Guidance on ASX Announcements

Size: px
Start display at page:

Download "Guidance on ASX Announcements"

Transcription

1 Guidance on ASX Announcements Steve Hunt, Chairman JORC JORC 2012 Workshop Sydney 6 th May 2014

2 Disclaimer While this presentation contains slides that are directly drawn from the JORC code (2012), it also contains a number of example Q&A s provided for illustrative and discussion purposes. These example are generic in nature and do not provide a replacement for full and considered evaluation of the specific public reporting requirements using all clauses of JORC ( 2012) and ASX listing rules by both the nominated Competent Person and reporting entity. ICMM International Council on Mining and Metals

3 Resource and Reserves guidelines, V1.0 "Moreover, a prudent owner, before buying shares, ought to go to the mine and carefully examine the nature of the vein, for it is very important that he should be on his guard lest fraudulent sellers of shares should deceive him" "Now a miner, before he begins to mine, must consider seven things, namely: the situation, the conditions, the water, the roads, the climate, the right of ownership and the neighbours" Georgius Agricola, De Re Metallica, 1556

4 Recap JORC 2012 key changes

5 JORC 2012 Code remains Principles based The JORC 2012 code review process confirmed strong support for the JORC Code to remain principles based, though much or the received comment emphasised the need improved disclosure standards and greater balance between the core principles of Transparency, Materiality and Competence in public reporting. Transparent disclosure was reinforced through redrafting of clauses 4, 18, 26 and 34 increased emphasis on Table 1 and specific comment if not why not context CP to confirm the materiality or otherwise of these criteria to the deposit in question.

6 JORC Code - Principles based The principles in Clause 4, 2012 JORC Code are: Enhanced through Table 1 commentary Transparency clear unambiguous presentation Enhanced focus on Competent Person s disclosure obligations Materiality all reasonable information expected JORC Public Reports Competence Based on work by Competent Person

7 Clause 4 Scope includes the principles The following slides contain extracts of key JORC (2012) clauses and guidance New text :- Transparency and Materiality are guiding principles of the Code, and the Competent Person must provide explanatory commentary on the Material assumptions underlying the declaration of Exploration Results, Mineral Resources or Ore Reserves. In particular, they must consider that the benchmark of Materiality is that which an investor or their advisors would reasonably expect to see explicit comment on from the Competent Person. The Competent Person must not remain silent on any issue for which the presence or absence of comment could impact the public perception or value of the mineral occurrence.

8 Clause 5 Scope includes the principles (2) 5. Table 1 criteria provide a useful checklist of criteria to be considered by the Competent Person in developing their documentation and in preparation of the Public Report. In the context of complying with the principles of the Code, comments relating to the items in the relevant sections of Table 1 should be provided on an if not why not basis within the Competent Person s documentation. Additionally comments related to the relevant sections of Table 1 must be complied with on an if not why not basis within public reporting for significant projects ( = material project) when reporting Exploration Results, Mineral Resources or Ore Reserves for the first time. Table 1 also applies in instances where these items have materially changed from when they were last reported. Reporting on an if not why not basis is to ensure that it is clear to the investor whether items have been considered and deemed of low consequence or are as yet not addressed or resolved.

9 Clause 18 Exploration Results ( old clause 17) New text: Clear diagrams and maps designed to represent the geological context must be included in the report. These should include, but not be limited to a plan view of drill hole collar locations and appropriate sectional views. And, As required under clause 4, the Competent Person must not remain silent on any issue for which the presence or absence of comment could impact the public perception or value of the mineral occurrence. For significant projects the reporting of all criterion in Table 1 on an if not, why not basis is particularly important where inadequate or uncertain data affect the reliability of, or confidence in, a statement of Exploration Results; for example, poor sample recovery, poor repeatability of assay or laboratory results etc.

10 Clause 19 Mineral Resources All reports of Mineral Resources must satisfy the requirement that there are reasonable prospects for eventual economic extraction (i.e. more likely than not), regardless of the classification of the resource. Portions of a deposit that do not have reasonable prospects for eventual economic extraction must not be included in a Mineral Resource. The basis for the reasonable prospects assumptions is always a material matter, and must be explicitly disclosed and discussed by the Competent Person(s) within the Public Report Where untested practices are applied in the determination of reasonable prospects then the use of the proposed practices for reporting of the Mineral Resource must be justified by the Competent Person in the Public Report.

11 Clause 19 Mineral Resources (2) Where a Mineral Resource is reported at an average grade or above a cut off grade (or at an equivalent average grade or above an equivalent cut off grade) that is not currently economic, the conditions under which it would be economic must be stated, and the Competent Person must provide justification for including these Mineral Resources at the time of making the Public Report. Geological evidence and knowledge required for the estimation of Mineral Resources must include sampling data of a type, and at spacings, appropriate to the geological, chemical, physical, and mineralogical complexity of the mineral occurrence, for all classifications of Inferred, Indicated and Measured Mineral Resources. A Mineral Resource cannot be estimated in the absence of sampling information. Also In all cases, the considered timeframe.. ( for eventual extraction)..should be disclosed and discussed by the Competent Person

12 Clauses 27, 35 Mineral Resources & Ore Reserves New Table 1 text in both clauses is identical: In a Public Report of a Mineral Resource ( Ore Reserve) for a significant project for the first time, or when those estimates have materially changed from when they were last reported, a brief summary of the information elicited under each of the criteria in Table 1 must be provided or, if a particular criterion is not relevant or material, a disclosure that it is not relevant or material and a brief explanation of why this is the case.

13 Clause 27/ 35 (2) Materiality When Mineral Resources (Ore Reserves ) are first released or when a material change occurs ( including classification changes), there is an increased need for transparent discussion of the basis for the new Mineral Resource estimate in order that investors are appropriately informed of the basis for the changes. As noted in Clause 4 the benchmark of materiality is that which an investor or their advisors would reasonably expect to see explicit comment on from the Competent Person, thus the reporting of all criteria in Table 1 on an if not, why not basis is particularly important. and The Technical summary based against Table 1 criteria should be made available as an appendix to the Public Report. If there is doubt about what should be reported, it is better to err on the side of providing too much information rather than too little. Uncertainties in any of the criteria listed in Table 1 that could lead to under or over statement of Mineral Resources ( Ore Reserves) should be disclosed.

14 Clauses 27/ 35 Comment on unresolved issues 27 Where there are as yet unresolved issues potentially impacting the reliability of, or confidence in, a statement of Mineral Resources; for example, poor sample recovery, poor repeatability of assay or laboratory results, limited information on bulk densities etc. this should be reported also. and 35 Where there are as yet unresolved issues potentially impacting the reliability of, or confidence in, a statement of Ore Reserves; for example, limited geotechnical information, complex orebody metallurgy, uncertainty in the permitting process etc. this should be reported also.

