1 Construction Quality Assurance/Quality Control Program CUIRE/UCT Trenchless Technology Engineering and Inspection School January 28 & 29, 2007 Hilton Americas, Houston, Texas Gerhard (Gerry) P. Muenchmeyer, P.E.

2 EPA Estimates Need According to the EPA, $388 billion is required for sewer rehabilitation and $274 billion for water renovation over the next 20 years in this country. That equates to over a $33 billion a year need 2002 EPA Clean Water Needs Survey (CWNS)

3 Projections Underground Construction magazine estimates that water & sewer rehabilitation spending in 2007 will exceed 4.1 billion. 8 th Annual Municipal Sewer & Water Survey

4 Potential For Manhole Rehabilitation Over 20 million existing manholes in the US 4 million are over 50 years old Over 5 million are years old Current expenditures are at $100 million/year Projected annual expenditures estimated at $500 million 2003 Wade & Assoc.

5 Potential Lateral Sewer Rehabilitation Over 72 million existing sewer laterals in US Over 48 million laterals will need replacement over the next 20 years At a cost of $2000 each = $72 billion $4.8 billion annually Estimate 20% trenchless = $1 billion/year

6 Potential Near Future Market Trends Future market for Trenchless Pipeline Renovation could be in excess of $5 billion per year Expanding Opportunities in the US Water & Sewer Pipe Renovation Industry Grant Whittle

7 Why The Increasing Demand For Pipeline Rehabilitation? Increased public awareness of the aging and deteriorating underground pipeline infrastructure Elimination of Combined Sewer Overflows (CSO s) Elimination of Sanitary Sewer Overflows (SSO s) Frequent emergency pipe failures NPDES permit requirements EPA consent decrees requiring pipeline renovation GASB 34 CMOM

8 Why Trenchless vs Excavation? Easier-faster Cleaner-safer Typically lower in cost Minimal or no utility impact Minimal environmental impact Typically no surprises/change orders 50 year design life when properly installed Significant social & political benefits

9 Technology Choices

10 Quality Assurance/Quality Control (QA/QC) Testing and Inspection Its All About Raising The Industry s s Quality Level

11 Background Trenchless technologies have improved significantly over the last 30 years (evolution) Industry standards have been developed over those years (trial and error) Many sources available for obtaining technology (products are now commodity items) But technologies, in some cases, do not perform as expected (wrong tool or wrong specifications) Occasionally customers suffer the inconvenience of accepting inferior products or have the expense of subsequent replacement (customer satisfaction has not been achieved?)

12 Why Are Some Technologies Not Performing As Expected or Failing? Wrong technology selected for the project Poor installation or application by untrained applicator Incomplete or vague project specifications Poorly enforced specifications Minimal or no project QA/QC Weak or no testing requirements Lack of technology training for inspection personnel

13 What is a Failure? The Technical Council on Forensic Engineering of the American Society of Civil Engineers (ASCE) defines failure as:.an un-acceptable difference between expected and observed performance

14 Project specific grouting pressures and procedures included in the Quality Assurance plan could have prevented this pipe collapse. Is this installation a candidate for repair or replacement?

15 Is the lift in the bottom of the liner repairable or is total replacement required?

16 Quality controls for existing pipe measurement and liner fabrication may have prevented folds in the cured pipe. Is this a candidate for repair or replacement?

17 Specified employee qualification requirements would have prevented this.

18 Project Problems Commonly Encountered Project requirements, in many cases, are based on specific manufacturers technical requirements and recommendations Standards are specified but not adequately enforced Low bids are received based on poorly written specifications resulting in poor quality work and extra work orders Trenchless technology inspection requirements, during construction, are not fully understood or enforced. Inspectors are untrained without the necessary tools to assure the quality of a project Poor quality installations are accepted by the Customer after completion of the project.

19 Some Common Technology Issues Customer expectations are not met. Customer relaxes specifications and accepts inferior products. Qualified inspection is not provided or enforced. Remedies for poor performance are not clearly defined in the specifications. Poor project results are directly related to the quality of the specification and the price paid. You Get What You Pay For

20 Quality Product Prerequisite: Good, consistent, quality products meet specification requirements and satisfy the expectations of the Customer Product & technology selection Well written, detailed specification Documented contractor/installer qualifications Quality assurance requirements clearly defined in the specifications Quality control requirements during construction with specified testing program and written documentation Qualified & trained inspector Warranty inspections

21 Correct Product & Technology Selection Product/technology matched to project requirements Minimum qualification (i.e. lineal feet in the ground, square feet applied, quantity & size installed, etc.). References with projects of similar size & application completed. Documented manufacturer s quality control program for the products selected. Longevity or history of material for similar applications. Verified third party testing of the material in a similar environment. Demonstration projects, for new unproven technologies, to verify acceptability for the project application.

22 Correct Specification Prescriptive (Design) Specifications Applicable to custom projects. Detailed installation procedures & requirements are typically defined. Performance Specifications Applicable to commodity type technologies. Leaves the means & methods of construction up to the contractor with defined verification procedures. Combination of Prescriptive & Performance Used for custom designs but with commodity product installation.

23 Performance Specifications Performance based type specifications result in a higher level of performance resulting in a high quality product. Performance specifications are a statement of the project requirements in terms of anticipated results. They define the functional requirements of the product. Have very specific criteria for verifying compliance.

24 Contractor /Installer Experience Must be licensed, certified, trained, etc. in the technology Must have installation history of technology for similar. project size and applications (typically 2-3 years) Superintendent experience (typically 2-3 years) Forman and crew experience

25 Quality Assurance Clearly Defined in the Specifications Must be technology specific. Quality Control Plan submittal required by the Contractor. Raw material & finished product sampling and testing by the customer to verify required product quality. Manufacturer certification requirements. Defined Quality Control implementation procedures during technology installation and completion. Clearly defined repair/replacement criteria for the technology in the event of defects.

26 Quality Control During Construction Verification of the specified QA requirements. Contractor s responsibility for general quality control during project execution. Quality control inspections by inspector fully documented in writing. Becomes part of the project records. Inspector follows documentation guidelines outlined in the specifications. Inspector ensures chain of custody of all materials to be tested. Trained inspectors verify proper installation.

