1 Vancleave High School Lift Station Vancleave, MS CONTRACTOR'S BID TABULATION BIDS RECEIVED December 9, 2014 Greater Gulf Development, LLC Graham Construction Hudson Contractors, Inc. CERTIFICATE OF RESPONSIBILITY MC MC MC BID BOND / ADDENDA Yes /Yes Yes /Yes Yes /Yes BASE BID ITEM NO. DESCRIPTION QTY UNIT UNIT PRICE EXTENSION UNIT PRICE EXTENSION UNIT PRICE EXTENSION 101 Mobilization 1 LS $ 5, $5, $25, $25, $18, $18, Removal of Pipe (4" 18" in Diameter) 300 LF $ $3, $5.00 $1, $2.50 $ Removal of Obstructions 30 CY $ $ $ $4, $15.00 $ Water Service Repair (4" Water Lines and Smaller) 3 EA $ $ $ $1, $ $ Excess Excavation 50 CY $ $ $15.00 $ $10.00 $ Borrow Excavation (AH) (FM) (Class B3) 100 CY $ $1, $15.00 $1, $12.00 $1, Select Bedding 10 CY $ $ $50.00 $ $30.00 $ Grassing 2200 SY $ 0.50 $1, $3.00 $6, $1.50 $3, Silt Fencing 750 LF $ 3.00 $2, $5.00 $3, $2.00 $1, Lift Station 1 EA $ 155, $155, $130, $130, $176, $176, ' Dia. Precast Concrete Manhole 2 EA $ 2, $4, $3, $6, $4, $8, % Epoxy Liner 15 LF $ $3, $ $3, $ $4, " PVC Sewer Force Main 1585 LF $ 5.50 $8, $12.00 $19, $8.00 $12, " PVC SDR 26 Sanitary Sewer Main 369 LF $ $11, $35.00 $12, $40.00 $14, Total Base Bid $197, $218, $242, A1 101 Mobilization 1 LS $5, $5, $2, $2, $3, $3, A1 102 Removal of Pipe (4" 18" in Diameter) 150 LF $10.00 $1, $5.00 $ $2.50 $ A1 103 Removal of Ginder / Lift Station 2 EA $4, $9, $1, $2, $3, $6, A1 104 Removal of Obstructions 30 CY $10.00 $ $ $4, $15.00 $ A1 105 Removal of Pavement 90 SY $18.00 $1, $6.00 $ $6.00 $ A1 106 Saw Cutting of Pavement 150 LF $5.00 $ $5.00 $ $9.00 $1, A1 107 Water Service Repair (4" Water Lines and Smaller) 3 EA $ $ $ $1, $ $ A Excess Excavation 20 CY $20.00 $ $15.00 $ $10.00 $ A1 109 Borrow Excavation (AH) (FM) (Class B3) 100 CY $10.50 $1, $15.00 $1, $12.00 $1, A1 110 Select Bedding 5 CY $35.00 $ $50.00 $ $30.00 $ A1 111 Grassing 600 SY $0.50 $ $3.00 $1, $1.50 $ A1 112 "610" Limestone (FM) 15 CY $65.10 $ $50.00 $ $50.00 $ A1 113 Hot Bitumous Pavement, Binder Course (Type BC 1) (2" Thick) 90 SY $15.00 $1, $25.00 $2, $22.00 $1,980.00

2 A " PVC SDR 26 Sanitary Sewer Main 295 LF $30.00 $8, $35.00 $10, $40.00 $11, Bid Alternate No.1 $51, $54, $60, A2 101 Mobilization 1 LS $ 5, $5, $ 2, $2, $ 3, $3, A2 102 Removal of Pipe (4" 18" in Diameter) 100 LF $ $1, $ 5.00 $ $ 2.50 $ A2 103 Removal of Ginder / Lift Station 2 EA $ 4, $9, $ 1, $2, $ 2, $4, A2 104 Removal of Obstructions 30 CY $ $ $ $4, $ $ A2 105 Removal of Pavement 220 SY $ $3, $ 6.00 $1, $ 6.00 $1, A2 106 Saw Cutting of Pavement 300 LF $ 5.00 $1, $ 5.00 $1, $ 9.00 $2, A2 107 Water Service Repair (4" Water Lines and Smaller) 3 EA $ $ $ $1, $ $ A2 108 Excess Excavation 20 CY $ $ $ $ $ $ A2 109 Borrow Excavation (AH) (FM) (Class B3) 100 CY $ $1, $ $1, $ $1, A2 110 Select Bedding 10 CY $ $ $ $ $ $ A2 111 Grassing 1200 SY $ 0.50 $ $ 3.00 $3, $ 1.50 $1, A2 112 "610" Limestone (FM) 40 CY $ $2, $ $2, $ $2, A2 113 Hot Bitumous Pavement, Binder Course (Type BC 1) (2" Thick) 220 SY $ $3, $ $5, $ $4, A2 114 Hot Bitumous Pavement, Binder Course (Type SC 1) (4" Thick) 220 SY $ $4, $ $11, $ $9, A2 115 Plain Cement Concrete Pavement (6" Thick) 20 SY $ $ $ $1, $ $1, A ' Diameter Precast Concrete Manhole 4 EA $ 2, $8, $ 3, $12, $ 3, $12, A " PVC SDR 26 Sanitary Sewer Main 1073 LF $ $30, $ $26, $ $38, Bid Alternate No. 2 $73, $77, $85, A3 101 Mobilization 1 LS $ 5, $5, $ 2, $2, $ 3, $3, A3 102 Removal of Pipe (4" 18" in Diameter) 100 LF $ $1, $ 2.00 $ $ 2.50 $ A3 103 Removal of Ginder / Lift Station 1 EA $ 4, $4, $ 1, $1, $ 3, $3, A3 104 Removal of Obstructions 30 CY $ $ $ $4, $ $ A3 105 Removal of Pavement 35 SY $ $ $ 6.00 $ $ 6.00 $ A3 106 Saw Cutting of Pavement 60 LF $ 5.00 $ $ 5.00 $ $ 9.00 $ A3 107 Water Service Repair (4" Water Lines and Smaller) 3 EA $ $ $ $1, $ $ A3 108 Excess Excavation 20 CY $ $ $ $ $ $ A3 109 Borrow Excavation (AH) (FM) (Class B3) 100 CY $ $1, $ $1, $ $1, A3 110 Select Bedding 10 CY $ $ $ $ $ $ A3 111 Grassing 1000 SY $ 0.50 $ $ 3.00 $3, $ 1.50 $1, A3 112 "610" Limestone (FM) 6 CY $ $ $ $ $ $ A3 113 Hot Bitumous Pavement, Binder Course (Type BC 1) (2" Thick) 35 SY $ $ $ $ $ $ A3 114 Hot Bitumous Pavement, Binder Course (Type SC 1) (4" Thick) 35 SY $ $ $ $1, $ $1, A3 115 Plain Cement Concrete Pavement (6" Thick) 20 SY $ $ $ $1, $ $1, A ' Diameter Precast Concrete Manhole 3 EA $ 2, $6, $ 3, $9, $ 3, $10, A " PVC SDR 26 Sanitary Sewer Main 938 LF $ $28, $ $32, $ $37, Bid Alternate No. 3 $51, $61, $101,298.00