15 New Clause 17 Exploration Targets Old Clause 18 which dealt with companies ability to comment on and discuss its exploration in terms of target size and type. Any such information relating to exploration targets..., has been replaced by a completely redrafted clause 17 Shift of clause order is to make it clear that it is separated from the main stream reporting of Exploration Results and Mineral Resources. The clause now defines the term: An Exploration Target is a statement or estimate of the exploration potential of a mineral deposit in a defined geological setting where the statement or estimate, quoted as a range of tonnes and a range of grade (or quality), relates to mineralisation for which there has been insufficient exploration to estimate a Mineral Resource. The new wording strengthens the requirement to disclose the detail of the supporting basis, work completed, work planned and the caution statement. Precludes use in a Headline statement Requires a formal Competent Person signoff

16 CRIRSCO standard definitions, studies & metal equivalents and in-situ values The CRIRSCO standard definitions, agreed by CRIRSCO and recommended for inclusion in all national reporting codes in order to provide uniformity for external reference, have been included in JORC a Pre-Feasibility Study is now required for the declaration of Ore Reserves as outlined in clause 29: Pre-Feasibility and Feasibility Studies are now defined in line with CRIRSCO definitions, and a Scoping Study is also defined. Clauses on metal equivalents and in-situ values have been extracted from ASX companies updates and inserted as clauses 50 and 51 in JORC. CRIRSCO: Committee for Mineral Reserves International Reporting Standards

17 Common Queries Received Post Transition

18 Table 1 release formats Do I have to use the JORC Table 1 template? Reformatting outside of the basic tabular format is not recommended as this makes it difficult for the investor to determine whether all points have been covered. Under if not why not a response to every listed table 1 criteria is required. Bullet point responses to individual criteria are acceptable; the table 1 is intended as a summary of key criteria, not a full text report Diagrams and tables may be inserted or appended to the table to improve the clarity of the disclosure.

19 What if the data I have isn't directly referred to in the Table 1 criteria Table 1 doesn t have specific criteria for key attributes of my project. How do I address this? The table 1 header includes the following. As always, relevance and Materiality are overriding principles that determine what information should be publicly reported and the Competent Person must provide sufficient comment on all matters that might materially affect a reader s understanding or interpretation of the results or estimates being reported. And It is the responsibility of the Competent Person to consider all the criteria listed below and any additional criteria that should apply to the study of a particular project or operation. The relative importance of the criteria will vary with the particular project and the legal and economic conditions pertaining at the time of determination. So, if it is a material aspect to the project add it in to the relevant section E.g. if the downhole geophysical data collection is a key attribute of your sampling, include special reference and description throughout the Section 1 elements The same would apply to additional responses the Resource Estimation section if the same data types are used in elements of the estimation

20 When should a Table 1 be generated? When should a Table 1 be generated by the competent person? Clause 5. The Table 1 should be generated as part of the competent persons documentation in all cases Generation of the relevant Table 1 sections within the internal Competent Persons reporting documentation format means that they should be available for publication promptly as required. Publication triggers may not always be obvious to the Competent Person, or can move forward quickly as the company situation or external market environment shifts, so being ready is good policy Many sections can be generated significantly ahead of the Resources and Reserves announcements eg description of sampling, drilling etc Continuous disclosure requirements do no negate the requirement to comply with the code

21 Triggers fro Table 1 release Why didn t BlueSky Minerals publish a Table 1 for each of its Resources and Reserves in its 2013 annual report? I am trying to do a company valuation and this information would be very useful for me. Clause 5 : Table 1 is required for new or materially changed Resources and Reserves for significant projects only Materiality triggers for significant projects has or could have a significant influence on market value, and /or has specific prominence in a public report ( appendix 1). Small changes to already stated Resources or Reserves would not require generation of a table 1 Depletion through mining of current Ore Reserves would not qualify as material ( it is an expected outcome) Changes to classifications, project stage, and material grade / tonnage changes would trigger the Table 1 requirement

22 Republishing previously released Table 1 content When reporting results of a follow on program, do you have to reproduce the entire Table 1 in your next announcement or can you just note anything that has changed and put it in the appropriate table 1 format with a note that nothing else has changed? You should republish the full relevant sections of table 1, though any sections without updated inputs would stay as they were previously and can be noted as such in the commentary. The code doesn t support partial publication of a Table 1 section all criteria must be covered with the if not why not commentary In rare circumstances, when prior sections have been recently published under JORC 2012 and remain current, direct referencing may be applicable However, the investor should not have to pull multiple updates the piece together the full picture ( transparency) and as pdf ink is free republication in a single location is recommended to ensure alignment of the disclosures.

23 Maiden Ore Reserves Release If we plan to release a maiden JORC 2012 Ore Reserve based on a JORC 2004 Resource, do we need to provide Table 1 sections 1-4 or just section 4? While the Resource component of the Ore Reserve may not have previously triggered a Table 1 prior to code transition, the release of an Ore Reserve requires a full update of the sections 1-3 criteria as well as section 4 in order that the transparency requirements of JORC 2012 can be met. Companies completing Pre-Feasibilty Studies and progressing toward maiden Ore Reserves releases should be aware of this and be progressing the generation of a full Table 1 release In rare circumstances, when prior sections have been recently published under JORC 2012 and remain current, direct referencing may be applicable However, the investor should not have to pull multiple updates the piece together the full picture ( transparency) and as pdf ink is free republication in a single location is recommended to ensure alignment of the disclosures

24 Ore Reserve updates at Operating mines Does an ore reserve update at an operating mine require a formal Pre- Feasibilty study? A Table 1 release will be required if the update is material but a full PFS may not be in a brownfields environment. Clause 29 of the JORC Code does not require a formal Pre- Feasibility or Feasibility Study, but rather information related to the Modifying Factors must be in studies at Pre-Feasibility or Feasibility level. Where a company has an operating mine for an Ore Reserve, its Life of Mine Plan would generally be expected to contain information at better than Pre-Feasibility or Feasibility level for the whole range of inputs normally required for a Pre-Feasibility or Feasibility study and this would meet the requirement in Clause 29 for the Ore Reserve to continue that classification. Any material change to an Ore Reserve will require generation and disclosure of a Table 1 based upon the LOM plan inputs

25 CP consent for republication In relation to clause 9 which states, This relaxation of the requirement to obtain the Competent Person s prior written consent does not apply to the requirements for annual reporting of Mineral Resources and Ore Reserves contained in Clause 15. Does this mean that a new Competent Persons consent form must be obtained each year for the annual reporting of Mineral Resources and Ore Reserves? Mineral Resources and Ore Reserves must be reported annually ( Clause 15) The annual report consent must be refreshed at his time. This is to ensure rolling over a previous annual report Mineral Resource or Ore Reserve does not occur without going back for CP consent on the basis that the company believes it hasn t changed This gives the CP the right to review on an annual basis. No CP would want their statement from 3 years ago still going out under their original signoff without expressly reviewing the position. Importantly however, if the provisions in clause 9 are misused, the Company, not the CP is held accountable by the ASX. The streamlining disclosure option within clause 9 was generated to reduce the need for new signoffs in the nearer term e.g. publishing Resource tables from press releases or the annual report in subsequent investor slide shows, not for rolling over annual results.

