1 FLORIDA BUILDING CODE BCT 1760 CHAPTER 5 FIRE-RESISTANT-RATED CONSTRUCTION MICHAEL KNOTEK 68

2 FIRE-RESISTANT-RATED CONSTRUCTION FIRE WALLS Each portion of a building separated by one or more fire walls shall be considered a separate building. Fire walls dividing buildings into separate buildings shall provide a 4-hour fire resistance rating Fire walls shall have sufficient structural stability under fire conditions to allow collapse of construction on either side without collapse of the wall for the duration of time indicated by the fire resistance rating. TOWNHOUSE FIRE SEPARATION Each townhouse shall be considered a separate building and shall be separated from adjoining townhouses by a party wall of 4-hour rating or by the use of separate exterior walls meeting the requirements of Table 601 and 602 for zero clearance from property lines as required for the type of construction Separate exterior walls fire separation shall include one of the following: A parapet not less than 18 above the roof line Roof sheathing of noncombustible materials or fire retardant treated wood, for not less than 4- foot width on each side of the exterior dividing wall One layer of 5/8 inch Type X gypsum board attached to the underside of roof decking, for not less than a 4 foot width on each side of the exterior dividing wall EXTERIOR WALLS Exterior walls shall be fire-resistance rated accordance with Table 601 and 602 The fire resistance rating of exterior walls with a fire separation distance of greater than 5 shall be rated for exposure to fire from the inside The fire resistance rating of exterior walls with a fire separation distance of 5 or less shall be rated for exposure to fire from both sides ROOF OVERHANGS, CORNICES, ETC. Roof overhangs, cornices, etc., shall be of noncombustible construction for buildings of Type I and II construction. For Types III, IV, and V construction, the projections may be combustible or noncombustible construction. 69

3 PROTECTION OF OPENINGS Wall openings require protection to restrict the spread of smoke and fire within buildings, whether from internal or external fire exposure Except in Group R3 occupancies, such as one and two family dwellings, openings in exterior walls have to be protected. Exceptions: PARAPETS Every exterior wall within 15 ft. of a property line shall be equipped with approved opening protectives. Exterior walls not required by Table 601 to have a fire resistance rating. Show windows fronting on a street or public space Opening parking structures Parapets shall be provided on exterior walls of buildings Exceptions: A parapet need not be provided on an exterior wall where any of the following conditions exist: The wall is not required to be fire-resistance rated in accordance with Table 602 because of fire separation distance The building has an area of not more than 1,000 square feet on any floor Walls that terminate at roofs of not less than 2-hour fire-resistance-rated construction or where the roof, including the deck and supporting construction, is constructed entirely of noncombustible materials VERTICAL SEPARATION OF OPENINGS Flame barriers are required to obstruct the passage of flames from floor to floor where openings are within 5 of each other horizontally and the openings in the lower story are not protected openings. The flame barrier may be either a 30 noncombustible horizontal projection beyond the exterior wall in the plan of the floor, or a vertical flame barrier of 3 ft. measured vertically above the top of the lower opening. Even though the horizontal projection must be noncombustible, regardless of the type of construction, the vertical flame barrier need only be a material consistent with the type of construction of the building. Flame barriers are not required when the building is equipped with an approved automatic sprinkler system. 70

4 FLAME BARRIERS APPROVED TYPES OF FIRE WINDOWS, DOORS AND SHUTTERS Wall openings required to be protected shall be protected by approved listed and labeled fire doors, windows, and shutters and their accompanying hardware, including all frames, closing devices, anchorage and sills, in accordance with the requirements of NFPA 80 Opening protective s is classified base on the fire conditions to which they are expected to be exposed. Fire doors are classified as 3 hour, 1 ½ hour, 1 hour, ¾ hour or 20 minute Automatic or self-closing devices are required for fire rated doors. Doors which connect adjoining guest rooms in hotels or motels are not required to have any closing devices, since the door will be closed when rooms are occupied by separate tenants. FIRE SHUTTERS A shutter is a labeled door assembly that is used for the protection of a window opening in an exterior wall. They are fire doors without glass lights They may be swinging doors, horizontally or vertically sliding doors, or rolling steel doors. Each must be equipped to automatically close At least one-third of the swinging type shutters used on each story facing the street must be distinguishable and readily openable from the outside for ready access by fire fighters. 71

5 VIEW PANELS Table gives, general, non-tested, non-labeled area and dimension limitations for wired glass used in fire rated doors. The glass must be fully embedded in putty, and the joints must be struck and pointed in order to allow expansion and prevent migration of smoke and hot gases through the joint. VIEW PANELS View panels are allowed in walls with a required fire resistance of 1-hour maximum and shall consist of one of the following: ¼ thick labeled wire glass assemblies installed in steel frames. The wired glass shall be limited to 1,296 sq.in. with no dimension greater than 54 Labeled glass block panels installed in steel channels. The glass block shall be limited to 120 sq.ft. with no dimension greater than 12 Other glazing materials which have been tested and labeled to indicate the type of opening to be protected for fire protection purposes In walls separating corridor from tenant spaces, the viewing panels cannot exceed 25% of the wall area. PROTECTION OF PENETRATIONS INTERIOR WALLS Protection of penetrations through fire rated and non fire rated assemblies is required Where sleeves are used, the sleeves shall be securely fastened to the assembly penetrated. All space between the item contained in the sleeve and the sleeve itself and any other space between the sleeve and the assembly penetrated shall be protected. 72

6 PENETRATIONS OF FIRE RATED WALLS Annular space is that space between a penetrating item and the rated assembly The annular space must be filled with an approved material that prevents the passage of flames and hot gases sufficient to ignite cotton waste MEMBRANE PENETRATIONS The separation requirement for electrical boxes on opposite sides of a wall is intended to prevent aligned penetrations on both sides of the wall. The 24 horizontal separation effectively places the boxes in separate wall cavities for wood and steel stud walls. The metal outlet or switch boxes should be securely fastened to the studs, and the opening in the wallboard facing should be cut so that the clearance between the box and the wallboard does not exceed 1/8 73

