1 NC A&T STATE UNIVERSITY NEW STUDENT CENTER ADVANCE PLANNING NARRATIVES PO BOX Project Description The project scope includes a new 175,000 GSF new replacement student center within the current site of the existing union. This facility will provide improved and expanded student organization, dining, meeting, recreation/entertainment, lounge, study areas and retail spaces including a bookstore. This project will also include significant outdoor spaces through the site and landscape development. This project will demolish the existing 67,000 SF Memorial Student Union in its entirety. Building accessibility, life safety codes, improved pedestrian connections to all the campus paths will be addressed. Sitework will include reconfiguring existing surface parking for a portion of displayed spaces, underground utility relocations, storm water management, plaza, landscape development and street improvements. A design and phasing plan will also required to maintain operations of some union services, and for possible cursory minor upgrades to an alternate building on campus which may be used as swing space. The project will be planned and designed as a LEED certified facility. 1.0 Heating, Ventilating and Air Conditioning (HVAC) Baseline Building Systems Senate Bill 668 Compliance The baseline building system for compliance with Senate Bill 668 is defined by Appendix G, ASHRAE Standard The building is nonresidential, has three floors and consists of 175,000 GSF (greater than 150,000 GSF). The baseline HVAC system is System 7 VAV with Reheat. The Climate Zone is 4A. The baseline system consists of packaged rooftop units with variable volume fan control and hot water reheat. Cooling is by chilled water coils. Heating water is provided by natural gas-fired boilers. Economizers (air and water) are not required in Zone 4A. Since we do not anticipate the project will have air supply systems over 5,000 CFM with minimum outside air of 70% or more, exhaust air energy recovery is not required. Heating and cooling load and energy analyses will be based on the following envelope characteristics: a) Envelope opaque elements: Roof insulation above deck: U = 0.063, R15 continuous insulation Walls - mass: U = 0.151, R5.7 continuous insulation Walls steel framed: U = 0.124, R13 insulation b) Envelope for fenestration areas less than 40% of wall: U-fixed = 0.57 U-oper = 0.67 c) Fenestration less than 40% of wall: SHGC-all = 0.39 SHGC-north = 0.49 LEED NC version 3.0 Compliance The baseline building system for compliance with LEED NC version 3.0 is defined by Appendix G, ASHRAE Standard The building is nonresidential, has three floors and consists of 175,000 GSF (greater than 150,000 GSF). The baseline HVAC system is System 7 VAV with Reheat. The Climate Zone is 4A. The baseline system consists of packaged rooftop units with variable volume fan control and hot water reheat. Cooling is by chilled water coils. Heating water is provided by natural gas-fired boilers. Economizers (air and water) are not required in Zone 4A. VINES ARCHITECTURE, INC. CANNON DESIGN INC. INFO@VINESARC.COM T F Page 1 of 5

2 Since we do not anticipate the project will have air supply systems over 5,000 CFM with minimum outside air of 70% or more, exhaust air energy recovery is not required. Terminal units will have a minimum of 0.4 cfm/sf airflow and hot water reheat coils. Heating and cooling load and energy analyses will be based on the following envelope characteristics: a) Envelope opaque elements: Roof insulation above deck: U = 0.048, R20 continuous insulation Walls - mass: U = 0.104, R9.5 continuous insulation Walls steel framed: U = 0.064, R13 insulation + R7.5 continuous insulation b) Envelope for fenestration areas less than 40% of wall: Non-metal framing: U = 0.40 Metal Framing (curtain wall/storefront): U = 0.50 Metal Framing (entrance door): U = 0.85 Metal Framing (all other): U = 0.55 c) Fenestration less than 40% of wall: SHGC-all = 0.40 The proposed building design will include several general building design strategies. HVAC zoning will be optimized based on the building space program, grouping for separate systems, occupancy and operation schedules and conditions (24-hr vs. daytime only; computer rooms/office/meeting/dining/entertainment, etc. zones). Interior design conditions will meet, but not exceed, temperature and relative humidity (RH) requirements. Exceeding these can have a significant effect on the cost of energy, systems and controls. Criteria will be reviewed and confirmed with the owner. Various types of lights and sources will be considered, including T8, T5, LED, HID and task lighting. The type and use will be considered for the most appropriate and efficient application for each type of space. Also, specific strategies and options will be evaluated based on complete building energy models. Since Senate Bill 668 and LEED NC version 3.0 reference different baseline models; therefore two different baseline models will be compared to the proposed building models. Various fenestrationtypes, building orientation, shading devices, and daylighting (distributed evenly each exposure in the model) will be considered. Envelope performance will include several roof and wall insulation options. Proper outside air quantities, without over-ventilating, will be utilized. CO2 demand controlled ventilation will be evaluated. The proposed building will use a high efficiency chilled water system in lieu of minimum required efficiency systems. Variable air volume (VAV) terminal systems with demand control ventilation and/or chilled beams will be used in lieu of baseline variable volume systems, with variable speed drive air handling unit (AHU) fans. Terminal units will have a minimum of 30% airflow and hot water reheat coils. Fundamental economizer performance will be evaluated based on the building energy model (not required in the base building). Baseline fan power will be compared to a proposed reduced static pressure (using lower coil and duct velocities). In addition to electrical sub-meters, natural gas and energy (BTU) meters will be provided so that HVAC system energy the savings can be measured and verified. System Alternatives: To meet or exceed the requirements of the energy bill of 30% greater energy efficiency than ASHRAE Standard , the following energy efficient strategies will be analyzed and Life Cycle Cost Analyses (LCCA) will be performed in accordance with SCO Guidelines for the following HVAC systems: 1. Air Handling Units Variable volume vs. VAV/RH with demand control ventilation and chilled beams will be analyzed. 2. Air Handling Units The use of air economizer cycle will be analyzed. Page 2 of 5

