1 Aurora Greenhouse Expansion Concept Summary of Supporting Studies by IBI Group
2 Table of Contents Introduction Stormwater Management Water Usage Water Supply Wastewater Phasing Existing Facility Phase Phase Traffic Impact Assessment Site Access and Driveway Landscaping and Lighting Landscaping Lighting... 4 i
3 Introduction The Concept Summary provides high level information on how the subject land will accommodate the proposed expansion of a Federally licensed and regulated marijuana production facility by addressing: (1) Stormwater management, (2) Water usage, (3) Phasing and size of the expansion, (4) Traffic impact and (5) Landscaping and lighting. Technical studies are currently underway and upon completion submitted to Mountain View County by October 12 th, These studies include a Traffic Impact Assessment, Stormwater Management Plan, Servicing Strategy (potable water, process water, waste water and fire capacity), and Landscaping and Lighting Plan. The technical reports will support and inform the Land Use re-designation. Client: Aurora Cannabis Inc. Location: NE W5 in Mountain View County, immediately south of Twp Rd. 304, east of Cremona. Site Area: hectares (+/ acres). 1 Stormwater Management A Stormwater Management Plan is being prepared that will address overland water flows for the subject lands, and will assess the neighbouring lands that drain naturally into and through the subject site. The study will identify stormwater management solutions for both the subject lands and the adjacent lands. The study will identify mitigation measures to ensure that the natural drainage of the lands is maintained and/or re-established when and where required. Currently the natural drainage course of the lands located to the west of the subject site is impeded by two barriers. The first barrier is a berm that was constructed at the time of the initial construction of the existing facility, and includes a dugout that is used for irrigation purposes. The second barrier is the constructed access road to the existing facility. These barriers have resulted in a few acres of land to the west of the existing facility, to be intermittently under water, as there is no natural drainage course. In order to recover the drainage course for these lands, the berm will be reshaped and culverts will be installed under the existing access road. The study will identify how the subject site and the neighbouring lands will deal with the stormwater and will include recommendations that will meet current design standards, taking into consideration the natural environment. The location of the proposed greenhouse expansion may interrupt the natural drainage course of the lands south of the subject site. The study will identify how this natural drainage course will be incorporated into the landscape and ensure that the natural drainage of the south lands will not be impacted. The proposed project is unique in that it will harvest all precipitation that falls (rain and snow) directly on the roof and store this runoff in a lined and covered storage pond. The collected water will be used for greenhouse irrigation. The study will address how additional runoff from the surrounding parking lot, driveways and immediate site area will be addressed. Upon completion the stormwater management plan will: Comply with Statutory Plan policies, Model the subject site and upstream adjacent lands to meet Mountain View County standards including maximum release rate, maximum annual release volume, and release quality.
4 Propose design guidelines to manage runoff from the development land and upstream contributing lands, Identify the spillways and check the capacity of existing culverts that service this development land and its upstream adjacent lands. 2 Water Usage 2.1 Water Supply Aurora has a license to divert water from a groundwater well and it is anticipated that this well will continue to serve as the source for potable water. With strict water conservation low-flow plumbing fixtures, the re-capturing of transpiration water in the plant-growing process and by utilizing the stormwater collection and existing well license, it is projected that this development can be selfsufficient. The only demand for potable water will be for employee use (washrooms and canteen). The construction of a storm pond is planned, which will capture and re-use all precipitation from the greenhouse roof. The expected water demands will not exceed the existing well license. During a particularly dry season, if the demand for water is in excess of the permitted usage of the existing well license, additional water will be brought in by truck. 2.2 Wastewater The wastewater assessment will include the following: A desktop review of the existing sanitary system for capacity and quality, Identification of the wastewater release rate and quantity from the proposed development and calculation of the new load from the development including sanitary sewage and wastewater from the proposed greenhouse operation, An estimate of the additional capacity requirement for the new development, based on the desktop and soil data review, Recommendation of a treatment and disposal system which meets the development demand and effluent quality guidelines established by Alberta Environment and Parks (AEP), the County, and the Alberta Safety Codes Act, in the case that the existing system capacity and/or treatment efficiency do not meet the requirements. The establishment of parameters and standards for the proposed new system addition, through collaboration with AEP and the County. Recommendations for the 2 to 3% of the annual water consumption from the greenhouse irrigation system will be disposed of through the use of irrigation around the perimeter of the building in summer months, and the sanitary system during the winter months. The report will identify how the process water and any by product will be dealt with to meet Provincial requirements. 3 Phasing 3.1 Existing Facility The existing facility is located on the central west edge of the site and is 5,110 sq. m. (55,000 sq. ft.) and employs 75 full time employees. Access to the site is gained from Township Road 304 on
