1 SECTION THERMOPLASTIC SHEET WATERPROOFING Platon Air Gap Waterproofing Membrane PART 1 GENERAL 1.1 SECTION INCLUDES A. HDPE (high-density polyethelene) membrane waterproofing and accessories. 1.2 RELATED SECTIONS A Sustainable Design Requirements B Heavyweight Structural Concrete C Elastomeric Joint Sealants D Finish Grading E Excavation F Backfill G Foundation Drainage Piping 1.3 REFERENCES A. ICC-ES ESR-2767 (USA). B. CCMC 12266R, CCMC 12878R, BMEC (Canada). C. US Green Building Council LEED Reference Guide for Green Building Design and Construction, 2009 Edition. D. US Green Building Council LEED for Homes Reference Guide, 2009 Edition. E. National Green Building Standard ICC PERFORMANCE REQUIREMENTS A. Prevent the passage of water in accordance with the following criteria: 1. Working temperature: Minus 58 degrees F to plus 176 degrees F (Minus 50 degrees C to plus 80.0 degrees C). 2. Softening temperature: Plus 257 degrees F (Plus 125 degrees C). 3. Thermal Resistance: R 0.68 (0.11 sq.m degrees C/W). 4. Water Vapor Permeability: 0.05 Perms. 5. Air volume / dimpled side: 1 gal/sq.yd. (4.0 litre/sq.m). 6. UV Stabilization: Minimum 2 percent carbon black content
2 1.5 SUBMITTALS 7. Toxicity: Not permitted. A. Submit under provisions of Section B. Product Data: Manufacturer's data sheets on each product to be used, including: 1. Preparation instructions and recommendations. 2. Storage and handling requirements and recommendations. 3. Certainteed A Installation Guide. C. Manufacturer s Certificates: Certify products meet or exceed specified requirements. D. LEED NC / LEED Schools 2009: MR4 Recycled Content. E. LEED H 2009: ID 2 Durability Management Process. F. National Green Building Standard ICC Green Approved: Foundation Waterproofing Crawlspaces. G. National Green Building Standard ICC : Termite Barrier Recycled Content Indigenous Materials. H. Verification Samples: For each product specified, two samples, representing actual product. 1. Membrane, minimum size 6 inches (150 mm) square. 2. Speedclips, speedstrips, plugs and moldings. 1.6 QUALITY ASSURANCE A. Manufacturer Qualifications: Company specializing in HDPE waterproofing membrane with minimum three years documented experience. B. Installer Qualifications: Company specializing in performing work of this section. 1.7 DELIVERY, STORAGE, AND HANDLING A. Store products in manufacturer's unopened packaging until ready for installation. B. Do not store in direct sunlight or in high heat environment exceeding 150 degrees F (66 degrees C). 1.8 SEQUENCING A. Ensure that information required for installation of products of this section is furnished to affected trades in time to prevent interruption of construction progress. 1.9 WARRANTY A. Manufacturer's limited 30 year Leakage Protection Warranty
3 PART 2 PRODUCTS 2.1 MANUFACTURERS A. Acceptable Manufacturer: CertainTeed Corp., Foundation and Pipe Products, which is located at: 750 E. Swedesford Rd. P. O. Box 860 ; Valley Forge, PA 19482; Toll Free Tel: ; request info (building.solutions@saint-gobain.com) B. Substitutions: Not permitted. C. Requests for substitutions will be considered in accordance with provisions of Section D. Unless otherwise specified for an individual product or material, supply all products specified in this section from the same manufacturer. 2.2 MATERIALS A. Carbon-compounded high density polyethylene membrane formed with dimples. 1. Thickness: Membrane is a minimum 24 mils (0.6 mm) thick except where extruded 20 mil (0.5 mm) in the dimple areas. 2. Roll Size: 65.6 feet (20 m) in length and up to 10 feet (3.05 m) in width. 3. Weight: Approximately 2.11 oz./sq.ft. (540 g/sq.m). 4. Surface Pattern: Double cone studs (dimples), approximately 0.24 inches (6 mm) high and 1.18 inches (30 mm) on center. 5. Material meets the requirements of ICC ESR Material meets the requirements of the Canadian Construction Materials Center, Technical Guide for Rigid Polyethylene Dampproofing (# ). 7. Post consumer recycled content: +/- 85%. B. Accessories. 1. Platon Plugs: Fastener sleeve. 2. Platon Molding: Continuous strips each 6 feet 6 inches (1.98 m) long. 3. Platon Speedclips: Corrosion-resistant metal fastener. 4. Platon SpeedStrips: continuous strips each inches (1.21 m) long. C. Related Products. 1. Elastomeric joint sealant: butyl rubber or asphalt-based; do not use silicone, latex or polyurethane sealants. Specified in related section Concrete fasteners: 1 ¼ min. concrete nails. 3. ICF foundations: 1 5/8 corrosion resistant deck screws. PART 3 EXECUTION 3.1 EXAMINATION A. Do not begin installation until substrates have been properly prepared. B. Verify substrate surfaces are durable; free of matter detrimental to application of waterproofing system. C. Verify that accessories have been used at joints as appropriate. D. Verify items penetrating surfaces to receive waterproofing are securely installed. E. If substrate preparation is the responsibility of another installer, notify Architect of
