ENCANTO REAL UTILITY DISTRICT MCKENZIE PARK LFIT STATION UNIT BID TABULATION

Size: px
Start display at page:

Download "ENCANTO REAL UTILITY DISTRICT MCKENZIE PARK LFIT STATION UNIT BID TABULATION"

Transcription

1 LIFT STATION Foot Wide, 8-Inch Cement Treated Crushed Limestone All- Weather Access Drive On Compacted Subgrade, Including Geotextile Fabric, Complete in Place 235 SY $25.00 $5, $35.00 $8, $50.00 $11, Site Work Including but not Limited to Site Stripping, Grading and 8 - Inch Cement Treated Crushed Limestone All-Weather Lift Station Surface, Complete in Place. 375 SY $25.00 $9, $10.00 $3, $55.00 $20, Construct/Install a 6-Foot Tall Chain Link Fence, Including Three (3) Strands of Barbed Wire with Two (2) Swing Gates and One (1) Pedestrian Gate Surrounding Wastewater Lift Station Site, Complete in Place 205 LF $20.00 $4, $37.00 $7, $25.00 $5, Construct Wastewater Lift Station Structure, Including but not Limited to 6-Foot Diameter C-76 Cl IV R/G RCP Wet Well and Reinforced Concrete Valve Pad, Complete in Place. 1 LS $216, $216, $190, $190, $93, $93, Construct Wastewater Lift Station Piping, Including but not Limited to Pipes, Valves, and Fittings, Complete in Place 1 LS $20, $20, $33, $33, $32, $32, Install Two (2) 153 Gallon Per Minute, 5HP Submersible Wastewater Pumps, Including but not Limited to Bases, 2-Inch Stainless Steel Guide Rails, Brackets, Power Cable and Ancillary Equipment, Complete in Place 1 LS $20, $20, $10, $10, $80, $80, Application of Protective Coating to include Wet Well Concrete Walls and All Interior and Exterior Piping, Valves and Fittings, Complete in Place 1 LS $6, $6, $20, $20, $9, $9, Page 1 of 6

2 8. Construct Wastewater Lift Station Electrical System, Including but not Limited to Control Panel with PLC, Conduit, Wiring, Electrical Service, and All Ancillary Equipment, Complete in Place. 1 LS $20, $20, $52, $52, $44, $44, Well Point De-Watering as Required for Wastewater Lift Station Wet Well Construction (Only as Approved by the Engineer) 1 LS $ $ $1, $1, $5, $5, Inch Schedule 40 Steel Pipe Bollards, Complete in Place. 7 EA $ $1, $ $1, $ $3, Yard Light Fixture, Complete in Place. 1 EA $ $ $1, $1, $2, $2, Inch Sanitary Sewer Force Main By-pass System with Manhole Blockout, Complete in Place. 1 LS $1, $1, $3, $3, $5, $5, Construction Excavation Spoil - On-Site Disposal (Contractor to Properly Dispose of all Excavated Material On-Site, as per Direction of Engineer) 95 CY $1.00 $95.00 $10.00 $ $5.00 $ TOTAL LIFT STATION: $304, $333, $312, WATER DISTRIBUTION SYSTEM 1. 3/4-Inch C-900, PVC Water Line 180 LF $5.00 $ $20.00 $3, $12.00 $2, /4-Inch Backflow Preventer 1 EA $ $ $ $ $ $ /4-Inch Water Meter 1 EA $ $ $ $ $ $ Page 2 of 6

3 4. 12-Inch x 3/4-Inch Tapping Saddle with Corporation Stop 1 EA $ $ $ $ $ $ Hose Bib 1 EA $ $ $ $ $ $ TOTAL WATER DISTRIBUTION SYSTEM: $2, $4, $4, WASTEWATER COLLECTION SYSTEM 1. 8-Inch SDR-26, PVC Sanitary Sewer (all depths, including restrained joints as required) 161 LF $ $17, $ $18, $ $30, Inch C-900, PVC Sanitary Sewer Force Main (including all fittings) 235 LF $64.00 $15, $40.00 $9, $45.00 $10, Inch C-900, Restrained Joint PVC Sanitary Sewer Force Main (including all restrained joint fittings) 56 LF $76.00 $4, $50.00 $2, $80.00 $4, Bore and Jack 4-Inch C-900, Restrained Joint PVC Sanitary Sewer Force Main (including all necessary bore pits and restrained joint fittings) 84 LF $76.00 $6, $90.00 $7, $ $25, Standard City of Houston 4-Foot Diameter Sanitary Sewer Manhole with Manhole Blockout, Complete in Place 1 EA $4, $4, $2, $2, $3, $3, Convert Existing Discharge Manhole to Standard City of Houston Corrosion Resistant Force Main Discharge Manhole, Complete in Place 1 EA $3, $3, $5, $5, $7, $7, Page 3 of 6

4 7. Extra Depth for Manhole (over 8-foot deep) 11 VF $ $1, $ $1, $ $1, Core Drilled Connection of Proposed Sanitary Sewer Force Main to Existing Sanitary Sewer Manhole using Resilient/Flexible Water Tight Connector 1 EA $1, $1, $1, $1, $3, $3, Well Point De-Watering for Gravity Sanitary Sewer and Restrained Joint Force Main Construction (only as directed by the Engineer; minimum bid $25.00/LF) 200 LF $25.00 $5, $25.00 $5, $25.00 $5, Crushed Stone Foundation with Filter Fabric Wrap as per City of Houston Detail No (only as directed by the Engineer; minimum bid $10.00/LF) 161 LF $10.00 $1, $10.00 $1, $10.00 $1, Crushed Stone Foundation with Filter Fabric Wrap as per City of Houston Detail No (only as directed by the Engineer; minimum bid $25.00/LF) 81 LF $25.00 $2, $25.00 $2, $25.00 $2, Trench Safety System (all depths) 455 LF $0.10 $45.50 $2.00 $ $5.00 $2, Construction Excavation Spoil - On-Site Disposal (Contractor to Properly Dispose of all Excavated Material On-Site, as per Direction of Engineer) 145 CY $1.00 $ $10.00 $1, $10.00 $1, TOTAL WASTEWATER COLLECTION SYSTEM: $63, $58, $98, Page 4 of 6

