1 Asbestos Policy Policy holder Asset and Senior Contracts Manager Approval date September 2016 Review date September 2021 Contents 1. Policy statement 2. Background 3. Policy details 4. Eligibility criteria 5. Equality considerations 6. Review and monitoring Appendix 1: Asbestos Management Plan 1. Policy statement 1.1 Asbestos is potentially hazardous and a clearly defined approach to asbestos management is essential to adhere to legislative requirements and ensure asbestos-containing materials are located, identified, recorded and maintained. 1.2 This policy explains how Greenfields manages asbestos-containing materials that are either identified or presumed to exist within its assets. 2. Background 2.1 This policy applies to all domestic dwellings properties where Greenfields has a maintenance responsibility. It also applies to any associated common areas, garages, commercial buildings and fly-tipped asbestos waste on Greenfields land. 2.2 This policy should be read in conjunction with other relevant policies and procedures published by Greenfields. 3. Policy details 3.1 Greenfields Asbestos Management Plan (Appendix 1) details Greenfields approach to the management of asbestos-containing material within Greenfields property assets. 1

2 3.2 In relation to asbestos-containing materials, Greenfields will comply with all relevant current legislation, including but not limited to the Health and Safety at Work Act, the Defective Premises Act as well as the Control of Asbestos Regulations and other relevant regulations, approved codes of practice and guidance. 3.3 Greenfields will identify and categorise asbestos through our survey and reinspection programme. 3.4 We will hold and maintain an asbestos register detailing the type of asbestos, its location, condition, quantity, re-inspection and management recommendations. 3.5 We will protect those working on the fabric of the building and those working and living in our properties, and will provide appropriate asbestos training to relevant employees. 3.6 We will share information about the location and condition of identified asbestos-containing materials with those who are likely to disturb them and effectively control works that are likely to affect asbestos. 3.7 We will monitor and maintain the condition of identified asbestos-containing materials in line with the risk assessment recommendations. 4. Equalities considerations 4.1 An equality analysis has been carried out for this policy. impacts have been identified. 5. Review and monitoring 5.1 This policy will be reviewed every five years or as legislation changes. 2

3 Appendix 1 Asbestos Management Plan Author Date of Initial Issue Date of revision Duty Holder Responsible Person Asset and Senior Contracts Manager Draft Director of Property Services Asset and Senior Contracts Manager 1. Review of the Asbestos Management Plan 1.1 The Asbestos Management Plan will be reviewed every two years or more frequently where there has been a change in legislation, change in organisational structure or if arrangements within the plan are no longer considered to be adequate. 1.2 This plan must be read in conjunction with Greenfields Asbestos Policy. 2. Managing asbestos 2.1 Greenfields recognises the importance of effectively managing and dealing with asbestos that may be present within its property assets, and the duties and obligations imposed by legislation. 2.2 Greenfields aim is to ensure that asbestos materials are not disturbed, except in a controlled environment during the removal process. 2.3 Appropriate employees are required to read and understand Greenfields Asbestos Policy and this management plan, and act appropriately in line with this and all current legislation. 2.4 All materials within Greenfields property assets MUST be presumed to contain asbestos and treated accordingly unless, or until, strong evidence is established to the contrary. 2.5 However, properties known to have been constructed from the year 2000 onwards are reasonably expected not to contain asbestos material. 3. Asbestos information, distribution and communication 3.1 Location of and access to the Asbestos Register All information regarding the type of asbestos, its location, condition, quantity, re-inspection and management recommendations will be recorded within the Asbestos Register which is held on Greenfields Asset Management System. Access to the register is available to all staff. 3

4 3.1.2 Routine back-ups of the Asbestos Register are completed on a daily basis Employees can access the Asbestos Register through Greenfields computer systems, Orchard and Keystone. If the employee does not have access to a computer, they can access the system through a suitable mobile device or by telephoning and enquiring through a colleague at Greenfields offices. 3.2 Requirements for contractors Appointed contractors are expected to request and review relevant information available within the Asbestos Register and take appropriate steps to safeguard their own and the occupant s safety prior to the start of their work The contractor will provide site-specific risk assessments and method statements for all work involving working with asbestos or any work where asbestos may be disturbed or damaged Greenfields will issue contractors with a copy of the current asbestos survey where appropriate. Where the current survey is not deemed appropriate, an appropriate survey will be instructed or commissioned Greenfields will check the competency of contractors through the tender process. Dependant on the type of work, Greenfields will also check the contractor s competency for working with or removal of asbestos-containing materials Where licensed removal forms part of a contract, Greenfields will also view the details of the license and check its validity with the Heath and Safety Executive (HSE). 3.3 Sharing asbestos information with residents and landlord s consent Greenfields residents are made aware of the risks of asbestos material within their home through their Tenants Handbook, Greenfields website and other Greenfields publications If a resident is proposing to carry out alterations that are likely to disturb asbestos, guidance will be provided through the Landlords Consent Process. If an appropriate asbestos survey is available, Greenfields will provide this to the resident. If an appropriate survey is not available, Greenfields will arrange for this to be conducted at the residents cost and the survey will be issued to the resident If the work involves disturbing or removing asbestos-containing material, Greenfields will give guidance to the resident or refuse landlords consent, as appropriate. 4

5 3.4 Sharing asbestos information with Emergency Fire Services Emergency Fire Services will be advised that they can contact Greenfields on if they require more specific information about a particular property they are about to attend for an emergency. 3.5 Approach to labelling asbestos materials Labelling of asbestos-containing materials within Greenfields properties has not been adopted by Greenfields. Labelling is considered unsightly in domestic premises and is not reliable or appropriate control measure. 4. Surveys and re-inspections 4.1 All new Greenfields asbestos surveys will be conducted in accordance with HSE Guidance HSG 264 Asbestos: The Survey Guide. All surveys will be completed by a UKAS accredited surveying company and in line with ISO Greenfields will maintain a programme of asbestos surveys and re-inspections to enable further asbestos-containing material to be identified and provide a monitoring service to check the condition of known asbestos material. 4.3 Following any survey or re-inspection, Greenfields Asbestos Register will be updated. 4.4 Re-inspections will be carried out by Greenfields-approved asbestos consultant or by trained and competent Greenfields staff members. 5