3 3. Chilled Water Systems Magnetic drive water cooled chillers vs. standard efficiency chillers and air-cooled heat pump chiller/heaters. 4. Heating Water Systems High efficiency condensing boilers vs. non-condensing boilers, aircooled heat pump chiller/heaters and campus steam. 2.0 Plumbing Systems The project goals include a minimum building water use reduction of 30% less than the water use baseline calculated for the building after meeting the Energy Policy Act of 1992 fixture performance requirements. The calculations are based on estimated occupant usage and include only the following fixture types: water closets, urinals, lavatory faucets, showers, and kitchen sinks. The Energy Policy Act of 1992 Flow Rate requirements are listed below: Energy Policy Act of 1992 Flow Requirement Fixture Water Closets Urinals Showerheads* Faucets* Replacement Aerators* Flow Rate 1.6 (gallons/flush) 1.0 (gallons/flush) * At 80 psi flowing water pressure Baseline Building Systems The baseline building service water heating system will consist of 80 % efficient natural gas-fired storage type water heaters with maximum allowable standby losses as defined by ASHRAE Water temperature controls are to be provided to limit the supply water temperature to 110 F at lavatory faucets in public facility restrooms. Operating limit control will be provided for storage tank recirculation pumps to limit operation to a maximum of 5 minutes after the end of the heating cycle. Plumbing fixtures will have flow rates in compliance with the Energy Policy Act of 1992 as summarized above. The following will be included in the building plumbing systems design: low flow water closets (1.28 GPF), low flow urinals (0.125 GPF) low flow (0.5 GPM) aerators for lavatory and sink faucets, low flow (1.8 GPM) showers, and automatic flow controls on lavatories and sinks to limit duration to 12 seconds. We are currently reviewing a study performed by John Hopkins University concerning the higher incidence of bacteria found in automatic faucets versus manual faucets in conjunction with the joint response issued by ASPE (American Society of Plumbing Engineers) and ASHE (American Society of Healthcare Engineers). System Alternatives: To meet or exceed the requirements of the energy bill of 30% energy and 20% building use water savings, the following energy efficient strategies will be analyzed and Life Cycle Cost Analyses (LCCA) performed in accordance with SCO Guidelines for the plumbing systems: 1) Service water heating Natural gas-fired condensing water heaters, electric water heaters and steam fired heat exchangers will be analyzed. Page 3 of 5

4 2) Air conditioning condensate recovery (roughly 250,000 gal/year) will be considered for use in cooling tower make-up, irrigation and toilet flushing. Rain water harvesting (roughly 0.50 gal/sf per inch of rainfall) will also be considered and these two strategies may be combined. 3) If rainwater harvesting proves to be appropriate for this facility we will also consider capturing the water from fire protection system testing as well. In addition to electrical sub-meters, natural gas and water meters will be provided so that the energy and water consumption savings can be measured and verified. 3.0 Electrical Systems Baseline Building Systems-Senate Bill 668 Compliance The baseline building interior lighting power densities for compliance with Senate Bill 668 will use 1.2 watts/sf as permitted by ASHRAE Standard , Table 9.5.1: Lighting Power Densities using the Building Area Method for the Health Care Clinic classification. The lighting system will consist of energy efficient T-5, T-8 and compact fluorescent lamp technologies with matching electronic ballasts. Fluorescent lamps will be Low-mercury or green fluorescent lamps and will have green markings to denote that they have passed the U.S. Federal EPA Toxicity Characteristic Leaching Procedure (TCLP). Automatic lighting controls shall be provided in areas by either occupancy sensors or a programmable relay based lighting control panel(s). Occupancy sensors will be utilized to provide automatic lighting shut-off in areas as required by Chapter 9 of ASHRAE Standard In accordance with ASHRAE , Appendix G, lighting controls for the baseline design will not have to be modeled. All other interior spaces within the building will be connected to the lighting control panel to provide scheduled time-of-day automatic lighting shut-off with local override switches. Dimming system controls will be utilized in spaces where applicable for the control of fluorescent lamps and for energy conservation. The baseline building exterior lighting system power densities will comply with ASHRAE Standard , Table 9.4.5: Lighting Power Densities for Building Exteriors and with Section for a minimum lamp efficacy of 60-lumens/watt. The baseline building electrical distribution system will be designed to meet Chapter 8 of ASHRAE Std for a feeder maximum voltage drop of 2% and a branch circuit maximum voltage drop of 3%. LEED NC version 3.0 Compliance The baseline building interior lighting power densities for compliance with Senate Bill 668 will use 1.2 watts/sf as permitted by ASHRAE Standard , Table 9.5.1: Lighting Power Densities using the Building Area Method for the Health Care Clinic classification. The lighting system will consist of energy efficient T-5, T-8 and compact fluorescent lamp technologies with matching electronic ballasts. Fluorescent lamps will be Low-mercury or green fluorescent lamps and will have green markings to denote that they have passed the U.S. Federal EPA Toxicity Characteristic Leaching Procedure (TCLP). Automatic lighting controls shall be provided in areas by either occupancy sensors or a programmable relay based lighting control panel(s). Occupancy sensors will be utilized to provide automatic lighting shut-off as required by Chapter 9 of ASHRAE Standard In accordance with ASHRAE , Appendix G, lighting controls for the baseline design will not have to be modeled. All other interior spaces within the building will be connected to the lighting control panel to provide scheduled time-of-day automatic lighting shut-off with local override switches. Dimming system controls will be utilized in spaces where applicable for the control of fluorescent lamps and for energy conservation. The baseline building exterior lighting system power densities will comply with ASHRAE Standard , Table 9.4.5: Lighting Power Densities for Building Exteriors and with Section for a minimum lamp efficacy of 60-lumens/watt. Page 4 of 5

5 The baseline building electrical distribution system will be designed to meet Chapter 8 of ASHRAE Std for a feeder maximum voltage drop of 2% and a branch circuit maximum voltage drop of 3%. For the proposed building the interior lighting system will be comprised of high-efficiency fluorescent fixtures and will not exceed 0.95 watts/sf. Occupancy sensors will control the lighting in all spaces except corridors, lobbies, and mechanical rooms. The lighting control for these spaces will be provided by a programmable relay based lighting control panel to automatically control the lighting fixtures using a time-of-day scheduling matrix. Wherever feasible, meeting rooms, offices, dining facilities will be provided with a fluorescent dimming system that is controlled locally. Additionally, LED lighting sources will be explored for cost effectiveness. Additional energy savings will be achieved by reducing the power density for the exterior lighting system to less than the maximum power allowance permitted in Table in ASHRAE Std A target of 70-80% below that of the base building design will be the goal of this design. Sub-metering of new mechanical and new lighting systems will be provided for validating the actual energy used versus the energy model results and assumptions. Lighting systems located in areas incorporating daylight harvesting will be metered separately from all other sub-metered systems to allow for the verification of the effectiveness of the daylight harvesting design. Electrical Systems Life Cycle Cost Analysis Interior lighting system: The building interior lighting system will be analyzed to determine the best lighting fixture, ballast and lamp type to be used for the majority of the interior areas. A life cycle cost analysis will be performed and analyzed for the best savings to investment ratio. Photo-voltaic System: The building site location, orientation and proposed roofing structure will be conducive for a photo-voltaic system. A life cycle cost analysis will be performed and analyzed for the best savings to investment ratio. System Alternatives Daylight Harvesting: Areas of the building will be analyzed for daylight harvesting applications. This will be a working collaboration between the Architect and the Engineer. Automatic lighting controls will be developed based upon the Daylighting Study. Prepared by: Victor Vines, AIA, LEED AP & Avery Monroe, PE VINES ARCHITECTURE CANNON DESIGN & RMF ENGINEERING Page 5 of 5