4 unsatisfactory preparation before proceeding. 3.2 PREPARATION A. Clean surfaces thoroughly prior to installation. B. Formed Concrete Surfaces: Remove fins and projections. Fill voids, rock pockets, form-tie holes, and other defects with cementitious patching material as required. C. Seal small cracks and joints with sealant materials using depth to width ratio as recommended by sealant manufacturer in accordance with Section D. Prepare surfaces, as required, for achieving the best result for the substrate under the project conditions. E. Mark finished grade with chalk line along top edge of Platon installation. 3.3 INSTALLATION AS A VERTICAL FOUNDATION PROTECTOR A. Install in sequence in accordance with Certainteed Platon A Installation Guide. B. Install full height membrane sheets whenever practical. Overlap multiple membrane rolls horizontally six inches (6 ) when height from footing to finished grade exceeds roll height. Where upper roll overlaps lower roll, secure top edge of lower roll with Speedclips 12 inches (305 mm) on center; no sealant or Platon Molding required. C. Hold top edge of membrane along grade line in place with: 1) - Speedclips (sealant required) or 2) - Speedstrips (no sealant required) or 3) - Speedclips and Platon Molding (no sealant required). D. Fasten Speedclips 12 inches (305 mm) on center along the top edge of the membrane. Each Speedclip engages four (4) dimples. When using Speedclips only and not Speedstrips or Platon Molding, caulk between smooth tab along top edge and wall sealing open gaps. E. Fasten Speedstrips along grade line through holes in fastening area starting at center and working to ends. ¼ gap between ends of contiguous Speedstrips. F. Install Platon molding at beginning and ends of installation or along top edge of membrane at grade line in conjunction with Speedclips. G. Coordinate with installation of foundation drainage piping at the base of foundation specified in Section H. Caulk items protruding to or penetrating through membrane. I. Installation of cast-in-place concrete footings is specified in Section J. Placement of backfill fill is specified in Do not displace membrane during placement
5 3.4 INSTALLATION AS A SUBFLOOR MOISTURE BARRIER A. No accessories are required. B. Clean surfaces of debris. C. Install first Platon membrane sheet with dimples facing downwards; cut to length; cut off smooth tab. D. Install subsequent membrane sheets overlap previous roll 2 rows of dimples; tape seams with exterior flashing tape. E. Install min. 7/16 OSB t&g subfloor over Platon membrane and fasten at room perimeter with concrete screws or nails; fasten where vertical movement occurs. F. Install laminate flooring over laminate underpad over Platon membrane following manufacturer s instructions for the laminate flooring. 3.5 INSTALLATION AS UNDERSLAB DAMPROOFING A. No accessories are required. B. Install Platon membrane sheets with dimples facing downwards over crushed stone substrate. Reinforcement is subsequently installed atop Platon membrane in accordance with Section and concrete is poured atop Platon membrane in accordance with Section C. Overlap rolls using the smooth edge to overlap adjacent dimpled edge; seal with continuous bead of butyl rubber sealant. Exterior flashing tape may be used to secure edges prior to concrete pour. 3.6 FIELD QUALITY CONTROL A. Request inspection prior to and immediately after placing membrane and before placing backfill. 3.7 PROTECTION A. Protect installed products until completion of project. B. Protect system from damage or displacement until backfilling operations begin. END OF SECTION
How To Test A Wrap N Drain X Dampproofing System
National Research Council Canada Institute for Research in Construction Conseil national de recherches Canada Institut de recherche en construction CCMC 13094-R &&0& EVALUATION DIVISION 07111 REPORT Issued
More informationDELTA Premium Moisture Management Systems for Foundations.
DELTA protects property. Saves energy. Creates comfort. DELTA Premium Moisture Management Systems for Foundations. DELTA Premium Moisture Management Systems provide the best protection for foundations.
More informationA. This Section includes rubberized asphalt sheet membrane waterproofing systems.