26 JORC ( 2012) extraterritorial BlueSky Minerals is not listed on the ASX but wishes to publish a JORC ( 2012) Resource statement. Can they do this and what are the requirements? The Resources or Reserves should be published complying to all aspects of the JORC ( 2012) code, with special attention to the Competent Person qualification and membership disclosures Table 1 triggers and disclosures requirements Competent Persons must be AusIMM / AIG or current RPO members to sign off on a JORC 2012 statement. AusIMM / AIG and JORC RPO s have extraterritorial reach for ethics complaints if required. Non complying or incomplete statements expose Competent Persons even if the corporate reporting requirements for the company are less rigorous in that listing jurisdiction.

27 Acknowledgements To our JORC colleagues and to the staff of ASX and ASIC for their cooperation in developing the revised JORC (2012) Code and updated ASX Listing Rules.

Guidelines for the Estimation and Reporting of Australian Black Coal Resources and Reserves

Guidelines for the Estimation and Reporting of Australian Black Coal Resources and Reserves Guidelines for the Estimation and Reporting of Australian Black Coal Resources and Reserves 2001 Edition (as referred to in the Joint Ore Reserves Committee Code ( The JORC Code ) 1999 edition) Prepared

More information

CIM DEFINITION STANDARDS - For Mineral Resources and Mineral Reserves

CIM DEFINITION STANDARDS - For Mineral Resources and Mineral Reserves CIM DEFINITION STANDARDS - For Mineral Resources and Mineral Reserves Prepared by the CIM Standing Committee on Reserve Definitions Adopted by CIM Council on November 27, 2010 FOREWORD CIM Council, on

More information

TORONTO STOCK EXCHANGE COMPANY MANUAL APPENDIX B DISCLOSURE STANDARDS FOR COMPANIES ENGAGED IN MINERAL EXPLORATION, DEVELOPMENT & PRODUCTION

TORONTO STOCK EXCHANGE COMPANY MANUAL APPENDIX B DISCLOSURE STANDARDS FOR COMPANIES ENGAGED IN MINERAL EXPLORATION, DEVELOPMENT & PRODUCTION B-1 APPENDIX B DISCLOSURE STANDARDS FOR COMPANIES ENGAGED IN MINERAL EXPLORATION, DEVELOPMENT & PRODUCTION 1.0 INTRODUCTION The disclosure of the results of exploration and development activity on mineral

More information

THE SOUTH AFRICAN CODE FOR THE REPORTING OF EXPLORATION RESULTS, MINERAL RESOURCES AND MINERAL RESERVES (THE SAMREC CODE) 2007 EDITION

THE SOUTH AFRICAN CODE FOR THE REPORTING OF EXPLORATION RESULTS, MINERAL RESOURCES AND MINERAL RESERVES (THE SAMREC CODE) 2007 EDITION THE SOUTH AFRICAN CODE FOR THE REPORTING OF EXPLORATION RESULTS, MINERAL RESOURCES AND MINERAL RESERVES (THE SAMREC CODE) 2007 EDITION Prepared By The South African Mineral Resource Committee (SAMREC)

More information

Chapter 5. Rules and Policies

Chapter 5. Rules and Policies Chapter 5 Rules and Policies 5.1.1 NI 43-101 Standards of Disclosure for Mineral Projects, Form 43-101F1 Technical Report and Related Consequential Amendments NATIONAL INSTRUMENT 43-101 STANDARDS OF DISCLOSURE

More information

2015/01/04. New SAMREC Representative. Ken Lomberg. Group. Pr.Sci.Nat. Senior Principal Consultant. with Coffey. 30 years experience in South Africa

2015/01/04. New SAMREC Representative. Ken Lomberg. Group. Pr.Sci.Nat. Senior Principal Consultant. with Coffey. 30 years experience in South Africa New SAMREC Representative Ken Lomberg Chairman of the SAMREC Working Group Pr.Sci.Nat. Senior Principal Consultant with Coffey 30 years experience in South Africa 1 THE SOUTH AFRICAN CODE FOR THE REPORTING

More information

International approaches to mining projects: Due Diligence, Scoping, Pre-Feasibility, Feasibility Studies

International approaches to mining projects: Due Diligence, Scoping, Pre-Feasibility, Feasibility Studies International approaches to mining projects: Due Diligence, Scoping, Pre-Feasibility, Feasibility Studies Sergei Sabanov, PhD, CEng MIMMM Date:10 December 2013 Location: Almaty, Kazakhstan SRK Consulting

More information

Response from the Department of Treasury, Western Australia, to the Productivity Commission s Draft Report Regulatory Impact Analysis: Benchmarking

Response from the Department of Treasury, Western Australia, to the Productivity Commission s Draft Report Regulatory Impact Analysis: Benchmarking Response from the Department of Treasury, Western Australia, to the Productivity Commission s Draft Report Regulatory Impact Analysis: Benchmarking Context Regulatory Impact Assessment (RIA) began in Western

More information

INTERNATIONAL STANDARD ON ASSURANCE ENGAGEMENTS 3000 ASSURANCE ENGAGEMENTS OTHER THAN AUDITS OR REVIEWS OF HISTORICAL FINANCIAL INFORMATION CONTENTS

INTERNATIONAL STANDARD ON ASSURANCE ENGAGEMENTS 3000 ASSURANCE ENGAGEMENTS OTHER THAN AUDITS OR REVIEWS OF HISTORICAL FINANCIAL INFORMATION CONTENTS INTERNATIONAL STANDARD ON ASSURANCE ENGAGEMENTS 3000 ASSURANCE ENGAGEMENTS OTHER THAN AUDITS OR REVIEWS OF HISTORICAL FINANCIAL INFORMATION (Effective for assurance reports dated on or after January 1,

More information

London STOCK EXCHANGE

London STOCK EXCHANGE London STOCK EXCHANGE 16 March 2006 For the attention of the Nominated Advisers/ Finance Directors/ Company Secretaries, all AIM Companies 10 Paternoster Square London EC4M 7LS Telephone 020 7797 1000

More information

November 20, 2014. The key points included in the November 20, 2014 document are included below where necessary.