3 Vancleave High School Lift Station Vancleave, MS CONTRACTOR'S BID TABULATION BIDS RECEIVED December 9, 2014 Gulf Breeze Landscaping, LLC Plaas Inc. C. B. Developers, Inc. CERTIFICATE OF RESPONSIBILITY MC MC AL BID BOND / ADDENDA Yes /Yes Yes /Yes Yes /Yes BASE BID ITEM NO. DESCRIPTION QTY UNIT UNIT PRICE EXTENSION UNIT PRICE EXTENSION UNIT PRICE EXTENSION 101 Mobilization 1 LS $ 19, $19, $20, $20, $51, $51, Removal of Pipe (4" 18" in Diameter) 300 LF $ $3, $70.00 $21, $6.00 $1, Removal of Obstructions 30 CY $ $ $65.00 $1, $23.00 $ Water Service Repair (4" Water Lines and Smaller) 3 EA $ 1, $3, $1, $4, $1, $3, Excess Excavation 50 CY $ $ $85.00 $4, $26.00 $1, Borrow Excavation (AH) (FM) (Class B3) 100 CY $ $2, $22.30 $2, $20.00 $2, Select Bedding 10 CY $ $ $75.00 $ $65.00 $ Grassing 2200 SY $ 0.75 $1, $3.25 $7, $1.00 $2, Silt Fencing 750 LF $ 4.00 $3, $4.50 $3, $3.00 $2, Lift Station 1 EA $ 203, $203, $143, $143, $239, $239, ' Dia. Precast Concrete Manhole 2 EA $ 4, $8, $9, $19, $4, $8, % Epoxy Liner 15 LF $ $4, $0.00 $0.00 $ $3, " PVC Sewer Force Main 1585 LF $ $20, $11.00 $17, $7.00 $11, " PVC SDR 26 Sanitary Sewer Main 369 LF $ $13, $ $45, $37.00 $13, Total Base Bid $283, $291, $342, A1 101 Mobilization 1 LS $2, $2, $10, $10, $2, $2, A1 102 Removal of Pipe (4" 18" in Diameter) 150 LF $10.00 $1, $70.00 $10, $12.00 $1, A1 103 Removal of Ginder / Lift Station 2 EA $1, $2, $4, $8, $5, $10, A1 104 Removal of Obstructions 30 CY $30.00 $ $65.00 $1, $23.00 $ A1 105 Removal of Pavement 90 SY $10.00 $ $45.00 $4, $12.00 $1, A1 106 Saw Cutting of Pavement 150 LF $7.00 $1, $3.18 $ $8.00 $1, A1 107 Water Service Repair (4" Water Lines and Smaller) 3 EA $1, $3, $1, $4, $1, $3, A Excess Excavation 20 CY $15.00 $ $85.00 $1, $23.00 $ A1 109 Borrow Excavation (AH) (FM) (Class B3) 100 CY $25.00 $2, $22.30 $2, $20.00 $2, A1 110 Select Bedding 5 CY $75.00 $ $75.00 $ $65.00 $ A1 111 Grassing 600 SY $0.75 $ $3.25 $1, $3.00 $1, A1 112 "610" Limestone (FM) 15 CY $ $1, $ $2, $70.00 $1, A1 113 Hot Bitumous Pavement, Binder Course (Type BC 1) (2" Thick) 90 SY $33.34 $3, $28.56 $2, $53.00 $4,770.00

4 A " PVC SDR 26 Sanitary Sewer Main 295 LF $35.00 $10, $ $33, $41.00 $12, Bid Alternate No.1 $58, $151, $75, A2 101 Mobilization 1 LS $ 4, $4, $ 12, $12, $ 2, $2, A2 102 Removal of Pipe (4" 18" in Diameter) 100 LF $ $1, $ $7, $ $1, A2 103 Removal of Ginder / Lift Station 2 EA $ 1, $2, $ 4, $8, $ 5, $10, A2 104 Removal of Obstructions 30 CY $ $ $ $1, $ $ A2 105 Removal of Pavement 220 SY $ $2, $ $9, $ $2, A2 106 Saw Cutting of Pavement 300 LF $ 7.00 $2, $ 3.18 $ $ 8.00 $2, A2 107 Water Service Repair (4" Water Lines and Smaller) 3 EA $ 1, $3, $ 1, $4, $ 1, $3, A2 108 Excess Excavation 20 CY $ $ $ $1, $ $ A2 109 Borrow Excavation (AH) (FM) (Class B3) 100 CY $ $2, $ $2, $ $2, A2 110 Select Bedding 10 CY $ $ $ $ $ $ A2 111 Grassing 1200 SY $ 0.75 $ $ 3.25 $3, $ 3.00 $3, A2 112 "610" Limestone (FM) 40 CY $ $3, $ $6, $ $2, A2 113 Hot Bitumous Pavement, Binder Course (Type BC 1) (2" Thick) 220 SY $ $7, $ $6, $ $11, A2 114 Hot Bitumous Pavement, Binder Course (Type SC 1) (4" Thick) 220 SY $ $12, $ $6, $ $11, A2 115 Plain Cement Concrete Pavement (6" Thick) 20 SY $ $1, $ $6, $ $1, A ' Diameter Precast Concrete Manhole 4 EA $ 3, $12, $ 8, $33, $ 3, $12, A " PVC SDR 26 Sanitary Sewer Main 1073 LF $ $33, $ $84, $ $36, Bid Alternate No. 2 $89, $197, $107, A3 101 Mobilization 1 LS $ 2, $2, $ 12, $12, $ 2, $2, A3 102 Removal of Pipe (4" 18" in Diameter) 100 LF $ $1, $ $7, $ $1, A3 103 Removal of Ginder / Lift Station 1 EA $ 1, $1, $ 4, $4, $ 5, $5, A3 104 Removal of Obstructions 30 CY $ $ $ $1, $ $ A3 105 Removal of Pavement 35 SY $ $ $ $1, $ $ A3 106 Saw Cutting of Pavement 60 LF $ 7.00 $ $ 3.18 $ $ 8.00 $ A3 107 Water Service Repair (4" Water Lines and Smaller) 3 EA $ 1, $3, $ 1, $4, $ 1, $3, A3 108 Excess Excavation 20 CY $ $ $ $1, $ $ A3 109 Borrow Excavation (AH) (FM) (Class B3) 100 CY $ $2, $ $2, $ $2, A3 110 Select Bedding 10 CY $ $ $ $ $ $650.00