SECTION 07110 SHEET MEMBRANE WATERPROOFING PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification
More informationSun Windows General Information Sun New Construction Window Installation Instructions
Sun Windows General Information Section 1 G F H H H A. Apply Weather Resistive Barrier B. Apply Sill Flashing Tape C. Place Waterproof Sill Shims D. Caulk Back of Nail Fin Sides & Top, Set Window, Fasten
More informationNCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)
NCMA TEK National Concrete Masonry Association an information series from the national authority on concrete masonry technology CONCRETE MASONRY FOUNDATION WALL DETAILS TEK 5-3A Details (2003) Keywords:
More informationComment Form on Proposed Gut Rehabilitation Alternatives
Comment Form on Gut Rehabilitation Alternatives Name: Organization: Email: Instructions Submission: Please submit this form to energystarhomes@energystar.gov by October 10 th, 2012 with the subject line
More informationWindow Installation Instructions
Caution The correct installation methods of windows in full frame or insert applications is critical towards achieving the tested performance of the window and longterm enjoyment and energy savings for
More informationState of Connecticut Department of Public Health RADON PROGRAM
State of Connecticut Department of Public Health RADON PROGRAM Scope The Connecticut Department of Public Health (DPH) Radon Program is providing this information for contractors who decide to build radon
More informationThe better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs
The better way to build TM Installation Manual FOUNDATION SIPs & FROST WALLS SIPs February 2016 PWF FOUNDATION & FROST WALL SIPs Installation Manual Table of Contents Topics General Requirements...................................
More informationCavity Drain R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high.
CI/SfB Tn6 L6813 September 2013 RIW CAVITY DRAIN R20 R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high. Other systems are available for specific uses,
More informationCERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011
CERTIFICATE NAME OF PRODUCT No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011 H-CONTROL REFLEX+ reflective insulating vapour control layer for roof and wall applications MANUFACTURER ACTIS
More informationINSTALLATION GUIDE. americanwick.com 800.242.WICK (9425)
INSTALLATION GUIDE americanwick.com 800.242.WICK (9425) American Wick Drain SITEDRAIN prefabricated drainage products may be installed in a variety of civil construction applications including: retaining
More informationROXUL Board Insulation Section 07 21 13 Master Guide Specification (CAVITYROCK ) Page 1 April 2016
Master Guide Specification (CAVITYROCK ) Page 1 Click on the pilcrow in the MS Word Toolbar to toggle ROXUL GUIDE NOTES on and off. Delete this text before incorporating the section into a Project Manual.
More informationHow to Install Hardwood Flooring Over a Sub Floor
How to Install Hardwood Flooring Over a Sub Floor Installation Preparation Instructions Read the entire instructions before starting your project. 1) INSPECT EACH PLANK (see fig. a) Wood is a natural product
More informationVA25014B0516 VA CINCINNATI PROJECT NO. 539-328 INPATIENT BED TOWER ADDITION (4 TH AND 5 TH FLOORS) SECTION 09 29 00 GYPSUM BOARD
SECTION 09 29 00 GYPSUM BOARD PART 1 - GENERAL 1.1 DESCRIPTION This section specifies installation and finishing of gypsum board, vapor retarder and air and moisture barrrier. 1.2 RELATED WORK A. Installation
More informationWe urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit.
Important Information for New Construction Installations Attention Installer! We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden
More informationINSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles
INSTALLATION RECOMMENDATIONS Outdoor Rubber Tiles Prior to Installation: The Outdoor Rubber Tiles and accessory transition pieces intended for this installation have been shipped to you via a freight carrier
More informationGUIDELINE SPECIFICATIONS
GUIDELINE SPECIFICATIONS GORDON SOFFIT-SHIELD - An Exterior Metal Soffit System DIVISION 05 5800 or DIVISION 07 7700 Note To Specifier: SOFFIT-SHIELD should be installed by tradesmen that are experienced
More informationSuperform Products Ltd.
