1 EFFECT OF RAINGAGE DENSITY ON RUNOFF SIMULATION MODELING by Ken MacKenzie, P.E., M.ASCE 1, Ben Urbonas, P.E., D.WRE, L.ASCE 2, Michael Jansekok 3, James C.Y. Guo, PhD, P.E., M.ASCE 4 ABSTRACT Rainfall and runoff data for a 3.08 square mile urban watershed in Denver, Colorado was used to investigate the effects of raingage density and hyetograph compositing on urban stormwater runoff simulation. This watershed has rainfall data from five raingages and flow data from two gages, all in 5-minute time increments. The data were used to calibrate the EPA Storm Water Management Model (EPA SWMM, version 5.0), and the Urban Drainage and Flood Control District s version of an earlier EPA SWM model (UDSWMM). This calibrated model served two purposes; first, to examine the effects on runoff calculations using a single composite hyetograph for each of the recorded storm rainfall and runoff events modeled and second, to determine the effects of raingage density on volume of runoff and peak flow simulations. The effects of raingage density were investigated by processing rainfall data from each raingage using several different combinations of raingage densities. The data were used to drive the calibrated SWMM model and the results compared against recorded runoff volumes and flow rates for the recorded storms. It was demonstrated that raingage density does affect the accuracy and the scatter of simulated results. The effects of compositing recorded rainfall data at several raingages into a single rainfall hyetograph were also investigated. Two types of compositing were performed. One method simply used area weighted averaging of rainfall recorded at each time increment. This method was defined as straight across compositing. In the second method, each hyetographs at the five gages was examined and all values were time shifted to line up the most intense five-minute rainfall values of the storms. The simulation results were then compared to the recorded flows. This paper describes the findings of this study and discusses their implications for urban stormwater runoff modeling. It presents a summary the collaborative work and findings by the authors over the last 17 years. INTRODUCTION This report is based on a draft MSCE Thesis prepared by Mike Jansekok in 1990 (an abbreviated summary of which was presented at the International Conference on Computer Applications in Water Resources, Tamsui, Taiwan, July 1991), and on the author s analyses of new rainfall and runoff data collected during the 15 years since. Two questions arise with hydrologic computer modeling. The first is whether that modeling appropriately accounts for the temporal and spatial variations in rainfall patterns that occur in 1 Sr. Project Engineer, Master Planning Program, Urban Drainage & Flood Control District, Denver, CO. 2 Manager, Master Planning Program, Urban Drainage & Flood Control District, Denver, CO. 3 Programmer/Analysts, Oppenheimer Funds, Inc., Centennial, CO. 4 Professor, University of Colorado at Denver, Denver, CO.

2 nature. If only one raingage is used to represent the rainfall for an entire watershed, any given storm could easily concentrate its main intensities near the raingage and totally miss most of the watershed altogether. The resulting rainfall/runoff ratio could vary from either very high to very low, and attempting to establish any relationship between the two would be problematic, as much of past attempts have shown, especially for larger catchments. Specifically, this question can be broken down into the following components: Does this rainfall/runoff ratio become more constant when raingage density increases? How does compositing of several rainfall records affect the calculated surface runoff? Is there a compositing technique that yields more realistic results? What impact does the rainfall data time increment have on the model results? The last question regards the impact of a large (e.g. 60-minute) inputted rainfall time step vs. a smaller (e.g. 5-minute) rainfall time step on the rainfall/runoff ratio Much of what is written about the effects of raingage density and hyetograph compositing methods in runoff modeling revolves around synthetically manufactured design storm hyetographs. The authors were fortunate to have access to 23 years of simultaneous rainfall and runoff records incremented at 5-minute time steps for a relatively small and stable urban watershed with a high raingage density. This paper attempts to show both the variance in runoff calculations which can occur when raingage density is increased or decreased and the effects of hyetograph compositing on stormwater runoff modeling of peak flows and runoff volumes, and to compare the results when using 60-minute, 15-minute, and 5-minute rainfall input data. RAINFALL AND RUNOFF GAGES USED BY THIS STUDY Rainfall/runoff data was recorded between 1979 and 2002 for the Harvard Gulch drainage watershed ware obtained from the U.S. Geologic Survey at the Denver Federal Center in Lakewood, CO. The data were collected under a cooperative agreement between the Urban Drainage and Flood Control District and USGS. Data from two stream flow gages and five rain gages were used in the investigations. Detailed records of rainfall were obtained using a recording tipping bucket raingage at each site and a flow-stage data collected at the two stations by digital recorders. The locations of all gages are shown in Figure 1. SELECTION AND PREPARATION OF DATA FOR ANALYSIS Minimum Rainfall & Runoff Criteria for this Study From the rainfall/runoff data set recorded between 1979 and 1987, seventeen storms were selected for further hydrologic analysis based on the following criteria: 1) Five (5) raingages and two (2) flow gages must be reporting during the storm. 2) Minimum recorded rainfall at any gage must equal or exceed 0.08 inches during at least one 5 minute period within a storm. 3) The recorded peak flow at any gage must equal or exceed 50 cubic feet per second (cfs).

3 Figure 1. Harvard Gulch Watershed Stream and Rain Gage Location Map. Preparation of UDSWM Model The drainage conveyance element layout consisted of 78 conveyance elements, which were divided into five types as either pipe, pipe with overflow, channel, channel with overflow, or non-routing. One detention element was incorporated into the model to reflect a sump area in the upper watershed at Colorado Boulevard. Calibration of UDSWM Model Each one of the seventeen selected storms was processed through the UDSWM model. Calculated runoff volumes and peak discharges were plotted against observed values, and data regression was used to draw a best-fit line through plotted points. Adjustments were made to modeling parameters such as imperviousness, roughness, sub-catchment tributary width, etc., and the model was calibrated for each of the seventeen storms, until each best-fit line approximated 45 degrees between modeled results and recorded data for both peak flows and runoff volumes in each watershed.

4 USE OF CALIBRATED SWMM MODEL Investigating the Effects of Raingage Density Five increasing raingage density combinations were used to show the effects of raingage density on peak flows and runoff volumes. Two different scenarios of these five-gage combinations were simulated. All these simulation scenarios are shown Table 1. Normalized values of deviations from the calibrated 5-raingage UDSWM model output for peak flows and runoff volumes were plotted against number of raingages used in simulations for both upper and total watersheds. Comparisons were made for (1) 5-gage calibrated UDSWM model vs. 1 through 4 gage for both scenarios and (2) actual recorded data vs. 1 through 5 gage calibrated UDSWM model, also for both scenarios. The normalizing method for defining percent variance is described by the following equation: Vi = [(Ri-Rci)/Rci]*100 in which, Vi = variance from the calibrated five rain gage peak flow or runoff volume for storm i, Ri - peak flow or runoff volume for the test run for storm i, Rci = peak flow or runoff volume for calibrated model or recorded data for storm i UDSW M Calculated Peak Flow -CFS Best Regression Fit R 2 = O bserved Peak Flow s -CFS Figure 2: Calibration of UDSWM Peak Flows.