5 A3 111 Grassing 1000 SY $ 0.75 $ $ 3.25 $3, $ 3.00 $3, A3 112 "610" Limestone (FM) 6 CY $ $ $ $ $ $ A3 113 Hot Bitumous Pavement, Binder Course (Type BC 1) (2" Thick) 35 SY $ $1, $ $ $ $1, A3 114 Hot Bitumous Pavement, Binder Course (Type SC 1) (4" Thick) 35 SY $ $1, $ $ $ $1, A3 115 Plain Cement Concrete Pavement (6" Thick) 20 SY $ $1, $ $6, $ $1, A ' Diameter Precast Concrete Manhole 3 EA $ 3, $10, $ 8, $26, $ 3, $10, A " PVC SDR 26 Sanitary Sewer Main 938 LF $ $32, $ $105, $ $38, Bid Alternate No. 3 $61, $180, $74, Note: Highlighted cells are miscalculations The information presented in the bid tabulation above is accurate and complete to the best of my knowledge and understanding of the submitted bids. Bradley P Patano Bradley P. Patano, P.E. 11 Dec 14 Date

SANITARY SEWER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix D

SANITARY SEWER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix D SANITARY SEWER PROJECT COST ESTIMATES & LOCATION MAPS Appendix D RIVERDALE CITY CAPITAL FACILITIES PLAN SANITARY SEWER Engineer's Cost Estimate January 2009 Project Name: Riverdale Road - Rumbi Grill -

More information

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation 644-10-569 Page 1 of 9 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING

More information

Special Specification 7021 Water Main and Sewer Line Replacements

Special Specification 7021 Water Main and Sewer Line Replacements Special Specification 7021 Water Main and Sewer Line Replacements 1. DESCRIPTION Furnish, install, or replace water pipe, water valves, water meters and boxes, water service connections, fire hydrant assemblies,

More information

FY08 SEWER POINT REPAIRS BID TABULATION

FY08 SEWER POINT REPAIRS BID TABULATION 6-07-831 Page 1 of 12 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING "

More information

Storm Sewer Trenchless Upgrade Alternatives and Recommendations

Storm Sewer Trenchless Upgrade Alternatives and Recommendations Storm Sewer Trenchless Upgrade Alternatives and Recommendations Background Approximately 1,930 feet of the 40-inch and 42-inch CMP storm sewer pipe from manhole M22 to manhole M12 will be evaluated for

More information

CITY OF COOS BAY CITY COUNCIL Agenda Staff Report

CITY OF COOS BAY CITY COUNCIL Agenda Staff Report CITY OF COOS BAY CITY COUNCIL Agenda Staff Report MEETING DATE August 4, 2015 AGENDA ITEM NUMBER TO: Mayor Shoji and City Councilors FROM: Aaron Real, Engineering Technician THROUGH: Jim Hossley, Public

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS

San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS 854.1 DESCRIPTION: This item shall govern sanitary sewer laterals installed in accordance with these

More information

LS 2540 SEWER LATERALS AND INSPECTION TEES

LS 2540 SEWER LATERALS AND INSPECTION TEES LS 2540 SEWER LATERALS AND INSPECTION TEES A. Summary B. Submittals C. Site Information D. Sewer Pipe and Fittings E. Lateral Locations F. Lateral Installation G. Inspection Tee Installation H. Removal

More information

3. Amend the following: Item 410 Traffic Compacted Surface, Type C to Item 446 Cold Patch.

3. Amend the following: Item 410 Traffic Compacted Surface, Type C to Item 446 Cold Patch. To Prospective Bidders: CITY OF TOLEDO, OHIO PARKSIDE AREA SSO ELIMINATION PHASE 2 GRAVITY RELIEF SEWER NO. 2011 Addendum No. 2 December 8, 2011 Information disclosed and/or questions raised since issuing

More information

City of Balch Springs, Texas. Request for Proposal (RFP 2016-2-15) Pipe Bursting Sewer Line Replacement

City of Balch Springs, Texas. Request for Proposal (RFP 2016-2-15) Pipe Bursting Sewer Line Replacement City of Balch Springs, Texas Request for Proposal (RFP 2016-2-15) Pipe Bursting Sewer Line Replacement Balch Springs is a city in Dallas County, Texas, United States. It is a suburb of Dallas and part

More information

Item No. Description Estimated Unit Total Unit Total Unit Total Unit Total Quantity Price Amount Price Amount Price Amount Price Amount

Item No. Description Estimated Unit Total Unit Total Unit Total Unit Total Quantity Price Amount Price Amount Price Amount Price Amount Engineer's Estimate DiPaolo Company 4350 DiPaolo Center Glenview, IL 60025 Stark Excavating, Inc. 1805 W. Washington Street Bloomington, IL 61701 Rowe Construction 1523 N. Cottage Avenue Bloomington, IL

More information

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions. SECTION LS 2530 SANITARY SEWERS PART 1 GENERAL 1.1 SUBMITTALS A. General: Submit the following in accordance with The General Conditions. 1. Product data for drainage piping specialties. 2. Shop drawings

More information

Demo Existing Curb Demo Existing Asphalt Roadway Demo Asphalt Saw Cutting Protection Fence - 4 Snow Fence with T posts

Demo Existing Curb Demo Existing Asphalt Roadway Demo Asphalt Saw Cutting Protection Fence - 4 Snow Fence with T posts SECTION 00300 BID FORM S For additions and deletions to the Contract, the following unit prices shall be applicable for the specific items listed. Unit Prices shall be complete, in place including required

More information

ADVERTISEMENT FOR BIDDERS

ADVERTISEMENT FOR BIDDERS ADVERTISEMENT FOR BIDDERS Sealed Bids will be received by the City of Lookout Mountain, Georgia, 1214 Lulu Lake Road, Lookout Mountain, Georgia 30103, Attention: Brad Haven, City Manager until: for the