TYPICAL CORNER REINFORCING NOTE : SEE ENGINEERED REBAR SCHEDULES SUPPLIED BY THE MANUFACTURER STEEL REINFORCEMENT WALL CORNER 90 Copyright 2012 Sept. 2012 5.1.1 Rebar Spacing 6" 12" Max. Load LB./FT. 2000
More informationSTANDARD PROCEDURES FOR INSTALLATION OF METAL ROOF SYSTEMS
ROOFING APPLICATION STANDARD (RAS) No. 133 STANDARD PROCEDURES FOR INSTALLATION OF METAL ROOF SYSTEMS 1. Scope 1.1 This application standard has been developed to provide consistent information for the
More informationBasements are Changing. Basements Part of the Enclosure. Basements. Energy Efficient, Durable, Healthy. Below grade enclosure
Basements are Changing John Straube, Ph.D., P.Eng Basements: New & Retrofit Energy Efficient, Durable, Healthy Increasingly used as living space Not a root /coal cellar anymore! High quality space expected
More informationMETAL ROOF RESTORATION SAMPLE DESIGN GUIDELINES
METAL ROOF RESTORATION SAMPLE DESIGN GUIDELINES REFLECTICLEAN ACRYLIC/URETHANE Elastomeric Roofing Systems, Inc 6900 Bleck Dr. Rockford, MN 55373 800.403.7747 -or- 763.565.6900 fax: 763.565.6901 email:
More informationITEM 599.06060008 THERMOPLASTIC MEMBRANE ROOFING
DESCRIPTION Construct adhered membrane roofing system, roof insulation, and vapor retarder in accordance with these specifications. MATERIALS: General: Provide installed roofing membrane and base flashings
More informationSection 2100-Trenching and Tunneling
SECTION 5200 - STORM SEWER PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of storm sewer mains and culverts. Topics include permits and fees, trench widths, pipe laying, bedding, initial
More informationWe urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit.
Important Information for New Construction Installations Attention Installer! We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden
More informationProduct Guide Specification
Reef Industries, Inc. 9209 Almeda Genoa Rd. Houston, Texas 77075 Toll Free (800) 231-6074 Phone (713) 507-4251 Fax (713) 507-4295 Web Site www.reefindustries.com E-Mail ri@reefindustries.com Product Guide
More informationSECTION 07530 SINGLE PLY MEMBRANE ROOFING. 4. Minor repair to adjacent clay tile roofing and flashings.
SECTION 07530 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section includes the flowing: 1. Removal of existing roofing membrane. Existing bur roof has one overlay and penetration mastic is asbestos containing.
More informationWaterproofing Problems: A Simple Explanation, A Simple Solution
Waterproofing Problems: A Simple Explanation, A Simple Solution The purpose of this paper is to point out the underlying causes of waterproofing problems and simple means of preventing them. Such problems
More informationA D D E N D U M # 3 QUESTIONS FROM BIDDERS: DATE: November 5, 2012. All Bidders. Jenne dos Santos, CBI Consulting Inc. City of Chelsea, MA
Page 1 of 10, Addendum No. 3 Temporary Garage Structure City of Chelsea, MA November 5, 2012 CBI Job No.: 12055-A A D D E N D U M # 3 DATE: November 5, 2012 TO: FROM: PROJECT: All Bidders Jenne dos Santos,
More informationSECTION 07560 FLUID APPLIED ROOFING (LIGHT TRAFFIC DECKS OVER CONCRETE)
SECTION 07560 FLUID APPLIED ROOFING (LIGHT TRAFFIC DECKS OVER CONCRETE) PART 1 GENERAL 1.1 DESCRIPTION 1. Fluid applied flexible acrylic waterproofing system over concrete. This work shall include the
More informationSECTION 05 42 16 COLD-FORMED METAL DECK FRAMING Elevations Steel Deck Framing by Trex
(Specifier Note: The purpose of this guide specification is to assist the specifier in correctly specifying cold-formed metal deck framing products and execution. The specifier needs to edit the guide
More informationAsphalt Shingle Application Requirements
Alberta Allied Roofing Association Asphalt Shingle Application Requirements Section 1 Roof Decks 1.1 General Asphalt Shingles are not permitted to be installed directly over rigid insulation. When Asphalt
More informationINSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS
2009 Pella Corporation INSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS Part Number: 80WH0100 Installation Instructions for Typical Wood Frame Construction.
More informationMUNICODE SERVICES LTD.