5 STORM WATER POLLUTION PREVENTION PLAN 1. Reinforced Filter Fabric Fence with Steel Fence Posts and 2-Inch x 4-Inch, 12-Gauge Galvanized Welded Wire Mesh (installation around perimeter and maintenance) 450 LF $2.00 $ $1.50 $ $3.00 $1, Stabilized Construction Access/Exit 1 LS $ $ $1, $1, $2, $2, Concrete Truck Washout Structure (Installation, maintenance and removal) 1 LS $ $ $1, $1, $1, $1, Street Cleaning 2 EA $ $ $1, $3, $1, $2, Storm Water Pollution Prevention Plan Compliance (including SWPPP implementation, performing project site inspections, completing inspection reports, filing notices, posting permits, certificates and notices, installation of new control measures, maintenance of existing control measures, etc.) 1 LS $ $ $1, $1, $3, $3, TOTAL STORM WATER POLLUTION PREVENTION PLAN: $2, $8, $11, Page 5 of 6

6 BID SUMMARY 1. Lift Station $304, $333, $312, Water Distribution System $2, $4, $4, Wastewater Collection System $63, $58, $98, Storm Water Pollution Prevention Plan $2, $8, $11, One-Time Only Construction Staking Service (minimum bid $5,200.00) $5, $5, $5, Post Construction Topographic Verification of Underground Utilities and Record Drawing Preparation (minimum bid $2,500.00) $2, $2, $2, TOTAL AMOUNT BID: $380, $413, $434, Calendar Days Page 6 of 6

7

SAM HOUSTON TOLLWAY AT FAIRBANKS N. HOUSTON

SAM HOUSTON TOLLWAY AT FAIRBANKS N. HOUSTON SAM HOUSTON TOLLWAY AT FAIRBANKS N. HOUSTON WATER DISTRIBUTION LINE EXTENSION 1. 8-Inch C-900, PVC Water Line (open cut) 10 LF $23.30 $233.00 $18.30 $183.00 $30.00 $300.00 2. 8-Inch C-900, PVC Restrained

More information

TOTAL WATER DISTRIBUTION SYSTEM: $136, $125, $139,302.50

TOTAL WATER DISTRIBUTION SYSTEM: $136, $125, $139,302.50 HARRIS COUNTY UNIT BID TABULATION WATER DISTRIBUTION SYSTEM 1. 16-Inch C-905, PVC Water Line 1,741 LF $30.00 $52,230.00 $28.00 $48,748.00 $32.35 $56,321.35 2. 12-Inch C-900, PVC Water Line 1,124 LF $20.00

More information

HARRIS COUNTY MUNICIPAL UTILITY DISTRICT NO. 65 STORM SEWER TRUNKLINE

HARRIS COUNTY MUNICIPAL UTILITY DISTRICT NO. 65 STORM SEWER TRUNKLINE HARRIS COUNTY MUNICIPAL UTILITY DISTRICT NO. 64 SITE PREPARATION 1. Strip Republic at Katy Apartments Site to Receive Utility Spoil Stockpile Fill Material of all Organics and Deleterious Materials to

More information

WATER DISTRIBUTION SYSTEM $111, TOTAL WATER DISTRIBUTION SYSTEM $90, $80, BID DATE November ENGINEER'S ESTIMATE $

WATER DISTRIBUTION SYSTEM $111, TOTAL WATER DISTRIBUTION SYSTEM $90, $80, BID DATE November ENGINEER'S ESTIMATE $ ENGINEERS ESTIMATE $981 610 00 MUNICIPAL UTILITY DISTRICT WATER DISTRIBUTION, WASTEWATER COLLECTION, STORM SEWER FACILITIES AND WASTEWATER LIFT STATION TO SERVE COLONY, SECTION ONE CLEARWATER UTiliTIES,

More information

CITY OF WINTER GARDEN CONSTRUCTION SERVICES LABOR, EQUIPMENT, AND MATERIALS BID FORM MOBILIZATION/DEMOBILIZATION

CITY OF WINTER GARDEN CONSTRUCTION SERVICES LABOR, EQUIPMENT, AND MATERIALS BID FORM MOBILIZATION/DEMOBILIZATION 1 2 3 4 < 100K Work Order > 100K Work Order < 100K Work Order > 100K Work Order % of Work Order % of Work Order % of Work Order % of Work Order 5 1 Each/Day Type I Barricade 6 1 Each/Day Type II Barricade

More information

FY08 SEWER POINT REPAIRS BID TABULATION

FY08 SEWER POINT REPAIRS BID TABULATION 6-07-831 Page 1 of 12 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING "

More information

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation 644-10-569 Page 1 of 9 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING

More information

City Business Registration Number Signature Title

City Business Registration Number Signature Title INVITATION TO BID BID FORM Golf Course Barn Lift Station BID NO. 2013-13 City of Carlsbad 101 N. Halagueno Carlsbad, New Mexico 88220 or PO Box 1569 Carlsbad, New Mexico 88221 BID DUE DATE: Please submit

More information

Section XVII SANITARY SEWER PUMP STATION DESIGN GUIDELINES

Section XVII SANITARY SEWER PUMP STATION DESIGN GUIDELINES Section XVII SANITARY SEWER PUMP STATION DESIGN GUIDELINES A. GENERAL 1. The following sanitary sewer pump station design guidelines are based on Federal, State and local health requirements and the Hilton

