1 TRUE Consulting July 20, Falcon Road File: 389 Kamloops, BC V2C 4J2 Attention: Mr. Dave Underwood, P.Eng. 1.0 INTRODUCTION Re: Geotechnical Investigation Report District of 100 Mile House Water Treatment Plant and Reservoir Highway 97, 100 Mile House, BC We understand that it is proposed to construct a new water reservoir, water treatment plant and approximately 1,700 m of associated water mains. This report summarises the results of a geotechnical investigation of the soil and groundwater conditions at the proposed development sites and makes recommendations for the design and construction of the new improvements. The report has been prepared exclusively for TRUE Consulting and the District of 100 Mile House for their use, and the use of others on their design team. 2.0 SITE DESCRIPTION The proposed water reservoir site is forested and undeveloped. The majority of the water main would be located within the forested lands. The water treatment plan would be located adjacent to the existing pump house on Highway FIELD INVESTIGATION The site was investigated on June 15, 2016 at which time 7 test pits were excavated using two excavators. The test pits were logged in the field by a technician from our office and loosely backfilled after logging and sampling. The test pits were excavated between depths of 2.8 and 3.2 m below the existing site grades. The approximate location of the test pits are shown on the Test Pit Location Plan, drawing following the text of this report. 4.0 SUBSURFACE CONDITIONS 4.1 Soil Profile The soils encountered in our test pits generally consist of dense glacial deposits (TP16 01 to TP16 05) to compact fluvial fan deposits (TP16 06 & 07). At the location of the proposed water reservoir, the soils consist of topsoil and loose overburden soils to a depth of 0.7 to 0.8 m, then very stiff lacustrine silt over dense glacial till. The glacial till consists of a dense to very dense clayey silt with some sand, gravel and File: 389 Proposed 100 Mile House Water Treatment Plant and Reservoir Page 1 of 4

2 frequent boulders and cobbles. At the water treatment plant location (TP16 06), the soils consist of thin topsoil, over firm silt, then loose to compact sand. A detailed description of the test pit logs are presented in Appendix A and the results of the laboratory testing are presented in Appendix B. 4.2 Groundwater Conditions The groundwater table was encountered in TP16 06 at a depth of 2.8 m below the existing site grades. 5.0 DISCUSSION 5.1 General Comments As noted, it is proposed to construct a new water reservoir, water treatment plant and approximately 1,700 m of associated water mains. The areas are generally underlain by less than 1 m of topsoil and loose overburden, over compact sand, or stiff silt and/or dense glacial till and are considered suitable for the support of the structures at moderate bearing pressures. Following our review, we are of the opinion that the proposed development is feasible from a geotechnical standpoint provided that our recommendations outlined below are followed. 6.0 RECOMMENDATIONS FOR DEVELOPMENT 6.1 Site Preparations The recommended site preparations for the proposed water treatment plant and reservoir include the removal of any topsoil and loose soils, to expose a subgrade of compact sand to dense glacial till. Any soils sub excavated beneath the structures should be removed for a distance outside of the building footprint equal to its thickness. Any grade reinstatement beneath the structures should consist of clean, well graded sand and gravel compacted to 100% Standard Proctor (ASTM D698) maximum dry density (SPMDD). In situ nuclear density tests should be conducted to ensure that the fills are being compacted properly. 6.2 Spread Foundations Foundations constructed for the water treatment plant on the compact sand, or engineered fill can be designed for a Serviceability Limit State (SLS) bearing pressure of 100 kpa and an Ultimate Limit State (ULS) bearing pressure of 200 kpa. Foundations constructed for the water reservoir can be designed for a SLS bearing pressure of 400 kpa and an ULS of 800 kpa. Post construction settlements should be less than 25 mm and differential settlements should be less than 10 mm over 5 m at the recommended bearing pressures. Footings should not be less than 450 and 600 mm in width for strip footings and pads, respectively. The exterior foundations should be buried at least 1200 mm for frost protection. File: 389 Proposed 100 Mile House Water Treatment Plant and Reservoir Page 2 of 4

3 All footing subgrades must be reviewed by Telford Geotechnical Ltd. to confirm the recommended bearing capacities for the site. 6.3 Seismic Design of Foundations The soils underlying this site, as defined in Table A. of the 2012 BC Building Code are classified as Site Class C for the water reservoir and Site Class D for the water treatment plant. 6.4 Grade Supported Floor Slabs To provide suitable support for any concrete slabs on grade, we recommend that any grading fills placed under the slab should be compacted in 200 mm loose lifts to a minimum of 98% SPMDD. The floor slab should be underlain by a polyethylene moisture barrier and 100 mm of 19 mm clean sand and gravel fill to inhibit upward migration of moisture beneath the slab. 6.5 Utility Installation We recommend that all utility excavations be sloped or shored in accordance with the latest WorkSafe BC regulations. Pipe bedding, backfill materials and compaction requirements should be in accordance with the MMCD. 7.0 FIELD REVIEWS As required by the 2012 BC Building Code Letters of Assurance, Telford Geotechnical Ltd. will carry out sufficient field reviews during construction to ensure that the geotechnical design recommendations contained within this report have been adequately communicated to the design team and to the contractors implementing the design. These field reviews are not carried out for the benefit of the contractor s; therefore they do not in any way effect the contractor s obligations to construct the works in accordance with the design. It is the contractors responsibility to advise Telford Geotechnical Ltd. (a minimum of 48 hours in advance) that a field review is required. Geotechnical field reviews are normally required at the time of these activities: 1. Stripping Site stripping of unsuitable soils 2. Fill Review of placement and compaction of engineered fills 3. Foundation Foundation subgrade 4. Slab on Grade Subgrade and under slab fill 5. Water main Compaction testing of trench backfill File: 389 Proposed 100 Mile House Water Treatment Plant and Reservoir Page 3 of 4

