1 VIRGINIA DEPARTMENT OF TRANSPORTATION STRUCTURE AND BRIDGE DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: Bridge Touchdown Points NUMBER: SPECIFIC SUBJECT: Procedure for Establishing HPB Funding Eligibility DIVISION ADMINISTRATOR APPROVAL: DATE: June 17, 2009 SUPERSEDES: None /original signed/ Kendal R. Walus, P.E. State Structure and Bridge Engineer Approved: June 17, 2009 Changes are shaded. EFFECTIVE DATE: This memorandum is effective upon receipt. POLICY: This memorandum establishes criteria for determining project eligibility and project limits (touchdown points) utilizing Highway Bridge Program (HBP) Funding. CRITERIA FOR DETERMINING ELIGIBILITY OF BRIDGE WORK FOR HBP FUNDING: The following four criteria must be met for a structure to qualify for (HBP) funding previously known as Highway Bridge Rehabilitation and Replacement Program (HBRRP): 1. BRIDGE MUST HAVE AN OPENING MEASURED ALONG THE CENTER OF THE ROADWAY OF MORE THAN TWENTY (20) FEET between undercopings of abutments or springlines of arches, or extreme ends of the openings for multiple boxes or pipes.

2 Sheet 2 of 9 2. BRIDGE MUST NOT HAVE BEEN REPLACED OR REHABILITATED DURING THE PAST TEN YEARS (the 10-year rule ). 3. BRIDGE MUST BE STRUCTURALLY DEFICIENT OR FUNCTIONALLY OBSOLETE. 4. BRIDGE MUST HAVE A SUFFICIENCY RATING (SR) OF: < 80 FOR REHABILITATION / RECONSTRUCTION < 50 FOR REPLACEMENT A classification of STRUCTURALLY DEFICIENT (Bridge Inventory Records) will be determined as follows: GENERAL CONDITION RATING OF 4 OR LESS for one of the following: Decks (Item 58) Superstructures (Item 59) Substructures (Item 60) Culverts (Item 62) (Item 62 is applicable only if Item 43 is coded 19) - or - APPRAISAL RATING OF 2 OR LESS for one of the following: Structural Condition (Item 67) Waterway Adequacy (Item 71) (Item 71 applies only if the last digit of Item 42 is coded 0, 5, 6, 7, 8, or 9) A classification of FUNCTIONALLY OBSOLETE (Bridge Inventory Records) will be determined as follows: APPRAISAL RATING OF 3 or less for one of the following: Deck Geometry (Item 68) Under-clearances (Item 69) (Item 69 applies only if the last digit of item 42 is coded 0, 1 2, 4, 6, 7 or 8) Approach Roadway Alignment (Item 72) - or -

3 Sheet 3 of 9 APPRAISAL RATING OF 3 for one of the following: Structural Condition (Item 67) Waterway Adequacy (Item 71) (Item 71 applies only if the last digit of item 42 is coded 0, 5, 6, 7, 8 or 9) QUALIFYING APPROACH WORK ITEMS AND SAFETY APPURTANCES: 1. Transitions to existing roadway to accommodate minimum design criteria. 2. Temporary detours (when used). 3. Temporary drainage. 4. Approach slabs (when used). 5. Guardrail and attachments. 6. Earthwork for bridge fill. 7. Right of way costs (except utilities). 8. Preliminary Engineering costs. 9. Construction costs. NON-QUALIFYING ITEMS (when constructed beyond the approved touchdown points): 1. Interchanges and ramps. 2. Long approach fills. 3. Connecting roadways. 4. Causeways. 5. Construction of extensive earth structures. 6. Utility work. PROCEDURE FOR ESTABLISHING TOUCHDOWN POINTS FOR ELIGIBLE BRIDGES: Requirements specified in 23 CFR Sec under Eligible Projects, available at: prqtr/pdf/23cfr pdf shall be considered in establishing reasonable touchdown points for approach work to be funded with HBP funds. Every deficient bridge scheduled for rehabilitation or replacement shall be evaluated individually to establish reasonable touchdown points for approach work. The Project Manager shall submit a completed Form SB 107 (Federal Bridge Replacement Program Determination of Touchdown Points) for approval to the Assistant State Structure and Bridge Engineer for Inspection and Maintenance. See Appendix B for a completed sample form.

4 Sheet 4 of 9 The reasonable touchdown points for all eligible bridges shall be determined by the Project Manager based on the following two criteria: 1. The cost of the approach work funded with HBP funds does not exceed 25% of the bridge rehabilitation or replacement cost on the Federal-aid System and 50% on the Off-System. 2. The length of the eligible approach work on each side of the bridge is less than 600 feet. For ease in establishing project limits, the Project Manager may adjust the approach work limits to just one side of the bridge not to exceed 1200 feet for ease in determining quantities and cost. If the Project Manager feels that the reasonable touchdown points should exceed both of the criteria above, then the project shall be submitted to FHWA with supporting documentation for review and approval. EXAMPLES: See examples in Appendix A for eligible work. Cc: Chief Engineer Chief Financial Officer Location and Design Division Administrator Local Assistance Division Administrator Programming Division Administrator Assistant State Structure and Bridge Engineers District Preliminary Engineering Managers District Structure and Bridge Engineers Structure and Bridge Program Managers

5 Sheet 5 of 9 APPENDIX A EXAMPLE 1 : SUBSTANDARD BRIDGE ON EXISTING LOCATION (Bridge Project Only): When replacing or rehabilitating a substandard bridge to minimum standards or greater, on existing grade and location, all approach work items required to transition back into the existing roadway and safety appurtenances pertaining to the bridge are eligible. The cost of any temporary detour required for maintenance of traffic while the structure is being built is eligible. EXISTING LOCATION - BRIDGE ONLY SUBSTANDARD STRUCTURE ON EXISTING LOCATION AND GRADE

6 Sheet 6 of 9 APPENDIX A EXAMPLE 2: STANDARDS COMPLIANT BRIDGE ON EXISTING LOCATION When replacing a bridge that conforms to standard widths on existing grade and location, all approach work items and safety appurtenances pertaining to the bridge are eligible. The cost of any temporary detour required for maintenance of traffic while the structure is being built is eligible. EXISTING LOCATION- BRIDGE ONLY STRUCTURE CONFORMS TO STANDARD WIDTHS ON EXISTING LOCATION AND GRADE