More information

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth TABLE OF CONTENTS NO. MP-1 MP-2 MP-3 MP-4 MP-4.01 MP-4.02 MP-4.03 MP-5 MP-5.01 MP-5.02 MP-5.03 MP-5.04 MP-5.05 MP-5.06 MP-5.07 MP-5.08 MP-5.11 MP-5.12 MP-5.13 MP-5.14 MP-5.15 MP-5.16 MP-5.18 MP-5.19 MP-5.20

More information

W. REYNOLDS ST. (SR 574) SEWER LINE REPLACEMENT BID NO. 10-91345-003 Addendum 3a

W. REYNOLDS ST. (SR 574) SEWER LINE REPLACEMENT BID NO. 10-91345-003 Addendum 3a PROPOSAL AND BID FORM W. REYNOLDS ST. (SR 574) SEWER LINE REPLACEMENT Pursuant to and in compliance with your Invitation to Bid dated February 9, 2010, the Instructions to Bidders, Special Conditions and

More information

2014 Inlet Rehab Project II Various Locations

2014 Inlet Rehab Project II Various Locations 2014 Inlet Rehab Project II Various Locations in the City of Sioux Falls, South Dakota Bid Request No. 14-1078 Prepared by: Engineering Division 224 West 9 th Street Sioux Falls, SD 57104 TABLE OF CONTENTS

More information

2006-2008 MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS

2006-2008 MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS 2006-2008 MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS GENERAL 10/16/2008 The listed average unit prices are based on the

More information

SECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING

SECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING SECTION 33 41 13 PUBLIC STORM PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm drainage piping, fittings, and accessories at proposed station areas and locations other than under and immediately adjacent

More information

CITY OF EL PASO BID TABULATION FORM

CITY OF EL PASO BID TABULATION FORM CITY OF EL PASO BID TABULATION FORM BID TITLE: Parks Upgrade 2014 BID NO: 2014-394 KAIZEN CONSTRUCTION AG2M, LLC. PRIME IRRIGATION & SERVICE, LLC. LANDSCAPING, INC. BIDDER (1 OF 8) BIDDER (2 OF 8) BIDDER

More information

SPR PE Steel Reinforced Liner

SPR PE Steel Reinforced Liner ENGINEERED SOLUTIONS SPR PE Steel Reinforced Liner Reline Done Right Contech is your single source for rehabilitation of sanitary & storm sewers, culverts and bridges. Contech Engineered Solutions has

More information

STANDARD SPECIFICATIONS SECTION 02701 INSTALLATION OF GRAVITY SEWER PIPELINES. 1. Trenching, Backfilling and Compacting: 02223

STANDARD SPECIFICATIONS SECTION 02701 INSTALLATION OF GRAVITY SEWER PIPELINES. 1. Trenching, Backfilling and Compacting: 02223 STANDARD SPECIFICATIONS SECTION 02701 INSTALLATION OF GRAVITY SEWER PIPELINES PART 1 - GENERAL A. Description This section describes the installation of gravity sewer pipelines fabricated of vitrified

More information

CONSTRUCTION COST MODELS

CONSTRUCTION COST MODELS CONSTRUCTION COST MODELS Prepared by: The New England Environmental Finance Center For the Maine Department of Transportation Office of Environmental Planning November 1, 2010 The following are a series

More information

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES 33 00 00 SITE UTILITIES

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES 33 00 00 SITE UTILITIES SECTION INCLUDES Domestic Water Fire Water Service Water Well Sanitary Sewer Storm Drains Foundation Drainage RELATED SECTIONS 03 30 00 Concrete 21 00 00 Fire Suppression - Sprinklers 22 00 00 Plumbing

More information

RESPONSIBLE DEPARTMENT: ADDITIONAL DIRECTOR (S): ASSISTANT CITY MANAGER: JIM CALLAWAY

RESPONSIBLE DEPARTMENT: ADDITIONAL DIRECTOR (S): ASSISTANT CITY MANAGER: JIM CALLAWAY CITY COUNCIL AGENDA REQUEST AGENDA OF: 07-01-14 AGENDA REQUEST NO: IV-D INITIATED BY: GREG NICHOLS PROJECT MANAGER RESPONSIBLE DEPARTMENT: ENGINEERING PRESENTED BY: TIMOTHY JAHN, P.E. SENIOR ENGINEER DIRECTOR:

More information

STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix F

STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix F STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS Appendix F RIVERDALE CITY CAPITAL FACILITIES PLAN STORM DRAINAGE Engineer's Cost Estimate January 2009 Project Name: 4400 South Street - Piping and Collection

More information

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250. 02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily

More information

How To Install An Overhead Sewer

How To Install An Overhead Sewer Village of Broadview Flood Control Assistance Program Village of Broadview 2350 S. 25 th Avenue, Broadview, IL 60155 INTRODUCTION The Village of Broadview is served by combined sewers which carry sewage

More information

Before H 2 Town of South Windsor, CT Evaluates Large Diameter Concrete Pipe

Before H 2 Town of South Windsor, CT Evaluates Large Diameter Concrete Pipe Before H 2 Town of South Windsor, CT Evaluates Large Diameter Concrete Pipe September 11, 2012 NEWEA Collection Systems Conference Presented by: Laurie L. Perkins, PE Dennis A. Dievert, PE C. Frederick

More information

New Road 11.0m Asphalt 23m ROW

New Road 11.0m Asphalt 23m ROW New Road 11.0m Asphalt 23m ROW Granular A - 150 mm sq. m. $5.35 $69.53 Granular B - 300 mm sq. m. $7.35 $95.54 Concrete Curb and Gutter m. $44.67 $89.34 HL3 Asphalt - 40 mm sq. m. $7.66 $84.23 HL 4 or

More information

Figure 3 Pipe Cracking

Figure 3 Pipe Cracking The illustration shown below depicts the system analyzed. As-built drawings and survey information were not available; aerial photos and survey shots of inverts were used to determine the system s geometries.

More information

CITY OF SAN ANTONIO. Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03

CITY OF SAN ANTONIO. Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03 CITY OF SAN ANTONIO Issued By: Transportation and Capital Improvements Date Issued: February 10, 2016 ID NO.: 23-01472-05-03 (010) FORMAL INVITATION FOR BIDS (IFB) to CONTRACT 2016-2017 TASK ORDER CONTRACT

More information

SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS

SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING

More information

STANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY

STANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY STANDARD SPECIFICATIONS FOR PRIVATE BUILDING SEWER LINES IN PUBLIC RIGHT-OF-WAY Approved and adopted as Official Document Number 800576 this 10th day of December, 1980 Donald R. Boyd, P.E., Director Water

More information

Let Us Give Utilities the Respect that they Deserve.