November 20, 2014. The key points included in the November 20, 2014 document are included below where necessary. 2015 CIM Guidance on Commodity Pricing used in Resource and Reserve Estimation and Reporting submitted by the Commodity Price Sub-Committee of the CIM Best Practices Committee adopted by CIM Council November

More information

Savannah North Scoping Study Looking into the future 3 February 2016

Savannah North Scoping Study Looking into the future 3 February 2016 Savannah North Scoping Study Looking into the future 3 February 2016 ASX: PAN Disclaimer Cautionary Statements This presentation includes information extracted from Panoramic Resources Limited ASX announcement

More information

NOTE FOR MINING AND OIL & GAS COMPANIES - JU N E 2 0 0 9

NOTE FOR MINING AND OIL & GAS COMPANIES - JU N E 2 0 0 9 NOTE FOR MINING AND OIL & GAS COMPANIES - JU N E 2 0 0 9 A G U I D E T O A I M U K TA X B E N E F I T S 2 AIM Note for Mining, Oil and Gas Companies Contents Introduction 1 Companies to which this Note

More information

INTERNATIONAL FRAMEWORK FOR ASSURANCE ENGAGEMENTS CONTENTS

INTERNATIONAL FRAMEWORK FOR ASSURANCE ENGAGEMENTS CONTENTS INTERNATIONAL FOR ASSURANCE ENGAGEMENTS (Effective for assurance reports issued on or after January 1, 2005) CONTENTS Paragraph Introduction... 1 6 Definition and Objective of an Assurance Engagement...

More information

Investing in an Underground Coal Mine in Indonesia

Investing in an Underground Coal Mine in Indonesia Coal Supplying Key Resources into expanding Asian markets Investing in an Underground Coal Mine in Indonesia Disclaimer Forward Looking Statements This presentation includes certain forward looking Statements.

More information

The dispute is about the sale of a payment protection insurance (PPI) policy in connection with a credit card account with the firm in April 2007.

The dispute is about the sale of a payment protection insurance (PPI) policy in connection with a credit card account with the firm in April 2007. FINAL DECISION complaint by: Mr E complaint about: the firm complaint reference: date of decision: April 2009 This final decision is issued by me, Robert Short, an ombudsman with the Financial Ombudsman

More information

Corporate Governance Statement

Corporate Governance Statement ASX and Media Release 2 October 2015 Black Oak Minerals Limited (ASX: BOK) releases its current as referenced in the Annual Report to Shareholders and Appendix 4G which were released to ASX on 29 September

More information

Positioned for Production: Exploring for Growth

Positioned for Production: Exploring for Growth ASX Code: AYN Positioned for Production: Exploring for Growth Andrew King, Managing Director May 2010 Pg 1 Disclaimer and Key Information Disclaimer This presentation has been prepared by the Directors

More information

ALCYONE REPORTS JORC SILVER RESOURCES

ALCYONE REPORTS JORC SILVER RESOURCES ASX ANNOUNCEMENT & MEDIA RELEASE 29 March 2010 ALCYONE REPORTS JORC SILVER RESOURCES +15Moz RESOURCE INVENTORY UNDERPINS PROGRAM TARGETING RESUMPTION OF SILVER PRODUCTION AT TEXAS PROJECT LATER THIS YEAR

More information

INTERNATIONAL STANDARD ON REVIEW ENGAGEMENTS 2410 REVIEW OF INTERIM FINANCIAL INFORMATION PERFORMED BY THE INDEPENDENT AUDITOR OF THE ENTITY CONTENTS

INTERNATIONAL STANDARD ON REVIEW ENGAGEMENTS 2410 REVIEW OF INTERIM FINANCIAL INFORMATION PERFORMED BY THE INDEPENDENT AUDITOR OF THE ENTITY CONTENTS INTERNATIONAL STANDARD ON ENGAGEMENTS 2410 OF INTERIM FINANCIAL INFORMATION PERFORMED BY THE INDEPENDENT AUDITOR OF THE ENTITY (Effective for reviews of interim financial information for periods beginning

More information

INTERNATIONAL STANDARD ON AUDITING 540 AUDITING ACCOUNTING ESTIMATES, INCLUDING FAIR VALUE ACCOUNTING ESTIMATES, AND RELATED DISCLOSURES CONTENTS

INTERNATIONAL STANDARD ON AUDITING 540 AUDITING ACCOUNTING ESTIMATES, INCLUDING FAIR VALUE ACCOUNTING ESTIMATES, AND RELATED DISCLOSURES CONTENTS INTERNATIONAL STANDARD ON AUDITING 540 AUDITING ACCOUNTING ESTIMATES, INCLUDING FAIR VALUE ACCOUNTING ESTIMATES, AND RELATED DISCLOSURES (Effective for audits of financial statements for periods beginning

More information

Funds from the placement will be used for working capital requirements, including the completion of the Productora Pre-feasibility Study (PFS).

Funds from the placement will be used for working capital requirements, including the completion of the Productora Pre-feasibility Study (PFS). ASX ANNOUNCEMENT Monday 1 st February 2016 Hot Chili to Raise A$1.6m via Placement to Strategic Shareholders Hot Chili Limited (ASX Code: HCH) is pleased to announce that it has received commitments from

More information

Appendix 15 CORPORATE GOVERNANCE CODE AND CORPORATE GOVERNANCE REPORT

Appendix 15 CORPORATE GOVERNANCE CODE AND CORPORATE GOVERNANCE REPORT Appendix 15 CORPORATE GOVERNANCE CODE AND CORPORATE GOVERNANCE REPORT The Code This Code sets out the principles of good corporate governance, and two levels of recommendations: code provisions; and recommended

More information

For personal use only. MRV Metals Launch February 2016

For personal use only. MRV Metals Launch February 2016 MRV Metals Launch February 2016 Important Information This document has been prepared by Moreton Resources Limited ( Moreton or Company ) for the purpose of providing a company and technical overview to

More information

Clear, transparent reporting The new auditor s report

Clear, transparent reporting The new auditor s report Clear, transparent reporting The new auditor s report 2015 Clear transparent reporting 1 Clear, transparent reporting Introduction Business has over the last few years become more complex, and financial

More information

Exploration. Exploration methods

Exploration. Exploration methods Exploration Activities related to establishing a mineral deposit through geological, geophysical and geochemical methods. It is preceded by Prospecting and followed by Planning & Development. Geological

More information

For personal use only

For personal use only DECEMBER 2011 Issued 31 January 2012 HIGHLIGHTS INDIAN IRON ORE MINING PROJECT Significant on-site work completed and installation of phase one processing infrastructure underway at Kurnool iron beneficiation

More information

Technical Due Diligence what do we look out for?

Technical Due Diligence what do we look out for? Technical Due Diligence what do we look out for? AusIMM M&A Masterclass May 2014 Mark Noppe General Manager and Principal Consultant XstractGroup.com Xstract - Excellence from the Outset GEOLOGY ENVIRONMENT

More information

For personal use only

For personal use only Korab Resources Limited Gold Operations Update November 2012 Andrej K. Karpinski Executive Chairman Korab Projects BOBRIKOVO MELROSE 1 Korab Gold Projects Other Korab Projects Robust Undervalued Gold Portfolio

More information

Appendix 25. Content of a Competent Person s Report for Petroleum Reserves and Resources

Appendix 25. Content of a Competent Person s Report for Petroleum Reserves and Resources Appendix 25 Content of a Competent Person s Report for Petroleum Reserves and Resources (See rule 18.20) The Competent Person s Report for Petroleum Reserves and Resources must include the following: 1.