27 Quality Assurance/Quality Control SAMPLE FORM Contract Name: CIPP Lining Contract No: Contractor/Installer: Construction Observer/Inspector: Report No. Weather: Structure Temp: Ambient Surface Other Work in Progress: _ByPass Pumping, Cleaning, Point Repairs, Traffic Control, CCTV Inspection Performance Acceptable Results No. Quality Assurance Standard Quality Quality Control Pass/Fail Comments Tube meets type, size, length, thickness and quality as specified. Measure the size (dia) length and thickness of Submit for third-party testing as ASTM F1216, material supplied for the project. Obtain tube 1 required. F % samples for third-party testing. Record testing lab used. 2 Resin meets type and quality as specified and approved. Submit materials for testing as specified. ASTM D5813, F1216, F % Obtain resin and catalyst samples and submit to lab for testing. Record testing lab used. 3 Wet-out - Quantities of resin used to impregnate tube. Wet-out procedure to ensure no dry spots. Industry Standard % Record resin quantity for tube size and length. 4 Installation rate not to exceed 10 fpm Curing and cool down at manufacturer's recommended rate. Release pressure only after recommended temperatures 5 have been achieved. ASTM F1216, F % ASTM F1216, F % Verify cleanliness of pipe installation rate not to exceed 10 fpm. Record minimum and maximum curing temperatures. Record cool down method, time and pressure readings for the installation. 6 Finished pipeliner shall be continuous, defect free and fit tight within the host pipe. ASTM F1216, F % Verify liner from end to end. Review final video and record defects. Check liner fit at service connections and at pipe ends. Owners Representative: Name Signature Date Contractor/Installer Representative: Name Signature Date All QA/QC as per specific manufacturer's recommendations.

28 Qualified & Trained Inspector The project inspector is key to the successful trenchless rehabilitation project Is trained and knowledgeable in the project technology. Is knowledgeable in quality controls, testing and documentation of product being installed including instrumentation and equipment to be used. Is ability to recognize key elements of product success or failure during installation.

29 Warranty Inspections Detailed visual or CCTV inspection of the project upon completion before final acceptance. Inspections, during warranty period, based on specific product requirements. Specific warranty inspection work defined. Parties participating in inspection. Written documentation of inspection and results. Contractor affects repairs based on acceptable remedies clearly defined in the specifications

30 Expected Project Results Project meets or exceeds product manufacturer s advertised claims. Project meets or exceeds specification requirements. Product performs for the life expected. Customer s expectations are met

31 Conclusion The key to successful Trenchless construction projects includes: Selection of the correct technology. Complete performance based specifications. Qualified contractor/installer. Quality assurances clearly defined in the specifications. Quality controls implemented during construction. Product testing with a verified chain of custody. Knowledgeable and trained inspection personnel. Clearly defined warranty inspections. Raising The Industry s Quality Level

32 The solution is not cheaper technologies. The solution is better engineered technologies at a lower cost

33 Any Questions Gerhard Gerry P. Muenchmeyer, P.E Director of Engineering & Operations Reline America, Inc. Web Site

34 References/Credits Photo s and schematics by: Underground Construction Aries Industries LMK Liners Permaliner Industries TT Technologies John Jurgens TRI International

Tuesday Jan 30, 2007Track V = Sewer QA:QC/ Asset Management/ European & Japanese Quality Standards

Tuesday Jan 30, 2007Track V = Sewer QA:QC/ Asset Management/ European & Japanese Quality Standards Underground Construction Technology International Conference & Exhibition January 30 - February 1, 2007 George R. Brown Convention Center Houston, Texas Tuesday Jan 30, 2007Track V = Sewer QA:QC/ Asset

More information

REVIEW OF TRENCHLESS TECHNIQUES FOR THE REHABILITATION OF SEWERS. Gerhard (Gerry) P. Muenchmeyer, P.E. Muenchmeyer Associates, LLC

REVIEW OF TRENCHLESS TECHNIQUES FOR THE REHABILITATION OF SEWERS. Gerhard (Gerry) P. Muenchmeyer, P.E. Muenchmeyer Associates, LLC REVIEW OF TRENCHLESS TECHNIQUES FOR THE REHABILITATION OF SEWERS Gerhard (Gerry) P. Muenchmeyer, P.E. Muenchmeyer Associates, LLC What is really out there? DO YOU DIG IT? INDUSTRY CONCERNS UNEXPECTED DEVELOPMENTS

More information

4 Steps for Quality Sewer Performance in Perpetuity

4 Steps for Quality Sewer Performance in Perpetuity 4 Steps for Quality Sewer Performance in Perpetuity By Gerhard Gerry P. Muenchmeyer, P. E. Principal Muenchmeyer Associates, LLC E-mail gerry@muenchmeyerassoc.com INTRODUCTION A well maintained and functional

More information

Mainline Pipe Rehabilitation Using Cured-in-Place Pipe (CIPP) & Folded Pipe Technology

Mainline Pipe Rehabilitation Using Cured-in-Place Pipe (CIPP) & Folded Pipe Technology 2007 Pumper & Cleaner Environmental Expo International Wednesday February 7, 2007 Mainline Pipe Rehabilitation Using Cured-in-Place Pipe (CIPP) & Folded Pipe Technology What is Cured-In-Place Pipe (CIPP)

More information

PORTLAND BES ADVANCES IN SEWER MAINTENANCE AND REPAIRS BY OPERATING MULTIPLE CIPP CREWS.

PORTLAND BES ADVANCES IN SEWER MAINTENANCE AND REPAIRS BY OPERATING MULTIPLE CIPP CREWS. North American Society for Trenchless Technology 2007 No-Dig Conference & Exhibition San Diego, California April 15-20, 2007 Paper # PORTLAND BES ADVANCES IN SEWER MAINTENANCE AND REPAIRS BY OPERATING

More information

SAWS SSO Reduction Program

SAWS SSO Reduction Program SAWS SSO Reduction Program Jeff Haby, P.E. Director Sewer System Improvements February 20, 2014 TMDL Implementation Plan Technical Committee Overview Sanitary Sewer Overflows Consent Decree Overview Major

More information

SEWER PIPELINE AND MANHOLE REHABILITATION FOR VARIOUS LOCATIONS WITHIN THE CITY OF BEVERLY HILLS, CALIFORNIA CITY OF BEVERLY HILLS

SEWER PIPELINE AND MANHOLE REHABILITATION FOR VARIOUS LOCATIONS WITHIN THE CITY OF BEVERLY HILLS, CALIFORNIA CITY OF BEVERLY HILLS SEWER PIPELINE AND MANHOLE REHABILITATION FOR VARIOUS LOCATIONS WITHIN THE CITY OF BEVERLY HILLS, CALIFORNIA CITY OF BEVERLY HILLS RESPONSE TO BIDDER S QUESTIONS Question #1: Is the Contractor required

