Specialty Applications. for Keystone Walls

Save this PDF as:
 WORD  PNG  TXT  JPG

Size: px
Start display at page:

Download "Specialty Applications. for Keystone Walls"

Transcription

1 for Walls SHEET INDEX Title Sheet Sheet 1 Soil Nail Facing Sheet 2 Rock/Shotcrete Facing Sheet 3 Manta Ray Anchor Wall Sheet 4 H-Pile Wall Facing Sheet 5 Sheet Pile Wall Facing Sheet 6 Railing per Site Plans 7.5' 6.5' Top of concrete wall Concrete Wall Stairway Sheet 7 Thickness varies at steps and landings Bond Breaker/Exp Jt Compac Units " Coping Exp Jt 6" Thick Concrete Slab Select Backfill #6 Pipe Anchors Drill & Epoxy into wall Existing Concrete Wall SG200 Wrap Pipe and Return Interlocking Gravity Wall Sheet 8 Geofoam Wall Construction Sheet 9 Foundation Obstruction Sheet 10 Slip Joint Installation Sheet 11 In-situ Slip Joint Sheet 12 Cap Unit 8 1± 2' Typ. 5 Stiff Firm Soil Soil Failure Plane Leveling Pad Leveling pad at elevations and stations per layout plans Title Sheet 1

2 #4 Rebar Drainage Net Flowable Concrete Fill Shotcrete Soil Anchors 5' c/c Compac Unit Flowable Concrete Fill #4 Rebar #10 bar-extended Threads #10 Grade 60 Anchor (2) - Nuts to Secure Plate 6" x 6" x 1/2" Steel Plate 1/2" Expansion Joint Material (50' c/c Maximum) Typical Plan View Typical Anchorage Detail 2' ± Top of Wall Steps Cap Unit 1' Nominal (6" min) See Anchorage Detail Draingage Net (design by others) Horizontal #4 2.5' c/c (at anchor locations) Soil Anchors 5' c/c Vertical #4 2.5' c/c Flowable Concrete Fill f'c = 500 psi - 2' Lifts 1± Temporary Shotcrete & Mesh Facing Support System with Drainage. (design by others) 8 5' Typ. - 2' Vertical c/c Extend to Shotcrete Between rebar Soil Nail/Anchor System (design by others) #57 Stone Wrapped in Geotextile Typical Wall Elevation Footing Steps Leveling Pad at Elevations and Stations per Layout Plans Typical Soil Nail/Anchor Section 6" Perforated PVC Collector Pipe to Underdrain System Soil Nail Facing 2

3 #5 Rebar Rock 1/2" Exp Joint in 18' c/c - Stop rebar Rock Anchors 6' c/c 4" x 4" x 1/4" Steel Plate with (2) - Nuts to Secure Plate Standard Unit with Tail Cutoff Protect Exposed Anchor from Corrosion. (galvanize, cold tar epoxy, grouted sleeve) Rock Bolt or Rock Anchor (length and spacing determined by design engineer) Standard Unit with Tail Cutoff Standard Units Typical Plan View Standard Unit (4) - #5 Rebar Typical Concrete Beam Detail Concrete Beam (min 2" into unit above and below, f'c psi) 1.75'± 6" Top of Wall Steps Cap Unit Soil Limits of Concrete Beam Standard Units See Concrete Beam Detail Standard Unit with Tail Cutoff Rock Bolt Patttern (4' x 6' staggered) 1± 4' c/c (Max) Rock 32 Joint in Concrete Beam Rock Anchor System (design by others) Footing Steps Leveling Pad at Elevations and Stations per Layout Plans 6" Perforated PVC Collector Pipe Typical Wall Elevation Typical Rock Facing Section Rock/Shotcrete Facing 3

4 (LTDS >1200 plf) Stiff Firm Soil Manta Ray Anchors 6' c/c Galvanized Pipe Loop Connector Compac Unit, Sch 40 Galvanized Pipe Loop Connector 3/4" Galv. CTB Rod Manta Ray Anchor Typical Connector Detail Typical Plan View 2' Typ. Top of Wall Steps Cap Unit 5 Stiff Firm Soil Galvanized Pipe, Loop Connector and Manta Ray Anchors (staggered installation) 8 1± Soil Failure Plane Threaded Pipe Coupling Footing Steps Leveling Pad at Elevations and Stations per Layout Plans Typical Wall Elevation Typical Manta Ray Anchor Section Manta Ray Anchor Facing 4