APPENDIX E: CAPITAL NEEDS SUMMARY

APPENDIX E: CAPITAL NEEDS SUMMARY APPENDIX E: CAPITAL NEEDS SUMMARY Building A Foundation Hall Building to be replaced ARCHITECTURAL Roof Repair North Structural Wall Repair Flooring Repairs Ceiling Repairs Lighting Repairs Lighting Repairs

More information

Sustainable Strategies for Rehabilitation Projects: 9th Street Office Building Adaptive Reuse Case Study

Sustainable Strategies for Rehabilitation Projects: 9th Street Office Building Adaptive Reuse Case Study Sustainable Strategies for Rehabilitation Projects: 9th Street Office Building Adaptive Reuse Case Study Robert C. Burns, AIA, LEED AP Principal Director of Historic Architecture 804. 648. 5040, ext. 1107

More information

2011 Energy Efficiency Expo!

2011 Energy Efficiency Expo! Welcome to the 2011 Energy Efficiency Expo! Thank you to our session sponsors! Comparison Between the 2009 and 2012 International Energy Conservation Code What s coming when the new commercial energy code

More information

Raising the Bar: A Comparison Study of Iowa s Current and Proposed Energy Code

Raising the Bar: A Comparison Study of Iowa s Current and Proposed Energy Code Raising the Bar: A Comparison Study of Iowa s Current and Proposed Energy Code Julia Gauthier, LEED AP BD+C Jeanne Huntsman, AIA, LEED Green Associate The Weidt Group Raising the Bar Special statements

More information

Water Use Reduction Additional Guidance

Water Use Reduction Additional Guidance December 1, 2009 (Updated July 6, 2012) Version 7 Water Use Reduction Additional Guidance This guidance applies to Water Efficiency (WE) Prerequisite 1 and WE Credit 3 in LEED 2009 for New Construction,

More information

UNIVERSITY OF MISSOURI 23 0000 - Heating Ventilating and Air-Conditioning (HVAC) March 2015.01

UNIVERSITY OF MISSOURI 23 0000 - Heating Ventilating and Air-Conditioning (HVAC) March 2015.01 GENERAL: This section provides general standards for overall sizing and design of Heating, Ventilating, and Air Conditioning (HVAC) systems. Other sections contain specific standards for each system per

More information

KU DESIGN GUIDELINES APPENDIX XVI RECOMMENDED BAS I/O CONTROL POINTS BY EQUIPMENT / SYSTEM

KU DESIGN GUIDELINES APPENDIX XVI RECOMMENDED BAS I/O CONTROL POINTS BY EQUIPMENT / SYSTEM KU DESIGN GUIDELINES APPENDIX XVI RECOMMENDED BAS I/O CONTROL POINTS BY EQUIPMENT / SYSTEM AIR HANDLING UNITS... 1 CHILLERS... 2 COOLING TOWERS... 2 CLOSED LOOP COOLERS... 2 MISCELLANEOUS SUPPLY FANS...

More information

SPECIAL ISSUE: NATIONAL SCIENCE FOUNDATION WORKSHOP

SPECIAL ISSUE: NATIONAL SCIENCE FOUNDATION WORKSHOP research journal 2013 / VOL 05.01 www.perkinswill.com SPECIAL ISSUE: NATIONAL SCIENCE FOUNDATION WORKSHOP ARCHITECTURE AND ENGINEERING OF SUSTAINABLE BUILDINGS Current Trends in Low-Energy HVAC Design

More information

Presentation Outline. Common Terms / Concepts HVAC Building Blocks. Links. Plant Level Building Blocks. Air Distribution Building Blocks

Presentation Outline. Common Terms / Concepts HVAC Building Blocks. Links. Plant Level Building Blocks. Air Distribution Building Blocks Presentation Outline Common Terms / Concepts HVAC Building Blocks Plant Level Building Blocks Description / Application Data Green opportunities Selection Criteria Air Distribution Building Blocks same

More information

Preliminary Final Proposal

Preliminary Final Proposal 1 Butler Memorial Hospital New Inpatient Tower Senior Capstone Project Mechanical Option Preliminary Final Proposal Mechanical System Re-design and Breadth Topics Butler Memorial Hospital New Inpatient

More information

Energy Efficiency Analysis for a Multi-Story Commercial Office Building. (LG Multi V Water II Heat Recovery VRF System)

Energy Efficiency Analysis for a Multi-Story Commercial Office Building. (LG Multi V Water II Heat Recovery VRF System) Energy Efficiency Analysis for a Multi-Story Commercial Office Building (LG Multi V Water II Heat VRF System) Commercial Air-Conditioning Engineering Study VRF-ES-BL-001-US 011M05 Executive Summary Contents

More information

Training for Building Technicians: Energy Efficiency & Sustainability (BEST) Program. Seminar Outline & Sample BEST Exam Questions

Training for Building Technicians: Energy Efficiency & Sustainability (BEST) Program. Seminar Outline & Sample BEST Exam Questions Training for Building Technicians: Energy Efficiency & Sustainability (BEST) Program Seminar Outline & Sample BEST Exam Questions Buildings in the United State consume a significant amount of energy. According

More information

Innovent LASER Packaged Fresh Air Conditioning Units

Innovent LASER Packaged Fresh Air Conditioning Units LASER Latent And Sensible Energy Reduction Latent And Sensible Energy Reduction For Outside Air Innovent LASER Packaged Fresh Air Conditioning Units Innovent LASER units provide both sensible and latent

More information

MECHANICAL SYSTEMS DESIGN. Team 2010 2

MECHANICAL SYSTEMS DESIGN. Team 2010 2 MECHANICAL SYSTEMS DESIGN Andrew Bridges, Ben Hollon, Sean Kolich, Weston Arbogast, Kaitlin Page Andrew Bridges, Ben Hollon, Sean Kolich, Weston Arbogast, Kaitlin Page Team 2010 2 PRESENTATION OVERVIEW