More information

REHABILITATION OF UNDERGROUND SEWER LATERAL PIPES WITH CURED-IN-PLACE-PIPE LINER SECTION 02542

REHABILITATION OF UNDERGROUND SEWER LATERAL PIPES WITH CURED-IN-PLACE-PIPE LINER SECTION 02542 1.0 INTENT REHABILITATION OF UNDERGROUND SEWER LATERAL PIPES 1.01 It is the intent of this specification to provide for the reconstruction of pipelines and conduits by the installation of a resin-impregnated

More information

Jeff Haby, P.E. Director Sewer System Improvements. September 15, 2015. Agenda

Jeff Haby, P.E. Director Sewer System Improvements. September 15, 2015. Agenda SAWS Sanitary Sewer Overflow Reduction Program Jeff Haby, P.E. Director Sewer System Improvements SA Military Engineers Meeting Agenda SAWS Overview Consent Decree CD Compliance Programs Program Transition

More information

SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO)

SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO) SPECIFICATIONS FOR SEWER PIPE AND LINING INSERTION - TRENCHLESS; GENERAL GUIDELINES (As Provided by NASSCO) 1 Intent: The intent of trenchless sewer pipe Insertion is to rehabilitate the existing sewer

More information

INSTALLATION OF INSITUFORM LINER

INSTALLATION OF INSITUFORM LINER PART 1 GENERAL 1.1 SCOPE: A. This item shall include all work and materials to install, insert a flexible polyester felt liner saturated with a thermo-setting resin into the existing sewer line for rehabilitation

More information

Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe

Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe 1. GENERAL The following supplemental sewer main specifications are intended to address the installation of high-density polyethylene

More information

Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority

Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority Abstract The United States Virgin Islands Waste Management Authority

More information

Rehabilitation or Replacement? That Is The Question

Rehabilitation or Replacement? That Is The Question Rehabilitation or Replacement? That Is The Question Chris L. Windley PE Greg Anderson, PE 94th Annual Conference November 18, 2014 Overview Project Background Existing Sewer Condition Flow Projections

More information

Industrial Pipeline Integrity Management & Remote Polyurea Pipe Lining Systems.

Industrial Pipeline Integrity Management & Remote Polyurea Pipe Lining Systems. Industrial Pipeline Integrity Management & Remote Polyurea Pipe Lining Systems. Aging pipeline infrastructure and industry s inability to evaluate and inspect has left many engineers and plant managers

More information

VERIFICATION TESTING GUIDELINES FOR CONTRACTORS

VERIFICATION TESTING GUIDELINES FOR CONTRACTORS Public Works Department Engineering Division VERIFICATION TESTING GUIDELINES FOR CONTRACTORS CITY OF BERKELEY PRIVATE SEWER LATERAL ORDINANCE BMC Chapter 17.24 Effective November 3, 2014 A consent decree

More information

Analyzing The Bread & Butter Benefits of Sewer Main Pipebursting. Matt Werth General Manager PM Construction

Analyzing The Bread & Butter Benefits of Sewer Main Pipebursting. Matt Werth General Manager PM Construction Analyzing The Bread & Butter Benefits of Sewer Main Pipebursting Matt Werth General Manager PM Construction Pipebursting is the answer to many very difficult rehabilitation needs where there are almost

More information

Storm Sewer Trenchless Upgrade Alternatives and Recommendations

Storm Sewer Trenchless Upgrade Alternatives and Recommendations Storm Sewer Trenchless Upgrade Alternatives and Recommendations Background Approximately 1,930 feet of the 40-inch and 42-inch CMP storm sewer pipe from manhole M22 to manhole M12 will be evaluated for

More information

MIAMI-DADE LATERAL PILOT PROGRAM. James T. Cowgill, P.E. Rodney J. Lovett Franklin Torrealba, P.E.

MIAMI-DADE LATERAL PILOT PROGRAM. James T. Cowgill, P.E. Rodney J. Lovett Franklin Torrealba, P.E. MIAMI-DADE LATERAL PILOT PROGRAM James T. Cowgill, P.E. Rodney J. Lovett Franklin Torrealba, P.E. Hazen and Sawyer, P.C. 4000 Hollywood Boulevard Hollywood, FL 33021 ABSTRACT Since 1994 the Miami-Dade

More information

by Leonard Friesenhahn, P.E.

by Leonard Friesenhahn, P.E. by Leonard Friesenhahn, P.E. of sight, out of mind is an adage your top administrators may apply to your campus Out wastewater collection system but as a facilities professional, you know how serious a

More information

Trouble Shooting for Trenchless Liner Installation During Sewer Line Rehabilitation

Trouble Shooting for Trenchless Liner Installation During Sewer Line Rehabilitation Trouble Shooting for Trenchless Liner Installation During Sewer Line Rehabilitation Salam Khan*, P.E. and Christoph Dobson, P.E. Sacramento County Sanitation District 1 (CSD-1) 10545 Armstrong Avenue,

More information

PRODUCT CATALOGUE. for. SMARTPHONE / WEBSITE / DIGITAL EDITION / BOOK / ipad / GPS

PRODUCT CATALOGUE. for. SMARTPHONE / WEBSITE / DIGITAL EDITION / BOOK / ipad / GPS PRODUCT CATALOGUE for This product catalogue has been downloaded from COSSD.com. Listed products/services and their descriptions are shown as supplied by the title company COSSD does not guarantee the

More information

SECTION XXXXXX TECHNICAL SPECIFICATIONS FOR INSTALLATION OF PROTECTIVE COATINGS FOR MANHOLES, WETWELLS, AND OTHER SANITARY SEWER STRUCTURES

SECTION XXXXXX TECHNICAL SPECIFICATIONS FOR INSTALLATION OF PROTECTIVE COATINGS FOR MANHOLES, WETWELLS, AND OTHER SANITARY SEWER STRUCTURES 1.00 PART 1 GENERAL 1.01 SCOPE A. It is the intent of this contract to install a 100% solids epoxy monolithic coating to the walls, benches and inverts of all manholes and the specified surfaces of other

More information

Large Bore Rectangular Box Culvert and Non Circular Rehabilitation with CIPP

Large Bore Rectangular Box Culvert and Non Circular Rehabilitation with CIPP North American Society for Trenchless Technology 2007 No-Dig Conference & Exhibition San Diego, California April 16-19, 2007 Large Bore Rectangular Box Culvert and Non Circular Rehabilitation with CIPP