5 UDSW M Calculated RunoffVolum e -Inches Perfect Fit Line R 2 = O bserved RunoffVolum e -Inches Figure 3: Calibration of UDSWM Runoff Volumes. TABLE 1. SIMULATING RUNOFF UNDER DIFFERENT GAGE SCENARIOS. GAGES USED TO MODEL SCENARIO #1 FOR THE TOTAL WATERSHED TRIBUTARY TO HARVARD PARK Run Number Harvard Park Bradley School University Park Slaven School Bethesda School 1 X 2 X X 3 X X X 4 X X X X 5 X X X X X GAGES USED TO MODEL SCENARIO #2 FOR THE TOTAL WATERSHED TRIBUTARY TO HARVARD PARK 1 X 2 X X 3 X X X 4 X X X X 5 X X X X X

6 Hydrograph Comparisons The following two hydrograph comparisons were made using eight selected storms: 1. UDSWM model simulated flows at Harvard Park calibrated using all 5 raingages vs. field observed hydrographs. 2. UDSWM model simulated flows at Harvard Park calibrated using all 5 raingages vs. simulated flows using a single composite rainfall hyetographs for each storm using the following two methods of compositing: a. Area weighted composite at each time increment, no consideration for highest peak rainfall b. Area weighted composite at each time increment after aligning each hyetograph peak rainfall increments to be at the same time increment (i.e., peak preservation). PRESENTATION OF DATA AND DISCUSSION OF RESULTS Effect of Raingage Density and Location Tables 2 and 3 compare the simulated peak flows and Tables 4 and 5 compare the simulated runoff volume for two scenarios of distributions of one through four raingage combinations used in these simulation against the simulated peak flows for the entire watershed that were obtained using the five raingage calibrated UDSWM model. All these tables show the percent variation in the mean, percent range in the variations and the standard deviation in the variation percentages from the five-gage simulations. TABLE 2. PEAK FLOW (SCENARIO #1) PERCENT FROM 5 GAGE CALIBRATED RUN to to to to TABLE 3. PEAK FLOW (SCENARIO #2) PERCENT FROM 5 GAGE CALIBRATED RUN to to to to to

7 TABLE 4. RUNOFF VOLUME (SCENARIO #1) PERCENT FROM 5 GAGE CALIBRATED RUN to to to to to TABLE 5. RUNOFF VOLUME (SCENARIO #2) PERCENT FROM 5 GAGE CALIBRATED RUN to to to to to Similar comparisons were made for the simulated peak flows and runoff volumes results for the two sets of raingage distribution scenarios. For each scenario one through five raingages were used and the simulated results were compared against the observed values at the stream gaging site for the total watershed. Tables 6 through 9 show these comparisons. TABLE 6. PEAK FLOW (SCENARIO #1) PERCENT FROM ACTUAL RECORDED PEAKS to Harvard only to Harvard & Bradley to to to TABLE 7. PEAK FLOW (SCENARIO #2) PERCENT FROM ACTUAL RECORDED PEAKS to Slaven only to Slaven & Bethesda to to to

8 TABLE 8. RUNOFF VOLUME (SCENARIO #1) PERCENT FROM ACTUAL RECORDED VOLUMES RANGE MEAN STANDARD to to to to to TABLE 9. RUNOFF VOLUME (SCENARIO #2) PERCENT FROM ACTUAL RECORDED VOLUMES RANGE MEAN STANDARD to to to to to Effect of Composite Type One of the notable trends found in this study is the tendency for the composite hyetographs to somewhat underestimate peak flows and runoff volumes. The variation of peak flows from the calibrated five gage model were observed as low as -65 percent and for runoff volumes were observed as low as -20 percent. There no significant difference observed in the results between the two compositing methods investigated. This, however, may be because of the population of rainstorms used in the studies. (For example, peak intensities for most of the 17 selected storm events rarely varied in time by more than 15 minutes from the mean). Effect of Temporal Density All of the modeled results tabulated so far in this report was based on 5-minute time step rainfall input data. The question remaining regards how the temporal density of rainfall data will affect the modeled peak flows. For this study, continuous rainfall data collected at the five raingages over the course of 15 years from 1989 to 2004 was used with the EPA Storm Water Management Model (EPA SWMM, version 5.0). The 5-minute time step 15-year rainfall record was used in a continuous simulation, and the resulting peak flows were plotted as a probability distribution. Next the 15-year continuous rainfall record was converted into a 15-minute time step equivalent rainfall record and a 60-minute time step equivalent rainfall record. These rainfall records were similarly used in a continuous EPA SWMM simulation. The resulting peak flows from these coarser time step rainfall records were also plotted as a probability distribution for comparison with the original 5-minute time step record. The 5-minute time step record generated 912 peak flows, while the 15-minute record generated 899 peak flows and 60-minute record generated only 834 peaks. This indicated that the lesser

9 temporal density of the data resulted in lesser simulated volumes. More interestingly, the magnitude of the largest peak flow for the 5-minute rainfall simulation was more than 250 percent greater than the magnitude of the largest peak flow for 60-minute simulation and 25 percent greater than the 15-minute rainfall record. Figure 4: Probability Distribution of Peak Flows for Varying Rainfall Time Step Records CONCLUSIONS Regarding Raingage Density and Location It is clear that variation of the simulated peak flows and volumes increased as the rain gage density decreased. The largest variations occurred when only one rain gage was used to represent the rainfall over the entire watershed. The location of the raingages had a noticeable impact on how the simulated results varied from the field-observed data. This variation was largest when only one gage was used. The least amount of error occurred when the gage was located closest to the centroid of the watershed and the largest when it was located at the downstream end where the flow gage was located. When two raingages were used, having the raingages positions near the two ends of the watershed resulted in least variances (Scenario 2). This finding implies that if two gages are used within the watershed of similar size they are best located within the upper and lower 1/3 portions of the watershed. When comparing the simulated results to the observed data it was observed that when the gage density exceeded approximately one gage per square mile, very little change occurred in the