More information

HOW TO CONDUCT ENERGY SAVINGS ANALYSIS IN A FACILITY VALUE ENGINEERING STUDY

HOW TO CONDUCT ENERGY SAVINGS ANALYSIS IN A FACILITY VALUE ENGINEERING STUDY HOW TO CONDUCT ENERGY SAVINGS ANALYSIS IN A FACILITY VALUE ENGINEERING STUDY Benson Kwong, CVS, PE, CEM, LEED AP, CCE envergie consulting, LLC Biography Benson Kwong is an independent consultant providing

More information

Energy Efficiency Analysis for a Multi-Story Commercial Office Building. (LG Multi V III Heat Recovery VRF System)

Energy Efficiency Analysis for a Multi-Story Commercial Office Building. (LG Multi V III Heat Recovery VRF System) Energy Efficiency Analysis for a Multi-Story Commercial Office Building (LG Multi V III Heat Recovery VRF System) Commercial Air-Conditioning Engineering Study VRF-ES-BK-011-US 011L18 Executive Summary

More information

2 STEPS TO CONDUCTING YOUR HVAC ASSESSMENT

2 STEPS TO CONDUCTING YOUR HVAC ASSESSMENT Presentation Synopsis Heating, Ventilating and Air Conditioning Building Condition Assessment Vancouver, B.C. Prepared for: EPIC Prepared by: Douglas Spratt, P.Eng Douglas Spratt & Associates Ltd. www.dspratt-associates.com

More information

NYC Department of Education Building Condition Assessment Survey 2014-2015 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 10004

NYC Department of Education Building Condition Assessment Survey 2014-2015 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 10004 School: InspectionId Asset Data Inspection Type Building Assessment Survey 204-205 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 0004 Time In Last Edited 255 MECHANICAL 205-05-8 09:00AM

More information

Energy Efficiency for Businesses: An Overview of Best Practices to Help Reduce Energy Costs

Energy Efficiency for Businesses: An Overview of Best Practices to Help Reduce Energy Costs Energy Efficiency for Businesses: An Overview of Best Practices to Help Reduce Energy Costs Presented by: Paul Spiegel, Practical Energy Solutions Courtney Lane, PennFuture Commercial Building Energy Use

More information

Mechanical, Plumbing, and Fire Protection Conditions

Mechanical, Plumbing, and Fire Protection Conditions Mechanical, Plumbing, and Fire Protection Conditions Mechanical Conditions The mechanical systems within the building consist of a combination of the original 1926 systems and renovations that occurred

More information

Enclosed Football Stadium Design History and Lessons Learned

Enclosed Football Stadium Design History and Lessons Learned Enclosed Football Stadium Design History and Lessons Learned Robert L. Towell, P.E., LEED AP, QCxP btowell@cxegroup.com CxE Group LLC St. Louis, Missouri 314-436-6543 With thanks to the St. Louis Convention

More information

EnergyPro Building Energy Analysis. Assisted Living Building

EnergyPro Building Energy Analysis. Assisted Living Building EnergyPro Building Energy Analysis Assisted Living Building EnergyPro Building Energy Analysis for an assisted living building Project Scope The purpose of the EnergyPro energy model was to evaluate the

More information

Building Performance Evaluation Guide Version 1.7

Building Performance Evaluation Guide Version 1.7 Building Performance Evaluation Guide Version 1.7 Prepared by Center for Energy and Environment January 2014 Minnesota Sustainable Building 2030: Building Performance Evaluation Guide p 1 1. Schematic

More information

2009 IECC Update. Scope. Content. International Energy Conservation Code

2009 IECC Update. Scope. Content. International Energy Conservation Code 2009 IECC Update International Energy Conservation Code Scope The code applies to both residential and commercial buildings. In the code, the United States is divided into eight climate zones which are

More information

Advanced Energy Design Guide LEED Strategies for Schools. and High Performance Buildings

Advanced Energy Design Guide LEED Strategies for Schools. and High Performance Buildings Advanced Energy Design Guide LEED Strategies for Schools and High Performance Buildings Today s Presenters Stephen Koontz, LEED AP Energy Services Leader Tampa Bay Trane Allen Irvine General Sales Manager

More information

Table 1: Prescriptive Envelope Requirements: Residential WOOD FRAME WALL R-VALUE MASS WALL R-VALUE CEILING R-VALUE

Table 1: Prescriptive Envelope Requirements: Residential WOOD FRAME WALL R-VALUE MASS WALL R-VALUE CEILING R-VALUE June 24, 2011 North Carolina Has a New Energy Conservation Code! By R. Christopher Mathis Executive Summary On Friday, June 24, 2011, Governor Beverly Perdue signed SB 708 into law and, with it, approved

More information

IES <Virtual Environment> training. Trainee notes. ASHRAE 90.1 Appendix G - PRM Navigator. Version 6.4.0.7

IES <Virtual Environment> training. Trainee notes. ASHRAE 90.1 Appendix G - PRM Navigator. Version 6.4.0.7 IES training Trainee notes ASHRAE 90.1 Appendix G - PRM Navigator Version 6.4.0.7 Introduction These training notes are to be used in conjunction with your ASHRAE 90.1 Appendix G

More information

Nominal Life Expectancy for Building Components

Nominal Life Expectancy for Building Components Nominal Life Expectancy for Building Components Building System Page A. HVAC 2 B. Elevator/Escalator 6 C. Plumbing 7 D. Roofing 8 E. Electrical 10 F. Fire/Life/Safety/Security System 11 G. Interior Finishes

More information

This report presents the findings and recommendations of the assessment of energy use and

This report presents the findings and recommendations of the assessment of energy use and This report presents the findings and recommendations of the assessment of energy use and environmental stewardship of Arlington Street Church, Boston, MA. As stewards of the earth it is important that

More information

2012 BIM Guidelines and Standards (Rev. 00) University at Albany

2012 BIM Guidelines and Standards (Rev. 00) University at Albany A. Building Information Modeling (BIM) Guidelines: The Office of AECM will require the submission of BIM modeling files as part of an electronic file submission to the AECM project manager as requested

More information

Mechanical Technical Assignment One ASHRAE Standard 62.1 and Standard 90.1 Evaluation

Mechanical Technical Assignment One ASHRAE Standard 62.1 and Standard 90.1 Evaluation Mechanical Technical Assignment One ASHRAE Standard 62.1 and Standard 90.1 Evaluation Prepared for: Dr. James D. Freihaut Department of Architectural Engineering The Pennsylvania State University Prepared

More information

Energy Efficient HVAC-system and Building Design

Energy Efficient HVAC-system and Building Design Energy Efficient HVAC-system and Building Design Maija Virta 1, Harri Itkonen 1, Panu Mustakallio 1, Risto Kosonen 1 1 Halton Oy, Finland Corresponding email: maija.virta@halton.com SUMMARY This paper