More information

Item No. Description Estimated Unit Total Unit Total Unit Total Unit Total Quantity Price Amount Price Amount Price Amount Price Amount

Item No. Description Estimated Unit Total Unit Total Unit Total Unit Total Quantity Price Amount Price Amount Price Amount Price Amount Engineer's Estimate DiPaolo Company 4350 DiPaolo Center Glenview, IL 60025 Stark Excavating, Inc. 1805 W. Washington Street Bloomington, IL 61701 Rowe Construction 1523 N. Cottage Avenue Bloomington, IL

More information

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250. 02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily

More information

Job No.: Desalination Production Well Construction Services, Package 1 BGD Wells 1-4 B DD PRICE PROPOSAL. PROPOSAL OF, corporation,

Job No.: Desalination Production Well Construction Services, Package 1 BGD Wells 1-4 B DD PRICE PROPOSAL. PROPOSAL OF, corporation, Job : 10-8610 PRICE PROPOSAL PROPOSAL OF, corporation, a partnership consisting of, an individual doing business as, THE SAN ANTONIO WATER SYSTEM: Pursuant to Instructions and Invitations to Respondent,

More information

1 Mobilization LS 1 2 Myers Model 6VC200M4-43 Pump EA 2 3 Duplex Control Panel EA 1. Heavy Duty Floatholder & 4 S50NO Floats Assembly EA 1

1 Mobilization LS 1 2 Myers Model 6VC200M4-43 Pump EA 2 3 Duplex Control Panel EA 1. Heavy Duty Floatholder & 4 S50NO Floats Assembly EA 1 ADDENDUM #2 BID #FY2011-2012-006: PUMP STATION REHABILITATION PROJECT AS THE RESULT OF THE MANDATORY PRE-BID MEETING HELD,THURSDAY, JUNE 21, 2012 @ 10:30 A.M. AT THE HALLANDALE BEACH CULTURAL COMMUNITY

More information

PROPOSAL. Item Description Unit Quantity Unit Price Total Price No. (Unit Price to be written in Words) (Figures) (Figures)

PROPOSAL. Item Description Unit Quantity Unit Price Total Price No. (Unit Price to be written in Words) (Figures) (Figures) PROPOSAL PROPOSAL OF, a corporation a partnership consisting of and an individual doing business as TO THE SAN ANTONIO WATER SYSTEM: Pursuant to Instruction and Invitations to Bidders, the undersigned

More information

Special Specification 7021 Water Main and Sewer Line Replacements

Special Specification 7021 Water Main and Sewer Line Replacements Special Specification 7021 Water Main and Sewer Line Replacements 1. DESCRIPTION Furnish, install, or replace water pipe, water valves, water meters and boxes, water service connections, fire hydrant assemblies,

More information

SECTION 02763 POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.

SECTION 02763 POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe. SECTION 02763 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Repairs to existing sewer lines by replacing short lengths of failed pipe. 1.02 UNIT PRICES A. Measurement for point repairs is on a unit price

More information

CCU Engineering Specifications. Section 003300 PRECAST CONCRETE PRODUCTS

CCU Engineering Specifications. Section 003300 PRECAST CONCRETE PRODUCTS CCU Engineering Specifications Section 003300 Effective Date: Nov. 1st, 2011 Page 1 of 5 PRECAST CONCRETE PRODUCTS PART 1 - GENERAL The following specification is intended for use for the design, selection

More information

MWA SPLOST (Projects C F) Bid Math Check. Project C F, I, & L Bid Results (for MWA).xlsx.xls Worksheet: "Projects C F Bid Math Check" 1/8

MWA SPLOST (Projects C F) Bid Math Check. Project C F, I, & L Bid Results (for MWA).xlsx.xls Worksheet: Projects C F Bid Math Check 1/8 SPLOST Drainage Projects Package 2013-1 Project C: Hillcrest Avenue (Hillcrest Boulevard -to- Dillon Branch) Project D: Main Street Project E: Riverside Drive (at Railroad) Project F: Riverside Drive (at

More information

PWC DESIGN MANUAL TABLE OF CONTENTS. Introduction Acknowledgment Copies of Manual Contact List Disclaimer

PWC DESIGN MANUAL TABLE OF CONTENTS. Introduction Acknowledgment Copies of Manual Contact List Disclaimer PWC DESIGN MANUAL TABLE OF CONTENTS Preface Introduction Acknowledgment Copies of Manual Contact List Disclaimer Page i-ii iii iv v vi Chapter One - General Requirements for Water and Sewer Extensions

More information

Greater Gulf Development, LLC Graham Construction Hudson Contractors, Inc. CERTIFICATE OF RESPONSIBILITY

Greater Gulf Development, LLC Graham Construction Hudson Contractors, Inc. CERTIFICATE OF RESPONSIBILITY Vancleave High School Lift Station Vancleave, MS CONTRACTOR'S BID TABULATION BIDS RECEIVED December 9, 2014 Greater Gulf Development, LLC Graham Construction Hudson Contractors, Inc. CERTIFICATE OF RESPONSIBILITY

More information

Contractor Bid Tabulation Sheet

Contractor Bid Tabulation Sheet 1 SILT FENCE LF 800 2 INLET PROTECTION, TYPE B EA 8 3 TURBIDITY CURTAIN LF 400 4 TREE PROTECTION LF 150 5 CONSTRUCTION ENTRANCE EA 2 6 CLEARING AND GRUBBING LS 1 7 SAW-CUT, ASPHALT PAVEMENT (UP TO 20"

More information

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees. The following shall serve as the minimum requirements for contractors performing work in relation to the Authority s potable water and sanitary sewer system(s), appurtenances and service connections. General:

More information

OPERATING POLICY MANUAL

OPERATING POLICY MANUAL Page 1 of 7 Section 1. PURPOSE These requirements apply for any wastewater lift stations located in Bedford County that are capable of pumping 30 gallons per minute (gpm) or more, including those that