5 the east side of the site. The facility uses traditional growing methods and makes use of an existing storm pond. The greenhouse expansion is expected to include a total of 61,171 sq. m (658,438 sq. ft.) comprised of greenhouse and support services. The expansion will be constructed in two phases. Upon full build out the facility will employ approximately 200 full time employees. 3.2 Phase 1 Phase 1 of the expansion when completed will contain approximately 24,192 sq. m. (260,400 sq. ft.), including greenhouse and support services including washrooms, staff facilities, office, storage and shipping. 3.3 Phase 2 Phase 2 of the expansion will contain approximately 36,979 sq. m. (398,038 sq. ft.). 4 Traffic Impact Assessment A Traffic Impact Assessment (TIA) is currently being prepared that will assess the potential impacts of traffic changes caused by the proposed development on Township Road 304, and will identify applicable improvements that will be needed to mitigate impacts. Depending on the traffic volumes, roadway classification and design vehicles, the road network improvements may include widening, addition of left or right turn lanes, change in traffic control, etc. Traffic counts at three intersections are currently being conducted for the AM and PM peak periods. The TIA will also address the hours of operation, the times that the facility is in operation with employees present, the number of shipments to and from the facility for delivery of fertilizers, packing materials, etc. and courier movements to and from the facility. In addition a parking analysis will be conducted to ensure that the facility meets parking requirements for employees and visitors to the facility. 4.1 Site Access and Driveway The site is currently accessed and will continue to be accessed from Township Road 304 which is an undivided road. The existing private driveway is located at the west property line and is opposite a private driveway north of Twp. Road 304 that provides access to Block 1, Plan The existing private driveway to the facility will be widened to accommodate two-way traffic as per County Roadway Design Standards. The asphalt pavement of the existing private driveway to the facility will be analyzed and upgraded as needed. The appropriate driveway setback from Twp. Road 304 will be integrated into the redevelopment and the approach constructed according to the County s Policy Any existing culverts will be checked for size, type and cover against the County s guidelines. Appropriate traffic control signage and a security gate will be installed on the property straddling the driveway. Design of approach will adhere to Mountain View County Procedure # and Policy Landscaping and Lighting 5.1 Landscaping The Landscape Plan will address environmental challenges and opportunities that Aurora will encounter during the process of obtaining the Development Permit for the expansion project.
6 When completed, the Landscape Plan will: Study and describe the existing vegetation on the development site, including plant species inventory, descriptions of existing vegetation communities and identification of rare plant species. Existing vegetation will be preserved where possible. Provide a report suggesting a seed mix suitable for revegetating plant communities disturbed by the project, and recommend the appropriate shrub and tree species for disturbed areas based on the study results. Only native, non-invasive plants (trees and shrubs) will be recommended for restoration and aesthetic purposes Provide a Weed Control Management Plan Provide strategy to protect the environmental stability of pond/wetland area. This will include measures to protect the existing wetland (pond) area and increase the extent and quality of wetland and riparian habitats. Present planting selection and planting schedule that meets the Mountain View county requirements for natural areas. For example, the utilization of native large caliper trees to create screening for the farm lands that are directly impacted by the facility. Prepare a Landscape Plan that will include the use of natural landscaped mounds along the western edge of the facility for visual screening purposes; Achieve a durable near-native landscape that is as self-sustaining as possible including strategies for managing controlled weed species. 5.2 Lighting Lighting on the site will be minimal and will be located for security and safety purposes in correlation with Federal regulations for licensed marijuana producers. To ensure that there is minimal impact (light pollution) from the site lighting, Dark Sky Policies will be followed for all lighting that is located outside of the greenhouse within the fenced site. These policies indicate that all outdoor lighting will have shields on the sides to direct the light towards the ground and prevent it from projecting off the site.
A Developer s Guide: Watershed-Wise Development
A Developer s Guide: Watershed-Wise Development Environmental Protection What is a watershed? It does not matter how far away you build from a creek, lake, or the ocean, you are in a watershed. Another
More informationB. Improve the appearance and character of areas surrounding new development.
