1 Bridge Engineering Seminar Micropile Foundations for Bridges Lexington, KY Dan Thome, P.E. January 10, 2012

2 Micropiles Overview Installation Techniques Applications/Case Histories Design Load Testing

3 Reasons for Deep Foundations Incompetent bearing layer Total settlements and/or differential settlements can not be achieved with shallow foundations Surface soil is subject to scour Excavation will undermine existing shallow foundations

4 Micropiles Description 5 to 12 Inch diameter drilled and grouted piles Can achieve capacities in Soil and Rock (250 tons) Develop primarily skin friction capacity Ductile steel tubes (traditionally) Depths over 200 feet (~330 feet)

5 Micropiles Advantages Hole is typically cased until grouted Obstruction/rock drilling typically not an issue Equipment could fit in 8 feet headroom and 3 foot doorways Vibrations/noise less of an issue than with other systems Disadvantages Most expensive foundation system unless there are geotechnical or physical constraint

6 Typical Compression Compressible Zone Bond Zone

7 Typical Tension Compressible Zone Bond Zone

8 Casing Only Compressible Zone Bond Zone

9 Bar Only Compressible Zone Bond Zone

10 End-Bearing Piles

11 Materials Steel Casing Use mill secondary oil field casing Typically y flush threaded joints 80 ksi minimum yield strength

12 Materials Reinforcing Bar Grade 60 Grade 75 or 80 Grade 150 Centralizers are used

13 Materials - Grout Neat cement with water/cement ratio of 0.45 Compressive strength of 4-6 ksi Improved stiffness w/confinement

14 Drilling Methods Proximity to other structures? Soil stratigraphy? Location of water table? Soil gradation? Boulders/obstructions present? Cost of spoil removal? Total depth?

15 Installation/Drilling Methods Duplex Rotary eccentric percussive duplex External flush Self-drilling bars (bar only)

16 Duplex Drilling

17 Duplex Drilling Often specified - least risk Minimal loss of ground in cohesionless soils Grouted through the casing - then pulled with tremie head or excess pressure

18 Eccentric Duplex Drilling

19 Eccentric Duplex Drilling Top of Rock Void Bond Zone

20 External Flush Drilling Opening larger than casing size Risk of ground loss in cohesionless soils Tremie grouted through casing then pulled with tremie head or excess pressure

21 Applications New Structures in Difficult Ground

22 MDOT M-78 Bellevue, MI

23 J.W. Marriott Parking Structure Grand Rapids, MI

24 SR 33 Stockertown, PA

25 Applications Additions to Existing Structures

26 Route 139 NJ DOT

27 Route 139 NJ DOT

28 Applications Rehabilitation of Existing Structures

29 MDOT I-94 - Project Background Original Construction (Late 1950s) Two, three-span bridges for Interstate 94 over Riverside Drive T-beam deck sections Common partial height abutments Abutments supported by shallow foundations on embankment fill Piers supported by shallow foundations on native soils Reconstruction (Summer 2009) Two, single span bridges Common full height abutments Both abutments on driven H piles 29

30 MDOT I-94 - Original Reconstruction Plan New Pile Caps Phases III & IV Construction Phases I & II Construction Existing Shallow Fdns Phases III & IV Construction 30

31 MDOT I-94 - Timeline of Events Mid April - Removal of bridge deck, piers and abutments for Phases I & II construction April 30 th Pile driving with vibratory hammer begins for shallow depths May 5 th Test piles are driven with impact hammer to LRFD refusal Estimated pile lengths ~ 90 to 100 feet Actual pile lengths ~ 140 feet May 13 th Pile driving continues with vibratory hammer for shallow depths MDOT observes: Pavement cracks behind eastbound abutment (rotation of abutments towards Riverside Drive) Settlement of existing piers (towards centerline of I-94) Settlement of Riverside Drive (~ 1 foot concluded) Pile driving discontinued with vibratory hammer (~ 51 piles installed) May 14 th MDOT observes lateral lshift of eastbound dpier 2( (~ 6i inches) Shutdown EB and WB lanes of Interstate 94 (WB lanes reopened on May 15th) Per MDOT, Nicholson visited site to observe movements May 15 th MDOT contracted Nicholson to perform an emergency micropile retrofit of the existing eastbound pier footings and perform real-time monitoring of the two bridges 31

32 MDOT I-94 - Timeline of Events Westbound Lane Looking Northeast 32

33 MDOT I-94 - Timeline of Events Eastbound Lane Looking South 33

34 MDOT I-94 - Timeline of Events Eastbound Lane Looking Northwest 34

35 MDOT I-94 - Emergency Micropile Retrofit Pile Layout N Phases I & II Construction Phases III & IV Construction 35

36 MDOT I-94 - Emergency Micropile Retrofit Pile Detail 36

37 MDOT I-94 - Emergency Micropile Retrofit West Pier Interior Column 37

38 MDOT I-94 - Emergency Micropile Retrofit East Pier Interior Column 38

39 MDOT I-94 - Emergency Micropile Retrofit West Pier Interior Column 39

40 Micropile Design Aspects Geotechnical Frictional bond compression & tension End bearing Structural Lateral loads/bending Battered piles/axial Connection

41 FHWA Allowable Compression P allc = 0.40 * f c * A grout * f ycasing * A casing * f ybar * A bar

42 FHWA Allowable Tension P allt = 0.55 * f ybar * A bar

43 Code Allowable Load in Kips ACI with LF = 1.55 FHWA Micropiles AASHTO Caisson AASHTO Driven Unfilled AASHTO Driven Concrete Filled AREA Driven CIP Concrete AREA Drilled Shafts MASS BLDG CODE City of Chicago IBC2000 & BOCA Drilled uncased piles IBC2000 Concrete filled pipe piles > 8" IBC2000 Concrete filled pipe piles IBC2000 Caisson Piles > 18" BOCA Concrete filled pipe pp piles > 8" UBC Uncased CIP Concrete Piles UBC Metal Cased Concrete Piles UBC Concrete-filled Pipe Piles UBC180872ConcretefilledPipePiles Concrete-filled Piles 7 OD x 0.5 wall casing with 5 ksi grout