7 FIRE DAMPERS To maintain the fire resistance of a wall, partition, or shaft, ducts that penetrate such fire rated assemblies must also be effective in resisting the spread of smoke and fire. The damper may be omitted if the duct system is for the exhaust of air to the outside and serves only one floor. However, if the duct penetrates a wall or partition with a fire resistant rating of two hours or more or passes through a shaft enclosure, the damper would be required. SMOKE BARRIERS An approved damper designed to resist the passage of smoke shall be installed at each air transfer opening or duct penetration of a required smoke barrier. Smoke dampers located in ducts that penetrate smoke barriers shall close upon detection of smoke by smoke detectors Required smoke dampers in air transfer openings shall close upon detection of smoke by smoke detectors that are installed in accordance with NFPA 72. FIREBLOCKING The danger of fire spread through continuous vertical and horizontal concealed spaces has been substantiated numerous times. Uncontained by fire blocking and draft stopping, a fire can rapidly spread throughout the concealed spaces within the components of a building, encompassing the entire building in a short time In all construction, whether combustible or noncombustible, fire blocking ids required to separate the vertical from the horizontal concealed spaces. The intersection of such spaces typically occurs at the intersection of walls with floor/ceiling assemblies. COMBUSTIBLES IN CONCEALED SPACES Structural members of Types I, II, and IV construction are required to be noncombustible. The use of combustibles in non-structural applications is limited to prevent fire spread within building elements. The severity of a potential problem increases when combustibles are located within concealed spaces and are inaccessible to manual firefighting. The code regulates the use of combustibles within concealed spaces of noncombustible buildings. 74

8 DRAFTSTOPPING Draft stopping is another measure taken in combustible construction to contain flame spread through horizontal concealed spaces. The materials and their proper installation should prevent the movement of hot air, gases, and flame across the barrier Draft stopping is not required in noncombustible construction, such as open web steel joist construction. Care must be taken during the life of the building to maintain the integrity of draft stopping from penetrations during the installation of cable and other utility systems SHAFT ENCLOSURES SHAFT ENCLOSURES It is important to recognize the terminology for shafts and enclosures Shafts are the floor openings, and Enclosures are the walls that surround such openings. Enclosures are used to protect shafts in multistory buildings so that smoke and hot gases, and eventually the fire, do not enter the shaft and travel from floor to floor. For those shafts housing items that may cause a fire, such as electrical cables and kitchen exhaust ducts, the enclosure acts to contain the fire. SHAFT ENCLOSURE CONSTRUCTION The fire resistance rating of the shaft enclosure walls must be as required by Section or equivalent to the rating of the floor assembly penetrated, whichever is the greatest, but the rating need not exceed 2 hours. EXAMPLE Consider a Group B unsprinklered building of Type I construction with a shaft that penetrates two floors. Section requires a 1-hour shaft enclosure Table 601 requires the floor/ceiling construction to be 3-hour rated Solution: Therefore, a 2-hour shaft enclosure and 1 1/2 hour opening protectives are required. 75

9 ENCLOSURE AT TOP Where shafts terminates below the roof, an enclosure at the top is required to insure protection against the fire spreading to the stories above Where termination is trough a combustible roof, the shaft enclosure wall is extended at least 36 inches above the highest part of the roof to form a parapet to protect the roof from a fire within the shaft ENCLOSURE AT BOTTOM Shafts which do not extend to the bottom of the building or structure shall be enclosed at the lowest level with construction of the same fire resistance as the lowest floor through which the shaft passes, but not less than the rating required for the shaft enclosure, or shall terminate in a room having a use related to the purpose of the shaft. CALCULATED FIRE RESISTANCE This portion of the code contain procedures by which the fire resistance of specific materials or combinations of materials can be established by calculations EXAMPLE GIVEN: The exterior wall assembly in the figure below has a layer of 15/32 wood structural panel bonded with exterior glue covered with a layer of 5/8 gypsum wallboard and attached to studs spaced at 16 o.c. FIND: Does the wall assembly qualify as a 1-hour resistant wall assembly? 76

10 SOLUTION from Tables: 15/32 in wood structural panel bonded with exterior glue - 10 min. 5/8 gypsum board - 30 min. Wood studs 16 o.c min. 60 min. Therefore, the wall does qualify as a 1-hour wall SOLUTION It should be noted that if the wall cavities between the studs had been filled with mineral fiber batts, the 15/32 plywood membrane layer could be eliminated because the insulation will add 15minute of fire resistance. Thus, adding the contribution times for the 5/8 gypsum board, the wood framing, and the insulation (30 minutes + 20 minutes + 15 minutes), the resultant rating for the wall would be 65 minutes and meet a 1-hour fire resistant rating 77

FIRE-RESISTANCE-RATED CONSTRUCTION

FIRE-RESISTANCE-RATED CONSTRUCTION CHAPTER 7 FIRE-RESISTANCE-RATED CONSTRUCTION SECTION 70 GENERAL 70. Scope. The provisions of this chapter shall govern the materials and assemblies used for structural fire resistance and fire-resistance-rated

More information

FIRE AND SMOKE PROTECTION FEATURES

FIRE AND SMOKE PROTECTION FEATURES CHAPTER 7 FIRE AND SMOKE PROTECTION FEATURES SECTION 70 GENERAL 70. Scope. The provisions of this chapter shall govern the materials, systems and assemblies used for structural fire resistance and fire-resistance-rated

More information

FIRE-RESISTANCE-RATED CONSTRUCTION

FIRE-RESISTANCE-RATED CONSTRUCTION CHAPTER 7 FIRE-RESISTANCE-RATED CONSTRUCTION SECTION 70 GENERAL 70. Scope. The provisions of this chapter shall govern the materials and assemblies used for structural fire resistance and fire-resistance-rated

More information

RESIDENTIAL PLUMBING ALTERATIONS PERMIT REQUIREMENTS

RESIDENTIAL PLUMBING ALTERATIONS PERMIT REQUIREMENTS RESIDENTIAL PLUMBING ALTERATIONS PERMIT REQUIREMENTS The following guidelines are intended to assist with the permit acquisition process with regard to Plumbing Alterations. Not all information, or additional

More information

Excerpts from the Canadian National Building Code (NBC)

Excerpts from the Canadian National Building Code (NBC) Excerpts from the Canadian National Building Code (NBC) Reproduced here with Permission of the Copyright Owner, the National Research Council of Canada, Institute for Research in Construction. For more

More information

LIFE SAFETY UPDATE. FULL SPRINKLERING OF ALL NURSING FACILITIES ADDITIONAL CLARIFICATIONS Prepared by Eric Rosenbaum, P.E. Hughes Associates, Inc.