More information

Resources Rising Stars

Resources Rising Stars ASX Code: AYN Resources Rising Stars Andrew King, Managing Director September 2010 Pg 1 Disclaimer and Key Information Disclaimer This presentation has been prepared by the Directors of Alcyone Resources

More information

How the Ministry of Education managed the 2008 national school bus transport tender process. Report to the Ministry of Education October 2009

How the Ministry of Education managed the 2008 national school bus transport tender process. Report to the Ministry of Education October 2009 How the Ministry of Education managed the 2008 national school bus transport tender process Report to the Ministry of Education October 2009 Contents 1: Introduction... 3 What is school transport?... 3

More information

Audit issues when financial market conditions are difficult and credit facilities may be restricted

Audit issues when financial market conditions are difficult and credit facilities may be restricted Bulletin 2008/01 Audit issues when financial market conditions are difficult and credit facilities may be restricted THE AUDITING PRACTICES BOARD The Auditing Practices Board Limited, which is part of

More information

Queensland Mining Corporation L I M I T E D. Maiden JORC Resources Estimate for Horseshoe Copper Deposit, Duck Creek, South Cloncurry District

Queensland Mining Corporation L I M I T E D. Maiden JORC Resources Estimate for Horseshoe Copper Deposit, Duck Creek, South Cloncurry District ASX Release 12 October 2012 Maiden JORC Resources Estimate for Horseshoe Copper Deposit, Duck Creek, South Cloncurry District Total mineral resource at Duck Creek Project area of 960,000t @ 1.47% Cu (0.2%

More information

Final Draft Guidance on Audit Committees

Final Draft Guidance on Audit Committees Guidance Corporate Governance April 2016 Final Draft Guidance on Audit Committees The FRC is responsible for promoting high quality corporate governance and reporting to foster investment. We set the UK

More information

Exposure Draft: Improving the Structure of the Code of Ethics for Professional Accountants Phase 1

Exposure Draft: Improving the Structure of the Code of Ethics for Professional Accountants Phase 1 Ken Siong IESBA Technical Director IFAC 6 th Floor 529 Fifth Avenue New York 10017 USA 22 April 2016 Dear Mr Siong Exposure Draft: Improving the Structure of the Code of Ethics for Professional Accountants

More information

For personal use only

For personal use only ASX Release 27 September 2012 OPTION TO ACQUIRE 560,000oz PEAK HILL GOLD PROJECT RESOURCE AND INVESTMENT NL (ASX: RNI) (RNI or the Company) has reached agreement with Montezuma Mining Company Limited for

More information

BACANORA MINERALS ANNOUNCES SONORA LITHIUM PROJECT UPDATE, FILING OF PRE-FEASIBILITY STUDY AND AMENDED MINERAL RESOURCE ESTIMATE

BACANORA MINERALS ANNOUNCES SONORA LITHIUM PROJECT UPDATE, FILING OF PRE-FEASIBILITY STUDY AND AMENDED MINERAL RESOURCE ESTIMATE TSX-V/AIM Symbol: BCN April 15, 2016 NEWS RELEASE BACANORA MINERALS ANNOUNCES SONORA LITHIUM PROJECT UPDATE, FILING OF PRE-FEASIBILITY STUDY AND AMENDED MINERAL RESOURCE ESTIMATE BACANORA MINERALS LTD.

More information

Reports on Audited Financial Statements

Reports on Audited Financial Statements Reports on Audited Financial Statements 2149 AU Section 508 * Reports on Audited Financial Statements (Supersedes sections 505, 509, 542, 545, and 546.) Source: SAS No. 58; SAS No. 64; SAS No. 79; SAS

More information

ANNUAL GENERAL MEETING. Investor Presentation 24 November 2015

ANNUAL GENERAL MEETING. Investor Presentation 24 November 2015 ANNUAL GENERAL MEETING Investor Presentation 24 November 2015 Corporate Structure ASX Code: OVR Shares on Issue 205.4 million Top 20 133.0 million (64.8%) Market Capitalisation $1.23 million (share price

More information

WRITING A CRITICAL ARTICLE REVIEW

WRITING A CRITICAL ARTICLE REVIEW WRITING A CRITICAL ARTICLE REVIEW A critical article review briefly describes the content of an article and, more importantly, provides an in-depth analysis and evaluation of its ideas and purpose. The

More information

FINANCIAL REPORTING COUNCIL GOING CONCERN AND LIQUIDITY RISK: GUIDANCE FOR DIRECTORS OF UK COMPANIES 2009

FINANCIAL REPORTING COUNCIL GOING CONCERN AND LIQUIDITY RISK: GUIDANCE FOR DIRECTORS OF UK COMPANIES 2009 FINANCIAL REPORTING COUNCIL GOING CONCERN AND LIQUIDITY RISK: GUIDANCE FOR DIRECTORS OF UK COMPANIES 2009 THE PRINCIPLES ASSESSING GOING CONCERN 1 Directors should make and document a rigorous assessment

More information

DECEMBER 2015 QUARTERLY REPORT HIGHLIGHTS

DECEMBER 2015 QUARTERLY REPORT HIGHLIGHTS 29 th January 2016 DECEMBER 2015 QUARTERLY REPORT HIGHLIGHTS Minerals Development Licence (MDL) formal application lodged with all requested associated technical documentation, awaiting Departmental approval

More information

NEWS RELEASE LEXAM ANNOUNCES POSITIVE PRELIMINARY ECONOMIC ASSESSMENT RESULTS FOR THE OPEN PIT PROJECTS IN TIMMINS

NEWS RELEASE LEXAM ANNOUNCES POSITIVE PRELIMINARY ECONOMIC ASSESSMENT RESULTS FOR THE OPEN PIT PROJECTS IN TIMMINS NEWS RELEASE LEXAM ANNOUNCES POSITIVE PRELIMINARY ECONOMIC ASSESSMENT RESULTS FOR THE OPEN PIT PROJECTS IN TIMMINS Project Generates 32% IRR and C$33 Million NPV After-Tax; Cash Costs of US$865 per Ounce

More information

The significant milestones achieved by New Age Exploration Limited ( NAE or the Company ) during this period include:

The significant milestones achieved by New Age Exploration Limited ( NAE or the Company ) during this period include: Quarterly Report To 31 December 2015 New Age Exploration Limited ( NAE or "the Company") is pleased to provide shareholders the Company s Quarterly Report for the period ending 31 December 2015. Highlights

More information

RE: IESBA s Exposure Draft Responding to Non-Compliance with Laws and Regulations

RE: IESBA s Exposure Draft Responding to Non-Compliance with Laws and Regulations 8 September 2015 Mr. Ken Siong Technical Director International Ethics Standards Board for Accountants (IESBA) International Federation of Accountants (IFAC) 545 Fifth Avenue, 14 th Floor New York, New

