROUP 1 CONCRETE GRAVITY SS USED FOR SHORTEST CONCRETE WALL REQUIRED REINF. CONC. CANTILEVER SS THE BASIC MOST COMMON GROUP 1 FILL WLL TYPE REINF. CONC. COUNTERFORT SS USED IF TALLER CANTILEVER WALL REQUIRED GABIONS RSP BEST WHERE AESTHETICS NOT A CONCERN REINFORCED SOIL SLOPES U RELATIVELY NEW FILL, GROUP 2 CONCRETE CRIBWALL U RARELY USED MSE, PRECAST PANELS RSP THE MOST COMMON GROUP 2 WALL TYPE MSE, GEOGRIDFACINC U RARELY USED MODULAR BLOCK, WITH R0NF RSP STILL LIMITED USE, MOSTLY LOCAL AGENDES MODULAR BLOCK, W/ O REINF RSP GROUP 2 COMPLEMENT TO CONCRETE GRAVITY WLL BINWALL U RARELY USED CUT, GROUP 1 SHEET PILING SS MOST COMMON CUT WLL TYPE; MOST OFTEN TEMP. SOLDIER PILES U MAY BETEMPORARY OR TIEBACK ANCHORED WALL U RELATHELY NEW; MAY BE TEMPORARY SOIL NAILING U RELATHELY NEW; MAY BE TEMPORARY R / WREQD. - Required Portion of Wall Height Shown SPECS - SS: In Standard Specifications RSP: Among Rscifring Special Provisions U: Unique Special Provision Cuirently Reqired 1 4

15 SUMMARY OF WALL TYPES AND PROPERTIES WALL TYPE HEIGHT RANGE Meters Feet R /W REQD. COST PER m2 ft2 FILL, GROUP 1 CONCRETE GRAVITY REINF. CONC. CANTILEVER REINF. CONC. COUNTERFORT GABIONS REINFORCED SOIL SLOPES FILL, GROUP 2 CONCRETE CRIBWALL MSE, PRECAST PANELS MSE, GEOGRID FACING MODULAR BLOCK, WITH REINF MODULAR BLOCK, W /O REINF BINWALL CUT, GROUP 1 SHEET PILING SOLDIER PILES OR TIEBACK ANCHORED WALL SOIL NAILING R /W REQD. - Required Portion of Wall Height Shown SPECS - SS: In Standard Specifications RSP: Among Recurring Special Provisions U: Unique Special Provision Currently Required

16 SPECS COMMENTS SS SS SS RSP U USED FOR SHORTEST CONCRETE WALL REQUIRED THE BASIC MOST COMMON GROUP 1 FILL WALL TYPE USED IF TALLER CANTILEVER WALL REQUIRED BEST WHERE AESTHETICS NOT A CONCERN RELATIVELY NEW U RSP U RSP RSP U RARELY USED THE MOST COMMON GROUP 2 WALL TYPE RARELY USED STILL LIMITED USE, MOSTLY LOCAL AGENCIES GROUP 2 COMPLEMENT TO CONCRETE GRAVITY WALL RARELY USED SS U U U MOST COMMON CUT WALL TYPE; MOST OFTEN TEMP. MAY BE TEMPORARY RELATIVELY NEW; MAY BE TEMPORARY RELATIVELY NEW; MAY BE TEMPORARY

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13)

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13) Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised ) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular blocks

More information

THE OBJECTIVES OF ROUTINE ROAD CUTS AND FILLS

THE OBJECTIVES OF ROUTINE ROAD CUTS AND FILLS Chapter 11 Slope Stabiliza bilization and Stability of Cuts and Fills THE OBJECTIVES OF ROUTINE ROAD CUTS AND FILLS are 1) to create space for the road template and driving surface; 2) to balance material

More information

Types of Retaining Walls - Gravity walls - Pre-cast crib walls - Gabion walls - Reinforced concrete walls - Sheet pile walls - MS walls (mechanically

Types of Retaining Walls - Gravity walls - Pre-cast crib walls - Gabion walls - Reinforced concrete walls - Sheet pile walls - MS walls (mechanically Foundation Engineering Lecture #23 Types of Retaining Walls - Gravity walls - Pre-cast crib walls - Gabion walls - Reinforced concrete walls - Sheet pile walls - MS walls (mechanically stabilized) - Slurry

More information

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary

More information

Module 6 : Design of Retaining Structures. Lecture 28 : Anchored sheet pile walls [ Section 28.1 : Introduction ]

Module 6 : Design of Retaining Structures. Lecture 28 : Anchored sheet pile walls [ Section 28.1 : Introduction ] Lecture 28 : Anchored sheet pile walls [ Section 28.1 : Introduction ] Objectives In this section you will learn the following Introduction Lecture 28 : Anchored sheet pile walls [ Section 28.1 : Introduction

More information

Index 6040 Precast Concrete Sheet Pile Wall (Rev. 07/12)