More information

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth TABLE OF CONTENTS NO. MP-1 MP-2 MP-3 MP-4 MP-4.01 MP-4.02 MP-4.03 MP-5 MP-5.01 MP-5.02 MP-5.03 MP-5.04 MP-5.05 MP-5.06 MP-5.07 MP-5.08 MP-5.11 MP-5.12 MP-5.13 MP-5.14 MP-5.15 MP-5.16 MP-5.18 MP-5.19 MP-5.20

More information

CMOM How to Develop Your Collection System Maintenance Program NWOWEA Pre-Conference Utility Workshop June 22, 2015 Kalahari Conference Center

CMOM How to Develop Your Collection System Maintenance Program NWOWEA Pre-Conference Utility Workshop June 22, 2015 Kalahari Conference Center CMOM How to Develop Your Collection System Maintenance Program NWOWEA Pre-Conference Utility Workshop June 22, 2015 Kalahari Conference Center Thomas A. Fishbaugh Ohio RCAP What is CMOM? CMOM: Capacity,

More information

PROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY

PROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY PROVIDING THE SAFE CHOICE FOR UNDERGROUND PIPE RENEWAL, INTEGRITY MANAGEMENT AND ASSET RELIABILITY Cured-In-Place Pipe Pressure & Gravity Lines Pipe Splitting Trenchless Pipe Replacement EcoCast Advanced

More information

Section 4 Pipe and Maintenance Hole Inspection and Condition Assessment Plan

Section 4 Pipe and Maintenance Hole Inspection and Condition Assessment Plan and Condition Assessment Plan 4.1 Introduction 4.1.1 Purpose This addresses the requirements of Section IV.A. of the EPA Order. The plan documents the progress that each agency has made to date regarding

More information

Defense Technical Information Center Compilation Part Notice

Defense Technical Information Center Compilation Part Notice UNCLASSIFIED Defense Technical Information Center Compilation Part Notice ADP017712 TITLE: Rehabilitation of TCE-Contaminated Underground Storm Water System Using Trenchless Technology DISTRIBUTION: Approved

More information

M I D W E S T S O C I E T Y F O R T R E N C H L E S S T E C H N O L O G Y. Kansas City, Missouri s Trenchless Program

M I D W E S T S O C I E T Y F O R T R E N C H L E S S T E C H N O L O G Y. Kansas City, Missouri s Trenchless Program M I D W E S T S O C I E T Y F O R T R E N C H L E S S T E C H N O L O G Y Kansas City, Missouri s Trenchless Program Outline of Presentation Intro to Kansas City Water Services information Trenchless Program

More information

INTRODUCTION AND BACKGROUND

INTRODUCTION AND BACKGROUND Chapter 1 INTRODUCTION AND BACKGROUND 1.1 INTRODUCTION The City of Lincoln s Sewer System Management Program (SSMP) generally describes the City s sanitary sewer system operation and maintenance procedures,

More information

Phased Assessment Strategy for Sewers

Phased Assessment Strategy for Sewers Phased Assessment Strategy for Sewers A plan for understanding sewer system condition quicker, with fewer resources. Venay Sehgal Bhatia Digital Marketing Manager Envirosight Are deteriorating infrastructure

More information

THE BIG FIX: Public works administration would be easy if infrastructure. San Diego s Sewer Renewal Program. By Steve Gibbs

THE BIG FIX: Public works administration would be easy if infrastructure. San Diego s Sewer Renewal Program. By Steve Gibbs THE BIG FIX: San Diego s Sewer Renewal Program By Steve Gibbs Public works administration would be easy if infrastructure lasted forever. It does not. Roads, bridges and sewers eventually wear out. Even

More information

Corporate Headquarters located in Davison, MI Family owned business with over 50 years industry experience Focus on value based, environmentally safe

Corporate Headquarters located in Davison, MI Family owned business with over 50 years industry experience Focus on value based, environmentally safe Corporate Headquarters located in Davison, MI Family owned business with over 50 years industry experience Focus on value based, environmentally safe products for the infrastructure rehabilitation and

More information

STANDARD SPECIFICATIONS SECTION 02959 SEWER MAIN AND LATERAL CONNECTION SEALING BY CHEMICAL GROUT

STANDARD SPECIFICATIONS SECTION 02959 SEWER MAIN AND LATERAL CONNECTION SEALING BY CHEMICAL GROUT STANDARD SPECIFICATIONS SECTION 02959 SEWER MAIN AND LATERAL CONNECTION SEALING BY CHEMICAL GROUT PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for rehabilitation of defective mainline

More information

City of Bakersfield Public Works Department Sewer System Management Plan December 2014

City of Bakersfield Public Works Department Sewer System Management Plan December 2014 City of Bakersfield Public Works Department Sewer System Management Plan December 2014 C:\Users\hmayberry\Desktop\SEWER SYSTEM MANAGEMENT PLAN 2014.doc 1 Sewer System Management Plan Index: Section 1 Goals

More information

REQUEST FOR PROPOSALS SANITARY SEWER MAINTENANCE SERVICES FOR THE TOWN CENTER SEWER ASSESSMENT DISTRICT WITHIN THE TOWN OF WOODSIDE

REQUEST FOR PROPOSALS SANITARY SEWER MAINTENANCE SERVICES FOR THE TOWN CENTER SEWER ASSESSMENT DISTRICT WITHIN THE TOWN OF WOODSIDE REQUEST FOR PROPOSALS SANITARY SEWER MAINTENANCE SERVICES FOR THE TOWN CENTER SEWER ASSESSMENT DISTRICT WITHIN THE TOWN OF WOODSIDE Submit Proposals to: Town of Woodside Public Works Department 2955 Woodside

More information

METHODS TO CONTROL LEAKS IN SEWER COLLECTION SYSTEMS

METHODS TO CONTROL LEAKS IN SEWER COLLECTION SYSTEMS METHODS TO CONTROL LEAKS IN SEWER COLLECTION SYSTEMS White Paper Prepared by C. Vipulanandan, Ph.D., P.E. and H. Gurkan Ozgurel Center for Innovative Grouting Materials and Technology (CIGMAT) Department

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 1100 SLIP-LINING SANITARY SEWERS

San Antonio Water System Standard Specifications for Construction ITEM NO. 1100 SLIP-LINING SANITARY SEWERS ITEM NO. 1100 SLIP-LINING SANITARY SEWERS 1100.1 DESCRIPTION: This item shall consist of slip-lining sanitary sewer pipe, which is accomplished by pulling or pushing liner pipe into existing sewers by