6 5. Risk Assessments and Actions 5.1 An asbestos risk assessment will be carried out after a survey or re-inspection has been completed on a property or before any planned or responsive maintenance is carried out on a property. For the purpose of this Management Plan the following table should be used as a guide to prioritise asbestos remedial work requirements. Overall RA score Overall risk rating Action: access to ACM 16 High Restrict access to the area using a physical barrier and asbestos warning notice Medium Restrict access to the material if necessary Action where works are involved Where practicable remove. If not practicable to remove, encapsulate or remediate immediately Where practicable remove. If not encapsulate or remediate when practical Action where works are not involved In order of preference, but dependant on reasonable practicalities, remove / encapsulate / remediate immediately Schedule for encapsulation / removal / remediation when practical Low immediate action required immediate action required < 9 Very Low immediate action required immediate action required Re-inspection timeframe Unless removed, reinspect every six months Unless removed, reinspect every 12 months Monitor closely, and re-inspect every two years Monitor closely, and re-inspect every three years Reassurance air test frequency Unless asbestoscontaining material is removed, reassurance air test every three months N/A unless instructed by the Duty Holder N/A unless instructed by the Duty Holder N/A unless instructed by the Duty Holder 5.2 Although these are the recommended actions, Greenfields will decide on an individual property basis what the appropriate action will be, and instruct the approved Asbestos Consultant accordingly if any changes are necessary. Individual asbestos-containing materials, their unique risk assessments and recommended actions an can be found in the Asbestos Register. 6

7 6. Action Plan Re-survey all Property Assets that do not have an asbestos survey that complies with HSG 264 Asbestos: The Survey Guide, by A property-specific Action Plan will be developed based on the asbestos risk assessments. Actions will be in line with the risk assessment actions as highlighted in Section 6. These actions will be logged on Greenfields Asbestos Register Review the Asbestos Policy and Management Plan in line with Section 2 of this document. 7. Safe systems of work 7.1 Restriction of access Greenfields has a permit to work form which can be used as a control measure by Greenfields employees when they consider it is necessary. 7.2 Work on Greenfields properties Before starting any routine or planned maintenance work, a risk assessment must be undertaken by Greenfields, its designated Designer or Principal Contractor. If the risk assessment indicates it is necessary, the Asbestos Register should be checked for relevant asbestos survey reports relating to the property. If there is no survey report available, an appropriate survey complying with HSG264 must be arranged and the report reviewed before planned work can commence Significant refurbishment or demolition work will require a refurbishment and demolition survey to be completed, unless a suitable survey is already available All materials on site must be presumed to contain asbestos and treated accordingly unless, or until, strong evidence is received to the contrary If a contractor or Greenfields Trades Team is approved to carry out emergency work, they must conduct an asbestos-specific risk assessment before starting work. Their risk assessment may: demonstrate that no further action needs to be taken in relation to asbestos before work can proceed (i.e. no asbestos present or no asbestoscontaining materials will be damaged/disturbed during the work) demonstrate that work can proceed but methods need to be adjusted to account for assumed asbestos-containing materials require them not to proceed with work until they have looked at the survey for the property (note: in this instance work cannot proceed until a survey has been carried out and if the repairs fall into the emergency category the resident may need to be decanted until the work is completed). 7

8 7.2.5 An emergency out-of-hours arrangement is established with Greenfields approved Asbestos Consultant to ensure they are readily accessible to provide asbestos services and work. 7.3 Acquiring new properties for Greenfields housing stock Before acquiring properties, Greenfields will check the properties are compliant with legislation and the relevant information is transferred with the freehold or as part of the lease agreement If the property was built or modified before the year 2000, Greenfields will arrange for an asbestos survey through their asbestos consultant. The survey will be conducted before any work on, or occupation of the property and the relevant details will be added to the Asbestos Register If the property was built after the year 2000, Greenfields will assess the build data, and if the source of materials cannot be ratified a Management Survey will be instructed to validate if any asbestos-containing materials are present. 7.4 Asbestos-containing material uncovered during work If suspected asbestos-containing material is disturbed or uncovered on an unplanned basis during works, the Emergency Procedures should be implemented (please refer to the Emergency Procedures flowchart). 7.5 Fly-tipped asbestos material Greenfields is responsible for the removal of asbestos waste illegally tipped on its land. Any person discovering fly-tipped asbestos waste on Greenfields land should notify Greenfields Customer Services Centre. They will log the details on our systems and notify the Responsible Person of the problem Greenfields approved Asbestos Consultant will be instructed to attend the site and assess the materials. They will arrange for the area to be quarantined and secured, and for any asbestos material to be safely and appropriately removed and disposed of. Warning notices should be posted to prevent access Greenfields will attempt to determine the source of the fly-tipped waste and will take action to recover any costs incurred. 7.6 Asbestos removal, encapsulation and remedial works If licensed work is required, Greenfields will employ a contractor holding a full license with the HSE If notifiable asbestos works are required, including those considered nonlicensable under Sporadic Low Intensity Exposure (SLIE), Greenfields will employ a competent contractor to deal with these materials. 8

9 7.6.3 If asbestos works are non-licensed and non-notifiable, Greenfields will either perform removal, encapsulation or remediation using our own, trained and competent trades or alternatively employ a competent contractor to deal with these materials All work must have site specific Risk Assessments and Method Statements before work is started. 8. Employee training 8.1 Greenfields and their contractors will provide asbestos-awareness training for all personnel who are identified as being liable to be exposed to asbestos, and for their direct supervisors. This course must be refreshed annually. 8.2 Any employee or contractor who is assigned to work with asbestos MUST be appropriately trained and competent 8.3 Greenfields Asbestos Policy and Management Plan and other sources of asbestos information will be included as part of Greenfields employee induction process. 8.4 Greenfields employees whose work could reasonably be expected to expose them to asbestos or who may be involved in directly managing asbestos programmes of work may also be required to attend relevant additional training. 8.5 As a minimum, Greenfields Responsible Person will have completed and passed the BOHS P405 training course and can advise others where necessary. 9

10 9. Emergency Procedures Emergency Procedure If presumed asbestos materials are uncovered, damaged during work or found damaged STOP WORK IMMEDIATELY Is there dust or debris present in the area from the suspect material, or on you as a person, or on the clothing you are wearing? E.g. contaminated clothes, hair, footwear, etc. Yes Report the problem to the person in charge of the site as soon as possible. Keep everyone else out of the area, then leave the area by going outside by the shortest route where there is nobody else around. Restrict access to the area The person in charge of the site should arrange for a safe material sample to be taken and analysed through Greenfields approved Asbestos Consultant. Contact your line manager immediately using your mobile phone. (Or alternatively, if they are not available contact the Customer Services Centre, on ) Explain the situation and request that they contact Greenfields approved Asbestos Consultant, Environtec Ltd, on , and arrange for an asbestos specialist to attend site, on an emergency basis, to deal with presumed asbestos contamination. Greenfields approved Asbestos Consultant will arrange for an asbestos specialist, and a mobile decontamination unit if necessary, to attend site to safely deal with any contamination. Does sample contain asbestos? Yes action required Keep a record of the event using Greenfields form Record of Risk of Exposure to Asbestos Dust Greenfields develops an Asbestos Management Plan and decides appropriate removal method / contractor 10