10 range of variations in the results or in the standard deviation for the five-gage simulated case. Similar results were also seen when simulated results were compared to the observed values, where the variability of the simulated results did not change significantly after a density of one raingage per square mile was reached. From these observations one can conclude that a raingage density of one raingage per square mile does not have to be exceeded to improve on the simulation results. When lesser raingage densities than one per square mile are used, the placement and distribution of the raingages can have a significant effect on the accuracy of simulated results. The authors postulate that the rainstorm footprints and the direction of the storm track across the watershed (i.e., watershed orientation relative to the track of the storm) affect the accuracy of simulated results for any given rainfall-runoff event. In conclusion, raingage density plays a very important role in the accuracy of hydrologic modeling. At the same time, it appears that if a sufficient number of rainfall events are used, the averages of peak flows and runoff volumes can be reasonable close to the averages obtained using either multi-gage simulation results or the observed data. Although it appears that one raingage per square mile is sufficient density needed to achieve most representative simulations of rainfall-runoff events, this number will probably vary with climatologic region and the types of storms that dominate it. At the same time, judicious placement of fewer raingages (i.e., 1.5 gages per square mile) can also achieve reasonable simulations of individual events. Although these findings are appropriate for the Denver, Colorado region, one that is dominated mostly by convective and frontal storms, it is probably not the case for other regions such as Seattle, Washington where rainfall patterns are dominated by lower intensity area-wide upslope storms. Regarding Hyetograph Compositing Using Several Gages Very little difference was found in peak flow and runoff volume simulations between the two rainfall compositing techniques tested. Both methods tended to underestimate the simulated peak flows and volumes when compared to field-recorded data. Some hydrologic models require incremental rainfall depths to be composited into a single input hyetograph when more than one raingage record is available. These numerical models are then calibrated against observed data by modifying runoff coefficients and other parameters in order to increase the calculated peak flows and volumes to bring calculated values in line with observed data. If this type of model is then used with recorded point rainfall or long-term non-composite rainfall data, the calculated peak flows and volumes are likely to be overestimated by the same percentage by which calibration parameters were adjusted to increase calculated peak flows and volumes. It is this possibility of overestimating during long term simulations that should be considered by modelers when calibrating models using composite hyetographs, particularly when studying larger urban watersheds.

11 Regarding Temporal Density of Rainfall Record Raingage data collected on a 60-minute time step, or even a 15-minute time step will not capture the true characteristics of a rainfall event of rapidly varying intensity, and will result in peak flow simulations using long-term continuous simulation procedures that result in considerably lower peak flow and runoff volume populations than those resulting from 5-minute or lesser time step rainfall records. This in turn can result in misleading conclusions on the design of real time control, the design of stormwater control basins and needed volumes, and on the effects on the receiving stream hydrology. When modeling runoff in a region where the majority of storms are of this nature, the modeler should consider this phenomenon, use 5-minute rainfall data when available (and rainfall records with 15-minute time increments when 5-minute data is not available), and calibrate the model accordingly. When modeling in regions where rainfall patterns are dominated by low intensity area-wide upslope storms, coarser rainfall records may provide an adequate basis for long-term continuous simulation. REFERENCES Proceedings, International Conference on Computer Applications in Water Resources, Tamsui, Taiwan, Jul 1991 Urbonas, Jansekok, & Guo (1990) Effect of Raingage Density on Runoff Simulation Modeling

Estimating Potential Reduction Flood Benefits of Restored Wetlands

Estimating Potential Reduction Flood Benefits of Restored Wetlands Estimating Potential Reduction Flood Benefits of Restored Wetlands Kenneth W. Potter University of Wisconsin Introduction Throughout the summer of 1993 a recurring question was the impact of wetland drainage

More information

Computing Stormwater Runoff Rates and Volumes

Computing Stormwater Runoff Rates and Volumes New Jersey Stormwater Best Management Practices Manual February 2004 C H A P T E R 5 Computing Stormwater Runoff Rates and Volumes This chapter discusses the fundamentals of computing stormwater runoff

More information

Havnepromenade 9, DK-9000 Aalborg, Denmark. Denmark. Sohngaardsholmsvej 57, DK-9000 Aalborg, Denmark

Havnepromenade 9, DK-9000 Aalborg, Denmark. Denmark. Sohngaardsholmsvej 57, DK-9000 Aalborg, Denmark Urban run-off volumes dependency on rainfall measurement method - Scaling properties of precipitation within a 2x2 km radar pixel L. Pedersen 1 *, N. E. Jensen 2, M. R. Rasmussen 3 and M. G. Nicolajsen

More information

TENNESSEE GAS PIPELINE COMPANY, L.L.C.

TENNESSEE GAS PIPELINE COMPANY, L.L.C. TENNESSEE GAS PIPELINE COMPANY, L.L.C. HYDROLOGIC & HYDRAULIC CALCULATIONS FOR WATERBODIES CROSSED BY CONNECTICUT PIPELINE EXPANSION PROJECT CONNECTICUT LOOP Submitted by: Tennessee Gas Pipeline Company,

More information

1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan, Governor Boyd

1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan, Governor Boyd ENVIRONMENTAL SITE DESIGN (ESD) REDEVELOPMENT EXAMPLES OCTOBER 2010 1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan,

More information

Burnsville Stormwater Retrofit Study

Burnsville Stormwater Retrofit Study Burnsville Stormwater Retrofit Study Prepared for City of Burnsville June 2006 4700 West 77 th Street Minneapolis, MN 55435-4803 Phone: (952) 832-2600 Fax: (952) 832-2601 Burnsville Stormwater Retrofit

More information

URBAN DRAINAGE CRITERIA

URBAN DRAINAGE CRITERIA URBAN DRAINAGE CRITERIA I. Introduction This division contains guidelines for drainage system design and establishes a policy for recognized and established engineering design of storm drain facilities

More information

Geoprocessing Tools for Surface and Basement Flooding Analysis in SWMM

Geoprocessing Tools for Surface and Basement Flooding Analysis in SWMM 3 Geoprocessing Tools for Surface and Basement Flooding Analysis in SWMM Eric White, James Knighton, Gary Martens, Matthew Plourde and Rajesh Rajan A geoprocessing routine was used for the development

More information

CHAPTER 2 HYDRAULICS OF SEWERS

CHAPTER 2 HYDRAULICS OF SEWERS CHAPTER 2 HYDRAULICS OF SEWERS SANITARY SEWERS The hydraulic design procedure for sewers requires: 1. Determination of Sewer System Type 2. Determination of Design Flow 3. Selection of Pipe Size 4. Determination

More information

5.14 Floodplains and Drainage/Hydrology

5.14 Floodplains and Drainage/Hydrology I-70 East Final EIS 5.14 Floodplains and Drainage/Hydrology 5.14 Floodplains and Drainage/Hydrology This section discusses floodplain and drainage/hydrology resources and explains why they are important

More information

APPENDIX B DESIGN GUIDELINES FOR APPROVED TREATMENT METHODS

APPENDIX B DESIGN GUIDELINES FOR APPROVED TREATMENT METHODS APPENDIX B DESIGN GUIDELINES FOR APPROVED TREATMENT METHODS PLANTER BOXES 1. Determine the impervious area contributing flow to the planter box (see Chapter 4.2). 2. Assumption: Typical soil infiltration

More information

The Rational Method. David B. Thompson Civil Engineering Deptartment Texas Tech University. Draft: 20 September 2006

The Rational Method. David B. Thompson Civil Engineering Deptartment Texas Tech University. Draft: 20 September 2006 The David B. Thompson Civil Engineering Deptartment Texas Tech University Draft: 20 September 2006 1. Introduction For hydraulic designs on very small watersheds, a complete hydrograph of runoff is not

More information

Hydrologic Modeling using HEC-HMS

Hydrologic Modeling using HEC-HMS Hydrologic Modeling using HEC-HMS Prepared by Venkatesh Merwade School of Civil Engineering, Purdue University vmerwade@purdue.edu April 2012 Introduction The intent of this exercise is to introduce you

More information

Quantifying Potential Floodplain Restoration Benefits in the Upper Mississippi River Basin, USA