4 8.0 CLOSURE This report has been prepared exclusively for TRUE Consulting and the District of 100 Mile House for the purpose of providing geotechnical recommendations for the design and construction of the proposed structures as described in this report. We are pleased to be of assistance to you on this project and we trust that our comments and recommendations are both helpful and sufficient for this project. If you would like further details or require clarification, please do not hesitate to contact the undersigned. For: Telford Geotechnical Ltd. Bill Telford, M.Eng., P.Eng. Geotechnical Engineer File: 389 Proposed 100 Mile House Water Treatment Plant and Reservoir Page 4 of 4

5

6 APPENDIX A - TEST PIT LOG

7 File: 389 Project: Water Treatment Plant & Reservoir Location: Hwy 97, 100 Mile House, BC Method: Hitatchi EX120-5 & John Deer 310SG Date: 15-Jun-2016 TP16-01 (Hitatchi EX120-5) From (m) To (m) Description Topsoil: Dark brown, moist Overburden: Silt, trace sand and gravel, occasional rootlets, light brown, dry, loose to compact Till: Silt, some sand, trace gravel, occasional cobbles and boulders, light brown, slight moisture, becoming moist with depth, compact, becoming very dense with depth TP16-02 (Hitatchi EX120-5) From (m) To (m) Description Topsoil: Dark brown, moist Overburden: Sandy silt, trace cobbles, occasional rootlets, light brown, dry, loose to compact Till: Silt, some sand, trace gravel, frequent cobbles and boulders, light brown, slight moisture, becoming moist with depth, compact, becoming very dense with depth TP16-03 (Hitatchi EX120-5) From (m) To (m) Description Topsoil: Dark brown, moist Overburden: Sandy silt, trace cobbles, occasional rootlets, light brown, dry, loose to compact Colluvium: Silt, trace fine sand, sandy seams, light brown, dry, firm to stiff Lacustrine: Silt, trace fine sand, seams of coarse sand and fine gravel, light brown to grey, dry to moist, blocky Glacial till: Clayey silt, some sand and gravel, frequent cobbles and boulders, sub-angular to sub-rounded, brown, moist, dense, becoming very dense with depth

8 TP16-04 (Hitatchi EX120-5) From (m) To (m) Description Topsoil: Dark brown, moist Overburden: Sandy silt, trace gravel, occasional cobbles and rootlets, light brown, dry, soft to firm Lacustrine: Silt, trace fine sand, light brown to grey, dry very stiff, blocky, layered Glacial till: Clayey silt, some sand and gravel, frequent cobbles and boulders, sub-angular to sub-rounded, brown, moist, dense, becoming very dense with depth TP16-05 (Hitatchi EX120-5) From (m) To (m) Description Topsoil: Dark brown, moist Overburden: Sandy silt, trace cobbles, occasional rootlets, light brown, dry, loose to compact Glacial till: Clayey silt, some sand and gravel, frequent cobbles and boulders, sub-angular to sub-rounded, brown, moist, dense, becoming very dense with depth TP16-06 (John Deer 310SG) Topsoil: Dark brown, moist Silt, light brown, very moist, firm Sand, fine to medium grained, light brown, moist, becoming very moist with depth, loose to Groundwater encountered TP16-07 (John Deer 310SG) Topsoil: Dark brown, moist Overburden: Sandy silt, trace cobbles and organics, occasional rootlets, light brown, dry, loose to compact Silt, light brown, dry, firm to stiff, blocky, no visible porosity Sand, medium grained, brown to grey, dry, loose Sandy silt, thin fine sand seams, light brown, dry, stiff, blocky Sand, fine to medium grained, trace silt, light brown, dry, loose to compact

9 APPENDIX B - LABORATORY TESTING

10 MOISTURE CONTENT REPORT (ASTM D2216) TELFORD GEOTECHNICAL LTD Rockcress Drive Kamloops, B.C V2E 0B CLIENT: TRUE CONSULTING PROJECT # 389 PROJECT NAME: WATER TREATMENT PLANT & RESERVOIR PROJECT LOCATION: HWY 97, 100 MILE HOUSE SAMPLED BY: KATIE KALLHOOD DATE SAMPLED: TESTED BY: KATIE KALLHOOD DATE TESTED: TP16 01 TP16 01 TP16 02 TP m 1.4 m 1.8 m 0.9 m Moisture: 10.1% 11.2% 12.3% 4.7% TP16 03 TP16 03 TP16 03 TP m 1.6 m 2.6 m 0.9 m Moisture: 14.2% 17.0% 13.0% 7.4% TP16 04 TP16 05 TP16 05 TP m 1.6 m 2.0 m 0.6 m Moisture: 10.4% 9.0% 13.0% 20.7% TP16 06 TP16 06 TP16 06 TP m 2.6 m 3.0 m 1.4 m Moisture: 9.6% 24.5% 25.2% 2.8% TP16 07 TP m 2.6 m Moisture: 2.6% 3.1% Moisture: Comments: Per: Katie Kallhood Reviewed by: Bill Telford, M.Eng., P.Eng. Lab Technician Geotechnical Engineer

11 FINES CONTENT REPORT (ASTM C117) TELFORD GEOTECHNICAL LTD Rockcress Drive Kamloops, B.C V2E 0B CLIENT: PROJECT NAME: PROJECT LOCATION: SAMPLED BY: TESTED BY: TRUE CONSULTING WATER TREATMENT PLANT & RESERVOIR HWY 97, 100 MILE HOUSE, BC KATIE KALLHOOD DANIKA MARTIN PROJECT # 389 DATE SAMPLED: DATE TESTED: TP m 38.9% TP m 61.1% Comments: Per: Danika Martin Reviewed by: Bill Telford, M.Eng., P.Eng. Lab Technician Geotechnical Engineer

Soils, Foundations & Moisture Control

Soils, Foundations & Moisture Control Soils, Foundations & Moisture Control Soil The top loose layer mineral and/or organic material on the surface of the Earth that serves as a natural medium for the growth of plants and support for the foundations