44 Geotechnical Design Typical friction pile Tip resistance neglected P all = σπdl where: σ = Allowable bond stress of Soil/Rock in bond zone (F.S. = 2.0 or 2.5) d = Diameter of bond zone L = Length of bond zone L D

45 Bond Stress Recommendations FHWA 1 kpa = psi

46 Bond Stress PTI Recommendations

47 Bond Stress PTI Recommendations

48 Bond Stress PTI Recommendations

49 Lateral Load Analysis Batter piles NAVFAC procedure LPILE to determine bending moment GROUP5 considers effect of batter Combined stress = axial load + bending

50 Simple Compression, New Footing

51 Compression and Tension, New Footing

52

53 Existing Footing Connection

54 Pile Load Testing Compression ASTM D1143 Tension ASTM D3689 Lateral ASTM 3966

55 Compression Test

56 Tension Test

57 Lateral Load Test Test 2 Piles Jack & Load Cell between 2 piles Hand Pump small load increments

58 Load Test Acceptance Criteria - FHWA Micropile Guidelines The pile shall sustain the compression and tension design loads (100% DL) with no more than inches total t vertical movement at tthe top of fthe pile. The slope of the pile deflection curve at twice the allowable design load is less than a slope of 0.15 mm per kn (0.05 in / Ton) of applied load. Creep at Test Load of 0.04 inches 1 to 10 min or 0.08 inch/log cycle

59 Thank You

USE OF MICROPILES IN TEXAS BRIDGES. by John G. Delphia, P.E. TxDOT Bridge Division Geotechnical Branch

USE OF MICROPILES IN TEXAS BRIDGES. by John G. Delphia, P.E. TxDOT Bridge Division Geotechnical Branch USE OF MICROPILES IN TEXAS BRIDGES by John G. Delphia, P.E. TxDOT Bridge Division Geotechnical Branch DEFINITION OF A MICROPILE A micropile is a small diameter (typically less than 12 in.), drilled and

More information

Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation

Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation Jeff R. Hill, P.E. Hayward Baker Inc. 111 W. Port Plaza Drive Suite 600 St. Louis, MO 63146 314-542-3040 JRHill@HaywardBaker.com

More information

Outline MICROPILES SUBJECT TO LATERAL LOADING. Dr. Jesús Gómez, P.E.

Outline MICROPILES SUBJECT TO LATERAL LOADING. Dr. Jesús Gómez, P.E. MICROPILES SUBJECT TO LATERAL LOADING Dr. Jesús Gómez, P.E. Micropile Design and Construction Seminar Las Vegas, NV April 3-4, 2008 Outline When are micropiles subject to lateral load? How do we analyze

More information

STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.

STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL. STRUCTURES 1. General. Critical structures may impact the integrity of a flood control project in several manners such as the excavation for construction of the structure, the type of foundation, backfill

More information

The International Workshop on Micropiles, 2007

The International Workshop on Micropiles, 2007 MICROPILE FOUNDATION REPAIR AND UNDERPINNING, ARTS AND SCIENCE MUSEUM, UNIVERSITY OF PUERTO RICO, MAYAGUEZ Presented at: International Society of Micropiles (ISM) The International Workshop on Micropiles,

More information

Communication Tower Foundation Selection Criteria

Communication Tower Foundation Selection Criteria Communication Tower Foundation Selection Criteria Introduction This foundation selection criteria document has been prepared by the Engineering Specialties Group as a resource for public and private entities,

More information

BRIDGE RESTORATION AND LANDSLIDE CORRECTION USING STRUCTURAL PIER AND GRADE BEAM

BRIDGE RESTORATION AND LANDSLIDE CORRECTION USING STRUCTURAL PIER AND GRADE BEAM BRIDGE RESTORATION AND LANDSLIDE CORRECTION USING STRUCTURAL PIER AND GRADE BEAM Swaminathan Srinivasan, P.E., M.ASCE H.C. Nutting/Terracon David Tomley, P.E., M.ASCE KZF Design Delivering Success for

More information

Step 11 Static Load Testing

Step 11 Static Load Testing Step 11 Static Load Testing Test loading is the most definitive method of determining load capacity of a pile. Testing a pile to failure provides valuable information to the design engineer and is recommended

More information

UNDERPINNING OF NEW STUDENT HOUSING BUILDING USING MICROPILES, NORTH CAROLINA USA

UNDERPINNING OF NEW STUDENT HOUSING BUILDING USING MICROPILES, NORTH CAROLINA USA UNDERPINNING OF NEW STUDENT HOUSING BUILDING USING MICROPILES, NORTH CAROLINA USA John R. Wolosick, P.E.,D.GE 1, Michael W. Terry, P.E. 2, W. David Kirschner 3 and Robert F. Scott Jr. P.E. 4 SYNOPSIS In

More information

TYPES OF FOUNDATIONS

TYPES OF FOUNDATIONS TYPES OF FOUNDATIONS 1 Foundation Systems Shallow Foundation Deep Foundation Pile Foundation Pier (Caisson) Foundation Isolated spread footings Wall footings Combined footings Cantilever or strap footings

More information

Safe & Sound Bridge Terminology

Safe & Sound Bridge Terminology Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries

More information

Up-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations

Up-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations Up-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations Nathan A. Ingraffea, P.E., S.E. Associate, KPFF Consulting Engineers, Portland, Oregon, USA Abstract The use of steel sheet

More information

METHOD OF STATEMENT FOR STATIC LOADING TEST

METHOD OF STATEMENT FOR STATIC LOADING TEST Compression Test, METHOD OF STATEMENT FOR STATIC LOADING TEST Tension Test and Lateral Test According to the American Standards ASTM D1143 07, ASTM D3689 07, ASTM D3966 07 and Euro Codes EC7 Table of Contents

More information

Comprehensive Design Example 2: Foundations for Bulk Storage Facility

Comprehensive Design Example 2: Foundations for Bulk Storage Facility Comprehensive Design Example 2: Foundations for Bulk Storage Facility Problem The project consists of building several dry product storage silos near an existing rail siding in an open field presently

More information

LEGACY REPORT ER-5110. www.icc-es.org. ICC Evaluation Service, Inc. Reissued November 1, 2003. Legacy report on the 1997 Uniform Building Code

LEGACY REPORT ER-5110. www.icc-es.org. ICC Evaluation Service, Inc. Reissued November 1, 2003. Legacy report on the 1997 Uniform Building Code LEGACY REPORT Reissued November 1, 2003 ICC Evaluation Service, Inc. www.icc-es.org Business/Regional Office # 5360 Workman Mill Road, Whittier, California 90601 # (562) 699-0543 Regional Office # 900

More information

Project Location. Project Limits: The Grand River east to Fuller Ave.

Project Location. Project Limits: The Grand River east to Fuller Ave. Outline Project Location Project Description Project History Site Constraints Geotechnical Investigation & Soil Profile Foundation Design Process Photos Project Location Project Limits: The Grand River

More information

Value of Instrumentation Systems and Real-Time Monitoring: An Owner s Perspective

Value of Instrumentation Systems and Real-Time Monitoring: An Owner s Perspective Value of Instrumentation Systems and Real-Time Monitoring: An Owner s Perspective FHWA NATIONAL GEOTECHNICAL PROGRAM www.fhwa.dot.gov/engineering/geotech Why Geotechnical Instrumentation? Provide warning

More information

Design, Testing and Automated Monitoring of ACIP Piles in Residual Soils

Design, Testing and Automated Monitoring of ACIP Piles in Residual Soils Design, Testing and Automated Monitoring of ACIP Piles in Residual Soils Stephen W. Lacz 1, M. ASCE, P.E. and Richard C. Wells 2, F. ASCE, P.E. 1 Senior Professional, Trigon Kleinfelder, Inc., 313 Gallimore

More information

Page B-1 Hubbell Power Systems, Inc. All Rights Reserved Copyright 2014 LOAD TESTS

Page B-1 Hubbell Power Systems, Inc. All Rights Reserved Copyright 2014 LOAD TESTS Page B-1 Hubbell Power Systems, Inc. All Rights Reserved Copyright 2014 Appendix B CONTENTS STATIC (TIEBACKS)... B-3 STATIC AXIAL (COMPRESSION/TENSION)... B-6 STATIC (LATERAL)... B-9 CAPACITY VERIFICATION

More information

Challenging Skew: Higgins Road Steel I-Girder Bridge over I-90 OTEC 2015 - October 27, 2015 Session 26

Challenging Skew: Higgins Road Steel I-Girder Bridge over I-90 OTEC 2015 - October 27, 2015 Session 26 2014 HDR Architecture, 2014 2014 HDR, HDR, Inc., all all rights reserved. Challenging Skew: Higgins Road Steel I-Girder Bridge over I-90 OTEC 2015 - October 27, 2015 Session 26 Brandon Chavel, PhD, P.E.,

More information

GLOSSARY OF TERMINOLOGY

GLOSSARY OF TERMINOLOGY GLOSSARY OF TERMINOLOGY AUTHORIZED PILE LENGTHS - (a.k.a. Authorized Pile Lengths letter) Official letter stating Engineer's recommended length of concrete piles to be cast for construction of foundation.

More information

AN INTRODUCTION TO BUILDING FOUNDATIONS AND SOIL IMPROVEMENT METHODS

AN INTRODUCTION TO BUILDING FOUNDATIONS AND SOIL IMPROVEMENT METHODS AN INTRODUCTION TO BUILDING FOUNDATIONS AND SOIL IMPROVEMENT METHODS SEAONC 2008 Spring Seminar San Francisco, 16 April 2008 Hadi J. Yap, PhD, PE, GE 1 General Foundation Types Shallow Foundations Spread

More information

CHAPTER 9 LONG TERM MONITORING AT THE ROUTE 351 BRIDGE

CHAPTER 9 LONG TERM MONITORING AT THE ROUTE 351 BRIDGE CHAPTER 9 LONG TERM MONITORING AT THE ROUTE 351 BRIDGE 9.1 INTRODUCTION An important reason that composite piles have not gained wide acceptance in the civil engineering practice is the lack of a long

More information

FOUNDATION DESIGN. Instructional Materials Complementing FEMA 451, Design Examples

FOUNDATION DESIGN. Instructional Materials Complementing FEMA 451, Design Examples FOUNDATION DESIGN Proportioning elements for: Transfer of seismic forces Strength and stiffness Shallow and deep foundations Elastic and plastic analysis Foundation Design 14-1 Load Path and Transfer to

More information

Lymon C. Reese & Associates LCR&A Consulting Services Tests of Piles Under Axial Load

Lymon C. Reese & Associates LCR&A Consulting Services Tests of Piles Under Axial Load Lymon C. Reese & Associates LCR&A Consulting Services Tests of Piles Under Axial Load Nature of Services The company has a long history of performance of tests of piles and pile groups under a variety

More information

ALLOWABLE LOADS ON A SINGLE PILE

ALLOWABLE LOADS ON A SINGLE PILE C H A P T E R 5 ALLOWABLE LOADS ON A SINGLE PILE Section I. BASICS 5-1. Considerations. For safe, economical pile foundations in military construction, it is necessary to determine the allowable load capacity

More information

VERTICAL MICROPILE LATERAL LOADING. Andy Baxter, P.G.