More information

CITY UTILITIES DESIGN STANDARDS MANUAL

CITY UTILITIES DESIGN STANDARDS MANUAL CITY UTILITIES DESIGN STANDARDS MANUAL (SA) Chapter 6 October 2013 SA6.01 Purpose This chapter establishes the technical design and construction criteria for all City of Fort Wayne building sewers. Any

More information

SECTION 02563 SANITARY SEWER FORCE MAINS

SECTION 02563 SANITARY SEWER FORCE MAINS SECTION 02563 SANITARY SEWER FORCE MAINS 1.0 GENERAL A. Description Sanitary sewer force main installation shall include, but not necessarily be limited to, furnishing and installing pressure rated pipe,

More information

UNIT PRICE LIST ITEM UNIT UNIT PRICE STREETS & DRAINAGE CURB & GUTTER/SIDEWALKS/HANDICAP RAMPS

UNIT PRICE LIST ITEM UNIT UNIT PRICE STREETS & DRAINAGE CURB & GUTTER/SIDEWALKS/HANDICAP RAMPS STREETS & DRAINAGE CURB & GUTTER/SIDEWALKS/HANDICAP RAMPS CG-2/3 LF $12.75 CG-5 LF $15.00 CG-6 LF $18.00 CG-7 EA $3,133.50 CG-7A (STONE) SY $10.00 CG-8 EA $6,500.00 CG-9/10 EA $6,200.00 CG-11 EA $6,900.00

More information

FORM A: BID (See B9) 1. Contract Title SEVEN OAKS POOL PARKING LOT RECONSTRUCTION ADSUM DRIVE

FORM A: BID (See B9) 1. Contract Title SEVEN OAKS POOL PARKING LOT RECONSTRUCTION ADSUM DRIVE Page 1 of 7 Template Version: C320140606 - C LR FORM A: BID (See B9) 1. Contract Title SEVEN OAKS POOL PARKING LOT RECONSTRUCTION - 444 ADSUM DRIVE 2. Bidder Usual Business as it appears on Invoice (if

More information

BID PROPOSAL. a partnership consisting of

BID PROPOSAL. a partnership consisting of BID PROPOSAL PROPOSAL OF, a corporation a partnership consisting of an individual doing business as THE SAN ANTONIO WATER SYSTEM: Pursuant to Instructions and Invitations to Bidders, the undersigned proposes

More information

PRECAST REINFORCED CONCRETE PIPE MANHOLE. Precast reinforced concrete manhole risers and top sections shall conform to ASTM C478.

PRECAST REINFORCED CONCRETE PIPE MANHOLE. Precast reinforced concrete manhole risers and top sections shall conform to ASTM C478. SECTION 1205 MANHOLES AND INLETS 1205-1 DESCRIPTION These items shall consist of the construction or installation of manholes and inlets, in accordance with these specifications, at the specified locations

More information

TWA Construction Review Checklist

TWA Construction Review Checklist TWA Construction Review Checklist General / Miscellaneous Two sets of plans (Forward one set to Gary Basham for Review) Cover sheet with project name, location, vicinity map, Parcel ID, and engineer &

More information

HARRIS COUNTY FlOOD CONTROl DISTRICT UNIT NO. U CHANNEl IMPROVEMENTS TO SERVE HORSEPEN CREEK UNIT BID TABULATION

HARRIS COUNTY FlOOD CONTROl DISTRICT UNIT NO. U CHANNEl IMPROVEMENTS TO SERVE HORSEPEN CREEK UNIT BID TABULATION ENGINEER'S ESTIMATE: $391,537.50 ITEM DESCRIPTION SITE PREPARATION PlAN HARRIS COUNTY FlOOD CONTROl DISTRICT UNIT NO. U1 06-00-00 CHANNEl IMPROVEMENTS LINDSEY CONSTRUCTION, INC. BONTERRE CONSTRUCTION QUANTITY

More information

Standards for Water, Sewer, and Sewage Lift Station Design

Standards for Water, Sewer, and Sewage Lift Station Design Standards for Water, Sewer, and Sewage Lift Station Design February 2015 Edition I. Plan Format Requirements General Requirements Water Line Requirements Sewer Line Requirements II. III. IV. Water Design

More information

Storm Sewer Trenchless Upgrade Alternatives and Recommendations

Storm Sewer Trenchless Upgrade Alternatives and Recommendations Storm Sewer Trenchless Upgrade Alternatives and Recommendations Background Approximately 1,930 feet of the 40-inch and 42-inch CMP storm sewer pipe from manhole M22 to manhole M12 will be evaluated for

More information

Single Family Residential Erosion and Sediment Control Standards

Single Family Residential Erosion and Sediment Control Standards July 2011 Planning and Development Services Single Family Residential Erosion and Sediment Control Standards This booklet contains standard plans and procedures appropriate for typical residential building

More information

Water Treatment Plant

Water Treatment Plant Water Treatment Plant Site Construction Sample Prepared: 5/25/2007 Final Version 1.0 This takeoff has been prepared by Walsh Estimating Service, a division of Maracorp International: Although we have been

More information

Construction Plans- Bond Estimate Calculation Sheet

Construction Plans- Bond Estimate Calculation Sheet Warrenton, VA 201871646 Phone: (540) 3492092 Fax: (540) 3477689 Water Construction 8" Water Main/Appurtenances 1 8" Ductile Iron Pipe (DIP) LF 72.00 2 8" Gate Valve 800.00 3 8" Tee 650.00 4 8" Cross 650.00

More information

CITY OF NEWTON, KANSAS DESIGN STANDARDS FOR SANITARY SEWER IMPROVEMENTS

CITY OF NEWTON, KANSAS DESIGN STANDARDS FOR SANITARY SEWER IMPROVEMENTS CITY OF NEWTON, KANSAS DESIGN STANDARDS FOR SANITARY SEWER IMPROVEMENTS APRIL 2005 THE CITY OF NEWTON, KANSAS STANDARD ENGINEERING DESIGN CRITERIA AND GENERAL IMPROVEMENT POLICY TABLE OF CONTENTS Page