More information

Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition. Design Guide Basis of Design This section applies to the design and installation of earthwork and backfill. Design Criteria No stockpiling of excavation materials is allowed unless the Geotechnical Engineer

More information

ENCE 4610 Foundation Analysis and Design

ENCE 4610 Foundation Analysis and Design This image cannot currently be displayed. ENCE 4610 Foundation Analysis and Design Shallow Foundations Total and Differential Settlement Schmertmann s Method This image cannot currently be displayed. Strength

More information

SECTION 31 20 00 EARTH MOVING

SECTION 31 20 00 EARTH MOVING SECTION 31 20 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for excavating, filling, and grading for earthwork at Parking Structure, new exit stair and as required to

More information

patersongroup Geotechnical Investigation Proposed Residential Development 590 Hazeldean Road - Ottawa Prepared For 2118356 Ontario Inc.

patersongroup Geotechnical Investigation Proposed Residential Development 590 Hazeldean Road - Ottawa Prepared For 2118356 Ontario Inc. Geotechnical Engineering patersongroup Environmental Engineering Hydrogeology Geological Engineering Materials Testing Building Science Proposed Residential Development 590 Hazeldean Road - Ottawa Archaeological

More information

APPENDIX B. Geotechnical Engineering Report

APPENDIX B. Geotechnical Engineering Report APPENDIX B Geotechnical Engineering Report GEOTECHNICAL ENGINEERING REPORT Preliminary Geotechnical Study Upper Southeast Salt Creek Sanitary Trunk Sewer Lincoln Wastewater System Lincoln, Nebraska PREPARED

More information

Appendix D.1. Testing Requirements for Infiltration, Bioretention and Sand Filter Subsoils

Appendix D.1. Testing Requirements for Infiltration, Bioretention and Sand Filter Subsoils Appendix D.1 Testing Requirements for Infiltration, Bioretention and Sand Filter Subsoils General Notes Pertinent to All Testing 1. For infiltration trench (I-1) and basin (I-2) practices, a minimum field

More information

CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS

CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS December 2014 CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS 1. DESCRIPTION... 1 1.1 General... 1 1.2 Definitions... 1 1.3 Referenced Standard Construction Specifications...

More information

SNC-Lavalin Inc. Montcalm Wastewater Pumping Station Upgrades - Geotechnical Report. October 2011

SNC-Lavalin Inc. Montcalm Wastewater Pumping Station Upgrades - Geotechnical Report. October 2011 SNC-Lavalin Inc. Montcalm Wastewater Pumping Station Upgrades - Geotechnical Report October 2011 SNC-Lavalin Inc Montcalm Wastewater Pumping Station Upgrades - Geotechnical Report Table of Contents 1.0

More information

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary

More information

C. Section 014510 TESTING LABORATORY SERVICE.

C. Section 014510 TESTING LABORATORY SERVICE. SECTION 014500 QUALITY CONTROL PART 1 GENERAL 1.01 RELATED REQUIREMENTS A. Drawings and General Provisions of Contract, including General and Special Conditions and other Division 1 Specification Sections,

More information

EARTHWORKS COMPLETION REPORT ELLEN STIRLING PARADE, ELLENBROOK. Ellenbrook, W.A. Georgiou Group Pty Ltd

EARTHWORKS COMPLETION REPORT ELLEN STIRLING PARADE, ELLENBROOK. Ellenbrook, W.A. Georgiou Group Pty Ltd EARTHWORKS COMPLETION REPORT ELLEN STIRLING PARADE, ELLENBROOK Ellenbrook, W.A. Georgiou Group Pty Ltd GEOTPERT08050AZ-AH 27 March 2013 EARTHWORKS COMPLETION REPORT ELLEN STIRLING PARADE, ELLENBROOK Ellenbrook,

More information

JOHNSON STREET BRIDGE REPLACEMENT PROJECT

JOHNSON STREET BRIDGE REPLACEMENT PROJECT JOHNSON STREET BRIDGE REPLACEMENT Victoria, BC GEOTECHNICAL INVESTIGATION REPORT Prepared for: City Hall No. 1 Centennial Square Victoria, BC VW 1P Prepared by: Stantec 7 Dominion Street, Suite 5 Burnaby,

More information

FREDERICK SHERRELL LTD

FREDERICK SHERRELL LTD FREDERICK SHERRELL LTD CONSULTING ENGINEERING GEOLOGISTS AND GEOTECHNICAL ENGINEERS 66 WEST STREET TAVISTOCK DEVON PL19 8AJ Your Ref: Our Ref: 2962.NS.JR Telephone: 01822 612915 Facsimile: 01822 617394

More information

Appendix D: Geotechnical Investigation

Appendix D: Geotechnical Investigation City of Fontana Sierra Lakes Commerce Center Recirculated Draft EIR Appendix D: Geotechnical Investigation FirstCarbon Solutions H:\Client (PN JN)\0144\01440050\EIR\3 RDEIR\01440050 Sec99 99 Appendix Dividers.doc

More information

The Manitoba Water Services Board SECTION 022180 Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11

The Manitoba Water Services Board SECTION 022180 Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11 Page 1 of 11 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the excavation of trenches (or excavation of tunnels); the supply and placing of bedding and backfill materials;

More information

APPENDIX F GEOTECHNICAL REPORT

APPENDIX F GEOTECHNICAL REPORT The City of Winnipeg Bid Opportunity No. 101-2016 Template Version: C420150806 - RW APPENDIX F GEOTECHNICAL REPORT AECOM 99 Commerce Drive 204 477 5381 tel Winnipeg, MB, Canada R3P 0Y7 204 284 2040 fax

More information

9.00 THE USE OF HUNTER LAND DRAINAGE PERFORATED PIPES. Hunter Underground Systems

9.00 THE USE OF HUNTER LAND DRAINAGE PERFORATED PIPES. Hunter Underground Systems 9.00 THE USE OF HUNTER LAND DRAINAGE PERFORATED PIPES Hunter Underground Systems 9.01 General 9.02 Surface water Drainage 9.03 Groundwater Drainage 9.04 Dispersal of Septic Tank Effluent 9.01 The use of

More information

Area No. 8 Test Pit No. 191

Area No. 8 Test Pit No. 191 Area No. 8 Test Pit No. 191 Area Sierra-Yoyo-Desan Road Excavator Cat 322 B Photographs Location 43 m @ 40 degrees from TP-189 Northing 6571912 Date 03 March 2003 R4-7 Easting 0568784 Weather -17 C, Snow

More information

A perforated conduit such as pipe, tubing or tile installed beneath the ground to intercept and convey ground water. or structures.