More information

Element D Services Heating, Ventilating, and Air Conditioning

Element D Services Heating, Ventilating, and Air Conditioning Load Calculation Criteria PART 1 - GENERAL 1.01 OVERVIEW A. This section includes requirements for calculating HVAC cooling and heating loads. B. Load calculations must be performed in accordance with

More information

ASHRAE Level I Energy Audit June 2011

ASHRAE Level I Energy Audit June 2011 Knight Law Center Eugene, Oregon ASHRAE Level I Energy Audit June 2011 Prepared for University of Oregon by, PORTLAND SACRAMENTO HOUSTON ORLANDO 421 SW Sixth Ave Suite 200 Portland, OR 97204 1721 2 nd

More information

LOW-RISE RESIDENTIAL BUILDINGS ADDITIONS AND ALTERATIONS IN EXISTING LOW-RISE RESIDENTIAL BUILDINGS

LOW-RISE RESIDENTIAL BUILDINGS ADDITIONS AND ALTERATIONS IN EXISTING LOW-RISE RESIDENTIAL BUILDINGS SUBCHAPTER 9 LOW-RISE RESIDENTIAL BUILDINGS ADDITIONS AND ALTERATIONS IN EXISTING LOW-RISE RESIDENTIAL BUILDINGS SECTION 150.2 ENERGY EFFICIENCY STANDARDS FOR ADDITIONS AND ALTERATIONS IN EXISTING BUILDINGS

More information

TABLE OF CONTENTS 1.0 EXECUTIVE SUMMARY... 3

TABLE OF CONTENTS 1.0 EXECUTIVE SUMMARY... 3 TABLE OF CONTENTS 1.0 EXECUTIVE SUMMARY... 3 2.0 BACKGROUND... 5 2.1 Space Types 2.2 Occupancy and Use Schedules 2.3 Recent Building System Upgrades and Existing Conditions 2.4 Renewable Energy Assessment

More information

IECC Compliance Guide for Homes in Virginia

IECC Compliance Guide for Homes in Virginia IECC Compliance Guide for Homes in Virginia Amended Version of 2012 International Energy Conservation Code July 14, 2014 Climate Zone Since the entire state of Virginia falls in the IECC Climate Zone 4,

More information

HVAC Processes. Lecture 7

HVAC Processes. Lecture 7 HVAC Processes Lecture 7 Targets of Lecture General understanding about HVAC systems: Typical HVAC processes Air handling units, fan coil units, exhaust fans Typical plumbing systems Transfer pumps, sump

More information

SAVE ENERGY AT HOME INSULATE AND AIR SEAL

SAVE ENERGY AT HOME INSULATE AND AIR SEAL SAVE ENERGY AT HOME INSULATE AND AIR SEAL Check the roof insulation level and add insulation to maintain minimum R-38 (6 of blown cellulose or equal). Use R-19 between frame or R-10 rigid insulation for

More information

Red River College MECB 101 School of Construction and Engineering Technologies Manitoba Energy Code for Buildings 101 (MECB 101)

Red River College MECB 101 School of Construction and Engineering Technologies Manitoba Energy Code for Buildings 101 (MECB 101) Manitoba Energy Code for Buildings 101 (MECB 101) The National Research Council of Canada (NRC) has issued the National Energy Code for Buildings (NECB) in 2011. The main objective of NECB 2011 was to

More information

Design Guide. Retrofitting Options For HVAC Systems In Live Performance Venues

Design Guide. Retrofitting Options For HVAC Systems In Live Performance Venues Design Guide Retrofitting Options For HVAC Systems In Live Performance Venues Heating, ventilation and air conditioning (HVAC) systems are major energy consumers in live performance venues. For this reason,

More information

AIR COOLED CHILLER CHILLED WATER PUMP CONTROL: The chilled water pump with the lowest runtime will automatically start when the outside air temperature rises above the system enable setpoint. When the

More information

Codes and High Performance Hot Water Systems. Gary Klein Affiliated International Management, LLC 916 549 7080 gary@aim4sustainability.

Codes and High Performance Hot Water Systems. Gary Klein Affiliated International Management, LLC 916 549 7080 gary@aim4sustainability. Codes and High Performance Hot Water Systems Gary Klein Affiliated International Management, LLC 916 549 7080 gary@aim4sustainability.com Annual Energy Use for Heating Water Natural Gas Gallons Per Day

More information

Energy and Water Conservation Design Guide (for Sustainment, Restoration and Modernization [SRM] Projects and MILCON Construction)

Energy and Water Conservation Design Guide (for Sustainment, Restoration and Modernization [SRM] Projects and MILCON Construction) Energy and Water Conservation Design Guide (for Sustainment, Restoration and Modernization [SRM] Projects and MILCON Construction) Prepared for Installation Management Command (IMCOM) 2511 Jefferson Davis

More information

FDA Building One. R. Andy Pahwa. Faculty Advisor: Jim Freihaut/Dustin Eplee

FDA Building One. R. Andy Pahwa. Faculty Advisor: Jim Freihaut/Dustin Eplee FDA Building One R. Andy Pahwa Faculty Advisor: Jim Freihaut/Dustin Eplee Project Background Building One Project Background Originally the headquarters of the Naval Surface Warfare Center Project Background

More information

for K-12 School Buildings

for K-12 School Buildings Advanced Energy Design Guide for K-12 School Buildings HVAC Section John Murphy Applications Engineer, LEED AP Trane La Crosse, Wisconsin jmurphy@trane.com www.trane.com AEDG-K12 HVAC Subcommittee John

More information

Green Built Texas Protocol v3 Project Summary and Checklist, One and Two Family New Construction

Green Built Texas Protocol v3 Project Summary and Checklist, One and Two Family New Construction Date of Application Path Project Identification Project Address Owner Identification Architect Identification Contractor Identification Third Party Provider Green Built Texas Protocol v3 Project Summary

More information

Course #0009078 Resubmitted for On-line Use

Course #0009078 Resubmitted for On-line Use Provider: Florida Refrigeration and Air Conditioning Contractors Association 466 94 th Avenue N., St. Petersburg, FL 33702 727-576-3225 / fax 727-578-9982 / email: charris@fracca.org Course Title: Advanced

More information

Components HVAC General Standards HVAC Guidelines HVAC System Selection Life Cycle Cost Analysis

Components HVAC General Standards HVAC Guidelines HVAC System Selection Life Cycle Cost Analysis Components HVAC General System Selection Life Cycle Cost Analysis Outdoor Air Design Values Indoor Air Design Values Outdoor Air Ventilation Welding Ventilation Temperature Control Systems Ductwork HVAC