Index 6040 Precast Concrete Sheet Pile Wall (Rev. 07/12) Index 6040 Precast Concrete Sheet Pile Wall (Rev. 07/12) Design Criteria AASHTO LRFD Bridge Design Specifications, 6th Edition; Structures Design Guidelines (SDG) Design Assumptions and Limitations These

More information

Retaining Wall Global Stability & AASHTO LRFD Unnecessary, Unreasonable Guideline Changes Result in Huge Wastes of Money at Some Wall Locations

Retaining Wall Global Stability & AASHTO LRFD Unnecessary, Unreasonable Guideline Changes Result in Huge Wastes of Money at Some Wall Locations Retaining Wall Global Stability & AASHTO LRFD Unnecessary, Unreasonable Guideline Changes Result in Huge Wastes of Money at Some Wall Locations The implementation of the AASHTO LRFD Bridge Design Specifications

More information

DESIGN GUIDELINES FOR EARTH RETENTION

DESIGN GUIDELINES FOR EARTH RETENTION DESIGN GUIDELINES FOR EARTH RETENTION Strata Systems, Inc. 380 Dahlonega Rd., Suite 200 Cumming, GA 30040 USA www.geogrid.com TABLE OF CONTENTS MECHANICS OF RETAINING WALLS... 3 THE STRATAWEB SOLUTION...4

More information

STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.

STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL. STRUCTURES 1. General. Critical structures may impact the integrity of a flood control project in several manners such as the excavation for construction of the structure, the type of foundation, backfill

More information

The unit costs are based on the trend line of the 3 low bids for the average quantity.

The unit costs are based on the trend line of the 3 low bids for the average quantity. Page 1 of 8 COST ESTIMATE GENERAL INSTRUCTIONS The unit costs are based on the trend line of the 3 low bids for the average quantity. Apply the Unit Costs to ordinary structures. Unit Costs should generally

More information

The demand for new roadway

The demand for new roadway Designing strong walls on weak soils Civil engineers have options to remedy foundation soil problems and meet project cost and schedule requirements. By Fadi Faraj, P.E.; Michael H. Garrison, P.E.; and

More information

Precast Concrete Retaining Wall Products

Precast Concrete Retaining Wall Products Precast Concrete Retaining Wall Products NPCA Products Brochure 1 MSE Systems - 5 Modular Block Wall Systems - 6 Unreinforced Modular Block Systems - 7 Reinforced Modular Block - 8 Cantilever Wall - 9

More information

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering Geotechnical Bulletin GB 2 SPECIAL BENCHING AND SIDEHILL EMBANKMENT FILLS Geotechnical Bulletin GB2

More information

San Francisco State University Civil Engineering. Course Outline for Engr 431 Foundation Engineering

San Francisco State University Civil Engineering. Course Outline for Engr 431 Foundation Engineering San Francisco State University Civil Engineering Course Outline for Engr 431 Foundation Engineering Bulletin Description: ENGR 431 Foundation Engineering (3 units) Prerequisite: Engr 430. Settlement of

More information

Concrete Pipe Design Manual INDEX OF CONTENTS. FOREWORD... iii. Chapter 1. INTRODUCTION... 1

Concrete Pipe Design Manual INDEX OF CONTENTS. FOREWORD... iii. Chapter 1. INTRODUCTION... 1 Concrete Pipe Design Manual INDEX OF CONTENTS FOREWORD...... iii Chapter 1. INTRODUCTION... 1 Chapter 2. HYDRAULICS OF SEWERS Sanitary Sewers... 3 Determination of Sewer System Type... 3 Determination

More information

Value of Instrumentation Systems and Real-Time Monitoring: An Owner s Perspective

Value of Instrumentation Systems and Real-Time Monitoring: An Owner s Perspective Value of Instrumentation Systems and Real-Time Monitoring: An Owner s Perspective FHWA NATIONAL GEOTECHNICAL PROGRAM www.fhwa.dot.gov/engineering/geotech Why Geotechnical Instrumentation? Provide warning

More information

SECTION 206 EXCAVATION FOR STRUCTURES

SECTION 206 EXCAVATION FOR STRUCTURES SECTION 206 EXCAVATION FOR STRUCTURES 206.1 Description. This work shall consist of the necessary excavation for the foundations of all structures, removal and disposal of all excavated material, backfilling

More information

Earth Pressure and Retaining Wall Basics for Non-Geotechnical Engineers

Earth Pressure and Retaining Wall Basics for Non-Geotechnical Engineers PDHonline Course C155 (2 PDH) Earth Pressure and Retaining Wall Basics for Non-Geotechnical Engineers Instructor: Richard P. Weber, P.E. 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA

More information

Managing North Carolina's MSE Wall Assets through Design, Construction and Performance

Managing North Carolina's MSE Wall Assets through Design, Construction and Performance Managing North Carolina's MSE Wall Assets through Design, Construction and Performance Robert A. Gladstone, P.E. Executive Director Association for Metallically Stabilized Earth 2013 Early Earth Reinforcement

More information

Safe & Sound Bridge Terminology

Safe & Sound Bridge Terminology Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries

More information

Table of Contents. July 2015 12-1

Table of Contents. July 2015 12-1 Table of Contents 12.1 General... 3 12.2 Abutment Types... 5 12.2.1 Full-Retaining... 5 12.2.2 Semi-Retaining... 6 12.2.3 Sill... 7 12.2.4 Spill-Through or Open... 7 12.2.5 Pile-Encased... 8 12.2.6 Special

More information

BRIDGE RESTORATION AND LANDSLIDE CORRECTION USING STRUCTURAL PIER AND GRADE BEAM

BRIDGE RESTORATION AND LANDSLIDE CORRECTION USING STRUCTURAL PIER AND GRADE BEAM BRIDGE RESTORATION AND LANDSLIDE CORRECTION USING STRUCTURAL PIER AND GRADE BEAM Swaminathan Srinivasan, P.E., M.ASCE H.C. Nutting/Terracon David Tomley, P.E., M.ASCE KZF Design Delivering Success for

More information

Current Version: September 26, 2012 Previous Versions: 02/24/10, 03/26/08, 03/09/04, 02/17/00 and 05/16/97 Item No. 509S Excavation Safety Systems

Current Version: September 26, 2012 Previous Versions: 02/24/10, 03/26/08, 03/09/04, 02/17/00 and 05/16/97 Item No. 509S Excavation Safety Systems Item No. 509S Excavation Safety Systems 509S.1 Description This item shall govern the designing, furnishing, installing, maintaining and removing or abandoning of temporary Excavation Safety Systems consisting

More information

CHAPTER 1 INTRODUCTION TO FOUNDATIONS

CHAPTER 1 INTRODUCTION TO FOUNDATIONS CHAPTER 1 INTRODUCTION TO FOUNDATIONS The soil beneath structures responsible for carrying the loads is the FOUNDATION. The general misconception is that the structural element which transmits the load

More information

Plan Preparation Guide. Chapter 9

Plan Preparation Guide. Chapter 9 Plan Preparation Guide Chapter 9 Drainage Structures R.C. Box Culverts Ditches - Gutters - Curbs Section Description Page 1 Plans for Hydrology 9-1 2 Catch Basin Types and Uses 9-2 3 Drop Inlet Types and

More information

REINFORCED CONCRETE. Reinforced Concrete Design. A Fundamental Approach - Fifth Edition. Walls are generally used to provide lateral support for:

REINFORCED CONCRETE. Reinforced Concrete Design. A Fundamental Approach - Fifth Edition. Walls are generally used to provide lateral support for: HANDOUT REINFORCED CONCRETE Reinforced Concrete Design A Fundamental Approach - Fifth Edition RETAINING WALLS Fifth Edition A. J. Clark School of Engineering Department of Civil and Environmental Engineering

More information

Emergency repair of Bridge B421

Emergency repair of Bridge B421 Emergency repair of Bridge B421 over the Olifants River after fl ood damage INTRODUCTION AND BACKGROUND Bridge B421 is located on the R555 at km 5.03 on Section 01E between Witbank (now known as emalahleni)

More information

Project Location. Project Limits: The Grand River east to Fuller Ave.

Project Location. Project Limits: The Grand River east to Fuller Ave. Outline Project Location Project Description Project History Site Constraints Geotechnical Investigation & Soil Profile Foundation Design Process Photos Project Location Project Limits: The Grand River

More information

SECTION 02200 SUPPORT OF EXCAVATION

SECTION 02200 SUPPORT OF EXCAVATION SECTION 02200 PART 1 GENERAL 1.01 DESCRIPTION A. Section including specifications for design and installation of excavation support. B. Section also includes specifications for excavation support systems

More information

COSMOS 2012: Earthquakes in Action COSMOS 2012

COSMOS 2012: Earthquakes in Action COSMOS 2012 COSMOS 2012 What is SFSI and why is it important? Soil issues in Earthquakes Structures where SFSI important Retaining structures (lateral earth pressure) Foundations (spread and pile footings, bearing

More information

CIVIL BREADTH Exam Specifications

CIVIL BREADTH Exam Specifications NCEES Principles and Practice of Engineering Examination CIVIL BREADTH and GEOTECHNICAL DEPTH Exam Specifications Effective Beginning with the April 2015 Examinations The civil exam is a breadth and depth

More information

RETAINING WALL CONSTRUCTION DETAILS 2006 ESTIMATING AND INSTALLATION MANUAL. Featuring Highland Stone. anchorwall.com

RETAINING WALL CONSTRUCTION DETAILS 2006 ESTIMATING AND INSTALLATION MANUAL. Featuring Highland Stone. anchorwall.com RETAINING WALL CONSTRUCTION DETAILS 2006 ESTIMATING AND INSTALLATION MANUAL 11 Featuring Highland Stone anchorwall.com TABLE OF CONTENTS 2 TABLE OF CONTENTS BEFORE YOU BEGIN............................