A perforated conduit such as pipe, tubing or tile installed beneath the ground to intercept and convey ground water. or structures. BMP: SUBSURFACE DRAIN Definition A perforated conduit such as pipe, tubing or tile installed beneath the ground to intercept and convey ground water. PurRoses 1. To prevent sloping soils from becoming

More information

STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.

STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL. STRUCTURES 1. General. Critical structures may impact the integrity of a flood control project in several manners such as the excavation for construction of the structure, the type of foundation, backfill

More information

SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION

SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION 1. SCOPE Pipe subsoil drains shall be constructed in accordance with this specification and in conformity with the lines, grades and cross-sections shown

More information

Project Location. Project Limits: The Grand River east to Fuller Ave.

Project Location. Project Limits: The Grand River east to Fuller Ave. Outline Project Location Project Description Project History Site Constraints Geotechnical Investigation & Soil Profile Foundation Design Process Photos Project Location Project Limits: The Grand River

More information

Strength Determination of "Tooth-Paste" Like Sand and Gravel Washing Fines Using DMT

Strength Determination of Tooth-Paste Like Sand and Gravel Washing Fines Using DMT Strength Determination of "Tooth-Paste" Like Sand and Gravel Washing Fines Using DMT David L. Knott, P.E. and James M. Sheahan, P.E. HDR Engineering, Inc. 3 Gateway Center Pittsburgh, PA 15222-1074 Phone:

More information

Permeable Pavement Construction Guide

Permeable Pavement Construction Guide Permeable Pavement Construction Guide Permeable pavement at Olympic Park, Waitakere Final Construction result What are permeable pavements? Permeable pavements are hard surface paving systems that reduce

More information

Geotechnical Investigation Test Report

Geotechnical Investigation Test Report Geotechnical Investigation Test Report Report No. htsc/rcd/ 3457 Dated: - 20/03/2010 Asphalt Standard Penetration Test as per IS 2131 ------------- IS 6403 Soil Job Card No - 1649 Cement Client/Department

More information

FACTUAL GROUND INVESTIGATION

FACTUAL GROUND INVESTIGATION FACTUAL GROUND INVESTIGATION REPORT COMMERCIAL/INDUSTRIAL REDEVELOPMENT OF LAND AT STEADMAN S WELTON CUMBRIA Web: www.geoenvironmentalengineering.com Telephone: 08456 768 895 Project Ref: 2013-657 Site

More information

Geotechnical Investigation using Standard Penetration Test (SPT) in Rangamati, Bandarban and Khagrachari Towns

Geotechnical Investigation using Standard Penetration Test (SPT) in Rangamati, Bandarban and Khagrachari Towns 1. Introduction 1.1 Scope of Work The Asian Disaster Preparedness Centre (ADPC) is implementing the project Seismic Hazard and Vulnerability Mapping for Rangamati, Bandarban and Khagrachari Municipality.

More information

Geotechnical Investigation Report London Street Generating Station Peterborough, Ontario. February 2012

Geotechnical Investigation Report London Street Generating Station Peterborough, Ontario. February 2012 Geotechnical Investigation Report London Street Generating Station Peterborough, Ontario February 2012 Project No. 111-25780-00 February 7, 2012 Mr. Kevin McKeown, Generation Project Manager Peterborough

More information

The Islamic university - Gaza Faculty of Engineering Civil Engineering Department CHAPTER (2) SITE INVESTIGATION. Instructor : Dr.

The Islamic university - Gaza Faculty of Engineering Civil Engineering Department CHAPTER (2) SITE INVESTIGATION. Instructor : Dr. The Islamic university - Gaza Faculty of Engineering Civil Engineering Department CHAPTER (2) SITE INVESTIGATION Instructor : Dr. Jehad Hamad Definition The process of determining the layers of natural

More information

GEOTECHNICAL INVESTIGATION. Adelaide Street Pollution Control Plant Outlet Structure Replacement London, Ontario

GEOTECHNICAL INVESTIGATION. Adelaide Street Pollution Control Plant Outlet Structure Replacement London, Ontario September 2013 GEOTECHNICAL INVESTIGATION Adelaide Street Pollution Control Plant Outlet Structure Replacement London, Ontario Submitted to: Mr. Simon Jeater, C.Tech., Environmental Technician Stantec

More information

Washington 98102-3699, mike.bailey@hartcrowser.com

Washington 98102-3699, mike.bailey@hartcrowser.com LESSONS LEARNED FROM A STONE COLUMN TEST PROGRAM IN GLACIAL DEPOSITS Barry S. Chen 1, P.E., Member, Geo-Institute and Michael J. Bailey 2, P.E., Member, Geo-Institute ABSTRACT A stone column test program

More information

GUIDE TO SETTLEMENT OF CANTERBURY FLAT LAND CLAIMS

GUIDE TO SETTLEMENT OF CANTERBURY FLAT LAND CLAIMS GUIDE TO SETTLEMENT OF CANTERBURY FLAT LAND CLAIMS April 2013 i Introduction This guide focuses on repair methods for some of the types of land damage that occurred on flat residential land as a result

More information

UFGS-02362 (August 2004) UNIFIED FACILITIES GUIDE SPECIFICATIONS

UFGS-02362 (August 2004) UNIFIED FACILITIES GUIDE SPECIFICATIONS USACE / NAVFAC / AFCEC / NASA UFGS-31 31 16.20 (April 2006) Change 2-11/14 ----------------------------- Preparing Activity: NAVFAC Replacing without change UFGS-02362 (August 2004) UNIFIED FACILITIES

More information

Section 2 Specification 2.18 Concrete and/or Corrugated Steel Storm Sewer TABLE OF CONTENTS

Section 2 Specification 2.18 Concrete and/or Corrugated Steel Storm Sewer TABLE OF CONTENTS TABLE OF CONTENTS 2.18 CONCRETE AND/OR CORRUGATED STEEL STORM SEWER... 1 2.18.1 GENERAL... 1 2.18.2 MATERIALS... 1 2.18.2.1 Storm Sewer Pipe... 1 2.18.2.2 Cement Mortar... 1 2.18.2.3 Granular Materials...