The Preserved Wood Foundation Guide MUNICODE SERVICES LTD. Prepared by MuniCode Services Ltd. Outline and Restrictions of this Guide The following information required for the construction of Preserved
More information2.18 INTERIOR & EXTERIOR FINISHES 2.18.1 VAPOR & AIR BARRIERS
2.18 INTERIOR & EXTERIOR FINISHES 2.18.1 VAPOR & AIR BARRIERS The LOGIX wall assembly has no need for an additional vapor barrier, the solid concrete core covered with the low permeance EPS (Type II) foam
More informationSECTION 07400 STANDING SEAM METAL ROOF
SECTION 07400 STANDING SEAM METAL ROOF PART 1 - GENERAL 1.01 SECTION INCLUDES A. Work described in this section includes pre-formed standing seam metal roofing system complete with clips, perimeter and
More informationINSTALLATION INSTRUCTIONS for Vinyl Windows without Nailing Fin (JII011) ImPOrTANT INFOrmATION & GlOssAry. rough OPeNINGs
Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for vinyl windows without a nailing fin (including finless, flush fin and flange). Read these instructions
More informationRead and understand all installation instructions and precautions before installing. GENERAL APPLICATION INSTRUCTIONS
AC TOPSEAL SELF-ADHERED, GRANULAR SURFACED, SINGLE PLY, LOW SLOPE ROLLED ROOFING 3 X 33.3 = 100 SQ. FT. 10 YEAR MATERIAL LIMITED WARRANTY For Use on Porches / Sheds / Utility Buildings / Accessory Buildings
More informationIntroduction...COMB-2 Design Considerations and Examples...COMB-3
SECTION DIRECTORY General Information Introduction...COMB-2 Design Considerations and Examples...COMB-3 Combination Assembly Recommendations and Limitations Composite Configurations...COMB-4 Typical Sealant
More informationAvoiding Air Barrier Pitfalls
Avoiding Air Barrier Pitfalls Design & Durability November 2013 Air barriers, when correctly installed, help buildings achieve high levels of energy efficiency by decreasing heat loss. For example, great
More informationHIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS
BSW HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS BSW is a fully reinforced Pre-Applied system membrane designed for horizontal and vertical external blind-side
More informationENERGY STAR Qualified New Homes Thermal Enclosure Checklist. Water Management Checklist. Eli Caudill
ENERGY STAR Qualified New Homes Thermal Enclosure Checklist & Water Management Checklist Eli Caudill ENERGY STAR Version 3 Tighter Standards Whole Home Approach Better, More Sustainable Construction Surpasses
More informationPANELIZED HOME INSTALLATION GUIDELINE
PANELIZED HOME INSTALLATION GUIDELINE A typical home package will be constructed of Snap-N-Lock Insulated Panels clad with steel skins. 4" panels will be used for the walls, and 6" panels for the roof.
More informationSECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)
SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains
More informationConstruction. SikaProof A-08 Edge, A-12 Edge. Fully bonded FPO sheet membrane in L-shape for the SikaProof A waterproofing system. Product Description
Product Data Sheet Edition 15/10/2014 Identification no: 02 07 04 10 300 0 000002 SikaProof A Edge SikaProof A-08 Edge, A-12 Edge Fully bonded FPO sheet membrane in L-shape for the SikaProof A waterproofing
More informationStorage Store the siding in a dry and ventilated area. Do not place it directly on the ground. Always cover the siding after a day s work.
Installation Guide Before you begin, take the time to read this entire guide to clearly understand the requirements and steps to follow for proper installation. Warning Do not install defective material.
More informationCHAPTER 7: Building Systems ROOFING SYSTEMS
ROOFING SYSTEMS Purpose Examples 1. Shingle roof system 2. Metal roof with blanket insulation 3. Metal roof with rigid insulation 4. Built-up asphalt roof system 5. Single-ply roof system 6. Modified Bitumen
More informationAir-Conditioning, Heating, and Refrigeration Institute. Sheet Metal and Air-Conditioning Contractors National Association
Air-Conditioning, Heating, and Refrigeration Institute Sheet Metal and Air-Conditioning Contractors National Association GUIDELINE B-1997 ACKNOWLEDGEMENT These guidelines for Roof Mounted Outdoor Air-
More informationDivision 9. SignaFlor Pad and Pour Flooring System
Division 9 SignaFlor Pad and Pour Flooring System SPECIFICATIONS Page 1. General... 2 1.1 Description 2 1.2 Quality Assurance 2 1.3 Submittals 2 1.4 Delivery and Storage 3 1.5 Warranty 3 1.6 Working Conditions
More informationTHERMOTEK SELF ADHESIVE MEMBRANE +G2 OVER WOOD SYSTEM DESCRIPTION SELF ADHESIVE OVER WOOD (8YR) BS-SA/CS
THERMOTEK SELF ADHESIVE MEMBRANE +G OVER DESCRIPTION SELF ADHESIVE OVER (8YR) BS-SA/CS 1 0 No 0. SUBSTRATE 1. BASE SHEET G FIBER GLASS BASE. THERMOTEK SELF ADHESIVE 3.0 FP GRANULE COMPONENTS AND WEIGHTS
More informationThe Closed Crawl Space: Making the Transition Climate Zones 3A & 4A
TechSpecs A builder s blueprint for construction technologies January 2013 The Closed Crawl Space: Making the Transition Climate Zones 3A & 4A C B A E D H G F A. Wood Floor Framing - p. 2 B. Foundation
More informationTundra Series Windows January 2016
Tundra Series Windows January 2016 New Construction Installation Instructions Nail Fin, J-Fin and Brickmold Aplications product. ATTENTION! Read and understand all installation instructions before installing
More informationSECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS
SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS PART 1 GENERAL 1.01 SECTION INCLUDES A. The requirements for pipe material and installation in sewer and drainage collection systems. All materials
More informationWater Damage & Repair
Water Damage & Repair Chinatown Preservation Talks 2015 James Engler, P.A Glenn Mason, AIA Mason Architects Program Outline Terminology & Waterproofing Basics Discussion of why this is important Below
More informationEcoTouch Insulation with PureFiber Technology
PROJECT ENGINEER RESPONSIBILITY: This is a general specification guide, intended to be used by experienced construction professionals, in conjunction with good construction practice and professional judgment.