More information

Chapter 4 SUBSURFACE INVESTIGATION GUIDELINES

Chapter 4 SUBSURFACE INVESTIGATION GUIDELINES Chapter 4 SUBSURFACE INVESTIGATION GUIDELINES Final SCDOT GEOTECHNICAL DESIGN MANUAL August 2008 Table of Contents Section Page 4.1 Introduction...4-1 4.2 Subsurface Investigation...4-2 4.2.1 Preliminary

More information

IH-635 MANAGED LANES PROJECT, SEG. 3.2

IH-635 MANAGED LANES PROJECT, SEG. 3.2 IH-635 MANAGED LANES PROJECT, SEG. 3.2 Location: Dallas, Texas Owner: Texas Department of Transportation Client: Ferrovial Agroman Construction Cost: $1 Billion Construction Completion Date: December,

More information

Design of Bridges. Introduction. 3 rd to 4 th July 2012. Lecture for SPIN Training at the University of Dar es Salaam

Design of Bridges. Introduction. 3 rd to 4 th July 2012. Lecture for SPIN Training at the University of Dar es Salaam Design of Bridges Introduction 3 rd to 4 th July 2012 1 FUNCTION OF A BRIDGE To connect two communities which are separated by streams, river, valley, or gorge, etc. 2 EVOLUTION OF BRIDGES 1. Log Bridge

More information

Reinforced Soil Retaining Walls-Design and Construction

Reinforced Soil Retaining Walls-Design and Construction Lecture 31 Reinforced Soil Retaining Walls-Design and Construction Prof. G L Sivakumar Babu Department of Civil Engineering Indian Institute of Science Bangalore 560012 Evolution of RS-RW Classical gravity

More information

BRIDGES ARE relatively expensive but often are

BRIDGES ARE relatively expensive but often are Chapter 10 Bridges Chapter 10 Bridges Bridg Bridges -- usually the best, but most expensive drainage crossing structure. Protect bridges against scour. BRIDGES ARE relatively expensive but often are the

More information

Module 7 (Lecture 24 to 28) RETAINING WALLS

Module 7 (Lecture 24 to 28) RETAINING WALLS Module 7 (Lecture 24 to 28) RETAINING WALLS Topics 24.1 INTRODUCTION 24.2 GRAVITY AND CANTILEVER WALLS 24.3 PROPORTIONING RETAINING WALLS 24.4 APPLICATION OF LATERAL EARTH PRESSURE THEORIES TO DESIGN 24.5

More information

PREFABRICATED VERTICAL WICK & STRIP DRAINS. Soil drainage method for accelerating settlement through vertical drainage. americanwick.

PREFABRICATED VERTICAL WICK & STRIP DRAINS. Soil drainage method for accelerating settlement through vertical drainage. americanwick. PREFABRICATED VERTICAL WICK & STRIP DRAINS Soil drainage method for accelerating settlement through vertical drainage americanwick.com INTRODUCTION THE PROBLEM Historically, the design of structures on

More information

SECTION VALVE BOXES AND METER VAULTS

SECTION VALVE BOXES AND METER VAULTS SECTION 03 48 20 VALVE BOXES AND METER VAULTS PART 1: GENERAL 1.01 SECTION INCLUDES A. Valve boxes for water and cleanout boxes for wastewater service. B. Meter boxes for water service. C. Meter vaults

More information

Recommended Specifications, Commentaries, and Example Problems

Recommended Specifications, Commentaries, and Example Problems Draft Final Report Volume 2 to the NATIONAL COOPERATIVE HIGHWAY RESEARCH PROGRAM (NCHRP) on Project 12-70 Seismic Analysis and Design of Retaining Walls, Buried Structures, Slopes, and Embankments Recommended

More information

Soil Screw Design Manual Edition 2

Soil Screw Design Manual Edition 2 Soil Screw Design Manual Edition 2 Page TOC-1 Hubbell Power Systems, Inc. All Rights Reserved Copyright 2015 CONTENTS CONTENTS TABLE of CONTENTS INTRODUCTION and APPLICATIONS Section 1 PURPOSE AND SCOPE...

More information

EXAMPLE 1 DESIGN OF CANTILEVERED WALL, GRANULAR SOIL

EXAMPLE 1 DESIGN OF CANTILEVERED WALL, GRANULAR SOIL EXAMPLE DESIGN OF CANTILEVERED WALL, GRANULAR SOIL A sheet pile wall is required to support a 2 excavation. The soil is uniform as shown in the figure. To take into account the friction between the wall

More information

Settlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains

Settlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains Settlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains Doug Jenkins 1, Chris Lawson 2 1 Interactive Design Services, 2 Reinforced

More information

Wang, L., Gong, C. "Abutments and Retaining Structures." Bridge Engineering Handbook. Ed. Wai-Fah Chen and Lian Duan Boca Raton: CRC Press, 2000

Wang, L., Gong, C. Abutments and Retaining Structures. Bridge Engineering Handbook. Ed. Wai-Fah Chen and Lian Duan Boca Raton: CRC Press, 2000 Wang, L., Gong, C. "Abutments and Retaining Structures." Bridge Engineering Handbook. Ed. Wai-Fah Chen and Lian Duan Boca Raton: CRC Press, 000 9 Abutments and Retaining Structures Linan Wang California