More information

COMPENDIUM OF INDIAN STANDARDS ON SOIL ENGINEERING PART 2

COMPENDIUM OF INDIAN STANDARDS ON SOIL ENGINEERING PART 2 (PREVIEW) SP 36 (Part 2) : 1988 COMPENDIUM OF INDIAN STANDARDS ON SOIL ENGINEERING PART 2 IS 1893 : 1979 (Reaffirmed 1987) CODE OF PRACTICE FOR SUBSURFACE INVESTIGATION FOR FOUNDATIONS 1.1 This code deals

More information

Design, Testing and Automated Monitoring of ACIP Piles in Residual Soils

Design, Testing and Automated Monitoring of ACIP Piles in Residual Soils Design, Testing and Automated Monitoring of ACIP Piles in Residual Soils Stephen W. Lacz 1, M. ASCE, P.E. and Richard C. Wells 2, F. ASCE, P.E. 1 Senior Professional, Trigon Kleinfelder, Inc., 313 Gallimore

More information

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified. Section 33 0200- Page 1 of 4 PART 1 - GENERAL 1.1 DESCRIPTION OF WORK The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

More information

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees. The following shall serve as the minimum requirements for contractors performing work in relation to the Authority s potable water and sanitary sewer system(s), appurtenances and service connections. General:

More information

Underground Injection Control Storm Water Information

Underground Injection Control Storm Water Information Underground Injection Control Storm Water Information Best Management Practices DEQ has reviewed the EPA definition of a subsurface fluid distribution system and the infiltration design best management

More information

Chittagong Hill Tract Development Facilities (CHTDF) United Nations Development Programme

Chittagong Hill Tract Development Facilities (CHTDF) United Nations Development Programme Chittagong Hill Tract Development Facilities (CHTDF) United Nations Development Programme Main Report Deliverable 02 Sub-Surface Properties of Soil Development in Rangamati, Bandarban and Khagrachari Municipality

More information

Geotechnical Foundation Investigation Report for the Saskatchewan Metals Processing Plant Project. Prepared for: Fortune Minerals Limited

Geotechnical Foundation Investigation Report for the Saskatchewan Metals Processing Plant Project. Prepared for: Fortune Minerals Limited Geotechnical Foundation Investigation Report for the Saskatchewan Metals Processing Plant Project Prepared for: Fortune Minerals Limited Submitted by: M2112-2840010 June 2010 Fortune Minerals Ltd. SMPP

More information

APPENDIX G SETTLEMENT

APPENDIX G SETTLEMENT APPENDIX G SETTLEMENT TABLE OF CONTENTS G.1 IN T R O D U C T IO N... 1 G.2 MATERIAL PLACEMENT AND COMPACTION... 1 G.2.1 Incom pressible M aterials... 1 G.2.2 Compressible Materials... 2 G.2.3 Soil P lacem

More information

SUBSURFACE INVESTIGATION and FOUNDATION RECOMMENDATIONS

SUBSURFACE INVESTIGATION and FOUNDATION RECOMMENDATIONS A M E R I C A N GEOTECHNICAL Littleton, Colorado SUBSURFACE INVESTIGATION and FOUNDATION RECOMMENDATIONS at 3440 West Moncrieff Place Denver, CO for TK Morrison Homes May 17, 2013 DAVID E. BEASLEY, P.E.

More information

RESIDENTIAL FOUNDATION GUIDELINE Johnson County, KS

RESIDENTIAL FOUNDATION GUIDELINE Johnson County, KS RESIDENTIAL FOUNDATION GUIDELINE Johnson County, KS Johnson County Building Officials Association January 2008 Residential Foundation Guideline Foundation designs for one-and two-family dwellings may use

More information

Stormwater/Wetland Pond Construction Inspection Checklist

Stormwater/Wetland Pond Construction Inspection Checklist : Construction Inspection ChecklistsTools Stormwater/Wetland Pond Construction Inspection Checklist Project: Location: Site Status: Date: Time: Inspector: SATISFACTORY/ UNSATISFACTORY COMMENTS Pre-Construction/Materials

More information

EXHIBIT "A. Technical Specifications for Water and Sewer Service Lines

EXHIBIT A. Technical Specifications for Water and Sewer Service Lines EXHIBIT "A Technical Specifications for Water and Sewer Service Lines Water and Sewer Line Bedding and Backfill: Drawings show cross-section of trench, pipe laid on top of 6" min. bedding material, bedding

More information

Guidelines for Control of Water Runoff on Small Lots. Revised 6/09

Guidelines for Control of Water Runoff on Small Lots. Revised 6/09 Guidelines for Control of Water Runoff on Small Lots Revised 6/09 Table of Contents Introduction and Purpose 3 Administrative Procedures 3 Plan Submittal Requirements 3 General Design Criteria 4 Dry Wells

More information

FOUNDATION TECHNICAL CATEGORY 3 (TC3) AUGUST 2012

FOUNDATION TECHNICAL CATEGORY 3 (TC3) AUGUST 2012 FOUNDATION TECHNICAL CATEGORY 3 (TC3) AUGUST 2012 Building and Housing has published technical guidance for foundation repairs and reconstruction for residential properties in green zone Foundation Technical

