1 DEstimating Design Stream Flows at Road- Stream Crossings D.1 Introduction D.2 Design Flow Estimates D.3 Verifying Flow Estimates at Ungauged Streams

2 Stream Simulation

3 Appendix D Estimating Design Stream Flows at Road-Stream Crossings D.1 INTRODUCTION Assessing the stability of any crossing structure requires estimating design peak flows for the site. This appendix provides guidance and resources for estimating peak flows at gauged and ungauged sites. It is intended as a desk reference rather than an introduction to hydrologic analysis. Two types of design flows apply to stream-simulation design: l structural-design flows, for evaluating the structural integrity and stability of the culvert, bridge, etc., during flood events. l bed-design flows, for evaluating the stability of the particles intended to be permanent inside a drainage structure. Design flows are the flows that, if exceeded, may cause failure of the structure or the bed. The two design flows may be different if the consequences of bed failure are different from those of complete structural failure (see risk discussion in section ). For example, if the acceptable risk of bed failure is 4 percent in any one year, the bed design flow would be the flow that is exceeded on average only every 25 years the 25-year flow. The acceptable risk of losing the structure might be lower, perhaps only 1-percent per year, in which case the 100-year flow would be the structural-design flow. These design flows are often taken to be the same in real applications, but it is important to understand the concept that design flows are determined based on acceptable risks and consequences. All stream-simulation designs require estimating the structural and bed design flows. Some designs also require further hydraulic analysis the bed-mobility analysis which compares key-piece entrainament flows in the reference reach to those in the project reach (appendix E). For the comparative analysis, we do not need to know the flow recurrence interval. However, determining the recurrence interval can be an independent check on the reasonableness of your estimate of entrainment flow. The frequency of the estimated flow can be compared to the bed-mobilization frequencies listed in table 6.5 for each channel type, or to field observations of actual floods of known recurrence interval. Estimating flood flows on small watersheds is particularly difficult, because relatively few stream gauges exist on small streams. The U.S. Geological Survey (USGS) maintains nearly 6,000 gauges, 26 percent of D 1

4 Stream Simulation which are on or within 10 miles of national forest lands. However, only 132 gauges are on streams with a contributing area of less than 5 square miles, and only 22 of those are on or within 10 miles of a national forest (figure D.1). Fewer still have a long-term flow record to allow for accurate estimates of extreme events. More inactive gauges exist than active ones and the historic records from inactive gauges are also very useful for estimating flood flows. There are 407 inactive gauged sites with a contributing area of less than 5 square miles and within 10 miles of a national forest. The lack of gauging stations in small, forested watersheds requires the analyst to use varied approaches, employing multiple flow-estimation methods to arrive at the best estimate of design flows. Methods can be grouped according to the project site s proximity to a stream gauge: l Direct application of gauge data. l Extrapolation of flow estimates from gauged sites. s To ungauged sites on the same stream. s To ungauged sites on nearby streams. l Predictions in ungauged basins with regional regression equations. To meet project objectives, teams must invest appropriate time and effort in developing both structural- and bed-design flows. If structural-design flows are underestimated, then the risk of hydraulic failure is likewise underestimated. Conversely, if design flows are overestimated, both immobile bed particles and the structure itself may be oversized. D.2 Design Flow Estimates Many sources of streamflow data exist. Stream gauges are most commonly operated by State or Federal agencies or by utilities. The best and most reliable data are generally those published by the USGS, which has welldefined protocols for data collection and quality control. Gauge data collected without defined protocols and documentation may be of lesser quality. At the National Water Information Systems (NWIS) Web site ( you can download gauge station information, field measurements, summary statistics, and mean daily flow, peak flow, and partial peak flow data. D 2

5 Appendix D Estimating Design Stream Flows at Road/Stream Crossings Figure D.1 U.S. Geological Survey stream gauges in and near national forests. D 3

6 Stream Simulation Professional papers and reports are a good source of historical flow data, regional regression equations, and other flow estimation tools. USGS publications for estimating flows describe the methods to be used for each State. Check the National Flood Frequency Program (NFF) Web site for the electronic documentation for the State in which your project lies: ( D.2.1 Design Flow Estimates at Gauged Sites Although aquatic organism passage projects rarely occur at a gauged site, it may be necessary to analyze data from nearby gauges to determine flows of particular recurrence intervals (flood frequency) in the vicinity. Accuracy of flood frequency estimates at a gauged site depends on the length of record of the gauge. The longer the period of record, the better the estimate. As an example, figure D.2 shows the measured peak discharges for the period of record for the gauge on the North River in Alabama. Notice how the estimated magnitude of the 100-year flood (Q 100 ) changes as different time periods are considered. In the development of flood frequency estimates, the general recommendation is that a gauge station have a minimum of 10 years of record. Gauges with fewer than 10 years of data can be used to develop flow estimates for frequent floods (e.g., Q 2 ), but they should not be used for higher recurrence interval flood flows. For flood flow estimates for infrequent events (e.g., 25- to 100-year floods) at a gauged site, use the guidelines in Bulletin 17b (Interagency Advisory Committee on Water Data, dl_flow.pdf). The bulletin suggests using the Log-Pearson type III floodfrequency distribution. The required three parameters for this distribution are the mean, standard deviation, and skew of the logarithms of the annual series of peak streamflows. To determine the values of the parameters, follow the guidelines in the bulletin. In addition to Bulletin 17b, other useful references for flood-frequency analysis include McCuen (2003), Chow et al. (1988), and Linsley et al. (1982). To facilitate flood-frequency analysis using the methods recommended in Bulletin 17b, you can download computer programs from private vendors or the USGS. The USGS program is called PEAKFQ; the most current version (4.1) is a DOS version, last updated in February You can download the program and user guide at surface_water.html. D 4

7 Appendix D Estimating Design Stream Flows at Road-Stream Crossings , ,000 North River, Alabama , Q 100 = 1050 m 3 /s 900 Annual Peak Discharge, ( m3/s ) , Q 100 = 631 m 3 /s , Q 100 = 601 m 3 /s , Q 100 = 466 m 3 /s Feb-39 Mar-44 Feb-48 Dec-51 Apr-56 Mar-60 Apr-64 Dec-67 Jan-72 Oct-75 Mar-80 Dec-83 Feb-88 Feb-92 Jan-96 Date Figure D.2 Variation in peak discharge estimates over difficult periods of record. As part of the NFF Program, the USGS has completed flood-frequency analyses for most of their gauges with adequate data. The NFF Web site ( has the information for each State, summarizing estimated discharges for a range of flood frequencies. Be aware of the date on which the summary was last updated; it may not include the most recent years of data. D Weighted flood frequency Because a gauging station s period of record is limited, computed floodfrequency values may contain some bias. The period of record for the station may or may not include years when large floods occurred (see figure D.2). Flood-frequency values calculated from a record that includes several large floods will be very different from one that happens to lack any large floods. To improve the reliability of the estimate especially for gauges with short periods of record you can weight the flow computed from streamflow data (Q G ) for a specific recurrence interval (RI) with the same RI flow computed from regression equations (Q R ). The weighting is based on the number of years of record for the gauging station and the equivalent period of record for the regression equation (see equation D.1). The equivalent period of record for the regression equation is the number of years of actual gauge record that would be required for producing the same accuracy as the equation. Hardison (1971) describes the calculations involved in estimating an equivalent number of years of record. For many D 5