More information

PRECAST CONCRETE BOX CULVERTS

PRECAST CONCRETE BOX CULVERTS PRECAST CONCRETE BOX CULVERTS OUTLINE Introduction Applications Manufacturing Methods Design Procedures & Joints Installation Quality Summary INTRODUCTION Four-sided culverts are typically referred to

More information

Designed and Engineered to Perform

Designed and Engineered to Perform History EARTH CONTACT PRODUCTS, L.L.C., is a family owned company, based in Olathe, Kansas. This company was built upon Don May s U.S. Patented fourth-generation Steel Piering System that has led to the

More information

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin PLAN SUBGRADES

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin PLAN SUBGRADES Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering Geotechnical Bulletin GB 1 PLAN SUBGRADES Geotechnical Bulletin GB1 was jointly developed by the Offices

More information

Work Type Definition and Submittal Requirements

Work Type Definition and Submittal Requirements Work Type: Geotechnical Studies Soils Analysis & Recommendations The first section, Work Type Definition, provides a detailed explanation of the work type. The second section, Work Type Submittal Requirements,

More information

Specification Guidelines: Allan Block Modular Retaining Wall Systems

Specification Guidelines: Allan Block Modular Retaining Wall Systems Specification Guidelines: Allan Block Modular Retaining Wall Systems The following specifications provide Allan Block Corporation's typical requirements and recommendations. At the engineer of record's

More information

How To Retaining Wall Guide

How To Retaining Wall Guide How To Retaining Wall Guide Before you start: Consents and Engineering Building Consent Retaining walls over 1.5m high will require a building consent from the Local Body Council. Walls that carry extra

More information

H 300 DESIGN LOADS AND DISTRIBUTION OF LOADS

H 300 DESIGN LOADS AND DISTRIBUTION OF LOADS 6-86 H 300 TABLE OF CONTENTS H 300 DESIGN LOADS AND DISTRIBUTION OF LOADS SECTION NO. SUBJECT DATE H 310 GENERAL REQUIREMENTS Feb. 1984 H 320 DEAD LOAD " H 330 LIVE LOAD " H 331 HIGHWAY LIVE LOAD " H 332

More information

Auger Boring. Dr. Mark Knight. Centre for Advancement of Trenchless Technologies (CATT) University of Waterloo. New Installations.

Auger Boring. Dr. Mark Knight. Centre for Advancement of Trenchless Technologies (CATT) University of Waterloo. New Installations. Auger Boring Dr. Mark Knight Centre for Advancement of Trenchless Technologies (CATT) University of Waterloo 1 New Installations New Installations Non-Steering Methods Steering Methods Moling/Piercing

More information

Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation

Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation Jeff R. Hill, P.E. Hayward Baker Inc. 111 W. Port Plaza Drive Suite 600 St. Louis, MO 63146 314-542-3040 JRHill@HaywardBaker.com

More information

Challenging Skew: Higgins Road Steel I-Girder Bridge over I-90 OTEC 2015 - October 27, 2015 Session 26

Challenging Skew: Higgins Road Steel I-Girder Bridge over I-90 OTEC 2015 - October 27, 2015 Session 26 2014 HDR Architecture, 2014 2014 HDR, HDR, Inc., all all rights reserved. Challenging Skew: Higgins Road Steel I-Girder Bridge over I-90 OTEC 2015 - October 27, 2015 Session 26 Brandon Chavel, PhD, P.E.,

More information

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains

More information

This section includes materials, installation and testing of earthwork for excavations, fills and embankments for structures and sites.

This section includes materials, installation and testing of earthwork for excavations, fills and embankments for structures and sites. STANDARD SPECIFICATION SECTION 02200 EARTHWORK PART 1 - GENERAL 1.01 DESCRIPTION This section includes materials, installation and testing of earthwork for excavations, fills and embankments for structures

More information

Geofoam A Light Weight Fill Alternative

Geofoam A Light Weight Fill Alternative Geofoam A Light Weight Fill Alternative Insulfoam A wholly owned subsidiary of Carlisle Construction Materials Headquarters in Puyallup, WA Producer of expanded polystyrene (EPS) for more than 45 years

More information

Geotechnical Building Works (GBW) Submission Requirements

Geotechnical Building Works (GBW) Submission Requirements Building Control (Amendment) Act 2012 and Regulations 2012: Geotechnical Building Works (GBW) Submission Requirements Building Engineering Group Building and Construction Authority May 2015 Content : 1.

More information

GEOTECHNICAL ENGINEERING FORMULAS. A handy reference for use in geotechnical analysis and design

GEOTECHNICAL ENGINEERING FORMULAS. A handy reference for use in geotechnical analysis and design GEOTECHNICAL ENGINEERING FORMULAS A handy reference for use in geotechnical analysis and design TABLE OF CONTENTS Page 1. SOIL CLASSIFICATION...3 1.1 USCS: Unified Soil Classification System...3 1.1.1

More information

Landslides in the White Mountain (Geotechnical Studies and Engineering Tests)

Landslides in the White Mountain (Geotechnical Studies and Engineering Tests) J. Al-Azhar University Gaza 2004, Vol. 7, NO. 2 P 15-26 Landslides in the White Mountain (Geotechnical Studies and Engineering Tests) Isam G. Jardaneh (1), Jalal Al-Dabeek (2), Abdel hakeem Al-Jawhari

More information

Pipeline bridge crossing for mining trucks A geotechnical engineering design.