Quantifying Potential Floodplain Restoration Benefits in the Upper Mississippi River Basin, USA Quantifying Potential Floodplain Restoration Benefits in the Upper Mississippi River Basin, USA Michael Schwar, Ph.D. PE (MARS) Eileen Fretz (American Rivers) Mississippi River Commission/USACE Upper Mississippi

More information

Lecture 4: Streamflow and Stream Gauging

Lecture 4: Streamflow and Stream Gauging Lecture 4: Streamflow and Stream Gauging Key Questions 1. What is stream discharge and what controls its magnitude? 2. What is a hydrograph? 3. Where is the velocity highest in a stream? 4. Where is the

More information

MARYLAND AVENUE BACKUPS DURING AUGUST 31, 2014 STORM EVENT COMMUNITY OUTREACH

MARYLAND AVENUE BACKUPS DURING AUGUST 31, 2014 STORM EVENT COMMUNITY OUTREACH MARYLAND AVENUE BACKUPS DURING AUGUST 31, 2014 STORM EVENT COMMUNITY OUTREACH MARYLAND AVENUE BACKUPS COMMUNITY OUTREACH MEETING AGENDA Introductions History of PWSA Actions August 31 Storm Impacts Short

More information

AZ EGER-PATAK HIDROLÓGIAI VIZSGÁLATA, A FELSZÍNI VÍZKÉSZLETEK VÁRHATÓ VÁLTOZÁSÁBÓL ADÓDÓ MÓDOSULÁSOK AZ ÉGHAJLATVÁLTOZÁS HATÁSÁRA

AZ EGER-PATAK HIDROLÓGIAI VIZSGÁLATA, A FELSZÍNI VÍZKÉSZLETEK VÁRHATÓ VÁLTOZÁSÁBÓL ADÓDÓ MÓDOSULÁSOK AZ ÉGHAJLATVÁLTOZÁS HATÁSÁRA AZ EGER-PATAK HIDROLÓGIAI VIZSGÁLATA, A FELSZÍNI VÍZKÉSZLETEK VÁRHATÓ VÁLTOZÁSÁBÓL ADÓDÓ MÓDOSULÁSOK AZ ÉGHAJLATVÁLTOZÁS HATÁSÁRA GÁBOR KEVE 1, GÉZA HAJNAL 2, KATALIN BENE 3, PÉTER TORMA 4 EXTRAPOLATING

More information

The Mississippi River & Tributaries Project

The Mississippi River & Tributaries Project The Mississippi River & Tributaries Project The Mississippi River & Tributaries (MR&T) project was authorized by the 1928 Flood Control Act. Following the devastating 1927 flood, the nation was galvanized

More information

CHAPTER 3 STORM DRAINAGE SYSTEMS

CHAPTER 3 STORM DRAINAGE SYSTEMS CHAPTER 3 STORM DRAINAGE SYSTEMS 3.7 Storm Drains 3.7.1 Introduction After the tentative locations of inlets, drain pipes, and outfalls with tail-waters have been determined and the inlets sized, the next

More information

How To Understand And Understand The Flood Risk Of Hoang Long River In Phuon Vietnam

How To Understand And Understand The Flood Risk Of Hoang Long River In Phuon Vietnam FLOOD HAZARD AND RISK ASSESSMENT OF HOANG LONG RIVER BASIN, VIETNAM VU Thanh Tu 1, Tawatchai TINGSANCHALI 2 1 Water Resources University, Assistant Professor, 175 Tay Son Street, Dong Da District, Hanoi,

More information

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth

More information

WATER QUALITY MODELING TO SUPPORT THE ROUGE RIVER RESTORATION

WATER QUALITY MODELING TO SUPPORT THE ROUGE RIVER RESTORATION WATER QUALITY MODELING TO SUPPORT THE ROUGE RIVER RESTORATION Edward H. Kluitenberg, P.E., Applied Science, Inc. Gary W. Mercer, P.E., Camp, Dresser and McKee Vyto Kaunelis, Wayne County Department of

More information

USGS StreamStats Web Application for Kentucky

USGS StreamStats Web Application for Kentucky USGS StreamStats Web Application for Kentucky Implementation of selected low- and mean-flow estimating equations Gary Martin, Hydrologist Project Chief U.S. Geological Survey, Kentucky Water Science Center

More information

Next Generation Flood Alert in Houston

Next Generation Flood Alert in Houston Next Generation Flood Alert in Houston Philip B. Bedient Civil and Environmental Eng., Rice University Houston, TX Major Causes of Urban Flooding (Excess Water that Inundates) Highly Developed (urbanized)

More information

Flash Flood Science. Chapter 2. What Is in This Chapter? Flash Flood Processes

Flash Flood Science. Chapter 2. What Is in This Chapter? Flash Flood Processes Chapter 2 Flash Flood Science A flash flood is generally defined as a rapid onset flood of short duration with a relatively high peak discharge (World Meteorological Organization). The American Meteorological

More information

ANALYSIS OF RAINFALL AND ITS INFLOW INTO MOBILE, ALABAMA S, ESLAVA SEWER SHED SYSTEM

ANALYSIS OF RAINFALL AND ITS INFLOW INTO MOBILE, ALABAMA S, ESLAVA SEWER SHED SYSTEM ANALYSIS OF RAINFALL AND ITS INFLOW INTO MOBILE, ALABAMA S, ESLAVA SEWER SHED SYSTEM Jerrod Frederking, Department of Earth Sciences, University of South Alabama, Mobile, AL 36688. E-mail: twisterj@gmail.com.

More information

Ruissellement du Bassin Précipitation Abstractions Hydrogramme Flux de Base. Superposition Routage

Ruissellement du Bassin Précipitation Abstractions Hydrogramme Flux de Base. Superposition Routage HEC-1 Leçon 11 This lesson will focus on how WMS can be used to develop HEC-1 modeling parameters and not on the fundamental hydrologic principles simulated by HEC-1. 1 Vue D Emsemble Utilisés Couramment

More information

Rainfall Intensities for Southeastern Arizona

Rainfall Intensities for Southeastern Arizona Rainfall Intensities for Southeastern Arizona By Herbert B. Osborn, Member, ASCE1 and Kenneth G. Renard, Fellow, ASCE1 Introduction Small watershed storm runoff in the southwestern United States is dominated

More information

Basic Hydrology. Time of Concentration Methodology

Basic Hydrology. Time of Concentration Methodology Basic Hydrology Time of Concentration Methodology By: Paul Schiariti, P.E., CPESC Mercer County Soil Conservation District What is the Time of Concentration? The time it takes for runoff to travel from

More information

URBAN STORMWATER GUIDELINES AND BEST MANAGEMENT PRACTICES FOR PROTECTION OF FISH AND FISH HABITAT DRAFT DISCUSSION DOCUMENT

URBAN STORMWATER GUIDELINES AND BEST MANAGEMENT PRACTICES FOR PROTECTION OF FISH AND FISH HABITAT DRAFT DISCUSSION DOCUMENT URBAN STORMWATER GUIDELINES AND BEST MANAGEMENT PRACTICES FOR PROTECTION OF FISH AND FISH HABITAT DRAFT DISCUSSION DOCUMENT Contacts: Barry Chilibeck (666-3765) or Megan Sterling (666-2322) Revision 4