More information

CITY UTILITIES DESIGN STANDARDS MANUAL

CITY UTILITIES DESIGN STANDARDS MANUAL CITY UTILITIES DESIGN STANDARDS MANUAL (SA) Chapter 8 June 2013 SA8.01 Purpose This chapter establishes the minimum standards and technical design criteria for all City of Fort Wayne sanitary lift stations

More information

SANITARY SEWER SPECIFICATIONS

SANITARY SEWER SPECIFICATIONS SANITARY SEWER SPECIFICATIONS OCTOBER 2003 HARVEST-MONROVIA WATER, SEWER, AND FIRE PROTECTION AUTHORITY SECTION 1.00 1.10 Purpose The purpose of this document is to assemble the sewer specifications, policies,

More information

SECTION 12 EXCAVATIONS

SECTION 12 EXCAVATIONS 12.01 DEFINITIONS SECTION 12 EXCAVATIONS Backfill Material which covers and surrounds the pipe and extends from the pipe bedding to the top of the trench, inclusive of initial backfill, select backfill

More information

Installation Instructions for Underground Kleerwater Oil Water Separators October, 2007

Installation Instructions for Underground Kleerwater Oil Water Separators October, 2007 Installation Instructions for Underground Kleerwater Oil Water Separators October, 2007 Notice: - Kleerwater underground oil water separators shall be installed by personnel who have the proper knowledge

More information

Unit Price Averages Reports

Unit Price Averages Reports Unit Price Averages Reports 12/7/2015 UNIT PRICE AVERAGES REPORT Disclaimer The information provided in the following Unit Price Averages Report is only for the use of Alberta Infrastructure & Transportation

More information

Section 402. STORM SEWERS

Section 402. STORM SEWERS 402.02 Section 402. STORM SEWERS 402.01. Description. This work consists of constructing storm sewers of the size and class required, including excavation, bedding, and backfill. 402.02. Materials. Provide

More information

SANITARY SEWER MANHOLE CONSTRUCTION 2.2 PORTLAND CEMENT AND PORTLAND CEMENT CONCRETE (PCC):

SANITARY SEWER MANHOLE CONSTRUCTION 2.2 PORTLAND CEMENT AND PORTLAND CEMENT CONCRETE (PCC): PART 1 GENERAL 1.1 SCOPE: A. This item includes the work necessary for the construction and installation of sanitary sewer manholes. B. The Contractor may, at his option, use cast-in-place type manholes,

More information

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE 6.01 SCOPE The work covered by this section of the specifications consists of the furnishing of all plant, labor, materials, equipment and supervision and performing all operations involved in the construction

More information

SCHIRMER CONSTRUCTION INDEPENDENCE EXCAVATING, INC. NORTH RETAINING WALL SUBTOTAL $82, $74, $85, $102, $120,399.

SCHIRMER CONSTRUCTION INDEPENDENCE EXCAVATING, INC. NORTH RETAINING WALL SUBTOTAL $82, $74, $85, $102, $120,399. CITY OF BRECKSVILLE BID TABULATION WIESE ROAD RETAINING WALL & STORM SEWER IMPROVEMENTS BID OPENING: MARCH 21, 2012 PROJECT NO. 3810 149 SUBURBAN MAINTENANCE & CONSTRUCTION MAROUS BROTHERS CONSTRUCTION

More information

SECTION 4 EXCAVATION, TRENCHING AND BACKFILLING 4.01 SCOPE OF WORK

SECTION 4 EXCAVATION, TRENCHING AND BACKFILLING 4.01 SCOPE OF WORK 4.01 SCOPE OF WORK The work covered by this section shall consist of furnishing all materials, equipment and labor for the excavating, trenching, backfilling, and bore and jack required to install or repair

More information

SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors.

SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors. SUBDRAINS AND FOOTING DRAIN COLLECTORS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Subdrains B. Subdrain Cleanouts and Outlets C. Footing Drain Collectors D. Storm Sewer Service and Connections 1.02 DESCRIPTION

More information

SECTION UTILITY HORIZONTAL DIRECTIONAL DRILLING

SECTION UTILITY HORIZONTAL DIRECTIONAL DRILLING SECTION 33 05 24 UTILITY HORIZONTAL DIRECTIONAL DRILLING PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Excavation and backfill for approach trenches and pits. 2. Horizontal directional drilling. 3.

More information

SANITARY SEWER SYSTEMS

SANITARY SEWER SYSTEMS SANITARY SEWER SYSTEMS I. Sanitary sewer size and slope design. A. Minimum size is 8 inch. B. Minimum flow velocity is 2 feet per second, 2 fps. C. Maximum flow velocity shall be 11 fps. D. Larger lines

More information

3. Amend the following: Item 410 Traffic Compacted Surface, Type C to Item 446 Cold Patch.

3. Amend the following: Item 410 Traffic Compacted Surface, Type C to Item 446 Cold Patch. To Prospective Bidders: CITY OF TOLEDO, OHIO PARKSIDE AREA SSO ELIMINATION PHASE 2 GRAVITY RELIEF SEWER NO. 2011 Addendum No. 2 December 8, 2011 Information disclosed and/or questions raised since issuing

More information

Los Angeles County Department Of Public Works. Land Development Division. Bond Calculation Sheets

Los Angeles County Department Of Public Works. Land Development Division. Bond Calculation Sheets Los Angeles County Department Of Public Works Land Development Division Bond Calculation Sheets Effective July 1, 2015 COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS LAND DEVELOPMENT DIVISION ROADS COST