VERTICAL MICROPILE LATERAL LOADING. Andy Baxter, P.G. EFFICIENT DESIGN OF VERTICAL MICROPILE SYSTEMS TO LATERAL LOADING Dr. Jesús Gómez, P.E. PE Andy Baxter, P.G. Outline When are micropiles subject to lateral load? How do we analyze them? Shear Friction

More information

IJESRT. Scientific Journal Impact Factor: 3.449 (ISRA), Impact Factor: 2.114 [205] [Elarabi, 3(12): December, 2014] ISSN: 2277-9655

IJESRT. Scientific Journal Impact Factor: 3.449 (ISRA), Impact Factor: 2.114 [205] [Elarabi, 3(12): December, 2014] ISSN: 2277-9655 IJESRT INTERNATIONAL JOURNAL OF ENGINEERING SCIENCES & RESEARCH TECHNOLOGY Micropiles for Structural Support Elarabi*, Abbas *Associate Professor at Building and Road Research Institute, University of

More information

Paper - 4 - The relation of Micropile Diameters in case of Pressure casting and non-pressure casting (30)

Paper - 4 - The relation of Micropile Diameters in case of Pressure casting and non-pressure casting (30) Paper - 4 - Elarabi, H.; Abbas A., The relation of Micropile Diameters in case of Pressure casting and non-pressure casting,magnt Research Report (ISSN. 1444-8939), Vol.2 (2) Accepted for publication The

More information

New construction Repairing failed or old foundations Retrofit foundations Permanent battered piers Machinery/equipment foundations

New construction Repairing failed or old foundations Retrofit foundations Permanent battered piers Machinery/equipment foundations from New construction foundations don t have to be a headache. The CHANCE Helical Pier Foundation System gives you the performance of concrete without the drawbacks and liabilities of driven piles and

More information

Design and Construction of Auger Cast Piles

Design and Construction of Auger Cast Piles Design and Construction of Auger Cast Piles 101 th Annual Road School 2015 3/11/2015 Malek Smadi, Ph.D., P.E. Principal Engineer - GEOTILL - Fishers, IN msmadi@geotill.com - www.geotill.com CONTENTS 1.

More information

Shaft Friction of Bored Piles in Hard Clay

Shaft Friction of Bored Piles in Hard Clay Pak. J. Engg. & Appl. Sci. Vol. 3 Jul 2008 (p.54 60) Shaft Friction of Bored Piles in Hard Clay A. Akbar 1, S. Khilji 1, S.B. Khan 1, M.S.Qureshi 1 and M. Sattar 2 1 Civil Engineering Department, University

More information

Helical Design Theory and Applications. By Darin Willis, P.E.

Helical Design Theory and Applications. By Darin Willis, P.E. Helical Design Theory and Applications By Darin Willis, P.E. Solution Systems Ram Jack utilizes two unique underpinning & anchoring systems Hydraulically driven piles (pressed) Helical piles (torqued)

More information

Florida Department of Transportation 605 Suwannee Street Tallahassee, FL 32399-0450

Florida Department of Transportation 605 Suwannee Street Tallahassee, FL 32399-0450 RICK SCOTT GOVERNOR Florida Department of Transportation 605 Suwannee Street Tallahassee, FL 32399-0450 JIM BOXOLD SECRETARY Tips for Professional Services Prequalification Resume Submission In an effort

More information

MICROPILE FOUNDATIONS IN KARST: STATIC AND DYNAMIC TESTING VARIABILITY

MICROPILE FOUNDATIONS IN KARST: STATIC AND DYNAMIC TESTING VARIABILITY MICROPILE FOUNDATIONS IN KARST: STATIC AND DYNAMIC TESTING VARIABILITY Jesús Gómez, Ph.D., P.E Allen Cadden, P.E. O. Christopher Webster, P.E. Schnabel Engineering, Inc. Schnabel Engineering, Inc. Schnabel

More information

How to Design Helical Piles per the 2009 International Building Code

How to Design Helical Piles per the 2009 International Building Code ABSTRACT How to Design Helical Piles per the 2009 International Building Code by Darin Willis, P.E. 1 Helical piles and anchors have been used in construction applications for more than 150 years. The

More information

Table of Contents 16.1 GENERAL... 16.1-1. 16.1.1 Overview... 16.1-1 16.1.2 Responsibilities... 16.1-1

Table of Contents 16.1 GENERAL... 16.1-1. 16.1.1 Overview... 16.1-1 16.1.2 Responsibilities... 16.1-1 Table of Contents Section Page 16.1 GENERAL... 16.1-1 16.1.1 Overview... 16.1-1 16.1.2 Responsibilities... 16.1-1 16.1.2.1 Geotechnical Section/Bridge Bureau Coordination... 16.1-1 16.1.2.2 Geotechnical

More information

Emergency repair of Bridge B421

Emergency repair of Bridge B421 Emergency repair of Bridge B421 over the Olifants River after fl ood damage INTRODUCTION AND BACKGROUND Bridge B421 is located on the R555 at km 5.03 on Section 01E between Witbank (now known as emalahleni)

More information

The Installation and Load Testing of Drilled Shafts

The Installation and Load Testing of Drilled Shafts Presentation to the North American Chinese Geotechnical Engineers Association The Installation and Load Testing of Drilled Shafts at Clarksville, Virginia by James M. Sheahan, P.E. HDR Engineering, Inc.