More information

Rational Method Hydrologic Calculations with Excel. Rational Method Hydrologic Calculations with Excel, Course #508. Presented by:

Rational Method Hydrologic Calculations with Excel. Rational Method Hydrologic Calculations with Excel, Course #508. Presented by: Rational Method Hydrologic Calculations with Excel, Course #508 Presented by: PDH Enterprises, LLC PO Box 942 Morrisville, NC 27560 www.pdhsite.com Calculation of peak storm water runoff rate from a drainage

More information

CITY UTILITIES DESIGN STANDARDS MANUAL

CITY UTILITIES DESIGN STANDARDS MANUAL CITY UTILITIES DESIGN STANDARDS MANUAL Book 2 (SW) SW9 June 2015 SW9.01 Purpose This Chapter provides information for the design of open channels for the conveyance of stormwater in the City of Fort Wayne.

More information

06 - NATIONAL PLUVIAL FLOOD MAPPING FOR ALL IRELAND THE MODELLING APPROACH

06 - NATIONAL PLUVIAL FLOOD MAPPING FOR ALL IRELAND THE MODELLING APPROACH 06 - NATIONAL PLUVIAL FLOOD MAPPING FOR ALL IRELAND THE MODELLING APPROACH Richard Kellagher 1, Mike Panzeri 1, Julien L Homme 1, Yannick Cesses 1, Ben Gouldby 1 John Martin 2, Oliver Nicholson 2, Mark

More information

10/4/2012. 40 slide sample of Presentation. Key Principles to Current Stormwater Management

10/4/2012. 40 slide sample of Presentation. Key Principles to Current Stormwater Management 40 slide sample of Presentation Please contact mhoalton@pacewater.com if you would like the complete presentation Key Principles to Current Stormwater Management Distributed Control Measures Integrated

More information

CITY OF CHARLOTTE STORM WATER SERVICES CREDIT APPLICATION INSTRUCTION MANUAL

CITY OF CHARLOTTE STORM WATER SERVICES CREDIT APPLICATION INSTRUCTION MANUAL CITY OF CHARLOTTE STORM WATER SERVICES CREDIT APPLICATION INSTRUCTION MANUAL March 2008 A note to recipients of the Charlotte-Mecklenburg Storm Water Services Credit Application Manual: This is the second

More information

Chapter 4. Flood Risk Assessment

Chapter 4. Flood Risk Assessment Chapter 4 Flood Risk Assessment Chapter Overview Any floodplain management program must be established on a sound technical and scientific basis in order to be effective, whether for flood loss reduction

More information

Costs for Green Infrastructure and Stormwater Controls

Costs for Green Infrastructure and Stormwater Controls Costs for Green Infrastructure and Stormwater Controls August 5, 2015 Bob Newport U.S. EPA Region 5 (Chicago Office) Topics to be Covered EPA data collection and cost analysis focused on postconstruction

More information

PRECIPITATION AND EVAPORATION

PRECIPITATION AND EVAPORATION PRECIPITATION AND EVAPORATION OBJECTIVES Use historical data to analyze relationships between precipitation, evaporation and stream flow in the San Antonio River Basin TOPICS Water cycle Precipitation

More information

Shooks Run Drainage Study Basic Terminology

Shooks Run Drainage Study Basic Terminology Shooks Run Drainage Study Basic Terminology PREPARED FOR: PREPARED BY: City of Colorado Springs CH2M DATE: April 9, 2015 Introduction This document is intended to provide an introduction to Colorado Springs

More information

Application of Monte Carlo Simulation Technique with URBS Model for Design Flood Estimation of Large Catchments

Application of Monte Carlo Simulation Technique with URBS Model for Design Flood Estimation of Large Catchments Application of Monte Carlo Simulation Technique with URBS Model for Design Flood Estimation of Large Catchments J. Charalambous ab, A. Rahman c and D. Carroll a a City Design, Brisbane City Council, hc@brisbane.qld.gov.au

More information

CSO Modelling Considering Moving Storms and Tipping Bucket Gauge Failures M. Hochedlinger 1 *, W. Sprung 2,3, H. Kainz 3 and K.

CSO Modelling Considering Moving Storms and Tipping Bucket Gauge Failures M. Hochedlinger 1 *, W. Sprung 2,3, H. Kainz 3 and K. CSO Modelling Considering Moving Storms and Tipping Bucket Gauge Failures M. Hochedlinger 1 *, W. Sprung,, H. Kainz and K. König 1 Linz AG Wastewater, Wiener Straße 151, A-41 Linz, Austria Municipality

More information

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE 1008 STORM DRAINAGE (3/24/05) 1008.01 PURPOSE To minimize the amount of stormwater runoff resulting from development utilizing nonstructural controls where possible, maintain and improve water quality,

More information

Costs for Green Infrastructure and Stormwater Retention Practices

Costs for Green Infrastructure and Stormwater Retention Practices Costs for Green Infrastructure and Stormwater Retention Practices Bob Newport U.S. EPA December 9, 2014 Topics to be Covered EPA data collection and cost analysis focused on postconstruction stormwater

More information

Stormwater Management in Chicago waterways :Basement Flooding and its prevention Kyungmin Kim

Stormwater Management in Chicago waterways :Basement Flooding and its prevention Kyungmin Kim Stormwater Management in Chicago waterways :Basement Flooding and its prevention Kyungmin Kim CE 394K GIS in Water Resources - David R. Maidment. Dec 4th 2015 Motivation and Objective Recently, Chicago

More information

Appendix C - Risk Assessment: Technical Details. Appendix C - Risk Assessment: Technical Details

Appendix C - Risk Assessment: Technical Details. Appendix C - Risk Assessment: Technical Details Appendix C - Risk Assessment: Technical Details Page C1 C1 Surface Water Modelling 1. Introduction 1.1 BACKGROUND URS Scott Wilson has constructed 13 TUFLOW hydraulic models across the London Boroughs

More information

COLORADO FRONT RANGE FLOOD OF 2013:

COLORADO FRONT RANGE FLOOD OF 2013: USDA NATURAL RESOURCES CONSERVATION SERVICE COLORADO COLORADO FRONT RANGE FLOOD OF 2013: Peak Flow Estimates at Selected Mountain Stream Locations December 2013 James Creek in Jamestown North Fork of the

More information

Water Resources Collections and Archives University of California

Water Resources Collections and Archives University of California Water Resources Collections and Archives University of California Title: Effects of climate change on the hydrology of upper Alameda Creek Author: Klausmeyer, Kirk, University of California, Berkeley Publication

More information

HYDROLOGIC/HYDRAULIC MODELING OF WESTMINSTER WATERSHED ORANGE COUNTY, CALIFORNIA

HYDROLOGIC/HYDRAULIC MODELING OF WESTMINSTER WATERSHED ORANGE COUNTY, CALIFORNIA HYDROLOGIC/HYDRAULIC MODELING OF WESTMINSTER WATERSHED ORANGE COUNTY, CALIFORNIA James Chieh, Ph.D., P.E., Senior Hydraulic Engineer, USACE, Los Angeles, California, Shih.H.Chieh@usace.army.mil; Jay Pak,

More information

APPENDIX D INLET CAPACITY AND SPACING. The capacity and spacing design of storm drainage inlets are presented in detail in this Appendix.