More informationFoundation. Foundation
Moisture Aside from structural concerns, the most important consideration for foundation design is moisture. No client wants a wet basement. No client wants a damp basement. No client wants mold in their
More informationSEAMS SEAMING USING SEAM TAPE
SEAMING USING SEAM TAPE SEAMS The membrane should be positioned so that the width of the seam is 3. Remove excess chalk from a chalk line by snapping the line into the air and then chalk a line one-quarter
More informationNEW ELECTRICAL SUBSTATION Building 300 SECTION 07 53 23 ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK
ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to within
More informationClad Direct Glaze Window Installation Instructions
Clad Direct Glaze Window Installation Instructions Sill flashing and sealing: 2. An overview of the proper flashing sequence is shown in figure 1. Please read entire installation instructions carefully
More informationMembrane for tunnels and underground construction
System Platon Membrane for tunnels and underground construction Drainage Protection Waterproofing Dry and healthy buildings The Isola history quality through innovation CONTENT The Isola History Air Gap
More informationTEXAS A&M CENTRAL ACADEMIC BUILDIING & PATRIOT S CASA SUBMITTAL. 23 21 13.19 Pre-Insulated Piping 4-8-13
TEXAS A&M CENTRAL ACADEMIC BUILDIING & PATRIOT S CASA SUBMITTAL 23 21 13.19 Pre-Insulated Piping 4-8-13 MATERIAL SUBMITTAL JOB NAME: TEXAS A&M SAN ANTONIO CENTRAL ACADEMIC BUILDING & PATRIOTS CASA CONTRACTOR:
More informationWATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12
WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12 87 88 GOOD INDUSTRY PRACTICES 12 WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12.1 BACKGROUND Most roofs in Singapore are constructed using reinforced
More informationRESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000
RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 SECTION R905 REQUIREMENTS FOR ROOF COVERINGS R905.1 Roof covering application. Roof coverings
More informationC. Remove all existing asphalt shingles, underlayment and any loose debris into contractor provided dumpsters.
SCOPE OF WORK Project Title: Replace Deteriorated Roof Singles at Cape Lookout National Seashore Maintenance Shop PMIS # 159350 Prepared By: Mike Baker Cape Lookout National Seashore 131Charles St Harkers
More informationINTERIOR WALLS AND BASEMENTS CHOOSING THE RIGHT MEMBRANE FOR INTERIOR WALLS. Multi-Layer Technology provides increased strength.