7 Sheet 7 of 9 APPENDIX A EXAMPLE 3: SUBSTANDARD BRIDGE AND ROADWAY ON EXISTING LOCATION (Project to upgrade roadway and rehabilitate or replace a deficient bridge): When replacing or rehabilitating a substandard bridge to minimum standards or greater, on existing grade and location, bridge work items will be limited to 50 feet of approach work at beginning and end of bridge. All approach work items within 100 feet are eligible for consideration. (This allows the coverage of the cost of approach slabs, select material behind the abutments, guardrail attachments and other approach work items.) If a detour is required, associated roadway costs required for maintenance of traffic while the structure is being built are eligible. EXISTING LOCATION BRIDGE AND ROADWAY UPGRADE SUBSTANDARD STRUCTURE - EXISTING LOCATION & GRADE

8 Sheet 8 of 9 APPENDIX A EXAMPLE 4: SUBSTANDARD BRIDGE ON NEW LOCATION When replacing a bridge that needs to be raised or relocated due to substandard vertical and horizontal alignment, substandard clearances, hydraulic design issues, constructability issues, etc., the minimum amount of approach roadway work necessary to tie the relocated alignment back into the existing roadway is eligible. The alignment will conform to current AASHTO standards based on the functional classification and projected traffic volumes for that particular roadway. When a section of roadway that has poor geometry is being upgraded, and this roadway section includes the replacement of a bridge that does not have a geometric problem, engineering judgment shall be used in determining the amount of approach work to be funded with HBRRP funds. BRIDGE ON NEW LOCATION REPLACEMENT OF QUALIFYING STRUCTURE ON RELOCATED ALIGNMENT

9 Sheet 9 of 9 APPENDIX B SAMPLE FORM DETERMINATION OF TOUCHDOWN POINTS DISTRICT: Bristol PROJECT NO.: ,B601 ROUTE NO.: 58 UPC: COUNTY/CITY: Scott County PROJ. MNGR.: John Smith PROJECT LIMITS DATE FROM STA.: SUBMITTED: June 1, 2009 TO STA.: EXISTING STRUCTURE PROJECT ESTIMATED COST CROSSING OVER: Deer Crossing Creek PE: $ 500,000 VA STRUC. NO.: 1012 ROW/UTIL: $ 250,000 FED. STRUC ID.: CONSTR: $ 4,000,000 STRUC. LENGTH (ft): 120 TOTAL: $ 4,750,000 SUFF. RATING : 30 PROPOSED STRUCTURE BRIDGE EST. COST BEGIN STA.: PE: $ 150,000 END STA.: ROW: $ 50,000 BRIDGE LENGTH (ft): 150 CONSTR.: $ 2,000,000 APPROACHES (ft): 200 APPROACHES: $ 100,000 TOTAL LENGTH (ft): 350 TOTAL: $ 2,300,000 APPROVED STRUCTURE REPLACEMENT PROJECT LIMITS BEGIN STA.: END STA.: APPROVED BY: Anwar S. Ahmad, P.E. BRIDGE LENGTH (ft): 150 For State S&B Engineer APPROACHES (ft): 200 TOTAL LENGTH (ft): 350 DATE: June 05, 2009 Comments: The proposed bridge replacement and approach roadway limits are approved. This request doesn t require FHWA approval. APPROVED BY: Comments: FHWA REVIEW AND APPROVAL* DATE: * Submit this form to FHWA for review and approval when BOTH the cost of the approach roadway work exceeds 25% the cost of the bridge located on Federal Aid route or 50% of the bridge located on non-federal Aid route AND the total length of approaches exceed 1200 feet. CC: Programming Division Administrator Local Assistance Division Administrator FHWA (Attn: VA Division Bridge Engineer) District Preliminary Engineer State Structure & Bridge Engineer SB-107

Colorado Off-System Bridge Program Description and Guidelines for Selecting Bridges for Rehabilitation or Replacement Funding

Colorado Off-System Bridge Program Description and Guidelines for Selecting Bridges for Rehabilitation or Replacement Funding C Colorado Off-System Bridge Program Description and Guidelines for Selecting Bridges for Rehabilitation or Replacement Funding These guidelines are intended to provide assistance in selecting OFF-SYSTEM

More information

LOCATION AND DESIGN DIVISION

LOCATION AND DESIGN DIVISION VIRGINIA DEPARTMENT OF TRANSPORTATION LOCATION AND DESIGN DIVISION INSTRUCTIONAL AND INFORMATIONAL MEMORANDUM GENERAL SUBJECT: DESIGN EXCEPTIONS / WAIVERS SPECIFIC SUBJECT: DESIGN EXCEPTION REQUEST FORM

More information

National Bridge Inspection Standards (NBIS) Metrics

National Bridge Inspection Standards (NBIS) Metrics Table of Contents National Bridge Inspection Standards (NBIS) Metrics NATIONAL BRIDGE INSPECTION STANDARDS (NBIS) METRICS TABLE OF CONTENTS...1 Metric #1: 23 CFR 650.307 Bridge inspection organization...2

More information

CHAPTER 7: QUALITY CONTROL/QUALITY ASSURANCE ***DRAFT***

CHAPTER 7: QUALITY CONTROL/QUALITY ASSURANCE ***DRAFT*** CHAPTER 7: QUALITY CONTROL/QUALITY ASSURANCE ***DRAFT*** CHAPTER 7: QUALITY CONTROL/QUALITY ASSURANCE... 1 SECTION 7.1 INTRODUCTION... 2 Subsection 7.1.1 Purpose... 2 Subsection 7.1.2 Scope... 2 Subsection

More information

Bridge Preservation Guide. Maintaining a State of Good Repair Using Cost Effective Investment Strategies

Bridge Preservation Guide. Maintaining a State of Good Repair Using Cost Effective Investment Strategies Bridge Preservation Guide Maintaining a State of Good Repair Using Cost Effective Investment Strategies Notice This document is disseminated under the sponsorship of the U.S. Department of Transportation