APPENDIX D INLET CAPACITY AND SPACING. The capacity and spacing design of storm drainage inlets are presented in detail in this Appendix. Storm Drainage 3-D- PPENDIX D INET CPCITY ND SPCING.0 Introduction The capacity and spacing design of storm drainage inlets are presented in detail in this ppendix. 2.0 Design Recurrence Interval and Spread

More information

Travel Time. Computation of travel time and time of concentration. Factors affecting time of concentration. Surface roughness

Travel Time. Computation of travel time and time of concentration. Factors affecting time of concentration. Surface roughness 3 Chapter 3 of Concentration and Travel Time Time of Concentration and Travel Time Travel time ( T t ) is the time it takes water to travel from one location to another in a watershed. T t is a component

More information

Evaluation of Open Channel Flow Equations. Introduction :

Evaluation of Open Channel Flow Equations. Introduction : Evaluation of Open Channel Flow Equations Introduction : Most common hydraulic equations for open channels relate the section averaged mean velocity (V) to hydraulic radius (R) and hydraulic gradient (S).

More information

2D Modeling of Urban Flood Vulnerable Areas

2D Modeling of Urban Flood Vulnerable Areas 2D Modeling of Urban Flood Vulnerable Areas Sameer Dhalla, P.Eng. Dilnesaw Chekol, Ph.D. A.D. Latornell Conservation Symposium November 22, 2013 Outline 1. Toronto and Region 2. Evolution of Flood Management

More information

C.3 Workshop Track 2: Sizing Calculations and Design Considerations for LID Treatment Measures

C.3 Workshop Track 2: Sizing Calculations and Design Considerations for LID Treatment Measures C.3 Workshop Track 2: Sizing Calculations and Design Considerations for LID Treatment Measures Jill Bicknell, P.E., EOA, Inc. Santa Clara Valley Urban Runoff Pollution Prevention Program Presentation Overview

More information

Lansdowne Stormwater UPDATE

Lansdowne Stormwater UPDATE Lansdowne Stormwater UPDATE August 22, 2012 Ann Arbor Footing Drain Disconnection Stormwater Review Presentation Agenda Welcome and introductions Background on stormwater and sanitary sewer issues Footing

More information

Stormwater Management Functional Servicing Report

Stormwater Management Functional Servicing Report Stormwater Management Functional Servicing Report Part of Lot 12, Concession 10 Township of Cavan Monaghan Ian Cameron Rural Subdivision Engage Project No. 14016 Engage Engineering Ltd. January 7, 2015

More information

Hydrologic Engineering Techniques for Regional Water Resources Planning

Hydrologic Engineering Techniques for Regional Water Resources Planning US Army Corps of Engineers Hydrologic Engineering Center Hydrologic Engineering Techniques for Regional Water Resources Planning October 1969 Approved for Public Release. Distribution Unlimited. TP-17

More information

2014 Low Impact Development Project Performance Monitoring Report

2014 Low Impact Development Project Performance Monitoring Report OA and ADOT&PF 2 Low Impact Development Project Performance onitoring Report Prepared for: The unicipality of Anchorage Prepared by: And January 2 Table of Contents OA and ADOT&PF 2 Low Impact Development

More information

CHAPTER 7 STORM WATER DESIGN

CHAPTER 7 STORM WATER DESIGN CITY OF BOULDER DESIGN AND CONSTRUCTION STANDARDS CHAPTER 7 STORM WATER DESIGN TABLE OF CONTENTS Section Page 7.01 GENERAL...4 (A) INTENT... 4 (B) STORM WATER AND GREENWAYS MASTER PLANS... 4 (C) REFERENCE

More information

Climate Change Case Study: Flood risk arising from future precipitation changes in Gleniti, Timaru

Climate Change Case Study: Flood risk arising from future precipitation changes in Gleniti, Timaru Climate Change Case Study: Flood risk arising from future precipitation changes in Gleniti, Timaru Prepared for the NZ Climate Change Office (Ministry for the Environment) by OPUS International Consultants

More information

COMPARISON OF DISTRIBUTED VERSUS LUMPED HYDROLOGIC SIMULATION MODELS USING STATIONARY AND MOVING STORM EVENTS APPLIED TO SMALL SYNTHETIC

COMPARISON OF DISTRIBUTED VERSUS LUMPED HYDROLOGIC SIMULATION MODELS USING STATIONARY AND MOVING STORM EVENTS APPLIED TO SMALL SYNTHETIC COMPARISON OF DISTRIBUTED VERSUS LUMPED HYDROLOGIC SIMULATION MODELS USING STATIONARY AND MOVING STORM EVENTS APPLIED TO SMALL SYNTHETIC RECTANGULAR BASINS AND AN ACTUAL WATERSHED BASIN By MICHAEL JAY

More information

Stormwater Sand Filter Sizing and Design A Unit Operations Approach

Stormwater Sand Filter Sizing and Design A Unit Operations Approach Stormwater Sand Filter Sizing and Design A Unit Operations Approach Ben R. Urbonas, P.E. Chief, Master Planning and South Platte River Programs, Urban Drainage and Flood Control District, 2480 W. 26 th

More information

DRAINAGE POLICY CONTENTS

DRAINAGE POLICY CONTENTS CONTENTS Section Page DP- 1.0 STATEMENT OF POLICY... 1 1.1 Policy... 1 1.2 Principles... 2 1.3 Basic Knowledge... 2 1.4 Planning... 3 1.5 Technical Issues... 3 1.6 Flood Insurance... 4 1.7 Implementation...

More information

LYNDE CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT

LYNDE CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT Whitby CLOCA Whitby CLOCA LYNDE CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT June 2008 TABLE OF CONTENTS 1.0 INTRODUCTION... 3 2.0 STUDY AREA AND SCOPE... 4 3.0 METHODOLOGY...