Pipeline bridge crossing for mining trucks A geotechnical engineering design. Pipeline bridge crossing for mining trucks A geotechnical engineering design. Bernard Shen Pells Sullivan Meynink, Sydney, Australia ABSTRACT The Donaldson open pit coal mine is located in Blackhill, New

More information

SECTION 6 Geotechnical Engineering Field Investigation

SECTION 6 Geotechnical Engineering Field Investigation SECTION 6 Geotechnical Engineering Field Investigation Equipment to Take 1. Hand-held inclinometer. 2. Optical survey equipment. 3. Maps. Every effort should be made to acquire a reasonable topographic

More information

RESIDENTIAL FOUNDATION GUIDELINE Johnson County, KS

RESIDENTIAL FOUNDATION GUIDELINE Johnson County, KS RESIDENTIAL FOUNDATION GUIDELINE Johnson County, KS Johnson County Building Officials Association January 2008 Residential Foundation Guideline Foundation designs for one-and two-family dwellings may use

More information

Tensartech Earth Retaining Systems for Architects Attractive Tensartech Earth Retaining Walls and Slopes

Tensartech Earth Retaining Systems for Architects Attractive Tensartech Earth Retaining Walls and Slopes Curves, Terracing and Planting Complete Solutions Choices of Finish Tensartech Earth Retaining Systems for Architects Attractive Tensartech Earth Retaining Walls and Slopes We re here to help Tensar Technology

More information

Section 402. STORM SEWERS

Section 402. STORM SEWERS 402.02 Section 402. STORM SEWERS 402.01. Description. This work consists of constructing storm sewers of the size and class required, including excavation, bedding, and backfill. 402.02. Materials. Provide

More information

Foundation design to Eurocode 7

Foundation design to Eurocode 7 Foundation design to Eurocode 7 Dr Andrew Bond (Geocentrix) Outline of talk Overview of Eurocode 7 New principles for geotechnical design Impact on retaining wall design Impact on pile design Benefits

More information

Florida Department of Transportation 605 Suwannee Street Tallahassee, FL 32399-0450

Florida Department of Transportation 605 Suwannee Street Tallahassee, FL 32399-0450 RICK SCOTT GOVERNOR Florida Department of Transportation 605 Suwannee Street Tallahassee, FL 32399-0450 JIM BOXOLD SECRETARY Tips for Professional Services Prequalification Resume Submission In an effort

More information

Kingsbury Run Greenway Project

Kingsbury Run Greenway Project Kingsbury Run Greenway Project Slavic Village Development & Burton, Bell, Carr Project Goals Create Conceptual Plans and Cost Estimate. Coordinate with other ongoing and future projects in the area. Description

More information

Estimating Trench Excavation

Estimating Trench Excavation Estimating Excavation By Steven J. Peterson, PE, MBA Introduction excavation is often performed by hydraulic backhoe excavators. This is because hydraulic excavators are not only good at excavating below

More information

EXECUTIVE SUMMARY CHAPTER 6

EXECUTIVE SUMMARY CHAPTER 6 EXECUTIVE SUMMARY CHAPTER 6 This Bridge Development Report was prepared to document the decision process and recommendations for constructing a bridge carrying Maitland Boulevard (eastbound) over I-4 as

More information

SECTION 02401 SHEETING, SHORING AND BRACING

SECTION 02401 SHEETING, SHORING AND BRACING SECTION 02401 SHEETING, SHORING AND BRACING This section should be edited to reflect soil conditions specific to the project site and the recommendations of a Geotechnical Engineer licensed in the State

More information

CONCRETE SEGMENTAL RETAINING WALL SYSTEM

CONCRETE SEGMENTAL RETAINING WALL SYSTEM CONCRETE SEGMENTAL RETAINING WALL SYSTEM PART 1: GENERAL SPECIFICATIONS 1.01 Work Included A. Work shall consist of furnishing and constructing a Rockwood Classic 8 with PCS unit segmental retaining wall

More information

SECTION 32 32 23 CONCRETE SEGMENTAL RETAINING WALL SYSTEM

SECTION 32 32 23 CONCRETE SEGMENTAL RETAINING WALL SYSTEM Section 32 32 23 Concrete Segmental Retaining Wall Page 1 of 12 PART 1 GENERAL 1.01 SECTION INCLUDES SECTION 32 32 23 CONCRETE SEGMENTAL RETAINING WALL SYSTEM A. Concrete segmental retaining wall units.