More information

Richland Resources Limited ("Richland" or "the Company") (AIM: RLD) Resource Upgrade

Richland Resources Limited (Richland or the Company) (AIM: RLD) Resource Upgrade 1 of 5 7/02/2012 8:14 AM Regulatory Story Go to market news section Company TIDM Headline Released Number Richland Resources Ltd RLD Resource Upgrade 07:00 06-Feb-2012 8004W07 RNS Number : 8004W Richland

More information

Risk management systems of responsible entities

Risk management systems of responsible entities Attachment to CP 263: Draft regulatory guide REGULATORY GUIDE 000 Risk management systems of responsible entities July 2016 About this guide This guide is for Australian financial services (AFS) licensees

More information

RISK MANAGEMENT POLICY

RISK MANAGEMENT POLICY RISK MANAGEMENT POLICY 1. INTRODUCTION 1.1 This Policy sets out Marindi Metals Ltd ( Marindi or the Company ) system of risk oversight, management of material business risks and internal control. 1.2 Marindi

More information

For personal use only

For personal use only Investor Presentation August 2012 Disclaimer/Competent Person s Disclaimer: This presentation has been prepared by Buxton Resources ( Buxton ). The information contained in this presentation is a professional

More information

Appendix A Use of Supporting Studies in Process for NI 43-101 Documentation

Appendix A Use of Supporting Studies in Process for NI 43-101 Documentation Appendix A Use of Supporting Studies in Process for NI 43-101 Documentation Foreword Appendix A serves as support documentation within the Best Practice Guidelines for Mineral Processing (BPGMP). It supplements

More information

INTERNATIONAL STANDARD ON ASSURANCE ENGAGEMENTS (ISAE) 3402 ASSURANCE REPORTS ON CONTROLS AT A SERVICE ORGANIZATION

INTERNATIONAL STANDARD ON ASSURANCE ENGAGEMENTS (ISAE) 3402 ASSURANCE REPORTS ON CONTROLS AT A SERVICE ORGANIZATION INTERNATIONAL STANDARD ON ASSURANCE ENGAGEMENTS (ISAE) 3402 ASSURANCE REPORTS ON CONTROLS AT A SERVICE ORGANIZATION (Effective for service auditors assurance reports covering periods ending on or after

More information

GEOLOGICAL REINTERPETATION LEADS TO MAJOR DRILL PROGRAM AT JUPITER

GEOLOGICAL REINTERPETATION LEADS TO MAJOR DRILL PROGRAM AT JUPITER GEOLOGICAL REINTERPETATION LEADS TO MAJOR DRILL PROGRAM AT JUPITER Dacian Gold Ltd ( Dacian or the Company ) (ASX:DCN) is pleased to announce that it has completed a major geological review and reinterpretation

More information

The University of Adelaide Business School

The University of Adelaide Business School The University of Adelaide Business School MBA Projects Introduction There are TWO types of project which may be undertaken by an individual student OR a team of up to 5 students. This outline presents

More information

Interim Financial Report for the half-year ended 31 December 2011

Interim Financial Report for the half-year ended 31 December 2011 Interim Financial Report for the half-year ended 31 December 2011 Note: The information contained herein should be read in conjunction with the most recent annual report. Aura Energy Limited Level 4, 66

More information

IAASB. AUDIT Considerations in Respect o f Going Concern STAFF AUDIT PRACTICE ALERT JANUARY 2009. Key Messages within This Alert

IAASB. AUDIT Considerations in Respect o f Going Concern STAFF AUDIT PRACTICE ALERT JANUARY 2009. Key Messages within This Alert IAASB JANUARY 2009 STAFF AUDIT PRACTICE ALERT International Auditing and Assurance Standards Board The IAASB is an independent standard-setting board of the International Federation of Accountants. AUDIT

More information

Evaluating teaching. 6.1 What is teacher evaluation and why is it important?

Evaluating teaching. 6.1 What is teacher evaluation and why is it important? 6 Evaluating Just as assessment that supports is critical for student, teacher evaluation that focuses on providing accurate evidence of practice and supports improvement is central for teachers. Having

More information

Corporate Governance in D/S NORDEN

Corporate Governance in D/S NORDEN Corporate Governance in D/S NORDEN Contents: 1. The role of the shareholders and their interaction with the management of the company... 2 2. The role of the stakeholders and their importance to the company...

More information

ENVIRONMENTAL IMPACT ASSESSMENT (EIA) AND THE DECISION ON ENVIRONMENTAL CONDITIONS IN RELATION TO THE INVESTMENT CONSTRUCTION PROCESS

ENVIRONMENTAL IMPACT ASSESSMENT (EIA) AND THE DECISION ON ENVIRONMENTAL CONDITIONS IN RELATION TO THE INVESTMENT CONSTRUCTION PROCESS ENVIRONMENTAL IMPACT ASSESSMENT (EIA) AND THE DECISION ON ENVIRONMENTAL CONDITIONS IN RELATION TO THE INVESTMENT CONSTRUCTION PROCESS FKA Furtek Komosa Aleksandrowicz sp.k. for Polska Agencja Informacji

More information

Structured Products. Designing a modern portfolio

Structured Products. Designing a modern portfolio ab Structured Products Designing a modern portfolio Achieving your personal goals is the driving motivation for how and why you invest. Whether your goal is to grow and preserve wealth, save for your children

More information

To be used in conjunction with the Invitation to Tender for Consultancy template.

To be used in conjunction with the Invitation to Tender for Consultancy template. GUIDANCE NOTE Tendering for, choosing and managing a consultant Using this guidance This information is not intended to be prescriptive, but for guidance only. Appointing consultants for relatively small

More information

Barkly Phosphate Project Tenement Granted

Barkly Phosphate Project Tenement Granted MANTLE MINING ASX: MNM DIRECTORS Mr Martin Blakeman Non-Executive Chairman Mr Ian Kraemer Managing Director Mr Peter Anderton Non-Executive Director Mr Stephen de Belle Non-Executive Director ASX Release

More information

Effective complaint handling

Effective complaint handling This guide sets out key information for state sector agencies about developing and operating an effective complaints process. It also provides information about the Ombudsman s role, as an independent,

More information

The Auditor s Consideration of an Entity s Ability to Continue as a Going Concern *

The Auditor s Consideration of an Entity s Ability to Continue as a Going Concern * An Entity s Ability to Continue as a Going Concern 2047 AU Section 341 The Auditor s Consideration of an Entity s Ability to Continue as a Going Concern * Source: SAS No. 59. See section 9341 for interpretations

More information

Update on Heap Leach potential of the Murchison gold project

Update on Heap Leach potential of the Murchison gold project 3 July 2012 Australian-based Kentor Gold Limited (ASX: KGL) is entering the ranks of operating gold mining companies in 2012. The Company is progressing a pipeline of advanced projects in Australia and