11 Outline of safe systems of works for asbestos-containing material (ACM) Work process Prior to work, check Asbestos Register Does a suitable survey exist? Yes Will the work disturb asbestos or require ACM removal? Yes Is the work notifiable or requires licenced ACM removal? Yes Update register, share survey report / make accessible as appropriate to those who may disturb asbestos Instruct Greenfields Asbestos surveyor to conduct a targeted or full Refurbishment and Demolition survey as appropriate Plan & execute works or service via competent contractor or with caution using competent trained Greenfields staff and approved Site specific Method Statements tify Asset Team. Asset Team instruct removal by an approved licenced contractor Work process complete ACM n-notifiable & nonlicensed ACM Greenfields-approved Asbestos Consultant to complete sample air tests on a minimum of 10% of non-notifiable / non-licensed ACM removal work Licenced contractor notifies with ASB5 form and performs removal Approved Asbestos Consultant will verify whether records are appropriate before they update asbestos register and management plan Send updated survey record, analysts reports and hazardous waste consignment notes to approved Asbestos Consultant 11 Contracts Manager to check the Waste Consignment te and Clearance Certificate Independent Analysts clearance report / clean air test / confirmation area safe for reoccupation

12 Record of risk of exposure to asbestos dust Client: Site: Part A: (Completed by the affected person and issued to the Responsible Person) Name: Job title: Company: Tel. no.: Location of occurrence: Description of material: Brief description of what occurred: Signed (Affected Person) Signed (Manager) Name / Position of Manager: Part B (to be completed by the Responsible Person) Name: Position: Has the area been cordoned off?...yes / NO Were all safe system of work procedures followed?...yes / NO What can be implemented to prevent a re-occurrence? (detail) What remedial action has been implemented to make safe the ACM? What was the estimated level of exposure of asbestos?...f/ml In damaging the ACM, has the control limit or action level been exceeded?...yes / NO If yes to the above, has RIDDOR 1995 been complied with?...yes / N/A Signed: Date: 12

13 12. Permit to Work Asbestos Register Site Signing In / Out Form When specified by Greenfields, this form is to be completed and signed by the Greenfields employees or the contractors before starting their work. Date: Time In: Signed Time Out: Signed Name Job Title Company Greenfields Contract Ref or Order.: Greenfields contact authorising work: Address and description of works: Has the asbestos report been reviewed and understood? Yes Has work been planned in accordance with the Control of Asbestos Regulations 2012? Yes Declaration I have thoroughly read the copy of the asbestos report on site. I am fully aware of the location and content of the areas/materials that contain asbestos. I am aware the exclusions to the surveys which must be presumed to contain asbestos. If the report is a management level survey, I understand the limitations and that it is only suitable for non-intrusive maintenance work. OR asbestos report is available on site. I have contacted the relevant Greenfields Contract Manager for further instruction, and I am now fully aware of how to safely proceed. I have completed an asbestos risk assessment which indicates it is safe to proceed with the work and I understand that an approved and fully HSE licensed asbestos contractor must be employed for access to work within, an area that is likely to contain damaged or friable asbestos materials. The works are fully completed in line with the plan of work and I confirm that the area and all remaining materials are left in a safe condition for re-occupation. Any other relevant comments: Signed (Operative)..Date Signed (Greenfields)..Date. 13

Asbestos Management Plan

Asbestos Management Plan Harlow Council Asbestos Management Plan Version 4 Scope: This management plan applies to the management of all asbestos containing materials to properties under the ownership/management of Harlow Council

More information

The Management of Asbestos containing Materials

The Management of Asbestos containing Materials The Management of Asbestos containing Materials Status Owner Approval by University Court Draft Head of Estates and Building 1 Purpose... 1 2 Scope... 3 3 Principles... 4 4 Procedure... 5 5 Accountabilities...

More information

ASBESTOS MANAGEMENT PLAN

ASBESTOS MANAGEMENT PLAN ASBESTOS MANAGEMENT PLAN PREPARED BY: Scott Gregory: Estates - Property Services DATE: 18/04/2014 STATUS: Draft ISSUE: 2014 (02) September 2014 NEXT REVISION DATE: April 2014 Contents 1.0 Introduction

More information

HAVEBURY HOUSING PARTNERSHIP

HAVEBURY HOUSING PARTNERSHIP HS028 HAVEBURY HOUSING PARTNERSHIP POLICY ASBESTOS MANAGEMENT Controlling Authority Director of Resources Policy No. HS028 Issue No. 3 Status Final Date November 2013 Review Date: November 2016 Equality

More information

UNIVERSITY OF LEICESTER ESTATES & FACILITIES MANAGEMENT DIVISION ASBESTOS MANAGEMENT PLAN

UNIVERSITY OF LEICESTER ESTATES & FACILITIES MANAGEMENT DIVISION ASBESTOS MANAGEMENT PLAN UNIVERSITY OF LEICESTER ESTATES & FACILITIES MANAGEMENT DIVISION ASBESTOS MANAGEMENT PLAN Revision Date Nature of Revision Prepared by Approved by 0.2 Jul 2013 Initial draft for comment Jon Fahie 0.3 Sep

More information

Policy on the Management of Asbestos

Policy on the Management of Asbestos WISHAW AND DISTRICT HOUSING ASSOCIATION Policy on the Management of Asbestos As with all the Association s policies and procedures, this document, where required, may be able to be translated into other

More information

Asbestos Management Policy

Asbestos Management Policy Central Bedfordshire Council www.centralbedfordshire.gov.uk Asbestos Management Policy The Housing Service Version 1.0 Directorate Social Care Health and Housing Service Housing Service Approved by Director

More information

ASBESTOS MANAGEMENT PLAN. Borough of Poole Transportation Services, Property Management, Civic Centre, Poole, Dorset BH15 2RU

ASBESTOS MANAGEMENT PLAN. Borough of Poole Transportation Services, Property Management, Civic Centre, Poole, Dorset BH15 2RU ASBESTOS MANAGEMENT PLAN Borough of Poole Transportation Services, Property Management, Civic Centre, Poole, Dorset BH15 2RU CONTENTS 1. INTRODUCTION 2. HOW DOES THE BOROUGH OF POOLE MANAGE ITS ASBESTOS

More information

Author G Morton July 2015. Newcastle University Asbestos Management Plan 2015

Author G Morton July 2015. Newcastle University Asbestos Management Plan 2015 Newcastle University Asbestos Management Plan 2015 1 Contents 1.0 Introduction 2.0 Asbestos Management Duty Holder Responsibilities 2.1 Asbestos Manager (Head of Maintenance) 2.2 University Asbestos Survey

More information

Asbestos Management Plan

Asbestos Management Plan Health and Safety Services Asbestos Management Plan Policy, Organisation and Arrangements Sean Callaghan Issue number 3 April 2014 Issue Date Nature of revision Prepared by Approved by 2 April 2013 First