More information

Section 2100-Trenching and Tunneling

Section 2100-Trenching and Tunneling SECTION 5200 - STORM SEWER PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of storm sewer mains and culverts. Topics include permits and fees, trench widths, pipe laying, bedding, initial

More information

SECTION TRENCHING AND BACKFILLING. 1. Section , Temporary Environmental Controls. 2. Section , Excavation and Fill.

SECTION TRENCHING AND BACKFILLING. 1. Section , Temporary Environmental Controls. 2. Section , Excavation and Fill. SECTION 31 23 33 TRENCHING AND BACKFILLING PART 1 GENERAL 1.01 SECTION INCLUDES A. This WORK shall consist of all labor, equipment, and materials necessary for excavation, trenching, and backfilling for

More information

Portable Bridges. Stream crossings on forest roads frequently. For Forest Road Stream Crossings. Stream Crossing Structures.

Portable Bridges. Stream crossings on forest roads frequently. For Forest Road Stream Crossings. Stream Crossing Structures. ANR-1074 Portable Bridges For Forest Road Stream Crossings Stream crossings on forest roads frequently create problems for loggers and many landowners. Stream crossings are costly to build and time-consuming

More information

EGYPTIAN CODES FOR DESIGN AND CONSTRUCTION OF BUILDINGS

EGYPTIAN CODES FOR DESIGN AND CONSTRUCTION OF BUILDINGS in the Euro-Mediterranean Area EGYPTIAN CODES FOR DESIGN AND CONSTRUCTION OF BUILDINGS By Prof. Amr Ezzat Salama Chairman of Housing, Building National Center Cairo, Egypt Former Minister of High Education

More information

RAILROAD DAMAGE FROM THE OCTOBER 16, 1999 HECTOR MINE EARTHQUAKE

RAILROAD DAMAGE FROM THE OCTOBER 16, 1999 HECTOR MINE EARTHQUAKE RAILROAD DAMAGE FROM THE OCTOBER 16, 1999 HECTOR MINE EARTHQUAKE By: William G. Byers, P.E. Burlington Northern and Santa Fe Railway 4515 Kansas Avenue Kansas City, Kansas 66106 Phone (913) 551-4070 Fax

More information

Foundations over Piles. Constructing Load Transfer Platforms over weak ground with piled foundations

Foundations over Piles. Constructing Load Transfer Platforms over weak ground with piled foundations Foundations over Piles Constructing Load Transfer Platforms over weak ground with piled foundations 2 Tensar Technology - proven practical solutions and the know-how to get them built Based on the characteristic

More information

SECTION 32 32 23 CONCRETE SEGMENTAL RETAINING WALL SYSTEM

SECTION 32 32 23 CONCRETE SEGMENTAL RETAINING WALL SYSTEM Anchor [coarse-split products] SECTION 32 32 23 CONCRETE SEGMENTAL RETAINING WALL SYSTEM PART 1 GENERAL 1.01 SUMMARY A. Section Includes 1. Concrete segmental retaining wall units 2. Geosynthetic reinforcement

More information

Section 205. ROADWAY EARTHWORK

Section 205. ROADWAY EARTHWORK 205.02 Section 205. ROADWAY EARTHWORK 205.01. Description. This work consists of the following: A. Constructing earth grades by excavating soil or rock and placing embankments or fills; B. Salvaging and

More information

HIGH TENSION CABLE BARRIER

HIGH TENSION CABLE BARRIER Special Provision September 11, 2006 SECTION 02845 S HIGH TENSION CABLE BARRIER PART 1 GENERAL 1.1 SECTION INCLUDES A. Cable barrier materials and installation procedures. 1.2 RELATED SECTIONS A. Section

More information

Rehabilitation of Existing River Piers for

Rehabilitation of Existing River Piers for Creating Value Delivering Solutions Rehabilitation of Existing River Piers for Dick Henderson Bridge, West Virginia i i Joe Carte, P.E. W.V. Department of Transportation Scott Zang, P.E. Michael Baker

More information

Geotechnical Engineering in the Urban Environment Engineering Consulting Services, LTD

Geotechnical Engineering in the Urban Environment Engineering Consulting Services, LTD Geotechnical Engineering in the Urban Environment Engineering Consulting Services, LTD Karl A. Higgins, III, P.E., Senior Principal Engineer 2014 Annual Meeting Introduction Geotechnical Engineering Challenges

More information

No allowance will be made for classification of different types of material encountered.

No allowance will be made for classification of different types of material encountered. PROJECT : Repair/ Maintenance of Flood Control and Drainage Structures Along Butuan City Cagayan de Oro City Iligan City Road LOCATION : San Antonio, Jasaan, Misamis Oriental SUBJECT : General Notes and

More information

SECTION TRENCHING, BACKFILLING AND COMPACTING

SECTION TRENCHING, BACKFILLING AND COMPACTING SECTION 02221 TRENCHING, BACKFILLING AND COMPACTING PART 1 GENERAL 1.01 SUMMARY A. This section addresses excavation and trenching; including subsurface drainage, dewatering, preparation of subgrade, pipe

More information

MSE Wall Engineering A New Look at Contracting, Design, and Construction. Presented by: James M. Schmidt, P.E., P.Eng. 1 Daniel L. Harpstead, P.E.