Let Us Give Utilities the Respect that they Deserve. Water & Sewer Utilities Miscellaneous Design and Plan Preparation Guidelines Issued by: Ray Mowla, P.E. Jefferson Parish Department of Engineering, Utilities Section The purpose of issuing these miscellaneous

More information

SEWER PIPELINE AND MANHOLE REHABILITATION FOR VARIOUS LOCATIONS WITHIN THE CITY OF BEVERLY HILLS, CALIFORNIA CITY OF BEVERLY HILLS

SEWER PIPELINE AND MANHOLE REHABILITATION FOR VARIOUS LOCATIONS WITHIN THE CITY OF BEVERLY HILLS, CALIFORNIA CITY OF BEVERLY HILLS SEWER PIPELINE AND MANHOLE REHABILITATION FOR VARIOUS LOCATIONS WITHIN THE CITY OF BEVERLY HILLS, CALIFORNIA CITY OF BEVERLY HILLS RESPONSE TO BIDDER S QUESTIONS Question #1: Is the Contractor required

More information

32-02.05 Precast Manhole Sections and Castings. These items shall conform to Section 31, "Storm Drain Installation," of these Standard Provisions.

32-02.05 Precast Manhole Sections and Castings. These items shall conform to Section 31, Storm Drain Installation, of these Standard Provisions. SECTION 32: SANITARY SEWER INSTALLATION 32-01 SCOPE. The Work shall consist of furnishing and installing sewer mains, manholes, laterals, cleanout fittings and appurtenances; and testing, flushing and

More information

SECTION 02763 POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.

SECTION 02763 POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe. SECTION 02763 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Repairs to existing sewer lines by replacing short lengths of failed pipe. 1.02 UNIT PRICES A. Measurement for point repairs is on a unit price

More information

MEMORANDUM GEOFF ENGLISH, PUBLIC WORKS DIRECTOR MIKE LINN, ASSISTANT CITY ENGINEER

MEMORANDUM GEOFF ENGLISH, PUBLIC WORKS DIRECTOR MIKE LINN, ASSISTANT CITY ENGINEER MEMORANDUM TO: FROM: BY: SUBJECT: CITY COUNCIL GEOFF ENGLISH, PUBLIC WORKS DIRECTOR MIKE LINN, ASSISTANT CITY ENGINEER CONSIDERATION OF AN AWARD OF CONTRACT TO D-KAL ENGINEERING, INC. FOR THE CROWN TERRACE

More information

WILDCAT CANYON ROAD SPECIFICATION NO. 16-11001 SLIDE REPAIR BIDDER'S PROPOSAL (continued)

WILDCAT CANYON ROAD SPECIFICATION NO. 16-11001 SLIDE REPAIR BIDDER'S PROPOSAL (continued) BIDDER'S PROPOSAL (continued) Item Estimated No. Description Quantity Unit Unit Cost Total Cost BASE BID 1 Traffic Control 1 LS $ $ 2 Construction Area Signs 1 LS $ $ 3 Excavation Safety 1 LS $ $ 4 Reset

More information

Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe

Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe 1. GENERAL The following supplemental sewer main specifications are intended to address the installation of high-density polyethylene

More information

Bidding and Contract Requirements:

Bidding and Contract Requirements: CITY OF LAREDO, TEXAS WATER UTILITIES DEPARTMENT 24-INCH TRANSMISSION MAIN ADDENDUM 7 June 10, 2016 To Bidder of Record: The following changes, additions, and/or deletions are hereby made a part of the

More information

INDEX. Sec. No. Items Page Nos.

INDEX. Sec. No. Items Page Nos. INDEX Sec. No. Items Page Nos. 1. Types of Pipe............... MSSP- 2 2. Concrete Pipe............... MSSP- 2 thru MSSP-3 3. ABS and PVC Truss Pipe............... MSSP- 3 4. ABS and PVC Solid Wall Pipe...............

More information

SANITARY SEWER SERVICE CONNECTION INSTRUCTIONS

SANITARY SEWER SERVICE CONNECTION INSTRUCTIONS 1 SANITARY SEWER SERVICE CONNECTION INSTRUCTIONS TABLE OF CONTENTS I. Introduction II. General Information and Requirements A. Applying for Sewer connection B. Excavation C. Cutting Concrete and Asphalt

More information

A. Structures Quantity Item Price Cost @ $3,500 EA

A. Structures Quantity Item Price Cost @ $3,500 EA PRINCE WILLIAM COUNTY Department of Development Services Land Development Division UNIT PRICE LIST (Performance Bonds, Landscaping Escrows, and Siltation & Erosion Control Escrows) Revised: November 17,

More information

Master Planning and Examples of Infrastructure Repair

Master Planning and Examples of Infrastructure Repair Campus Energy Conference Distribution Workshop: Session 3 Master Planning and Examples of Infrastructure Repair An engineering solutions company February 22, 2011 Master Plan Definition Means many things

More information

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS C PROJECT ESTIMATE ASSUMPTIONS AND EXCLUSIONS In support of the alternatives development process, preliminary cost estimates were prepared for each of the three Candidate Build Alternatives. The cost estimates

More information

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST-09-06 BID PROPOSAL I/We hereby agree to furnish to the Village of Lombard all necessary materials, equipment, and labor, to complete the North Industrial

More information

INSTALLATION OF INSITUFORM LINER

INSTALLATION OF INSITUFORM LINER PART 1 GENERAL 1.1 SCOPE: A. This item shall include all work and materials to install, insert a flexible polyester felt liner saturated with a thermo-setting resin into the existing sewer line for rehabilitation

More information

SECTION 02400 - STORM DRAIN SYSTEM

SECTION 02400 - STORM DRAIN SYSTEM SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And

More information

UNIT PRICE LIST January 2009

UNIT PRICE LIST January 2009 UNIT PRICE LIST January 2009 1 INTRODUCTION The purpose of the Unit Price List is to provide a resource for the preparation of cost estimates for subdivisions and permit projects and should be used only

More information

How to Do a Water & Sewer System Inventory - Capital Improvements Plan

How to Do a Water & Sewer System Inventory - Capital Improvements Plan Table of Contents Background, Objective and Method... 2 Capital Outlay - Water System... 3 Capital Outlay - Sewer System... 4 Summary... 4 Water Exhibit... 5 Sewer Exhibit....6 w w w. c a v a n a u g h