More information

Soils and Aggregates Division

Soils and Aggregates Division Dan Sajedi, Division Chief 443-572-5162 George Hall, Assistant Division Chief Field Operations 443-572-5271 Eric Frempong, Assistant Division Chief Laboratory 443-572-5055 Aggregate Materials, Controlled

More information

GEOTECH ENGINEERING and TESTING

GEOTECH ENGINEERING and TESTING GEOTECH ENGINEERING and TESTING Geotechnical, Environmental, Construction Materials, and Forensic Engineering ACCREDITED GEOTECHNICAL AND CONSTRUCTION CONSIDERATIONS FOR A TYPICAL RESIDENTIAL STRUCTURE

More information

SIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA 95728-1039 (7300 Short Road, Serene Lakes)

SIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA 95728-1039 (7300 Short Road, Serene Lakes) SIERRA LAKES COUNTY WATER DISTRICT P.O. Box 1039, Soda Springs, CA 95728-1039 (7300 Short Road, Serene Lakes) Maintenance Office Administrative Office Billing Office 530-426-7802 530-426-7800 916-332-4872

More information

Residential Foundations and Basements

Residential Foundations and Basements Residential Foundations and Basements Disclaimer All of the following information is based on the 2006 International Residential Code with Kentucky Amendments. As some information is paraphrased, article

More information

SECTION 1 GENERAL REQUIREMENTS

SECTION 1 GENERAL REQUIREMENTS Page 1 of 6 SECTION 1 GENERAL REQUIREMENTS 1. SCOPE OF WORK: The work to be performed under the provisions of these documents and the contract based thereon includes furnishing all labor, equipment, materials,

More information

SECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795)

SECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795) SECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795) Note: This guide specification for U.S. applications describes construction of permeable interlocking concrete

More information

Settlement of Foundations on Expansive Clays Due to Moisture Demand of Trees CIGMAT 2008

Settlement of Foundations on Expansive Clays Due to Moisture Demand of Trees CIGMAT 2008 Settlement of Foundations on Expansive Clays Due to Moisture Demand of Trees CIGMAT 2008 Kenneth E. Tand, P.E. Practicing Geotechnical Engineer FRIEND OR FOE Trees are our friends. They extract carbon

More information

Louisiana Administrative Code Title 51 Part XIII. Sewage Disposal

Louisiana Administrative Code Title 51 Part XIII. Sewage Disposal Louisiana Administrative Code Title 51 Part XIII. Sewage Disposal Regulations Regarding Septic Tank Installations with Field Beds/Absorption Trenches For Individual Residential Installations Chapter 3.

More information

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains

More information

patersongroup Geotechnical Investigation Proposed Multi-Storey Buildings 267 O Connor Street Ottawa, Ontario Prepared For Mastercraft Starwood Group

patersongroup Geotechnical Investigation Proposed Multi-Storey Buildings 267 O Connor Street Ottawa, Ontario Prepared For Mastercraft Starwood Group Geotechnical Engineering patersongroup Environmental Engineering Hydrogeology Geological Engineering Materials Testing Building Science Archaeological Services 267 O Connor Street Ottawa, Ontario Prepared

More information

Engineered, Time-Tested Foundation Repairs for Settlement in Residential and Light Commercial Structures. The Leading Edge.

Engineered, Time-Tested Foundation Repairs for Settlement in Residential and Light Commercial Structures. The Leading Edge. TM TM Engineered, Time-Tested Foundation Repairs for Settlement in Residential and Light Commercial Structures. SM The Leading Edge. 10 One Major Causes of foundation settlement or more conditions may

More information

Highway 23 Paynesville Richmond Soils Borings, Soils Tests, and Reporting

Highway 23 Paynesville Richmond Soils Borings, Soils Tests, and Reporting Highway 23 Paynesville Richmond Soils Borings, Soils Tests, and Reporting MnDOT Contract No. 1003249 General Project Overview This work is located along Trunk Highway (TH) 23, for State Project (SP) 7305-124.

More information

TABLE OF CONTENTS 6. LABORATORY ANALYSIS 6.1 INDEX PARAMETERS 6-1 6.2 PHYSICAL PARAMETERS 6-1 6.3 CHEMICAL PARAMETERS 6-1 7.

TABLE OF CONTENTS 6. LABORATORY ANALYSIS 6.1 INDEX PARAMETERS 6-1 6.2 PHYSICAL PARAMETERS 6-1 6.3 CHEMICAL PARAMETERS 6-1 7. S11187 Lind WWTP - TOC TABLE OF CONTENTS 1. CONTEXT 1.1 PROJECT CONSIDERATIONS 1-1 1.2 LOCATION 1-1 1.3 SCOPE 1-1 2. ENCOUNTERED CONDITIONS 2.1 GEOLOGIC SETTING 2-1 2.2 SURFACE CONDITIONS 2-2 2.3 SUBSURFACE

More information

SOILS AND FOUNDATIONS

SOILS AND FOUNDATIONS CHAPTER 18 SOILS AND FOUNDATIONS SECTION BC 1801 GENERAL 1801.1 Scope. The provisions of this chapter shall apply to building and foundation systems in those areas not subject to scour or water pressure

More information

Guide to working on Public Sewers

Guide to working on Public Sewers Guide to working on Public Sewers affected by Building Works Introduction Severn Trent Water Ltd requires the work to be done in order to protect the public sewer and minimise the risk of us having to

More information

R E S I D E N T I A L H O U S I N G

R E S I D E N T I A L H O U S I N G HL 252 Rev. April 1997 R E S I D E N T I A L H O U S I N G CONTROLLING EXTERNALWATER PROBLEMS FOR RESIDENCES I II III IV V Lot Drainage Gutter Water Management Foundation Waterproofing Floor Slab Waterproofing