More information

3.1 Historical Considerations

3.1 Historical Considerations 3. Recommended Scope of Bridge improvements 3.1 Historical Considerations In the fall of 2000, an outside consultant, Fraser Design, suggested that the existing 4 th St. Bridge is potentially eligible

More information

ENGINEERING DESIGN GUIDELINES. for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS

ENGINEERING DESIGN GUIDELINES. for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS ENGINEERING DESIGN GUIDELINES for SUBDIVISIONS OR COMMERCIAL DEVELOPMENTS City of Birmingham Department of Planning, Engineering and Permits Engineering Division Office of the City Engineer 2008 TABLE

More information

Methodology to Identify Preservation Priority Bridges

Methodology to Identify Preservation Priority Bridges Methodology to Identify Preservation Priority Bridges Louisiana Historic Bridge Inventory Task 8 Prepared for Louisiana Department of Transportation and Development Prepared by www.meadhunt.com November

More information

MCRC Project No.: 459-014-150332 459-014-150333

MCRC Project No.: 459-014-150332 459-014-150333 MCRC Project No.: 459-014-150332 459-014-150333 MONROE COUNTY ROAD COMMISSION AGREEMENT DESIGN SERVICES FOR HIGH FRICTION SURFACE TREATMENT RESURFACING Sylvania Petersburg Road and Deerfield Road THIS

More information

P. ALTERNATE TECHNICAL CONCEPTS FOR CONSTRUCTION, STAGING AND TRAFFIC CONTROL

P. ALTERNATE TECHNICAL CONCEPTS FOR CONSTRUCTION, STAGING AND TRAFFIC CONTROL P. ALTERNATE TECHNICAL CONCEPTS FOR CONSTRUCTION, STAGING AND TRAFFIC CONTROL 1.0 Description. 1.1 This specification allows bidders the opportunity to include in their overall bid proposal, pricing for

More information

Alternatives Presentation Meeting Middlebury WCRS(23)

Alternatives Presentation Meeting Middlebury WCRS(23) Alternatives Presentation Meeting Middlebury WCRS(23) Main Street (VT 30/TH 2 Bridge 102) and Merchants Row (TH 8 Bridge 2) over Vermont Railway June 4, 2013 Twilight Hall Auditorium, Middlebury College

More information

CIRCULAR LETTER 2007-20 Page 2 of 5 November 30, 2007

CIRCULAR LETTER 2007-20 Page 2 of 5 November 30, 2007 CIRCULAR LETTER 2007-20 PPC DECK BEAM NEW SHAPE IMPLEMENTATION, STANDARD BRIDGE PLAN RETIREMENT, AND PPC DECK BEAM INSPECTION COUNTY ENGINEERS/SUPERINTENDENTS OF HIGHWAYS MUNICIPAL ENGINEERS/DIRECTORS

More information

CONSTRUCTION COST ESTIMATES

CONSTRUCTION COST ESTIMATES Chapter 8 CONSTRUCTION COST ESTIMATES SCDOT BRIDGE DESIGN MANUAL April 2006 Table of Contents Section Page 8.1 PROGRAMMING ESTIMATES...8-1 8.1.1 Bridge Replacement Projects...8-1 8.1.2 Other Projects...8-1

More information

QUALITY ASSURANCE. and QUALITY CONTROL PROCESS GUIDE. for PROJECT MANAGERS

QUALITY ASSURANCE. and QUALITY CONTROL PROCESS GUIDE. for PROJECT MANAGERS QUALITY ASSURANCE and QUALITY CONTROL PROCESS GUIDE for PROJECT MANAGERS MDOT Trunkline Projects January 2005 TABLE OF CONTENTS Discussion.. 2 Scope Verification Meeting..... 3 Overview 3 Procedure...

More information

Informational Workshop Public Meeting Kanawha Falls Bridge Project

Informational Workshop Public Meeting Kanawha Falls Bridge Project Informational Workshop Public Meeting Kanawha Falls Project WV Department of Transportation Division of Highways in Cooperation with the Federal Highway Administration State Project S310-13-0.02 00 Federal

More information

Virginia Department of Transportation Rural Rustic Road Program Manual

Virginia Department of Transportation Rural Rustic Road Program Manual Virginia Department of Transportation Rural Rustic Road Program Manual Prepared by Local Assistance Division Virginia Department of Transportation 1401 East Broad Street Richmond, Virginia 23219 Jennifer

More information

Bridge Type Selection

Bridge Type Selection Bridge Type Selection The major consideration for bridge type selection for bridges on the State Aid system is initial cost. Future maintenance costs, construction time, and location are considered when

More information

SECTION III-06 Surfacing Page 1 Revised 3/2/10. See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway.

SECTION III-06 Surfacing Page 1 Revised 3/2/10. See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway. Page 1 Revised 3/2/10 See the DESIGN GUIDELINES in Section I-06 for requirements for cross slope of the roadway. For New/Reconstruction projects: The cross slope of the driving lanes range from 1.5% to

More information

Public Information & Public Scoping Meeting

Public Information & Public Scoping Meeting Public Information & Public Scoping Meeting William F. Cribari Memorial Bridge Route 136 over the Saugatuck River Review of Rehabilitation Study Report Public Scoping for the gathering and analysis of

More information

CHAPTER 12 Revised January 1, 2013 SIGNING AND SEALIN OF PROFESSIONAL SURVEY DELIVERABLES

CHAPTER 12 Revised January 1, 2013 SIGNING AND SEALIN OF PROFESSIONAL SURVEY DELIVERABLES CHAPTER 12 Revised January 1, 2013 SIGNING AND SEALIN OF PROFESSIONAL SURVEY DELIVERABLES Chapter Contents Sec. 12.01 Sec. 12.02 Sec. 12.03 Sec. 12.04 Sec. 12.05 Sec. 12.06 Introduction Business & Legal

More information

Safe & Sound Bridge Terminology

Safe & Sound Bridge Terminology Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries

More information

100 Design Controls and Exceptions

100 Design Controls and Exceptions Table of Contents 100 Introduction... 1 101 Functional Classification... 1 101.1 General... 1 101.2 Urban & Rural... 1 101.3 Classification Used In ODOT Design Criteria... 1 102 Traffic Data... 2 102.1