More information

Pent Up Load and Its Effect on Load Test Evaluation

Pent Up Load and Its Effect on Load Test Evaluation Nicholson Construction Company 12 McClane Street Cuddy, PA 15031 Telephone: 412-221-4500 Facsimile: 412-221-3127 Pent Up Load and Its Effect on Load Test Evaluation by T.D. Richards Jr., P.E. Nicholson

More information

SECTION 700 STRUCTURES SECTION 701 DRIVEN PILING MATERIALS. 701.02 Materials Materials shall be in accordance with the following:

SECTION 700 STRUCTURES SECTION 701 DRIVEN PILING MATERIALS. 701.02 Materials Materials shall be in accordance with the following: 701.03 SECTION 700 STRUCTURES SECTION 701 DRIVEN PILING 10 701.01 Description This work shall consist of furnishing and driving foundation piles of the type and dimensions specified including cutting off

More information

Chapter 3 DESIGN AND CONSTRUCTION FEATURES IMPORTANT TO SEISMIC PERFORMANCE

Chapter 3 DESIGN AND CONSTRUCTION FEATURES IMPORTANT TO SEISMIC PERFORMANCE Chapter 3 DESIGN AND CONSTRUCTION FEATURES IMPORTANT TO SEISMIC PERFORMANCE To satisfy the performance goals of the NEHRP Recommended Seismic Provisions, a number of characteristics are important to the

More information

TYPES OF PIERS USED IN NORTH AND EAST TEXAS RESIDENTIAL FOUNDATION REPAIR

TYPES OF PIERS USED IN NORTH AND EAST TEXAS RESIDENTIAL FOUNDATION REPAIR TYPES OF PIERS USED IN NORTH AND EAST TEXAS RESIDENTIAL FOUNDATION REPAIR If you listen to the hype, it sounds like there must be 20 or 30 different types of piers out there. Company A says they have an

More information

IH-635 MANAGED LANES PROJECT, SEG. 3.2

IH-635 MANAGED LANES PROJECT, SEG. 3.2 IH-635 MANAGED LANES PROJECT, SEG. 3.2 Location: Dallas, Texas Owner: Texas Department of Transportation Client: Ferrovial Agroman Construction Cost: $1 Billion Construction Completion Date: December,

More information

Draft Table of Contents. Building Code Requirements for Structural Concrete and Commentary ACI 318-14

Draft Table of Contents. Building Code Requirements for Structural Concrete and Commentary ACI 318-14 Draft Table of Contents Building Code Requirements for Structural Concrete and Commentary ACI 318-14 BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE (ACI 318 14) Chapter 1 General 1.1 Scope of ACI 318

More information

ATLAS RESISTANCE Pier Foundation Systems

ATLAS RESISTANCE Pier Foundation Systems ATLAS RESISTANCE Pier Foundation Systems Foundation Repair Systems for Civil Construction Applications: Residential, Commercial, Industrial Atlas Resistance Piers have been used to restore and/or stabilize

More information

11/1/2010 3:57 PM 1 of 11

11/1/2010 3:57 PM 1 of 11 Masonry Wall 6.0 - MASONRY WALL ANALYSIS AND DESIGN ================================================================================ Job ID : Job Description : Designed By : ================================================================================

More information

Tiebacks/Anchors & Soil Nails. Tom Richards, PE Chief Design Engineer Nicholson Construction Company 12 McClane Street Cuddy, PA 15031

Tiebacks/Anchors & Soil Nails. Tom Richards, PE Chief Design Engineer Nicholson Construction Company 12 McClane Street Cuddy, PA 15031 Tiebacks/Anchors & Soil Nails Tom Richards, PE Chief Design Engineer Nicholson Construction Company 12 McClane Street Cuddy, PA 15031 Anchors & Nails Design Intro Materials Construction Testing Anchor

More information

HELICAL SCREW ANCHORS AND FOUNDATIONS IN SOIL. History, Applications, Design

HELICAL SCREW ANCHORS AND FOUNDATIONS IN SOIL. History, Applications, Design HELICAL SCREW ANCHORS AND FOUNDATIONS IN SOIL Historical Perspective 1 st Recorded use of a Screw Pile was by Alexander Mitchell in 1836 for Moorings and was then applied by Mitchell to Maplin Sands Lighthouse

More information

High Capacity Helical Piles Limited Access Projects

High Capacity Helical Piles Limited Access Projects High Capacity Helical Piles Limited Access Projects Tel 403 228-1767 Canada, USA, Russia Brendan ODonoghue 519 830-6113 Presentation Summary 1. Helical piles Background on large diameter shafts and helices

More information

(laboratory) (fall semester)

(laboratory) (fall semester) Civil Engineering Courses-1 CIV 211/Surveying Prerequisite: MAT 127 An introduction to the theory and applications of modern surveying processes. Students use optical and digital land surveying instruments

More information

Basics of Reinforced Concrete Design

Basics of Reinforced Concrete Design Basics of Reinforced Concrete Design Presented by: Ronald Thornton, P.E. Define several terms related to reinforced concrete design Learn the basic theory behind structural analysis and reinforced concrete

More information

PTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE

PTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE FORM A PTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE The following suggested specifications are written as a guide to assist the specifier in writing his own specifications. Specific circumstances

More information

Auger Boring. Dr. Mark Knight. Centre for Advancement of Trenchless Technologies (CATT) University of Waterloo. New Installations.

Auger Boring. Dr. Mark Knight. Centre for Advancement of Trenchless Technologies (CATT) University of Waterloo. New Installations. Auger Boring Dr. Mark Knight Centre for Advancement of Trenchless Technologies (CATT) University of Waterloo 1 New Installations New Installations Non-Steering Methods Steering Methods Moling/Piercing

More information

SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors.

SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors. SUBDRAINS AND FOOTING DRAIN COLLECTORS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Subdrains B. Subdrain Cleanouts and Outlets C. Footing Drain Collectors D. Storm Sewer Service and Connections 1.02 DESCRIPTION

More information

Instrumentations, Pile Group Load Testing, and Data Analysis Part II: Design & Analysis of Lateral Load Test. Murad Abu-Farsakh, Ph.D., P.E.

Instrumentations, Pile Group Load Testing, and Data Analysis Part II: Design & Analysis of Lateral Load Test. Murad Abu-Farsakh, Ph.D., P.E. Instrumentations, Pile Group Load Testing, and Data Analysis Part II: Design & Analysis of Lateral Load Test Murad Abu-Farsakh, Ph.D., P.E. Louisiana Transportation Research Center Louisiana State University

More information

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary

More information

Figure A-1. Figure A-2. continued on next page... HPM-1. Grout Reservoir. Neat Cement Grout (Very Flowable) Extension Displacement Plate

Figure A-1. Figure A-2. continued on next page... HPM-1. Grout Reservoir. Neat Cement Grout (Very Flowable) Extension Displacement Plate Addendum HELICAL PULLDOWN Micropile (HPM) Introduction The HPM is a system for constructing a grout column around the shaft of a standard Helical Screw Foundation (see Figure A1). To begin the process,

More information

Retrofitting By Means Of Post Tensioning. Khaled Nahlawi 1

Retrofitting By Means Of Post Tensioning. Khaled Nahlawi 1 Retrofitting By Means Of Post Tensioning Khaled Nahlawi 1 Abstract An analytical program was prepared to retrofit the Holy Cross Church in Santa Cruz, California. An inelastic analysis was perfonned on

More information

SECTION 1 GENERAL REQUIREMENTS

SECTION 1 GENERAL REQUIREMENTS Page 1 of 6 SECTION 1 GENERAL REQUIREMENTS 1. SCOPE OF WORK: The work to be performed under the provisions of these documents and the contract based thereon includes furnishing all labor, equipment, materials,

More information

Source: Port Mann Bridge Plans Unveiled Today, CBC News, February 4, 2009.

Source: Port Mann Bridge Plans Unveiled Today, CBC News, February 4, 2009. Total project cost $2.5 billion (Canadian) Financed by tolls about $3 each direction. Total project length 37 km (McGill St in Vancouver to 216 th in Langley) The new Port Mann bridge 10 lanes (existing

More information

Dr. Jesús Gómez, P.E. 36th Annual Conference on Deep Foundations, Boston, MA

Dr. Jesús Gómez, P.E. 36th Annual Conference on Deep Foundations, Boston, MA FHWA Hollow Bar Soil Nail (HBSN) Test Program Dr. Jesús Gómez, P.E. 36th Annual Conference on Deep Foundations, Boston, MA Outline Introduction and motivation Installation methods for testing Testing and

More information

2012 Ohio Geotechnical Consultant Workshop Columbus, Ohio; May 8, 2012

2012 Ohio Geotechnical Consultant Workshop Columbus, Ohio; May 8, 2012 2012 Ohio Geotechnical Consultant Workshop Columbus, Ohio; May 8, 2012 Overview of New FHWA Course: NHI-132083 Implementation of LRFD Geotechnical Design for Bridge Foundation Naser Abu-Hejleh, Ph.D.,

More information

ENGINEERED FOUNDATIONS. Department of Public Works Jeff Hill, PE

ENGINEERED FOUNDATIONS. Department of Public Works Jeff Hill, PE ENGINEERED FOUNDATIONS Department of Public Works Jeff Hill, PE What is an engineered foundation. A Foundation Design Developed by a Trained Professional (Engineer) Types of Foundations (All of which can

More information

Technical Notes 3B - Brick Masonry Section Properties May 1993

Technical Notes 3B - Brick Masonry Section Properties May 1993 Technical Notes 3B - Brick Masonry Section Properties May 1993 Abstract: This Technical Notes is a design aid for the Building Code Requirements for Masonry Structures (ACI 530/ASCE 5/TMS 402-92) and Specifications

More information

The Stabilizer TM. Benefits. www.griptite.com. Supplemental support system for sagging beams and floor joists within a crawl space

The Stabilizer TM. Benefits. www.griptite.com. Supplemental support system for sagging beams and floor joists within a crawl space The Stabilizer TM Supplemental support system for sagging beams and floor joists within a crawl space Pre-drilled holes in steel plate allow for connection to beam or floor joists. Benefits Levels and

More information

Type of Force 1 Axial (tension / compression) Shear. 3 Bending 4 Torsion 5 Images 6 Symbol (+ -)

Type of Force 1 Axial (tension / compression) Shear. 3 Bending 4 Torsion 5 Images 6 Symbol (+ -) Cause: external force P Force vs. Stress Effect: internal stress f 05 Force vs. Stress Copyright G G Schierle, 2001-05 press Esc to end, for next, for previous slide 1 Type of Force 1 Axial (tension /

More information

SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS

SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS Page 1 of 9 SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS 1. GENERAL REQUIREMENTS 1. Description of Work: This work consists of furnishing all materials, equipment and

More information

System. Stability. Security. Integrity. 150 Helical Anchor

System. Stability. Security. Integrity. 150 Helical Anchor Model 150 HELICAL ANCHOR System PN #MBHAT Stability. Security. Integrity. 150 Helical Anchor System About Foundation Supportworks is a network of the most experienced and knowledgeable foundation repair

More information

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13)

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13) Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised ) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular blocks