INTERIOR WALLS AND BASEMENTS CHOOSING THE RIGHT MEMBRANE FOR INTERIOR WALLS Multi-Layer Technology provides increased strength. Specifically designed for interior applications. Compatible with most internal
More informationChapter 3 Pre-Installation, Foundations and Piers
Chapter 3 Pre-Installation, Foundations and Piers 3-1 Pre-Installation Establishes the minimum requirements for the siting, design, materials, access, and installation of manufactured dwellings, accessory
More informationapplication instructions
application instructions ARCHITECTURAL COLLECTION PRIMED BOLD PROFILE 120 SERIES LAP SIDING (D5, T4, D8, T5, Q4) General At the time of manufacture, siding meets or exceeds the performance standards set
More informationCOMMONLY USED RESIDENTIAL BUILDING CODES
COMMONLY USED RESIDENTIAL BUILDING CODES INTERNATIONAL RESIDENTIAL CODE (2009) form revised 5/10 FOUNDATION 1. DESIGN OF FORMWORK. Section 1906.1 IBC 2009, Section R404.1.2.3.6 IRC 2009, ACI 318 Section
More informationOwner's Manual & Assembly Instructions
Owner's Manual & Assembly Instructions PM01 BASE KIT Model No. FDN1014 717090311 CAUTION: SOME PARTS HAVE SHARP EDGES. CARE MUST BE TAKEN WHEN HANDLING THE VARIOUS PIECES TO AVOID A MISHAP. FOR SAFETY
More informationFIRESTOPPING & SMOKE SEALS
SPECIFICATION SECTION 07 84 00 FIRESTOPPING & SMOKE SEALS 1 GENERAL 1.1 SECTION INCLUDES 1.1.1 Comply with Division 1, General Requirements and Documents referred to therein. 1.1.2 It is the intent of
More informationInterior Walls below and above ground OLDROYD THE ULTIMATE WATERPROOF MEMBRANE SYSTEM
P r o d u c t a p p l i c a t i o n s a n d t e c h n i c a l i n f o r m a t i o n 2 below and above ground V OLDROYD THE ULTIMATE WATERPROOF MEMBRANE SYSTEM V The flexible, fast and cost-effective answer
More informationSECTION 08560 SERIES 1500 VINYL PATIO DOORS
SERIES 1500 VINYL PATIO DOORS PART 1 GENERAL 1.1 SECTION INCLUDES A. Patio Doors 1.2 RELATED SECTIONS A. Section 05450: Cold Formed Metal Framing. B. Section 06100: Rough Carpentry. C. Section 06200: Finish
More informationC. Section 014510 TESTING LABORATORY SERVICE.
SECTION 014500 QUALITY CONTROL PART 1 GENERAL 1.01 RELATED REQUIREMENTS A. Drawings and General Provisions of Contract, including General and Special Conditions and other Division 1 Specification Sections,
More informationHigh Performance PSA in Sheet Membrane in Water Protection
High Performance PSA in Sheet Membrane in Water Protection Xia Cao, Senior R&D Chemist, W. R. Grace, Cambridge MA 02140 Jyoti Seth, Strategic Program Leader, W. R. Grace, Cambridge MA 02140 Concrete is
More informationDrexel Metals Inc. DMC 100SS 16oz min. Copper Mechanical Seam Metal Roof System over Plywood
Drexel Metals Inc. DMC 100SS 16oz min. Copper Mechanical Seam Metal Roof System over Plywood Section 07411 Metal Roof Panels Part 1 General 1.1 Summary A. This section includes the following: a. Factory-formed
More informationProduct Guide Specification
Stabilit America, Inc., dba Glasteel June 2005 285 Industrial Drive Moscow, Tennessee 38057 Toll Free (800) 238-5546 Phone (901) 877-3010 Fax (901) 877-1388 Web Site www.glasteel.com Product Guide Specification
More informationRenovating Your Basement
building science.com 2006 Building Science Press All rights of reproduction in any form reserved. Renovating Your Building America Report - 0309 2003 (revised 2007) Building Science Corporation Abstract:
More informationRoxul Board Insulation Section 07 21 13 Master Guide Specification (CAVITYROCK DD) Page 1 October 2013
Master Guide Specification (CAVITYROCK DD) Page 1 ROXUL GUIDE NOTE: This master specification section is based on ROXUL INC., CAVITYROCK DD. Standard application: Cavity wall. ROXUL GUIDE NOTE: This master
More informationTHERMOTEK MODIFIED BITUMEN TORCH MEMBRANE OVER
THERMOTEK MODIFIED BITUMEN TORCH MEMBRANE OVER DESCRIPTION TORCH OVER (15,17,19 YR) TH/BS-TH/CS 2 1 0 No 0. SUBSTRATE 1. THERMOTEK USA 2.0 FV TORCH SMOOTH 2. THERMOTEK USA PRO FP TORCH GRANULE COMPONENTS
More informationHOW TO INSULATE A CRAWLSPACE
HOW TO INSULATE A CRAWLSPACE Many homes throughout the United States have what are commonly referred to as crawlspaces. Crawlspaces are open spaces underneath a portion of a home. They are very common
More informationLaminate Flooring T-Lock Angle-Drop Installation Instructions
TECHNICAL SERVICE Laminate Flooring T-Lock Angle-Drop Installation Instructions March 23, 2012 Read all instructions carefully before beginning installation. Make sure that the instructions are the most
More informationSECTION 07550 - MODIFIED BITUMINOUS MEMBRANE ROOFING. A. Vapor barrier (base ply); cover board at existing roof deck.