More information

Micromanagement of Stormwater in a Combined Sewer Community for Wet Weather Control The Skokie Experience

Micromanagement of Stormwater in a Combined Sewer Community for Wet Weather Control The Skokie Experience Micromanagement of Stormwater in a Combined Sewer Community for Wet Weather Control The Skokie Experience Robert W. Carr 1 * and Stuart G. Walesh 2 1 Water Resources Modeling, LLC, 4144 S. Lipton Ave,

More information

H. Khalid Jamil 9367 Verain Street San Diego, CA, 92129 (858) 663-9200

H. Khalid Jamil 9367 Verain Street San Diego, CA, 92129 (858) 663-9200 OFFSITE DRAINAGE REPORT Ramona Assisted Living 1236 "D" Street Ramona, CA 92065 re~*7lb3 Prepared for H. Khalid Jamil 9367 Verain Street San Diego, CA, 92129 (858) 663-9200 July 1 1, 2008 Daniel Tobar,

More information

Innovative Approaches in Flood Damage Reduction

Innovative Approaches in Flood Damage Reduction Innovative Approaches in Flood Damage Reduction Solutions for the Stormwater Management High Level Results 3D geospatial model of storm water management pond (GRCA, 2013) Enhanced understanding of storm

More information

Flood Mitigation Strategy for the Milwaukee 30 th Street Corridor Redevelopment Program

Flood Mitigation Strategy for the Milwaukee 30 th Street Corridor Redevelopment Program Flood Mitigation Strategy for the Milwaukee 30 th Street Corridor Redevelopment Program Eric Loucks, P.E., D.WRE Kumar Gali, P.E. June 4, 2015 Outline MMSD Service Area Problem and Challenges Solution

More information

Post Construction Stormwater Management Checklist Program

Post Construction Stormwater Management Checklist Program Post Construction Stormwater Management Checklist Program Anahid Damerau, CPESC, CPSWQ Christopher Smith, P.E. Department of Environmental Protection Stormwater Section Watershed Management Program The

More information

Westerly Creek, A Poster Child for Understanding the Benefit of Stormwater Investment

Westerly Creek, A Poster Child for Understanding the Benefit of Stormwater Investment Westerly Creek, A Poster Child for Understanding the Benefit of Stormwater Investment Presented at the ASFPM Annual Conference Atlanta, GA June 1 June 5 2015 Jon Villines, EIT, CFM Aurora Water Alan Turner,

More information

Lower Raritan Watershed Management Area Stormwater & Flooding Subcommittee Strategy Worksheet LRSW-S3C1

Lower Raritan Watershed Management Area Stormwater & Flooding Subcommittee Strategy Worksheet LRSW-S3C1 Strategy Name: Reduce Existing Potential for Flood Damages LRSW-S3C1. Develop and implement a program to: Minimize flood damages through the use of structural measures. Minimize flood damages through the

More information

STORMWATER MANAGEMENT CHECKLIST

STORMWATER MANAGEMENT CHECKLIST STORMWATER MANAGEMENT CHECKLIST *This checklist must be completed and part of the Land Disturbing Permit submittal for review if the acreage disturbed is one (1) acre or more: I. SUPPORTING DATA Narrative

More information

Riprap-lined Swale (RS)

Riprap-lined Swale (RS) Riprap-lined Swale (RS) Practice Description A riprap-lined swale is a natural or constructed channel with an erosion-resistant rock lining designed to carry concentrated runoff to a stable outlet. This

More information

SSO Modeling and Calibration for SSO Case Studies

SSO Modeling and Calibration for SSO Case Studies Wastewater Master Plan DWSD Project No. CS-1314 SSO Modeling and Calibration for SSO Case Studies Technical Memorandum Original Date: January 17, 2003 Revision September 2003 Author: CDM September 2003

More information

Methods for Determination of Safe Yield and Compensation Water from Storage Reservoirs

Methods for Determination of Safe Yield and Compensation Water from Storage Reservoirs US Army Corps of Engineers Hydrologic Engineering Center Methods for Determination of Safe Yield and Compensation Water from Storage Reservoirs October 1966 Approved for Public Release. Distribution Unlimited.

More information

REQUEST FOR PROPOSALS NEW YORK-NEW JERSEY HARBOR & ESTUARY PROGRAM

REQUEST FOR PROPOSALS NEW YORK-NEW JERSEY HARBOR & ESTUARY PROGRAM REQUEST FOR PROPOSALS NEW YORK-NEW JERSEY HARBOR & ESTUARY PROGRAM Planning and Technical Support for Incorporating Green Infrastructure in Long Term Control Plans February 19, 2016 The New York-New Jersey

More information

1 in 30 year 1 in 75 year 1 in 100 year 1 in 100 year plus climate change (+30%) 1 in 200 year

1 in 30 year 1 in 75 year 1 in 100 year 1 in 100 year plus climate change (+30%) 1 in 200 year Appendix C1 Surface Water Modelling 1 Overview 1.1 The Drain London modelling was designed to analyse the impact of heavy rainfall events across each London borough by assessing flow paths, velocities

More information

APPENDIX B. PRO-RATA SHARE PROGRAM EVALUATION

APPENDIX B. PRO-RATA SHARE PROGRAM EVALUATION APPENDIX B. PRO-RATA SHARE PROGRAM EVALUATION B.1 Introduction Across the United States, municipalities utilize mechanisms such as storm water utilities and pro rata share programs to fund activities required

More information

Watershed Modeling System

Watershed Modeling System Watershed Modeling System WMS v8.0 MARICOPA COUNTY TUTORIALS TABLE OF CONTENTS 1 MARICOPA COUNTY: NFF AND HEC-1... 1-1 1.1 OBJECTIVES... 1-1 1.2 DELINEATING THE WATERSHED... 1-1 1.3 BUILDING THE NFF SIMULATION...

More information

Watershed Data Collection and Analysis

Watershed Data Collection and Analysis Watershed Data Collection and Analysis Chris Keithley Department of Forestry and Fire Protection October, 2006 Why Collect Data for a Watershed Assessment? Environmental data is needed to both evaluate

More information

FLOOD PROTECTION BENEFITS

FLOOD PROTECTION BENEFITS IV. (340 points) Flood Protection Benefits A. Existing and potential urban development in the floodplain (50) 1. Describe the existing and potential urban development at the site and the nature of the

More information

The Clean Water Project What Is The Stormwater Impact?

The Clean Water Project What Is The Stormwater Impact? The Clean Water Project What Is The Stormwater Impact? Presentation To: Seminar On Water Issues Bob Weimar, PE, BCEE Chief of Program Management The Metropolitan District Sewage Overflows Have Become More

More information

ELIMINATE STORM WATER FROM ENTERING SANITARY SEWER SYSTEMS

ELIMINATE STORM WATER FROM ENTERING SANITARY SEWER SYSTEMS (408) 761 5882 http://www.sewerlock.net ELIMINATE STORM WATER FROM ENTERING SANITARY SEWER SYSTEMS 1. `The United States and various State Environmental Protection Agency regulations require elimination

More information

Storm Drainage Design and Technical Criteria Manual. City of Brookings, SD

Storm Drainage Design and Technical Criteria Manual. City of Brookings, SD Storm Drainage Design and Technical Criteria Manual City of Brookings, SD May, 2006 City of Brookings Storm Drainage Manual Ecological Resource Consultants, Inc. Storm Drainage Design and Technical Criteria

More information

Guidance for Flood Risk Analysis and Mapping. Changes Since Last FIRM

Guidance for Flood Risk Analysis and Mapping. Changes Since Last FIRM Guidance for Flood Risk Analysis and Mapping Changes Since Last FIRM May 2014 This guidance document supports effective and efficient implementation of flood risk analysis and mapping standards codified

More information

Fort Dodge Stormwater Master Planning. Prepared By: Ralph C. Stark, Jr., P.E., C.F.M. Joel N. Krause, P.E., C.F.M.