Chapter 4.3: Landscape Regulations Sections: 4.301 Purposes 4.302 Applicability 4.303 General Provisions 4.304 Landscape Maintenance 4.301 Purposes The purposes of these regulations are to: A. Promote
More informationAppendix C. Municipal Planning and Site Restoration Considerations
Appendix C Municipal Planning and Site Restoration Considerations 67 68 Appendix C - Municipal Planning and Site Restoration Considerations This appendix contains best practice standards for site planning
More informationHow To Plan A Buffer Zone
Backyard Buffers Protecting Habitat and Water Quality What is a buffer? A buffer (also called a riparian buffer area or zone) is the strip of natural vegetation along the bank of a stream, lake or other
More informationHow To Amend A Stormwater Ordinance
Regulatory Alternatives to Address Stormwater Management and Flooding in the Marlboro Street Study Area Alternative 1: Amend Existing Local Regulations This proposed alternative provides an incremental
More informationChapter 3 SENSITIVE AREAS AND VEGETATED CORRIDORS
Chapter 3 3.01 General Provisions 3.01.1 Introduction 3.01.2 Application and Interpretation of Chapter 3.01.3 Unbuildable Lots 3.01.4 Other Permits 3.01.5 Prohibited Activities 3.02 Service Provider Letter
More informationAGENDA LARIMER COUNTY PLANNING COMMISSION Wednesday, April 20, 2016/6:30 P.M./Commissioners' Hearing Room
AGENDA LARIMER COUNTY PLANNING COMMISSION Wednesday, April 20, 2016/6:30 P.M./Commissioners' Hearing Room A. CALL TO ORDER B. PLEDGE OF ALLEGIANCE C. PUBLIC COMMENT ON THE COUNTY LAND USE CODE D. PUBLIC
More informationPLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013
PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 NAME LOCATION Audubon Properties, LLC. 4700 & 4960 Dauphin Island Parkway West side of Dauphin Island Parkway, 580
More informationCLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE
1008 STORM DRAINAGE (3/24/05) 1008.01 PURPOSE To minimize the amount of stormwater runoff resulting from development utilizing nonstructural controls where possible, maintain and improve water quality,
More informationWESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, 2015 1512-SPP-24 & 1512-ODP-24
Petition Number: Subject Site Address: Petitioner: Request: East side of Oak Road, north of 151 st Street Langston Development Co. Primary Plat and Overall Development Plan amendment review for Mapleridge
More informationCOMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES. April 20, 2010 EXHIBIT 1
COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES April 20, 2010 EXHIBIT 1 ELEMENT 4 WATER RESOURCES TABLE OF CONTENTS 4.1 INTRODUCTION 4.2 GOALS AND POLICIES 4.2.A General Goals and Policies 1 4.2.B
More informationComprehensive Plan for the National Capital DRAFT Federal Environment Element Policies
Comprehensive Plan for the National Capital DRAFT Federal Environment Element Policies SECTION A: Climate Change 1. Ensure that climate change impacts are addressed in long range plans and in the review
More informationProposed General Plan Update Goals, Policies, and Implementation Actions
Proposed General Plan Update Goals, Policies, and Implementation Actions The construction and maintenance of infrastructure is necessary to support existing and planned land uses and to achieve Environmental
More informationCONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE
CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE The following template may be used as a general guide for development of a Stormwater Pollution Prevention Plan (SWPPP) for construction activities.
More informationSTATEMENT OF RON HUNTSINGER NATIONAL SCIENCE COORDINATOR BUREAU OF LAND MANAGEMENT U.S
STATEMENT OF RON HUNTSINGER NATIONAL SCIENCE COORDINATOR BUREAU OF LAND MANAGEMENT U.S. DEPARTMENT OF THE INTERIOR BEFORE THE HOUSE APPROPRIATIONS SUBCOMMITTEE ON INTERIOR, ENVIRONMENT AND RELATED AGENCIES
More informationL A N D S C A P E P A T T E R N S
A PATTERN BOOK FOR NEIGHBORLY HOUSES LANDSCAPE PATTERNS E Landscape Patterns Throughout the United States there is an incredible range of climatic zones, microclimates, plant species, and landscape traditions.
More informationInterlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010
Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010 Background What are permeable interlocking concrete pavements (PICP)?