More information

KENTUCKY TRANSPORTATION CABINET POLICY FOR FEDERALLY FUNDED PAVEMENT REHABILITATION AND PREVENTATIVE MAINTENANCE PROJECTS

KENTUCKY TRANSPORTATION CABINET POLICY FOR FEDERALLY FUNDED PAVEMENT REHABILITATION AND PREVENTATIVE MAINTENANCE PROJECTS KENTUCKY TRANSPORTATION CABINET POLICY FOR FEDERALLY FUNDED PAVEMENT REHABILITATION AND PREVENTATIVE MAINTENANCE PROJECTS I. GENERAL The following policy shall apply when the intent of the project is to

More information

Appendix A Alternative Contracting General Engineering Consultant RFP. Appendix A

Appendix A Alternative Contracting General Engineering Consultant RFP. Appendix A Appendix A 1 1.0 Requirements and Minimum Qualifications This section outlines requirements and minimum qualifications for the GEC. It is anticipated that the GEC will be used to support and supplement

More information

2015 ODOT Bridge Design Conference May 12, 2014. DeJong Rd Bridge High- Seismic Zone Case Study: Bridge Rehab vs. Replacement.

2015 ODOT Bridge Design Conference May 12, 2014. DeJong Rd Bridge High- Seismic Zone Case Study: Bridge Rehab vs. Replacement. 2015 ODOT Bridge Design Conference May 12, 2014 DeJong Rd Bridge High- Seismic Zone Case Study: Bridge Rehab vs. Replacement Mary Ann Triska 2015 HDR, all rights reserved. Presentation Outline Project

More information

I-25/ARAPAHOE INTERCHANGE RECONSTRUCTION PROJECT

I-25/ARAPAHOE INTERCHANGE RECONSTRUCTION PROJECT MANDATORY PRE-BID SIGN IN CDOT Carrie DeJiacomo, Program Engineer John Hall, Resident Engineer Telecia McCline, Project Manager Tammy Maurer, Assistant Project Manager David Evans/Hartwig Design Consultant

More information

CONCEPTUAL REHABILITATION ALTERNATIVE

CONCEPTUAL REHABILITATION ALTERNATIVE Appendix D While federal law requires preservation/rehabilitation of historic bridges be considered, there is no standard procedure to determine when rehabilitation is appropriate and when replacement

More information

5 ALTERNATIVE SOLUTIONS AND EVALUATION

5 ALTERNATIVE SOLUTIONS AND EVALUATION Page 23 5 ALTERNATIVE SOLUTIONS AND EVALUATION The process used for the assessment and evaluation of the alternatives follows the procedures of the Municipal Class EA, as described below: Identify a reasonable

More information

LIMITED SCOPE CONCEPT DEVELOPMENT REPORT

LIMITED SCOPE CONCEPT DEVELOPMENT REPORT LIMITED SCOPE CONCEPT DEVELOPMENT REPORT Route 33 Resurfacing Project Eastbound: Milepost 24.2 to Milepost 28.9 Westbound: Milepost 24.3 to Milepost 28.9 Manalapan & Freehold Townships, Monmouth County

More information

PENNDOT 3D MODELING FOR STRUCTURES WORKSHOP. Presented by: Steven Pletcher and Chris Daniels, P.E. October 21, 2014

PENNDOT 3D MODELING FOR STRUCTURES WORKSHOP. Presented by: Steven Pletcher and Chris Daniels, P.E. October 21, 2014 PENNDOT 3D MODELING FOR STRUCTURES WORKSHOP Presented by: Steven Pletcher and Chris Daniels, P.E. October 21, 2014 Agenda Introduction G.A. & F.C. Wagman History Process used to prepare 3D models Estimating

More information

City of Auburn Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN

City of Auburn Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN Americans with Disabilities Act (ADA) Transition Plan for Curb Ramps, Sidewalks, and Pedestrian Signals ADA TRANSITION PLAN December 21, 2009 Public Works Department 171 N. Ross Street, Suite 200 Auburn,

More information

Design of Bridges. Introduction. 3 rd to 4 th July 2012. Lecture for SPIN Training at the University of Dar es Salaam

Design of Bridges. Introduction. 3 rd to 4 th July 2012. Lecture for SPIN Training at the University of Dar es Salaam Design of Bridges Introduction 3 rd to 4 th July 2012 1 FUNCTION OF A BRIDGE To connect two communities which are separated by streams, river, valley, or gorge, etc. 2 EVOLUTION OF BRIDGES 1. Log Bridge

More information

FOREWORD. William A. Weseman, Director Office of Engineering

FOREWORD. William A. Weseman, Director Office of Engineering FOREWORD The Recording and Coding Guide for the Structure Inventory and Appraisal of the Nation's Bridges (Guide) has been revised several times in the past. This latest edition revises the Guide to convert

More information

IH-635 MANAGED LANES PROJECT, SEG. 3.2

IH-635 MANAGED LANES PROJECT, SEG. 3.2 IH-635 MANAGED LANES PROJECT, SEG. 3.2 Location: Dallas, Texas Owner: Texas Department of Transportation Client: Ferrovial Agroman Construction Cost: $1 Billion Construction Completion Date: December,

More information

Chapter 4 ASSET INVENTORY AND CONDITION CHAPTER 4 ASSET INVENTORY AND CONDITION PAGE 33

Chapter 4 ASSET INVENTORY AND CONDITION CHAPTER 4 ASSET INVENTORY AND CONDITION PAGE 33 Chapter 4 ASSET INVENTORY AND CONDITION CHAPTER 4 ASSET INVENTORY AND CONDITION PAGE 33 This page intentionally left blank. PAGE 34 MINNESOTA GO MNDOT TRANSPORTATION ASSET MANAGEMENT PLAN ASSET INVENTORY

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS Engineering Design Services for the Preliminary (Design) Engineering 1. Imlay City Road Imlay City Road at Wilder Road (signal modernization), Lapeer Township 2. Imlay City Road Imlay

More information

May 29, 2015. Ongoing Flood Damages to County Federal-aid Routes

May 29, 2015. Ongoing Flood Damages to County Federal-aid Routes OKLAHOMA DEPARTMENT OF TRANSPORTATION Local Government Division 200 N.E. 21 st Street Oklahoma City, OK 73105-3204 www.odot.org May 29, 2015 Ongoing Flood Damages to County Federal-aid Routes We are anticipating