More information

ASBESTOS POLICY AND PROCEDURES

ASBESTOS POLICY AND PROCEDURES ASBESTOS POLICY AND PROCEDURES a CORPORATE RESOURCES DEPARTMENT PROPERTY SERVICES POLICY FOR THE MANAGEMENT OF ASBESTOS IN BUILDINGS OWNED AND/OR OPERATED BY LEICESTERSHIRE COUNTY COUNCIL LCC ASB/001 ISSUE

More information

POLICY Contents. 1.0 Introduction Statement

POLICY Contents. 1.0 Introduction Statement POLICY Contents 1.0 Introduction Statement 2.0 Legal Responsibility 2.1 Asbestos Management Hierarchy 2.2 Duty Holders Responsibility 2.3 Employees Responsibility 3.0 Asbestos Management Procedure 4.0

More information

Managing Asbestos Policy

Managing Asbestos Policy Managing Asbestos Policy Liverpool Mutual Homes Page 1 of 16 Table of Contents 1. MANAGEMENT INFORMATION 2. POLICY STATEMENT 3. POLICY AIMS AND KEY OBJECTIVES 4. INTRODUCTION 5. DETAIL 6. LINKS TO LMH

More information

Asbestos Management Policy (Version 3)

Asbestos Management Policy (Version 3) Asbestos Management Policy (Version 3) Contents Page Introduction 3 College Policy Statement for Asbestos Management 3 Objectives (of this Policy and Procedure) 3 Application of Policy 4 Licensed Asbestos

More information

Policy 7 Management of Asbestos

Policy 7 Management of Asbestos Policy 7 Management of Asbestos 1.0 Introduction Development & Infrastructure recognise both the need to protect their employees from the risks associated with encountering asbestos and the potential for

More information

Policy for the Management of Asbestos in Council Premises (Corporate and Housing)

Policy for the Management of Asbestos in Council Premises (Corporate and Housing) Policy for the Management of Asbestos in Council Premises (Corporate and Housing) Page 1 of 14 1. Policy Statement 1.1 This policy is designed to provide a clear acknowledgement of the responsibilities

More information

Asbestos Policy & Procedure

Asbestos Policy & Procedure Asbestos Policy & Procedure 1. Purpose & Introduction This policy and procedure sets out Octavia s commitment and approach to ensuring, so far as reasonably practicable, that residents, contractors and

More information

Control of Asbestos Policy

Control of Asbestos Policy Control of Asbestos Policy Version Number: V1D Name of originator/author: Estates Manager 0161 277 1235 Name of responsible committee: Estates and Facilities Committee Name of executive lead: Director

More information

Asbestos-Containing Materials in Buildings: Asbestos Management Plan for LBC Housing

Asbestos-Containing Materials in Buildings: Asbestos Management Plan for LBC Housing LUTON BOROUGH COUNCIL, BUILDING AND TECHNICAL SERVICES CENTRAL DEPOT, KINGSWAY, LUTON LU4 8AU. Asbestos-Containing Materials in Buildings: Asbestos Management Plan for LBC Housing In accordance with the

More information

ASBESTOS MANAGEMENT POLICY AND GUIDANCE

ASBESTOS MANAGEMENT POLICY AND GUIDANCE ASBESTOS MANAGEMENT POLICY AND GUIDANCE Belvoir High School Policy and Procedures Date approved 08/10/2013 Signed by Chair of Governors (Mr B Lovegrove Date approved 08/10/2013 Signed by Executive Principal

More information

Asbestos Safety Management Standard Issue 8 October 2008. www.walsall.org.uk/healthandsafety

Asbestos Safety Management Standard Issue 8 October 2008. www.walsall.org.uk/healthandsafety www.walsall.org.uk/healthandsafety Asbestos Safety Management Standard Issue 8 October 2008 Page 1 of 7 / WMBC/SMS Asb/008/01 UNCONTROLLED WHEN PRINTED Please contact us if you have any difficulty reading

More information

Asbestos Management Policy

Asbestos Management Policy Asbestos Management Policy Originator: Approval date: Policy and Strategy Team Sovini Board PCHA Board OVH Board/EMT 3 rd December 2012 22 nd November 2012 25 th September 2012 Review date: December 2013

More information

Review Date 01/09/2015 Director of Estates and Facilities Expiry Date 11/09/2016 Withdrawn Date

Review Date 01/09/2015 Director of Estates and Facilities Expiry Date 11/09/2016 Withdrawn Date Policy No: RM78 Version: 1.0 Name of Policy: Corporate Asbestos Management Policy, Organisational Arrangements and Procedures Policy Effective From: 24/10/2013 Date Ratified 12/09/2013 Ratified Health

More information

Asbestos Policy and Management Plan 2013-16

Asbestos Policy and Management Plan 2013-16 Policy reviewed by Thomas Eggar Solicitors, January 2013 Equality Assessment completed January 2013 Policy reviewed by the Health and Safety Committee, February 2013 Policy reviewed and adopted by the

More information

ASBESTOS MANAGEMENT POLICY

ASBESTOS MANAGEMENT POLICY ASBESTOS MANAGEMENT POLICY Published : 4th Revision December 2014 1 Table of Contents INTRODUCTION... 3 DUTY TO MANAGE ASBESTOS... 3 DUTIES OF CAMPUS SERVICES... 3 1.0 POLICY OBJECTIVES... 5 2.0 RESPONSIBILITIES...

More information

Bield Housing and Care POLICY, PROCEDURES. and MANAGEMENT PLAN ASBESTOS CONTAINING MATERIALS

Bield Housing and Care POLICY, PROCEDURES. and MANAGEMENT PLAN ASBESTOS CONTAINING MATERIALS Bield Housing and Care POLICY, PROCEDURES and MANAGEMENT PLAN for ASBESTOS CONTAINING MATERIALS Approved on: 24 April 2014 By Health & Safety Management Group Implementation date: 1 June 2014 Review Date

More information

Asbestos Management Procedure

Asbestos Management Procedure Asbestos Management Procedure Reference: HS/021/2010 Version No: 2.0 Issue Date: July 2010 Document Control Document Ref: HS/021/2010 Date Created: Jan 2010 Version: 2 Date Modified: Revision due December

More information

An Introduction to Asbestos, Legislation and Licensed

An Introduction to Asbestos, Legislation and Licensed An Introduction to Asbestos, Legislation and Licensed Contractor Selection MARK W ROBERTS Director Kitsons Environmental Europe Ltd Chair ARCA CHRIS BISHOP BA, C.Chem MRSC, MCQI CQP, CCP (Asbestos) Head

More information

STRATEGIC PLANNING & PLACE BUILDING CONTRACT DIRECTIVE

STRATEGIC PLANNING & PLACE BUILDING CONTRACT DIRECTIVE BCD.26 STRATEGIC PLANNING & PLACE BUILDING CONTRACT DIRECTIVE DATE: March 2015 Copyright Reserved TESTING, ASSESSMENT AND WORK WITH ASBESTOS CONTAINING MATERIALS (ACM S) REFERENCE This Directive deals

More information

Asbestos Policy ASBESTOS POLICY. Version 2 / Jun 2015 Page 1 of 11 Asbestos Policy

Asbestos Policy ASBESTOS POLICY. Version 2 / Jun 2015 Page 1 of 11 Asbestos Policy ASBESTOS POLICY Version 2 / Jun 2015 Page 1 of 11 Asbestos Policy This is a controlled document. It should not be altered in any way without the express permission of the author or their representative.