More informationCWSRF Project Descriptions and Examples for Green Project Reserve
CWSRF Project Descriptions and Examples for Green Project Reserve I. Water Efficiency a. Water efficiency is the use of improved technologies and practices to deliver equal or better services with less
More informationSANTA BARBARA COUNTY COMPREHENSIVE PLAN LOMPOC AREA
SANTA BARBARA COUNTY COMPREHENSIVE PLAN LOMPOC AREA A. LAND USE ELEMENT INTERPRETIVE GUIDELINES B. COMMUNITY BENEFITS C. COUNTY ACTION ITEMS Adopted by the Board of Supervisors November 9, 1999 A. Santa
More informationCASFM Stormwater Quality Field Trip June 23rd, 2011
CASFM Stormwater Quality Field Trip June 23rd, 2011 The 2011 CASFM Stormwater field trip included 42 attendees coming from as far south as Colorado Springs up to the Denver area and another 12 who joined
More informationSCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY
SCHEDULE 2 TO THE DEVELOPMENT PLAN OVERLAY Shown on the planning scheme map as DPO2 WAVERLEY GOLF COURSE, LYSTERFIELD VALLEY 1.0 Conditions and requirements for permits A permit to use and develop the
More informationSustainable Landscaping RFP Language City of Long Beach, CA
Sustainable Landscaping RFP Language City of Long Beach, CA I. PROJECT DESCRIPTION Design and landscaping techniques for [PROJECT NAME] shall conform to the intent of the City of Long Beach s Green Building
More information1. It would create hazardous effects of storm water run-off. 3. It would increase hazardous driving conditions on the public road.
SECTION 6: REQUIREMENTS FOR A DRIVEWAY CONNECTION A. Required information. The application shall be accompanied by a sketch of the proposed driveway which at a minimum shall indicate: 1. Geometric information
More informationK A N S A S DEPARTMENT OF HEALTH AND ENVIRONMENT PERMIT APPLICATION FOR A RECLAMATION FACILITY. 1. Applicant's Name
K A N S A S DEPARTMENT OF HEALTH AND ENVIRONMENT PERMIT APPLICATION FOR A RECLAMATION FACILITY 1. Applicant's Name Address (Street or Rural Route) (City & State) (Zip) Person to contact Title Phone Fax
More informationStorm Water Management Requirements for Construction Projects Less than One Acre
Storm Water Management Requirements for Construction Projects Less than One Acre Purpose: UC Irvine s Phase II Small MS4 Storm Water Permit requires construction projects less than one acre in size to
More informationPROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS
C PROJECT ESTIMATE ASSUMPTIONS AND EXCLUSIONS In support of the alternatives development process, preliminary cost estimates were prepared for each of the three Candidate Build Alternatives. The cost estimates
More informationSITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST
This checklist may be used by applicants for encroachment permits, and contractors in development of Site Specific Best Management Practice (SSBMP) Plans or Storm Water Pollution Prevention Plans (SWPPP)
More information2010 Salida Community Priorities Survey Summary Results
SURVEY BACKGROUND The 2010 Salida Community Priorities Survey was distributed in September in an effort to obtain feedback about the level of support for various priorities identified in the draft Comprehensive
More information1.7.0 Floodplain Modification Criteria
1.7.0 Floodplain Modification Criteria 1.7.1 Introduction These guidelines set out standards for evaluating and processing proposed modifications of the 100- year floodplain with the following objectives:
More informationDevelopment proposals will require to demonstrate, according to scale, type and location, that they:-
Appendix 2 : Relevant Development Plan Policies Angus Local Plan Review 2009 Policy S1 : Development Boundaries (a) Within development boundaries proposals for new development on sites not allocated on
More informationCOLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION
COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION (1) Project Name: (2) Project Contractor: (3) Erosion Control Supervisor/SWMP Administrator: (4) CDOT Project
More informationPost-Construction Stormwater Management Checklist* (5,000 SF or Greater)
Applicability: Required for projects that create and/or replace 5,000 square feet or greater of impervious surface (i.e. asphalt roads, concrete structures, building area, sidewalks, etc.). Impervious
More informationLand Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department
Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth
More informationTownship of Enniskillen. Asset Management Plan
Township of Enniskillen Asset Management Plan 2014 1 TABLE OF CONTENTS Page A. Introduction 3 B. State of Local Infrastructure 4 C. Desired Levels of Service 7 D. Asset Management Strategy 8 E. Financing
More informationRESTORATION & REVITALIZATION
RESTORATION & REVITALIZATION Legal preservation has not proved to be sufficient to preserve natural communities. Restoration activities are diverse and includes revitalization of natural communities which
More informationMassachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands Program Checklist for Stormwater Report
Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key. A. Introduction A Stormwater Report must be submitted with the Notice of Intent
More informationGOALS, OBJECTIVES AND POLICIES
GOALS, OBJECTIVES AND POLICIES The following goal, objective and policy statements have been developed for the use of local policy makers in guiding and directing the decision making process as it relates
More informationDesigned and produced by geo-graphicsdesign.com DP 300 3/02
Designed and produced by geo-graphicsdesign.com DP 300 3/02 Guidance for Developers and Regulators Purpose This booklet is produced on behalf of the North East Scotland Flooding Advisory Group and is intended
More information2012-2013 Annual Report
2012-2013 Annual Report Department Mission and Vision Landscape and Natural Resources (LNR) enriches the community by creating and maintaining an inviting and sustainable outdoor environment; providing
More informationHouse Code. House Code
1 Application This Code will apply in assessing material change of use and/or building work for a house. 2 Using this Code In using this Code reference should also be made to Section 1.1 How to use the
More informationPolicy GRN-1.1.2. The City will adopt a Go Green Initiative to implement strategies to reduce greenhouse gas emissions within the City s borders.