More information

ENERGY AUDIT IN THE KACST BUILDING

ENERGY AUDIT IN THE KACST BUILDING ENERGY AUDIT IN THE KACST BUILDING S. M. Hasnain, S. H. Alawaji, A. M. Al-Ibrahim and S. M. Smiai Energy Research Institute (ERI) King Abdulaziz City for Science and Technology (KACST) P.O. Box 6086, Riyadh

More information

HVACPowDen.xls An Easy-to-Use Tool for Recognizing Energy Efficient Buildings and HVAC Systems

HVACPowDen.xls An Easy-to-Use Tool for Recognizing Energy Efficient Buildings and HVAC Systems HVACPowDen.xls An Easy-to-Use Tool for Recognizing Energy Efficient Buildings and HVAC Systems Fundamental Principles of Environmentally Responsible, Energy Efficient Buildings 1. Energy efficiency is

More information

PLAN REVIEW SERVICES CONSTRUCTION DOCUMENTS NECESSARY FOR A THOROUGH PLAN REVIEW

PLAN REVIEW SERVICES CONSTRUCTION DOCUMENTS NECESSARY FOR A THOROUGH PLAN REVIEW CONSTRUCTION DOCUMENTS NECESSARY FOR A THOROUGH PLAN REVIEW PRELIMINARY BUILDING REVIEW two sets of the following: Architectural/engineering design development drawings indicating size of the building,

More information

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal. 2.02 DESIGN DEVELOPMENT PHASE GENERAL The Architect shall prepare the Design Development Documents from the approved Schematic Design. The Design Development Documents shall consist of drawings and other

More information

How to Reduce Energy Costs in Your Commercial Building

How to Reduce Energy Costs in Your Commercial Building How to Reduce Energy Costs in Your Commercial Building Mark Steinmetz, Energy Advisor, GDS Associates, Inc., an ActOnEnergy Partner Mary Bentsen, Education and Training Coordinator SAIC, an Ameren Illinois

More information

Energy Efficiency HOSPITALITY. www.energia.ie

Energy Efficiency HOSPITALITY. www.energia.ie Energy Efficiency HOSPITALITY www.energia.ie Your chance to reduce your business energy usage by as much as 20%! 20% is a significant figure and reducing your energy bill by this amount could make a real

More information

Energy Savings in High-Rise Buildings Using High-Reflective Coatings

Energy Savings in High-Rise Buildings Using High-Reflective Coatings Energy Savings in High-Rise Buildings Using High-Reflective Coatings Executive Summary: Nevertheless, the simulation analyses showed that when designing a building for low energy consumption, even in cold

More information

Occupancy: Assembly (A-3) and Business -Includes offices, seminar rooms, classrooms, and café facility. Duke University Medical School

Occupancy: Assembly (A-3) and Business -Includes offices, seminar rooms, classrooms, and café facility. Duke University Medical School Introduction Background The Duke School of Nursing building offers a new three-story state of the art facility that has helped strengthen the quality and integrity of the School of Nursing at Duke. The

More information

Energy Conservation Audits for Six Performing Arts Facilities A Toronto s Green Theatres Project

Energy Conservation Audits for Six Performing Arts Facilities A Toronto s Green Theatres Project Energy Conservation Audits for Six Performing Arts Facilities A Toronto s Green Theatres Project Anthony Marshall, P.Eng., CEM January 2012 For Creative Trust for Arts & Culture Table of Contents Introduction

More information

APPLICATION GUIDE. Moisture Management in Waterborne Climate Systems

APPLICATION GUIDE. Moisture Management in Waterborne Climate Systems APPLICATION GUIDE Moisture Management in Waterborne Climate Systems Contents Introduction 3 WBCS Concept 3 Condensation 4 Moisture Sources in the Space 4 Impact of a High Moisture Load 5 Designing to Manage

More information

Commissioning - Construction Documents (Page 1 of 6)

Commissioning - Construction Documents (Page 1 of 6) Commissioning - Construction Documents (Page 1 of 6) A. General Information Climate Zone: Building Type: Conditioned Area (sf): Reviewer's Name: Reviewer's Agency: Note: Design Review for each system/subsystem

More information

Florida Energy Efficiency Code For Building Construction

Florida Energy Efficiency Code For Building Construction Florida Energy iciency Code For Building Construction EnergyGauge Summit Fla/Com-2010, ective Date: March 15, 2012 -- Form 506-2010 Total Building Performance Method for Commercial Buildings PROJECT SUMMARY

More information

Commercial Energy Efficiency Program. Save money, reduce energy use and earn incentives. Save money, reduce energy use and qualify for incentives

Commercial Energy Efficiency Program. Save money, reduce energy use and earn incentives. Save money, reduce energy use and qualify for incentives Save money, reduce energy use and earn incentives by improving the energy efficiency of your business. Georgia Power s Commercial Energy Efficiency Program makes incorporating energy-efficient improvements

More information

Mechanical Systems Proposal revised

Mechanical Systems Proposal revised Mechanical Systems Proposal revised Prepared for: Dr. William Bahnfleth, Professor The Pennsylvania State University, Department of Architectural Engineering Prepared by: Chris Nicolais Mechanical Option

More information

SECTION 15010 BASIC MECHANICAL REQUIREMENTS

SECTION 15010 BASIC MECHANICAL REQUIREMENTS SECTION 15010 BASIC MECHANICAL REQUIREMENTS A. DESIGN PARAMETERS 1. Climate Data a. For cooling design utilize the 1% Monthly Design Dry Bulb and Mean Coincident Wet Bulb Temperatures as listed in ASHRAE

More information

Richardsville Elementary The First Net Zero Energy Public School in the U.S. Installations Conference

Richardsville Elementary The First Net Zero Energy Public School in the U.S. Installations Conference Richardsville Elementary The First Net Zero Energy Public School in the U.S. Presented to: ARMY Net Zero Energy Installations Conference Kenneth L. Seibert, PE, LEED AP Kenny Stanfield, AIA, LEED AP January

More information

Flexibility, Efficiency In San Antonio Arena

Flexibility, Efficiency In San Antonio Arena 2005, American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. (www.ashrae.org). Reprinted by permission from ASHRAE Journal, (Vol. 47, No. 9, September 2005). This article may not

More information

Industrial Green Building Retrofit 101 Opportunities and Challenges. Light Industrial Green Building Retrofits. Why Green Retrofit?