More information

FHWA Emergency Relief (FHWA-ER) Training

FHWA Emergency Relief (FHWA-ER) Training FHWA Emergency Relief (FHWA-ER) Training Training Developed and Coordinated By Colorado Department of Transportation 2 Agenda FHWA Flowchart Policies, Purpose, Agency Roles Application Process Eligibility

More information

SUMMARY OF CATEGORIES 2007 STATEWIDE PRESERVATION PROGRAM (SPP) _MAINTAIN IT_

SUMMARY OF CATEGORIES 2007 STATEWIDE PRESERVATION PROGRAM (SPP) _MAINTAIN IT_ 2007 STATEWIDE PRESERVATION (SPP) _MAINTAIN IT_ 1 Preventive Maintenance and Rehabilitation MING AUTHORITY allocation by fmula. Projects selected by districts. State % 0% State Districts RANKING INDEX

More information

Maintenance Management and Asset Management

Maintenance Management and Asset Management Defining and Understanding the Difference Between Maintenance Management and Asset Management Dr. Simon Lewis AgileAssets, Inc. 12th AASHTO-TRB Maintenance Management Conference Annapolis Maryland, July

More information

Stone Arch Bridges of Washington County, MD

Stone Arch Bridges of Washington County, MD Stone Arch Bridges of Washington County, MD Presentation for the County Engineers Association of Maryland (CEAM) 2009 Spring Conference May 14, 2009 Scott Hobbs, P.E. Capital Projects Engineering John

More information

The Corporation of the TOWN OF MILTON

The Corporation of the TOWN OF MILTON The Corporation of the TOWN OF MILTON Report to: From: Mayor G. A. Krantz & Members of Council M. Paul Cripps, P. Eng., Director, Engineering Services Date: November 11, 2013 Report No. ENG-039-13 Subject:

More information

Project Manager & Key Staff Standards for Technical Proposals Projects using Level A and/or Level B prequalification disciplines

Project Manager & Key Staff Standards for Technical Proposals Projects using Level A and/or Level B prequalification disciplines Projects using Level A and/or Level B prequalification disciplines Project Manager PROJECT MANAGER Key Staff/ ROADWAY DESIGN (TP Section 5) (TP Section 6) BACHELORS DEGREE 4 TO 8 YEARS (TP Sections 6 &

More information

CHAPTERS 600 670 PAVEMENT ENGINEERING CHAPTER 600 GENERAL ASPECTS

CHAPTERS 600 670 PAVEMENT ENGINEERING CHAPTER 600 GENERAL ASPECTS HIGHWAY DESIGN MANUAL 600-1 May 7, 2012 CHAPTERS 600 670 PAVEMENT ENGINEERING CHAPTER 600 GENERAL ASPECTS Topic 601 - Introduction Pavement engineering involves the determination of the type and thickness

More information

US 51 Ohio River Bridge Engineering and Environmental Study

US 51 Ohio River Bridge Engineering and Environmental Study US 51 Ohio River Bridge Engineering and Environmental Study ITEM NOS. 1-100.00 & 1-1140.00 Prepared by: Michael Baker Jr., Inc. 9750 Ormsby Station Rd Louisville, KY 40223 August 16, 2013 Table of Contents

More information

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix. Storm Drainage 13-C-1 APPENDIX C INLETS 1.0 Introduction The application and types of storm drainage inlets are presented in detail in this Appendix. 2.0 Inlet Locations Inlets are required at locations

More information

BRIDGE DESIGN MANUAL

BRIDGE DESIGN MANUAL BRIDGE DESIGN MANUAL 2003 Edition (U.S. Customary Units) State of Connecticut Department of Transportation Revisions: 7/04, 11/04, 1/05, 3/05, 1/09, 3/09, 2/11 PREFACE The Connecticut Department of Transportation

More information

Chapter 22. Lump Sum Project Guidelines

Chapter 22. Lump Sum Project Guidelines Chapter 22 Lump Sum Project Guidelines 22.1 General...22-1 22.2 Project Selection...22-3 22.3 Plans Preparation...22-5 22.4 Preliminary Estimate...22-7 22.5 Specifications...22-9 22.6 Contracts Administration...22-11

More information

EI 08-002 ENGINEERING INSTRUCTION

EI 08-002 ENGINEERING INSTRUCTION To: New York State Department of Transportation ENGINEERING INSTRUCTION EI 08-002 Title: REVISED PLAN SHEET GUIDANCE Distribution: Approved: Manufacturers (18) Surveyors (33) Local Govt. (31) Consultants

More information

Project Management On-line Guide

Project Management On-line Guide Project Management On-line Guide Project Life Cycle Processes Flowchart Department Policy Memorandum Project Management Policy To support the Project Management Initiative, respond to Policy Agreement

More information

Presentation to NYSAMPO, June 2015 Steve Wilcox, P.E., Director, Maintenance Program Planning Bureau NYSDOT

Presentation to NYSAMPO, June 2015 Steve Wilcox, P.E., Director, Maintenance Program Planning Bureau NYSDOT Presentation to NYSAMPO, June 2015 Steve Wilcox, P.E., Director, Maintenance Program Planning Bureau NYSDOT Comprehensive Asset Management Planning What Is Your Asset Management Organization? What Do You

More information

VERTICAL SPEED CONTROL DEVICES

VERTICAL SPEED CONTROL DEVICES H-3.8 VERTICAL SPEED CONTROL DEVICES GENERAL 1. Description This standard identifies minimum requirements that shall be met for all Vertical Speed Control Devices in the design and construction of elements

More information

HIGHWAY DEPARTMENT ACCESS AND RIGHT OF WAY WIDTH GUIDELINES

HIGHWAY DEPARTMENT ACCESS AND RIGHT OF WAY WIDTH GUIDELINES Approved 6/26/01 HIGHWAY DEPARTMENT ACCESS AND RIGHT OF WAY WIDTH GUIDELINES All new, modified and/or changed use access(es) onto county roads shall be subject to the access and corridor protection guidelines