More information

Mis- Selling of life Insurance products and its impact on recessionary trends of the Industry

Mis- Selling of life Insurance products and its impact on recessionary trends of the Industry Mis- Selling of life Insurance products and its impact on recessionary trends of the Industry Mr. Parshuram Mishra Asst. Prof in Finance, Srusti Academy of Management, Bhubaneswar, E-Mail parshuram@srustiacademy.org,

More information

U & D COAL LIMITED A.C.N. 165 894 806 BOARD CHARTER

U & D COAL LIMITED A.C.N. 165 894 806 BOARD CHARTER U & D COAL LIMITED A.C.N. 165 894 806 BOARD CHARTER As at 31 March 2014 BOARD CHARTER Contents 1. Role of the Board... 4 2. Responsibilities of the Board... 4 2.1 Board responsibilities... 4 2.2 Executive

More information

Appendix 14 CORPORATE GOVERNANCE CODE AND CORPORATE GOVERNANCE REPORT

Appendix 14 CORPORATE GOVERNANCE CODE AND CORPORATE GOVERNANCE REPORT Appendix 14 CORPORATE GOVERNANCE CODE AND CORPORATE GOVERNANCE REPORT The Code This Code sets out the principles of good corporate governance, and two levels of recommendations: code provisions; and recommended

More information

Establishing the feasibility of your proposed mining venture

Establishing the feasibility of your proposed mining venture RUPPRECHT, S. Establishing the feasibility of your proposed mining venture. International Platinum Conference Platinum Adding Value, The South African Institute of Mining and Metallurgy, 2004. Establishing

More information

It is a Criminal Offence to buy or sell the shares of any publicly listed company if you have inside information about that company.

It is a Criminal Offence to buy or sell the shares of any publicly listed company if you have inside information about that company. Policy: Air New Zealand Securities Trading & Disclosure Department/division: Legal/Governance Version Number: 1.4 Last Updated: June 2016 Introduction Trading in shares involves areas of legal compliance

More information

Dragon Mining A Growing Nordic Gold Producer. RMG Helsinki Mining Summit October 2012

Dragon Mining A Growing Nordic Gold Producer. RMG Helsinki Mining Summit October 2012 Dragon Mining A Growing Nordic Gold Producer RMG Helsinki Mining Summit October 2012 Disclaimer The purpose of this presentation is to provide general information about Dragon Mining Limited (the "Company").

More information

basic corporate documents, in particular the company s articles of association; The principle is applied.

basic corporate documents, in particular the company s articles of association; The principle is applied. Warszawa, 2016-04-29 13:14:53 Grupa Żywiec Spółka Akcyjna A statement on the company's compliance with the corporate governance recommendations and principles contained in Best Practice for GPW Listed

More information

Office of the National Coordinator for Health IT Proposed Rule Public Comment Template

Office of the National Coordinator for Health IT Proposed Rule Public Comment Template Office of the National Coordinator for Health IT Proposed Rule Public Comment Template ONC Health IT Certification Program: Enhanced Oversight and Accountability Preface This document is meant to provide

More information

ISA 620, Using the Work of an Auditor s Expert. Proposed ISA 500 (Redrafted), Considering the Relevance and Reliability of Audit Evidence

ISA 620, Using the Work of an Auditor s Expert. Proposed ISA 500 (Redrafted), Considering the Relevance and Reliability of Audit Evidence International Auditing and Assurance Standards Board Exposure Draft October 2007 Comments are requested by February 15, 2008 Proposed Revised and Redrafted International Standard on Auditing ISA 620, Using

More information

Internal Model Approval Process (IMAP) Contents of Application (CoA) Template. August 2011 Version 1.0

Internal Model Approval Process (IMAP) Contents of Application (CoA) Template. August 2011 Version 1.0 Internal Model Approval Process (IMAP) Contents of Application (CoA) Template August 2011 Version 1.0 C O N T A C T D E T A I L S Physical Address: Riverwalk Office Park, Block B 41 Matroosberg Road (Corner

More information

ABI resource pack for financial promotions. November 2005

ABI resource pack for financial promotions. November 2005 ABI resource pack for financial promotions November 2005 1 What is a resource pack and why has the ABI produced one? Our aim with the material contained in the pack is not to replace FSA requirements or

More information

ANNUAL GENERAL MEETING 2015. 30 November 2015

ANNUAL GENERAL MEETING 2015. 30 November 2015 ANNUAL GENERAL MEETING 2015 30 November 2015 Disclaimer Competent Person Statement This presentation may contain some references to forecasts, estimates, assumptions and other forward-looking statements.

More information

Actuarial Standard of Practice No. 23. Data Quality. Revised Edition

Actuarial Standard of Practice No. 23. Data Quality. Revised Edition Actuarial Standard of Practice No. 23 Data Quality Revised Edition Developed by the General Committee of the Actuarial Standards Board and Applies to All Practice Areas Adopted by the Actuarial Standards

More information

Pathway to Production

Pathway to Production Charging forward with Lithium Pathway to Production 8th Lithium Supply & Markets Conference 24 26 May 2016 Las Vegas Disclaimer This presentation has been prepared by Altura Mining Limited ( Altura or

More information

De Grey Mining Ltd. Wingina Deeps Drilling Commenced (Turner River Project) Highlights. Turner River Unlocking Shareholder Value

De Grey Mining Ltd. Wingina Deeps Drilling Commenced (Turner River Project) Highlights. Turner River Unlocking Shareholder Value De Grey Mining Ltd ASX RELEASE 5 July 2016 ASX Code DEG ABN 65 094 206 292 Wingina Deeps Drilling Commenced (Turner River Project) Highlights Diamond drilling programme of approximately 1,500m has COMPANY

More information

BEPS ACTIONS 8-10. Revised Guidance on Profit Splits

BEPS ACTIONS 8-10. Revised Guidance on Profit Splits BEPS ACTIONS 8-10 Revised Guidance on Profit Splits DISCUSSION DRAFT ON THE REVISED GUIDANCE ON PROFIT SPLITS 4 July 2016 Public comments are invited on this discussion draft which deals with the clarification

More information

Barkerville Gold Mines Investor presentation q1 2016. The last great Canadian gold mining camp controlled by a junior mining company.