More information

Asbestos Policy Lead officer: Date agreed: Review date: Working together to deliver quality homes and a better environment for all

Asbestos Policy   Lead officer: Date agreed: Review date: Working together to deliver quality homes and a better environment for all Asbestos Policy Lead officer: Jeff Scott Date agreed: May 2013 Review date: May 2016 Working together to deliver quality homes and a better environment for all Page 1 of 11 Contents Page 1 Introduction

More information

ASBESTOS POLICY MANAGEMENT PLAN

ASBESTOS POLICY MANAGEMENT PLAN ASBESTOS POLICY & MANAGEMENT PLAN HS20 Version V2 Approved by: Health, Safety and Security Committee Date approved: March 2011 Ratified by: Hospital Executive Committee Date ratified 24 th April 2012 Document

More information

Policy for the Management of Asbestos in the Workplace

Policy for the Management of Asbestos in the Workplace Southwark Council Management of Asbestos in the Workplace November 2011 Page 1 of 15 CONTENTS 1. INTRODUCTION... 3 2. POLICY STATEMENT... 3 3. ASBESTOS RISK CLASSIFICATION SCHEME... 5 4. SAMPLING OF ASBESTOS

More information

REVISION 9 January 2015 ASBESTOS MANAGEMENT PLAN

REVISION 9 January 2015 ASBESTOS MANAGEMENT PLAN REVISION 9 January 2015 ASBESTOS MANAGEMENT PLAN ULSTER UNIVERSITY - ASBESTOS MANAGEMENT PLAN CONTENTS PAGE 1. Introduction 4 2. Background 4 2.1 Types of Asbestos 2.2 Hazards of Asbestos dust 2.3 Use

More information

Asbestos at work guide

Asbestos at work guide Asbestos at work guide Contents Introduction.... 2 Frequently asked questions.... 4 The Control of Asbestos Regulations 2006... 5 Types of asbestos survey.... 7 1 Introduction This document provides a

More information

AUDIT OF DET ASBESTOS MANAGEMENT IN QUEENSLAND SCHOOLS

AUDIT OF DET ASBESTOS MANAGEMENT IN QUEENSLAND SCHOOLS AUDIT OF DET ASBESTOS MANAGEMENT IN QUEENSLAND SCHOOLS Conducted By GASKIN CONSTRUCTION SERVICES PTY LTD TABLE OF CONTENTS SECTIONS Section 1 Section 2 Section 3 Section 4 Section 5 Section 6 Section 7

More information

Asbestos Management Plan

Asbestos Management Plan Asbestos Management Plan This procedural document was previously incorporated within the Asbestos Management Policy and Procedures CORP/HSFS 10 v.3 Did you print this document yourself? The Trust discourages

More information

Asbestos Management Plan. April 2011

Asbestos Management Plan. April 2011 Reviewed by: Approved by: Health & Safety Management Committee Management Board -. R3. Part 1: Introduction Part 2: Policy Part 3: Organisation and Responsibilities Part 4: Procedures Appendices: 1 Management

More information

ASBESTOS CONTAINING MATERIALS POLICY

ASBESTOS CONTAINING MATERIALS POLICY ASBESTOS CONTAINING MATERIALS POLICY Document Control Version 3 Ratified by Risk Management Sub Group Date Ratified 19 December 2012 Name of Originator/Author Head of Estates and Facilities Name of Responsible

More information

MANAGEMENT OF ASBESTOS POLICY

MANAGEMENT OF ASBESTOS POLICY MANAGEMENT OF ASBESTOS POLICY The application of this policy and procedure ensures that no employee receives less favourable treatment on grounds of sex, trans-gender status, sexual orientation, religion

More information

Asbestos Policy. Ymddiriedolaeth GIG Gwasanaethau Ambiwlans Cymru Welsh Ambulance Service (NHS) Trust. November 2007. All Staff.

Asbestos Policy. Ymddiriedolaeth GIG Gwasanaethau Ambiwlans Cymru Welsh Ambulance Service (NHS) Trust. November 2007. All Staff. Appendix 1 Ymddiriedolaeth GIG Gwasanaethau Ambiwlans Cymru Welsh Ambulance Service (NHS) Trust Asbestos Policy Approved by Date Review Date Target Audience Trust Board November 2007 November 2008 All

More information

Asbestos Surveys and Removals Progress Report Financial Year 07/08

Asbestos Surveys and Removals Progress Report Financial Year 07/08 Report title Asbestos Surveys and Removals Progress Report Financial Year 07/08 Agenda item 8 Meeting Date Finance, Procurement & Property Committee 16 June 2008 Report by Document Number (12/05/2008)

More information

ROYAL HOLLOWAY, UNIVERSITY OF LONDON

ROYAL HOLLOWAY, UNIVERSITY OF LONDON ROYAL HOLLOWAY, UNIVERSITY OF LONDON ASBESTOS MANAGEMENT POLICY (Version 2) This Policy defines the College s arrangements for the management of asbestos and the measures to be taken for the protection

More information

SAFETY RESPONSIBILITIES AND ARRANGEMENTS IN RESPECT OF ASBESTOS MANAGEMENT (ASBESTOS MANAGEMENT PLAN)

SAFETY RESPONSIBILITIES AND ARRANGEMENTS IN RESPECT OF ASBESTOS MANAGEMENT (ASBESTOS MANAGEMENT PLAN) KING S COLLEGE LONDON Health, Safety & Environmental Protection Office SAFETY RESPONSIBILITIES AND ARRANGEMENTS IN RESPECT OF ASBESTOS MANAGEMENT (ASBESTOS MANAGEMENT PLAN) Issue Date: May 2012 Issue Number:

More information

Policy for the Management of Asbestos in Buildings

Policy for the Management of Asbestos in Buildings in Buildings Health and Safety Services 1 A1. Introduction If asbestos fibres enter the lungs they can cause cancer or incurable disease. Consequently the University is committed to ensure that all reasonably

More information

Asbestos Management Plan

Asbestos Management Plan Safety Standard Asbestos Management Plan Version 8.0 May 2015 Page 1 of 60 Engineering Maintenance & Infrastructure Safety Standard Asbestos Management UNIVERSITY COLLEGE LONDON STANDARD ASBESTOS MANAGEMENT