More information

Division 2 Section 32 14 13.19 Section 02795

Division 2 Section 32 14 13.19 Section 02795 Note: The text must be edited to suit specific project requirements. It should be reviewed by a qualified civil or geotechnical engineer, or landscape architect familiar with the site conditions. Edit

More information

SECTION 311 PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE

SECTION 311 PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE PLACEMENT AND CONSTRUCTION OF CEMENT TREATED SUBGRADESOIL CEMENT BASE COURSE 311.1 DESCRIPTION: This item shall consist of a cement treated subgrade base course composed of a mixture of local soil, portland

More information

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003) NCMA TEK National Concrete Masonry Association an information series from the national authority on concrete masonry technology CONCRETE MASONRY FOUNDATION WALL DETAILS TEK 5-3A Details (2003) Keywords:

More information

Part 7 GEOTEXTILE FILTER FABRICS

Part 7 GEOTEXTILE FILTER FABRICS Part 7 GEOTEXTILE FILTER FABRICS Well Screens Slotted casings are normally employed as well screens within the aquifers being taped by water wells. The width of the slots should allow 50 to 60% of the

More information

Moving Small Mountains Vesuvius Dam Rehab

Moving Small Mountains Vesuvius Dam Rehab Moving Small Mountains Vesuvius Dam Rehab Susan L. Peterson, P.E., regional dams engineer, Eastern Region, Bedford, IN Note: The following article, Moving Small Mountains Vesuvius Dam Rehab, by Sue Peterson,

More information

Up-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations

Up-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations Up-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations Nathan A. Ingraffea, P.E., S.E. Associate, KPFF Consulting Engineers, Portland, Oregon, USA Abstract The use of steel sheet

More information

Building Your Interlocking Concrete Pavement to Last a Lifetime

Building Your Interlocking Concrete Pavement to Last a Lifetime Building Your Interlocking Concrete Pavement to Last a Lifetime A Guide for Consumers Contents Building Your Interlocking Concrete Pavement to Last a Lifetime.... 3 What Does Installation Involve?....

More information

Part 9 SUBDRAIN DESIGN AND LAYOUT

Part 9 SUBDRAIN DESIGN AND LAYOUT Part 9 SUBDRAIN DESIGN AND LAYOUT Early subdrainage often consisted of placing free-draining material, mostly gravel and rock, in the axis of filled swales, as sketched above. These began to be employed

More information

Work Type Definition and Submittal Requirements

Work Type Definition and Submittal Requirements Work Type: Geotechnical Studies Soils Analysis & Recommendations The first section, Work Type Definition, provides a detailed explanation of the work type. The second section, Work Type Submittal Requirements,

More information

Settlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains

Settlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains Settlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains Doug Jenkins 1, Chris Lawson 2 1 Interactive Design Services, 2 Reinforced

More information

SECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795)

SECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795) SECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795) Note: This guide specification for U.S. applications describes construction of permeable interlocking concrete

More information

EVALUATING THE IMPROVEMENT FROM IMPACT ROLLING ON SAND

EVALUATING THE IMPROVEMENT FROM IMPACT ROLLING ON SAND EVALUATING THE IMPROVEMENT FROM IMPACT ROLLING ON SAND D.L. Avalle, Broons Hire (SA) Pty Ltd, Australia J.P. Carter, The University of Sydney, Australia Abstract Impact rolling, utilising a non-circular

More information

Underground Installation of PE Piping

Underground Installation of PE Piping Chapter 7 265 Chapter 7 Introduction Piping systems are prevalent throughout our everyday world. Most of us think of piping systems as underground structures used to convey liquids of one sort or another.

More information

State of Connecticut Department of Public Health RADON PROGRAM

State of Connecticut Department of Public Health RADON PROGRAM State of Connecticut Department of Public Health RADON PROGRAM Scope The Connecticut Department of Public Health (DPH) Radon Program is providing this information for contractors who decide to build radon

More information

Beacon Hill Sewer District Standard Specifications

Beacon Hill Sewer District Standard Specifications Beacon Hill Sewer District Standard Specifications Residential Gravity Side Sewer Including Design Criteria and Standard Construction Drawings Residential Gravity Side Sewer Design Criteria 1. Provisions

More information

CONCRETE SEGMENTAL RETAINING WALL SYSTEM

CONCRETE SEGMENTAL RETAINING WALL SYSTEM CONCRETE SEGMENTAL RETAINING WALL SYSTEM PART 1: GENERAL SPECIFICATIONS 1.01 Work Included A. Work shall consist of furnishing and constructing a Rockwood Classic 8 with PCS unit segmental retaining wall

More information

INDEX 03010-1 DESCRIPTION 2 03010-2 MATERIALS 2 03010-3 APPROVAL OF SUBBASE COURSE 3 03010-4 CONSTRUCTION 4 03010-5 MEASUREMENT 6 03010-6 PAYMENT 6

INDEX 03010-1 DESCRIPTION 2 03010-2 MATERIALS 2 03010-3 APPROVAL OF SUBBASE COURSE 3 03010-4 CONSTRUCTION 4 03010-5 MEASUREMENT 6 03010-6 PAYMENT 6 03010_Dec22_2009.pdf Page 1 of 5 INDEX Page 03010-1 DESCRIPTION 2 03010-2 MATERIALS 2 03010-3 APPROVAL OF SUBBASE COURSE 3 03010-4 CONSTRUCTION 4 03010-5 MEASUREMENT 6 03010-6 PAYMENT 6 03010_Dec22_2009.pdf

More information

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE JURISDICTION OF ALBERTA TRANSPORTATION 1.0 Application Procedures 2.0

More information

CONTENTS. Yale University Design Standards. Underground Electrical Duct Bank. A. Summary. B. System Design and Performance Requirements

CONTENTS. Yale University Design Standards. Underground Electrical Duct Bank. A. Summary. B. System Design and Performance Requirements 16600 Underground Electrical Duct Bank This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications

More information

WET/DAMP BASEMENTS ANSWER: BASEMENT WALLS AND FLOORS CAN BECOME WET BY A LEAK, CAPILLARY SUCTION OR CONDENSATION.