More information

SECTION 02732 CLEANING AND CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION OF SEWER PIPE

SECTION 02732 CLEANING AND CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION OF SEWER PIPE SECTION 02732 CLEANING AND CLOSED CIRCUIT TELEVISION (CCTV) INSPECTION OF SEWER PIPE PART 1 - GENERAL 1.01 WORK INCLUDED A. This section covers the initial and final cleaning, and the initial and final

More information

Impact of the ALCOSAN Consent Decree by Steve Morus, Borough Manager

Impact of the ALCOSAN Consent Decree by Steve Morus, Borough Manager Impact of the ALCOSAN Consent Decree by Steve Morus, Borough Manager In June, 3 Rivers Wet Weather (3RWW) hosted a joint meeting for Allegheny County communities with participants from ALCOSAN and the

More information

DRAFT Public Outreach Document for What s an SSMP?

DRAFT Public Outreach Document for What s an SSMP? DRAFT Public Outreach Document for What s an SSMP? This easy to read document is developed and provided to interested parties to assist in educating cities, agencies, their management, elected officials

More information

Summary 7/11/2012. Michigan Water Environment Association 2012 Annual Conference Boyne Mountain Resort

Summary 7/11/2012. Michigan Water Environment Association 2012 Annual Conference Boyne Mountain Resort Michigan Water Environment Association 2012 Annual Conference Boyne Mountain Resort June 25, 2012 Thomas Gossiaux, PE (AECOM) Matt Raysin, PE (GCDC-WWS) Dave Barnas, PE (AECOM) Ed Tharp, PE (AECOM) Summary

More information

GENERAL SPECIFICATIONS AND GUIDELINES FOR INSTALLATION MASTERLINER CURED-IN-PLACE PIPE SYSTEMS

GENERAL SPECIFICATIONS AND GUIDELINES FOR INSTALLATION MASTERLINER CURED-IN-PLACE PIPE SYSTEMS GENERAL SPECIFICATIONS AND GUIDELINES FOR INSTALLATION OF MASTERLINER CURED-IN-PLACE PIPE SYSTEMS 34 TABLE OF CONTENTS 1.00 INTRODUCTION 2.00 SITE WORK PREPARATIONS 3.00 THE PRODUCT AND COMPONENT MATERIALS

More information

Affordable Asset Management Making Use of the Data You Have: An Owner s Perspective

Affordable Asset Management Making Use of the Data You Have: An Owner s Perspective Affordable Asset Management Making Use of the Data You Have: An Owner s Perspective An Owner Operator s Approach for Asset Management on a Budget Lane Longley, City of St. Petersburg Presented by the April

More information

SECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD

SECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD SECTION 21 REHABILITATION OF SANITARY SEWER MAINS BY THE PIPE BURSTING AND TRENCHLESS PIPE REPLACEMENT METHOD 21.01 SCOPE: It is the intent of the Specification to define the approved methods and materials

More information

SEWER CLEANING, INSPECTION AND ASSESSMENT

SEWER CLEANING, INSPECTION AND ASSESSMENT 3.1 OVERVIEW Chapter 3 SEWER CLEANING, INSPECTION AND ASSESSMENT Preventive maintenance protects the investment of the sanitary sewer collection system infrastructure. Higher frequency cleaning of gravity

More information

Working together to improve beach water quality. Fixing our. public and private. sewers

Working together to improve beach water quality. Fixing our. public and private. sewers Working together to improve beach water quality Fixing our public and private sewers May 2004 FIND FIX DECIDE Narrow Neck Beach on a summer day As part of Project CARE, our long-term project to improve

More information

CURED-IN-PLACE PIPE MINIMIZING RISK BY DEFECT CODING

CURED-IN-PLACE PIPE MINIMIZING RISK BY DEFECT CODING North American Society for Trenchless Technology 2007 No-Dig Conference & Exhibition San Diego, California April 16-19, 2007 CURED-IN-PLACE PIPE MINIMIZING RISK BY DEFECT CODING Robert K. Lee, P.E. 1 1

More information

City of Dallas Wastewater Collection System: TCEQ Sanitary Sewer Outreach Agreement City Council Briefing January 17, 2007

City of Dallas Wastewater Collection System: TCEQ Sanitary Sewer Outreach Agreement City Council Briefing January 17, 2007 City of Dallas Wastewater Collection System: TCEQ Sanitary Sewer Outreach Agreement City Council Briefing January 17, 2007 1/12/2007 1 Briefing Purpose Provide update on Wastewater Collection Activities

More information

Request for Proposals Sanitary Sewer System Condition Assessment (PILOT PROJECT)

Request for Proposals Sanitary Sewer System Condition Assessment (PILOT PROJECT) Request for Proposals Sanitary Sewer System Condition Assessment (PILOT PROJECT) Utilizing CCTV equipment, equipment use training, NASSCO PACP defect coding, and infrastructure program management software

More information

Water Main Lining A Sustainable Alternative to Open Cut Replacement

Water Main Lining A Sustainable Alternative to Open Cut Replacement Water Main Lining A Sustainable Alternative to Open Cut Replacement Sean O Dell, PE Baxter & Woodman, Inc. B&W Client Seminar, Crystal Lake May 1, 2014 Agenda Why, What, When, Where, Who, How Reduction

More information

REHABILITATION METHOD FOR INCREASING FLOW VELOCITY AND REDUCING SEDIMENTATION

REHABILITATION METHOD FOR INCREASING FLOW VELOCITY AND REDUCING SEDIMENTATION .asu/ North American Society for Trenchless Technology (NASTT) NO-DIG 2005 Orlando, Florida April 24-27, 2005 REHABILITATION METHOD FOR INCREASING FLOW VELOCITY AND REDUCING SEDIMENTATION Hwan-Kook Hwang

More information

02780 LINER FOR SEWER REHABILITATION

02780 LINER FOR SEWER REHABILITATION Section 02780 Liner for Sewer Rehabilitation Page 02780-1 (Revised 11/06/09) 02780 LINER FOR SEWER REHABILITATION SELECTED LINKS TO SECTIONS WITHIN THIS SPECIFICATION Part 1 GENERAL Part 2 PRODUCTS Part

More information

PROVIDING SUPPORT TO THE CONSTRUCTION INDUSTRY BY SUPPLYING CURED IN PLACE PIPE (CIPP) LINING TO COVER DRAINS, SEWERS AND PIPELINES