More information

Policy for the Management of Asbestos

Policy for the Management of Asbestos CARDIFF AND VALE NHS TRUST YMDDIRIEDOLAETH GIG CAERDYDD A R FRO Policy for the Management of Asbestos Author Keith Jones Estate Controls Assurance Officer / Environmental Management Co-ordinator Policy

More information

Sprayed vermiculite ceiling coating management plan, Condell Park High School, Condell Park, NSW

Sprayed vermiculite ceiling coating management plan, Condell Park High School, Condell Park, NSW Sprayed vermiculite ceiling coating management plan, Condell Park High School, Condell Park, NSW August 2006 NSW Department of Commerce Parsons Brinckerhoff Australia Pty Limited ACN 078 004 798 and Parsons

More information

ASBESTOS POLICY AND MANAGEMENT PLAN

ASBESTOS POLICY AND MANAGEMENT PLAN ASBESTOS POLICY AND MANAGEMENT PLAN 1. INTRODUCTION 1.1. The Control of Asbestos at Work Regulations 2006 requires employers to prevent the exposure of their employees to asbestos, or where this is not

More information

ASBESTOS POLICY. Version: Asbestos Policy v 1.2. Date ratified: 22 nd March 2013 Approving Committee/Group (Date)

ASBESTOS POLICY. Version: Asbestos Policy v 1.2. Date ratified: 22 nd March 2013 Approving Committee/Group (Date) ASBESTOS POLICY Version: Asbestos Policy v 1.2 Ratified by: Policy Committee Date ratified: 22 nd March 2013 Approving Committee/Group (Date) Date Approved by Medicines Management Committee: (NB: All Procedural

More information

Housing Scrutiny Sub-Committee 27 March 2012

Housing Scrutiny Sub-Committee 27 March 2012 b Housing Scrutiny Sub-Committee 27 March 2012 Asbestos Commission Update All Wards Report authorised by: Executive Director Housing Regeneration and Environment Sue Foster Executive summary The Council

More information

Report to Cabinet Item 25 June 2014

Report to Cabinet Item 25 June 2014 Report to Cabinet Item 25 June 2014 Report of Deputy Chief executive (operations) 12 Subject Asbestos Management Policy Purpose To consider the council s Asbestos Management Policy. Recommendation To approve

More information

University of Pittsburgh Safety Manual. EH&S Guideline Number: 01-007 ASBESTOS

University of Pittsburgh Safety Manual. EH&S Guideline Number: 01-007 ASBESTOS Page 1 of 5 The inhalation of asbestos fibers in excess amounts can lead to chronic lung disease. Our knowledge of these health effects comes from studies of workers exposed routinely to high concentrations

More information

Derby City Council. Asbestos Management Plan

Derby City Council. Asbestos Management Plan Derby City Council Asbestos Management Plan April 2014 Page 1 of 44 Index of Contents 1.1 Introduction 3 1.2 Glossary of Terms 4 2.0 Action Plan 2.1 Scope and purpose 6 2.2 Competent persons who they are

More information

Summary of the main steps in managing asbestos (from HSG264) Find out if ACMs present: Check plans/ drawings. Carry out survey (2)

Summary of the main steps in managing asbestos (from HSG264) Find out if ACMs present: Check plans/ drawings. Carry out survey (2) Asbestos The University s asbestos management procedure follows the stages set out in guidance provided by the HSE (HSG64), as follows. (The numbers in the boxes below refer to the subsequent sections

More information

CAPITAL WORKS GUIDANCE DOCUMENT

CAPITAL WORKS GUIDANCE DOCUMENT COMMUNITY BUILDINGS TRANSFER PROGRAMME CAPITAL WORKS GUIDANCE DOCUMENT This document has been prepared to assist and advise management groups of community buildings who are involved in Durham County Council

More information

Asbestos Management Plan. Policy. The whole of the Trust. Intranet. The Trust Board/Executive Management Team

Asbestos Management Plan. Policy. The whole of the Trust. Intranet. The Trust Board/Executive Management Team Document name: Document type: What does this policy replace? Staff group to whom it applies: Distribution: Asbestos Management Plan Policy Update of previous Procedure for the Safe Management of Asbestos

More information

Asbestos Management Plan

Asbestos Management Plan Asbestos Management Plan Document title Asbestos Management Plan Document author and department Jonathan Latter Health and Safety Compliance Manager Approving body Responsible person and department Fiona

More information

P404 - Air Sampling of Asbestos and MMMF and Requirements for a Certificate of Reoccupation Following Clearance of Asbestos

P404 - Air Sampling of Asbestos and MMMF and Requirements for a Certificate of Reoccupation Following Clearance of Asbestos Proficiency Module Syllabus P404 - Air Sampling of Asbestos and MMMF and Requirements for a Certificate of Reoccupation Following Clearance of Asbestos Aim To provide candidates with theoretical and practical

More information

SMS0045 Construction Health and Safety Policy and Procedures

SMS0045 Construction Health and Safety Policy and Procedures SMS0045 Construction Health and Safety Policy and Procedures March 2015 Version 8 Please note that for projects utilising a CDM Co-ordinator under the transitional arrangements of CDM 2015 (between 6 April

More information

ASBESTOS CONTAINING MATERIALS POLICY

ASBESTOS CONTAINING MATERIALS POLICY POLICY REF : AM01 Version No. 5.0 December 2014 ASBESTOS CONTAINING MATERIALS POLICY 1.0 INTRODUCTION 1.1 We recognise the risks to the health of those who have to work with materials containing asbestos

More information

Property & Infrastructure Support Policy & Guidance

Property & Infrastructure Support Policy & Guidance Asbestos Policy & Procedures» March 2015 Policy & Guidance Asbestos Policy & Procedures Key Document Information Document Owner: Steve Hamilton Job Title Statutory Service Manager (Asebstos) Team ST PI

More information

Date of issue: January 2014. Date of next review: February 2016. Author: V Thornton. Service area applies to: Operations. Link to the 5 Pledges: Yes

Date of issue: January 2014. Date of next review: February 2016. Author: V Thornton. Service area applies to: Operations. Link to the 5 Pledges: Yes Title: Asbestos Policy 2013 Date of issue: January 2014 Date of next review: February 2016 Author: V Thornton Service area applies to: Operations Link to the 5 Pledges: Yes Approved by: Date approved:

More information

Asbestos Survey Report

Asbestos Survey Report 0340 Asbestos Survey Report Sunnyside Court Avondale Road Southport PR9 0NU Client Contact: Gary Rostron The Regenda Group Regenda House Enterprise Business Park Northgate Close Horwich, Bolton BL6 6PQ

More information

Asbestos Policy. Policy. The whole of the Trust. Intranet

Asbestos Policy. Policy. The whole of the Trust. Intranet Document name: Document type: What does this policy replace? Staff group to whom it applies: Distribution: Asbestos Policy Policy Update of previous Procedure for the Safe Management of Asbestos guidance