Vision Statement: Provide goals, objectives, and policies that preserve, improve, and promote responsible use and protect the City s natural and built environment. Goals, Objectives and Policies: Goal
More informationSection 5: Conserve to Enhance Program Goals What is Conserve to Enhance All About?
Section 5: Conserve to Enhance Program Goals What is Conserve to Enhance All About? Conserve to Enhance (C2E) was originally conceptualized as an approach to giving the environment a seat at the table
More informationMission Creek Flood Control & Restoration Project. City of Fremont, Alameda County
Mission Creek Flood Control & Restoration Project City of Fremont, Alameda County Agenda Background Why are proposed improvements necessary? Proposed project components Challenges Construction schedule/phasing
More informationTownship of Georgian Bluffs POLICY USE OF UNOPENED ROAD ALLOWANCES
Township of Georgian Bluffs POLICY USE OF UNOPENED ROAD ALLOWANCES 1.0 Background An unopened road allowance as defined by the Municipal Act is a public highway that has not been opened and assumed for
More informationGreater Los Angeles County Region
Attachment 6 Greater Los Angeles County Region IRWM Implementation Grant Proposal Monitoring, Assessment, and Attachment 6 consists of the following items: Monitoring, Assessment, and. The purpose of this
More informationMinimizes sediment and debris from entering storm drains that lead to waterways and watercourses.
4.5-p DRAIN INLET PROTECTION Alternative Names: DI protection, Drop Inlet Protection DESCRIPTION Storm drain inlet (DI) protection slows and ponds stormwater, and filters sediment and debris before it
More informationAREA: 2.37 acres NUMBER OF LOTS: 1 FT. NEW STREET: 0 LF. Single-family, Non-conforming machine shop
FILE NO.: Z-8958 NAME: Rock Structure Repair Short-form PID LOCATION: Located at 8024 Stanton Road DEVELOPER: Rock Structure Repair Attn. Rudy Gutierrez 3 Kipling Court Little Rock, AR 72209 ENGINEER:
More informationA Self Assessment to Address Climate Change Readiness in Your Community Midwest Region
A Self Assessment to Address Climate Change Readiness in Your Community Midwest Region 0 Climate Change Readiness Index A Self Assessment to Address Climate Change Readiness in Your Community Communities
More informationSustainable Landscape Maintenance Planning and Strategies
Chapter 2 Sustainable Landscape Maintenance Planning and Strategies In this Chapter What are our goals for sustainable landscape maintenance? What is sustainable landscape maintenance? How is a sustainable
More informationTOWNSVILLE WATER Customer Service Standards
TOWNSVILLE WATER Customer Service Standards CONTENTS Townsville Water who are we? 3 What is the Customer Service Standard? 3 >> Does the Customer Service Standard apply to me? 3 >> What will Townsville
More informationATTACHMENT 7. CWSRF Project Descriptions and Examples for Green Project Reserve
Attachments 7 and 8 are from the American Recovery and Reinvestment Act Guidance, produced March 2, 2009 by the U.S. EPA Office of Water. Attachments 7 and 8 specifically address the 20% Green Project
More informationFirst Annual Centennial Strategy for. Yucca House National Monument
First Annual Centennial Strategy for Yucca House National Monument August 2007 Year: 2007 Vision Statement Yucca House National Monument was set aside in 1919 to preserve an unexcavated Ancestral Puebloan
More information720 Contour Grading. General. References. Resources. Definitions
720 Contour Grading General Contour grading directs water to a desired point, prevents erosion, provides noise deflection, provides visual fit of the facility into the landscape, and protects desirable
More informationSTORMWATER POLLUTION PREVENTION PLAN TEMPLATE. 1.0 SITE DESCRIPTION 1.1 Project Name and Location Date
STORMWATER POLLUTION PREVENTION PLAN TEMPLATE Disclaimer: This template was developed for guidance purposes only in an effort to assist Construction Storm Water permit applicants in meeting state and local
More informationNOTICE OF PREPARATION
PLANNING DIVISION CITY OF SUNNYVALE P.O. BOX 3707 SUNNYVALE, CA 94088-3707 NOTICE OF PREPARATION TO: Responsible, Trustee, and Other Interested Public Agencies FROM: Sunnyvale Community Development 456