More information

PDCA Driven-Pile Terms and Definitions

PDCA Driven-Pile Terms and Definitions PDCA Driven-Pile Terms and Definitions This document is available for free download at piledrivers.org. Preferred terms are descriptively defined. Potentially synonymous (but not preferred) terms are identified

More information

Structural Inspection Foundations

Structural Inspection Foundations Structural Inspection Foundations 0211 Footings Concrete pad and continuous footings The concrete footings consist of continuous strip footings at the building perimeter of the following sizes: 16 wide

More information

Foundation Underpinning Process and Relationship with Groundwater in West- Central Florida

Foundation Underpinning Process and Relationship with Groundwater in West- Central Florida Foundation Underpinning Process and Relationship with Groundwater in West- Central Florida Ahmed Said, PhD, PE Principal Engineering Consultant, Sinkhole Geotech, Inc. e-mail: admin@sinkholegeotech.com

More information

National Council of Examiners for Engineering and Surveying. Principles and Practice of Engineering Structural Examination

National Council of Examiners for Engineering and Surveying. Principles and Practice of Engineering Structural Examination Structural Effective Beginning with the April 2011 The structural engineering exam is a breadth and exam examination offered in two components on successive days. The 8-hour Vertical Forces (Gravity/Other)

More information

BUTE Department of Construction Management and Technology

BUTE Department of Construction Management and Technology BUTE Department of Construction Management and Technology 02.10.2012 Definition 1: Foundation: The structure, that transmits the load of the building to the soil Definition 2: Load bearing soil (strata):

More information

Innovative Use Of FRP For Sustainable Precast Concrete Structures. Sami Rizkalla Distinguished Professor North Carolina State University, USA

Innovative Use Of FRP For Sustainable Precast Concrete Structures. Sami Rizkalla Distinguished Professor North Carolina State University, USA Innovative Use Of FRP For Sustainable Precast Concrete Structures Sami Rizkalla Distinguished Professor North Carolina State University, USA FRP MATERIALS Fibers: GFRP CFRP AFRP + Resins: Epoxy Polyester

More information

Underpinning Systems 14.1 FOUNDATION REPAIR. Helical Piles

Underpinning Systems 14.1 FOUNDATION REPAIR. Helical Piles Helical Piles Howard A. Perko Copyright 0 2009 by John Wiley & Sons, Inc. All rights reserved. C h a p t e r 14 Underpinning Systems There has been tremendous growth in the use of helical piles for underpinning

More information

1997 Uniform Administrative Code Amendment for Earthen Material and Straw Bale Structures Tucson/Pima County, Arizona

1997 Uniform Administrative Code Amendment for Earthen Material and Straw Bale Structures Tucson/Pima County, Arizona for Earthen Material and Straw Bale Structures SECTION 70 - GENERAL "APPENDIX CHAPTER 7 - EARTHEN MATERIAL STRUCTURES 70. Purpose. The purpose of this chapter is to establish minimum standards of safety

More information

Engineered, Time-Tested Foundation Repairs for Settlement in Residential and Light Commercial Structures. The Leading Edge.

Engineered, Time-Tested Foundation Repairs for Settlement in Residential and Light Commercial Structures. The Leading Edge. TM TM Engineered, Time-Tested Foundation Repairs for Settlement in Residential and Light Commercial Structures. SM The Leading Edge. 10 One Major Causes of foundation settlement or more conditions may

More information

SECTION 5 ANALYSIS OF CONTINUOUS SPANS DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE LEAD AUTHOR: BRYAN ALLRED

SECTION 5 ANALYSIS OF CONTINUOUS SPANS DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE LEAD AUTHOR: BRYAN ALLRED SECTION 5 ANALYSIS OF CONTINUOUS SPANS DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE LEAD AUTHOR: BRYAN ALLRED NOTE: MOMENT DIAGRAM CONVENTION In PT design, it is preferable to draw moment diagrams

More information

DIVISION: 31 00 00 EARTHWORK SECTION: 31 63 00 BORED PILES REPORT HOLDER: HUBBELL POWER SYSTEMS, INC.

DIVISION: 31 00 00 EARTHWORK SECTION: 31 63 00 BORED PILES REPORT HOLDER: HUBBELL POWER SYSTEMS, INC. 0 ICC ES Report ICC ES (800) 4 6587 (56) 699 054 www.icc es.org 000 Most Widely Accepted and Trusted ESR 794 Reissued 05/05 This report is subject to renewal 05/06. DIVISION: 00 00 EARTHWORK SECTION: 6

More information

Stability. Security. Integrity.

Stability. Security. Integrity. Stability. Security. Integrity. PN #MBHPT Foundation Supportworks provides quality helical pile systems for both new construction and retrofit applications. 288 Helical Pile System About Foundation Supportworks

More information

Module 4 : Design of Shallow Foundations. Lecture 16 : Introduction [ Section16.1 : Introduction ] Objectives

Module 4 : Design of Shallow Foundations. Lecture 16 : Introduction [ Section16.1 : Introduction ] Objectives Lecture 16 : Introduction [ Section16.1 : Introduction ] Objectives In this section you will learn the following Introduction Different types of footings Lecture 16 : Introduction [ Section16.1 : Introduction

More information

DYNAMIC PILE MONITORING FOR OFFSHORE PILE ACCEPTANCE

DYNAMIC PILE MONITORING FOR OFFSHORE PILE ACCEPTANCE DYNAMIC PILE MONITORING FOR OFFSHORE PILE ACCEPTANCE Scott Webster and Robin Givet, GRL Engineers, Inc., Charlotte, NC, USA Dynamic pile Monitoring Services (DMS) have been used for testing of offshore

More information

The unit costs are based on the trend line of the 3 low bids for the average quantity.