LIFE SAFETY UPDATE. FULL SPRINKLERING OF ALL NURSING FACILITIES ADDITIONAL CLARIFICATIONS Prepared by Eric Rosenbaum, P.E. Hughes Associates, Inc. LIFE SAFETY UPDATE FULL SPRINKLERING OF ALL NURSING FACILITIES ADDITIONAL CLARIFICATIONS Prepared by Eric Rosenbaum, P.E. Hughes Associates, Inc. The purpose of this update is as follows: Remind all state

More information

Building Code Clarifications - 7. Fire Resistance

Building Code Clarifications - 7. Fire Resistance Building Code Clarifications - 7. Fire Resistance 7.1 (15-12-030) Use of combustibles in Type III construction roof assemblies Code Section (15-12-030) Use of Combustibles was revised on May 17, 2000,

More information

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances.

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances. Basement Finishing Guide Community Development Department Building Inspections Division 5200 85 th Avenue North / Brooklyn Park, MN 55443 Phone: (763) 488-6379 / Fax: (763) 493-8171 6/15 www.brooklynpark.org

More information

HCD DSA OSHPD 1 2 1/AC AC SS SS/CC 1 2 3 4 2013 CALIFORNIA BUILDING CODE 199

HCD DSA OSHPD 1 2 1/AC AC SS SS/CC 1 2 3 4 2013 CALIFORNIA BUILDING CODE 199 CALIFORNIA BUILDING CODE MATRIX ADOPTION TABLE CHAPTER 7 FIRE AND SMOKE PROTECTION FEATURES (Matrix Adoption Tables are non-regulatory, intended only as an aid to the user. See Chapter for state agency

More information

FIRE AND SMOKE PROTECTION FEATURES

FIRE AND SMOKE PROTECTION FEATURES CHAPTER 7 FIRE AND SMOKE PROTECTION FEATURES SECTION 70 GENERAL 70. Scope. The provisions of this chapter shall govern the materials, systems and assemblies used for structural fire resistance and fire-resistance-rated

More information

CHAPTER 6 CONSTRUCTION TYPES

CHAPTER 6 CONSTRUCTION TYPES CHAPTER 6 CONSTRUCTION TYPES SECTION 601 GENERAL 601.1 Scope. Provisions of this chapter shall govern the classification of construction type by materials and fire resistance of its elements and the use

More information

A ROAD MAP FOR YOUR CODE, SMOKE BARRIER & SMOKE PARTITION REQUIREMENTS

A ROAD MAP FOR YOUR CODE, SMOKE BARRIER & SMOKE PARTITION REQUIREMENTS A ROAD MAP FOR YOUR CODE, SMOKE BARRIER & SMOKE PARTITION REQUIREMENTS International Code Council National Fire Protection Association Underwriters Laboratories Inc. 5203 Leesburg Pike, Suite 600 1 Batterymarch

More information

Design Options (Tradeoffs) Allowed by the 2012 Building Codes for Properties with Sprinkler Systems. April 2013

Design Options (Tradeoffs) Allowed by the 2012 Building Codes for Properties with Sprinkler Systems. April 2013 Design Options (Tradeoffs) Allowed by the 2012 Building Codes for Properties with Sprinkler Systems April 2013 The National Multi Housing Council and the National Apartment Association (NMHC/NAA) have

More information

- 5 - Table1. Maximum Compartment Volumes

- 5 - Table1. Maximum Compartment Volumes - 5 - Part II - SPECIFIC REQUIREMENTS 5. Compartmentation 5.1 Every building should be divided into compartments by walls and floors to inhibit the spread of fire. 5.2 Compartment walls, compartment floors,

More information

Requirements for Fire Protection of Light Weight Floor Systems **Act 1 Revisited**

Requirements for Fire Protection of Light Weight Floor Systems **Act 1 Revisited** PHRC Webinar Series Tuesday, September 9, 2014 1:00 pm Requirements for Fire Protection of Light Weight Floor Systems **Act 1 Revisited** Presented by: Bryan Heitzmann Credit(s) earned on completion of

More information

Building Codes Update: The 2009 International Fire Code and the Apartment Industry

Building Codes Update: The 2009 International Fire Code and the Apartment Industry ! Building Codes Update: The 2009 International Fire Code and the Apartment Industry Apartment operators and developers should be aware of organizational changes in the 2009 edition of the International

More information

Certification: Building Plans Examiner. Exam ID: B3

Certification: Building Plans Examiner. Exam ID: B3 Certification: Building Plans Examiner Exam ID: B3 Scope: A Building Plans Examiner will be responsible for reviewing submitted plans to determine if they meet the requirements of the various Building

More information

MAJOR 2015 MN RESIDENTIAL CODE CHANGES Effective Date: January 24 th, 2015

MAJOR 2015 MN RESIDENTIAL CODE CHANGES Effective Date: January 24 th, 2015 MAJOR 2015 MN RESIDENTIAL CODE CHANGES Effective Date: January 24 th, 2015 **Disclaimer: This document is to serve as informational purposes only. This is not a code book or a final interpretation of the

More information

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 SECTION R905 REQUIREMENTS FOR ROOF COVERINGS R905.1 Roof covering application. Roof coverings

More information

COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES

COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES These guidelines are to be used for ALL commercial cooking hoods, ventilation systems and related fire suppression

More information

DUCT SYSTEMS CHAPTER 6

DUCT SYSTEMS CHAPTER 6 CHAPTER 6 DUCT SYSTEMS SECTION 601 GENERAL 601.1 Scope. Duct systems used for the movement of air in air-conditioning, heating, ventilating and exhaust systems shall conform to the provisions of this chapter

More information

Building Department John Fiedler Construction Official Ext. 211. SAMPLE GUIDE FOR 1&2 FAMILY DWELLING BASEMENTS Rev 4-3-2014

Building Department John Fiedler Construction Official Ext. 211. SAMPLE GUIDE FOR 1&2 FAMILY DWELLING BASEMENTS Rev 4-3-2014 TOWNSHIP OF HILLSBOROUGH COUNTY OF SOMERSET Hillsborough Township Municipal Complex The Peter J. Biondi Building 379 South Branch Road Hillsborough, NJ 08844 P: (908) 369-4313 F: (908) 369-3954 Building

More information

Tremco Fire Protection Systems Group Technical Bulletin

Tremco Fire Protection Systems Group Technical Bulletin Compartmentalization products and design play a key role in protecting lives and property from fire. Understanding the tools and techniques available for firestopping is of utmost importance to designers,

More information

HOOVER TREATED WOOD PRODUCTS, INC. TECHNICAL NOTE FOR ADDITIONAL INFORMATION: 1-800-TEC-WOOD (832-9663)

HOOVER TREATED WOOD PRODUCTS, INC. TECHNICAL NOTE FOR ADDITIONAL INFORMATION: 1-800-TEC-WOOD (832-9663) HOOVER TREATED WOOD PRODUCTS, INC. TECHNICAL NOTE FOR ADDITIONAL INFORMATION: 1-800-TEC-WOOD (832-9663) Fire-Retardant-Treated Wood Framed Wall Assemblies GENERAL INFORMATION Fire-resistant construction

More information

CHAPTER 6 DUCT SYSTEMS

CHAPTER 6 DUCT SYSTEMS CHAPTER 6 DUCT SYSTEMS SECTION MC 601 GENERAL 601.1 Scope. Duct systems used for the movement of air in air-conditioning, heating, ventilating and exhaust systems shall conform to the provisions of this

More information

Single Family Residential Basement Finish

Single Family Residential Basement Finish How to Use This Guide Building Guide Pottawattamie County Planning & Development Department Building & Safety Division Single Family Residential Basement Finish Provide two (2) sets of plans and complete

More information

MINNESOTA STATE DEPARTMENT OF PUBLIC SAFETY

MINNESOTA STATE DEPARTMENT OF PUBLIC SAFETY MINNESOTA STATE DEPARTMENT OF PUBLIC SAFETY State Fire Marshal Division 444 Cedar Street, Suite 145, St. Paul, Minnesota 55101-5145 Phone: 651/201-7200 FAX: 651/215-0525 TTY: 651/282/6555 Internet: http://www.fire.state.mn.us

More information

Firestopping & Fireblocking:

Firestopping & Fireblocking: Firestopping & Fireblocking: By Vickie J. Lovell A discussion of the definitions of firestopping and fireblocking will help fire protection engineers clarify existing code language and sort out prevailing

More information

Fire Barriers & Fire Stopping

Fire Barriers & Fire Stopping Presented by: Bill Lauzon, PE Lauzon Life Safety Consulting, LLC 262-945-4567 Lauzon.lsc@gmail.com Web: Lauzon-LSC.com Environmental Part 2 Life Safety Code Chapter 8 Fire Barriers & Fire Stopping 1 Fire

More information

Typical Finished Basement Details

Typical Finished Basement Details Fauquier County, Virginia Typical Finished Basement Details Based on the 2012 International Residential Code Finished basements must be constructed in conformance with this document. For requirements,

More information

H-Stud Area Separation Wall System

H-Stud Area Separation Wall System 12 TH EDITION 09 21 16.33/NGC H-Stud Area Separation Wall System 09 21 16.33 139 H-STUD AREA SEPARATION WALL SYSTEM The fire-protection of gypsum-based Area Separation Walls is demonstrated in dramatic

More information

Errata has been identified as follows:

Errata has been identified as follows: 2009 IFC Performing Commercial Fire Inspections Inventory Number: 1424S09 Second Printing; July 2014 Changes HAVE been made- Third Printing: September 2014 Errata has been identified as follows: 1. Page

More information

Envelope INSULATION BATT (2) Avoid Using Batt Insulation With Metal Framing. Pressure or Friction Fit

Envelope INSULATION BATT (2) Avoid Using Batt Insulation With Metal Framing. Pressure or Friction Fit R-H-DI1 INSULATION BATT NR-E-IB1 Avoid Using Batt Insulation With Metal Framing Batt insulation should not be used with metal framing systems. Although it is common to see fiberglass batt insulation installed

More information

How To Make A House Safe

How To Make A House Safe 1 RESIDENTIAL Screen Enclosures Orange County Residential Code Compliance Alternative design method for screen enclosures R301.2.1.1.3 PLAN REVIEW Engineered plans must state that the Alternative Design

More information

Page 4 of 17. Committee Input NFPA 101 Coordinate Smoke detector versus smoke alarm terminology.

Page 4 of 17. Committee Input NFPA 101 Coordinate Smoke detector versus smoke alarm terminology. Page 1 of 17 Page 2 of 17 Committee Input NFPA 101 Coordinate Smoke detector versus smoke alarm terminology. CODE PARAGRAPH WITH SUGGESTED CHANGES: 6.4.6.1.2 Residents should be rated as response probable

More information

CITY OF FAIRFAX CODE ADMINISTRATION 703-385-7830 / FAX 703-385-9265 www.fairfaxva.gov

CITY OF FAIRFAX CODE ADMINISTRATION 703-385-7830 / FAX 703-385-9265 www.fairfaxva.gov CITY OF FAIRFAX CODE ADMINISTRATION 703-385-7830 / FAX 703-385-9265 www.fairfaxva.gov Finishing a basement to make additional living space in a house is a popular construction project for many homeowners.

More information

Additions and Alterations

Additions and Alterations Additions and Alterations Addition and alteration construction is a miscellaneous grouping of home improvement and renovation projects that are generally geared toward the enhancement of an existing principal

More information

Mark Cramer Inspection Services, Inc.

Mark Cramer Inspection Services, Inc. Mark Cramer Inspection Services, Inc. 492 Twentieth Avenue, Indian Rocks Beach, FL 34635-2970 (727) 595-4211 Fax (727) 596-7583 Certified Member #12085 American Society of Home Inspectors Construction

More information

New Ontario Building Code Requirements for Mid-rise Wood Frame Buildings

New Ontario Building Code Requirements for Mid-rise Wood Frame Buildings New Ontario Building Code Requirements for Mid-rise Wood Frame Buildings Note: This information addresses complex issues in a summary fashion. Consideration should be given to the official version of the

More information

General Fire Code Requirements Within Commercial Tenant Spaces

General Fire Code Requirements Within Commercial Tenant Spaces FIRE DEPARTMENT in cooperation with Scope: General Fire Code Requirements Within Commercial Tenant Spaces This handout is designed to assist owners, architects, contractors and others in understanding

More information

Typical Finished Basement Details

Typical Finished Basement Details Fairfax County, Virginia Typical Finished Basement Details Based on the 2012 International Residential Code Finished basements must be constructed in conformance with this document. For requirements, details

More information

Fire Barrier Duct Wrap 15A

Fire Barrier Duct Wrap 15A 3 Fire Barrier Duct Wrap 15A Commerical Kitchen Grease Duct Fire Protection System Product Data and Installation Instructions Compliance 1998 Edition Complies with International Mechanical Code Complies

More information

POST AND FRAME STRUCTURES (Pole Barns)

POST AND FRAME STRUCTURES (Pole Barns) POST AND FRAME STRUCTURES (Pole Barns) Post and frame structures. The following requirements serve as minimum standards for post and frame structures within all of the following structural limitations:

More information

Fire-Retardant-Treated (FRT) Plywood

Fire-Retardant-Treated (FRT) Plywood T e c h n i c a l n o t e Fire-Retardant-Treated (FRT) Plywood Number K320 January 2009 Introduction Codes assure fire safety by controlling such things as size and design of the structure and flame-spread

More information

BUILDING INSPECTORS INSPECTION FORM FOR CHILD CARE CENTERS

BUILDING INSPECTORS INSPECTION FORM FOR CHILD CARE CENTERS DCD-0304 Identification # Rev. 9/08 County Date of Inspection NAME OF OPERATION BUILDING INSPECTORS INSPECTION FORM FOR CHILD CARE CENTERS ADDRESS TELEPHONE: CITY STATE ZIP BUILDING INSPECTORS CERTIFICATE

More information

Florida Building Code 2004 SECTION 1009 STAIRWAYS AND HANDRAILS

Florida Building Code 2004 SECTION 1009 STAIRWAYS AND HANDRAILS Florida Building Code 2004 SECTION 1009 STAIRWAYS AND HANDRAILS 1009.1 Stairway width. The width of stairways shall be determined as specified in Section 1005.1, but such width shall not be less than 44

More information

Wood use in Type I and II (noncombustible) construction

Wood use in Type I and II (noncombustible) construction Wood use in Type I and II (noncombustible) construction D.G. Bueche Hoover Treated Wood Products, Thomson, Georgia, USA ABSTRACT: As with many products, the building code regulates the use of wood in construction.

More information

INSTALLATION GUIDELINES for SOLAR PHOTOVOLTAIC SYSTEMS 1

INSTALLATION GUIDELINES for SOLAR PHOTOVOLTAIC SYSTEMS 1 City of Cotati Building Division 201 W. Sierra Ave. Cotati, CA 94931 707 665-3637 Fax 792-4604 INSTALLATION GUIDELINES for SOLAR PHOTOVOLTAIC SYSTEMS 1 Any PV system on a new structures should be included

More information

Retardants Inc. The Decision You Make May Save A Life! 123 Columbia Court North Suite 201 Chaska, MN 55318

Retardants Inc. The Decision You Make May Save A Life! 123 Columbia Court North Suite 201 Chaska, MN 55318 Fire Barrier Moldable Putty+ Pads 123 Columbia Court North Suite 201 Chaska, MN 55318 952-448-7377 FAX:952-448-2613 e-mail: info@fireretardantsinc.com Visit Our Web Site at www.fireretardantsinc.com Protecting

More information

SUBCHAPTER 5 FIRE PROTECTION CONSTRUCTION REQUIREMENTS

SUBCHAPTER 5 FIRE PROTECTION CONSTRUCTION REQUIREMENTS SUBCHAPTER 5 FIRE PROTECTION CONSTRUCTION REQUIREMENTS TABLE OF CONTENTS [Sub-Art. Or Sec.]* Art. or Sec.** [500.0] Art.1 General [500.1] 318 Scope [500.2] 319 Standards [500.3] 320 Definitions [500.4]

More information

CHILD CARE CENTER INFORMATION SHEET

CHILD CARE CENTER INFORMATION SHEET CHILD CARE CENTER INFORMATION SHEET SECTION 1 INTRODUCTION This fire safety information sheet is based on the 2007 Minnesota State Fire Code (MSFC) and the 2007 Minnesota State Building Code (MSBC). It

More information

Healthcare Engineering. Code Summary Report

Healthcare Engineering. Code Summary Report American Society for Healthcare Engineering Code Summary Report CODE SUMMARY HEALTH CARE NEW BUILDINGS This code summary is based on the following codes: 2000 Edition NFPA 101, The Life Safety Code (LSC),

More information

The replacement or modification of existing windows shall comply with the following requirements:

The replacement or modification of existing windows shall comply with the following requirements: City of La Habra Heights Building Division 1245 N. Hacienda Road La Habra Heights, CA 90631 Office: (562) 694-6302 ext. 228 Fax: (562) 690-5010 WINDOW REPLACEMENT 2010 CALIFORNIA RESIDENTIAL CODE (CRC)

More information

VA25014B0516 VA CINCINNATI PROJECT NO. 539-328 INPATIENT BED TOWER ADDITION (4 TH AND 5 TH FLOORS) SECTION 09 29 00 GYPSUM BOARD

VA25014B0516 VA CINCINNATI PROJECT NO. 539-328 INPATIENT BED TOWER ADDITION (4 TH AND 5 TH FLOORS) SECTION 09 29 00 GYPSUM BOARD SECTION 09 29 00 GYPSUM BOARD PART 1 - GENERAL 1.1 DESCRIPTION This section specifies installation and finishing of gypsum board, vapor retarder and air and moisture barrrier. 1.2 RELATED WORK A. Installation

More information

GENERAL FIRE SAFETY TERMS & DEFINITIONS

GENERAL FIRE SAFETY TERMS & DEFINITIONS UCL Fire Technical Note - TN006 Fire Safety Technical Guide GENERAL FIRE SAFETY TERMS & DEFINITIONS Reference: BS4422-2005 Fire Safety Vocabulary - for further information and definitions BS EN ISO 13943-2000:

More information

How To Build A Basement House

How To Build A Basement House Single Family Basement Finish Purpose of Guide The purpose of this guide is to assist you in the permit process for your project. This handout is intended as a basic plan submittal under the 2009 International

More information

Fiberglas, Exterior Wall Thermal Insulation

Fiberglas, Exterior Wall Thermal Insulation PROJECT ENGINEER RESPONSIBILITY: This is a general specification guide, intended to be used by experienced construction professionals, in conjunction with good construction practice and professional judgment.

More information

Appendix B. 2010 Florida Building Code Building Section 423.25 Public Shelter Design Criteria

Appendix B. 2010 Florida Building Code Building Section 423.25 Public Shelter Design Criteria Appendix B 2010 Florida Building Code Building Section 423.25 Public Shelter Design Criteria 423.25 Public shelter design criteria. 423.25.1 New facilities. New educational facilities for school boards

More information

Office of the State Fire Marshal. Fire Rated Doors

Office of the State Fire Marshal. Fire Rated Doors Office of the State Fire Marshal Fire Rated Doors Fire Rated Doors These doors serve a purpose. They are manufactured in a way that is to help reduce the spread of fire and smoke. Fire rated doors allow

More information

2014 British Columbia Building Code Changes

2014 British Columbia Building Code Changes District of Houston 250-845-2238 2014 British Columbia Building Code Changes A District of Houston interpretation of the 2014 Building Code Changes for 9.36 & 9.32 The following changes reflect the most

More information

Preparation for 2015 Residential Code Changes Discussion with Local Builders and Designers

Preparation for 2015 Residential Code Changes Discussion with Local Builders and Designers City of Duluth Preparation for 2015 Residential Code Changes Discussion with Local Builders and Designers Thank you for taking the time to join us today. We know you are busy and your time is valuable.

More information

city of edmonds development information

city of edmonds development information #B17 city of edmonds development information Commercial Kitchen Hood & Hood Fire Suppression System Permit Submittal Requirements PERMIT REQUIRED: CODES: FEES: A Commercial Kitchen Hood Mechanical Permit

More information

1/9/2013. Terminology Calculating Heat Transfer Code Requirements Design Examples and Sustainability

1/9/2013. Terminology Calculating Heat Transfer Code Requirements Design Examples and Sustainability 1/9/13 By Brett T. Fagan, P.E. Presented by Marie Horan, P.E. Building Diagnostics, Inc. Building Diagnostics Terminology Calculating Heat Transfer Code Requirements Design Examples and Sustainability

More information

MINNESOTA STATE DEPARTMENT OF PUBLIC SAFETY

MINNESOTA STATE DEPARTMENT OF PUBLIC SAFETY MINNESOTA STATE DEPARTMENT OF PUBLIC SAFETY State Fire Marshal Division 444 Cedar Street, Suite 145, St. Paul, Minnesota 55101-5145 Phone: 651/201-7200 FAX: 651/215-0525 TTY: 651/282/6555 Internet: http://www.fire.state.mn.us

More information

ISO Types 1-6: Construction Code Descriptions

ISO Types 1-6: Construction Code Descriptions ISO 1 Frame (combustible walls and/or roof) Class 1B Buildings where the exterior walls are wood or other combustible materials, including construction where the combustible materials are combined with

More information

The Source of Firestop Expertise SM

The Source of Firestop Expertise SM The Source of Firestop Expertise SM Inspector Pocket Guide The following information is intended to provide construction and code enforcement professionals with basic checkpoints to ensure that the required

More information

Gypsum Board Systems Manual

Gypsum Board Systems Manual CertainTeed Gypsum Board Systems Manual Fire Resistance and Sound Control Design Manual Division 09 GYPSUM BOARD SYSTEMS MANUAL TABLE OF CONTENTS Introduction General Fire Resistance...1 Sound Control...3

More information

FSD35, FSD36 AND FSD37 COMBINATION FIRE and SMOKE DAMPERS

FSD35, FSD36 AND FSD37 COMBINATION FIRE and SMOKE DAMPERS 3900 Dr. Greaves Rd. Kansas City, MO 64030 (816) 761-7476 FAX (816) 765-8955 INSTALLATION INSTRUCTIONS FSD35, FSD36 AND FSD37 COMBINATION FIRE and SMOKE DAMPERS 11/2 HOUR UL555 RATED UL555S LEAKAGE RATED