Industrial Green Building Retrofit 101 Opportunities and Challenges. Light Industrial Green Building Retrofits. Why Green Retrofit? Industrial Green Building 101 Opportunities and Challenges Joanne Sawatzky Senior Project Manager, Light House Sustainability at Work Re-visioning a Sustainable False Creek Flats Light Industrial Green

More information

This presentation premiered at WaterSmart Innovations. watersmartinnovations.com

This presentation premiered at WaterSmart Innovations. watersmartinnovations.com This presentation premiered at WaterSmart Innovations watersmartinnovations.com Green Plumbing and Mechanical Code Supplement David Viola IAPMO Director of Special Services 1 IAPMO Group Association of

More information

I. ENERGY PLAN STATEMENT:

I. ENERGY PLAN STATEMENT: Brownsville Independent School District Energy Management Plan BISD Board of Trustees Approved (January 19, 2010 Agenda XI. General Function, A. Item 16) PURPOSE: The intent of this plan is to create a

More information

Technical Investigation Elizabeth C. Krauss Mechanical Option September 18, 2013

Technical Investigation Elizabeth C. Krauss Mechanical Option September 18, 2013 Technical Investigation Elizabeth C. Mechanical Option September 18, 2013 State Institute of Rehabilitation T e c h n i c a l R e p o r t I 1 Technical Investigation... 0 Executive Summary... 2 Mechanical

More information

1. What percent of a commercial business s energy usage comes from their HVAC system? A. 13% B. 23% C. 33% D. 43% E. 53%

1. What percent of a commercial business s energy usage comes from their HVAC system? A. 13% B. 23% C. 33% D. 43% E. 53% 1 1. What percent of a commercial business s energy usage comes from their HVAC system? A. 13% B. 23% C. 33% D. 43% E. 53% 2. How much money do commercial facilities spend per square foot on energy costs

More information

Building Energy Codes 101 October 23, 2013. Matthew Giudice Building Policy Associate Midwest Energy Efficiency Alliance

Building Energy Codes 101 October 23, 2013. Matthew Giudice Building Policy Associate Midwest Energy Efficiency Alliance Building Energy Codes 101 October 23, 2013 Matthew Giudice Building Policy Associate Midwest Energy Efficiency Alliance OVERVIEW 1. Introduction 2. Energy Code Development 3. Adoption Process 4. Elements

More information

125 Mount Auburn Second Floor Office Renovation LEED-CI Silver, September 2008

125 Mount Auburn Second Floor Office Renovation LEED-CI Silver, September 2008 125 Mount Auburn Second Floor Office Renovation LEED-CI Silver, September 2008 The Harvard Law School s 125 Mount Auburn office renovation project team was committed to sustainable design and construction,

More information

Basics of HVAC Cleaning

Basics of HVAC Cleaning Basics of HVAC Cleaning Seminar Outline Residential 1. Types of systems used and why 2. Types of air distribution systems 3. System components 4. Determining the need for cleaning (ACR2002) 5. Project

More information

Greenhouse Gas Implications of HVAC Upgrades in Multi-Unit Residential Buildings

Greenhouse Gas Implications of HVAC Upgrades in Multi-Unit Residential Buildings Greenhouse Gas Implications of HVAC Upgrades in Multi-Unit Residential Buildings J A NUARY 2015 INTRODUCTION This Research Report explores best practices and approaches for reducing greenhouse gas (GHG)

More information

COMPARATIVE LIFE-CYCLE ANALYSIS OF ENERGY-EFFICIENCY MEASURES AT TVA S CHATTANOOGA OFFICE COMPLEX: PHASE II RESULTS & FINAL DESIGN

COMPARATIVE LIFE-CYCLE ANALYSIS OF ENERGY-EFFICIENCY MEASURES AT TVA S CHATTANOOGA OFFICE COMPLEX: PHASE II RESULTS & FINAL DESIGN COMPARATIVE LIFE-CYCLE ANALYSIS OF ENERGY-EFFICIENCY MEASURES AT TVA S CHATTANOOGA OFFICE COMPLEX: PHASE II RESULTS & FINAL DESIGN Umesh Atre Innovative Design Inc 850 W Morgan St Raleigh, NC 27603 umesh@innovativedesign.net

More information

Deep Energy Savings in Existing Buildings

Deep Energy Savings in Existing Buildings Case Study Deep Energy Savings in Existing Buildings Overview Site Details Owner: Alliance for Sustainable Colorado Location: Denver, CO Building Type: Office Project Description: Major Renovation Size

More information

RULES FOR THE SETTING UP OF SUSTAINABLE BRANCHES Summary

RULES FOR THE SETTING UP OF SUSTAINABLE BRANCHES Summary RULES FOR THE SETTING UP OF SUSTAINABLE BRANCHES Summary January 2013 TABLE OF CONTENTS INTRODUCTION... 3 GENERAL RECOMMENDATIONS... 3 Communication with customers in the field of environmental sustainability...

More information

Energy Efficiency. Bars & RestauRants. www.energia.ie

Energy Efficiency. Bars & RestauRants. www.energia.ie Energy Efficiency Bars & RestauRants www.energia.ie 2 Your chance to reduce your business energy usage by as much as 20%! 20% is a significant figure and reducing your energy bill by this amount could

More information

THESIS PROJECT PROPOSAL: INTRODUCTION TO DESIGN AND DELIVERY ALTERNATIVES

THESIS PROJECT PROPOSAL: INTRODUCTION TO DESIGN AND DELIVERY ALTERNATIVES December 12, 2014 THESIS PROJECT PROPOSAL: INTRODUCTION TO DESIGN AND DELIVERY ALTERNATIVES Samuel T Bridwell DR. JAMES FREIJHAUT NEOMED Research and Graduate Education Building Table of Contents Executive

More information

Comparing Energy Savings of Different VAV Systems

Comparing Energy Savings of Different VAV Systems Comparing Energy Savings of Different VAV Systems Prepared By: Martyn Dodd mart@energysoft.com EnergySoft LLC 1025 5th Street, Suite A Novato, CA 94945 415-897-6400 www.energysoft.com Last Modified: March

More information

Vestibule Case Study. Vestibule Requirement Intent [2003 IECC, 2006 IECC, 2003 IBC, 2006 IBC, 90.1-2001, 90.1-2004]

Vestibule Case Study. Vestibule Requirement Intent [2003 IECC, 2006 IECC, 2003 IBC, 2006 IBC, 90.1-2001, 90.1-2004] Vestibule Case Study [2003 IECC, 2006 IECC, 2003 IBC, 2006 IBC, 90.1-2001, 90.1-2004] Vestibule Requirement Intent Page 1 of 14 The primary intent behind the requirement for a vestibule is to reduce infiltration