More information

MAIDENHEAD AND DISTRICT HOUSING ASSOCIATION TITLE: PAGE:

MAIDENHEAD AND DISTRICT HOUSING ASSOCIATION TITLE: PAGE: TITLE: PAGE: 1 OF 23 Maidenhead and District Housing Association Asbestos Policy and Management Page 1 of 23 TITLE: PAGE: 2 OF 23 FOREWORD This document details the system for the management of health

More information

ASBESTOS MATERIALS IN SCHOOLS

ASBESTOS MATERIALS IN SCHOOLS CODE OF PRACTICE FOR MANAGEMENT OF ASBESTOS MATERIALS IN SCHOOLS CONTENTS 1. Introduction 1.1 Scope 1.2 The OPW Health and Safety Unit 2 Background 2.1 General Information 2.2 Main Risks 2.3 Main Risk

More information

Construction (Design and Management) Regulations 2007

Construction (Design and Management) Regulations 2007 MEETING Finance, Procurement and Property Committee AGENDA ITEM 14 MEETING DATE 9 th July 2007 DOCUMENT NUMBER FEP 1052 SUBJECT REPORT Construction (Design and Management) Regulations 2007 (12/06/07) by

More information

Asbestos Policy. Planning, Performance Management and Support Services. Legacy Causeway Asbestos Policy (Ref: CHSST/04/211)

Asbestos Policy. Planning, Performance Management and Support Services. Legacy Causeway Asbestos Policy (Ref: CHSST/04/211) Asbestos Policy Reference Number: NHSCT/09/192 Responsible Directorate: Planning, Performance Management and Support Services Replaces (if appropriate): Legacy Causeway Asbestos Policy (Ref: CHSST/04/211)

More information

DIRECTORATE OF ESTATES & FACILITIES PROCEDURE AND INFORMATION MANUAL EPM HS25 Asbestos Management Plan

DIRECTORATE OF ESTATES & FACILITIES PROCEDURE AND INFORMATION MANUAL EPM HS25 Asbestos Management Plan DIRECTORATE OF ESTATES & FACILITIES PROCEDURE AND INFORMATION MANUAL EPM HS25 Document Originated: November 2012 By: Lynn Fleming Issue Number: 4 Number of pages: 71 Approved by EMG: Status: Final Last

More information

UWE Facilities Asbestos Management Plan Issue 15

UWE Facilities Asbestos Management Plan Issue 15 UWE Facilities Asbestos Management Plan Issue 15 Review Date: March 2015 Contents Section 1: Introduction... 3 Asbestos Management Standard & Asbestos Management Plan (AMP)... 3 Section 2: Policy... 5

More information

Asbestos licensing and notification guide for applicants

Asbestos licensing and notification guide for applicants Asbestos licensing and notification guide for applicants Use this guide if you are: applying for an asbestos removal work licence applying for an asbestos assessor licence notifying of asbestos removal

More information

Project Management. Advice on the provision of Local Decontamination Units (LDUs) Decontamination Services

Project Management. Advice on the provision of Local Decontamination Units (LDUs) Decontamination Services Advice on the provision of Local Decontamination Units (LDUs) Decontamination Services January 2010 Contents Project Management Page Local Decontamination Units (LDUs) Construction Project Management...3

More information

Approved Code of Practice. Management of Exposure to Asbestos in Workplace Buildings and Structures. Health and Safety at Work (Jersey) Law, 1989

Approved Code of Practice. Management of Exposure to Asbestos in Workplace Buildings and Structures. Health and Safety at Work (Jersey) Law, 1989 Approved Code of Practice Management of Exposure to Asbestos in Workplace Buildings and Structures Health and Safety at Work (Jersey) Law, 1989 ACoP 8 Revised 2015 Cover: Magnified image of asbestos fibres,

More information

RSPH Level 3 Certificate in Asbestos Project Management. February 2013. 10 Guided Learning Hours 2 Prior Learning Hours

RSPH Level 3 Certificate in Asbestos Project Management. February 2013. 10 Guided Learning Hours 2 Prior Learning Hours RSPH Level 3 Certificate in Asbestos Project Management February 2013 10 Guided Learning Hours 2 Prior Learning Hours Description The Control of Asbestos Regulations impose duties on every person who has,

More information

ASBESTOS in state and local government

ASBESTOS in state and local government ASBESTOS in state and local government Inspection campaign In 2013/14, WorkSafe WA is conducting a proactive inspection campaign focusing on the management of asbestos in state and local government buildings.

More information

UNIVERSITY HOSPITALS OF LEICESTER NHS TRUST POLICY FOR THE MANAGEMENT OF ASBESTOS

UNIVERSITY HOSPITALS OF LEICESTER NHS TRUST POLICY FOR THE MANAGEMENT OF ASBESTOS UNIVERSITY HOSPITALS OF LEICESTER NHS TRUST POLICY FOR THE MANAGEMENT OF ASBESTOS APPROVED BY: UHL H&S Committee and UHL H&S Committee TRUST REF: B27/2005 DATE APPROVED: March 2008 ORIGINATOR: Glyn Lambley

More information

The Management of Asbestos. County Council Occupied Premises

The Management of Asbestos. County Council Occupied Premises The Management of Asbestos in County Council Occupied Premises Policy, Strategy and Management Procedures Corporate Building Services November 2005 Policy, Strategy, and Implementation Plan for the Management

More information

Management of Health and Safety for Work and Services Contractors Policy June 2010

Management of Health and Safety for Work and Services Contractors Policy June 2010 June 2010 Contents 1. Introduction 3 2. Policy Statement 4 3. Policy Objectives 5 4. Application 6 5. Organisational Responsibilities 7 6. Glossary of Terms 11 7. Authorised Directors Appendix 1 2 www.surrey.ac.uk

More information

Accommodation Officers Information Booklet. Asbestos The Asbestos Abatement Programme and the Asbestos Management Policy

Accommodation Officers Information Booklet. Asbestos The Asbestos Abatement Programme and the Asbestos Management Policy Accommodation Officers Information Booklet Asbestos The Asbestos Abatement Programme and the Asbestos Management Policy This Guideline has been produced solely for use by State Authorities that come within

More information

Plymouth City Council Asbestos Policy

Plymouth City Council Asbestos Policy Plymouth City Council Asbestos Policy Policy, Arrangements and Procedures for Asbestos Management in Buildings, Structures and Assets Owned or Occupied by Plymouth City Council. May 2008: Version 1.1-1

More information

Asbestos in Grounds Management Plan, Excelsior Public School, Castle Hill, NSW

Asbestos in Grounds Management Plan, Excelsior Public School, Castle Hill, NSW Asbestos in Grounds Management Plan, Excelsior Public School, Castle Hill, NSW January 2013 NSW Public Works Parsons Brinckerhoff Australia Pty Limited ABN 80 078 004 798 Level 27, Ernst & Young Centre