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 1100 SLIP-LINING SANITARY SEWERS

San Antonio Water System Standard Specifications for Construction ITEM NO. 1100 SLIP-LINING SANITARY SEWERS ITEM NO. 1100 SLIP-LINING SANITARY SEWERS 1100.1 DESCRIPTION: This item shall consist of slip-lining sanitary sewer pipe, which is accomplished by pulling or pushing liner pipe into existing sewers by

More information

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF MANITOWOC, WISCONSIN SECTION 400 SEWER AND WATER CONSTRUCTION

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF MANITOWOC, WISCONSIN SECTION 400 SEWER AND WATER CONSTRUCTION STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF MANITOWOC, WISCONSIN SECTION 400 SEWER AND WATER CONSTRUCTION Section Number Title 401 GENERAL 402 AMENDMENTS TO WSWS PART I - GENERAL CONDITIONS

More information

SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors.

SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors. SUBDRAINS AND FOOTING DRAIN COLLECTORS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Subdrains B. Subdrain Cleanouts and Outlets C. Footing Drain Collectors D. Storm Sewer Service and Connections 1.02 DESCRIPTION

More information

Riverside County Transportation Department Summary of Bids

Riverside County Transportation Department Summary of Bids Bids Open: 2 pm Date: Wednesday, March 4, 2015 BASE BID SCHEDULE 1 - Rudell Road Reconstruction Project NO. CODE CONTRACT PROJECT No. B3-0470 and C4-0069 COUNTY'S ESTIMATE 1 All American Asphalt Corona,

More information

Please find the attached agenda and supporting documentation for the March 5, 2015 Work Session.

Please find the attached agenda and supporting documentation for the March 5, 2015 Work Session. City of Hays Office of the City Manager Memo To: City Commission From: Toby Dougherty, City Manager Date: 2-26-15 Re: March 5, 2015 Work Session Please find the attached agenda and supporting documentation

More information

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees. The following shall serve as the minimum requirements for contractors performing work in relation to the Authority s potable water and sanitary sewer system(s), appurtenances and service connections. General:

More information

ADDENDUM NO. 2. Contract Documents for REPLACEMENT OF PHOENIX STREET BRIDGE OVER THE TANKERHOOSEN RIVER VERNON, CONNECTICUT

ADDENDUM NO. 2. Contract Documents for REPLACEMENT OF PHOENIX STREET BRIDGE OVER THE TANKERHOOSEN RIVER VERNON, CONNECTICUT ADDENDUM NO. 2 Contract Documents for REPLACEMENT OF PHOENIX STREET BRIDGE OVER THE TANKERHOOSEN RIVER VERNON, CONNECTICUT Bridge No. 1460008 (existing) Bridge No. 06806 (new) TO ALL BIDDERS: Anchor Engineering

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS

San Antonio Water System Standard Specifications for Construction ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS 1103.1 DESCRIPTION: 1. Repair of sanitary sewer lines by replacing short lengths of failed pipe with new pipe. 2. Repair of service laterals located

More information

SPECIFICATIONS FOR SANITARY SEWER LINE REPLACEMENT IN PIONEER PARK. City of Des Peres, Missouri. 12325 Manchester Road. Des Peres, Missouri 63131

SPECIFICATIONS FOR SANITARY SEWER LINE REPLACEMENT IN PIONEER PARK. City of Des Peres, Missouri. 12325 Manchester Road. Des Peres, Missouri 63131 SPECIFICATIONS FOR SANITARY SEWER LINE REPLACEMENT IN PIONEER PARK City of Des Peres, Missouri 12325 Manchester Road Des Peres, Missouri 63131 Prepared by City Engineer March 2011 INVITATION TO BID SANITARY

More information

Analyzing The Bread & Butter Benefits of Sewer Main Pipebursting. Matt Werth General Manager PM Construction

Analyzing The Bread & Butter Benefits of Sewer Main Pipebursting. Matt Werth General Manager PM Construction Analyzing The Bread & Butter Benefits of Sewer Main Pipebursting Matt Werth General Manager PM Construction Pipebursting is the answer to many very difficult rehabilitation needs where there are almost

More information

ARTICLE VI (ALTERNATE) STANDARD SPECIFICATIONS. for (PVC) SANITARY SEWER MAIN CONSTRUCTION

ARTICLE VI (ALTERNATE) STANDARD SPECIFICATIONS. for (PVC) SANITARY SEWER MAIN CONSTRUCTION ARTICLE VI (ALTERNATE) STANDARD SPECIFICATIONS for (PVC) SANITARY SEWER MAIN CONSTRUCTION VI(A).1 General VI(A).2 Materials and Equipment VI(A).3 Installation of Sanitary Sewer Mains VI(A).4 Laying of

More information

The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm:

The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm: Page 1 of 6 Section 1. PURPOSE This policy is an Engineering checklist of the Local Review Program for sanitary sewer improvement projects by the Bedford Regional Water Authority ( Authority ). Section

More information

Preliminary Design Report Clay County, Florida Carpet n Drapes Culvert Repair and Rehabilitation July 21, 2006

Preliminary Design Report Clay County, Florida Carpet n Drapes Culvert Repair and Rehabilitation July 21, 2006 Clay County, Florida Carpet n Drapes Culvert Repair and Rehabilitation July 21, 2006 1.0 Background and Repair and Rehabilitation Recommendation Clay County has contracted Camp Dresser & McKee Inc. (CDM)

More information

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL 1.01 DESCRIPTION A. Furnish and install all storm drains, including manholes, inlets, service lines and other appurtenant

More information

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE 6.01 SCOPE The work covered by this section of the specifications consists of the furnishing of all plant, labor, materials, equipment and supervision and performing all operations involved in the construction

More information

12/8/2014. Brought To You By: This webcast is sponsored by NASSCO with the support of IPBA.

12/8/2014. Brought To You By: This webcast is sponsored by NASSCO with the support of IPBA. Brought To You By: This webcast is sponsored by NASSCO with the support of IPBA. 1 Pipe Bursting A Mature and Diverse Trenchless Technology December 10, 2014 1:00 3:00 pm Eastern How to Participate Today

More information

SEWER BACK UP PREVENTION PILOT PROGRAM

SEWER BACK UP PREVENTION PILOT PROGRAM SEWER BACK UP PREVENTION PILOT PROGRAM FINANCIAL ASSISTANCE FOR HOMEOWNERS Village of South Holland 16240 Wausau Avenue South Holland, IL 60473 www.southholland.org Table ofcontents Page What is the Program?