PROVIDING SUPPORT TO THE CONSTRUCTION INDUSTRY BY SUPPLYING CURED IN PLACE PIPE (CIPP) LINING TO COVER DRAINS, SEWERS AND PIPELINES PROVIDING SUPPORT TO THE CONSTRUCTION INDUSTRY BY SUPPLYING CURED IN PLACE PIPE (CIPP) LINING TO COVER DRAINS, SEWERS AND PIPELINES CLIENTS BENEFIT FROM LINING SUPPORT S SEWER AND PIPE CIPP LINING THAT

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS

San Antonio Water System Standard Specifications for Construction ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS 1103.1 DESCRIPTION: 1. Repair of sanitary sewer lines by replacing short lengths of failed pipe with new pipe. 2. Repair of service laterals located

More information

THE ECOLOGICAL IMPLICATIONS OF TRENCHLESS PIPE REHABILITATION

THE ECOLOGICAL IMPLICATIONS OF TRENCHLESS PIPE REHABILITATION THE ECOLOGICAL IMPLICATIONS OF TRENCHLESS PIPE REHABILITATION Bridget Donaldson Research Scientist Virginia Transportation Research Council Transportation Infrastructure Deterioration of pipes is a growing

More information

Contracting Opportunities Vendor Day May 17, 2011

Contracting Opportunities Vendor Day May 17, 2011 Customer Care Team Contracting Opportunities Vendor Day May 17, 2011 Customer Care Team: What We Do Team Office customer advocacy and contracting Customer Relations Group call centers, claims, special

More information

Presented by: Scott E. Belz Project Manager- URS Corporation Robert P. Kelly, P.E. Director of Engineering-City of Westlake James J. Smolik, P.E.

Presented by: Scott E. Belz Project Manager- URS Corporation Robert P. Kelly, P.E. Director of Engineering-City of Westlake James J. Smolik, P.E. Presented by: Scott E. Belz Project Manager- URS Corporation Robert P. Kelly, P.E. Director of Engineering-City of Westlake James J. Smolik, P.E. Engineer-City of Westlake City of Westlake Facts Founded

More information

Ultraviolet (UV) Light Cured Fiberglass Reinforced Cured-In-Place Pipe (CIPP) It is not just for sanitary sewer rehabilitation

Ultraviolet (UV) Light Cured Fiberglass Reinforced Cured-In-Place Pipe (CIPP) It is not just for sanitary sewer rehabilitation Ultraviolet (UV) Light Cured Fiberglass Reinforced Cured-In-Place Pipe (CIPP) It is not just for sanitary sewer rehabilitation Dan Broderick Director of Pipeline Rehabilitation ACHEN-GARDNER ENGINEERING,

More information

REVISED SHORT TERM AND LONG TERM SEWER PIPE INSPECTION AND CONDITION ASSESSMENT PROGRAM SOUTH COAST WATER DISTRICT. June 2005

REVISED SHORT TERM AND LONG TERM SEWER PIPE INSPECTION AND CONDITION ASSESSMENT PROGRAM SOUTH COAST WATER DISTRICT. June 2005 REVISED SHORT TERM AND LONG TERM SEWER PIPE INSPECTION AND CONDITION ASSESSMENT PROGRAM SOUTH COAST WATER DISTRICT FOR SOUTH COAST WATER DISTRICT Prepared with the requirements identified in the United

More information

Tim Schneller, P.E. GBA Engineers and Architects

Tim Schneller, P.E. GBA Engineers and Architects Tim Schneller, P.E. GBA Engineers and Architects Portions of the presentation were taken from a presentation prepared by a member of the Water Environment Federation Collection Systems Committee CMOM Subcommittee.

More information

A CASE STUDY IN INFILTRATION REDUCTION THROUGH TRENCHLESS TECHNOLOGY

A CASE STUDY IN INFILTRATION REDUCTION THROUGH TRENCHLESS TECHNOLOGY A CASE STUDY IN INFILTRATION REDUCTION THROUGH TRENCHLESS TECHNOLOGY SOUTH PALOS TOWNSHIP SANITARY DISTRICT COOK COUNTY, ILLINOIS March 1999 By: Aaron E. Fundich, P.E. Robinson Engineering, Ltd. and Larry

More information

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250. 02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily

More information

City of Missoula Wastewater Division Public Works Department 435 Ryman Street, Missoula, Montana 59802

City of Missoula Wastewater Division Public Works Department 435 Ryman Street, Missoula, Montana 59802 City of Missoula Wastewater Division Public Works Department 435 Ryman Street, Missoula, Montana 59802 REQUEST FOR COMPETITIVE SEALED PROPOSALS (CSP) For Installation of 200 Feet of 12 inch Diameter Cure

More information

Request for Proposals PROFESSIONAL SERVICES FOR DRINKING WATER, WASTEWATER AND STORMWATER PROJECTS OPEN-END CONTRACTS 2016-18

Request for Proposals PROFESSIONAL SERVICES FOR DRINKING WATER, WASTEWATER AND STORMWATER PROJECTS OPEN-END CONTRACTS 2016-18 Request for Proposals PROFESSIONAL SERVICES FOR DRINKING WATER, WASTEWATER AND STORMWATER PROJECTS OPEN-END CONTRACTS 2016-18 Page 2 of 8 1. INTRODUCTION Capital Region Water (CRW) is requesting proposals

More information

READ THIS FIRST. Check here if you believe that fats, oils and/or grease (FOG) caused or contributed to the SSO. Date: Time: Title:

READ THIS FIRST. Check here if you believe that fats, oils and/or grease (FOG) caused or contributed to the SSO. Date: Time: Title: READ THIS FIRST In the event of a Sanitary Sewer Overflow Check here if you believe that fats, oils and/or grease (FOG) caused or contributed to the SSO Address: Date: 1 st : Open this envelope. Instructions

More information

San Antonio Water System Standard Specifications for Construction ITEM 866 SEWER MAIN TELEVISION INSPECTION

San Antonio Water System Standard Specifications for Construction ITEM 866 SEWER MAIN TELEVISION INSPECTION ITEM 866 SEWER MAIN TELEVISION INSPECTION 866.1 DESCRIPTION: The Contractor shall furnish all labor, materials, equipment, and incidentals to provide the televising and a NASSCO-(PACP) standard video,

More information

TOWN OF HILLSBOROUGH Compliance with Regulatory Mandates. Private Sewer Lateral Inspection and Repair Program