More information

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth TABLE OF CONTENTS NO. MP-1 MP-2 MP-3 MP-4 MP-4.01 MP-4.02 MP-4.03 MP-5 MP-5.01 MP-5.02 MP-5.03 MP-5.04 MP-5.05 MP-5.06 MP-5.07 MP-5.08 MP-5.11 MP-5.12 MP-5.13 MP-5.14 MP-5.15 MP-5.16 MP-5.18 MP-5.19 MP-5.20

More information

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions. SECTION LS 2530 SANITARY SEWERS PART 1 GENERAL 1.1 SUBMITTALS A. General: Submit the following in accordance with The General Conditions. 1. Product data for drainage piping specialties. 2. Shop drawings

More information

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES 33 00 00 SITE UTILITIES

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES 33 00 00 SITE UTILITIES SECTION INCLUDES Domestic Water Fire Water Service Water Well Sanitary Sewer Storm Drains Foundation Drainage RELATED SECTIONS 03 30 00 Concrete 21 00 00 Fire Suppression - Sprinklers 22 00 00 Plumbing

More information

STANDARD SPECIFICATIONS SECTION SLOPE AND WATERCOURSE PROTECTION

STANDARD SPECIFICATIONS SECTION SLOPE AND WATERCOURSE PROTECTION STANDARD SPECIFICATIONS SECTION 237 SLOPE AND WATERCOURSE PROTECTION PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for protection of slopes, ditches, and channels to configurations and

More information

DEPARTMENT OF ENVIRONMENTAL PROTECTION Bureau of Environmental Cleanup and Brownfields. Storage Tank Modification and Maintenance Issues

DEPARTMENT OF ENVIRONMENTAL PROTECTION Bureau of Environmental Cleanup and Brownfields. Storage Tank Modification and Maintenance Issues DEPARTMENT OF ENVIRONMENTAL PROTECTION Bureau of Environmental Cleanup and Brownfields DOCUMENT NUMBER: 263-0900-011 TITLE: Storage Tank Modification and Maintenance Issues EFFECTIVE DATE: March 29, 2014

More information

CHAPTER 11 STORM DRAINAGE

CHAPTER 11 STORM DRAINAGE CHAPTER STORM DRAINAGE SECTION GENERAL. Scope. The provisions of this chapter shall govern the materials, design, construction and installation of storm drainage..2 Where required. All roofs, paved areas,

More information

SECTION 33 11 00.15 DUCTILE IRON PIPE AND FITTINGS

SECTION 33 11 00.15 DUCTILE IRON PIPE AND FITTINGS SECTION 33 11 00.15 DUCTILE IRON PIPE AND FITTINGS PART 1: GENERAL 1.01 COORDINATION OF WORK Connection to existing pipelines may require shutdown of AW facilities. Closely coordinate construction work

More information

The Montana Public Works Standard Specifications are modified as follows:

The Montana Public Works Standard Specifications are modified as follows: The Montana Public Works Standard Specifications are modified as follows: 1. SECTION 02221 - TRENCH EXCAVATION AND BACKFILL FOR PIPELINES AND APPURTENANT STRUCTURES 02. STANDARD DRAWINGS Standard Drawing

More information

ARTICLE II (2) ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH 020001 Purpose and Application.

ARTICLE II (2) ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH 020001 Purpose and Application. ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH 020001 Purpose and Application. Article II provides rules governing the allowable connection to the City POTW and the construction and inspection of

More information

Wastewater Collection System Supplemental Design Standards for Capital Improvement Program Projects

Wastewater Collection System Supplemental Design Standards for Capital Improvement Program Projects Wastewater Collection System Supplemental Design Standards for Capital Improvement Program Projects March 2013 i Metropolitan Sewer District of Greater Cincinnati Wastewater Collection System Supplemental

More information

Demo Existing Curb Demo Existing Asphalt Roadway Demo Asphalt Saw Cutting Protection Fence - 4 Snow Fence with T posts

Demo Existing Curb Demo Existing Asphalt Roadway Demo Asphalt Saw Cutting Protection Fence - 4 Snow Fence with T posts SECTION 00300 BID FORM S For additions and deletions to the Contract, the following unit prices shall be applicable for the specific items listed. Unit Prices shall be complete, in place including required

More information

C. Trenching, Backfilling, and Compacting: STD SPEC H. Polyethylene Sheet or Tube Encasement: STD SPEC

C. Trenching, Backfilling, and Compacting: STD SPEC H. Polyethylene Sheet or Tube Encasement: STD SPEC STANDARD SPECIFICATION SECTION 15090 BLOW-OFF ASSEMBLIES PART 1 - GENERAL 1.01 DESCRIPTION This section includes materials, installation, and testing of blow-off assemblies. Unless otherwise noted on the

More information

Village of Broadview Flood Control Assistance Program

Village of Broadview Flood Control Assistance Program Village of Broadview Flood Control Assistance Program Village of Broadview 2350 S. 25 th Avenue, Broadview, IL 60155 INTRODUCTION The Village of Broadview is served by combined sewers which carry sewage

More information

City of Shelbyville Site Inspection Checklist

City of Shelbyville Site Inspection Checklist City of Shelbyville Site Inspection Checklist General Information Project Name: KYR10 Permit Number: Date: Project Location: Contractor: Conractor Representative: Inspector's Name: Title: Signature : Weather

More information

Installation of Private Swimming Pools, Hot Tubs, and Spas

Installation of Private Swimming Pools, Hot Tubs, and Spas Installation of Private Swimming Pools, Hot Tubs, and Spas CITY OF NEWARK, CALIFORNIA BUILDING INSPECTION DIVISION 37101 Newark Boulevard, Newark, CA 94560-3796 510-578-4261 Fax 510-578-4307 e-mail: building.inspection@newark.org

More information

Packaged Pump Stations

Packaged Pump Stations Packaged Pump Stations Pump Station Advantage Envirotech over many years have recognised the problems associated with the disposal of sewerage, effl uent, tradewaste and stormwater. Envirotech have been