The unit costs are based on the trend line of the 3 low bids for the average quantity. Page 1 of 8 COST ESTIMATE GENERAL INSTRUCTIONS The unit costs are based on the trend line of the 3 low bids for the average quantity. Apply the Unit Costs to ordinary structures. Unit Costs should generally

More information

PILE FOUNDATIONS FM 5-134

PILE FOUNDATIONS FM 5-134 C H A P T E R 6 PILE FOUNDATIONS Section I. GROUP BEHAVIOR 6-1. Group action. Piles are most effective when combined in groups or clusters. Combining piles in a group complicates analysis since the characteristics

More information

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS July 14, 2015 1.0 GENERAL BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS This work shall consist of furnishing all materials, equipment, labor, and incidentals necessary for conducting bi-directional

More information

AN ALTERNATIVE PILE TECHNOLOGY

AN ALTERNATIVE PILE TECHNOLOGY AN ALTERNATIVE PILE TECHNOLOGY Rimas Veitas, Ductile Pile Group, LLC, Braintree, MA, United States; James Panton, Helical Drilling, Inc., Braintree, MA, United States; Erich Steinlechner, Tiroler Rohne

More information

BEST PRACTICE GUIDELINES FOR CULVERT LINER SELECTION

BEST PRACTICE GUIDELINES FOR CULVERT LINER SELECTION BEST PRACTICE GUIDELINES FOR CULVERT LINER SELECTION GENERAL Rehabilitation of culverts with pipe liners is one of several methods available for extending the life of an existing culvert. It is often cost

More information

SECTION VALVE BOXES AND METER VAULTS

SECTION VALVE BOXES AND METER VAULTS SECTION 03 48 20 VALVE BOXES AND METER VAULTS PART 1: GENERAL 1.01 SECTION INCLUDES A. Valve boxes for water and cleanout boxes for wastewater service. B. Meter boxes for water service. C. Meter vaults

More information

The Evolution of Best Practices with High Performance Steel for Bridges

The Evolution of Best Practices with High Performance Steel for Bridges Proceedings Advanced Materials for Construction of Bridges, Buildings, and Other Structures III Engineering Conferences International Year 2003 The Evolution of Best Practices with High Performance Steel

More information

CIVIL BREADTH Exam Specifications

CIVIL BREADTH Exam Specifications NCEES Principles and Practice of Engineering Examination CIVIL BREADTH and TRANSPORTATION DEPTH Exam Specifications Effective Beginning with the April 2015 Examinations The civil exam is a breadth and

More information

Chapter 7 Substructure Design... 7.1-1 7.1 General Substructure Considerations...7.1-1 7.1.1 Foundation Design Process...7.1-1 7.1.

Chapter 7 Substructure Design... 7.1-1 7.1 General Substructure Considerations...7.1-1 7.1.1 Foundation Design Process...7.1-1 7.1. Chapter 7 Contents Chapter 7 Substructure Design... 7.1-1 7.1 General Substructure Considerations...7.1-1 7.1.1 Foundation Design Process...7.1-1 7.1.2 Foundation Design Limit States...7.1-3 7.1.3 Seismic

More information

ASSESSMENT AND PROPOSED STRUCTURAL REPAIR STRATEGIES FOR BRIDGE PIERS IN TAIWAN DAMAGED BY THE JI-JI EARTHQUAKE ABSTRACT

ASSESSMENT AND PROPOSED STRUCTURAL REPAIR STRATEGIES FOR BRIDGE PIERS IN TAIWAN DAMAGED BY THE JI-JI EARTHQUAKE ABSTRACT ASSESSMENT AND PROPOSED STRUCTURAL REPAIR STRATEGIES FOR BRIDGE PIERS IN TAIWAN DAMAGED BY THE JI-JI EARTHQUAKE Pei-Chang Huang 1, Graduate Research Assistant / MS Candidate Yao T. Hsu 2, Ph.D., PE, Associate

More information

vulcanhammer.net This document downloaded from

vulcanhammer.net This document downloaded from This document downloaded from vulcanhammer.net since 1997, your source for engineering information for the deep foundation and marine construction industries, and the historical site for Vulcan Iron Works

More information

Design of pile foundations following Eurocode 7-Section 7

Design of pile foundations following Eurocode 7-Section 7 Brussels, 18-20 February 2008 Dissemination of information workshop 1 Workshop Eurocodes: background and applications Brussels, 18-20 Februray 2008 Design of pile foundations following Eurocode 7-Section

More information

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains

More information

FOOTING DESIGN EXAMPLE

FOOTING DESIGN EXAMPLE County: Any Design: BRG Date: 10/007 Hwy: Any Ck Dsn: BRG Date: 10/007 FOOTING DESIGN EXAMPLE Design: Based on AASHTO LRFD 007 Specifications, TxDOT LRFD Bridge Design Manual, and TxDOT Project 0-4371

More information

Requirements on piling plan submission

Requirements on piling plan submission Requirements on piling plan submission Under BC (Amendment) Act 2007 & Regulations 2008 Er Dr Yet Nai Song Building and Construction Authority 1 Types of piling submissions Barrettes Bored cast-in place

More information

STATIC PILE LOAD TEST MANUAL. GEOTECHNICAL CONTROL PROCEDURE GCP-18 Revision #4

STATIC PILE LOAD TEST MANUAL. GEOTECHNICAL CONTROL PROCEDURE GCP-18 Revision #4 STATIC PILE LOAD TEST MANUAL GEOTECHNICAL CONTROL PROCEDURE GCP-18 Revision #4 AUGUST 2015 GEOTECHNICAL CONTROL PROCEDURE: STATIC PILE LOAD TEST MANUAL GCP-18 Revision #4 STATE OF NEW YORK DEPARTMENT

More information