More informationChagrin River Watershed Partners, Inc. Cost Analysis of Low Impact Development Best Management Practices
Chagrin River Watershed Partners, Inc. Cost Analysis of Low Impact Development Best Management Practices Amy H. Brennan (440) 975-3870 www.crwp.org abrennan@crwp.org Chagrin River Watershed Partners Formed
More informationINFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION. Infrastructure Flood Protection Remediation Policies
INFRASTRUCTURE, FLOOD PROTECTION AND REMEDIATION Infrastructure Flood Protection Remediation Policies DRAFT POOLBEG PLANNING SCHEME 196 FIGURE 9.1: UTILITIES WAYLEAVES Electricity Cables 8m Wayleave for
More information3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN
3.4 DRAINAGE PLAN This section describes the existing onsite drainage characteristics and improvements proposed within this Specific Plan. Following this description, drainage plan development standards
More informationINDEX. Introduction 3. The Septic System 3. What Does The Septic Tank Do? 4. Where It All Goes 5. Problems 7. Some Dontʼs 8
1 INDEX Introduction 3 The Septic System 3 What Does The Septic Tank Do? 4 Where It All Goes 5 Problems 7 Some Dontʼs 8 Management of Your On-Site System 9 Tank Maintenance 9 Disposal Field Area 10 Appendix
More informationSITE DEVELOPMENT PLAN CHECKLIST. Project Name: Site Plan No.:
SITE DEVELOPMENT PLAN CHECKLIST 5/12/05 Rev.3/14/06 Project Name: Site Plan No.: REVIEW CRITERIA Plans: A site development plan (signed and sealed) shall be on a 24 x 36 sheet at a scale that is no smaller
More informationSEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS
UPDATED: 01/31/14 SEMINOLE PRATT WHITNEY ROAD & NORTHLAKE BLVD. FREQUENTLY ASKED QUESTIONS Q. 1. What are the County s plans for Seminole Pratt Whitney Road between SR 80 (Southern Blvd) and the Bee Line
More informationGenesee Advanced Water Treatment Facility
Genesee Advanced Water Treatment Facility State Revolving Fund Loan Public Hearing April 28, 2015 Project Purpose Upgrade critical components of the District's water system Develop a more robust water
More informationRetention/Irrigation. Design Considerations. Soil for Infiltration Area Required Slope Environmental Side-effects
Description Retention/irrigation refers to the capture of stormwater runoff in a holding pond and subsequent use of the captured volume for irrigation of landscape of natural pervious areas. This technology
More information12/3/2015 MUNICIPAL STORMWATER RESPONSIBILITIES YOU NEED TO KNOW WHAT IS STORMWATER? WHY?
MUNICIPAL STORMWATER RESPONSIBILITIES YOU NEED TO KNOW WHAT IS STORMWATER? Stormwater occurs when precipitation from rain or snowmelt flows over the ground WHY? 1 DEP/EPA AUDITING It is happening! Here
More informationSTATEMENT OF PURPOSE
STATEMENT OF PURPOSE Community Properties, Inc. ( CPI ) is applying to Chatham County for approval of a major subdivision, Meadowview PUD (the Project ), with access to NC 87 and Old Graham Road, just
More informationA. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems.
19. STORMWATER MANAGEMENT A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems. The majority of the approximately ±500 acre Property
More informationExperienced Planning and Design
www.pizzo.info Consistently Better Natural Restoration Everyone should have a passion in life, and for me it s been to protect and restore our lands to their original native beauty. That s why in 1988
More informationRestoring Anadromous Fish Habitat in Big Canyon Creek Watershed. Summary Report 2002
Restoring Anadromous Fish Habitat in Big Canyon Creek Watershed Summary Report 2002 DOE/BP-00005268-5 November 2002 This Document should be cited as follows: "Restoring Anadromous Fish Habitat in Big Canyon
More informationChapter 2 Spatial Portrait
15 November 2013 Dear Julie Fylde Local Plan to 2030 Part 1 Preferred Options Thank you for the opportunity to meet with you on 9 October in respect of the above mentioned document. As discussed at the
More informationG James Contractors Ltd.
Proposed Self Storage Facility for Ivor DeLange 1579 Fanshawe Park Road West BY G James Contractors Ltd. Contents 1. Project description 2. Goals and Objectives 3. Site History 4. Design 5. Servicing 6.