More information

All referenced material contained in this design guide is taken from Title VII of the City of Lake Ozark Municipal Code (Utilities)

All referenced material contained in this design guide is taken from Title VII of the City of Lake Ozark Municipal Code (Utilities) GENERAL: The City of Lake Ozark operates a sewage collection system and treatment system in accordance with the Missouri Department of Natural Resource (MDNR) regulations. The system is comprised of pressure

More information

REEDY CREEK IMPROVEMENT DISTRICT. DESIGN CRITERIA for WATER, RECLAIMED WATER, & SEWER FACILITIES

REEDY CREEK IMPROVEMENT DISTRICT. DESIGN CRITERIA for WATER, RECLAIMED WATER, & SEWER FACILITIES REEDY CREEK IMPROVEMENT DISTRICT DESIGN CRITERIA for WATER, RECLAIMED WATER, & SEWER FACILITIES A. General 1. Reclaimed water, sanitary sewer, and sanitary force mains shall be designed to avoid crossing

More information

22) The interior of 750 ft of 24 in. pipe is uniformly coated with 1.5 inches of

22) The interior of 750 ft of 24 in. pipe is uniformly coated with 1.5 inches of 22) The interior of 750 ft of 24 in. pipe is uniformly coated with 1.5 inches of grease. How many gallons will this pipe hold when filled with water? Formula(s) needed: 1ft 3 = 7.48 gal., Area = D 2 x.785

More information

Standard Operating Procedures

Standard Operating Procedures Standard Operating Procedures Sanitary Sewer Collection Department 2/15/2016 Winchester Utilities Table of Contents Sewer Service Line Inspection... 2 Grinder Pump Sewer Service Line... 3 Typical Gravity

More information

MS-6/2009 Model Specification and Checklist for Polyethylene (PE) Pipe for the Sliplining of Sewers

MS-6/2009 Model Specification and Checklist for Polyethylene (PE) Pipe for the Sliplining of Sewers MS-6/2009 Model Specification and Checklist for Polyethylene (PE) Pipe for the Sliplining of Sewers The Plastics Pipe Institute March 2009 1 DISCLAIMER This guideline has been prepared by the Plastics

More information

SECTION 3 - DESIGN STANDARDS FOR SEWAGE PUMPING STATIONS AND FORCE MAINS

SECTION 3 - DESIGN STANDARDS FOR SEWAGE PUMPING STATIONS AND FORCE MAINS SECTION 3 - DESIGN STANDARDS FOR SEWAGE PUMPING STATIONS AND FORCE MAINS 3.1 GENERAL REQUIREMENTS 3.1.1 The design of sewage pumping stations and force mains is an engineering matter and is not subject

More information

LANDSCAPE RETAINING WALLS

LANDSCAPE RETAINING WALLS LANDSCAPE RETAINING WALLS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Modular Block Retaining Walls B. Limestone Retaining Walls C. Landscape Timber Retaining Walls 1.02 DESCRIPTION OF WORK A. Construction

More information

DETAILED SPECIFICATIONS FLOWMETER FACILITY

DETAILED SPECIFICATIONS FLOWMETER FACILITY DETAILED SPECIFICATIONS FLOWMETER FACILITY INDEX FLOWMETER FACILITY - 1 Paragraph - Number 2-17-1 General 2-17-2 Operation & Maintenance Manuals 2-17-3 Start-Up Service 2-17-4 Field Test 2-17-5 Spare Parts

More information

CITY OF SAN MARCOS ENGINEERING DIVISION

CITY OF SAN MARCOS ENGINEERING DIVISION AN APPLICANT S GUIDE TO PROCEDURES FOR: CITY OF SAN MARCOS ENGINEERING DIVISION 1 Civic Center Dr., San Marcos, CA 92069-2918 (760) 744-1050 FAX (760) 591-4135 UNIT PRICES FOR BOND PURPOSES (REVISED NOVEMBER

More information

PennBid 7-Jan-13 Solicitation: Centre Region Parks & Recreation SITE GENERAL - Oak Hall Regional Park Phase I Rebid

PennBid 7-Jan-13 Solicitation: Centre Region Parks & Recreation SITE GENERAL - Oak Hall Regional Park Phase I Rebid PennBid 7-Jan-13 Solicitation: Centre Region Parks & Recreation SITE GENERAL - Oak Hall Regional Park Phase I Rebid Leonard S. Fiore, Inc. HRI, INC. Woodstone Western Region Earth Const., Inc Tedesco Construction

More information

Specifications for Residential Property Owners Connection to New Public Sewer

Specifications for Residential Property Owners Connection to New Public Sewer Specifications for Residential Property Owners Connection to New Public Sewer Spalding Tract property owners are required to connect to the community sewer system when construction is complete and the

More information

UNIT PRICE LIST January 2009

UNIT PRICE LIST January 2009 UNIT PRICE LIST January 2009 1 INTRODUCTION The purpose of the Unit Price List is to provide a resource for the preparation of cost estimates for subdivisions and permit projects and should be used only

More information

PIPE AND TUBES FOR PLUMBING PIPING AND EQUIPMENT

PIPE AND TUBES FOR PLUMBING PIPING AND EQUIPMENT PIPE AND TUBES FOR PLUMBING PIPING AND EQUIPMENT GENERAL INFORMATION 1.1 This section applies to piping systems for domestic hot and cold water, sanitary waste, indirect waste, storm water, natural gas,

More information

Beacon Hill Sewer District Standard Specifications

Beacon Hill Sewer District Standard Specifications Beacon Hill Sewer District Standard Specifications Residential Gravity Side Sewer Including Design Criteria and Standard Construction Drawings Residential Gravity Side Sewer Design Criteria 1. Provisions