MSE Wall Engineering A New Look at Contracting, Design, and Construction. Presented by: James M. Schmidt, P.E., P.Eng. 1 Daniel L. Harpstead, P.E. MSE Wall Engineering A New Look at Contracting, Design, and Construction Presented by: James M. Schmidt, P.E., P.Eng. 1 Daniel L. Harpstead, P.E. 2 ABSTRACT Poor performance of mechanically stabilized

More information

The Verdura Wall check with your local building department

The Verdura Wall check with your local building department The Verdura Wall The Verdura Wall by Soil Retention Products, Inc of Carlsbad, California can be constructed as a gravity retaining structure or a geosynthetic reinforced segmental retaining wall, depending

More information

Mechanically stabilized layers in road construction

Mechanically stabilized layers in road construction Mechanically stabilized layers in road construction Zikmund Rakowski, Jacek Kawalec Tensar International, UK, Technical University of Silesia, Poland Abstract: Effective and economical technologies are

More information

Tiebacks/Anchors & Soil Nails. Tom Richards, PE Chief Design Engineer Nicholson Construction Company 12 McClane Street Cuddy, PA 15031

Tiebacks/Anchors & Soil Nails. Tom Richards, PE Chief Design Engineer Nicholson Construction Company 12 McClane Street Cuddy, PA 15031 Tiebacks/Anchors & Soil Nails Tom Richards, PE Chief Design Engineer Nicholson Construction Company 12 McClane Street Cuddy, PA 15031 Anchors & Nails Design Intro Materials Construction Testing Anchor

More information

2006-2008 MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS

2006-2008 MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS 2006-2008 MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS GENERAL 10/16/2008 The listed average unit prices are based on the

More information

National Council of Examiners for Engineering and Surveying. Principles and Practice of Engineering Structural Examination

National Council of Examiners for Engineering and Surveying. Principles and Practice of Engineering Structural Examination Structural Effective Beginning with the April 2011 The structural engineering exam is a breadth and exam examination offered in two components on successive days. The 8-hour Vertical Forces (Gravity/Other)

More information

The minimum reinforcement for the stem wall is the placement of:

The minimum reinforcement for the stem wall is the placement of: PolySteel creates an ideal insulated stem wall for concrete slabs that can make this part of your project easier and faster, in addition to making your finished project more energy-efficient. Figures 3.20

More information

SECTION CONCRETE SEGMENTAL RETAINING WALL SYSTEM

SECTION CONCRETE SEGMENTAL RETAINING WALL SYSTEM SECTION 32 32 23 CONCRETE SEGMENTAL RETAINING WALL SYSTEM PART 1 - GENERAL 1.01 DESCRIPTION A. Work consists of furnishing and construction of a RETANI Retaining Wall System in accordance with these specifications

More information

PDHonline Course S151A (1 PDH) Steel Sheet Piling. Instructor: Matthew Stuart, PE, SE. PDH Online PDH Center

PDHonline Course S151A (1 PDH) Steel Sheet Piling. Instructor: Matthew Stuart, PE, SE. PDH Online PDH Center PDHonline Course S151A (1 PDH) Steel Sheet Piling Instructor: Matthew Stuart, PE, SE 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone & Fax: 703-988-0088 www.pdhonline.org

More information

DESIGN-BUILD SUPPORT OF EXCAVATION FOR BLOCK 76. Rick Deschamps and Tom Hurley, Nicholson Construction, Pittsburgh, PA USA

DESIGN-BUILD SUPPORT OF EXCAVATION FOR BLOCK 76. Rick Deschamps and Tom Hurley, Nicholson Construction, Pittsburgh, PA USA DESIGN-BUILD SUPPORT OF EXCAVATION FOR BLOCK 76 Rick Deschamps and Tom Hurley, Nicholson Construction, Pittsburgh, PA USA The Block 76 project includes the demolition and redevelopment of an entire city

More information

Section 2 Specification 2.18 Concrete and/or Corrugated Steel Storm Sewer TABLE OF CONTENTS

Section 2 Specification 2.18 Concrete and/or Corrugated Steel Storm Sewer TABLE OF CONTENTS TABLE OF CONTENTS 2.18 CONCRETE AND/OR CORRUGATED STEEL STORM SEWER... 1 2.18.1 GENERAL... 1 2.18.2 MATERIALS... 1 2.18.2.1 Storm Sewer Pipe... 1 2.18.2.2 Cement Mortar... 1 2.18.2.3 Granular Materials...

More information

H 500 FOUNDATIONS AND RETAINING STRUCTURES

H 500 FOUNDATIONS AND RETAINING STRUCTURES 6-86 H 500 TABLE OF CONTENTS H 500 FOUNDATIONS AND RETAINING STRUCTURES SECTION NO. SUBJECT DATE H 510 PILES Feb. 1984 H 511 PILEE TYPE SELECTION " H 512 PILE TYPES " H 512.1 CAST-IN-DRILLED-HOLE PILES