SECTION DUCTWORK. A. Types of ductwork required for this project include the following:

Size: px
Start display at page:

Download "SECTION DUCTWORK. A. Types of ductwork required for this project include the following:"

Transcription

1 SECTION PART I - GENERAL 1.01 WORK INCLUDED A. Types of ductwork required for this project include the following: 1. Sheet Metal Ductwork 2. Flexible Ductwork 3. Air Plenums B. Construct all ductwork located between air handling unit and variable air volume boxes for 4 w.g. pressure class per SMACNA requirements and as listed herein. C. Construct all other ductwork for 2 w.g. pressure class, except as noted, per SMACNA requirements QUALITY ASSURANCE A. Installer: A firm with at least three years of successful installation experience on projects similar to that required for this work. 1. For work on fiberglass ductwork provide statement from manufacturer indicating that the manufacturer accepts this fabricator to be a qualified fabricator. 2. No fiberglass ductwork; no fiberglass in air stream. B. SMACNA Compliance: Comply with applicable portions of Sheet Metal and Air Conditioning Contractor's National Association (SMACNA) for all work in this section. C. ASHRAE Standards: Comply with American Society of Heating, Refrigerating and Air Conditioning Engineers, Inc. (ASHRAE) recommendations, latest edition, for all work in this section. D. NFPA Compliance: Comply with ANSI/NFPA 90A, "Standard for the Installation of Air Conditioning and Ventilating Systems," and ANSI/NFPA 90B, "Standard for the Installation of Warm Air Heating and Air Conditioning Systems." E. Patch, repair or replace ductwork as required. All ductwork shall be made airtight with 1% maximum or less leakage of design flow. Repair or replace ducts and joints as required to the satisfaction of the University's Representative SUBMITTALS A. Product Data: Submit manufacturer's specifications on manufactured products and factory-fabricated ductwork, used for work of this section. B. Record Drawings: At project close-out, submit Record Drawings of installed ductwork, duct accessories, and outlets and inlets in accordance with requirements of Division

2 PART II - MATERIALS 2.01 GENERAL A. All standing seams and transverse joints in ALL sheet metal ductwork shall be covered with 4 wide strip of 6-ounce canvas and lagging adhesive to assure airtight joints. Pressure-sensitive tapes not acceptable. B. No interior duct liner accepted TWO-INCH PRESSURE CLASS MATERIALS A. Sheet Metal Ductwork: Except as otherwise indicated, fabricate ductwork with commercial grade of galvanized steel. B. External Duct Lining: 1. Provide external duct lining only: 2. Oversize duct to maintain low pressure. C. Round supply ductwork shall be of the same materials, gauges, and construction as that indicated for 4 pressure class ductwork. D. Ductwork Support Materials: Except as otherwise indicated, provide hot-dipped galvanized steel fasteners, anchors, rods, straps, trim, and angles for support of ductwork TWO-INCH PRESSURE CLASS FABRICATION A. Shop fabricate ductwork in 4-, 8-, 10- or 12-foot lengths, unless otherwise indicated or required, to complete runs. Pre-assemble work in shop to greatest extent possible, so as to minimize field assembly of systems. Disassemble systems only to extent necessary for shipping and handling. Match-mark sections for reassembly and coordinated installation. B. Shop fabricate ductwork of gauges and reinforcement complying with SMACNA HVAC Duct Construction Standards, latest edition. C. Fabricate duct fittings to match adjoining ducts and to comply with duct requirements as applicable to fittings. Except as otherwise indicated, fabricate elbows with center-line radius equal to 1.5 times associated duct width and fabricate to include turning vanes in elbows where shorter radius is necessary. Limit angular tapers to 30º for contracting tapers and 20º for expanding tapers. D. Fabricate ductwork with accessories installed during fabrication to the greatest extent possible. Refer to Division 15, Section Duct Accessories for accessory requirements. E. Fabricate round supply connections at rectangular, plenum-type fittings using spin-in type fittings, complete with extractor and volume control damper. 1. Provide spiral-lock seam prefabricated duct, as specified for 4 pressure class. Longitudinal seam duct shall not be used

3 2.04 FOUR-INCH PRESSURE CLASS A. Sheet Metal: Except as otherwise indicated, fabricate ductwork with commercial grade of galvanized sheet steel FACTORY-FABRICATED, FOUR-INCH PRESSURE CLASS A. Spiral lock seam prefabricated factory-build round and oval duct and fittings shall be used wherever possible. Shop-fabricated ducts shall be used only where rectangular shaped ducts are shown on plans or where transitions and special fittings cannot be prefabricated by factory. B. Round Ductwork: Construct of galvanized sheet steel complying with ANSI/ASTM A 527 by the following methods and in minimum gauges listed. 1. DIAMETER MINIMUM GAUGE METHOD OF MANUFACTURE 3" to 14" 26 Spiral Lockseam 15" to 26" 24 Spiral Lockseam 27" to 36" 22 Spiral Lockseam 37" to 50" 20 Spiral Lockseam 51" to 60" 18 Spiral Lockseam Over 60" 16 Longitudinal Seam C. Provide locked seams for spiral duct; fusion-welded butt seam for longitudinal seam duct. D. Fittings and Couplings: Construct of minimum gauges listed. Provide continuous welds along seams. 1. DIAMETER MINIMUM GAUGE 3" to 36" 20 38" to 50" 18 Over 50" 16 E. Flat-Oval Ductwork: Construct of galvanized sheet steel complying with ANSI/ASTM A 527, of spiral lockseam construction, in minimum gauges listed. 1. MAXIMUM WIDTH MINIMUM GAUGE Under 25" 24 25" to 48" 22 49" to 70" 20 Over 70" 18 F. Fittings and Couplings: Construct of minimum gauges listed. Provide continuous weld along seams. 1. MAXIMUM WIDTH MINIMUM GAUGE Under 37" 20 37" to 50" 18 Over 50"

4 G. Manufacturers: 1. MANUFACTURER PRODUCT United Sheet Metal Div., United Magill Corp. Semco Manufacturing Incorporated Air Systems Incorporated - Las Vegas Or equal 2.06 MISCELLANEOUS MATERIALS Uniseal A. Provide miscellaneous materials and products of types and sizes indicated, and where not otherwise indicated, provide requirements as listed in the latest SMACNA manuals, including proper connection of ductwork and equipment. B. Fittings: Unless otherwise shown on Drawings, following fittings shall be used: two-piece, die-stamped, 45º to 90º elbows for sizes up to 8 ; five-piece, 90º elbows for sizes over 8 ; conical tees; and conical laterals. All reducers shall be placed after a tap has been made on the duct main. Reducers shall be long-taper style. C. Duct Sealant: Non-hardening, non-migrating mastic or liquid elastic sealant as compounded and recommended by manufacturer specifically for sealing joints and seams in ductwork. D. Duct Joints: Joint and seal prefabricated, factory-built ducts, fittings, and couplings in strict accordance with duct manufacturer's instructions. Install duct sealers, pop rivets or sheet metal screws and canvas and apply adhesive sealant, Foster SEALFAST, Hardcast Flex-Grip, Childers Chil-Perm or equal, on each joint. Duct sealer shall be fire retardant. Sheet metal screw for joints shall be minimum #10 size galvanized. E. Duct Access: Provide access panel sections in prefabricated, factory-built ducts for access to fire dampers, control equipment, etc. as specified in Duct Accessories Section. Access panel size shall be duct diameter wide by duct diameter high for all ducts under 24. Ducts over 24 in diameter shall have 24 x 18 access panels. Minimum size access panels shall be 6 x FLEXIBLE DUCTS A. Flexible ducts may be used in concealed areas only. B. Factory insulate all flexible ducts with 1 thick, one- pound density fiberglass insulation and wrap with factory-installed vapor barrier jacket. Ducts shall be UL approved and tested and meet Class 1 requirements of NFPA 90A. Make elbows to maintain R/W-1.5. C. Flexible ducts from rigid runouts to registers shall be Thermaflex M-KE, or equal, with maximum length of seven (7) feet. Flexible duct shall have no bends greater than 45º. D. Flexible ducts shall consist of an exterior reinforced laminated vapor barrier, 1-½ thick fiberglass insulation 75ºF), encapsulated spring steel wire Helix and impervious, smooth, non-perforated interior vinyl liner. Individual lengths of flexible ducts shall contain factory-fabricated steel connection collars. 1. Make connections to rigid duct and units with draw band and sealer, and then duct tape over outside of sheath

5 2.08 AIR PLENUMS 2. Minimum bend radius shall be twice the duct diameter. 3. Insulated flexible duct shall be attached to collar with a worm drive draw band rated for 175 pounds and inserted a minimum of 1 on to collar. Securely attach insulation and vapor barrier to the collar using a second worm drive draw band rated at 175 pounds. The vapor barrier shall be drawn over the insulation and fastened by the draw band such that no raw insulation is exposed. A. Construct air plenums designated on the Drawings of factory-fabricated panels or by Contractor-fabrication. In either case, provide all plenum enclosures in this work. B. Factory-fabricated panels shall be 4 thick. Industrial Acoustics, United Sheet Metal, or equal. Panels shall be constructed of 20-gauge (min.) galvanized steel solid panels. Entire plenum shall be sealed and caulked airtight in accordance with manufacturer's instructions. Framing members manufactured by panel manufacturer shall be used throughout and connected to base with preset studs with sheet metal screws through framing members as recommended by manufacturer. Plenum shall provide structural rigidity to a minimum of 4 VC pressure differential, either positive or negative. C. Fabricate Contractor fabricated panels as recommended by SMACNA Duct Construction Standards for 4 pressure differential. PART III - EXECUTION 3.01 INSTALLATION OF A. Assemble and install ductwork in accordance with recognized industry practices which will achieve air tight (leakage class 12 for 2 pressure class and leakage class 3 for 4 pressure class) and noiseless (no objectionable noise) systems capable of performing each indicated service. Install each run with minimum of joints. Align ductwork accurately at connections within ⅛ misalignment tolerance and with internal surfaces smooth. Support ducts rigidly with suitable ties, braces, hangers, and anchors of type which will hold ducts true to shape and to prevent buckling. B. Seal ductwork after installation to seal class required and method prescribed in SMACNA "HVAC Leakage Test Manual," latest edition. C. Install concrete inserts for support of ductwork in coordination with formwork as required to avoid delays in work. D. Where ducts pass through interior partitions and exterior walls, conceal space between construction opening and duct or duct-plus- insulation with sheet metal flanges of same gauge as duct. Overlap opening on four sides by at least 1-½. E. Support ductwork in manner complying with SMACNA "HVAC Duct Construction Standards," latest edition, hangers and supports sections. Where special hanging of ductwork is detailed or shown on Drawings, Drawings shall be followed. Angles shall be attached to overhead construction in a manner so as to allow a minimum of 2 of movement in all directions with no bending or sagging of the angle. F. Balancing dampers shall be installed in all branch ducts and elsewhere as indicated on the drawings

6 G. Use radius elbows in rectangular ducts unless otherwise indicated. Square turn in rectangular ductwork at following locations: immediately upstream from supply air outlets. When required to facilitate installation. Do not install one square turn immediately after another. H. All duct work on the high-pressure side of any seam 4" of water or higher shall use government clip or clip and flange with canvas and apply adhesive sealant on each connection. I. Medium pressure ductwork (from fan discharge to CAV inlet); Extreme care shall be used in the fabrication and installation of the medium pressure ductwork to insure that it will be airtight. All ductwork shall be tested for leaks in sections as soon as possible and before any insulating. J. Medium pressure duct: cap section ends and pressurize to 1-½ times fan static pressure, minimum 4 WC to 10 minutes. K. All duct except medium pressure duct: Cap section ends and pressurize to 2" W.C. for 10 minutes. L. Do not use flexible duct to connect to any air distribution device or terminal unit (with the exception of registers). Use flex connections where required by code or design for terminal units. M. Provide access doors at each change in direction requiring turning vanes, at bottom of risers, and every 50 in horizontal runs. Provide access doors in inaccessible ceilings and walls to gain access to all dampers, terminal units, coils, filters, valves, air vents, control devices, traps, cleanouts and other similar devices requiring periodic observation adjustment, service or replacement. N. Exact location of each access door shall be determined prior to installation and such information shall be submitted to University's Representative for review an approval. Ceiling access doors shall be no less than 24" x 24" and wall access doors shall be sized to suit equipment, but not less than 12" x 12" TESTING FOUR-INCH PRESSURE CLASS AND PLENUMS A. Contractor to test all pressure ductwork and plenums for leaks using a portable highpressure blower and necessary instrument. Extreme care shall be used in fabrication and installation of ductwork to ensure that it will be airtight. All ductwork shall be tested for leaks in sections as work progresses and as directed by University's Representative. Section to be tested shall have all open ends sealed off and shall then be tested using the following method: 1. Orifice Flow Test: Equipment required for this testing comprises a high-pressure blower, orifice test pipe assembly, and manometer with necessary valves and tubing. All testing shall be in conformance with SMACNA "HVAC Air Duct Leakage Test Manual," latest edition. Ductwork section being tested shall be held under a constant pressure of 4 of water with blower while any leakage flow through orifice is measured on manometer. Manometer readings shall be converted to CFM from a calibrated test curve. Leakage shall not exceed one percent of design air flow with a maximum allowable of 500 CFM. Complete information and data on equipment to be used must be submitted to University's Representative for approval before any tests are made

7 B. Testing of any completed section of ductwork must be made before installation of finished ceiling, if any, or before ductwork is furred in inaccessible spaces and must be witnessed by University's Representative. Any leaks found must be properly repaired or joints remade, and section re-tested until tight. Leaks which cause any objectionable noise must be repaired, regardless of amount of leakage. C. Upon completion of testing, the Contractor shall complete the test report forms provided by SMACNA "HVAC Air Duct Leakage Test Manual." These forms shall be made in triplicate and forwarded to the University's Representative for review CLEANING AND PROTECTION A. Clean ductwork internally, unit by unit as it is installed, of dust and debris. Clean external surfaces of foreign substances which might cause corrosive deterioration of metal or where ductwork is to be painted. B. Temporary Closure: At ends of ducts which are not connected to equipment or air distribution devices at time of ductwork installation, provide temporary closure of polyethylene film or other covering which will prevent entrance of dust and debris until time connections are to be completed OPERATION TEST A. Test each piece of equipment to show that it will operate in accordance with indicated requirements CLEANING UP A. Upon completion of Work remove materials, equipment, apparatus, and tools, and leave premises clean, neat, and orderly. B. Ductwork: Examine air-handling systems and clean any obstruction and debris. With dampers wide open and closed, run fan systems and check for air leaks. C. All distribution equipment shall not be operated until the building is cleaned. END OF SECTION

FINAL December 2012 SECTION 233100 DUCTWORK

FINAL December 2012 SECTION 233100 DUCTWORK SECTION 233100 DUCTWORK 1.0 Acoustical duct lining in any part of the duct system is prohibited. All ductwork requiring insula tion shall be externally insulated (Refer to the Sheet Metal Ductwork Insulation

More information

SECTION 15190 HVAC INSULATION. A. All work specified in this Section is subject to the provisions of Section 15010.

SECTION 15190 HVAC INSULATION. A. All work specified in this Section is subject to the provisions of Section 15010. SECTION 15190 HVAC INSULATION PART ONE - GENERAL PART 1 - GENERAL 1.01 DESCRIPTION A. All work specified in this Section is subject to the provisions of Section 15010. B. All insulation products shall

More information

B. ASTM C 533 Calcium Silicate Block and Pipe Thermal Insulation. C. ASTM C 547 Mineral Fiber Preformed Insulation

B. ASTM C 533 Calcium Silicate Block and Pipe Thermal Insulation. C. ASTM C 547 Mineral Fiber Preformed Insulation PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

HVAC Air Duct Leakage. Eli P. Howard, III Group Director Technical Resources SMACNA

HVAC Air Duct Leakage. Eli P. Howard, III Group Director Technical Resources SMACNA HVAC Air Duct Leakage Eli P. Howard, III Group Director Technical Resources SMACNA Key Variables that Affect the Amount of Leakage Static Pressure Amount of Duct Openings in the Duct Surface Seams, Joints,

More information

B. Types of mechanical insulation specified in this section include the following:

B. Types of mechanical insulation specified in this section include the following: SECTION 23 0700 HVAC INSULATION PART 1 - GENERAL 1.1 SUMMARY A. Extent of mechanical insulation required by this section is indicated on drawings and schedules, and by requirements of this section. B.

More information

DESIGN AND INSTALLATION OF RESIDENTIAL FLEXIBLE DUCTWORK SYSTEMS

DESIGN AND INSTALLATION OF RESIDENTIAL FLEXIBLE DUCTWORK SYSTEMS DESIGN AND INSTALLATION OF RESIDENTIAL FLEXIBLE DUCTWORK SYSTEMS A. SCOPE 1. This information is intended to assist contractors, installers and code officials in the proper design and installation of flexible

More information

4 Installation Requirements

4 Installation Requirements 4 Installation Requirements 9 4.1 Code Reference The authority having jurisdiction should be referenced to determine what law, ordinance or code shall apply in the use of flexible duct. Ducts conforming

More information

SECTION 233000 HVAC AIR DISTRIBUTION

SECTION 233000 HVAC AIR DISTRIBUTION 1320 / Talent Community Center 233000-1 HVAC AIR DISTRIBUTION SECTION 233000 HVAC AIR DISTRIBUTION PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Ductwork. 2. Ductwork accessories. 3. Fans. 4. Air

More information

FIRE DAMPER APPLICATION GUIDE

FIRE DAMPER APPLICATION GUIDE FIRE AND CEILING RADIATION DAMPERS FIRE DAMPER APPLICATION GUIDE Use this application guide to help determine what type of fire damper best suits the application. Below are listed the ten Metal-Fab fire

More information

SECTION 08332 COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)

SECTION 08332 COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here) SECTION 08332 COILING COUNTER DOORS Display hidden notes to specifier. (Don't know how? Click Here) PART 1 GENERAL 1.1 SECTION INCLUDES A. Coiling Metal Counter Doors. B. Coiling Counter Fire Doors. 1.2

More information

PART 1 GENERAL 1.1 SECTION INCLUDES

PART 1 GENERAL 1.1 SECTION INCLUDES J-1 Section 09110 Long Form Specification INTERIOR METAL STUD FRAMING This section includes lightweight, usually 0.036 inch (0.9 mm) thick or lighter, non-axial load bearing metal stud framing including

More information

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel

More information

Air-Conditioning, Heating, and Refrigeration Institute. Sheet Metal and Air-Conditioning Contractors National Association

Air-Conditioning, Heating, and Refrigeration Institute. Sheet Metal and Air-Conditioning Contractors National Association Air-Conditioning, Heating, and Refrigeration Institute Sheet Metal and Air-Conditioning Contractors National Association GUIDELINE B-1997 ACKNOWLEDGEMENT These guidelines for Roof Mounted Outdoor Air-

More information

HVAC Duct Construction. Bob Wasilewski Project Manager, Technical Resources SMACNA

HVAC Duct Construction. Bob Wasilewski Project Manager, Technical Resources SMACNA HVAC Duct Construction Bob Wasilewski Project Manager, Technical Resources SMACNA HVAC Duct Construction Standards WHAT? WHY? HOW? Today's Program 1 st 2 nd Edition HVAC-DCS Review Joints and Limitations

More information

SECTION 07 61 13 STANDING SEAM METAL ROOFING

SECTION 07 61 13 STANDING SEAM METAL ROOFING SECTION 07 61 13 STANDING SEAM METAL ROOFING PART 1 GENERAL 1.01 SCOPE OF WORK A. The Work shall include all labor, materials, equipment and supervision required to complete the work of the above referenced

More information

VA25014B0516 VA CINCINNATI PROJECT NO. 539-328 INPATIENT BED TOWER ADDITION (4 TH AND 5 TH FLOORS) SECTION 09 29 00 GYPSUM BOARD

VA25014B0516 VA CINCINNATI PROJECT NO. 539-328 INPATIENT BED TOWER ADDITION (4 TH AND 5 TH FLOORS) SECTION 09 29 00 GYPSUM BOARD SECTION 09 29 00 GYPSUM BOARD PART 1 - GENERAL 1.1 DESCRIPTION This section specifies installation and finishing of gypsum board, vapor retarder and air and moisture barrrier. 1.2 RELATED WORK A. Installation

More information

COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES

COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES These guidelines are to be used for ALL commercial cooking hoods, ventilation systems and related fire suppression

More information

AABC Specifications for Testing and Balancing HVAC Systems

AABC Specifications for Testing and Balancing HVAC Systems AABC Specifications for Testing and Balancing HVAC Systems The Associated Air Balance Council (AABC) Total System Balancing Specifications for HVAC Testing, Balancing and Performance Verification TOTAL

More information

Preformed Metal Roofing and Siding

Preformed Metal Roofing and Siding Page -1-1. GENERAL 1.1. Description This specification along with the drawings covers the furnishing of all material, products, equipment, accessories, tools, services, transportation, labor and supervision

More information

Duct Leakage Testing. Ken Helfers, TSI Inc. 2011, TSI Incorporated

Duct Leakage Testing. Ken Helfers, TSI Inc. 2011, TSI Incorporated Duct Leakage Testing Ken Helfers, TSI Inc. Agenda Need for duct leakage testing Duct leakage testing standards and regulations Performing duct leakage testing Why Test Ducts for Leakage? Conserve energy

More information

HVAC INSTALLATION. Success with 2015 IECC Northeast & Mid-Atlantic. Checklist for Builders & Trades

HVAC INSTALLATION. Success with 2015 IECC Northeast & Mid-Atlantic. Checklist for Builders & Trades Success with 2015 IECC Northeast & Mid-Atlantic Checklist for Builders & Trades COPYRIGHT 2015 ADVANCED ENERGY. ALL RIGHTS RESERVED TEMPLATE 2015.1.0 PAGE 1 CHECKLIST: JOB READY 1. 2. 3. 4. 5. 6. 7. 8.

More information

SECTION 23 05 12 GENERAL PROVISIONS FOR HVAC WORK

SECTION 23 05 12 GENERAL PROVISIONS FOR HVAC WORK SECTION 23 05 12 GENERAL PROVISIONS FOR HVAC WORK 1 GENERAL 1.1 GENERAL REQUIREMENTS A. This Section is coordinated with and complementary to the General Conditions and Supplementary General Conditions

More information

FRP AQUATIC DUCTWORK COMPONENTS LEADERS IN FIBERGLASS REINFORCED PLASTIC DUCT PRODUCTS

FRP AQUATIC DUCTWORK COMPONENTS LEADERS IN FIBERGLASS REINFORCED PLASTIC DUCT PRODUCTS Perry Fiberglass Products, Inc. FRP AQUATIC DUCTWORK COMPONENTS LEADERS IN FIBERGLASS REINFORCED PLASTIC DUCT PRODUCTS PERRY FIBERGLASS Perry Fiberglass Products, Inc. is a leading manufacturer of high

More information

Specifications. Preformed Metal Wall and Roof Panels. Alcoa Cladding Systems Manufacturing Plant 100 Industrial Boulevard Eastman, Georgia 31023

Specifications. Preformed Metal Wall and Roof Panels. Alcoa Cladding Systems Manufacturing Plant 100 Industrial Boulevard Eastman, Georgia 31023 Specifications Preformed Metal Wall and Roof Panels Alcoa Cladding Systems Manufacturing Plant 100 Industrial Boulevard Eastman, Georgia 31023 Section 07410 Preformed Metal Wall and Roof Panels Structural

More information

Design Information. Designing Your Dust Collection System. Typical dust or fume collection system

Design Information. Designing Your Dust Collection System. Typical dust or fume collection system Design Information Designing Your Dust Collection System There are five simple steps to designing an effective and efficient dust collection system. 1. Draw a floor plan of your shop Important Terms to

More information

All work shall comply with applicable codes and ordinances. Work shall comply with the BOCA National Plumbing Code, latest edition.

All work shall comply with applicable codes and ordinances. Work shall comply with the BOCA National Plumbing Code, latest edition. DIVISION 15 MECHANICAL SECTION 15100 - PLUMBING PART 1 - GENERAL SCOPE Plumbing work includes all domestic water, gas, and sanitary sewer systems as shown on plans. Also all fixtures and equipment which

More information

The Butler MR-24 Standing Seam Roof Difference. A comparison between metal roof systems

The Butler MR-24 Standing Seam Roof Difference. A comparison between metal roof systems The Butler MR-24 Standing Seam Roof Difference A comparison between metal roof systems Roof Systems Necessities Weathertight (don t leak!) Low maintenance Weathertightness Roof clips, seams, panel alignment

More information

HVAC INSTALLATION SUCCESS WITH 2012 IECC DELAWARE. for Builders & Trades. Recommended Practices for Optimized Energy Savings

HVAC INSTALLATION SUCCESS WITH 2012 IECC DELAWARE. for Builders & Trades. Recommended Practices for Optimized Energy Savings SUCCESS WITH 2012 IECC DELAWARE Recommended Practices for Optimized Energy Savings for Builders & Trades COPYRIGHT 2015 ADVANCED ENERGY. ALL RIGHTS RESERVED VERSION 2015.1.0 CHECKLIST: JOB READY 1. 2.

More information

2015 1322) SIGNIFICANT CHANGES INCLUDING CODE COMMENTARY

2015 1322) SIGNIFICANT CHANGES INCLUDING CODE COMMENTARY MINNESOTA ENERGY CODE COMPLIANCE COLLABORATIVE 2015 Minnesota Residential Energy Code (MR 1322) SIGNIFICANT CHANGES INCLUDING CODE COMMENTARY (July 15, 2015 Update) Note: The following information contains

More information

2014 British Columbia Building Code Changes

2014 British Columbia Building Code Changes District of Houston 250-845-2238 2014 British Columbia Building Code Changes A District of Houston interpretation of the 2014 Building Code Changes for 9.36 & 9.32 The following changes reflect the most

More information

SECTION 230529 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

SECTION 230529 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT SECTION 230529 - PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Steel pipe hangers and supports. 2. Metal framing systems. 3. Thermal-hanger shield inserts. 4. Fastener systems.

More information

Holiday Inn Express & Suites Covington (Newton County) 1. Standing-seam metal roofing, custom fabricated.

Holiday Inn Express & Suites Covington (Newton County) 1. Standing-seam metal roofing, custom fabricated. PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Standing-seam metal roofing, custom fabricated. 1.2 SUBMITTALS A. Product Data: For each type of product indicated. B. Shop Drawings: Show installation

More information

Heating Ventilation and Air Conditioning Diagnostics for Single Family Homes

Heating Ventilation and Air Conditioning Diagnostics for Single Family Homes Heating Ventilation and Air Conditioning Diagnostics for Single Family Homes Vincent Pedalino FSL Home Improvements Phoenix, AZ 1 HVAC Basics Ways to improve the performance of existing air conditioning

More information

ROOF TOP MOUNTED Air Handler Specification

ROOF TOP MOUNTED Air Handler Specification ROOF TOP MOUNTED Air Handler Specification PART 1: GENERAL (Model RT) Mechanical Specification 1.01 WORK INCLUDED A. Provide complete air handling unit(s) suitable for outdoor installation. Contractor

More information

Cooktop Low-Profile Ventilation Hoods

Cooktop Low-Profile Ventilation Hoods INSTALLATION GUIDE Cooktop Low-Profile Ventilation Hoods Contents Wolf Cooktop Low-Profile Ventilation Hoods........ 3 Cooktop Low-Profile Hood Specifications.......... 4 Cooktop Low-Profile Hood Installation............

More information

FSD35, FSD36 AND FSD37 COMBINATION FIRE and SMOKE DAMPERS

FSD35, FSD36 AND FSD37 COMBINATION FIRE and SMOKE DAMPERS 3900 Dr. Greaves Rd. Kansas City, MO 64030 (816) 761-7476 FAX (816) 765-8955 INSTALLATION INSTRUCTIONS FSD35, FSD36 AND FSD37 COMBINATION FIRE and SMOKE DAMPERS 11/2 HOUR UL555 RATED UL555S LEAKAGE RATED

More information

SECTION 07410 PREFORMED METAL STANDING SEAM ROOFING PART 1 - GENERAL 1.1 DESCRIPTION OF WORK

SECTION 07410 PREFORMED METAL STANDING SEAM ROOFING PART 1 - GENERAL 1.1 DESCRIPTION OF WORK SECTION 07410 PREFORMED METAL STANDING SEAM ROOFING PART 1 - GENERAL 1.1 DESCRIPTION OF WORK A. This section covers the pre-finished, pre-fabricated Architectural standing seam roof system. All metal trim,

More information

Duct Design. Presented by Dave Janquart

Duct Design. Presented by Dave Janquart Duct Design Presented by Dave Janquart Overview of Topics Duct design Duct insulation SMACNA Standards Factors Influencing Duct Design Equipment Losses Air Velocity Duct Material Duct Size & Shape Length

More information

Refrigeration Installation 101

Refrigeration Installation 101 Refrigeration Installation 101 Hundreds of Installations Refrigerated Cases 2 Compressor Racks 3 Condensing Units 4 Walk-in Boxes 5 Some were done very well 6 Some had some issues... 7 8 Some seemingly

More information

DIVISION 23 HEATING, COOLING, AIR CONDITIONING AND VENTILATION

DIVISION 23 HEATING, COOLING, AIR CONDITIONING AND VENTILATION SECTION 230713- ALUMAGUARD ENGINEER SPECIFICATION DIVISION 23 HEATING, COOLING, AIR CONDITIONING AND VENTILATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract,

More information

How To Install A Perfect 16 Id Series Filter System

How To Install A Perfect 16 Id Series Filter System IQAir Perfect 16 ID-Series MERV16 Micro-Particle Filtration System Perfect 16 Installation Manual Product Data High-Performance Medical-Grade Residential/Commercial Air Filtration System Application The

More information

SECTION 11 78 13 MORTUARY REFRIGERATORS

SECTION 11 78 13 MORTUARY REFRIGERATORS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 11 78 13 MORTUARY REFRIGERATORS SPEC WRITER NOTE: Delete between //---// if not applicable to project. Also delete any other item or paragraph not applicable in

More information

SECTION 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC INTRODUCTORY INFORMATION

SECTION 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC INTRODUCTORY INFORMATION SECTION 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC INTRODUCTORY INFORMATION The purpose of this guide specification is to assist the specifier in correctly specifying Mechanical System Testing

More information

SECTION 07400 STANDING SEAM METAL ROOF

SECTION 07400 STANDING SEAM METAL ROOF SECTION 07400 STANDING SEAM METAL ROOF PART 1 - GENERAL 1.01 SECTION INCLUDES A. Work described in this section includes pre-formed standing seam metal roofing system complete with clips, perimeter and

More information

Table of Contents. Western States Standing Seam SS675 Panel Installation, Flashings & Shop Drawing Detail Guide. Notes to Designer /Installers..

Table of Contents. Western States Standing Seam SS675 Panel Installation, Flashings & Shop Drawing Detail Guide. Notes to Designer /Installers.. Western States Standing Seam SS675 Panel Installation, Flashings & Shop Drawing Detail Guide Table of Contents Section Page Section Page Notes to Designer /Installers.. 1 Fastener Placement and Selection.2-3

More information

Fire Barrier Duct Wrap 15A

Fire Barrier Duct Wrap 15A 3 Fire Barrier Duct Wrap 15A Commerical Kitchen Grease Duct Fire Protection System Product Data and Installation Instructions Compliance 1998 Edition Complies with International Mechanical Code Complies

More information

GreenGuard Housewrap Installation Guide

GreenGuard Housewrap Installation Guide 000768PACBPHW_Flashing Bro 5/23/03 2:52 PM Page 1 For the most current product information, go to www.green-guard.com. Pactiv Building Products believes the information and recommendations herein to be

More information

DIVISION 8, METAL SOUND CONTROL DOOR ASSEMBLIES PART 1 GENERAL 1.1 RELATED DOCUMENTS

DIVISION 8, METAL SOUND CONTROL DOOR ASSEMBLIES PART 1 GENERAL 1.1 RELATED DOCUMENTS DIVISION 8, METAL SOUND CONTROL DOOR ASSEMBLIES PART 1 GENERAL 1.1 RELATED DOCUMENTS Drawings and general provisions of the contract, including general and supplementary conditions and other Division 1

More information

Acumen Enterprises, Inc.

Acumen Enterprises, Inc. Hourly rates Discount w/o Rebate Electrician $78.00 10% $70.20 $70.73 HVAC Technician $78.00 10% $70.20 $70.73 Insulator $42.00 10% $37.80 $38.08 Sheet Metal Worker $74.00 10% $66.60 $67.10 Plumber/Pipefitter

More information

Air-side Systems: Air Duct Design

Air-side Systems: Air Duct Design BBSE3006: Air Conditioning and Refrigeration II http://www.hku.hk/bse/bbse3006/ Air-side Systems: Air Duct Design Dr. Sam C M Hui Department of Mechanical Engineering The University of Hong Kong E-mail:

More information

Mark Cramer Inspection Services, Inc.

Mark Cramer Inspection Services, Inc. Mark Cramer Inspection Services, Inc. 492 Twentieth Avenue, Indian Rocks Beach, FL 34635-2970 (727) 595-4211 Fax (727) 596-7583 Certified Member #12085 American Society of Home Inspectors Construction

More information

SECTION 23 05 29 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

SECTION 23 05 29 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT SECTION 23 05 29 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipe hangers and supports. 2. Hanger rods. 3. Inserts. 4. Flashing. 5. Equipment

More information

Installation Instructions

Installation Instructions VentilAire IV Whole-House Fresh Air Supply System Installation Instructions 914228 Flat Roof Kit 914229 Sloped Roof Kit 5" x 11' Class I Insulated Flexible Duct Plastic Clamps (2) Metal Clamps (2) Ceiling

More information

GUIDELINE SPECIFICATIONS

GUIDELINE SPECIFICATIONS GUIDELINE SPECIFICATIONS GORDON SOFFIT-SHIELD - An Exterior Metal Soffit System DIVISION 05 5800 or DIVISION 07 7700 Note To Specifier: SOFFIT-SHIELD should be installed by tradesmen that are experienced

More information

SECTION 08360 SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS

SECTION 08360 SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS SECTION 08360 SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS Display hidden notes to specifier by using Tools / Options / View / Hidden Text. On newer versions of Microsoft Word

More information

Life Safety Dampers Selection and Application Manual. Ceiling Radiation Dampers Fire Dampers Combination Fire Smoke Dampers Smoke Dampers

Life Safety Dampers Selection and Application Manual. Ceiling Radiation Dampers Fire Dampers Combination Fire Smoke Dampers Smoke Dampers Life Safety Dampers Selection and Application Manual Ceiling Radiation Dampers Fire Dampers Combination Fire Smoke Dampers Smoke Dampers May 2014 1 2 Table of Contents HOW TO USE THIS MANUAL DAMPER APPLICATION

More information

Element D Services Heating, Ventilating, and Air Conditioning

Element D Services Heating, Ventilating, and Air Conditioning PART 1 - GENERAL 1.01 OVERVIEW A. This section supplements Design Guideline Element D3041 on air handling distribution with specific criteria for projects involving design of a Data Center spaces B. Refer

More information

SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS

SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS PART 1 GENERAL 1.01 SECTION INCLUDES A. The requirements for pipe material and installation in sewer and drainage collection systems. All materials

More information

CITY OF LONG BEACH Department of Development Services BUILDING AND SAFETY BUREAU MECHANICAL PLAN REVIEW CHECKLIST

CITY OF LONG BEACH Department of Development Services BUILDING AND SAFETY BUREAU MECHANICAL PLAN REVIEW CHECKLIST CITY OF LONG BEACH Department of Development Services BUILDING AND SAFETY BUREAU MECHANICAL PLAN REVIEW CHECKLIST PROJECT NO.: BMEC DATE: STATUS: INFORMATION PROJECT ADDRESS: WORK DESCRIPTION: APPLICANT

More information

PIPES AND TUBES FOR HVAC PIPING AND EQUIPMENT

PIPES AND TUBES FOR HVAC PIPING AND EQUIPMENT PIPES AND TUBES FOR HVAC PIPING AND EQUIPMENT GENERAL INFORMATION 1.1 This section applies to piping systems for chilled water, hot water, condenser water, steam, condensate return, fuel oil, refrigerant

More information

Tundra Series Windows January 2016

Tundra Series Windows January 2016 Tundra Series Windows January 2016 New Construction Installation Instructions Nail Fin, J-Fin and Brickmold Aplications product. ATTENTION! Read and understand all installation instructions before installing

More information

2010 Residential Water Heater Replacement Check List

2010 Residential Water Heater Replacement Check List 2010 Residential Water Heater Replacement Check List The intent of this check list is to provide installers a general reference for the enforcement of code requirements in the Greater San Diego Area. This

More information

Exhaust Calculation Booklet

Exhaust Calculation Booklet Exhaust Calculation Booklet American Dryer Corporation 88 Currant Road Fall River MA 02720-4781 Telephone: (508) 678-9000 / Fax: (508) 678-9447 e-mail: techsupport@amdry.com ADC Part No. 450450 Exhaust

More information

Components HVAC General Standards HVAC Guidelines HVAC System Selection Life Cycle Cost Analysis

Components HVAC General Standards HVAC Guidelines HVAC System Selection Life Cycle Cost Analysis Components HVAC General System Selection Life Cycle Cost Analysis Outdoor Air Design Values Indoor Air Design Values Outdoor Air Ventilation Welding Ventilation Temperature Control Systems Ductwork HVAC

More information

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 SECTION R905 REQUIREMENTS FOR ROOF COVERINGS R905.1 Roof covering application. Roof coverings

More information

Chapter 8. Duct Design and Sealing

Chapter 8. Duct Design and Sealing Chapter 8 Duct Design and Sealing Duct Materials The three most common types of duct material used in home construction are metal, rigid fiberglass duct board, and flex-duct. Both metal and fiberglass

More information

A D D E N D U M # 3 QUESTIONS FROM BIDDERS: DATE: November 5, 2012. All Bidders. Jenne dos Santos, CBI Consulting Inc. City of Chelsea, MA

A D D E N D U M # 3 QUESTIONS FROM BIDDERS: DATE: November 5, 2012. All Bidders. Jenne dos Santos, CBI Consulting Inc. City of Chelsea, MA Page 1 of 10, Addendum No. 3 Temporary Garage Structure City of Chelsea, MA November 5, 2012 CBI Job No.: 12055-A A D D E N D U M # 3 DATE: November 5, 2012 TO: FROM: PROJECT: All Bidders Jenne dos Santos,

More information

STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM

STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM Installed in Pre-engineered Steel Buildings Provides Lowest Cost Construction Method for CORROSIVE AND WET Environments PREFERRED SOLUTIONS, INC.

More information

SECTION 02630 STORM DRAINAGE SYSTEM

SECTION 02630 STORM DRAINAGE SYSTEM SECTION 02630 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for storm drainage systems including modifications and connections to existing storm drainage systems. 1.02 REFERENCE

More information

SECTION 15140 - PIPE HANGERS AND SUPPORTS

SECTION 15140 - PIPE HANGERS AND SUPPORTS Part I - GENERAL 1.01 SECTION INCLUDES A. The work covered under this section consists of the furnishing of all necessary labor, supervision, materials, equipment, and services to completely execute the

More information

SECTION 08 41 1 ALUMINUM FRAMED ENTRANCES and STOREFRONTS. System 402 Flush-Glazed Screw Spline Storefront

SECTION 08 41 1 ALUMINUM FRAMED ENTRANCES and STOREFRONTS. System 402 Flush-Glazed Screw Spline Storefront PART 1 GENERAL 1.01 Work Included SECTION 08 41 1 ALUMINUM FRAMED ENTRANCES and STOREFRONTS System 402 Flush-Glazed Screw Spline Storefront A. Furnish and install aluminum architectural storefront system

More information

DRYER VENTING SPECIFICATIONS DRYER SAFETY

DRYER VENTING SPECIFICATIONS DRYER SAFETY DRYER VENTING SPECIFICATIONS Table of Contents DRYER SAFETY...1 INSTALLATION REQUIREMENTS...4 Venting Requirements...5 DRYER INSPECTION AND CLEANING...7 Frequency of Exhaust System Cleaning...7 Inspecting

More information

EFFICIENT DUCT SYSTEM DESIGN

EFFICIENT DUCT SYSTEM DESIGN DUCT ACOUSTICAL EFFICIENT EFFICIENT DUCT SYSTEM DESIGN WHY SPIRAL DUCT SHOULD BE YOUR FIRST CHOICE 2 Aesthetically Pleasing & Easier to install Low air leakage Low pressure drop Lower air distribution

More information

Installation Guide. Bath and Wall Surrounds SERIES 7104 1021861-2-B

Installation Guide. Bath and Wall Surrounds SERIES 7104 1021861-2-B Installation Guide and Wall Surrounds SERIES 7104 1021861-2-B Thank You For Choosing Sterling We appreciate your commitment to Sterling value. Please take a few minutes to review this manual before you

More information

Pipe and Equipment Insulations. Zeston. PVC Insulated Fitting Covers Installation Instructions for Hot, Cold and USDA Piping Systems

Pipe and Equipment Insulations. Zeston. PVC Insulated Fitting Covers Installation Instructions for Hot, Cold and USDA Piping Systems Pipe and Equipment Insulations Zeston PVC Insulated Fitting Covers Installation Instructions for Hot, Cold and USDA Piping Systems Zeston PVC Insulated Fitting Covers Installation Instructions for Hot,

More information

Roof Curbs, Extensions and Equipment Supports

Roof Curbs, Extensions and Equipment Supports Roof s, Extensions and Equipment Supports December 2012 Roof Page s, Header Extensions and Equipment Supports Table of Contents Model GPI Standard and Optional Construction Features... 3 Model Number Code....

More information

Renovating Your Basement

Renovating Your Basement building science.com 2006 Building Science Press All rights of reproduction in any form reserved. Renovating Your Building America Report - 0309 2003 (revised 2007) Building Science Corporation Abstract:

More information

DUCT SYSTEM DESIGN CONSIDERATIONS Part 1

DUCT SYSTEM DESIGN CONSIDERATIONS Part 1 Refrigeration Service Engineers Society 1666 Rand Road Des Plaines, Illinois 60016 DUCT SYSTEM DESIGN CONSIDERATIONS Part 1 by Roger M Hensley, CMS TYPES OF SUPPLY DUCT SYSTEMS There are several basic

More information

DUCT SYSTEMS CHAPTER 6

DUCT SYSTEMS CHAPTER 6 CHAPTER 6 DUCT SYSTEMS SECTION 601 GENERAL 601.1 Scope. Duct systems used for the movement of air in air-conditioning, heating, ventilating and exhaust systems shall conform to the provisions of this chapter

More information

HVAC Air Duct Leakage. November 2013 Presented By: Mark Terzigni Project Manager Technical Services SMACNA

HVAC Air Duct Leakage. November 2013 Presented By: Mark Terzigni Project Manager Technical Services SMACNA HVAC Air Duct Leakage November 2013 Presented By: Mark Terzigni Project Manager Technical Services SMACNA Learning Objectives Understand the difference between System leakage and Duct leakage Understand

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 1100 SLIP-LINING SANITARY SEWERS

San Antonio Water System Standard Specifications for Construction ITEM NO. 1100 SLIP-LINING SANITARY SEWERS ITEM NO. 1100 SLIP-LINING SANITARY SEWERS 1100.1 DESCRIPTION: This item shall consist of slip-lining sanitary sewer pipe, which is accomplished by pulling or pushing liner pipe into existing sewers by

More information

SUGGESTED SPECIFICATION EXHAUST SYSTEM SILENCER, FLEX CONNECTOR, INSULATION BLANKETS, WALL / ROOF THIMBLES

SUGGESTED SPECIFICATION EXHAUST SYSTEM SILENCER, FLEX CONNECTOR, INSULATION BLANKETS, WALL / ROOF THIMBLES SUGGESTED SPECIFICATION EXHAUST SYSTEM SILENCER, FLEX CONNECTOR, INSULATION BLANKETS, WALL / ROOF THIMBLES 4121 N.W. 37 th Street, Lincoln, NE 68524 Telephone (402) 470-2627 Fax (404) 470-2410 www.gtexhaust.com

More information

Spray Booth Guideline

Spray Booth Guideline Department of Development Service 135 North D Street, Perris CA. 92570 Phone: (951) 443-1029 Fax: (951) 943-3293 PURPOSE The intent of this guideline is to provide the information necessary to ensure that

More information

ELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION 16050 PAGE 1

ELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION 16050 PAGE 1 KNOXVILLE, TENNESSEE SECTION 16050 PAGE 1 PART 1 - GENERAL 1.01 RELATED DOCUMENTS: SECTION 16050 A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1

More information

SECTION 23 00 01 HEATING, VENTILATION AND AIR CONDITIONING EQUIPMENT

SECTION 23 00 01 HEATING, VENTILATION AND AIR CONDITIONING EQUIPMENT SECTION 23 00 01 HEATING, VENTILATION AND AIR CONDITIONING EQUIPMENT PART 1 - GENERAL 1.1 DESCRIPTION A. The Work specified in this Section consists of designing, furnishing and installing factory-assembled

More information

DESIGN CLARIFICATION (DC)

DESIGN CLARIFICATION (DC) DESIGN CLARIFICATION (DC) Owner: Victor Valley Wastewater Reclamation Authority Date: 03/03/2015 Contractor: W M Lyles Carollo Project No.: 8299A.20 Project Name: Subregional WRPs DC No.: 001 DC Title:

More information

A. Air-Conditioning and Refrigeration Institute: 1. ARI 850 - Commercial and Industrial Air Filter Equipment.

A. Air-Conditioning and Refrigeration Institute: 1. ARI 850 - Commercial and Industrial Air Filter Equipment. SECTION 23 40 00 - HVAC AIR CLEANING DEVICES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Activated carbon filters. 2. Extended surface rigid air filter with synthetic media. 3. Disposable panel

More information

Excerpts from the Canadian National Building Code (NBC)

Excerpts from the Canadian National Building Code (NBC) Excerpts from the Canadian National Building Code (NBC) Reproduced here with Permission of the Copyright Owner, the National Research Council of Canada, Institute for Research in Construction. For more

More information

EAST LYME HIGH SCHOOL

EAST LYME HIGH SCHOOL Overview: 1971 N 1966 GYM 1966 CLASSROOM WING 1966 AUD. 1971 GYM 1998 1998 POOL EAST LYME HIGH SCHOOL Original 1966 Building: The original East Lyme High School was constructed in 1966 and was composed

More information

SECTION 07720 PREFORMED METAL STANDING SEAM ROOFING

SECTION 07720 PREFORMED METAL STANDING SEAM ROOFING SECTION 07720 PREFORMED METAL STANDING SEAM ROOFING PART ONE GENERAL DESCRIPTION This section includes pre-formed standing seam metal roofing and related flashings, closures, trim and accessories including,

More information

DARTMOUTH COLLEGE DESIGN November 15, 2007 &CONSTRUCTION GUIDELINES

DARTMOUTH COLLEGE DESIGN November 15, 2007 &CONSTRUCTION GUIDELINES SECTION 15250 MECHANICAL INSULATION PART 1 DESIGN DIRECTIVES 1.1 QUALITY ASSURANCE A. Manufacturer's Qualifications: Firms regularly engaged in manufacture of mechanical insulation products, of types and

More information

Mechanical Heating Ventilation and Air Conditioning Ductwork and Duct Accessories

Mechanical Heating Ventilation and Air Conditioning Ductwork and Duct Accessories Basis of Design This section applies to the design and installation of ductwork, air terminal boxes, air outlets and inlets, volume dampers, pressure relief dampers, smoke/fire dampers, and smoke/fire

More information

All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations.

All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations. DIVISION 16 ELECTRICAL SECTION 16100 - ELECTRICAL PART 1 - GENERAL SCOPE All electrical work as shown on the drawings and as necessary to provide a complete electrical system. Include primary service,

More information

Duct Construction Standards. Code Reference: 2013 Title 24, Part 6 Standards 150.0(m)1. UL Ratings

Duct Construction Standards. Code Reference: 2013 Title 24, Part 6 Standards 150.0(m)1. UL Ratings DUCTS - CONSTRUCTION DO YOU HAVE A PHOTO OF THIS? PLEASE SEND IT TO US! installation.feedback@ energycodeace.com R-H-DS1 Duct Construction Standards All air-distribution system ducts and plenums shall

More information

Fiberglas, Exterior Wall Thermal Insulation

Fiberglas, Exterior Wall Thermal Insulation PROJECT ENGINEER RESPONSIBILITY: This is a general specification guide, intended to be used by experienced construction professionals, in conjunction with good construction practice and professional judgment.

More information

SECTION 07530 SINGLE PLY MEMBRANE ROOFING. 4. Minor repair to adjacent clay tile roofing and flashings.

SECTION 07530 SINGLE PLY MEMBRANE ROOFING. 4. Minor repair to adjacent clay tile roofing and flashings. SECTION 07530 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section includes the flowing: 1. Removal of existing roofing membrane. Existing bur roof has one overlay and penetration mastic is asbestos containing.

More information

SECTION 27 05 36 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

SECTION 27 05 36 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS SECTION 27 05 36 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS PART 1 GENERAL 1.01 DESCRIPTION A. The work covered by this section of the Specifications includes all labor necessary to perform and complete such

More information

Town House 11265 Center Highway North Huntingdon, PA 15642

Town House 11265 Center Highway North Huntingdon, PA 15642 APPENDIX C SPECIFICATIONS FOR THE CONSTRUCTION OF BUILDING LATERAL SANITARY SEWERS DECEMBER 2004, INCLUDING AMENDMENTS ADOPTED ON FEBRUARY 6, 2008 AND APRIL 2, 2008; EFFECTIVE ON MAY 1, 2008 Town House

More information

Subpart 1. Installation. All plumbing systems must be. installed and tested according to this chapter and chapter 4715,

Subpart 1. Installation. All plumbing systems must be. installed and tested according to this chapter and chapter 4715, 4658.4500 PLUMBING SYSTEMS; NEW CONSTRUCTION. Subpart 1. Installation. All plumbing systems must be installed and tested according to this chapter and chapter 4715, the Minnesota Plumbing Code. Subp. 2.

More information

K. D. FRAME ASSEMBLY FOR CLOSED STEEL STUD WALLS...Ins 10. FRAME INSTALLATION DETAILS FOR CLOSED STEEL STUD WALLS...Ins 11

K. D. FRAME ASSEMBLY FOR CLOSED STEEL STUD WALLS...Ins 10. FRAME INSTALLATION DETAILS FOR CLOSED STEEL STUD WALLS...Ins 11 K. D. FRAME ASSEMBLY FOR MASONRY WALLS...........................Ins 2 FRAME INSTALLATION DETAILS FOR MASONRY WALLS......................Ins 3 INSTALLING EXISTING MASONRY WALL ANCHORS IN FRAME..................Ins

More information