More information

Asset Management Performance Report (Asset Management Plan Phase 1)

Asset Management Performance Report (Asset Management Plan Phase 1) 2016 Asset Management Performance Report (Asset Management Plan Phase 1) Prepared by the California Department of Transportation In Accordance with Government Code Section 14526.5 Table of Contents Executive

More information

GENERAL. This manual addresses five local programs that are funded under the current Highway Act:

GENERAL. This manual addresses five local programs that are funded under the current Highway Act: OVERVIEW The Local Public Agency Manual published by the Missouri Department of Transportation (MoDOT) is intended to be used as a guide for cities and counties that sponsor projects utilizing federal

More information

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE JURISDICTION OF ALBERTA TRANSPORTATION 1.0 Application Procedures 2.0

More information

3 Tappan Zee Bridge Rehabilitation Options

3 Tappan Zee Bridge Rehabilitation Options 3 Tappan Zee Bridge Rehabilitation Options 3.1 Introduction This chapter describes possible options that rehabilitate and enhance the existing Tappan Zee Bridge. Four Rehabilitation Options have been developed:

More information

Work Breakdown Structure Element Dictionary. Final Design

Work Breakdown Structure Element Dictionary. Final Design Initiation FD 4.1 Initiation encompasses deliverables associated with the development, implementation and control of the project s schedule, budget and scope. The lead office develops these project parameters

More information

Department of Public Works P.O Box 4186, San Rafael, CA 94913-4186 415/473-7877 Fax: 415/473-3724

Department of Public Works P.O Box 4186, San Rafael, CA 94913-4186 415/473-7877 Fax: 415/473-3724 Department of Public Works P.O Box 4186, San Rafael, CA 94913-4186 415/473-7877 Fax: 415/473-3724 San Antonio Road Bridge Replacement September 9, 2015 Community Meeting Summary The County of Marin in

More information

REHABILITATION PACKAGE 1-a

REHABILITATION PACKAGE 1-a 1-a WINONA BRIDGE (BRIDGE 5900) REHABILITATION PACKAGE 1-a Rehab option 1-a is a rehabilitation package whereby all spans of the existing structure would be rehabilitated to the degree feasible and strengthened

More information

Section 11.5 TESTING AND CORRECTING ASPHALT PAVEMENT SURFACE DEFICIENCIES

Section 11.5 TESTING AND CORRECTING ASPHALT PAVEMENT SURFACE DEFICIENCIES Section 11.5 TESTING AND CORRECTING ASPHALT PAVEMENT SURFACE DEFICIENCIES 11.5.1 Purpose To provide a uniform procedure for determining that the last structural layer meets the applicable straightedge

More information

THE USE OF HIGHWAY MAINTENANCE MANAGEMENT SYSTEMS IN STATE HIGHWAY AGENCIES

THE USE OF HIGHWAY MAINTENANCE MANAGEMENT SYSTEMS IN STATE HIGHWAY AGENCIES THE USE OF HIGHWAY MAINTENANCE MANAGEMENT SYSTEMS IN STATE HIGHWAY AGENCIES Introduction The American Association of State Highway and Transportation Officials (AASHTO) published its Guidelines for Maintenance

More information

Polk Commerce Centre CRA Spine Road Alignment Study

Polk Commerce Centre CRA Spine Road Alignment Study Polk Commerce Centre CRA Spine Road Alignment Study Florida Polytech Pace Road (LIMIT) Berkley Road Williams DRI Proposed Alignment Polk Commerce Centre CRA Boundary Braddock Road (LIMIT) Lake Myrtle Sports

More information

Surface Transportation Program (STP) Projects

Surface Transportation Program (STP) Projects Toledo Metropolitan Area Council of Governments American Reinvestment and Recovery Act (Economic Stimulus Program) Application Packet for: Surface Transportation Program (STP) Projects APPLICATIONS DUE

More information

CHAPTER 5 QUALITY CONTROL AND QUALITY ASSURANCE

CHAPTER 5 QUALITY CONTROL AND QUALITY ASSURANCE Bridge Inspection Handbook 5-1 CHAPTER 5 QUALITY CONTROL AND QUALITY ASSURANCE 5.1 QUALITY CONTROL and QUALITY ASSURANCE are integrated into all aspects of bridge inspection. They contain the essential

More information

DESIGN PUBLIC HEARING. August 10, 2015 WEST BOYLSTON TOWN HALL, BOARD MEETING ROOM. 140 Worcester Street WEST BOYLSTON, MASSACHUSETTS 6:30 PM

DESIGN PUBLIC HEARING. August 10, 2015 WEST BOYLSTON TOWN HALL, BOARD MEETING ROOM. 140 Worcester Street WEST BOYLSTON, MASSACHUSETTS 6:30 PM DESIGN PUBLIC HEARING August 10, 2015 AT WEST BOYLSTON TOWN HALL, BOARD MEETING ROOM 140 Worcester Street WEST BOYLSTON, MASSACHUSETTS 6:30 PM FOR THE PROPOSED Rehabilitation & Stormwater Improvements

More information

CHAPTER 27 New Public Road Connections. Table of Contents

CHAPTER 27 New Public Road Connections. Table of Contents Chapter 27 New Public Road Connections Table of Contents CHAPTER 27 New Public Road Connections Table of Contents CHAPTER 27 New Public Road Connections... 27-3 ARTICLE 1 - General... 27-3 Responsibility...