SECTION 07550 - PART I GENERAL 1.01 SECTION INCLUDES A. Vapor barrier (base ply); cover board at existing roof deck. B. Roof insulation at new roof deck. C. Modified bitumen membrane. D. Fluid applied
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-31 31 16.19 (February 2016) -------------------------------- Preparing Activity: NAVFAC Superseding UFGS 31 31 16.19 (August 2014) UFGS 31 31 16.20 (April 2006) UFGS
More informationSECTION 07540 - THERMOPLASTIC MEMBRANE ROOFING
SECTION 07540 - THERMOPLASTIC MEMBRANE ROOFING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification
More information1. Adhered KEE membrane roofing system. 2. Mechanically fastened KEE membrane roofing system.
SECTION 075416 - PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Adhered KEE membrane roofing system. 2. Mechanically fastened KEE membrane roofing system. 1.2 PERFORMANCE REQUIREMENTS A. Solar Reflectance
More informationFinal inspections are completed by site visit only. Access to fenced yards shall be planned.
ROOFING RESIDENTIAL BUILDING INSPECTIONS DEPARTMENT www.ci.blaine.mn.us This handout is intended only as a guide and is based in part on the 2015 Minnesota State Building Code, Blaine City ordinances,
More informationSPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 16 BRIDGE DECK WATERPROOFING. 16.1 General...16-1. 16.2 Materials...16-1. 16.3 Equipment...
SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 16 BRIDGE DECK WATERPROOFING TABLE OF CONTENTS 16.1 General...16-1 16.2 Materials...16-1 16.3 Equipment...16-1 16.4 Installation...16-2 16.4.1 Traffic Restrictions...16-2
More informationProposed Minimum Subterranean Termite Treatment Standards
Proposed Minimum Subterranean Termite Treatment Standards Introduction This document is intended to serve as a model for states considering the adoption of standards for soil application of termiticides.
More informationChapter 2 Basis of design and materials
Chapter 2 Basis of design and materials 2.1 Structural action It is necessary to start a design by deciding on the type and layout of structure to be used. Tentative sizes must be allocated to each structural
More informationDiscipline: Structural Issued 04-26-06
California Department of General Services. Division of the State Architect. Product Acceptance Report STRUCTURAL SHEAR PANEL SURE-BOARD SERIES 200 PANELS PA-132 Discipline: Structural Issued 04-26-06 This
More informationMASTERFORMAT SPECIFICATION
Insulspan, Incorporated 9012 East US 223 Blissfield, MI, USA 49228-0026 Phone: 800.726.3510 Insulspan Division of Plasti-Fab Ltd. 600 Chester Road Deltas, BC, Canada V3M 5Y3 Phone: 866.848.8855 www.insulspan.com
More informationWhat s Wrong with this Project? Report
NAHB RESEARCH CENTER INDUSTRY PARTNERSHIP FOR HIGH PERFORMING HOMES Task Order Agreement KNDJ-0-40335-01 Deliverable Task 11.3 What s Wrong with this Project? Report Prepared For: Alliance for Sustainable
More informationSTAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM
STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM Installed in Pre-engineered Steel Buildings Provides Lowest Cost Construction Method for CORROSIVE AND WET Environments PREFERRED SOLUTIONS, INC.
More informationSECTION 07 61 13 STANDING SEAM METAL ROOFING
SECTION 07 61 13 STANDING SEAM METAL ROOFING PART 1 GENERAL 1.01 SCOPE OF WORK A. The Work shall include all labor, materials, equipment and supervision required to complete the work of the above referenced
More informationReplacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin
Replacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin americancraftsmanwindows.com Project Requirements: Failure to follow these instructions may void product
More informationState of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary
More informationNRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS
NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS The (NRDCA) has prepared this document to provide customers and installers information that the industry
More informationCITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503. Re-Roofing: Asphalt Shingles
CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503 Re-Roofing: Asphalt Shingles This is a summary of the standard requirements based on the
More informationPART 1 GENERAL 1.1 SECTION INCLUDES
J-1 Section 09110 Long Form Specification INTERIOR METAL STUD FRAMING This section includes lightweight, usually 0.036 inch (0.9 mm) thick or lighter, non-axial load bearing metal stud framing including
More informationChapter 36 - STRAW BALE CONSTRUCTION SECTION 3601 - PURPOSE. SECTION 3602 - SCOPE. SECTION 3603 - DEFINITIONS.
Austin City Code - Volume II TITLE 25 LAND DEVELOPMENT\CHAPTER 25-12 TECHNICAL CODES\ARTICLE 1: UNIFORM BUILDING CODE\25-12-3 LOCAL AMENDMENTS TO THE BUILDING CODE Chapter 36 - STRAW BALE CONSTRUCTION
More information