8 Stream Simulation States, equivalent years of record for regional regression equations are displayed on the NFF Web site. To obtain a weighted flood frequency for a gauging station, multiply the flow estimate for the station by the years of record at the station (N), and multiply the flow computed from the appropriate regional regression equation by the equivalent years of record (N E ). Add the two values and divide by the sum of the years of record to obtain a weighted flood frequency for the stream at the gauging station (Stuckey and Reed 2000). Weighting of flood frequency records using the following equation is also discussed in detail by Cooper (2002) and Wiley et al. (2000). Equation D.1 Q W = (Q G x N + Q R x N E ) / (N + N E ) where: Q W = Weighted discharge for a return interval of T-years. Q G = T-year discharge computed from measured streamflow data. Q R = T-year discharge computed from regional regression equations. N = Number of years of record at the gauging station. N E = Equivalent years of record for regional regression equations. D.2.2 Design-flow Estimates Near Gauged Sites Flood frequency estimates at gauged sites must be in hand before you can estimate flood flows at ungauged sites. D 6

9 Appendix D Estimating Design Stream Flows at Road-Stream Crossings D Ungauged site on a gauged stream If a project site is on the same stream as a gauge, you can calculate peak discharges at the ungauged site by weighting the gauge data by a ratio of drainage areas (e.g., Thomas et al. 1993; Sumioka 1997) as follows: Equation D.2 Q (ungauged) = Q (gauged) (A ungauged / A gauged ) x where: Q = Discharge. A = Basin area at gauge site and project site. x = Slope exponent of the curve (power function) relating Q to A for suitable gauges in the hydro-physiographic province. The slope exponent (x) accounts for the difference between the ways in which larger basins and smaller basins react to precipitation. Larger basins usually have smaller peak discharges per unit area than smaller basins, because of differences in the amount of water storage (in ponds and soils), time of concentration, and spatial differences in precipitation during a storm. The exponent x is approximately the same value as the average exponent on basin area in the regional regression equation for that flood region. If necessary, you can directly determine the value of the exponent for any subset of gauges simply by plotting the flow estimates from floodfrequency analysis for a given recurrence interval (dependent variable) against drainage area (independent variable), and fitting a power function through the data (figure D.3). You can then average the drainage area exponents determined from this regression for several RI flows, to produce a single exponent for each flood region. However, you do not usually have to do this analysis, because the slope exponent is often reported by flood region in the USGS publications for individual States (see NFF Web site). D 7

10 Stream Simulation 10,000 Determination of Slope Exponent ((x) x) 8,000 6,000 4,000 2,000 Q 100 = 81.5A 0.68 Slope Exponent, x = ,000 Drainage Area (sq. mi.) Figure D.3 Typical example of the relationship of drainage area to flow of a specific recurrence interval (or exceedence probability), for determining the exponent (x) in equation D.2. Equation D.2 is valid as long as the drainage area of the ungauged site is between 0.5 and 1.5 times the area of the gauged site and the watersheds have similar characteristics. If the watersheds differ appreciably in topography, vegetative cover, geology, etc., make the peak discharge estimates using appropriate regional regression equations. Some investigators (e.g., Wiley et al. 2000; Stuckey and Reed 2000) recommend a different method of transferring gauged data to an ungauged site. This method uses a linear correction factor for the difference in drainage areas between the gauged and ungauged sites (equation D.3). Equation D.3 C u = C g [2( A g A u )/ A g ](C g 1) where: C u = Correction factor for the ungauged site. C g = Weighted flow for the gauged site (Q w from equation 1) divided by the regional regression estimate of the flow for the gauged site (Q R ). A g = Drainage area at the streamflow gauge. A u = Drainage area at the ungauged site. D 8

11 Appendix D Estimating Design Stream Flows at Road-Stream Crossings The flow estimate for the ungauged site is determined by multiplying the correction factor for the ungauged site (C u ) by the regional regression estimate for the ungauged site. Decide which transfer method (equation 2 or 3) to use, given the recommendations in the applicable USGS flood frequency analysis documentation within the NFF program (FEMA 1995). D Ungauged site near a gauged stream If the project site is near a gauge even if the project site is not in the same watershed you can often use the gauge data to estimate design flows. The methodology is the same as that presented in section D When extrapolating the data from a specific gauged site to a site in a nearby watershed, the two sites must have similar: l Precipitation. l l l l l Drainage area and shape. Orographic expression. Aspect. Vegetation. Lithology/geology. Again, when you transfer gauge data to an ungauged site, the basin area should be within 0.5 to 1.5 times that of the gauged site. The accuracy and validity of the flow estimates are directly tied to the similarity of watershed characteristics between the gauged and ungauged sites. As the differences between the watersheds increase, be more cautious in using this technique. Be familiar with the gauged site and recognize the hydrologic influence of lakes, water diversions, regulated rivers, or dams. In addition, be cautious when using gauges on losing streams in arid areas, in karst terrain, or in areas with evident regional ground water contributions to streamflow. Extrapolation in these situations can produce invalid results. D.2.3 Flow Estimates on Ungauged Streams You can also estimate peak stream flows for an ungauged watershed from equations that relate peak flows to climatologic and physical characteristics of the watershed (Thomas and Benson 1969; Riggs 1973). The equations are derived using multiple linear regression techniques. This generalization or regionalization of peak discharges from measured to unmeasured watersheds is known as regional regression analysis. Defining regions of relatively consistent geography, geology, and hydrology improves the accuracy of regional regression equations. States have different numbers D 9

12 Stream Simulation of equations, depending on the number of flood regions they have defined. For example, the State of Colorado has a different set of regional regression equations for each of five different flood regions; New Mexico has eight flood regions, and Maine has one. For most States, the USGS has completed regional regression analyses and developed predictive equations. First, gauge-site peak discharges corresponding to a suite of recurrence intervals are computed using the flood-frequency analysis techniques discussed previously. These peak flows are then used as dependent variables in a multiple regression analysis against independent variables such as drainage area, mean basin elevation, mean maximum January air temperature, area of lakes and ponds, etc. Although the list of independent variables is extensive, only a small subset correlates well enough with peak flows to be used in predictive equations. Drainage area and some measure of precipitation are commonly the most important variables. The form of the regional regression equations takes the general form: Equation D.4 Q = b 0 + b 1 x 1 + b 2 x b m x m Where Q represents the predicted streamflow for a selected recurrence interval and x 1, x 2,, x m represent the m watershed characteristics used as predictive variables. The regression coefficients b 1, b 2,, b m define the relationship among variables and are determined from the measured data in the flood region. Published regression equations typically provide some measure of their accuracy. The standard errors of prediction typically range between 30 and 60 percent, although some exceed a standard error of 100 percent. An example of predictions using regional regression equations from Oregon (figure D.4) shows the range of potential error included within 95-percent prediction limits. All of the published regional regression equations have limitations. First, they should only be applied where basin characteristics are within the limits of those used for developing the equations. For example, if regional regression equations were developed from gauges with drainage areas between 10 and 100 square miles, the accuracy of those equations is suspect for a site with a 5-square-mile drainage area. D 10

13 Appendix D Estimating Design Stream Flows at Road-Stream Crossings 1, Peak Flow Predictions Northern Oregon Coast Discharge ( cfs ) % % Prediction Limits Predicted (Cooper 2002) Recurrence Interval Figure D.4 Example of prediction errors asssociated with regional regression equations. A second limitation is that the names of the independent variables within the regional regression equations do not necessarily convey the method by which they should be quantified. For example, watershed slope can be characterized in a variety of ways. Carefully read the supporting documentation for the equations to fully understand the methodology in which the predictor variables are determined. Third, regressions may not be applicable in areas with unique geohydrologic features affecting floods, such as seeps or springs that contribute large parts of streamflow or areas with extremely high soil permeability (Omang 1992). Fourth, be aware that urbanization, roads, timber harvest, streamflow diversions, or other land use changes will affect water yield and can thus have an influence on calculated design flows. D 11

14 Stream Simulation D.3 Verifying Flow Estimates at Ungauged Streams Given the potential errors in estimating flows at ungauged sites, using field data to check flow estimates can greatly enhance their credibility. Keep in mind that the accuracy-checking methods described here are likely to allow detection only of gross errors. One method of verifying flood-flow predictions at ungauged sites is to compare the predictions to real flows that were observed or that left evidence on the landscape from which to calculate flow. Information about flood frequency and water-surface elevations can come from querying long-time residents and/or identifying historic flood markers in the field. Knowing the flood elevation and the morphology of the stream reach, you can use a hydraulic model to route a calculated flood flow (e.g., Q 100 ) through the stream reach. Compare the modeled water-surface elevation for the predicted flow to observed or field-identified flood levels to get an idea of whether your estimate is reasonable. Although you rarely know exactly what recurrence interval the historic flood was, news accounts or anecdotal information from residents often offer some indication of how unusual the flood was. You also can compare the modeled water-surface elevation to a geomorphic feature, such as a terrace, for which you can identify an approximate frequency of flooding. This check helps verify that the predictions are at the right order of magnitude so long as watershed changes (dam building, development of impervious areas, etc.) have not altered flow frequencies from those observed in the past. The routing analysis requires a measured cross section (or series of cross sections) and stream gradient at the site, along with some estimate of flow resistance in the channel and on the flood plain. You can perform hydraulic routing using Manning s or other equations (see Hardy et al. 2005) in uniform reaches or, for reaches where gradient or cross-sectional characteristics are changing, with backwater analysis programs such as HEC-RAS. Accurately determining flow resistance (typically the Manning s roughness coefficient, n) is a key element in hydraulic modeling aimed at verifying predicted flows. A number of publications are available for estimating channel roughness from photos (Barnes 1967) or descriptive tables (Chow 1959). Equations exist for estimating n from physical channel characteristics such as slope and sediment size distribution (e.g., D 12

15 Appendix D Estimating Design Stream Flows at Road-Stream Crossings Bathurst 1985; Jarrett 1985). Other methods use a combination of photos and physical channel characteristics (Hicks and Mason 1998). A USGS publication also is available to estimate roughness characteristics of flood plains from photographs and site descriptions (Arcement and Schneider 1989). Although these methods can give good estimates of channel roughness, the preferred method is to perform discharge measurements at high flows, then use Manning s equation to back-calculate the actual roughness. The most direct way of verifying the validity of calculated design flows is to check their reasonableness against measured values at nearby gauges (if they exist). Before doing so, check that the conditions affecting flow at the nearby gauge(s) (e.g., watershed characteristics and stream type) are similar to those at the project site. As a starting point, develop unit runoff relations at the local gauges: divide the flow for a given RI at the gauge by drainage area at the gauge to arrive at a discharge per unit area (i.e., cubic feet per second per square mile). These normalized values can provide a rough check on the magnitude of estimates made with regional regression equations at the project site. Bankfull is the flow we can most confidently estimate from field observations alone, and when the field data confirms the bankfull discharge value estimated using regional regression equations or other indirect methods, we have more confidence in estimates of larger floods made using the same methods. (Depending on the region of the country, bankfull discharge at gauging stations often corresponds to a recurrence interval between 1 and 2 years.) At the project site, estimate bankfull discharge directly from a regional regression equation, if one is available for such a frequent flood. Alternatively, make a plot of discharge vs. RI (figure D.4), and extrapolate the curve to arrive at a flow estimate with the same recurrence interval as bankfull discharge. Then, route this estimate of bankfull flow through a representative cross section, using WinXSPRO (Hardy et al. 2005) or another hydraulic model, and check how well the calculated water surface matches the field-identified bankfull indicators. If the calculated discharge corresponds to a water-surface elevation significantly different from the bankfull indicators, adjustments in the calculated flood estimates may be necessary. On the other hand, if the calculated discharge is a reasonable representation of the bankfull stage, this suggests, although it doesn t guarantee, that flood predictions of higher recurrence intervals are reasonable. We recommend confirming the accuracy of higher recurrence interval floods using other methods such as those described above. D 13

16 Stream Simulation Another way of checking on the reasonableness of an estimated flow is to check the Froude number (F) for that flow. The Froude number is a measure of whether flow is subcritical, critical, or supercritical. It is a ratio of inertial forces to gravitational forces and is calculated as follows: Equation D.5 Fr = V/ gd where: Fr = Froude Number V = Average velocity = Q/A g = Gravitational acceleration D = Hydraulic mean depth = A/T A = Cross-sectional area T = Top width of water If: Fr < Fr = Fr > 1 the flow regime is subcritical. 1 the flow regime is critical. 1 the flow regime is supercritical. Flows in natural channels are rarely critical or supercritical, so determining the Froude number for a calculated flood discharge at the project site may indicate whether problems with the estimate exist. For example, if the Froude number is greater than 1 for the calculated flood flow at the project site, this may indicate that the flow estimate is too high. Be sure to check the Froude number at local gauged sites. If the stream type is unusual (say, a bedrock channel), or the flow is extremely high, the high Froude number may be real. D 14

Evaluation of Open Channel Flow Equations. Introduction :

Evaluation of Open Channel Flow Equations. Introduction : Evaluation of Open Channel Flow Equations Introduction : Most common hydraulic equations for open channels relate the section averaged mean velocity (V) to hydraulic radius (R) and hydraulic gradient (S).

More information

CHAPTER 9 CHANNELS APPENDIX A. Hydraulic Design Equations for Open Channel Flow

CHAPTER 9 CHANNELS APPENDIX A. Hydraulic Design Equations for Open Channel Flow CHAPTER 9 CHANNELS APPENDIX A Hydraulic Design Equations for Open Channel Flow SEPTEMBER 2009 CHAPTER 9 APPENDIX A Hydraulic Design Equations for Open Channel Flow Introduction The Equations presented

More information

URBAN DRAINAGE CRITERIA

URBAN DRAINAGE CRITERIA URBAN DRAINAGE CRITERIA I. Introduction This division contains guidelines for drainage system design and establishes a policy for recognized and established engineering design of storm drain facilities

More information

CITY UTILITIES DESIGN STANDARDS MANUAL

CITY UTILITIES DESIGN STANDARDS MANUAL CITY UTILITIES DESIGN STANDARDS MANUAL Book 2 (SW) SW9 June 2015 SW9.01 Purpose This Chapter provides information for the design of open channels for the conveyance of stormwater in the City of Fort Wayne.

More information

2.0 BASIC CONCEPTS OF OPEN CHANNEL FLOW MEASUREMENT

2.0 BASIC CONCEPTS OF OPEN CHANNEL FLOW MEASUREMENT 2.0 BASIC CONCEPTS OF OPEN CHANNEL FLOW MEASUREMENT Open channel flow is defined as flow in any channel where the liquid flows with a free surface. Open channel flow is not under pressure; gravity is the

More information

PRECIPITATION AND EVAPORATION

PRECIPITATION AND EVAPORATION PRECIPITATION AND EVAPORATION OBJECTIVES Use historical data to analyze relationships between precipitation, evaporation and stream flow in the San Antonio River Basin TOPICS Water cycle Precipitation

More information

Flash Flood Science. Chapter 2. What Is in This Chapter? Flash Flood Processes

Flash Flood Science. Chapter 2. What Is in This Chapter? Flash Flood Processes Chapter 2 Flash Flood Science A flash flood is generally defined as a rapid onset flood of short duration with a relatively high peak discharge (World Meteorological Organization). The American Meteorological

More information

Appendix 4-C. Open Channel Theory

Appendix 4-C. Open Channel Theory 4-C-1 Appendix 4-C Open Channel Theory 4-C-2 Appendix 4.C - Table of Contents 4.C.1 Open Channel Flow Theory 4-C-3 4.C.2 Concepts 4-C-3 4.C.2.1 Specific Energy 4-C-3 4.C.2.2 Velocity Distribution Coefficient

More information

TENNESSEE GAS PIPELINE COMPANY, L.L.C.

TENNESSEE GAS PIPELINE COMPANY, L.L.C. TENNESSEE GAS PIPELINE COMPANY, L.L.C. HYDROLOGIC & HYDRAULIC CALCULATIONS FOR WATERBODIES CROSSED BY CONNECTICUT PIPELINE EXPANSION PROJECT CONNECTICUT LOOP Submitted by: Tennessee Gas Pipeline Company,

More information

COLORADO FRONT RANGE FLOOD OF 2013:

COLORADO FRONT RANGE FLOOD OF 2013: USDA NATURAL RESOURCES CONSERVATION SERVICE COLORADO COLORADO FRONT RANGE FLOOD OF 2013: Peak Flow Estimates at Selected Mountain Stream Locations December 2013 James Creek in Jamestown North Fork of the

More information

Computing Stormwater Runoff Rates and Volumes

Computing Stormwater Runoff Rates and Volumes New Jersey Stormwater Best Management Practices Manual February 2004 C H A P T E R 5 Computing Stormwater Runoff Rates and Volumes This chapter discusses the fundamentals of computing stormwater runoff

More information

CHAPTER 2 HYDRAULICS OF SEWERS

CHAPTER 2 HYDRAULICS OF SEWERS CHAPTER 2 HYDRAULICS OF SEWERS SANITARY SEWERS The hydraulic design procedure for sewers requires: 1. Determination of Sewer System Type 2. Determination of Design Flow 3. Selection of Pipe Size 4. Determination

More information

Catchment Scale Processes and River Restoration. Dr Jenny Mant Jenny@therrc.co.uk. The River Restoration Centre therrc.co.uk

Catchment Scale Processes and River Restoration. Dr Jenny Mant Jenny@therrc.co.uk. The River Restoration Centre therrc.co.uk Catchment Scale Processes and River Restoration Dr Jenny Mant Jenny@therrc.co.uk The River Restoration Centre therrc.co.uk 3 Main Catchment Elements Hydrology Energy associated with the flow of water affects

More information

Chapter 4. Flood Risk Assessment

Chapter 4. Flood Risk Assessment Chapter 4 Flood Risk Assessment Chapter Overview Any floodplain management program must be established on a sound technical and scientific basis in order to be effective, whether for flood loss reduction

More information

AZ EGER-PATAK HIDROLÓGIAI VIZSGÁLATA, A FELSZÍNI VÍZKÉSZLETEK VÁRHATÓ VÁLTOZÁSÁBÓL ADÓDÓ MÓDOSULÁSOK AZ ÉGHAJLATVÁLTOZÁS HATÁSÁRA

AZ EGER-PATAK HIDROLÓGIAI VIZSGÁLATA, A FELSZÍNI VÍZKÉSZLETEK VÁRHATÓ VÁLTOZÁSÁBÓL ADÓDÓ MÓDOSULÁSOK AZ ÉGHAJLATVÁLTOZÁS HATÁSÁRA AZ EGER-PATAK HIDROLÓGIAI VIZSGÁLATA, A FELSZÍNI VÍZKÉSZLETEK VÁRHATÓ VÁLTOZÁSÁBÓL ADÓDÓ MÓDOSULÁSOK AZ ÉGHAJLATVÁLTOZÁS HATÁSÁRA GÁBOR KEVE 1, GÉZA HAJNAL 2, KATALIN BENE 3, PÉTER TORMA 4 EXTRAPOLATING

More information

Travel Time. Computation of travel time and time of concentration. Factors affecting time of concentration. Surface roughness

Travel Time. Computation of travel time and time of concentration. Factors affecting time of concentration. Surface roughness 3 Chapter 3 of Concentration and Travel Time Time of Concentration and Travel Time Travel time ( T t ) is the time it takes water to travel from one location to another in a watershed. T t is a component

More information

Prattsville Berm Removal Project. 1.0 Project Location

Prattsville Berm Removal Project. 1.0 Project Location Prattsville Berm Removal Project 1.0 Project Location The project site is located between the New York State Route 23 Bridge over the Schoharie Creek and the Schoharie Reservoir. The restoration plan encompassed

More information

Lecture 4: Streamflow and Stream Gauging

Lecture 4: Streamflow and Stream Gauging Lecture 4: Streamflow and Stream Gauging Key Questions 1. What is stream discharge and what controls its magnitude? 2. What is a hydrograph? 3. Where is the velocity highest in a stream? 4. Where is the

More information

ROSE CREEK WATERSHED HYDROLOGIC, HYDRAULIC, SEDIMENT TRANSPORT, AND GEOMORPHIC ANALYSES TASK 1 EXISTING DATA AND INFORMATION SUMMARY REPORT BACKGROUND

ROSE CREEK WATERSHED HYDROLOGIC, HYDRAULIC, SEDIMENT TRANSPORT, AND GEOMORPHIC ANALYSES TASK 1 EXISTING DATA AND INFORMATION SUMMARY REPORT BACKGROUND ROSE CREEK WATERSHED HYDROLOGIC, HYDRAULIC, SEDIMENT TRANSPORT, AND GEOMORPHIC ANALYSES TASK 1 EXISTING DATA AND INFORMATION SUMMARY REPORT BACKGROUND The Rose Creek Watershed (RCW) consists of three planning

More information

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth

More information

DANIELS RUN STREAM RESTORATION, FAIRFAX, VIRGINIA: FLOODPLAIN ANALYSIS REPORT

DANIELS RUN STREAM RESTORATION, FAIRFAX, VIRGINIA: FLOODPLAIN ANALYSIS REPORT DANIELS RUN STREAM RESTORATION, FAIRFAX, VIRGINIA: FLOODPLAIN ANALYSIS REPORT By: Conor C. Shea Stream Habitat Assessment and Restoration Program U.S. Fish and Wildlife Service CBFO-S07-01 Prepared in

More information

Assessment of hydropower resources

Assessment of hydropower resources Assessment of hydropower resources Oliver Froend Assessment of hydropower resources Relevance of surveys, data assessment and analyses to the success of the project. Required data and field survey. Key

More information

Earth Science. River Systems and Landforms GEOGRAPHY 1710. The Hydrologic Cycle. Introduction. Running Water. Chapter 14.

Earth Science. River Systems and Landforms GEOGRAPHY 1710. The Hydrologic Cycle. Introduction. Running Water. Chapter 14. Earth Science GEOGRAPHY 1710 River Systems and Landforms DAVID R. SALLEE Robert W. Christopherson Charlie Thomsen Chapter 14 Introduction Rivers and streams are dynamic systems that continually adjust

More information

Rational Method Hydrologic Calculations with Excel. Rational Method Hydrologic Calculations with Excel, Course #508. Presented by:

Rational Method Hydrologic Calculations with Excel. Rational Method Hydrologic Calculations with Excel, Course #508. Presented by: Rational Method Hydrologic Calculations with Excel, Course #508 Presented by: PDH Enterprises, LLC PO Box 942 Morrisville, NC 27560 www.pdhsite.com Calculation of peak storm water runoff rate from a drainage

More information

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION DRAINAGE HANDBOOK OPEN CHANNEL. OFFICE OF DESIGN, DRAINAGE SECTION November 2009 TALLAHASSEE, FLORIDA

STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION DRAINAGE HANDBOOK OPEN CHANNEL. OFFICE OF DESIGN, DRAINAGE SECTION November 2009 TALLAHASSEE, FLORIDA STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION DRAINAGE HANDBOOK OPEN CHANNEL OFFICE OF DESIGN, DRAINAGE SECTION TALLAHASSEE, FLORIDA Table of Contents Open Channel Handbook Chapter 1 Introduction... 1

More information

UNION COUNTY, FLORIDA AND INCORPORATED AREAS

UNION COUNTY, FLORIDA AND INCORPORATED AREAS UNION COUNTY, FLORIDA AND INCORPORATED AREAS COMMUNITY NAME COMMUNITY NUMBER LAKE BUTLER, CITY OF 120595 RAIFORD, TOWN OF 120593 UNION COUNTY 120422 (UNINCORPORATED AREAS) WORTHINGTON SPRINGS, CITY OF

More information

Basic Hydrology. Time of Concentration Methodology

Basic Hydrology. Time of Concentration Methodology Basic Hydrology Time of Concentration Methodology By: Paul Schiariti, P.E., CPESC Mercer County Soil Conservation District What is the Time of Concentration? The time it takes for runoff to travel from

More information

CHAPTER 3 STORM DRAINAGE SYSTEMS

CHAPTER 3 STORM DRAINAGE SYSTEMS CHAPTER 3 STORM DRAINAGE SYSTEMS 3.7 Storm Drains 3.7.1 Introduction After the tentative locations of inlets, drain pipes, and outfalls with tail-waters have been determined and the inlets sized, the next

More information

Hydraulics Prof. A. K. Sarma Department of Civil Engineering Indian Institute of Technology, Guwahati. Module No. # 02 Uniform Flow Lecture No.

Hydraulics Prof. A. K. Sarma Department of Civil Engineering Indian Institute of Technology, Guwahati. Module No. # 02 Uniform Flow Lecture No. Hydraulics Prof. A. K. Sarma Department of Civil Engineering Indian Institute of Technology, Guwahati Module No. # 02 Uniform Flow Lecture No. # 04 Computation of Uniform Flow (Part 02) Welcome to this

More information

ESSENTIAL COMPONENTS OF WATER-LEVEL MONITORING PROGRAMS. Selection of Observation Wells

ESSENTIAL COMPONENTS OF WATER-LEVEL MONITORING PROGRAMS. Selection of Observation Wells ESSENTIAL COMPONENTS OF WATER-LEVEL MONITORING PROGRAMS Before discussing the uses and importance of long-term water-level data, it is useful to review essential components of a water-level monitoring

More information

APPENDIX B DESIGN GUIDELINES FOR APPROVED TREATMENT METHODS

APPENDIX B DESIGN GUIDELINES FOR APPROVED TREATMENT METHODS APPENDIX B DESIGN GUIDELINES FOR APPROVED TREATMENT METHODS PLANTER BOXES 1. Determine the impervious area contributing flow to the planter box (see Chapter 4.2). 2. Assumption: Typical soil infiltration

More information

The Rational Method. David B. Thompson Civil Engineering Deptartment Texas Tech University. Draft: 20 September 2006

The Rational Method. David B. Thompson Civil Engineering Deptartment Texas Tech University. Draft: 20 September 2006 The David B. Thompson Civil Engineering Deptartment Texas Tech University Draft: 20 September 2006 1. Introduction For hydraulic designs on very small watersheds, a complete hydrograph of runoff is not

More information

Training session for the. Firm Yield Estimator. Version 1.0. Prepared for the Massachusetts Department of Environmental Protection

Training session for the. Firm Yield Estimator. Version 1.0. Prepared for the Massachusetts Department of Environmental Protection Training session for the Firm Yield Estimator Version 1.0 Prepared for the Massachusetts Department of Environmental Protection June 6, 2000 Firm Yield Estimator - Introduction Software tool for estimating

More information

Topic 8: Open Channel Flow

Topic 8: Open Channel Flow 3.1 Course Number: CE 365K Course Title: Hydraulic Engineering Design Course Instructor: R.J. Charbeneau Subject: Open Channel Hydraulics Topics Covered: 8. Open Channel Flow and Manning Equation 9. Energy,

More information

Jitter Measurements in Serial Data Signals

Jitter Measurements in Serial Data Signals Jitter Measurements in Serial Data Signals Michael Schnecker, Product Manager LeCroy Corporation Introduction The increasing speed of serial data transmission systems places greater importance on measuring

More information

STORMWATER MANAGEMENT CHECKLIST

STORMWATER MANAGEMENT CHECKLIST STORMWATER MANAGEMENT CHECKLIST *This checklist must be completed and part of the Land Disturbing Permit submittal for review if the acreage disturbed is one (1) acre or more: I. SUPPORTING DATA Narrative

More information

USGS StreamStats Web Application for Kentucky

USGS StreamStats Web Application for Kentucky USGS StreamStats Web Application for Kentucky Implementation of selected low- and mean-flow estimating equations Gary Martin, Hydrologist Project Chief U.S. Geological Survey, Kentucky Water Science Center

More information

What is the most obvious difference between pipe flow and open channel flow????????????? (in terms of flow conditions and energy situation)

What is the most obvious difference between pipe flow and open channel flow????????????? (in terms of flow conditions and energy situation) OPEN CHANNEL FLOW 1 3 Question What is the most obvious difference between pipe flow and open channel flow????????????? (in terms of flow conditions and energy situation) Typical open channel shapes Figure

More information

Floodplain Hydraulics! Hydrology and Floodplain Analysis Dr. Philip Bedient

Floodplain Hydraulics! Hydrology and Floodplain Analysis Dr. Philip Bedient Floodplain Hydraulics! Hydrology and Floodplain Analysis Dr. Philip Bedient Open Channel Flow 1. Uniform flow - Manning s Eqn in a prismatic channel - Q, V, y, A, P, B, S and roughness are all constant

More information

Basic Principles of Channel Design

Basic Principles of Channel Design United States Department of Agriculture Natural Resources Conservation Service Stream Restoration Design Chapter 7 Basic Principles of Channel Design Issued August 2007 Cover photo: Where modification

More information

Hydrologic Engineering Techniques for Regional Water Resources Planning

Hydrologic Engineering Techniques for Regional Water Resources Planning US Army Corps of Engineers Hydrologic Engineering Center Hydrologic Engineering Techniques for Regional Water Resources Planning October 1969 Approved for Public Release. Distribution Unlimited. TP-17

More information

Methods for Determination of Safe Yield and Compensation Water from Storage Reservoirs

Methods for Determination of Safe Yield and Compensation Water from Storage Reservoirs US Army Corps of Engineers Hydrologic Engineering Center Methods for Determination of Safe Yield and Compensation Water from Storage Reservoirs October 1966 Approved for Public Release. Distribution Unlimited.

More information

Course Plan Day 1: Introduction and Overview Hydrology & Fluvial Geomorphology Day 2: Fieldwork on the Braid Burn Alan Jones

Course Plan Day 1: Introduction and Overview Hydrology & Fluvial Geomorphology Day 2: Fieldwork on the Braid Burn Alan Jones Course Plan Day 1: Introduction and Overview Hydrology & Fluvial Geomorphology Alan Jones E:mail: Alan.Jones@ed.ac.uk Water cycle Globally & Locally River shapes and forms River behaviour Closer look at

More information

Riprap-lined Swale (RS)

Riprap-lined Swale (RS) Riprap-lined Swale (RS) Practice Description A riprap-lined swale is a natural or constructed channel with an erosion-resistant rock lining designed to carry concentrated runoff to a stable outlet. This

More information

Hydrologic Modeling using HEC-HMS

Hydrologic Modeling using HEC-HMS Hydrologic Modeling using HEC-HMS Prepared by Venkatesh Merwade School of Civil Engineering, Purdue University vmerwade@purdue.edu April 2012 Introduction The intent of this exercise is to introduce you

More information

Estimating Potential Reduction Flood Benefits of Restored Wetlands

Estimating Potential Reduction Flood Benefits of Restored Wetlands Estimating Potential Reduction Flood Benefits of Restored Wetlands Kenneth W. Potter University of Wisconsin Introduction Throughout the summer of 1993 a recurring question was the impact of wetland drainage

More information

Environmental Data Management Programs

Environmental Data Management Programs Hydrologic Engineering Centre (HEC) Software CD Collection of programs, developed by the U.S. Army Corps of Engineers Environmental Data Management Programs Name: HEC-DSS Package Purpose: Data Storage

More information

Shooks Run Drainage Study Basic Terminology

Shooks Run Drainage Study Basic Terminology Shooks Run Drainage Study Basic Terminology PREPARED FOR: PREPARED BY: City of Colorado Springs CH2M DATE: April 9, 2015 Introduction This document is intended to provide an introduction to Colorado Springs

More information

Open Channel Flow 2F-2. A. Introduction. B. Definitions. Design Manual Chapter 2 - Stormwater 2F - Open Channel Flow

Open Channel Flow 2F-2. A. Introduction. B. Definitions. Design Manual Chapter 2 - Stormwater 2F - Open Channel Flow Design Manual Chapter 2 - Stormwater 2F - Open Channel Flow 2F-2 Open Channel Flow A. Introduction The beginning of any channel design or modification is to understand the hydraulics of the stream. The

More information

Guo, James C.Y. (2004). Design of Urban Channel Drop Structure, J. of Flood Hazards News, December,

Guo, James C.Y. (2004). Design of Urban Channel Drop Structure, J. of Flood Hazards News, December, Guo, James C.. (004). esign of Urban Channel rop Structure, J. of Flood azards News, ecember, Guo, James C.., (009) Grade Control for Urban Channel esign, submitted to Elsevier Science, J. of ydro-environmental

More information

Rural Flooding: The Potential Role of Forestry

Rural Flooding: The Potential Role of Forestry Rural Flooding: The Potential Role of Forestry Nadeem Shah, Tom Nisbet, & Huw Thomas Centre for Forestry and Climate Change Structure Background Woodland and Flood Alleviation The Theory. Studies on Woodland

More information

2011 HYDRAULICS MANUAL

2011 HYDRAULICS MANUAL STATE OF LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT P.O. Box 94245 Baton Rouge, Louisiana 70804-9245 http://www.dotd.la.gov/ HYDRAULICS MANUAL Hydraulics (225) 379-1306 PREFACE The following

More information

1 in 30 year 1 in 75 year 1 in 100 year 1 in 100 year plus climate change (+30%) 1 in 200 year

1 in 30 year 1 in 75 year 1 in 100 year 1 in 100 year plus climate change (+30%) 1 in 200 year Appendix C1 Surface Water Modelling 1 Overview 1.1 The Drain London modelling was designed to analyse the impact of heavy rainfall events across each London borough by assessing flow paths, velocities

More information

Broad Crested Weirs. I. Introduction

Broad Crested Weirs. I. Introduction Lecture 9 Broad Crested Weirs I. Introduction The broad-crested weir is an open-channel flow measurement device which combines hydraulic characteristics of both weirs and flumes Sometimes the name ramp

More information

5.14 Floodplains and Drainage/Hydrology

5.14 Floodplains and Drainage/Hydrology I-70 East Final EIS 5.14 Floodplains and Drainage/Hydrology 5.14 Floodplains and Drainage/Hydrology This section discusses floodplain and drainage/hydrology resources and explains why they are important

More information

Appendix C - Risk Assessment: Technical Details. Appendix C - Risk Assessment: Technical Details

Appendix C - Risk Assessment: Technical Details. Appendix C - Risk Assessment: Technical Details Appendix C - Risk Assessment: Technical Details Page C1 C1 Surface Water Modelling 1. Introduction 1.1 BACKGROUND URS Scott Wilson has constructed 13 TUFLOW hydraulic models across the London Boroughs

More information

FLOODPLAIN DELINEATION IN MUGLA-DALAMAN PLAIN USING GIS BASED RIVER ANALYSIS SYSTEM

FLOODPLAIN DELINEATION IN MUGLA-DALAMAN PLAIN USING GIS BASED RIVER ANALYSIS SYSTEM FLOODPLAIN DELINEATION IN MUGLA-DALAMAN PLAIN USING GIS BASED RIVER ANALYSIS SYSTEM Dr. Murat Ali HATİPOĞLU Fatih KESKİN Kemal SEYREK State Hydraulics Works (DSI), Investigation and Planning Department

More information

Performing a Steady Flow Analysis

Performing a Steady Flow Analysis C H A P T E R 7 Performing a Steady Flow Analysis This chapter discusses how to calculate steady flow water surface profiles. The chapter is divided into two parts. The first part discusses how to enter

More information

Stream Rehabilitation Concepts, Guidelines and Examples. Objectives. Pierre Y. Julien. Three Laws of Stream Restoration

Stream Rehabilitation Concepts, Guidelines and Examples. Objectives. Pierre Y. Julien. Three Laws of Stream Restoration Stream Rehabilitation Concepts, Guidelines and Examples Pierre Y. Julien Wuhan 2005 Objectives Part I - Stream restoration and rehabilitation: 1. Present and discuss important concepts, laws, criteria

More information

The Alternatives of Flood Mitigation in The Downstream Area of Mun River Basin

The Alternatives of Flood Mitigation in The Downstream Area of Mun River Basin The Alternatives of Flood Mitigation in The Downstream Area of Mun River Basin Dr.Phattaporn Mekpruksawong 1, Thana Suwattana 2 and Narong Meepayoong 3 1 Senior Civil Engineer, Office of Project Management,

More information

Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans

Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans APPENDIX IV Version: February 2, 2015 Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans Please fill in all blanks and please reference the plan sheets/pages where the information may

More information

EFFECTS OF ARUNDO DONAX ON RIVER HYDRAULICS, SEDIMENT TRANSPORT, AND GEOMORPHOLOGY, SANTA MARGARITA RIVER, CALIFORNIA

EFFECTS OF ARUNDO DONAX ON RIVER HYDRAULICS, SEDIMENT TRANSPORT, AND GEOMORPHOLOGY, SANTA MARGARITA RIVER, CALIFORNIA EFFECTS OF ARUNDO DONAX ON RIVER HYDRAULICS, SEDIMENT TRANSPORT, AND GEOMORPHOLOGY, SANTA MARGARITA RIVER, CALIFORNIA René Leclerc Geomorphologist Robert C. MacArthur, Ph.D., P.E. Principal Headwaters

More information

DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods

DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES Run-off Analysis Methods This document sets forth the minimum design, technical criteria and specifications for the