More information

SECTION 2200 WATER SERVICES

SECTION 2200 WATER SERVICES SECTION 2200 WATER SERVICES WATER SERVICES PART 1 GENERAL 1.01 Section Summary A. This Section includes the construction of water main services including the corporation stop, service pipe, curb stop and

More information

Fyke Road Lift Station Reconstruction

Fyke Road Lift Station Reconstruction City of Carrollton Fyke Road Lift Station Reconstruction American Public Works Association Texas Chapter Public Works Project of the Year Nomination 1 May 2012 Executive Summary The Fyke Road Lift Station

More information

CHAPTER 11 STORM DRAINAGE

CHAPTER 11 STORM DRAINAGE CHAPTER 11 STORM DRAINAGE SECTION 11 GENERAL 11.1 Scope. The provisions of this chapter shall govern the materials, design, construction and installation of storm drainage. 11.2 Where required. All roofs,

More information

CONSTRUCTION SPECIFICATION WIRE MESH GABIONS AND MATTRESSES, 9 GAUGE

CONSTRUCTION SPECIFICATION WIRE MESH GABIONS AND MATTRESSES, 9 GAUGE CONSTRUCTION SPECIFICATION WIRE MESH GABIONS AND MATTRESSES, 9 GAUGE 1. SCOPE The work shall consist of furnishing; assembling and installing rock filled wire mesh gabion baskets and mattresses. 2. TYPES

More information

Wastewater Collection Practice Test #3 Page 1 of 15

Wastewater Collection Practice Test #3 Page 1 of 15 Wastewater Collection Practice Test #3 Page 1 of 15 1) A 54 in. storm sewer flowing half full, at a velocity of 1.35 Ft./sec., will discharge how much flow into a creek in MGD? 13.85 MGD 10.73 MGD 1.85

More information

SEWER BACK UP PREVENTION PILOT PROGRAM

SEWER BACK UP PREVENTION PILOT PROGRAM SEWER BACK UP PREVENTION PILOT PROGRAM FINANCIAL ASSISTANCE FOR HOMEOWNERS Village of South Holland 16240 Wausau Avenue South Holland, IL 60473 www.southholland.org Table ofcontents Page What is the Program?

More information

San Antonio Water System Material Standard Specifications

San Antonio Water System Material Standard Specifications 853-01 San Antonio Water System Material Standard Specifications 853.1 DESCRIPTION: This item shall govern the construction of FRP sanitary sewer complete in place and the material therein, including manhole

More information

SECTION SUBMERSIBLE PUMP LIFT STATION

SECTION SUBMERSIBLE PUMP LIFT STATION SECTION 11306 SUBMERSIBLE PUMP LIFT STATION PART 1 - GENERAL 1.1 SCOPE A. This section of the specifications covers the rehabilitation of the lift station complete with wet well, valve pad, valves and

More information

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Civil. Utility Tunnels and Trenches. Basis of Design

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Civil. Utility Tunnels and Trenches. Basis of Design Basis of Design This section applies to reinforced concrete utility tunnels and trenches. Background Utility Tunnel is a utilidor for mechanical and electrical services, installed by drilling and/or tunneling.

More information

Halgan Pty Ltd General Purpose Pit

Halgan Pty Ltd General Purpose Pit 1.1 Introduction 2 1.2 Description 2 2.0 Detail Design & Installation Requirements 2 2.1 General 2 2.1.1 Location 2 2.1.2 Surcharge Relief Point 2 2.1.3 Sampling Points 2 2.1.4 Piping Material 2 2.1.5

More information

SECTION 603 SANITARY SEWER FORCE MAINS

SECTION 603 SANITARY SEWER FORCE MAINS SECTION 603 SANITARY SEWER FORCE MAINS 1. GENERAL Pipelines for sanitary sewer force main systems shall conform to the following specifications and shall be installed at the locations indicated on the

More information

Charlottetown - Water & Sewer Utility Minimum Standard of Acceptability for Water, Sewer & Sprinkler Connections

Charlottetown - Water & Sewer Utility Minimum Standard of Acceptability for Water, Sewer & Sprinkler Connections Charlottetown - Water & Sewer Utility Minimum Standard of Acceptability for Water, Sewer & Sprinkler Connections At the time of application for water, sewer and/or sprinkler service the applicant shall

More information

SECTION 3 - DESIGN STANDARDS FOR SEWAGE PUMPING STATIONS AND FORCE MAINS

SECTION 3 - DESIGN STANDARDS FOR SEWAGE PUMPING STATIONS AND FORCE MAINS SECTION 3 - DESIGN STANDARDS FOR SEWAGE PUMPING STATIONS AND FORCE MAINS 3.1 General Requirements 3.1.01 The design of sewage pumping stations and force mains is an engineering matter and is not subject

More information

SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT

SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT The following are minimum requirements for installation of conventional trench sewage disposal systems in St. Mary s County,

More information

Section JACK AND BORE. This specification provides the requirements for using the jack-bore for the project.

Section JACK AND BORE. This specification provides the requirements for using the jack-bore for the project. CCU STANDARD SPECIFICATIONS Section 002445 JACK AND BORE Effective Date: Nov. 1st, 2011 Page 1 of 6 PART 1 - GENERAL 1.1 SCOPE It is the intent of this specification to provide the requirements for any

More information

Storm Drain Inlet Protection - IP

Storm Drain Inlet Protection - IP Storm Drain Inlet Protection - IP DEFINITION A temporary protective device formed around a storm drain drop inlet to trap sediment. PURPOSE To prevent sediment from entering storm drainage systems, prior

More information

SECTION 4 SANITARY SEWER SYSTEMS

SECTION 4 SANITARY SEWER SYSTEMS SECTION 4 SANITARY SEWER SYSTEMS 4.1 General Requirements. Sanitary sewer systems shall be designed, constmcted, and tested in accordance with the current editions of the Montana Department of Environmental

More information