More information

STANDARD OPEN PATIO COVER

STANDARD OPEN PATIO COVER STANDARD OPEN PATIO COVER BUILDING & SAFETY DIVISION 201 E. LA HABRA BLVD. LA HABRA, CA 90631 62-90-9710 Call Before You Dig 1-800-227-2600 PLEASE NOTE: This information Bulletin is made available to assist

More information

CHIMNEYS AND FIREPLACES

CHIMNEYS AND FIREPLACES CHAPTER 10 CHIMNEYS AND FIREPLACES > > Pursuant to ORS 215.730, if a single-family dwelling located on forest-zoned lands has a chimney or chimneys, each chimney shall have a spark arrester. SECTION R1001

More information

800 Communications Circuits

800 Communications Circuits ARTICLE 800 Communications Circuits INTRODUCTION TO ARTICLE 800 COMMUNICATIONS CIRCUITS This article has its roots in telephone technology. Consequently, it addresses telephone and related systems that

More information

Fire Resistance of Brick Masonry

Fire Resistance of Brick Masonry TECHNICAL NOTES on Brick Construction 1850 Centennial Park Drive, Reston, Virginia 20191 www.gobrick.com 703-620-0010 Fire Resistance of Brick Masonry 16 March 2008 Abstract: This Technical Note presents

More information

Development Services City of Lawrence, KS

Development Services City of Lawrence, KS Development Services City of Lawrence, KS Building Planning Table R301.2 (1) Climatic & Geographic Design Criteria Building Planning The design criteria for wind speed increased from 90 MPH to 115 MPH.

More information

Spray Booth Guideline

Spray Booth Guideline Department of Development Service 135 North D Street, Perris CA. 92570 Phone: (951) 443-1029 Fax: (951) 943-3293 PURPOSE The intent of this guideline is to provide the information necessary to ensure that

More information

REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N

REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N PLAN REVIEW FOR: PROJECT NAME: OWNER: ARCH/DESIGNER: ADDRESS: Ph/Fx: Plans Dated: E-mail: Sealed By: Estimated Project Cost - $ REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N

More information

Changes to the NC Residential Code from the 2009 to 2012

Changes to the NC Residential Code from the 2009 to 2012 Changes to the NC Residential Code from the 2009 to 2012 Chapter 1 Scope and Administration R101.2 - Scope The 2012 NCRC scope is the same as 2009 with the exception below that permits Live/Work Units

More information

Vestibule Case Study. Vestibule Requirement Intent [2003 IECC, 2006 IECC, 2003 IBC, 2006 IBC, 90.1-2001, 90.1-2004]

Vestibule Case Study. Vestibule Requirement Intent [2003 IECC, 2006 IECC, 2003 IBC, 2006 IBC, 90.1-2001, 90.1-2004] Vestibule Case Study [2003 IECC, 2006 IECC, 2003 IBC, 2006 IBC, 90.1-2001, 90.1-2004] Vestibule Requirement Intent Page 1 of 14 The primary intent behind the requirement for a vestibule is to reduce infiltration

More information

ELECTRICAL GUIDELINES FOR SINGLE-FAMILY HOME OWNERS:

ELECTRICAL GUIDELINES FOR SINGLE-FAMILY HOME OWNERS: ELECTRICAL GUIDELINES FOR SINGLE-FAMILY HOME OWNERS: Chapter 12 of the Burlington Code of ordinances allows owner occupants of single family homes to do their own wiring if they choose. If you choose to

More information

Health Care Facilities

Health Care Facilities Health Care Facilities CHAPTER 25 Joseph M. Jardin A large Illinois hospital undergoing a sprinkler retrofit quickly discovered the benefits of upgrading its system when sprinklers confined a fire caused

More information

Decree of the Ministry of the Environment on fire safety of ventilation systems

Decree of the Ministry of the Environment on fire safety of ventilation systems THE NATIONAL BUILDING CODE OF FINLAND MINISTRY OF THE ENVIRONMENT Housing and Building Department Decree of the Ministry of the Environment on fire safety of ventilation systems Adopted in Helsinki, 18

More information

Fire 2This Technical Bulletin has been commissioned by the UK SIP Association in

Fire 2This Technical Bulletin has been commissioned by the UK SIP Association in REV 1-12.12.11/TB002 Technical Bulletin Fire 2This Technical Bulletin has been commissioned by the UK SIP Association in conjunction with TRADA Technology and is intended to provide the reader with introductory

More information

BUILDING PERMIT SPECIFICATIONS

BUILDING PERMIT SPECIFICATIONS BUILDING PERMIT SPECIFICATIONS The below noted requirements are based upon La Plata County Building Code. These specifications are not intended as a complete set of requirements, but are intended to provide

More information

GYPSUM AREA SEPARATION FIREWALLS GA-620-2011

GYPSUM AREA SEPARATION FIREWALLS GA-620-2011 GYPSUM AREA SEPARATION FIREWALLS GA-620-2011 GA-620-2011 Copyright 2011 Gypsum Association All rights reserved. Printed in U.S.A. Characteristics, properties, or performance of materials or systems herein

More information

CH. 2 LOADS ON BUILDINGS

CH. 2 LOADS ON BUILDINGS CH. 2 LOADS ON BUILDINGS GRAVITY LOADS Dead loads Vertical loads due to weight of building and any permanent equipment Dead loads of structural elements cannot be readily determined b/c weight depends

More information

HVAC Code Requirements

HVAC Code Requirements one and two family dwellings? Answer: SECTION 2001: GENERAL 2001.1 Air supply. Fuel-burning equipment shall be provided with a supply of air for fuel combustion, draft hood dilution and ventilation of

More information

KITCHEN AND BATH REMODELING BUILDING PERMIT REQUIREMENTS

KITCHEN AND BATH REMODELING BUILDING PERMIT REQUIREMENTS St. Louis County Department of Public Works Division of Code Enforcement KITCHEN AND BATH REMODELING BUILDING PERMIT REQUIREMENTS This guideline is intended to provide the homeowner/contractor with the

More information

Solar Panel Installations

Solar Panel Installations Solar Panel Installations Page 1 of 6 SINGLE-FAMILY RESIDENTIAL CHECKLIST City of Hayward Development Services Department Revised: 7-09-15 PERMIT REQUIREMENTS Permits are required for all solar panel installations.