More information

Asbestos Removal and Assessor Licensing Information

Asbestos Removal and Assessor Licensing Information Asbestos Removal and Assessor Licensing Information January 2013 Version 1.0 - GB366 1 2 Contents Introduction 5 Why you need a licence 5 Why you need to notify 5 Licence types 5 Class A asbestos removal

More information

British Columbia Institute of Technology. BCIT Safety Manual ASBESTOS MANAGEMENT

British Columbia Institute of Technology. BCIT Safety Manual ASBESTOS MANAGEMENT BCIT Safety Manual Contents 1. Purpose... 3 2. Definitions... 3 2.1 Asbestos... 3 2.2 Asbestos Containing Material (ACM)... 3 2.3 Friable Material... 3 2.4 Low Risk Work Activity... 3 2.5 Moderate Risk

More information

The Newcastle upon Tyne Hospitals NHS Foundation Trust. Asbestos Management Policy and Action Plan

The Newcastle upon Tyne Hospitals NHS Foundation Trust. Asbestos Management Policy and Action Plan The Newcastle upon Tyne Hospitals NHS Foundation Trust Asbestos Management Policy Action Plan Version No.:.3 Effective From: 24 August 205 Expiry Date: 24 August 208 Date Ratified: August 205 Ratified

More information

21316 PROCEDURE CONTROL OF ASBESTOS. 2. Risk Assessments / Health and Safety Considerations

21316 PROCEDURE CONTROL OF ASBESTOS. 2. Risk Assessments / Health and Safety Considerations Version: 15 Last Updated: 12/08/14 Review Date: 04/08/17 ECHR Potential Equality Impact Assessment: Low 1. About This Procedure 1.1. This procedure sets out the processes for managing asbestos in Hampshire

More information

Beech Housing Association Asbestos Management Policy

Beech Housing Association Asbestos Management Policy Beech Housing Association Asbestos Management Policy Policy Statement The aim of this document is to define a policy for the control and management of the risk of exposure to asbestos within the dwellings

More information

Asbestos Management Consultants COMPANY PROFILE Tersus Consultancy Limited

Asbestos Management Consultants COMPANY PROFILE Tersus Consultancy Limited Asbestos Management Consultants COMPANY PROFILE Tersus Consultancy Limited www.tersusgroup.co.uk Asbestos has been used in the UK construction industry since around 1890. Once hailed as the wonder building

More information

Northwards Housing. Asbestos Management Plan. October 2014

Northwards Housing. Asbestos Management Plan. October 2014 rthwards Housing Asbestos Management Plan October 2014 Last Review October 2014 Reviewed by Simon Roffey Issued by Larry Patrick Next Review Due October 2015 1 Table of Content Section Content 1.0 Purpose

More information

Asbestos removal and licensing

Asbestos removal and licensing Applicant Guide Asbestos removal and licensing Includes: Asbestos removal and asbestos assessor licence and notifications of asbestos removal work, asbestos fibres and emergency demolition of structures

More information

ASBESTOS MANAGEMENT PROGRAM

ASBESTOS MANAGEMENT PROGRAM ASBESTOS MANAGEMENT PROGRAM September 2015 Asbestos Management Program Table of Contents I. Purpose II. III. IV. Definitions Identification of Asbestos Asbestos Sampling V. Notification and Labeling VI.

More information

How To Deal With Asbestos In Minster Of Minsteria

How To Deal With Asbestos In Minster Of Minsteria RELATED TO EXPOSURE TO ASBESTOS AT WORK [S.L.424.23 1 SUBSIDIARY LEGISLATION 424.23 RELATED TO EXPOSURE TO ASBESTOS AT WORK REGULATIONS LEGAL NOTICE 323 of 2006. 15th December, 2006 1. (1) The title of

More information

Code of Practice EST 01 Decommissioning arrangements prior to site hand over Oct 2004

Code of Practice EST 01 Decommissioning arrangements prior to site hand over Oct 2004 Estates Division Imperial College London Room 503 Sherfield Building South Kensington Campus London SW7 2AZ, UK Tel: +44 (0)20 7594 9832 Fax: +44 (0)20 7594 9050 r.mayne@imperial.ac.uk www.imperial.ac.uk

More information

PROJECT BRIEF Version (insert number)

PROJECT BRIEF Version (insert number) PROJECT BRIEF Version (insert number) 1 Project Name ------------------------------------------------------------------- 1.1 The Project Project Address Nature of Work Location 1.2 DCC Client for Project

More information

Cardiff University Estates Department Asbestos Management Plan and Operational Procedures

Cardiff University Estates Department Asbestos Management Plan and Operational Procedures Reviewed November 2013 Details of Cardiff University s arrangements for managing asbestos contained within its Estates Buildings Approved by the CU Asbestos Management Group and signed off by the ARP S

More information

www.lhc.gov.uk Framework Arrangement Procurement Guide Asbestos Works & Services (AS1)

www.lhc.gov.uk Framework Arrangement Procurement Guide Asbestos Works & Services (AS1) Framework rrangement Procurement Guide sbestos Works & Services (S1) Workstream 1 sbestos Management & Supervision Services Incorporating Surveys & Bulk Sampling Workstream 2 ir Sampling & Monitoring Services

More information

Guide for applicants for asbestos removal and asbestos assessor licences and notifications

Guide for applicants for asbestos removal and asbestos assessor licences and notifications Guide for applicants for asbestos removal and asbestos assessor licences and notifications of asbestos removal work, asbestos fibres and emergency demolition of structures containing asbestos March 2013

More information

Caution Asbestos. Asbestos advice for residents

Caution Asbestos. Asbestos advice for residents Caution Asbestos Asbestos advice for residents Customer Approved This leaflet has been designed to address concerns and questions about asbestos in homes. It explains what it is, where it could be found,

More information

ASBESTOS REMOVAL LICENCE ASBESTOS NOTIFICATIONS

ASBESTOS REMOVAL LICENCE ASBESTOS NOTIFICATIONS GUIDE FOR APPLICANTS ASBESTOS REMOVAL LICENCE ASBESTOS NOTIFICATIONS TABLE OF CONTENTS INTRODUCTION... 2 WHY YOU NEED A LICENCE... 2 WHY YOU NEED TO NOTIFY... 2 LICENCE TYPES... 2 SCOPE... 2 WHO MAY APPLY

More information

FIRE RISK ASSESSMENT SW13 0HA

FIRE RISK ASSESSMENT SW13 0HA FIRE RISK ASSESSMENT at Carmichael Court Grove Road London SW13 0HA ON BEHALF OF Farrar Property Management Date of assessment: 14/01/2013 Recommended review date: January 2015 CONTENTS 1.0 INTRODUCTION

More information