More informationSITE-SPECIFIC BEST MANAGEMENT PRACTICES (BMP) PLAN REVIEW CHECKLIST
This checklist may be used by applicants for encroachment permits, and contractors in development of Site- Specific BMP Plans for projects. plan reviewers will use this checklist to review the Site-Specific
More informationChapter 3 CULVERTS. Description. Importance to Maintenance & Water Quality. Culvert Profile
Chapter 3 CULVERTS Description A culvert is a closed conduit used to convey water from one area to another, usually from one side of a road to the other side. Importance to Maintenance & Water Quality
More information5. Environmental Analysis
5.11 The potential for adverse impacts on utilities and service systems was evaluated based on information concerning current service levels and the ability of the service providers to accommodate the
More informationA GUIDE TO THE PREPARATION OF THE WATER SUPPLY FACILITIES WORK PLAN
A GUIDE TO THE PREPARATION OF THE WATER SUPPLY FACILITIES WORK PLAN Florida Department of Economic Opportunity Division of Community Development Bureau of Community Planning September 2007. Revised July
More informationRainWise Frequently Asked Questions
RainWise Frequently Asked Questions RAINWISE PROGRAM: HOW TO GET STARTED AND WHAT TO EXPECT What is the RainWise Rebate Program? RainWise is a program offered by Seattle Public Utilities and King County
More informationOperations and Maintenance
Seattle Public Utilities Green Stormwater Infrastructure: O&M Program Operations and Maintenance O&M Maintenance Took Kit 1. Landscape Maintenance Manual 2. GSI/LID Maintenance Manual for ROW 3. Identifiable
More informationProposed Terms of Reference for EIA studies
1 Proposed Terms of Reference for EIA studies Base line data collection will be collected for the Post-Monsoon season 2016 (September to November 2016) in study area and 10 kms radius from project site.
More informationTab III: HOUSING DESIGN CRITERIA
Tab III: HOUSING DESIGN CRITERIA The Harris County Community Services Department (HCCSD) uses standards of design and construction to implement its programs in order to develop safe housing that will serve
More informationBEFORE THE HEARING EXAMINER FOR THURSTON COUNTY
BEFORE THE HEARING EXAMINER FOR THURSTON COUNTY In the Matter of the Application of ) NO. SSDP 000748 ) Kevin Robinson ) FINDINGS, CONCLUSIONS ) AND DECISION For a Shoreline Substantial Development ) Permit
More informationMBJ Environmental Programmes
MBJ Airports Limited Environmental Policy The following is MBJ Airports Limited s (MBJ) Environmental Policy for Sangster International Airport (SIA): Integrate environmental management measures with planning,
More informationRecommendations for future developments
C Recommendations for future developments C.1 Reducing flood risk through site layout and design C.1.1 C.1.2 Flood risk should be considered at an early stage in deciding the layout and design of a site
More informationStandards Oversight Council (SOC) Supporting Technical Standards for Urban and Rural Soil and Water Conservation
Standards Oversight Council (SOC) Supporting Technical Standards for Urban and Rural Soil and Water Conservation 702 E. Johnson Street, Madison, Wisconsin 53703 (608) 441-2677 Fax (608) 441-2676 soc@wlwca.org
More informationSample DEQ Plan Submitter s Checklist for Stormwater Management Plans
APPENDIX IV Version: February 2, 2015 Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans Please fill in all blanks and please reference the plan sheets/pages where the information may
More informationAPPENDICES G) DETAILED BACKBONE INFRASTRUCTURE CONSTRUCTION COST ESTIMATE SUMMARY
ALAMEDA POINT MASTER INFRASTRUCTURE PLAN March 31, 2014 APPENDICES G) DETAILED BACKBONE INFRASTRUCTURE CONSTRUCTION COST ESTIMATE SUMMARY Carlson, Barbee & Gibson, Inc. Backbone Infrastructure Engineer
More informationModule 6 : Quantity Estimation of Storm Water. Lecture 6 : Quantity Estimation of Storm Water
1 P age Module 6 : Quantity Estimation of Storm Water Lecture 6 : Quantity Estimation of Storm Water 2 P age 6.1 Factors Affecting the Quantity of Stormwater The surface run-off resulting after precipitation