More information

MIKE 21 FLOW MODEL HINTS AND RECOMMENDATIONS IN APPLICATIONS WITH SIGNIFICANT FLOODING AND DRYING

MIKE 21 FLOW MODEL HINTS AND RECOMMENDATIONS IN APPLICATIONS WITH SIGNIFICANT FLOODING AND DRYING 1 MIKE 21 FLOW MODEL HINTS AND RECOMMENDATIONS IN APPLICATIONS WITH SIGNIFICANT FLOODING AND DRYING This note is intended as a general guideline to setting up a standard MIKE 21 model for applications

More information

Lecture 24 Flumes & Channel Transitions. I. General Characteristics of Flumes. Flumes are often used:

Lecture 24 Flumes & Channel Transitions. I. General Characteristics of Flumes. Flumes are often used: Lecture 24 Flumes & Channel Transitions I. General Characteristics of Flumes Flumes are often used: 1. Along contours of steep slopes where minimal excavation is desired 2. On flat terrain where it is

More information

1997-98 UPPER DESCHUTES R-EMAP TEMPERATURE SUMMARY

1997-98 UPPER DESCHUTES R-EMAP TEMPERATURE SUMMARY 1997-98 UPPER DESCHUTES R-EMAP TEMPERATURE SUMMARY Daria G. Mochan Oregon Department of Environmental Quality Laboratory Division Biomonitoring Section 1712 S.W. Eleventh Avenue Portland, Oregon 97201

More information

WATER STORAGE, TRANSPORT, AND DISTRIBUTION Multi-Dam Systems and their Operation - J.J. Cassidy MULTI-DAM SYSTEMS AND THEIR OPERATION

WATER STORAGE, TRANSPORT, AND DISTRIBUTION Multi-Dam Systems and their Operation - J.J. Cassidy MULTI-DAM SYSTEMS AND THEIR OPERATION MULTI-DAM SYSTEMS AND THEIR OPERATION J.J. Cassidy Consulting Hydraulic and Hydrologic Engineer, Concord, California, USA Keywords: Dams, reservoirs, rivers, water storage, dam safety, floods, environment,

More information

Design Charts for Open-Channel Flow HDS 3 August 1961

Design Charts for Open-Channel Flow HDS 3 August 1961 Design Charts for Open-Channel Flow HDS 3 August 1961 Welcome to HDS 3-Design Charts for Open-Channel Flow Table of Contents Preface DISCLAIMER: During the editing of this manual for conversion to an electronic

More information

Appendix F Benefit-Cost Analysis of Flood Protection Measures

Appendix F Benefit-Cost Analysis of Flood Protection Measures Appendix F Benefit-Cost Analysis of Flood Protection Measures Acronyms used in Appendix F: AA B AA C AA D BC BFE EAD FEMA NED O&M PV RED USACE Average Annual Benefits Average Annual Cost Average Annual

More information

Retention/Irrigation. Design Considerations. Soil for Infiltration Area Required Slope Environmental Side-effects

Retention/Irrigation. Design Considerations. Soil for Infiltration Area Required Slope Environmental Side-effects Description Retention/irrigation refers to the capture of stormwater runoff in a holding pond and subsequent use of the captured volume for irrigation of landscape of natural pervious areas. This technology

More information

Chapter 5: Working with contours

Chapter 5: Working with contours Introduction Contoured topographic maps contain a vast amount of information about the three-dimensional geometry of the land surface and the purpose of this chapter is to consider some of the ways in

More information

CITY OF CHARLOTTE STORM WATER SERVICES CREDIT APPLICATION INSTRUCTION MANUAL

CITY OF CHARLOTTE STORM WATER SERVICES CREDIT APPLICATION INSTRUCTION MANUAL CITY OF CHARLOTTE STORM WATER SERVICES CREDIT APPLICATION INSTRUCTION MANUAL March 2008 A note to recipients of the Charlotte-Mecklenburg Storm Water Services Credit Application Manual: This is the second

More information

Rainfall Intensities for Southeastern Arizona

Rainfall Intensities for Southeastern Arizona Rainfall Intensities for Southeastern Arizona By Herbert B. Osborn, Member, ASCE1 and Kenneth G. Renard, Fellow, ASCE1 Introduction Small watershed storm runoff in the southwestern United States is dominated

More information

Stream-Network Navigation in the U.S. Geological Survey StreamStats Web Application

Stream-Network Navigation in the U.S. Geological Survey StreamStats Web Application 2009 International Conference on Advanced Geographic Information Systems & Web Services Stream-Network Navigation in the U.S. Geological Survey StreamStats Web Application Kernell G. Ries III, Peter A.

More information

General Permit for Activities Promoting Waterway - Floodplain Connectivity [working title]

General Permit for Activities Promoting Waterway - Floodplain Connectivity [working title] General Permit for Activities Promoting Waterway - Floodplain Connectivity [working title] Purpose These rules set forth the conditions under which a person may, without an individual removal-fill permit

More information

Emergency Spillways (Sediment basins)

Emergency Spillways (Sediment basins) Emergency Spillways (Sediment basins) DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short-Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1]

More information

Charles R. Gamble TENNESSEE DEPARTMENT OF TRANSPORTATION CANE CREEK FLOOD-FLOW CHARACTERISTICS AT STATE ROUTE 30 NEAR SPENCER, TENNESSEE

Charles R. Gamble TENNESSEE DEPARTMENT OF TRANSPORTATION CANE CREEK FLOOD-FLOW CHARACTERISTICS AT STATE ROUTE 30 NEAR SPENCER, TENNESSEE CANE CREEK FLOOD-FLOW CHARACTERISTICS AT STATE ROUTE 30 NEAR SPENCER, TENNESSEE Charles R. Gamble U.S. GEOLOGICAL SURVEY Open-File Report 83-267 Prepared in cooperation with the TENNESSEE DEPARTMENT OF

More information

LATEST ENHANCEMENTS TO THE RIVERMorph STREAM RESTORATION SOFTWARE

LATEST ENHANCEMENTS TO THE RIVERMorph STREAM RESTORATION SOFTWARE LATEST ENHANCEMENTS TO THE RIVERMorph STREAM RESTORATION SOFTWARE J. George Athanasakes, PE RIVERMorph, LLC 1901 Nelson Miller Parkway Louisville, KY 40223-2177 233 BIOGRAPHICAL SKETCH J. George Athanasakes,

More information

26. HYDRAULIC MODEL CALIBRATION USING A MODERN FLOOD EVENT: THE MAE CHAEM RIVER, THAILAND

26. HYDRAULIC MODEL CALIBRATION USING A MODERN FLOOD EVENT: THE MAE CHAEM RIVER, THAILAND 26. HYDRAULIC MODEL CALIBRATION USING A MODERN FLOOD EVENT: THE MAE CHAEM RIVER, THAILAND R. Kidson 1, K.S. Richards 1 & P.A. Carling 2 (1) Department of Geography, University of Cambridge, Downing Place

More information

Flood Frequency Analysis Using the Gumbel Distribution

Flood Frequency Analysis Using the Gumbel Distribution Flood Frequency Analysis Using the Gumbel Distribution Never Mujere University of Zimbabwe, Department of Geography and Environmental Science, Box MP 167, Mount Pleasant, Harare E-mail mujere@arts.uz.ac.zw

More information

1.7.0 Floodplain Modification Criteria

1.7.0 Floodplain Modification Criteria 1.7.0 Floodplain Modification Criteria 1.7.1 Introduction These guidelines set out standards for evaluating and processing proposed modifications of the 100- year floodplain with the following objectives:

More information

Quality Assurance Reviews of Hydraulic Models Developed for the Central Valley Floodplain Evaluation and Delineation Program

Quality Assurance Reviews of Hydraulic Models Developed for the Central Valley Floodplain Evaluation and Delineation Program Quality Assurance Reviews of Hydraulic Models Developed for the Central Valley Floodplain Evaluation and Delineation Program Techniques Applied and Lessons Learned Seth Ahrens, P.E., CFM Selena Forman,

More information

The Hydrologic Engineering Center Training Course on

The Hydrologic Engineering Center Training Course on The Hydrologic Engineering Center Training Course on SEDIMENT TRANSPORT ANALYSIS WITH HEC-RAS Davis, California Course Objectives This course is intended to prepare engineers to perform studies using various

More information

Abaya-Chamo Lakes Physical and Water Resources Characteristics, including Scenarios and Impacts

Abaya-Chamo Lakes Physical and Water Resources Characteristics, including Scenarios and Impacts LARS 2007 Catchment and Lake Research Abaya-Chamo Lakes Physical and Water Resources Characteristics, including Scenarios and Impacts Seleshi Bekele Awulachew International Water Management Institute Introduction

More information

Ginger Paige and Nancy Mesner University of Wyoming Utah State University

Ginger Paige and Nancy Mesner University of Wyoming Utah State University Effective Water Quality BMP Monitoring Tools Ginger Paige and Nancy Mesner University of Wyoming Utah State University Overview BMP Monitoring Guidance Document for Stream Systems Lessons learned CEAP

More information

Fort Dodge Stormwater Master Planning. Prepared By: Ralph C. Stark, Jr., P.E., C.F.M. Joel N. Krause, P.E., C.F.M.

Fort Dodge Stormwater Master Planning. Prepared By: Ralph C. Stark, Jr., P.E., C.F.M. Joel N. Krause, P.E., C.F.M. Fort Dodge Stormwater Master Planning Prepared By: Ralph C. Stark, Jr., P.E., C.F.M. Joel N. Krause, P.E., C.F.M. Project Location Project Background Flooding History Localized flooding and storm sewer

More information

Chapter 7 Ditches and Channels

Chapter 7 Ditches and Channels Chapter 7 Ditches and Channels TABLE OF CONTENTS CHAPTER 7 - DITCHES AND CHANNELS... 7-1 7.1 Introduction... 7-1 7.2 Design Policy... 7-2 7.2.1 Federal Policy... 7-2 7.2.2 Commonwealth of Virginia Policy...

More information

Addendum 1 to Final Report for Southwest Crown CFLRP Question C1.1 CFLR Nutrient Monitoring: Agreement #14-PA-11011600-031.

Addendum 1 to Final Report for Southwest Crown CFLRP Question C1.1 CFLR Nutrient Monitoring: Agreement #14-PA-11011600-031. Water Quality Monitoring to Determine the Influence of Roads and Road Restoration on Turbidity and Downstream Nutrients: A Pilot Study with Citizen Science Addendum 1 to Final Report for Southwest Crown

More information

Part 654 Stream Restoration Design National Engineering Handbook

Part 654 Stream Restoration Design National Engineering Handbook United States Department of Agriculture Natural Resources Conservation Service Stream Restoration Design Chapter 6 Issued August 007 Cover photo: Stream hydraulics focus on bankfull frequencies, velocities,

More information

The Mississippi River & Tributaries Project

The Mississippi River & Tributaries Project The Mississippi River & Tributaries Project The Mississippi River & Tributaries (MR&T) project was authorized by the 1928 Flood Control Act. Following the devastating 1927 flood, the nation was galvanized

More information

The AIR Inland Flood Model for the United States In Spring 2011, heavy rainfall and snowmelt produced massive flooding along the Mississippi River,

The AIR Inland Flood Model for the United States In Spring 2011, heavy rainfall and snowmelt produced massive flooding along the Mississippi River, The AIR Inland Flood Model for the United States In Spring 2011, heavy rainfall and snowmelt produced massive flooding along the Mississippi River, inundating huge swaths of land across seven states. As

More information

USSD Workshop on Dam Break Analysis Applied to Tailings Dams

USSD Workshop on Dam Break Analysis Applied to Tailings Dams USSD Workshop on Dam Break Analysis Applied to Tailings Dams Antecedents Newtonian / non-newtonian flows Available models that allow the simulation of non- Newtonian flows (tailings) Other models used

More information

2D Modeling of Urban Flood Vulnerable Areas

2D Modeling of Urban Flood Vulnerable Areas 2D Modeling of Urban Flood Vulnerable Areas Sameer Dhalla, P.Eng. Dilnesaw Chekol, Ph.D. A.D. Latornell Conservation Symposium November 22, 2013 Outline 1. Toronto and Region 2. Evolution of Flood Management

More information

Watershed Modeling System

Watershed Modeling System Watershed Modeling System WMS v8.0 MARICOPA COUNTY TUTORIALS TABLE OF CONTENTS 1 MARICOPA COUNTY: NFF AND HEC-1... 1-1 1.1 OBJECTIVES... 1-1 1.2 DELINEATING THE WATERSHED... 1-1 1.3 BUILDING THE NFF SIMULATION...

More information

BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT

BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT Harmony Creek subwatershed Harmony Creek subwatershed BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT April 2011 TABLE OF CONTENTS 1.0 INTRODUCTION...

More information

Sediment Supply and the Upland-Stream Connection. Brian Bledsoe Department of Civil and Environmental Engineering Colorado State University

Sediment Supply and the Upland-Stream Connection. Brian Bledsoe Department of Civil and Environmental Engineering Colorado State University Sediment Supply and the Upland-Stream Connection Brian Bledsoe Department of Civil and Environmental Engineering Colorado State University Overview The sediment system (with an eye towards hillslope processes

More information

STORM DRAINS CHAPTER 7

STORM DRAINS CHAPTER 7 CHAPTER 7 Chapter 7 - Storm Drains A storm drain is a drainage system that conveys water or stormwater, consisting of two or more pipes in a series connected by one or more structures. Storm drains collect

More information

USING DETAILED 2D URBAN FLOODPLAIN MODELLING TO INFORM DEVELOPMENT PLANNING IN MISSISSAUGA, ON

USING DETAILED 2D URBAN FLOODPLAIN MODELLING TO INFORM DEVELOPMENT PLANNING IN MISSISSAUGA, ON 22nd Canadian Hydrotechnical Conference 22e Conférence canadienne d hydrotechnique Water for Sustainable Development : Coping with Climate and Environmental Changes L eau pour le développement durable:

More information

H. Khalid Jamil 9367 Verain Street San Diego, CA, 92129 (858) 663-9200

H. Khalid Jamil 9367 Verain Street San Diego, CA, 92129 (858) 663-9200 OFFSITE DRAINAGE REPORT Ramona Assisted Living 1236 "D" Street Ramona, CA 92065 re~*7lb3 Prepared for H. Khalid Jamil 9367 Verain Street San Diego, CA, 92129 (858) 663-9200 July 1 1, 2008 Daniel Tobar,

More information

Flooding in the Middle Koyukuk River Basin, Alaska August 1994

Flooding in the Middle Koyukuk River Basin, Alaska August 1994 Flooding in the Middle Koyukuk River Basin, Alaska August 1994 By David F. Meyer U.S. GEOLOGICAL SURVEY Water-Resources Investigations Report 95-4118 Prepared in cooperation with the FEDERAL EMERGENCY

More information