TOWN OF HILLSBOROUGH Compliance with Regulatory Mandates. Private Sewer Lateral Inspection and Repair Program TOWN OF HILLSBOROUGH Compliance with Regulatory Mandates Private Sewer Lateral Inspection and Repair Program SEWER SYSTEM- BACKGROUND 116 miles of gravity sanitary sewer pipelines 1 mile of force main

More information

Sanitation District No. 1 of Northern Kentucky. SD1's Sanitary and Storm Water Asset Management Program. KSPE Annual Convention

Sanitation District No. 1 of Northern Kentucky. SD1's Sanitary and Storm Water Asset Management Program. KSPE Annual Convention Sanitation District No. 1 of Northern Kentucky SD1's Sanitary and Storm Water Asset Management Program KSPE Annual Convention April 28, 2011 Background Outline CSAP Program Development CSAP Program Implementation

More information

GIS Applications for Regulatory Compliance

GIS Applications for Regulatory Compliance 4 GIS Applications for Regulatory Compliance Uzair (Sam) M. Shamsi Many cities in the world especially in the United States and Canada are dealing with regulatory enforcement actions for sewer overflows,

More information

IS THAT LINER THICK ENOUGH?

IS THAT LINER THICK ENOUGH? IS THAT LINER THICK ENOUGH? Philip McFarlane, Opus International Consultants Ltd ABSTRACT The amount of pipeline rehabilitation being undertaken in New Zealand is increasing each year. Larger diameter

More information

Overview of PG&E Cross Bore Inspection Program

Overview of PG&E Cross Bore Inspection Program Overview of PG&E Cross Bore Inspection Program Presented by: Greg Scoby, PE Vice President Technical Services Frontline Energy Services Greg@Frontline-Energy.com Cross Bore Unintended conflict between

More information

1.3.2 Method of construction and restoration of existing water service connections. This shall include:

1.3.2 Method of construction and restoration of existing water service connections. This shall include: 1.0 GENERAL 1.1 DESCRIPTION: This specification shall cover the rehabilitation of existing water lines using the GRUNDOCRACK PIPE BURSTING SYSTEM. Pipe bursting is a system by which the pneumatic bursting

More information

BEFORE THE PHILADELPHIA WATER, SEWER AND STORMWATER RATE BOARD DIRECT TESTIMONY OF STEPHEN J. FURTEK

BEFORE THE PHILADELPHIA WATER, SEWER AND STORMWATER RATE BOARD DIRECT TESTIMONY OF STEPHEN J. FURTEK BEFORE THE PHILADELPHIA WATER, SEWER AND STORMWATER RATE BOARD Re Application of the Philadelphia Water Department for Increased Rates and Related Charges Fiscal Years 2017-2018 DIRECT TESTIMONY OF STEPHEN

More information

Relining of Water Mains with. Flexible High Pressure Pipelines. Raedlinger Primus Line, Inc. Ivan Zubiaga Executive Vice President 2014

Relining of Water Mains with. Flexible High Pressure Pipelines. Raedlinger Primus Line, Inc. Ivan Zubiaga Executive Vice President 2014 Relining of Water Mains with Flexible High Pressure Pipelines Raedlinger Primus Line, Inc. Ivan Zubiaga Executive Vice President 2014 Aging water main infrastructure The American Society of Civil Engineers

More information

Texas Commission on Environmental Quality Page 1 Chapter 293 - Water Districts

Texas Commission on Environmental Quality Page 1 Chapter 293 - Water Districts Texas Commission on Environmental Quality Page 1 SUBCHAPTER F: DISTRICT ACTIONS RELATED TO CONSTRUCTION PROJECTS AND PURCHASE OF FACILITIES 293.62-293.70 Effective November 13, 2014 293.62. Construction

More information

ecmar SECTION INSTRUCTIONS: Sanitary Sewer Collection Systems

ecmar SECTION INSTRUCTIONS: Sanitary Sewer Collection Systems ecmar SECTION INSTRUCTIONS: Sanitary Sewer Collection Systems Please see the DEFINITIONS of terms at the end of this section. If you have any questions about these definitions, do not understand a question,

More information

FY15 Gravity Sewer and Manhole Rehabilitation

FY15 Gravity Sewer and Manhole Rehabilitation Contract Drawings For FY15 Gravity Sewer and Manhole Rehabilitation TRAVELERS REST TAYLORS Frazier Project No. -030 BASIN 850 Greenville, South Carolina April 2015 BASIN 700A GREENVILLE BASIN 700B FIVE

More information

53.03 MATERIALS FOR SEWER LINER PIPE AND FITTINGS: The following materials are approved for installation in sanitary sewer lines:

53.03 MATERIALS FOR SEWER LINER PIPE AND FITTINGS: The following materials are approved for installation in sanitary sewer lines: Division 53: Slip-Lining of Existing Sewer Line 53.01 GENERAL: This section includes all labor, materials, transportation, equipment necessary to rehabilitate by means of Instituform deteriorated sections

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 903 CONSTRUCTION QC/QA PROGRAM

San Antonio Water System Standard Specifications for Construction ITEM NO. 903 CONSTRUCTION QC/QA PROGRAM ITEM NO. 903 CONSTRUCTION QC/QA PROGRAM 903.1 DESCRIPTION: This item shall govern the preparation and implementation of the Contractor s Construction Quality Control/Quality Assurance (QC/QA) Program for

More information

Info What? Using InfoMaster to Develop a Rehabilitation and Replacement Plan

Info What? Using InfoMaster to Develop a Rehabilitation and Replacement Plan Info What? Using InfoMaster to Develop a Rehabilitation and Replacement Plan Amanda Lei - City of San Jose Alex Palmatier - HDR 2014 HDR, Inc., all rights reserved. Background Forecasting and Budget Data

More information

Cut Cost Not Roots! Eliminating SSOs With Chemical Root Control

Cut Cost Not Roots! Eliminating SSOs With Chemical Root Control Cut Cost Not Roots! Eliminating SSOs With Chemical Root Control How maintenance issues become political issues Chemical Root Control Roots entering a wastewater conveyance system is the number one contributing

More information

Session: HDPE Pipe Test Rafael Ortega, Vice President, Lockwood, Andrews & Newnam

Session: HDPE Pipe Test Rafael Ortega, Vice President, Lockwood, Andrews & Newnam Session: HDPE Pipe Test Rafael Ortega, Vice President, Lockwood, Andrews & Newnam Education Master of Business Administration University of Houston, 1985 Bachelor of Science, Civil Engineering University