Barkerville Gold Mines Investor presentation q1 2016. The last great Canadian gold mining camp controlled by a junior mining company. Barkerville Gold Mines Investor presentation q1 2016 The last great Canadian gold mining camp controlled by a junior mining company. 1 Forward Looking statement This presentation and the material contained

More information

CHALICE GOLD MINES AND SUB SAHARA RESOURCES ANNOUNCE PROPOSED MERGER TO CONSOLIDATE AND FUND ERITREAN GOLD PROJECT

CHALICE GOLD MINES AND SUB SAHARA RESOURCES ANNOUNCE PROPOSED MERGER TO CONSOLIDATE AND FUND ERITREAN GOLD PROJECT 3 APRIL 2009 CHALICE GOLD MINES AND SUB SAHARA RESOURCES ANNOUNCE PROPOSED MERGER TO CONSOLIDATE AND FUND ERITREAN GOLD PROJECT Key Points Chalice Gold Mines and Sub Sahara Resources agree to merge by

More information

Best Practices in Charity Annual Reporting

Best Practices in Charity Annual Reporting Best Practices in Charity Annual Reporting L ess ons f rom t he Volu nt ar y S e c tor Re p or ti ng Aw ards 2012 EDITION CA-Queen s Centre for Governance Smith School of Business Goodes Hall, Room 226

More information

For Immediate Release Date: February 3, 2016 #01-2016. Orvana Announces New Mineral Resources at El Valle Mine, Villar Zone and at La Brueva

For Immediate Release Date: February 3, 2016 #01-2016. Orvana Announces New Mineral Resources at El Valle Mine, Villar Zone and at La Brueva For Immediate Release TSX:ORV Date: February 3, 2016 #01-2016 Orvana Announces New Mineral Resources at El Valle Mine, Villar Zone and at La Brueva New Villar Zone discovered within 50m of existing reserves

More information

QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 30 SEPTEMBER 2015

QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 30 SEPTEMBER 2015 ASX RELEASE ASX:AWV 30 October 2015 QUARTERLY ACTIVITIES REPORT FOR PERIOD ENDED 30 SEPTEMBER 2015 HIGHLIGHTS Pit optimisation and final mine design completed Metallurgical test work completed Engineering

More information

Tax policy making: a new approach

Tax policy making: a new approach Tax policy making: a new approach June 2010 Tax policy making: a new approach June 2010 Official versions of this document are printed on 100% recycled paper. When you have finished with it please recycle

More information

These guidelines can help you in taking the first step and adopt a sustainability policy as well as plan your further sustainability communication.

These guidelines can help you in taking the first step and adopt a sustainability policy as well as plan your further sustainability communication. SUSTAINABILITY POLICY AND COMMUNICATION GUIDELINES Why communicate about sustainability? IFU encourages all our investments to be transparent and informative about business and sustainability performance

More information

Acquisition of Rice Lake. December 2015

Acquisition of Rice Lake. December 2015 Acquisition of Rice Lake December 2015 CAUTIONARY NOTES Qualified Person Brian Morris, is the non-independent Klondex Mines "qualified person" as defined by National Instrument 43-101 Standards of Disclosure

More information

STANDARDS AND GUIDELINES FOR VALUATION OF MINERAL PROPERTIES

STANDARDS AND GUIDELINES FOR VALUATION OF MINERAL PROPERTIES STANDARDS AND GUIDELINES FOR VALUATION OF MINERAL PROPERTIES SPECIAL COMMITTEE OF THE CANADIAN INSTITUTE OF MINING, METALLURGY AND PETROLEUM ON VALUATION OF MINERAL PROPERTIES (CIMVAL) FEBRUARY 2003 (FINAL

More information

Architects Regulation 2012 NSW Architects Code of Professional Conduct

Architects Regulation 2012 NSW Architects Code of Professional Conduct L2, 156 Gloucester Street Sydney NSW 2000 T. +61 2 9241 4033 / F. +61 2 9241 6144 mail@architects.nsw.gov.au / www.architects.nsw.gov.au ABN 63-092-097-847 NSW Code of Professional (Clause 13) Introductory

More information

INTERNATIONAL STANDARD ON AUDITING 620 USING THE WORK OF AN AUDITOR S EXPERT CONTENTS

INTERNATIONAL STANDARD ON AUDITING 620 USING THE WORK OF AN AUDITOR S EXPERT CONTENTS INTERNATIONAL STANDARD ON AUDITING 620 USING THE WORK OF AN AUDITOR S EXPERT (Effective for audits of financial statements for periods beginning on or after December 15, 2009) CONTENTS Paragraph Introduction

More information

Comments regarding Consultation Paper 209: Resignation, removal and replacement of auditors: Update to RG 26

Comments regarding Consultation Paper 209: Resignation, removal and replacement of auditors: Update to RG 26 Ernst & Young 8 Exhibition Street Melbourne VIC 3000 Australia GPO Box 67 Melbourne VIC 3001 Tel: +61 3 9288 8000 Fax: +61 3 8650 7777 ey.com/au Mr Doug Niven Senior Executive Leader Financial Reporting

More information

POLICY ON TRADING IN CCA S SHARES

POLICY ON TRADING IN CCA S SHARES POLICY ON TRADING IN CCA S SHARES Background The Board has adopted the following Policy in relation to the buying, selling and dealing (trading) of Coca-Cola Amatil Limited (CCA) shares. The Policy arises

More information

How To Compare The Requirements Of Five Stock Exchanges

How To Compare The Requirements Of Five Stock Exchanges Mineral Companies A comparison of the requirements of five stock exchanges FINANCIAL INSTITUTIONS ENERGY INFRASTRUCTURE, MINING AND COMMODITIES TRANSPORT TECHNOLOGY AND INNOVATION PHARMACEUTICALS AND LIFE

More information

Attachment - UK Fair and Effective Markets Review

Attachment - UK Fair and Effective Markets Review Attachment - UK Fair and Effective Markets Review What does Fair and Effective mean for FICC markets? Question Q1: The Review would welcome respondents views on the definition of fair and effective FICC

More information

Consolidated Financial Statements

Consolidated Financial Statements IFAC Board Exposure Draft October 2013 Comments due: February 28, 2014 Proposed International Public Sector Accounting Standard Consolidated Financial Statements This Exposure Draft 49, Consolidated Financial

More information

ICAEW TECHNICAL RELEASE GUIDANCE ON FINANCIAL POSITION AND PROSPECTS PROCEDURES

ICAEW TECHNICAL RELEASE GUIDANCE ON FINANCIAL POSITION AND PROSPECTS PROCEDURES TECHNICAL RELEASE ICAEW TECHNICAL RELEASE TECH 01/13CFF GUIDANCE ON FINANCIAL POSITION AND PROSPECTS PROCEDURES ABOUT ICAEW ICAEW is a professional membership organisation, supporting over 140,000 chartered

More information

ESRC Research Data Policy

ESRC Research Data Policy ESRC Research Data Policy Introduction... 2 Definitions... 2 ESRC Research Data Policy Principles... 3 Principle 1... 3 Principle 2... 3 Principle 3... 3 Principle 4... 3 Principle 5... 3 Principle 6...

More information

Proposed Consequential and Conforming Amendments to Other ISAs

Proposed Consequential and Conforming Amendments to Other ISAs IFAC Board Exposure Draft November 2012 Comments due: March 14, 2013, 2013 International Standard on Auditing (ISA) 720 (Revised) The Auditor s Responsibilities Relating to Other Information in Documents

More information