More information

PROJECT TASKS & SCHEDULING GUIDE PROJECT DEVELOPMENT AND DELIVERY PROCESS

PROJECT TASKS & SCHEDULING GUIDE PROJECT DEVELOPMENT AND DELIVERY PROCESS PROJECT TASKS & SCHEDULING GUIDE PROJECT DEVELOPMENT AND DELIVERY PROCESS REVISED DECEMBER, 2015 TABLE OF CONTENTS INTRODUCTION...3 TASK SUMMARY (BY ID)........4 TASK SUMMARY (BY PHASE)..........8 TASK

More information

Exhibit A Scope of Work

Exhibit A Scope of Work Exhibit A Scope of Work The agreement for S.P. 3116-142 (T.H. 169-Cross Range Expressway) includes final design plans for a 1.55 mile length of a 2 lane to 4 lane expansion project located 0.66 miles SW

More information

How To Improve Road Quality

How To Improve Road Quality A Customer Service Level Approach for Maine DOT s Asset Management System Jeffrey L. Zavitski, B.A. Senior Implementation Specialist Deighton Associates Limited Chip Getchell, P.E. Director, Work Plan

More information

ITD Pipe Materials Selection & Specification Procedures. July 2011

ITD Pipe Materials Selection & Specification Procedures. July 2011 ITD Pipe Materials Selection & Specification Procedures July 2011 INTRODUCTION: This technical memorandum is written as a guide to the selection of compliant pipe materials and the elimination of non-compliant

More information

Welcome! Purpose of Tonight s Meeting. Informational Open House to discuss two City projects: Goal is to LISTEN TO YOU

Welcome! Purpose of Tonight s Meeting. Informational Open House to discuss two City projects: Goal is to LISTEN TO YOU Purpose of Tonight s Meeting Informational Open House to discuss two City projects: Fairchild Street Subway Phase I Engineering: Immediate need to replace subway Bowman Avenue Feasibility Study Future

More information

STREET LIGHTING CONSTRUCTION DESIGN CRITERIA

STREET LIGHTING CONSTRUCTION DESIGN CRITERIA STREET LIGHTING CONSTRUCTION DESIGN CRITERIA DC9-001 GENERAL. Proposed street lighting construction in the city of Olathe shall in all respects conform to the technical criteria for analysis and design

More information

MassDOT s Work Zone Transportation Management Procedures. By: Neil Boudreau, MassDOT and Michael Sutton, P.E., VHB

MassDOT s Work Zone Transportation Management Procedures. By: Neil Boudreau, MassDOT and Michael Sutton, P.E., VHB MassDOT s Work Zone Transportation Management Procedures By: Neil Boudreau, MassDOT and Michael Sutton, P.E., VHB What is the Work Zone Safety and Mobility Rule? 23 CFR 630 Subpart J, effective October

More information

Bridge Office Policies and Procedures BOPP 2014

Bridge Office Policies and Procedures BOPP 2014 Bridge Office Policies and Procedures BOPP 2014 Nebraska Department of Roads Bridge Division Last updated: October 2014 Introduction Page I Purpose The BRIDGE OFFICE POLICIES AND PROCEDURES manual (BOPP)

More information

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary

More information

SIGHT DISTANCE. Presented by Nazir Lalani P.E. Traffex Engineers Inc. N_lalani@hotmail.com WHY IS SIGHT DISTANCE SO IMPORTANT?

SIGHT DISTANCE. Presented by Nazir Lalani P.E. Traffex Engineers Inc. N_lalani@hotmail.com WHY IS SIGHT DISTANCE SO IMPORTANT? SIGHT DISTANCE Presented by Nazir Lalani P.E. Traffex Engineers Inc. N_lalani@hotmail.com WHY IS SIGHT DISTANCE SO IMPORTANT? Drivers must be able to: Stop for objects in the roadway Stop for stationary

More information

1. It would create hazardous effects of storm water run-off. 3. It would increase hazardous driving conditions on the public road.

1. It would create hazardous effects of storm water run-off. 3. It would increase hazardous driving conditions on the public road. SECTION 6: REQUIREMENTS FOR A DRIVEWAY CONNECTION A. Required information. The application shall be accompanied by a sketch of the proposed driveway which at a minimum shall indicate: 1. Geometric information

More information

FEBRUARY 2014 LRFD BRIDGE DESIGN 4-1

FEBRUARY 2014 LRFD BRIDGE DESIGN 4-1 FEBRUARY 2014 LRFD BRIDGE DESIGN 4-1 4. STRUCTURAL ANALYSIS AND EVALUATION The analysis of bridges and structures is a mixture of science and engineering judgment. In most cases, use simple models with

More information

Structural Condition and Replacement Memorandum

Structural Condition and Replacement Memorandum Structural Condition and Replacement Memorandum Prepared by: D. Morales, MSA Design & Consulting Checked by: C. Subrizi, MSA Design & Consulting Reviewed by: Roupen Donikian, PB Submitted by: Gary Kennerley,

More information

Historic Bridge Alternatives Analysis Layout

Historic Bridge Alternatives Analysis Layout Section 4(f) of the USDOT Act of 1966 (Title 49, USC, Section 303) requires special considerations be made regarding the use of any publicly owned park, recreation area, wildlife/waterfowl refuge or historic

More information

SR-18 Corridor Improvements in Wood County

SR-18 Corridor Improvements in Wood County Public Meeting Information Package SR- Corridor Improvements in Wood County Thursday, May 19, 2011 10:00 a.m. to 1:00 p.m. Meeting Location: Hancock-Wood Electric Cooperative Building 1399 Business Park

More information

Chapter 4 SUBSURFACE INVESTIGATION GUIDELINES

Chapter 4 SUBSURFACE INVESTIGATION GUIDELINES Chapter 4 SUBSURFACE INVESTIGATION GUIDELINES Final SCDOT GEOTECHNICAL DESIGN MANUAL August 2008 Table of Contents Section Page 4.1 Introduction...4-1 4.2 Subsurface Investigation...4-2 4.2.1 Preliminary

More information

OVERVIEW OF TMH19: DRAFT STANDARD FOR THE VISUAL ASSESSMENT OF ROAD STRUCTURES

OVERVIEW OF TMH19: DRAFT STANDARD FOR THE VISUAL ASSESSMENT OF ROAD STRUCTURES ROAD PAVEMENTS FORUM TWENTY-FIFTH MEETING 7 May 2013 OVERVIEW OF TMH19: DRAFT STANDARD FOR THE VISUAL ASSESSMENT OF ROAD STRUCTURES Michael Roux (CSIR Built Environment) Acknowledgements SANRAL Team Members:

More information

EXHIBIT A Accessible Truck Routes Map

EXHIBIT A Accessible Truck Routes Map EXHIBIT A Accessible Truck Routes Map ASHEVILLE, NORTH CAROLINA ROUTE: A ROUTE: B ROUTE: C ROUTE: D ROUTE: E EXHIBIT A EXHIBIT B Craven Street Improvements Map ASHEVILLE, NORTH CAROLINA EXHIBIT B EXHIBIT

More information

The Rehabilitation Alternative Huey P. Long Bridge Case Study. Bruce E. Peterson, P.E. Project Manager Modjeski and Masters, Inc.