WET/DAMP BASEMENTS ANSWER: BASEMENT WALLS AND FLOORS CAN BECOME WET BY A LEAK, CAPILLARY SUCTION OR CONDENSATION. WET/DAMP BASEMENTS PROBLEM. IS THIS BASEMENT LEAKING OR COULD WE HAVE ANOTHER PROBLEM? Water line arching up on wall in corners of basement. Water collecting on concrete floor starting in corners. ANSWER:

More information

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250. 02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily

More information

APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT

APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT City of Swartz Creek 8083 Civic Drive Swartz Creek, MI 48473 810-635-4464 Fee Received: $ Date: / / Receipt No: Demolition Permit (including Right of

More information

QUALITY ASSURANCE PROGRAM (QAP) City Rohnert Park

QUALITY ASSURANCE PROGRAM (QAP) City Rohnert Park QUALITY ASSURANCE PROGRAM (QAP) City Rohnert Park The purpose of this program is to provide assurance that the materials incorporated into the construction projects are in conformance with the contract

More information

SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS

SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS Section Page 36-1 GENERAL... 36.1 36-2 PIPEMAKING EQUIPMENT... 36.1 36-3 TRENCH EXCAVATION... 36.1 36-4 SPECIAL FOUNDATION TREATMENT...

More information

G-126 (Continued) MTA Westside Subway Extension Los Angeles, California. Figure: A-2.22c

G-126 (Continued) MTA Westside Subway Extension Los Angeles, California. Figure: A-2.22c LA METRO PBTUNNEL ZONE S:\131 GEOTECH\GINTW\LIBRARY MACTEC JUNE11.GLB G:\PROJECT_DIRECTORIES\43\\61_METRO_WESTSIDE_EXTENSION\6.2.3.1 GEOTECHNICAL DESIGN\3.2 ALL FIELD NOTES\GINT LOG\NEW TEMPLATE MARCH

More information

Geotechnical Investigation Reports and Foundation Recommendations - Scope for Improvement - Examples

Geotechnical Investigation Reports and Foundation Recommendations - Scope for Improvement - Examples Geotechnical Investigation Reports and Foundation Recommendations - Scope for Improvement - Examples Prof. V.S.Raju (Formerly: Director, IIT Delhi & Professor and Dean, IIT Madras) Email: rajuvs_b@yahoo.com

More information

Section 02317 EXCAVATION AND BACKFILL FOR UTILITIES

Section 02317 EXCAVATION AND BACKFILL FOR UTILITIES Section 02317 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Excavation, trenching, foundation, embedment, and backfill for installation of utilities, including manholes and other pipeline structures. 1.02

More information

Site Investigation. Some unsung heroes of Civil Engineering. buried right under your feet. 4. Need good knowledge of the soil conditions

Site Investigation. Some unsung heroes of Civil Engineering. buried right under your feet. 4. Need good knowledge of the soil conditions This is an attempt to create a stand alone self learning module on site investigation. Fasten your seat belts. Sit back, relax and enjoy. 1 2 Site Investigation Some unsung heroes of Civil Engineering

More information

Unit Price Averages Reports

Unit Price Averages Reports Unit Price Averages Reports 12/7/2015 UNIT PRICE AVERAGES REPORT Disclaimer The information provided in the following Unit Price Averages Report is only for the use of Alberta Infrastructure & Transportation

More information

IAC 7/2/08 Utilities[199] Ch 9, p.1 CHAPTER 9 RESTORATION OF AGRICULTURAL LANDS DURING AND AFTER PIPELINE CONSTRUCTION

IAC 7/2/08 Utilities[199] Ch 9, p.1 CHAPTER 9 RESTORATION OF AGRICULTURAL LANDS DURING AND AFTER PIPELINE CONSTRUCTION IAC 7/2/08 Utilities[199] Ch 9, p.1 CHAPTER 9 RESTORATION OF AGRICULTURAL LANDS DURING AND AFTER PIPELINE CONSTRUCTION 199 9.1(479,479B) General information. 9.1(1) Authority. The standards contained herein

More information

Design Considerations for Water Storage Structures on Porous Foundation in South West Western Australia

Design Considerations for Water Storage Structures on Porous Foundation in South West Western Australia Design Considerations for Water Storage Structures on Porous Foundation in South West Western Australia Michael Ashley, Robert Wark GHD The construction of service reservoirs has been an integral part

More information

GUIDELINES FOR SOIL FILTER MEDIA IN BIORETENTION SYSTEMS (Version 2.01) March 2008

GUIDELINES FOR SOIL FILTER MEDIA IN BIORETENTION SYSTEMS (Version 2.01) March 2008 GUIDELINES FOR SOIL FILTER MEDIA IN BIORETENTION SYSTEMS (Version 2.01) March 2008 The following guidelines for soil filter media in bioretention systems have been prepared on behalf of the Facility for

More information

Report. Geotechnical Investigation Proposed Easy Access Upgrade Marrickville Railway Station Station Street, Marrickville, NSW

Report. Geotechnical Investigation Proposed Easy Access Upgrade Marrickville Railway Station Station Street, Marrickville, NSW Pty Ltd ABN 62 084 294 762 Unit 5/39-41 Fourth Avenue, Blacktown, NSW 2148, Australia Tel : (02) 9679 8733 PO Box 1543, Macquarie Centre. North Ryde, NSW 2113 Fax : (02) 9679 8744 Report Geotechnical Investigation

More information

REPORT. Earthquake Commission. Christchurch Earthquake Recovery Geotechnical Factual Report Merivale

REPORT. Earthquake Commission. Christchurch Earthquake Recovery Geotechnical Factual Report Merivale REPORT Earthquake Commission Christchurch Earthquake Recovery Geotechnical Factual Report Merivale REPORT Earthquake Commission Christchurch Earthquake Recovery Geotechnical Factual Report Merivale Report

More information