More information

SAM HOUSTON STATE UNIVERSITY

SAM HOUSTON STATE UNIVERSITY PART 1: GENERAL 1.01 General Requirements A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the

More information

ALBUQUERQUE PUBLIC SCHOOLS Facility Design & Construction / Maintenance & Operations

ALBUQUERQUE PUBLIC SCHOOLS Facility Design & Construction / Maintenance & Operations ALBUQUERQUE PUBLIC SCHOOLS Facility Design & Construction / Maintenance & Operations MECHANICAL SYSTEMS DESIGN STANDARDS Appendix A RECOMMENDED HVAC SYSTEMS BY TYPE OF SPACE Matt Higgins Valentin Lucero

More information

CHAPTER 10: APPLIANCES AND LIGHTING

CHAPTER 10: APPLIANCES AND LIGHTING Chapter 10: Appliances and Lighting 151 CHAPTER 10: APPLIANCES AND LIGHTING According to the U.S. Environmental Protection Agency, appliances and home electronics account for 20% of energy bills in the

More information

Subtropical Cities September 2006. Design for Energy Efficiency in Commercial Buildings in Queensland

Subtropical Cities September 2006. Design for Energy Efficiency in Commercial Buildings in Queensland Subtropical Cities September 2006 Design for Energy Efficiency in Commercial Buildings in Queensland Contents Typical Building Constraints & Requirements Understanding Energy Consumption in Buildings HVAC

More information

SOM. Data Needs to Achieve High-Performance Buildings. Teresa Rainey, PE, LEED AP BD+C Sustainable Engineering Studio, Washington, DC

SOM. Data Needs to Achieve High-Performance Buildings. Teresa Rainey, PE, LEED AP BD+C Sustainable Engineering Studio, Washington, DC Data Needs to Achieve High-Performance Buildings Skidmore Owings & Merrill Teresa Rainey, PE, LEED AP BD+C Sustainable Engineering Studio, Washington, DC Design Requirements Building Codes, Energy ICC:

More information

Green House, Hungary

Green House, Hungary Further information Skanska AB www.skanska.com Contact Noel Morrin, SVP Sustainability & Green Support noel.morrin@skanska.se Green House, Hungary Case Study 109 Aspects of Sustainability This project

More information

SECTION 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC INTRODUCTORY INFORMATION

SECTION 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC INTRODUCTORY INFORMATION SECTION 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC INTRODUCTORY INFORMATION The purpose of this guide specification is to assist the specifier in correctly specifying Mechanical System Testing

More information

BOMA BESt AND LEED EBOM COMPARISON

BOMA BESt AND LEED EBOM COMPARISON BOMA BESt AND LEED EBOM COMPARISON INTERNATIONAL FACILITY MANAGEMENT ASSOCIATION James Furlong, CET, LEED AP - Senior Associate, Stantec Consulting Ltd. BOMA BESt BOMA - Building Owners and Managers Association

More information

Plumbing Fixture Replacement (SB 407) for Existing Single-Family Residential, Multifamily Residential and Commercial Buildings

Plumbing Fixture Replacement (SB 407) for Existing Single-Family Residential, Multifamily Residential and Commercial Buildings Community Development Department Building Division 39550 Liberty Street, PO Box 5006, CA 94537-5006 510-494-4460 ph www.fremont.gov Plumbing Fixture Replacement (SB 407) for Existing Single-Family Residential,

More information

Case Study -Sandy Grove Middle School First Net Positive Energy P3 School In North Carolina

Case Study -Sandy Grove Middle School First Net Positive Energy P3 School In North Carolina Case Study -Sandy Grove Middle School First Net Positive Energy P3 School In North Carolina Public-Private Partnership (P3) Government - provides incentive(s): transfer of asset (land), one time grant,

More information

We ve got you covered.

We ve got you covered. Mechanical & Plumbing We ve got you covered. Energy Savings Maintenance Contracts Cooling Towers Re-piping Air-conditioning Building Automated Systems Boiler Retrofits Sewer Cleaning Drain Systems THE ONLY

More information

University of Maryland s Gossett Field House College Park, MD

University of Maryland s Gossett Field House College Park, MD Presentation Outline Project Background Existing Mechanical System Mechanical Redesign Structural Redesign Electrical Redesign Conclusions & Recommendations Acknowledgements Questions Project Team Owner:

More information

BPC Green Builders. Green building for new and existing homes. Health Comfort Energy

BPC Green Builders. Green building for new and existing homes. Health Comfort Energy BPC Green Builders Green building for new and existing homes Health Comfort Energy Mechanical Systems Installed HVAC Systems Primary energy source large, roof mounted, solar thermal array (AET flat plate)

More information

Mechanical Insulation. Hospitals and Schools

Mechanical Insulation. Hospitals and Schools Study on Mechanical Insulation in Hospitals and Schools March 1, 2011 Study Mechanical Insulation in Hospitals and Schools G. Christopher P. Crall, P.E. Ronald L. King Executive Summary Mechanical insulation

More information

ASHRAE Student System Selection Competition New Office Building - Nashville, Tennessee Spring 2009

ASHRAE Student System Selection Competition New Office Building - Nashville, Tennessee Spring 2009 ASHRAE Student System Selection Competition New Office Building - Nashville, Tennessee Spring 2009 Kansas State University Department of Architectural Engineering and Construction Science 240 Seaton Hall

More information

Sample Customer 123 Conservation Way TAMPA FL 33626 Tracking Number: 000675309

Sample Customer 123 Conservation Way TAMPA FL 33626 Tracking Number: 000675309 Thank you for completing the Online Home Energy Audit. Based on the answers that you provided in the questionnaire, the following is a complete analysis of your household's energy consumption. We have

More information

2009 Seattle Energy Code Impacts: See below for a recap of Changes in Envelope performance from 2006 to 2009

2009 Seattle Energy Code Impacts: See below for a recap of Changes in Envelope performance from 2006 to 2009 2009 Seattle Energy Code Impacts: Building Envelope Impacts: Below is a Summary of Changes that impact building envelope construction planned for 624 Yale. There are several modifications are required

More information

ENERGY EFFICIENCY ENERGY EFFICIENCY: Saving Dollars While Clearing the Air

ENERGY EFFICIENCY ENERGY EFFICIENCY: Saving Dollars While Clearing the Air : Saving Dollars While Clearing the Air After labor and food, energy is the largest controllable cost in a restaurant s operation. And energy is a great place to start in becoming a green restaurant because

More information