The Rehabilitation Alternative Huey P. Long Bridge Case Study. Bruce E. Peterson, P.E. Project Manager Modjeski and Masters, Inc. The Rehabilitation Alternative Huey P. Long Bridge Case Study Bruce E. Peterson, P.E. Project Manager Modjeski and Masters, Inc. March 22, 2010 Replacement vs. Rehabilitation Project Background Introduction

More information

PRECAST CONCRETE BOX CULVERTS

PRECAST CONCRETE BOX CULVERTS PRECAST CONCRETE BOX CULVERTS OUTLINE Introduction Applications Manufacturing Methods Design Procedures & Joints Installation Quality Summary INTRODUCTION Four-sided culverts are typically referred to

More information

NATIONAL BRIDGE INSPECTION PROGRAM COMMENDABLE PRACTICES

NATIONAL BRIDGE INSPECTION PROGRAM COMMENDABLE PRACTICES NATIONAL BRIDGE INSPECTION PROGRAM COMMENDABLE PRACTICES Portland, Oregon April 23-25, 2013 Larry D. O Donnell, P.E. Sr. Structural Engineer Federal Highway Administration Office of Technical Services

More information

IV. INDUSTRIAL TRACK DESIGN

IV. INDUSTRIAL TRACK DESIGN IV. INDUSTRIAL TRACK DESIGN 4.01 GENERAL The following sections govern the criteria to be used in the designing of industry tracks served, or to be served, by the Railway Company. Any deviation from these

More information

LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT CONSTRUCTION PLANS QUALITY CONTROL / QUALITY ASSURANCE MANUAL

LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT CONSTRUCTION PLANS QUALITY CONTROL / QUALITY ASSURANCE MANUAL LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT CONSTRUCTION PLANS QUALITY CONTROL / QUALITY ASSURANCE MANUAL August 2008 TABLE OF CONTENTS Section 1 - Introduction... 3 1.1 Defining Plan Quality...

More information

INDIANA DEPARTMENT OF TRANSPORTATION BRIDGE INSPECTION PROGRAM CODING GUIDE

INDIANA DEPARTMENT OF TRANSPORTATION BRIDGE INSPECTION PROGRAM CODING GUIDE INDIANA DEPARTMENT OF TRANSPORTATION BRIDGE INSPECTION PROGRAM CODING GUIDE BRAGI Bridge Reporting for Appraisal & Greater Inventory Volume III: Other INDOT Items November 2011 Item Number Item Name BRAGI

More information

Rehabilitation of the Red Bank Road Bridge over Hoover Reservoir. Presented By: Doug Stachler, P.E.

Rehabilitation of the Red Bank Road Bridge over Hoover Reservoir. Presented By: Doug Stachler, P.E. Rehabilitation of the Red Bank Road Bridge over Hoover Reservoir Presented By: Doug Stachler, P.E. Project Organization Owner Delaware County Engineers Office Design Consultant CH2M HILL Contractor Double

More information

Investigation of Unknown Bridge Foundations in Oregon

Investigation of Unknown Bridge Foundations in Oregon Investigation of Unknown Bridge Foundations in Oregon 2013 Pacific NW Bridge Inspection Conference Portland, Oregon April 24, 2013 Jan Six, Sr. Geotechnical Engineer ODOT Bridge Engineering Section 1 Scour

More information

I-25 / Rio Bravo Interchange

I-25 / Rio Bravo Interchange I-25 / Rio Bravo Interchange TONIGHT S MEETING SCHEDULE OPEN HOUSE 6:00 PM TO 6:30 PM PRESENTATION BEGINS AT 6:30 PM Q & A FOLLOWING PRESENTATION CN A300280 / PNA300280 I-25 / Rio Bravo Interchange SECOND

More information

Comparison of Bridge Rehabilitation versus Bridge Replacement Concepts

Comparison of Bridge Rehabilitation versus Bridge Replacement Concepts Technical Memorandum Comparison of Bridge Rehabilitation versus Bridge Replacement Concepts Introduction The comparison of rehabilitation versus replacement of the Sellwood Bridge is being conducted in

More information

District Three Design newsletter

District Three Design newsletter Florida Department of Transportation newsletter Inside this issue: Editor s Desk Highway Safety Manual Implementation Design Spotlight Plans Processing, Specifications & LAP Supplemental Agreement Report

More information

Truss Bridges of Kentucky

Truss Bridges of Kentucky ACEC Partnering Conference 2012 Truss Bridges of Kentucky 1899 Amanda Abner Rebecca Turner 1893 Truss Bridges of Kentucky Truss Bridges of Kentucky Vincennes Bridge Company Champion Bridge Company Empire

More information

CHAPTER 10 PERMIT PROCEDURES AND BONDING REQUIREMENTS FOR CONTRACTORS

CHAPTER 10 PERMIT PROCEDURES AND BONDING REQUIREMENTS FOR CONTRACTORS I "i,, I, 1 " CHAPTER 10 PERMIT PROCEDURES AND BONDING REQUIREMENTS FOR CONTRACTORS CHAPTER 10 PERMIT PROCEDURES A N D BONDING REQUIREMENTS FOR CONTRACTORS, Section I -, INDEX :, - % I I,,J Topic b 101

More information

Index 20010 Series Prestressed Florida-I Beams (Rev. 07/12)

Index 20010 Series Prestressed Florida-I Beams (Rev. 07/12) Index 20010 Series Prestressed Florida-I Beams (Rev. 07/12) Design Criteria AASHTO LRFD Bridge Design Specifications, 6th Edition; Structures Detailing Manual (SDM); Structures Design Guidelines (SDG)

More information

Ch a p t e r 5. Bridges Decks and Boardwalks

Ch a p t e r 5. Bridges Decks and Boardwalks 05 Ch a p t e r 5 Park Structures Bridges Decks and Boardwalks Intentionally Blank Br i d g e s Chapter 5: Park Structures Pu r p o s e Bridges shall facilitate safe access across bodies of water, unstable

More information