More information

TRENCHLESS SEWER SERVICE REHABILITATION ANNUAL CONTRACTING SERVICES

TRENCHLESS SEWER SERVICE REHABILITATION ANNUAL CONTRACTING SERVICES CITY OF BRENTWOOD REQUEST FOR PROPOSALS (RFP) TRENCHLESS SEWER SERVICE REHABILITATION ANNUAL CONTRACTING SERVICES RFP ISSUANCE DATE - October 13, 2011 I. NAME OF SOLICITING PUBLIC BODY City of Brentwood,

More information

Annular Space Grouting of Slipline Products

Annular Space Grouting of Slipline Products Annular Space Grouting of Slipline Products by David Gellings(, M.APWA & John Jurgens(, M.WWCPA Traditional methods of using neat cement slurries, (Portland cement and water, cement with fly ash or cement

More information

Section 2651 Television Inspection

Section 2651 Television Inspection Section 2651 Television Inspection PART 1: General 1.1 Description Provide all labor, materials, tools, equipment and incidentals as shown, specified, and required to perform television (TV) inspection

More information

San Antonio, TX July 28, 2011

San Antonio, TX July 28, 2011 Rehabilitation of a Deteriorated 60 RCP Wastewater Interceptor Using Competing Trenchless Technologies Bruce Cole, PE Corey Anderson, EIT TAWWA/WEAT Summer Seminar San Antonio, TX July 28, 2011 Wendy Martinez,

More information

07 21 19 Guide Specification STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM

07 21 19 Guide Specification STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM 07 21 19 STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM 7819 Broadview Road Cleveland, OH 44131 800-522-4522 February, 2011 SPEC NOTE: This guide specification is intended for use when specifying

More information

SIDE SEWER CONDITION ASSESSMENT AND REPAIR RECOMMENDATIONS

SIDE SEWER CONDITION ASSESSMENT AND REPAIR RECOMMENDATIONS SIDE SEWER CONDITION ASSESSMENT AND REPAIR RECOMMENDATIONS Introduction City of Tacoma property owners are responsible for the construction, maintenance and repair of private side sewers, which connect

More information

INTRODUCTION. WASTEWATER MANAGEMENT PLAN MAY 2009 Metropolitan North Georgia Water Planning District 7-1

INTRODUCTION. WASTEWATER MANAGEMENT PLAN MAY 2009 Metropolitan North Georgia Water Planning District 7-1 INTRODUCTION There are approximately 16,000 miles of sewers and more than 450,000 manholes within the Metro Water District. Sewers and manholes within the Metro Water District range in age from new to

More information

A Systematic Approach to Reduce Infiltration and Inflow (I&I) and Sanitary Sewer Overflows (SSO) PETE GORHAM, P.E. MIKE LYNN FEBRUARY 19, 2015

A Systematic Approach to Reduce Infiltration and Inflow (I&I) and Sanitary Sewer Overflows (SSO) PETE GORHAM, P.E. MIKE LYNN FEBRUARY 19, 2015 A Systematic Approach to Reduce Infiltration and Inflow (I&I) and Sanitary Sewer Overflows (SSO) PETE GORHAM, P.E. MIKE LYNN FEBRUARY 19, 2015 Infiltration/Inflow (I/I) I & I Reduction: Three-Prong Attack

More information

SECTION IX SLIP LINING PIPELINES

SECTION IX SLIP LINING PIPELINES AN SECTION IX SLIP LINING PIPELINES February, 2008 TABLE OF CONTENTS SECTION IX - SLIP LINING PIPELINES 9.01.00 GENERAL...2 9.01.01 SCOPE... 2 9.02.00 MATERIAL...2 9.03.00 CONSTRUCTION...2 9.03.01 REQUIREMENTS...

More information

Demonstration of an Innovative Large-Diameter Sewer Rehabilitation Technology in Houston, Texas

Demonstration of an Innovative Large-Diameter Sewer Rehabilitation Technology in Houston, Texas North American Society for Trenchless Technology (NASTT) NASTT s 2014 No-Dig Show Orlando, Florida April 13-17, 2014 Paper TA-T3-03 Demonstration of an Innovative Large-Diameter Sewer Rehabilitation Technology

More information

DRAIN BUSTERS PLUMBING SOLUTIONS ~SOLUTIONS THROUGH EXPERIENCE~

DRAIN BUSTERS PLUMBING SOLUTIONS ~SOLUTIONS THROUGH EXPERIENCE~ DRAIN BUSTERS ~SOLUTIONS THROUGH EXPERIENCE~ DRAIN BUSTERS Ptumblng P.O. Box 455 Garfield, NJ 07026 S~l.!tiom.., Inc: Tel: 973-340-0066 Fax: 973-340-9204 To Whom It May Concern: Realizing how busy you

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS

San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS San Antonio Water System Standard Specifications for Construction ITEM NO. 854 SANITARY SEWER LATERALS 854.1 DESCRIPTION: This item shall govern sanitary sewer laterals installed in accordance with these

More information

Platte River Interceptor Slipline Rehabilitation

Platte River Interceptor Slipline Rehabilitation Platte River Interceptor Slipline Rehabilitation Owner: Metro Wastewater Reclamation District Contractor: American West, Denver CO Slipline Pipe Manufacturer : Hobas Pipe USA Presented by: Tom Furie, Area

More information

The leader in trenchless rehabilitation

The leader in trenchless rehabilitation The leader in trenchless rehabilitation The trenchless rehabilitation of underground water and sewer pipes is a solution that s more ecological, more cost efficient, faster and less invasive for taxpayers

More information

The Environmental Implications of Road Culvert Repair Technologies. Bridget Donaldson Senior Research Scientist

The Environmental Implications of Road Culvert Repair Technologies. Bridget Donaldson Senior Research Scientist The Environmental Implications of Road Culvert Repair Technologies Bridget Donaldson Senior Research Scientist Presentation Overview Culvert repair technologies Past and ongoing research by VCTIR Cured-in-Place

More information

Superior Pipe Restoration Solutions. Proven, state-of-the-art technology that saves money, time and inconvenience. belcopipe.com

Superior Pipe Restoration Solutions. Proven, state-of-the-art technology that saves money, time and inconvenience. belcopipe.com Superior Pipe Restoration Solutions Proven, state-of-the-art technology that saves money, time and inconvenience. belcopipe.com About Us Belco Pipe Restoration was founded with the concept of using British