More informationPRELIMINARY PROJECT REVIEW PROCESS
CITY OF CYPRESS 5275 Orange Avenue Cypress, California 90630 (714) 229-6720 PRELIMINARY PROJECT REVIEW PROCESS 1. Discuss project with Planning staff to determine zoning regulations, unusual characteristics
More informationStormwater Design Guidelines Frequently Asked Questions:
525 Golden Gate, 11th Floor San Francisco, CA 94102 T 415.551.4694 F 415.934.5728 TTY 415.554.3488 Stormwater Design Guidelines Frequently Asked Questions: A. GENERAL INQUIRIES... 2 1. What projects are
More informationTRANSPORTATION SERVICE STANDARDS ELEMENT GOALS, OBJECTIVES & POLICIES
TRANSPORTATION SERVICE STANDARDS ELEMENT GOALS, OBJECTIVES & POLICIES Background One of the most critical public services provided by a community is the community s transportation system. An effective
More informationDELAWARE TOWNSHIP ORDINANCE #2011-06LU
DELAWARE TOWNSHIP ORDINANCE #2011-06LU AN ORDINANCE SUPPLEMENTING AND AMENDING THE LAND USE ORDINANCE OF THE TOWNSHIP OF DELAWARE BY PERMITTING SOLAR ENERGY SYSTEMS. #2011-06LU WHEREAS, it is the purpose
More informationMOBILE HOME LAW. Revised November 2001
MOBILE HOME LAW Revised November 2001 TABLE OF CONTENTS: SECTION 1: SECTION 2: SECTION 3: SECTION 4: SECTION 5: SECTION 6: SECTION 7: SECTION 8: SECTION 9: SECTION 10: SECTION 11: SECTION 12: INTENT DEFINITIONS
More informationTHE LEAGUE OF WOMEN VOTERS OF WASHINGTON COUNTY PROGRAM FOR ACTION
THE LEAGUE OF WOMEN VOTERS OF WASHINGTON COUNTY PROGRAM FOR ACTION I. PUBLIC TRANSPORTATION (1988, 2006) The LWVWC supports coordinated public transportation service in Washington County and Northwest
More information5.14 Floodplains and Drainage/Hydrology
I-70 East Final EIS 5.14 Floodplains and Drainage/Hydrology 5.14 Floodplains and Drainage/Hydrology This section discusses floodplain and drainage/hydrology resources and explains why they are important
More informationFlood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers
Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers Development and Regeneration Services Glasgow City Council 229 George Street Glasgow G1 1QU May 2011 1. Introduction...-
More informationLEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN
1 AUGUST 2011 LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN KEY ELEMENTS OF THE PLAN: 1. Replace the existing unsafe Ragged Mountain dam with a new dam and raise the reservoir pool level initially
More informationCOUNTY OF LAMBTON OFFICIAL PLAN UPDATE BACKGROUND REPORT NO.
COUNTY OF LAMBTON OFFICIAL PLAN UPDATE BACKGROUND REPORT NO. 6 RENEWABLE ENERGY Image Source: (Word Clip Art Stock Photo, 2011) Date: May, 2015 BACKGROUND PLANNING AND DEVELOPMENT SERVICES DEPARTMENT 789
More informationEcosystem Services in the Greater Houston Region. A case study analysis and recommendations for policy initiatives
Ecosystem Services in the Greater Houston Region A case study analysis and recommendations for policy initiatives Ecosystem Services Ecosystems provide services through their natural processes that we
More informationNatural Resources and Landscape Survey
Landscape Info Property Name Address Information Contact Person Relationship to Landscape Email address Phone / Fax Website Address Landscape Type (private/muni/resort, etc.) Former Land Use (if known)
More informationPROFFER STATEMENT REZONING TLZM 2013-0001 LEEGATE November 1, 2013
PROFFER STATEMENT REZONING TLZM 2013-0001 LEEGATE November 1, 2013 Leegate LLC and Stanley Martin Companies, LLC, owner and applicant, (the Applicant ) of certain property described as Loudoun County Tax
More informationINFORMATION SHEET ORDER NO. R5-2011-XXXX TRIANGLE ROCK PRODUCTS, INC. FLORIN ROAD AGGREGATE PLANT SACRAMENTO COUNTY
ORDER NO. R5-2011-XXXX INFORMATION SHEET Background Triangle Rock, Inc. (Discharger) submitted a Report of Waste Discharge (RWD) on 23 August 2010. The Discharger is expanding the mining operations at
More informationPreliminary Plan Application and Checklist
ALL APPLICATIONS ARE DUE AT 12:00 NOON ON THE FILING DATE Office Use Only PRELIMINARY / REVISED PRELIMINARY PLAN $300.00 Fee Paid: $ Date Paid: ALL FIELDS HIGHLIGHTED IN RED ARE REQUIRED FIELDS Case No.: