1 ER-4872 Reissued October, 2002 ICBO Evaluation Service, Inc. 60 Workman Mill Road, Whittier, California Filing Category: ROOF COVERING AND ROOF DECK CONSTRUCTION Roof Covering LUDOWICI AND CELADON CLAY ROOFING TILES LUDOWICI ROOF TILE, INC. 477 TILE PLANT ROAD NEW LEXINGTON, OHIO 4764 CELADON CO. 477 TILE PLANT ROAD NEW LEXINGTON, OHIO SUBJECT Ludowici and Celadon Clay Roofing Tiles. 2.0 DESCRIPTION 2. General: The roofing tiles are manufactured from southeastern Ohio shale and fire clay, ground and screened to particle size suitable for the extrusion process. The clay is mixed with water and extruded in dies or pressed in molds to form various shapes. A surface treatment of glazing is applied before drying and firing. Accessory tiles such as ridge, rake and hip tiles are also available. 2.2 Materials: 2.2. XL Interlocking Tiles: The XL Interlocking Tiles are flat, interlocking tiles. See Table for dimensions and installed weights of the five different types of XL Interlocking Tiles. Two nail holes are provided at the top of each tile. See Figures and 2 for additional details. The tiles are installed with a -inch (76 mm) headlap, and on roofs having a minimum slope of :2 (2%) Interlocking Tiles: The Interlocking Tiles are flat, interlocking tiles. See Table for dimensions and installed weights of the five different types of Interlocking Tiles. Two nail holes are provided at the top of each tile. See Figure for additional details. The tiles are installed with a -inch (76 mm) headlap, on roofs with a minimum slope of :2 (2%) Shingle Tiles: The Shingle Tiles are flat, shingletype tiles. See Table for dimensions and installed weights of the eight different types of shingle tiles. Two nail holes are provided at the top of each tile. The tiles are installed, with headlaps as shown in Figure 4, on roofs with a minimum slope of :2 (42%) Medium Profile Tiles: The Medium Profile Tiles have locks on all four edges reflecting French architectural features. See Table for dimensions and installed weights of the tiles. One nail hole is provided at the top of each tile. See Figure for additional details. The tiles are installed with a -inch (76 mm) headlap, on roofs with a minimum slope of :2 (2%) One Piece, High Profile Barrel Tiles: The One Piece, High Profile Barrel Tiles are S-shaped tiles having two nail holes at the top of each tile. See Table for dimensions and installed weights. See Figure 6 for additional details. The tiles are installed with a -inch (76 mm) headlap, on roofs with a minimum roof slope of 4:2 (%) Two Piece, High Profile Barrel Tiles: The Two Piece, High Profile Barrel Tiles consist of pan and cover units having one nail hole at the top of each tile. See Table for dimensions and installed weights. See Figures 7, 8 and 9 for additional details. The tiles are installed with a - inch (76 mm) headlap, on roofs with a minimum slope of :2 (42%). 2. Installation: 2.. General: Unless noted otherwise in this report, the tiles are applied to solid decks in accordance with UBC (997 Uniform Building Code ) Table -D- or -D-2, as applicable. The deck surfaces must be clean and dry prior to installation of underlayment. Foreign particles must be cleaned from all interlocking areas, to ensure proper seating and to prevent water damming. Cracked or broken tile must be replaced. See Figure 0 for additional details Roof Slopes: Minimum roof slopes are as specified for specific tiles in the applicable subsection of Section Decking: The decking is minimum -inch-thick (9. mm) plywood, nominal -by lumber, or other solid decking complying with the UBC. The decking must be structurally adequate to support the loads involved Underlayment: A minimum of one layer of coated base sheet, complying with ASTM D 2626 and having a minimum sheet weight of 4 pounds per 00 square feet (2. kg/m 2 ), or two layers of Type 0 asphalt-saturated felt complying with ASTM D 226, is required over all decking. Underlayment must be doubled on rough surfaces, hips, valleys and ridges. Underlayment must be lapped 2 inches (6. mm) horizontally and 6 inches (2 mm) vertically, and extended 6 inches (2 mm) up vertical surfaces behind flashings. In severe climate areas, an extra layer of felt extending from the eave to a point 24 inches (60 mm) inside the exterior wall line of the building must be applied and cemented as required in UBC Table -D- or -D Battens: When installed with battens, nominal - by-2 wood battens are spaced parallel to the eave to achieve the required minimum -inch (76 mm) headlap between successive tile courses. End joints of batten boards are separated by inch (2.4 mm) every 4 feet (29 mm) for drainage. Battens must be nailed to the deck with 8d corrosion-resistant box nails at 24 inches (60 mm) on center. are not to be construed as representing aesthetics or any other attributes not specifically addressed, nor are they to be construed as an endorsement of the subject of the report or a recommendation for its use. There is no warranty by ICBO Evaluation Service, Inc., express or implied, as to any finding or other matter in this report, or as to any product covered by the report. Copyright 2002 Page of 8

2 Page 2 of 8 ER Flashing: All valleys have a minimum 6-ounceper-square-foot (4882 g/m 2 ), inch-thick (0.49 mm) copper flashing extending a minimum of inches (279 mm) from the valley centerline each way, with a splash diverter rib not less than inch (2.4 mm) high at the flow line as part of the flashing. Sections of flashing must have a minimum end lap of 4 inches (02 mm). Directly under the flashing, a minimum 6-inch-wide (94 mm), coated base sheet underlayment, complying with ASTM D 2626, and having a minimum sheet weight of 4 pounds per 00 square feet (2. kg/m 2 ), is provided in addition to regular underlayment required in Section In severe climates as defined in UBC Tables -D- or -D-2, the valley flashing underlayment must be solid-cemented to the roofing underlayment for slopes of less than 7:2 (8%) Tile Fastening: Each tile is fastened to the plywood or wood deck with No. gage, / 6 -inch (7.9 mm) or larger head diameter copper nails for all roof slopes. Ring shank nails are used for plywood decks, and smooth shank nails for lumber decks. The nails must have sufficient length to penetrate through the underside of the deck. On roof slopes greater than 7:2 (8%) but less than 2:2 (7%), approved wind locks or hurricane clips are attached to each tile, in addition to the nails described above being used. See Figure. Fastening procedures in areas designated by the building official as being subject to repeated wind velocities in excess of 80 mph (29 km/h), or when the roof height exceeds 40 feet (292 mm) above grade, must comply with Footnote 2 of UBC Table -D- or Footnote of UBC Table -D-2, as applicable Hips, Ridges and Rakes: Hip and ridge tiles are installed with ridge boards. Each ridge and hip tile is nailed with one No. gage copper nail driven into the ridge and hip framing members. A bead of plastic cement is spread across the nail head so that the butt end of each succeeding tile is securely fixed. Gable rake tiles are fastened with two copper nails. Plastic cement for gable rakes, hip rolls, ridges, stringers and other conditions must be nonrunning, heavy-body flashing cement composed of mineral ingredients, to meet the requirements of ASTM D 486. Sealant, when used in lieu of plastic cement, shall be silicone, and shall be applied in accordance with the silicone manufacturer s recommendations. 2.4 Roof Classification: The tiles are noncombustible roof coverings, as defined in UBC Section Identification: Affixed to each shipping pallet is a tag bearing the company name and address (Ludowici Roof Tile, Inc., or Celadon Company), the installed weight, tile quantity, product code number, evaluation report number (ICBO ES ER-4872) and product name. Additionally, the name Ludowici is embossed on each tile, with the exception that the name Celadon is embossed on the Celadon Ceramic Slate tiles..0 EVIDENCE SUBMITTED Reports of tests in accordance with the ICBO ES Acceptance Criteria for Clay and Concrete Tiles (AC80), dated January 2002; installation instructions; and a quality control manual. 4.0 FINDINGS That the Ludowici and Celadon clay roofing tiles described in this report comply with the 997 Uniform Building Code, subject to the following conditions: 4. The tiles are manufactured, installed and identified in accordance with this report and the manufacturer s instructions. 4.2 The tiles are manufactured at the Ludowici Roof Tile, Inc., facility located at New Lexington, Ohio. This report is subject to re-examination in two years.

3 Page of 8 ER-4872 TILE PROFILE CATEGORY XL Interlocking Interlocking Shingle Tile Medium Profile One Piece, High Profile, Barrel Two Piece, High Profile Barrel PRODUCT NAME TABLE TILE DESCRIPTIONS LENGTH (inches) WIDTH (inches) THICKNESS (inch) INSTALLED WEIGHT (lbs/sq.ft.) PIECES/ SQUARE Celadon Ceramic Slate Americana XL Classic XL Williamsburg XL Lanai XL Americana 4 9 Classic 4 9 Williamsburg 4 9 Lanai 4 9 Imperial 0 Crude 2 7 Norman 7 Calais 7 Provincial 7 Brittany 2 7 Antique Colonial Georgian 8 French Spanish Spanish Straight Barrel Mission (8 inch) Straight Barrel Mission (6 inches) Straight Barrel Mission (4 inches) Palm Beach Tapered Mission 8 8 Cubana 8 8 For SI: inch = 2.4 mm, psf = 4.88 kg/m

4 Page 4 of 8 ER-4872 FIGURE XL INTERLOCKING TILES: XL AMERICANA, XL CLASSIC, XL LANAI, XL WILLIAMSBURG FIGURE 2 IMPERIAL XL INTERLOCKING TILE FIGURE INTERLOCKING TILES: AMERICANA, CLASSIC, LANAI, WILLIAMSBURG FIGURE 4 SHINGLE TILE

5 Page of 8 ER-4872 FIGURE MEDIUM PROFILE TILE FIGURE 6 ONE-PIECE, HIGH-PROFILE BARREL TILE FIGURE 7 TWO-PIECE, HIGH PROFILE BARREL TILE STRAIGHT BARREL MISSION FIGURE 8 TWO-PIECE, HIGH PROFILE BARREL TILE PALM BEACH TAPERED MISSION FIGURE 9 TWO-PIECE, HIGH-PROFILE BARREL TILE CUBANA

6 Page 6 of 8 ER-4872 FIGURE 0 INSTALLATION DETAILS

7 Page 7 of 8 ER-4872 FIGURE 0 INSTALLATION DETAILS (Continued)

8 Page 8 of 8 ER-4872 FIGURE 0 INSTALLATION DETAILS (Continued) FIGURE HURRICANE CLIPS

ICC-ES Evaluation Report Reissued March 1, 2011 This report is subject to renewal in one year.

ICC-ES Evaluation Report Reissued March 1, 2011 This report is subject to renewal in one year. ICC-ES Evaluation Report www.icc-es.org (800) 423-6587 (562) 699-0543 ESR-900* Reissued March, 20 This report is subject to renewal in one year. A Subsidiary of the International Code Council DIVISION:

More information

DIVISION: 07 00 00 THERMAL AND MOISTURE PROTECTION SECTION: 07 32 16 CONCRETE ROOF TILES REPORT HOLDER:

DIVISION: 07 00 00 THERMAL AND MOISTURE PROTECTION SECTION: 07 32 16 CONCRETE ROOF TILES REPORT HOLDER: 0 ICC ES Report ICC ES (800) 423 6587 (562) 699 0543 www.icc es.org 000 Most Widely Accepted and Trusted ESR 1900 Reissued 03/2016 This report is subject to renewal 03/2017. DIVISION: 07 00 00 THERMAL

More information

www.icc-es.org (800) 423-6587 (562) 699-0543 A Subsidiary of the International Code Council *Revised April 2014

www.icc-es.org (800) 423-6587 (562) 699-0543 A Subsidiary of the International Code Council *Revised April 2014 ICC-ES Evaluation Report ESR-1647* Issued July 2013 This report is subject to renewal August 1, 2015. www.icc-es.org (800) 423-6587 (562) 699-0543 A Subsidiary of the International Code Council DIVISION:

More information

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 SECTION R905 REQUIREMENTS FOR ROOF COVERINGS R905.1 Roof covering application. Roof coverings

More information

Asphalt Shingle Application Requirements

Asphalt Shingle Application Requirements Alberta Allied Roofing Association Asphalt Shingle Application Requirements Section 1 Roof Decks 1.1 General Asphalt Shingles are not permitted to be installed directly over rigid insulation. When Asphalt

More information

DIVISION: 07 00 00 THERMAL AND MOISTURE PROTECTION SECTION: 07 32 16 CONCRETE ROOF TILES REPORT HOLDER: BORAL ROOFING

DIVISION: 07 00 00 THERMAL AND MOISTURE PROTECTION SECTION: 07 32 16 CONCRETE ROOF TILES REPORT HOLDER: BORAL ROOFING 0 ICC-ES Report ICC-ES (800) 423-6587 (562) 699-0543 www.icc-es.org 000 Most Widely Accepted and Trusted ESR-1647 Reissued 08/2015 This report is subject to renewal 08/2016. DIVISION: 07 00 00 THERMAL

More information

RB271 06/07 R807.1 RB272 06/07 R807.1. Public Hearing: Committee: AS AM D Assembly: ASF AMF DF. Proponent: Rick Davidson, City of Hopkins, MN

RB271 06/07 R807.1 RB272 06/07 R807.1. Public Hearing: Committee: AS AM D Assembly: ASF AMF DF. Proponent: Rick Davidson, City of Hopkins, MN 3. The use of asphalt shingles and other roof coverings has been successful over these composite insulation panels, so the extra details about vapor retarders, etc. can be eliminated. RB271 06/07 R807.1

More information

Final inspections are completed by site visit only. Access to fenced yards shall be planned.

Final inspections are completed by site visit only. Access to fenced yards shall be planned. ROOFING RESIDENTIAL BUILDING INSPECTIONS DEPARTMENT www.ci.blaine.mn.us This handout is intended only as a guide and is based in part on the 2015 Minnesota State Building Code, Blaine City ordinances,

More information

ROOF ASSEMBLIES AND ROOFTOP STRUCTURES

ROOF ASSEMBLIES AND ROOFTOP STRUCTURES CHAPTER 15 ROOF ASSEMBLIES AND ROOFTOP STRUCTURES SECTION 1501 GENERAL 1501.1 Scope. The provisions of this chapter shall govern the design, materials, construction and quality of roof assemblies, and

More information

ROOF ASSEMBLIES AND ROOFTOP STRUCTURES

ROOF ASSEMBLIES AND ROOFTOP STRUCTURES CHAPTER 15 ROOF ASSEMBLIES AND ROOFTOP STRUCTURES SECTION 1501 GENERAL 1501.1 Scope. The provisions of this chapter shall govern the design, materials, construction and quality of roof assemblies, and

More information

HCD DSA OSHPD 1 2 1/AC AC SS 1 2 3 4

HCD DSA OSHPD 1 2 1/AC AC SS 1 2 3 4 CALIFORNIA RESIDENTIAL CODE MATRIX ADOPTION TABLE CHAPTER 9 ROOF ASSEMBLIES (Matrix Adoption Tables are non-regulatory, intended only as an aid to the user. See Chapter 1 for state agency authority and

More information

PREMIUM LAMINATED ASPHALT SHINGLES Dallas, TX Tuscaloosa, AL Phillipsburg, KS

PREMIUM LAMINATED ASPHALT SHINGLES Dallas, TX Tuscaloosa, AL Phillipsburg, KS Application Instructions for THESE ARE THE MANUFACTURER S APPLICATION INSTRUCTIONS FOR THE ROOFING CONDITIONS DESCRIBED. TAMKO BUILDING PRODUCTS, INC. ASSUMES NO RESPONSIBILITY FOR LEAKS OR OTHER ROOFING

More information

Shingle Installation Guide

Shingle Installation Guide Shingle Installation Guide Getting Started Dedicated to improving the environment, NewTech manufactures roofing tiles that are composed of up to 90% recycled post-industrial plastic. The manufacture of

More information

Detached accessory structures that contain no conditioned floor area are exempt.

Detached accessory structures that contain no conditioned floor area are exempt. RESIDENTIAL ROOFING PERMITS: A roofing permit is required for roofing of residential dwellings and garages in accordance with Section R105 of the International Residential Code. Updated 11/2013 City of

More information

ROOF ASSEMBLIES CHAPTER 9

ROOF ASSEMBLIES CHAPTER 9 CHAPTER 9 ROOF ASSEMBLIES SECTION R901 GENERAL R901.1 Scope. The provisions of this chapter shall govern the design, materials, construction and quality of roof assemblies. SECTION R902 ROOF CLASSIFICATION

More information

ROOF ASSEMBLIES AND ROOFTOP STRUCTURES

ROOF ASSEMBLIES AND ROOFTOP STRUCTURES CHAPTER 15 ROOF ASSEMBLIES AND ROOFTOP STRUCTURES SECTION 1501 GENERAL 1501.1 Scope. The provisions of this chapter shall govern the design, materials, construction and quality of roof assemblies, and

More information

780 CMR 15.00 ROOF ASSEMBLIES AND ROOFTOP STRUCTURES

780 CMR 15.00 ROOF ASSEMBLIES AND ROOFTOP STRUCTURES 780 CMR 15.00 ROOF ASSEMBLIES AND ROOFTOP STRUCTURES 780 CMR 1501.0 GENERAL 1501.1 Scope. The provisions of 780 CMR 15.00 shall govern the design, materials, construction and quality of roof assemblies,

More information

ROOF ASSEMBLIES AND ROOFTOP STRUCTURES

ROOF ASSEMBLIES AND ROOFTOP STRUCTURES CHAPTER 15 ROOF ASSEMBLIES AND ROOFTOP STRUCTURES SECTION 1501 GENERAL 1501.1 Scope. The provisions of this chapter shall govern the design, materials, construction and quality of roof assemblies, and

More information

ROOF ASSEMBLIES AND ROOFTOP STRUCTURES

ROOF ASSEMBLIES AND ROOFTOP STRUCTURES CHAPTER 15 ROOF ASSEMBLIES AND ROOFTOP STRUCTURES SECTION 1501 GENERAL 1501.1 Scope. The provisions of this chapter shall govern the design, materials, construction and quality of roof assemblies, and

More information

HERITAGE WOODGATE LAMINATED ASPHALT SHINGLES Dallas, TX

HERITAGE WOODGATE LAMINATED ASPHALT SHINGLES Dallas, TX Application Instructions for THESE ARE THE MANUFACTURER S APPLICATION INSTRUCTIONS FOR THE ROOFING CONDITIONS DESCRIBED. TAMKO BUILDING PRODUCTS, INC. ASSUMES NO RESPONSIBILITY FOR LEAKS OR OTHER ROOFING

More information

Residential Roofing Guide

Residential Roofing Guide Residential Roofing Guide TABLE OF CONTENTS Building Detail and Accessories...... 1 Panel Introduction and Handling...... 2 Cutting and Trimming.... 3 Roof Preparation..... 3 Roof Slope..... 3 Re-roofing...

More information

ROOFING APPLICATION STANDARD (RAS) No. 150 PRESCRIPTIVE BUR REQUIREMENTS

ROOFING APPLICATION STANDARD (RAS) No. 150 PRESCRIPTIVE BUR REQUIREMENTS ROOFING APPLICATION STANDARD (RAS) No. 150 PRESCRIPTIVE BUR REQUIREMENTS 1. 2. 3. 3.0 Scope 1.1 This application standard shall be used where the authority having jurisdiction has adopted its use, and

More information

STANDARD PROCEDURES FOR INSTALLATION OF METAL ROOF SYSTEMS

STANDARD PROCEDURES FOR INSTALLATION OF METAL ROOF SYSTEMS ROOFING APPLICATION STANDARD (RAS) No. 133 STANDARD PROCEDURES FOR INSTALLATION OF METAL ROOF SYSTEMS 1. Scope 1.1 This application standard has been developed to provide consistent information for the

More information

SECTION 07320 ROOFING TILE

SECTION 07320 ROOFING TILE SECTION 07320 ROOFING TILE PART 1 - GENERAL 1.1 SUMMARY: A. Section Includes: 1. Vitrified clay roofing tiles. 2. Tile accessories. 3. Felt underlayment. 4. Self-adhering sheet underlayment. 5. Snow guards.

More information

TABLE OF CONTENTS" SECTION 3: Comparing Standing Seam Metal to Other Metal Roofs PAGE 7"

TABLE OF CONTENTS SECTION 3: Comparing Standing Seam Metal to Other Metal Roofs PAGE 7 2 TABLE OF CONTENTS SECTION 1: What is a Standing Seam Metal Roof PAGE 3 SECTION 2: Common Types of Standing Seam Metal Roofs..PAGE 5 SECTION 3: Comparing Standing Seam Metal to Other Metal Roofs PAGE

More information

DIVISION: 07 00 00 THERMAL AND MOISTURE PROTECTION SECTION: 07 41 13 METAL ROOF PANELS REPORT HOLDER: FIRESTONE BUILDING PRODUCTS COMPANY, LLC

DIVISION: 07 00 00 THERMAL AND MOISTURE PROTECTION SECTION: 07 41 13 METAL ROOF PANELS REPORT HOLDER: FIRESTONE BUILDING PRODUCTS COMPANY, LLC 0 ICC ES Report ICC ES (800) 423 687 (62) 699 043 www.icc es.org 000 Most Widely Accepted and Trusted ESR 3422 Reissued 09/201 This report is subject to renewal 09/2016. DIVISION: 07 00 00 THERMAL AND

More information

How To Build A Roof Tile Deck

How To Build A Roof Tile Deck SECTION 07321 COMPOSITE ROOF TILE Display hidden notes to specifier by using Tools / Options / View / Hidden Text. PART 1 GENERAL 1.1 SECTION INCLUDES A. Composite roof tiles. B. Metal roof flashing. C.

More information

GUIDE SPECIFICATION. Manufacturer: DECRA Roofing Systems, Inc.

GUIDE SPECIFICATION. Manufacturer: DECRA Roofing Systems, Inc. GUIDE SPECIFICATION Manufacturer: DECRA Roofing Systems A Fletcher Building Company 1230 Railroad Street Corona, CA 92882 951-272-8180 phone 951-272-4476 facsimile www.decra.com SECTION 07313 [07 31 13]

More information

Titan Old World Spanish Tile

Titan Old World Spanish Tile Installation Guide Titan Old World Spanish Tile Titan Manufacturing Phone: 407-587-5492 Fax: (866) 859-8607 www.titanroofsystems.com Rev 70908 This document includes the recommended and suggested installation

More information

CHAPTER 5 ASPHALT-SHINGLE ROOFING

CHAPTER 5 ASPHALT-SHINGLE ROOFING CHAPTER 5 ASPHALT-SHINGLE ROOFING Section I. DESCRIPTION AND GENERAL DISCUSSION 5.1.1 References double-coverage shingles provide two layers over Specifications for shingles and allied materials are most

More information

STANDARD REQUIREMENTS FOR BONDING OR MECHANICAL ATTACHMENT OF INSULATION PANELS AND MECHANICAL ATTACHMENT OF ANCHOR AND/OR BASE SHEETS TO SUBSTRATES

STANDARD REQUIREMENTS FOR BONDING OR MECHANICAL ATTACHMENT OF INSULATION PANELS AND MECHANICAL ATTACHMENT OF ANCHOR AND/OR BASE SHEETS TO SUBSTRATES ROOFING APPLICATION STANDARD (RAS) No. 117 STANDARD REQUIREMENTS FOR BONDING OR MECHANICAL ATTACHMENT OF INSULATION PANELS AND MECHANICAL ATTACHMENT OF ANCHOR AND/OR BASE SHEETS TO SUBSTRATES Scope 1.1.

More information

GUIDE SPECIFICATION. Manufacturer: DECRA Roofing Systems, Inc.

GUIDE SPECIFICATION. Manufacturer: DECRA Roofing Systems, Inc. GUIDE SPECIFICATION Manufacturer: DECRA Roofing Systems A Fletcher Building Company 1230 Railroad Street Corona, CA 92882 951-272-8180 phone 951-272-4476 facsimile www.decra.com SECTION 07314 [07 31 14]

More information

SHINGLE APPLICATION GUIDE

SHINGLE APPLICATION GUIDE SHINGLE APPLICATION GUIDE CONTENTS 01. General conditions 01. Material requirements 02. Terms 07. Estimating shingle requirements 08. Roof preparation 10.Shingle application E version 2006 GENERAL CONDITIONS

More information

INSTALLATION MANUAL For Grand Rib-3 / Multi Purpose / & Classic Rib Roofing Panels

INSTALLATION MANUAL For Grand Rib-3 / Multi Purpose / & Classic Rib Roofing Panels INSTALLATION MANUAL For Grand Rib-3 / Multi Purpose / & Classic Rib Roofing Panels Grand Rib-3 / Multi-Purpose / Classic Rib Grand Rib-3 / Multi-Purpose / & Classic Rib Grand Rib 3 panels are a strong,

More information

CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503. Re-Roofing: Asphalt Shingles

CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503. Re-Roofing: Asphalt Shingles CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503 Re-Roofing: Asphalt Shingles This is a summary of the standard requirements based on the

More information

ROOF CONSTRUCTION Roof Styles Gable Roof Hip Roof Gambrel Roof

ROOF CONSTRUCTION Roof Styles Gable Roof Hip Roof Gambrel Roof ROOF CONSTRUCTION The overall appearance of a building is greatly affected by the roof lines and the roofing materials. The designer has many standard designs to choose from and should be able to find

More information

POST AND FRAME STRUCTURES (Pole Barns)

POST AND FRAME STRUCTURES (Pole Barns) POST AND FRAME STRUCTURES (Pole Barns) Post and frame structures. The following requirements serve as minimum standards for post and frame structures within all of the following structural limitations:

More information

How To Compare Roofing Material

How To Compare Roofing Material Roofing Material Comparisons Housing Fact Sheets One of the great strengths of our market economy is the number of product choices we are provided with. So when it comes time to replace the roof on your

More information

HURRICANE MITIGATION RETROFITS FOR EXISTING SITE-BUILT SINGLE FAMILY RESIDENTIAL STRUCTURES

HURRICANE MITIGATION RETROFITS FOR EXISTING SITE-BUILT SINGLE FAMILY RESIDENTIAL STRUCTURES HURRICANE MITIGATION RETROFITS FOR EXISTING SITE-BUILT SINGLE FAMILY RESIDENTIAL STRUCTURES 101 Retrofits Required. Pursuant to Section 553.844 553.884, Florida Statutes, strengthening of existing site-built,

More information

ROOF CONSTRUCTION Roof Styles Gable Roof Hip Roof Gambrel Roof

ROOF CONSTRUCTION Roof Styles Gable Roof Hip Roof Gambrel Roof ROOF CONSTRUCTION The overall appearance of a building is greatly affected by the roof lines and the roofing materials. The designer has many standard designs to choose from and should be able to find

More information

Discount Direct Metal Roofing Plus Rib Roofing Panels Installation Instructions

Discount Direct Metal Roofing Plus Rib Roofing Panels Installation Instructions Discount Direct Metal Roofing Plus Rib Roofing Panels Installation Instructions All questions and concerns please call 904-696-9700 Discount Direct Metal Roofing Plus Rib metal roofing panels are a strong,

More information

SECTION 07400 STANDING SEAM METAL ROOF

SECTION 07400 STANDING SEAM METAL ROOF SECTION 07400 STANDING SEAM METAL ROOF PART 1 - GENERAL 1.01 SECTION INCLUDES A. Work described in this section includes pre-formed standing seam metal roofing system complete with clips, perimeter and

More information

CI SfB. (4-) Nn2. Onduline. Mini Profile. Onduline Garden Roof Range. Onduline Building Products Ltd

CI SfB. (4-) Nn2. Onduline. Mini Profile. Onduline Garden Roof Range. Onduline Building Products Ltd CI SfB (4-) Nn2 Onduline Mini Profile Onduline Garden Roof Range Onduline Building Products Ltd Onduline Garden Roof Range Onduline Mini Profile The new Onduline Mini Profile sheets have been designed

More information

Shake. Northwest. Charcoal. Brown Antique. Taupe Antique. Grey Antique

Shake. Northwest. Charcoal. Brown Antique. Taupe Antique. Grey Antique Rooflines by Northwest Shake Creating an authentic Northwest look with the durability only Columbia Roof Tile can promise, this unique profile enhances the beauty of a traditional style home and offers

More information

GreenGuard Housewrap Installation Guide

GreenGuard Housewrap Installation Guide 000768PACBPHW_Flashing Bro 5/23/03 2:52 PM Page 1 For the most current product information, go to www.green-guard.com. Pactiv Building Products believes the information and recommendations herein to be

More information

G VYCOR DECK PROTECTOR

G VYCOR DECK PROTECTOR G VYCOR DECK PROTECTOR Self-Adhered Flashing Contractor s Guide DECKS AND DETAIL AREAS For longer lasting decks, install Grace Vycor Deck Protector. FROM THE MAKERS OF G Ice & Water Shield What Self-Adhered

More information

providing documentation that validates the year of construction. Acceptable documents include

providing documentation that validates the year of construction. Acceptable documents include 902. WINDSTM MITIGATION FEATURES A. For policies that cover the peril of Windstorm or Hail, a premium credit may be available if one or more of the following loss mitigation features or construction techniques

More information

Drexel Metals Inc. DMC 100SS 16oz min. Copper Mechanical Seam Metal Roof System over Plywood

Drexel Metals Inc. DMC 100SS 16oz min. Copper Mechanical Seam Metal Roof System over Plywood Drexel Metals Inc. DMC 100SS 16oz min. Copper Mechanical Seam Metal Roof System over Plywood Section 07411 Metal Roof Panels Part 1 General 1.1 Summary A. This section includes the following: a. Factory-formed

More information

SECTION 07 61 13 STANDING SEAM METAL ROOFING

SECTION 07 61 13 STANDING SEAM METAL ROOFING SECTION 07 61 13 STANDING SEAM METAL ROOFING PART 1 GENERAL 1.01 SCOPE OF WORK A. The Work shall include all labor, materials, equipment and supervision required to complete the work of the above referenced

More information

APPLICATION INFORMATION FOR RESIDENTIAL ROOFING AND RESIDENTIAL ROOFING PACKET

APPLICATION INFORMATION FOR RESIDENTIAL ROOFING AND RESIDENTIAL ROOFING PACKET Environmental Protection and Growth Management Department PERMITTING, LICENSING AND CONSUMER PROTECTION DIVISION 1 N. University Drive, Box #302 Plantation, Florida 33324 954-765-4400 www.broward.org/permittingandlicensing

More information

Mark Cramer Inspection Services, Inc.

Mark Cramer Inspection Services, Inc. Mark Cramer Inspection Services, Inc. 492 Twentieth Avenue, Indian Rocks Beach, FL 34635-2970 (727) 595-4211 Fax (727) 596-7583 Certified Member #12085 American Society of Home Inspectors Construction

More information

Chapter 9: INSTALLING ROOFING

Chapter 9: INSTALLING ROOFING 9.1 LEAK BARRIER (ICE AND WATER SHIELD) 9.2 SHINGLE UNDERLAYMENT 9.3 INSTALLING GUTTER APRON AND GABLE D-EDGE 9.4 INSTALLING SHINGLES 9.5 RIDGE VENT AND CAP Tools needed by each volunteer: Hammer (16 oz.

More information

THE DOW CHEMICAL COMPANY Issued: August 1, 2008 200 LARKIN CENTER 1605 JOSEPH DRIVE MIDLAND MICHIGAN 48674 (989) 638-8655 www.dowbuildingmaterials.

THE DOW CHEMICAL COMPANY Issued: August 1, 2008 200 LARKIN CENTER 1605 JOSEPH DRIVE MIDLAND MICHIGAN 48674 (989) 638-8655 www.dowbuildingmaterials. ICC EVALUATION SERVICE, INC. EvaluateP InformP Protect Los Angeles Business/Regional OfficeP 5360 Workman Mill RoadP Whittier, CA 90601 (562) 699-0543 phonep (562) 695-4694 fax DIVISION: Section: 6 WOOD

More information

16 2 10.3 Materials and Colors

16 2 10.3 Materials and Colors 16 2 10.3 Materials and Colors To create a harmonious and coherent image for each development, building designs shall pay close attention to choice of materials and colors. Building construction shall

More information

ROOF ASSEMBLIES AND ROOFTOP STRUCTURES

ROOF ASSEMBLIES AND ROOFTOP STRUCTURES CHAPTER 15 ROOF ASSEMBLIES AND ROOFTOP STRUCTURES SECTION 1501 GENERAL 1501.1 Scope. The provisions of this chapter shall govern the design, materials, construction and quality of roof assemblies, and

More information

Table of Contents. Western States Standing Seam SS675 Panel Installation, Flashings & Shop Drawing Detail Guide. Notes to Designer /Installers..

Table of Contents. Western States Standing Seam SS675 Panel Installation, Flashings & Shop Drawing Detail Guide. Notes to Designer /Installers.. Western States Standing Seam SS675 Panel Installation, Flashings & Shop Drawing Detail Guide Table of Contents Section Page Section Page Notes to Designer /Installers.. 1 Fastener Placement and Selection.2-3

More information

CONTENTS. General conditions 2. Material requirements 3. Terms 4. Estimating shingle requirements 4. Roof preparation 6. Shingle application 9 - 1 -

CONTENTS. General conditions 2. Material requirements 3. Terms 4. Estimating shingle requirements 4. Roof preparation 6. Shingle application 9 - 1 - CONTENTS General conditions Material requirements 3 Terms 4 Estimating shingle requirements 4 Roof preparation 6 Shingle application 9 Shingle Shingle application application guide guide - - b a 3a 3b

More information

Classic Products, Inc. ClickLock Standing Seam Installation Manual

Classic Products, Inc. ClickLock Standing Seam Installation Manual Classic Products, Inc. ClickLock Standing Seam Installation Manual Classic Products, Inc. 8510 Industry Park Drive Piqua, OH 45356 800.543.8938 Table of Contents page Introduction 1. 1 Starter. 2. 1 Panels.

More information

NRCA s steep-slope manual is thoroughly revised for 2013

NRCA s steep-slope manual is thoroughly revised for 2013 Photo courtesy of Boone Brothers Roofing, Omaha, Neb. NRCA s steep-slope manual is thoroughly revised for 2013 by Maciek Rupar 38 www.professionalroofing.net MARCH 2013 P ublished in January, The NRCA

More information

CHAPTER 6 ASPHALT ROLL ROOFING

CHAPTER 6 ASPHALT ROLL ROOFING CHAPTER 6 ASPHALT ROLL ROOFING Section I. DESCRIPTION AND GENERAL DISCUSSION 6.1.1 General 6.1.3 Mineral-Surfaced Asphalt roll roofing is roofing in sheet form Mineral-surfaced roll roofing is composed

More information

LEGACY REPORT. www.icc-es.org (800) 423-6587 (562) 699-0543 A Subsidiary of the International Code Council RETAINED ON U.S.

LEGACY REPORT. www.icc-es.org (800) 423-6587 (562) 699-0543 A Subsidiary of the International Code Council RETAINED ON U.S. ICC-ES Legacy Report ER-5043* Reissued March 2004 www.icc-es.org (800) 423-6587 (562) 699-0543 A Subsidiary of the International Code Council Legacy report on the 1997 Uniform Building Code DIVISION: 09

More information

METAL ROOFING INSTALLATION GUIDE

METAL ROOFING INSTALLATION GUIDE METAL ROOFING INSTALLATION GUIDE MIGHTY-RIB PBR (R-Panel) Regardless of whether your roofing project is a new installation or a re-roof, and whether your building is residential, commercial or agricultural,

More information

LEGACY REPORT ER-5110. www.icc-es.org. ICC Evaluation Service, Inc. Reissued November 1, 2003. Legacy report on the 1997 Uniform Building Code

LEGACY REPORT ER-5110. www.icc-es.org. ICC Evaluation Service, Inc. Reissued November 1, 2003. Legacy report on the 1997 Uniform Building Code LEGACY REPORT Reissued November 1, 2003 ICC Evaluation Service, Inc. www.icc-es.org Business/Regional Office # 5360 Workman Mill Road, Whittier, California 90601 # (562) 699-0543 Regional Office # 900

More information

Building it right like in the good old days.

Building it right like in the good old days. Building it right like in the good old days. Raise your expectations. Saving money doesn t require compromising quality. Doing our research and finding a better way is part of The Code we live by and MAXITILE

More information

CHAPTER 7: Building Systems ROOFING SYSTEMS

CHAPTER 7: Building Systems ROOFING SYSTEMS ROOFING SYSTEMS Purpose Examples 1. Shingle roof system 2. Metal roof with blanket insulation 3. Metal roof with rigid insulation 4. Built-up asphalt roof system 5. Single-ply roof system 6. Modified Bitumen

More information

foot skylight) is enough to knock a worker off their feet. A 10 mph wind gust on a 5 x 6 skylight develops a wind force of 270 lbs.

foot skylight) is enough to knock a worker off their feet. A 10 mph wind gust on a 5 x 6 skylight develops a wind force of 270 lbs. Skylight Installation Instructions This document provides instruction and guidelines for installation of both curb mount (CM) and self flashing (SF) unit skylights on flat, pitched (> or equal to 3/12

More information

SINGLE FAMILY RESIDENCE HURRICANE MITIGATION APPLICATION

SINGLE FAMILY RESIDENCE HURRICANE MITIGATION APPLICATION SINGLE FAMILY RESIDENCE HURRICANE MITIGATION APPLICATION As of October 1, 2007, this mitigation form must be submitted as part of the roofing permit application package. Secondary water barrier (if applicable)

More information

NEW ELECTRICAL SUBSTATION Building 300 SECTION 07 53 23 ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK

NEW ELECTRICAL SUBSTATION Building 300 SECTION 07 53 23 ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to within

More information

Metal Roof Systems in High-Wind Regions

Metal Roof Systems in High-Wind Regions Metal Roof Systems in High-Wind Regions http://www.fema.gov HURRICANE IKE RECOVERY ADVISORY Purpose: To recommend practices for designing and installing metal roof systems that will enhance wind resistance

More information

Multi-Width Shake. Widths: 9", 8", 7", 6", 4" Length: 22" Thickness at butt: 5/8" Single-Width Shake. Widths: 9" Length: 22" Thickness at butt: 5/8"

Multi-Width Shake. Widths: 9, 8, 7, 6, 4 Length: 22 Thickness at butt: 5/8 Single-Width Shake. Widths: 9 Length: 22 Thickness at butt: 5/8 N DaVinci Shake Multi-Width Shake Single-Width Shake INSTALLATION GUIDE DaVinci polymer shakes are carefully engineered to provide the authentic look of hand-split shakes with dramatically increased durability

More information

Chapter 3 Pre-Installation, Foundations and Piers

Chapter 3 Pre-Installation, Foundations and Piers Chapter 3 Pre-Installation, Foundations and Piers 3-1 Pre-Installation Establishes the minimum requirements for the siting, design, materials, access, and installation of manufactured dwellings, accessory

More information

CHAPTER VII. TITLE: STANDARDS FOR NEW ROOFING July 2015 CONSTRUCTION, RE-ROOFING CONSTRUCTION AND ROOFING SYSTEM GUARANTEE REQUIREMENTS

CHAPTER VII. TITLE: STANDARDS FOR NEW ROOFING July 2015 CONSTRUCTION, RE-ROOFING CONSTRUCTION AND ROOFING SYSTEM GUARANTEE REQUIREMENTS TITLE: STANDARDS FOR NEW ROOFING CONSTRUCTION, RE-ROOFING CONSTRUCTION AND ROOFING SYSTEM GUARANTEE REQUIREMENTS Responsible Organization: Office of Facilities Planning Instructions: This Manual supersedes

More information

VAIL Metal Shingles. Application Instructions. Custom-Bilt Metals 13940 Magnolia Ave. Chino, CA 91710

VAIL Metal Shingles. Application Instructions. Custom-Bilt Metals 13940 Magnolia Ave. Chino, CA 91710 VAIL Metal Shingles Application Instructions 13940 Magnolia Ave. Chino, CA 91710 VAIL Metal Shingles Application Instructions When installing or walking on VAIL Metal Shingles: 1. OSHA fall protection

More information

Directions For Applying Malarkey Laminate Shingles

Directions For Applying Malarkey Laminate Shingles S Laminate Shingle Instructions 1 Directions For Applying Malarkey Laminate Shingles GENERAL INSTRUCTIONS Install Malarkey laminate shingles according to building code and local amendments. To qualify

More information

Storage Store the siding in a dry and ventilated area. Do not place it directly on the ground. Always cover the siding after a day s work.

Storage Store the siding in a dry and ventilated area. Do not place it directly on the ground. Always cover the siding after a day s work. Installation Guide Before you begin, take the time to read this entire guide to clearly understand the requirements and steps to follow for proper installation. Warning Do not install defective material.

More information

tamko.com RESIDENTIAL ROOFING PRODUCT GUIDE

tamko.com RESIDENTIAL ROOFING PRODUCT GUIDE tamko.com RESIDENTIAL ROOFING PRODUCT GUIDE RESIDENTIAL ROOFING PRODUCT GUIDE SHINGLES / LAMINATED LIMITED DESIGN PRODUCT SPECIFICATIONS WARRANTY CERTIFICATIONS U.L. Laminated Shadowtone Choose From Classic

More information

1997 Uniform Administrative Code Amendment for Earthen Material and Straw Bale Structures Tucson/Pima County, Arizona

1997 Uniform Administrative Code Amendment for Earthen Material and Straw Bale Structures Tucson/Pima County, Arizona for Earthen Material and Straw Bale Structures SECTION 70 - GENERAL "APPENDIX CHAPTER 7 - EARTHEN MATERIAL STRUCTURES 70. Purpose. The purpose of this chapter is to establish minimum standards of safety

More information

GYPSUM AREA SEPARATION FIREWALLS GA-620-2011

GYPSUM AREA SEPARATION FIREWALLS GA-620-2011 GYPSUM AREA SEPARATION FIREWALLS GA-620-2011 GA-620-2011 Copyright 2011 Gypsum Association All rights reserved. Printed in U.S.A. Characteristics, properties, or performance of materials or systems herein

More information

Smooth cap sheet - 0-10 SQ $ 139.00. Smooth cap sheet - 11-50 SQ $ 63.00. Smooth cap sheet - 51-100 SQ $ 36.00 Smooth cap sheet - 101-200 SQ $ 36.

Smooth cap sheet - 0-10 SQ $ 139.00. Smooth cap sheet - 11-50 SQ $ 63.00. Smooth cap sheet - 51-100 SQ $ 36.00 Smooth cap sheet - 101-200 SQ $ 36. Demolition/Removal of Work 4-ply built up roofing to the insulation (smooth cap sheet) Smooth cap sheet - 0-10 SQ $ 63.00 Smooth cap sheet - 11-50 SQ $ 63.00 Smooth cap sheet - 51-100 SQ $ 35.00 Smooth

More information

Building Construction. Structural Systems 1. Load-bearing wall construction 2. Skeleton framing 3. Combination of the two

Building Construction. Structural Systems 1. Load-bearing wall construction 2. Skeleton framing 3. Combination of the two Structural Systems 1. Load-bearing wall construction 2. Skeleton framing 3. Combination of the two Factors governing type selection Economics not necessarily the one that requires the least structural

More information

CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011

CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011 CERTIFICATE NAME OF PRODUCT No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011 H-CONTROL REFLEX+ reflective insulating vapour control layer for roof and wall applications MANUFACTURER ACTIS

More information

Holiday Inn Express & Suites Covington (Newton County) 1. Standing-seam metal roofing, custom fabricated.

Holiday Inn Express & Suites Covington (Newton County) 1. Standing-seam metal roofing, custom fabricated. PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Standing-seam metal roofing, custom fabricated. 1.2 SUBMITTALS A. Product Data: For each type of product indicated. B. Shop Drawings: Show installation

More information

What makes DECRA Roofing Systems unique?

What makes DECRA Roofing Systems unique? Commercial Roofing As the pioneer of stone coated steel technology, Roofing Systems have been proven around the world since 1957. Marketed and installed in over 120 countries, there are over 1 million

More information

SECTION 07720 PREFORMED METAL STANDING SEAM ROOFING

SECTION 07720 PREFORMED METAL STANDING SEAM ROOFING SECTION 07720 PREFORMED METAL STANDING SEAM ROOFING PART ONE GENERAL DESCRIPTION This section includes pre-formed standing seam metal roofing and related flashings, closures, trim and accessories including,

More information

LP OSB Sheathing & Structural 1 Sheathing

LP OSB Sheathing & Structural 1 Sheathing Rated OSB Sheathing Roof Panels Span Ratings Max. Live Load Thickness Span Rating for Roofs (lbs)** 3/8" 24/0 30 7/16" 24/16 40 15/32" 32/16 70 1/2" 32/16 70 19/32" 40/20 130 23/32" 48/24 175 1-1/8" 48

More information

Free 12 x 8 Shed Plan With Illustrations, Blueprints & Step By Step Details

Free 12 x 8 Shed Plan With Illustrations, Blueprints & Step By Step Details Free 12 x 8 Shed Plan With Illustrations, Blueprints & Step By Step Details Brought To You By: MyShedPlans Click Here To Download 12,000 Shed Plans >> 12 x 8 Basic Shed This 8 12-ft. shed features a simple

More information

Introduction...COMB-2 Design Considerations and Examples...COMB-3

Introduction...COMB-2 Design Considerations and Examples...COMB-3 SECTION DIRECTORY General Information Introduction...COMB-2 Design Considerations and Examples...COMB-3 Combination Assembly Recommendations and Limitations Composite Configurations...COMB-4 Typical Sealant

More information

ICC-ES Evaluation Report

ICC-ES Evaluation Report ICC-ES Evaluation Report ESR-2369 Reissued May 1, 2010 This report is subject to re-examination in one year. www.icc-es.org (800) 423-6587 (562) 699-0543 A Subsidiary of the International Code Council

More information

BRIDGE & SUPPLY COMPANY. Installation Guide. Ultra 2000. Includes:

BRIDGE & SUPPLY COMPANY. Installation Guide. Ultra 2000. Includes: BRIDGE & SUPPLY COMPANY Installation Guide Ultra 2000 Includes: Ultra 2000 Installation Guide Stock Trim Profiles Ultra 2000 Trim Installation Guide Page 2 Table of Contents Ultra 2000 Profile, Colors

More information

MIAMI-DADE COUNTY PRODUCT CONTROL SECTION DEPARTMENT OF REGULATORY AND ECONOMIC RESOURCES (RER)

MIAMI-DADE COUNTY PRODUCT CONTROL SECTION DEPARTMENT OF REGULATORY AND ECONOMIC RESOURCES (RER) MIAMI-DADE COUNTY PRODUCT CONTROL SECTION DEPARTMENT OF REGULATORY AND ECONOMIC RESOURCES (RER) 11805 SW 26 Street, Room 208 BOARD AND CODE ADMINISTRATION DIVISION Miami, Florida 33175-2474 T (786) 315-2590

More information

Window Installation Instructions

Window Installation Instructions Caution The correct installation methods of windows in full frame or insert applications is critical towards achieving the tested performance of the window and longterm enjoyment and energy savings for

More information

Trusted SECTION: 04 HILTI, INC. TULSA, Conformity! ICC-ES Evaluation. not specifically. Copyright 2015

Trusted SECTION: 04 HILTI, INC. TULSA, Conformity! ICC-ES Evaluation. not specifically. Copyright 2015 0 ICC ES Report ICC ES (800) 42 6587 (562) 699 054 www.icc es.orgg 000 Most Widely Accepted and Trusted ESR 2269 Reissued 02/205 This report is subject to renewal 02/207. DIVISION: 0 00 00 CONCRETE SECTION:

More information

GYPSUM BOARD, GYPSUM PANEL PRODUCTS AND PLASTER

GYPSUM BOARD, GYPSUM PANEL PRODUCTS AND PLASTER CHAPTER 25 GYPSUM BOARD, GYPSUM PANEL PRODUCTS AND PLASTER User note: Code change proposals to this chapter will be considered by the IBC Structural Code Development Committee during the 2016 (Group B)

More information

CITY OF FLORIDA CITY Building and Zoning Department 404 West Palm Drive Florida City, FL 33034 305-247-8222 ROOFING PERMIT APPLICATION

CITY OF FLORIDA CITY Building and Zoning Department 404 West Palm Drive Florida City, FL 33034 305-247-8222 ROOFING PERMIT APPLICATION IF SUBSIDIARY, PROVIDE MASTER PERMIT NUMBER HERE: CITY OF FLORIDA CITY Building and Zoning Department 404 West Palm Drive Florida City, FL 33034 305-247-8222 ROOFING PERMIT APPLICATION Location of Improvements

More information

1. Adhered KEE membrane roofing system. 2. Mechanically fastened KEE membrane roofing system.

1. Adhered KEE membrane roofing system. 2. Mechanically fastened KEE membrane roofing system. SECTION 075416 - PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Adhered KEE membrane roofing system. 2. Mechanically fastened KEE membrane roofing system. 1.2 PERFORMANCE REQUIREMENTS A. Solar Reflectance

More information

H-Stud Area Separation Wall System

H-Stud Area Separation Wall System 12 TH EDITION 09 21 16.33/NGC H-Stud Area Separation Wall System 09 21 16.33 139 H-STUD AREA SEPARATION WALL SYSTEM The fire-protection of gypsum-based Area Separation Walls is demonstrated in dramatic

More information

Ver. 2. Guide to. Inspecting Residential Brick Veneer

Ver. 2. Guide to. Inspecting Residential Brick Veneer Ver. 2 Guide to Inspecting Residential Brick Veneer 1. A guide created by industry professionals. The knowledgeable staff at MASONPRO together with technical support from the Masonry Institute of Michigan

More information

SUPER SHED. Indoor shelter for your outdoor tools.

SUPER SHED. Indoor shelter for your outdoor tools. SUPER SHED Indoor shelter for your outdoor tools. Not everyone needs a garden shed. But, if you've no more space on your garage wall for that new leaf rake, if you can't find your potting trowel because

More information

Chapter 6 ROOF-CEILING SYSTEMS

Chapter 6 ROOF-CEILING SYSTEMS Chapter 6 ROOF-CEILING SYSTEMS Woodframe roof-ceiling systems are the focus of this chapter. Cold-formed steel framing for a roof-ceiling system also is permitted by the IRC but will not be discussed;

More information

ICC-ES Evaluation Report Reissued September, 2010 This report is subject to re-examination in one year.

ICC-ES Evaluation Report Reissued September, 2010 This report is subject to re-examination in one year. ICC-ES Evaluation Report ESR-2270 Reissued September, 2010 This report is subject to re-examination in one year. www.icc-es.org (800) 423-6587 (562) 699-0543 A Subsidiary of the International Code Council

More information