More information

SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO)

SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO) SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO) 1 Intent: The intent of trenchless sewer pipe Insertion is to rehabilitate the existing sewer

More information

08003-1 WATER SERVICE 2

08003-1 WATER SERVICE 2 08003_Mar08_2011.pdf Page 1 of 7 INDEX Page 08003-1 WATER SERVICE 2 1.1 Pipe 2 1.1.1 Copper 2 1.1.2 Polyethylene 2 1.2 Valves and Fittings 2 1.2.1 Main Stops 3 1.2.2 Curb Stops 3 1.2.3 Curb Box 3 1.2.4

More information

Wastewater Collection System Supplemental Design Standards for Capital Improvement Program Projects

Wastewater Collection System Supplemental Design Standards for Capital Improvement Program Projects Wastewater Collection System Supplemental Design Standards for Capital Improvement Program Projects March 2013 i Metropolitan Sewer District of Greater Cincinnati Wastewater Collection System Supplemental

More information

AGENDA ITEM EXECUTIVE SUMMARY

AGENDA ITEM EXECUTIVE SUMMARY AGENDA ITEM EXECUTIVE SUMMARY Title: Presenter: Recommendation to Award the Bid for Storm Sewer Point Repair Services to J&S Construction Sewer & Water AJ Reineking Please check appropriate box: Government

More information

ADDENDUM NO. 1. Manchester Boston Regional Airport, City of Manchester, NH

ADDENDUM NO. 1. Manchester Boston Regional Airport, City of Manchester, NH Hoyle, Tanner Project No. 093145 ADDENDUM NO. 1 Manchester Boston Regional Airport, City of Manchester, NH Construct Relocated Roadway Airport Service Rd. Outside Runway Object Free Area (ROFA); Construct

More information

Section 2100-Trenching and Tunneling

Section 2100-Trenching and Tunneling SECTION 5200 - STORM SEWER PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of storm sewer mains and culverts. Topics include permits and fees, trench widths, pipe laying, bedding, initial

More information

Rehabilitation or Replacement? That Is The Question

Rehabilitation or Replacement? That Is The Question Rehabilitation or Replacement? That Is The Question Chris L. Windley PE Greg Anderson, PE 94th Annual Conference November 18, 2014 Overview Project Background Existing Sewer Condition Flow Projections

More information

Exhibit A. Rules and Regulations for House Connections and Sewer Extensions

Exhibit A. Rules and Regulations for House Connections and Sewer Extensions The purpose of this application example is to provide assistance to small and medium sized rural communities in the drafting of documents necessary for the efficient operation of water, wastewater, and

More information

Close-Out Documents... 9

Close-Out Documents... 9 Water and Sanitary Sewer Service Connection Requirements Service Connection Requirements... 1 Application for Services... 2 Water Meter Application... 2 Wet Tap/Tie-in Connection Requirements... 3 Meter

More information

DIVISION 4300 STORM DRAINAGE

DIVISION 4300 STORM DRAINAGE DIVISION 4300 STORM DRAINAGE SECTION 4305 STORM SEWER PART 1 - GENERAL 1.01 SCOPE This section covers the construction of storm sewers for the collection and transport of stormwater runoff. 1.02 REFERENCES

More information

FLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR

FLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR FLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR ESTABLISHING CONSTRUCTION CONTRACT DURATION July 2010 DISCLAIMER: The following documentation as a whole was derived from Federal Highway Administration

More information

CCU Engineering Specifications. Section 003300 PRECAST CONCRETE PRODUCTS

CCU Engineering Specifications. Section 003300 PRECAST CONCRETE PRODUCTS CCU Engineering Specifications Section 003300 Effective Date: Nov. 1st, 2011 Page 1 of 5 PRECAST CONCRETE PRODUCTS PART 1 - GENERAL The following specification is intended for use for the design, selection

More information

VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10

VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10 VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10 SECTION B1: PREPARATION GUIDE B1.1 INTRODUCTION... B1-1

More information

City of Hilshire Village Pine Creek Ln Reconstruction

City of Hilshire Village Pine Creek Ln Reconstruction City of Hilshire Village Pine Creek Ln Reconstruction OVERVIEW The City will be soliciting bids for the Pine Creek Reconstruction Project with construction scheduled to begin in January 2015. This project

More information

GRAVITY SEWER REPAIR MARINE DRIVE CONSTRUCTION COMPLETION REPORT

GRAVITY SEWER REPAIR MARINE DRIVE CONSTRUCTION COMPLETION REPORT GRAVITY SEWER REPAIR MARINE DRIVE CONSTRUCTION COMPLETION REPORT PREPARED OCTOBER 9, 2001 PREPARED BY: CITY OF BLAINE, PUBLIC WORKS DEPARTMENT 1200 YEW AVENUE BLAINE, WA 98230 Introduction This completed

More information

Project : CONSTRUCTION OF BUILDING(including electrical and plumbing works) FOR NATIONAL CENTRE FOR SUSTAINABLE COASTAL MANAGEMENT,CHENNAI

Project : CONSTRUCTION OF BUILDING(including electrical and plumbing works) FOR NATIONAL CENTRE FOR SUSTAINABLE COASTAL MANAGEMENT,CHENNAI Project : CONSTRUCTION OF BUILDING(including electrical and plumbing works) FOR NATIONAL CENTRE FOR SUSTAINABLE COASTAL MANAGEMENT,CHENNAI TENDER CLARIFICATIONS- no 3 dated 3rd Oct 13 issued in response

More information

Model Specification 509 DRISCOPLEX 4200 and DRISCOPLEX 4300 Gravity Flow Sanitary Sewer

Model Specification 509 DRISCOPLEX 4200 and DRISCOPLEX 4300 Gravity Flow Sanitary Sewer Model Specification 509 DRISCOPLEX 4200 and DRISCOPLEX 4300 Gravity Flow Sanitary Sewer The user may choose to adopt part or all of this Model Specification; however, the user should ensure that all parts

More information

MIAMI-DADE LATERAL PILOT PROGRAM. James T. Cowgill, P.E. Rodney J. Lovett Franklin Torrealba, P.E.

MIAMI-DADE LATERAL PILOT PROGRAM. James T. Cowgill, P.E. Rodney J. Lovett Franklin Torrealba, P.E. MIAMI-DADE LATERAL PILOT PROGRAM James T. Cowgill, P.E. Rodney J. Lovett Franklin Torrealba, P.E. Hazen and Sawyer, P.C. 4000 Hollywood Boulevard Hollywood, FL 33021 ABSTRACT Since 1994 the Miami-Dade

More information

SECTION XXXXXX TECHNICAL SPECIFICATIONS FOR INSTALLATION OF PROTECTIVE COATINGS FOR MANHOLES, WETWELLS, AND OTHER SANITARY SEWER STRUCTURES

SECTION XXXXXX TECHNICAL SPECIFICATIONS FOR INSTALLATION OF PROTECTIVE COATINGS FOR MANHOLES, WETWELLS, AND OTHER SANITARY SEWER STRUCTURES 1.00 PART 1 GENERAL 1.01 SCOPE A. It is the intent of this contract to install a 100% solids epoxy monolithic coating to the walls, benches and inverts of all manholes and the specified surfaces of other

More information

LOGAN TOWNSHIP MUNICIPAL UTILITIES AUTHORITY DESIGN, CONSTRUCTION, INSPECTION AND TESTING MANUAL

LOGAN TOWNSHIP MUNICIPAL UTILITIES AUTHORITY DESIGN, CONSTRUCTION, INSPECTION AND TESTING MANUAL LOGAN TOWNSHIP MUNICIPAL UTILITIES AUTHORITY DESIGN, CONSTRUCTION, INSPECTION AND TESTING MANUAL February 2010 LOGAN TOWNSHIP UTILITIES AUTHORITY INSPECTION AND TESTING PROCEDURE TABLE OF CONTENTS SECTION

More information

Mainline Pipe Rehabilitation Using Cured-in-Place Pipe (CIPP) & Folded Pipe Technology

Mainline Pipe Rehabilitation Using Cured-in-Place Pipe (CIPP) & Folded Pipe Technology 2007 Pumper & Cleaner Environmental Expo International Wednesday February 7, 2007 Mainline Pipe Rehabilitation Using Cured-in-Place Pipe (CIPP) & Folded Pipe Technology What is Cured-In-Place Pipe (CIPP)

More information

Guideline Specification for the Replacement of Mainline Sewer Pipes By Pipe Bursting

Guideline Specification for the Replacement of Mainline Sewer Pipes By Pipe Bursting Guideline Specification for the Replacement of Mainline Sewer Pipes By Pipe Bursting Setting the Industry Standard for the Rehabilitation of Underground Utilities The International Pipe Bursting Association

More information

ITD Pipe Materials Selection & Specification Procedures. July 2011

ITD Pipe Materials Selection & Specification Procedures. July 2011 ITD Pipe Materials Selection & Specification Procedures July 2011 INTRODUCTION: This technical memorandum is written as a guide to the selection of compliant pipe materials and the elimination of non-compliant

More information

RICHMOND METROPOLITAN AUTHORITY RICHMOND EXPRESSWAY SYSTEM DECK REHABILITATION 2014 NORTHBOUND POWHITE OVER THE JAMES RIVER **********

RICHMOND METROPOLITAN AUTHORITY RICHMOND EXPRESSWAY SYSTEM DECK REHABILITATION 2014 NORTHBOUND POWHITE OVER THE JAMES RIVER ********** RICHMOND METROPOLITAN AUTHORITY RICHMOND EXPRESSWAY SYSTEM DECK REHABILITATION 2014 NORTHBOUND POWHITE OVER THE JAMES RIVER ********** February 11, 2014 DESCRIPTION The Invitation to Bid and Very High

More information

GOUVEIA ENGINEERING. Pre-Bid Conference Meeting Minutes. City of Los Banos. Henry Miller Area Storm Drain and L Street Waterline

GOUVEIA ENGINEERING. Pre-Bid Conference Meeting Minutes. City of Los Banos. Henry Miller Area Storm Drain and L Street Waterline GOUVEIA ENGINEERING Pre-Bid Conference Meeting Minutes City of Los Banos Henry Miller Area Storm Drain and L Street Waterline Conference held at Intersection of West I Street and L Street, in Los Banos

More information

SECTION 3 SANITARY SEWER DESIGN

SECTION 3 SANITARY SEWER DESIGN SECTION 3 SANITARY SEWER DESIGN 3.1 GENERAL DESIGN CRITERIA 3.1.1 Requirement for Sanitary Sewer 3.1.2 Design Approval 3.1.3 IEPA Permit Required 3.1.4 Differentiation Between Public and Private Sanitary

More information

SECTION 33 41 00 REINFORCED CONCRETE PIPE. A. The following is a list of SPECIFICATIONS, which may be related to this section:

SECTION 33 41 00 REINFORCED CONCRETE PIPE. A. The following is a list of SPECIFICATIONS, which may be related to this section: SECTION 33 41 00 REINFORCED CONCRETE PIPE PART 1 GENERAL 1.01 SECTION INCLUDES A. This section includes construction of reinforced concrete pipe for storm drainage, culverts, and sanitary sewer, including

More information

SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS

SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS PART 1 GENERAL 1.01 SECTION INCLUDES A. The requirements for pipe material and installation in sewer and drainage collection systems. All materials

More information

53.03 MATERIALS FOR SEWER LINER PIPE AND FITTINGS: The following materials are approved for installation in sanitary sewer lines:

53.03 MATERIALS FOR SEWER LINER PIPE AND FITTINGS: The following materials are approved for installation in sanitary sewer lines: Division 53: Slip-Lining of Existing Sewer Line 53.01 GENERAL: This section includes all labor, materials, transportation, equipment necessary to rehabilitate by means of Instituform deteriorated sections

More information

NORTH DAVIS SEWER DISTRICT STANDARD COLLECTION DETAILS

NORTH DAVIS SEWER DISTRICT STANDARD COLLECTION DETAILS STANDARD COLLECTION DETAILS Detail No. Detail Title Pages ND-01 NOTICE TO CONTRACTORS 1 ND-02 MANHOLE CONSTRUCTION NOTES AND INDEX 2 ND-10 STANDARD MANHOLE CONNECTION 2 ND-11 STANDARD MANHOLE DETAIL 54"

More information

The unit costs are based on the trend line of the 3 low bids for the average quantity.

The unit costs are based on the trend line of the 3 low bids for the average quantity. Page 1 of 8 COST ESTIMATE GENERAL INSTRUCTIONS The unit costs are based on the trend line of the 3 low bids for the average quantity. Apply the Unit Costs to ordinary structures. Unit Costs should generally