Fort Dodge Stormwater Master Planning. Prepared By: Ralph C. Stark, Jr., P.E., C.F.M. Joel N. Krause, P.E., C.F.M. Fort Dodge Stormwater Master Planning Prepared By: Ralph C. Stark, Jr., P.E., C.F.M. Joel N. Krause, P.E., C.F.M. Project Location Project Background Flooding History Localized flooding and storm sewer

More information

Modelling of Urban Flooding in Dhaka City

Modelling of Urban Flooding in Dhaka City Modelling of Urban Flooding in Dhaka City Chusit Apirumanekul*, Ole Mark* *Water Engineering & Management, Asian Inst. of Technology, PO Box 4, Klong Luang, Pathumthani 12120, Thailand Abstract Flooding

More information

Environmental Data Management Programs

Environmental Data Management Programs Hydrologic Engineering Centre (HEC) Software CD Collection of programs, developed by the U.S. Army Corps of Engineers Environmental Data Management Programs Name: HEC-DSS Package Purpose: Data Storage

More information

Understanding Complex Models using Visualization: San Bernardino Valley Ground-water Basin, Southern California

Understanding Complex Models using Visualization: San Bernardino Valley Ground-water Basin, Southern California Understanding Complex Models using Visualization: San Bernardino Valley Ground-water Basin, Southern California Zhen Li and Wesley R. Danskin U.S. Geological Survey, zhenli@usgs.gov, wdanskin@usgs.gov,

More information

Guo, James C.Y. (2004). Design of Urban Channel Drop Structure, J. of Flood Hazards News, December,

Guo, James C.Y. (2004). Design of Urban Channel Drop Structure, J. of Flood Hazards News, December, Guo, James C.. (004). esign of Urban Channel rop Structure, J. of Flood azards News, ecember, Guo, James C.., (009) Grade Control for Urban Channel esign, submitted to Elsevier Science, J. of ydro-environmental

More information

MIKE 21 FLOW MODEL HINTS AND RECOMMENDATIONS IN APPLICATIONS WITH SIGNIFICANT FLOODING AND DRYING

MIKE 21 FLOW MODEL HINTS AND RECOMMENDATIONS IN APPLICATIONS WITH SIGNIFICANT FLOODING AND DRYING 1 MIKE 21 FLOW MODEL HINTS AND RECOMMENDATIONS IN APPLICATIONS WITH SIGNIFICANT FLOODING AND DRYING This note is intended as a general guideline to setting up a standard MIKE 21 model for applications

More information

Project Manager. Geoff Masotti, P.Eng. T. 905.940.6161 Ext. 254 T. 905.940.6161 416.987.6161

Project Manager. Geoff Masotti, P.Eng. T. 905.940.6161 Ext. 254 T. 905.940.6161 416.987.6161 Rainbow Creek Master Plan Update Study The City of Vaughan june 2014 COLE ENGINEERING GROUP LTD. 70 Valleywood Drive Project Manager. Geoff Masotti, P.Eng. Markham, ON CANADA L3R 4T5 T. 905.940.6161 Ext.

More information

Storm Drainage Systems 11.9-1

Storm Drainage Systems 11.9-1 Storm Drainage Systems 11.9-1 11.9 Gutter Flow Calculations 11.9.1 Introduction Gutter flow calculations are necessary in order to relate the quantity of flow (Q) in the curbed channel to the spread of

More information

Catchment Scale Processes and River Restoration. Dr Jenny Mant Jenny@therrc.co.uk. The River Restoration Centre therrc.co.uk

Catchment Scale Processes and River Restoration. Dr Jenny Mant Jenny@therrc.co.uk. The River Restoration Centre therrc.co.uk Catchment Scale Processes and River Restoration Dr Jenny Mant Jenny@therrc.co.uk The River Restoration Centre therrc.co.uk 3 Main Catchment Elements Hydrology Energy associated with the flow of water affects

More information

STORMWATER MASTER PLAN. Basin A Georgia Institute of Technology June 2013

STORMWATER MASTER PLAN. Basin A Georgia Institute of Technology June 2013 STORMWATER MASTER PLAN Basin A Georgia Institute of Technology June 2013 EXECUTIVE SUMMARY The Georgia Institute of Technology is committed to developing its campus with an integrated, ecologically based

More information

City and County of San Francisco 2030 Sewer System Master Plan TASK 400 TECHNICAL MEMORANDUM NO. 405

City and County of San Francisco 2030 Sewer System Master Plan TASK 400 TECHNICAL MEMORANDUM NO. 405 City and County of San Francisco 2030 Sewer System Master Plan TASK 400 TECHNICAL MEMORANDUM NO. 405 REGULATORY CONSIDERATIONS FOR WET WEATHER COLLECTION SYSTEM BACKUPS FINAL DRAFT August 2009 2700 YGNACIO

More information

Using probability to understand 100-year storms

Using probability to understand 100-year storms 1 + Using probability to understand 100-year storms Grade Level: 5-7 Activity Duration: 30-45 minutes Overview: I. Storm stories II. 100-year Storm Probability III. Delineating Storms in NE Minnesota Summary:

More information

Components of a Basement Flooding Protection Plan: Sewer System Improvements. November 2000

Components of a Basement Flooding Protection Plan: Sewer System Improvements. November 2000 Components of a Basement Flooding Protection Plan: Sewer System Improvements November 2000 Components of a Basement Flooding Protection Plan: Sewer System Improvements November 2000 SEMCOG 2000 Prepared

More information

Evaluating Drain Inlet Cleaning as a Storm Water Best Management Practice

Evaluating Drain Inlet Cleaning as a Storm Water Best Management Practice California State University, Sacramento (CSUS) University of California, Davis (UCD) California Department of Transportation (Caltrans) Evaluating Drain Inlet Cleaning as a Storm Water Best Management

More information

ESTIMATION OF NRCS CURVE NUMBER FROM WATERSHED MORPHOMETRIC PARAMETERS: A CASE STUDY OF YIBA WATERSHED IN SAUDI ARABIA

ESTIMATION OF NRCS CURVE NUMBER FROM WATERSHED MORPHOMETRIC PARAMETERS: A CASE STUDY OF YIBA WATERSHED IN SAUDI ARABIA International Journal of Civil Engineering and Technology (IJCIET) Volume 7, Issue 2, March-April 2016, pp. 247 265, Article ID: IJCIET_07_02_022 Available online at http://www.iaeme.com/ijciet/issues.asp?jtype=ijciet&vtype=7&itype=2

More information

Impact of water harvesting dam on the Wadi s morphology using digital elevation model Study case: Wadi Al-kanger, Sudan

Impact of water harvesting dam on the Wadi s morphology using digital elevation model Study case: Wadi Al-kanger, Sudan Impact of water harvesting dam on the Wadi s morphology using digital elevation model Study case: Wadi Al-kanger, Sudan H. S. M. Hilmi 1, M.Y. Mohamed 2, E. S. Ganawa 3 1 Faculty of agriculture, Alzaiem

More information