More information

MINIMUM STANDARDS FOR HIGH-RISE BUILDINGS

MINIMUM STANDARDS FOR HIGH-RISE BUILDINGS CHAPTER 93 MINIMUM STANDARDS FOR HIGH-RISE BUILDINGS Note: Chapter 93 is entirely Seattle amendments to the International Fire Code and is not underlined. Point of Information The requirements of this

More information

FIRE LOSS STATISTICAL CONSIDERATIONS IN RELATING FAILURE AND BUILDING DAMAGE TO THE BUILDING CODE OBJECTIVES

FIRE LOSS STATISTICAL CONSIDERATIONS IN RELATING FAILURE AND BUILDING DAMAGE TO THE BUILDING CODE OBJECTIVES FIRE LOSS STATISTICAL CONSIDERATIONS IN RELATING FAILURE AND BUILDING DAMAGE TO THE BUILDING CODE OBJECTIVES P.L. Senez*, K.D. Calder, Hsing H (Isabella) Li Sereca Fire Consulting Ltd., Canada INTRODUCTION

More information

Final inspections are completed by site visit only. Access to fenced yards shall be planned.

Final inspections are completed by site visit only. Access to fenced yards shall be planned. ROOFING RESIDENTIAL BUILDING INSPECTIONS DEPARTMENT www.ci.blaine.mn.us This handout is intended only as a guide and is based in part on the 2015 Minnesota State Building Code, Blaine City ordinances,

More information

Whitley Manufacturing Co., Inc. 201 W. First Street S. Whitley, IN 46787 Phone (260) 723-5131 Sales Fax (260) 723-6396 whitley@whitleyman.

Whitley Manufacturing Co., Inc. 201 W. First Street S. Whitley, IN 46787 Phone (260) 723-5131 Sales Fax (260) 723-6396 whitley@whitleyman. Building Type Building Code Whitley Classroom Buildings BOCA, UBC, SBCCI, NEC, ADA Structural Support Outrigger construction standard, Whitley model classrooms. Main support beams to be 12 11.8# per lineal

More information

Dennis Fire Department Fire Prevention Mark Dellner Fire Chief

Dennis Fire Department Fire Prevention Mark Dellner Fire Chief Dennis Fire Department Fire Prevention Mark Dellner Fire Chief FIRE SAFETY INSPECTION GUIDELINES FOR COMMERCIAL PROPERTIES (MA Fire Prevention Regulations 527 CMR, MGL Chapter 148) FIRE PREVENTION CHECKLIST-

More information

Area of Rescue Assistance Communication System ADA Code Applicable excerpts:

Area of Rescue Assistance Communication System ADA Code Applicable excerpts: Area of Rescue Assistance Communication System ADA Code Applicable excerpts: CONTENTS (Guidelines and Definitions) Page 1 Area of Rescue Assistance Requirements Page 2 Emergency Communication Equipment

More information

Wood-frame Construction, Fire Resistance and Sound Transmission

Wood-frame Construction, Fire Resistance and Sound Transmission Fire Resistance and Sound Transmission For many years, wood-frame construction has been providing Canadians with high-quality, affordable housing. This goes from town houses to multi-storey apartment buildings,

More information

BASIC FIRE DOOR REQUIREMENTS TECHNICAL DATA SHEET NO. 401

BASIC FIRE DOOR REQUIREMENTS TECHNICAL DATA SHEET NO. 401 BASIC FIRE DOOR REQUIREMENTS SHEET NO. 401 Fire door openings are classified by their locations in the building. The location determines the length of exposure protection required, based on the potential

More information

INTERNATIONAL ASSOCIATION OF CLASSIFICATION SOCIETIES. Interpretations of the FTP

INTERNATIONAL ASSOCIATION OF CLASSIFICATION SOCIETIES. Interpretations of the FTP INTERNATIONAL ASSOCIATION OF CLASSIFICATION SOCIETIES Interpretations of the FTP CONTENTS FTP1 Adhesives used in A or B class divisions (FTP Code 3.1, Res A.754 para. 3.2.3) June 2000 FTP2 Pipe and duct

More information

Chapter 6 ROOF-CEILING SYSTEMS

Chapter 6 ROOF-CEILING SYSTEMS Chapter 6 ROOF-CEILING SYSTEMS Woodframe roof-ceiling systems are the focus of this chapter. Cold-formed steel framing for a roof-ceiling system also is permitted by the IRC but will not be discussed;

More information

FIRESTOPPING & SMOKE SEALS

FIRESTOPPING & SMOKE SEALS SPECIFICATION SECTION 07 84 00 FIRESTOPPING & SMOKE SEALS 1 GENERAL 1.1 SECTION INCLUDES 1.1.1 Comply with Division 1, General Requirements and Documents referred to therein. 1.1.2 It is the intent of

More information

WINDOW AND DOOR REPLACEMENT REQUIREMENTS

WINDOW AND DOOR REPLACEMENT REQUIREMENTS WINDOW AND DOOR REPLACEMENT REQUIREMENTS Should you have any questions after reading the following information, please call the Building Inspection Department at 651-439-4439 to discuss the topics of concern.

More information

2012 CODES SIGNIFICANT CHANGES 2012 IBC

2012 CODES SIGNIFICANT CHANGES 2012 IBC 2012 CODES SIGNIFICANT CHANGES 2012 IBC 1. Section 303.4 added language that includes commercial kitchens which are associated with restaurants, cafeterias, and similar dining facilities to be classified

More information