5 Welded Pipe Loops Steel H Piles Timber Lagging 6' to 8' c/c Compac Unit (LTDS >1200 plf) Welded Pipe Loop - #6 Rebar or 1/4" x 1.5" Bar Stock Typical Plan View Steel H Piling Timber Lagging as Req'd Typical Connector Detail 2' ± Top of Wall Steps Cap Unit 1'± nominal See Connector Detail Steel H Piling Driven or Augered 32 1± Timber Lagging as Req'd & Welded Pipe Loop 2.67' c/c (Max) Leveling pad at elevations and stations per layout plans 4" Perforated PVC Collector Pipe Typical Wall Elevation Typical Pile & Lagging Wall Section Soldier Pile Facing 5

6 Welded Pipe Loops Sheet Piling 6' to 8' c/c Compac Unit Welded Pipe Loop #6 Rebar or 1/4" x 1.5" Bar Stock Steel Sheet Piling Typical Plan View Typical Connector Detail 2' ± Top of Wall Steps Cap Unit 1'± nominal See Connector Detail 32 1± Steel Sheet Piling PZ22/PZ27 Typical (design by others) & Welded Pipe Loop 2.67' c/c (Max) Leveling Pad at Elevations and Stations per Layout Plans 4" Perforated PVC Collector Pipe Typical Wall Elevation Typical Sheet Piling Wall Section Sheet Pile Facing 6

7 Existing Concrete Wall Hilti HVA Epoxy Adhesive System (1" hole for #6 rebar) #6 Pipe Anchors 6' c/c 7.5' Top of Wall 8.2' Bottom of Wall for 1:32 Batter (use threaded couplers) 5"-6" #6 Rebar Pipe Anchors Bend as shown. Install per epoxy manufacturer. Coat with cold tar epoxy after installation. 6 5/8" 5"-6" Plan View - Front Face Pipe Anchor Detail 11" = 8.25' 7' 11" = 8.25' 7' 11" = 8.25' 7' Top of existing concrete wall Railing per Site Plans 7.5' 6.5' Top of concrete wall 7 1/2" = 6.25' 7 1/2" = 6.25' Key Pipe Anchors/Pipe Stratagrid SG200 Cut Blocks Thickness varies at steps and landings Bond Breaker/Exp Jt Compac Units 1 32 Exp Jt 2" Coping 6" Thick Concrete Slab Select Backfill #6 Pipe Anchors Drill & Epoxy into wall Existing Concrete Wall 7 1/2" = 6.25' Wrap Pipe and Return Depth to Concrete Wall 7.5'± 46'± 7.5' To Pipe Anchoring System Leveling Pad Elevation - Front Face Typical Section - Second Landing Stairway Facing/ Concrete Wall 7

8 Back Units with no Pins Stiff Firm Soil Front Units with Pins Standard Units Typical Plan View Typical Detail PL 5' ± Top of Wall Steps Standard Units Cap Unit Low Permeable Soil 8 1 Limits of excavation Interlocked Standard Units 1'± Standard Units 1" setback Footing Steps Standard Units 1" setback - Interlocked Leveling Pad Interlock units where required on elevation Typical Wall Elevation Typical Interlocked Wall Section Interlocking Standard Units 8

9 Reinforced Wall Section Wing Wall Standard Unit Typical Wall Plan Barrier Parapet Top of Wall Top of Sidewalk Profile Cap Unit Compac Unit Roadway Wing Wall Standard Unit Gravel Borrow 12" Concrete Slab 1/2"φ pins Geofoam Geofoam Geofoam Bottom of Wall Footing Step Bottom of Geofoam Geofoam Blocks (32" x 4' x 8' Typ.) Base Leveling Pad Elevation - Front Face Typical Section /Geofoam Wall 9

10 C L Pier Foundation 6' Wide Galv Nut & Washers 3/4" Galv CTB Bar - 7' Long 5' Dia 4" Galv Pipe - 6' long 1 1 Wall Pier 4' Typ 5' Lap - Wrap pipe and return to wall Design Level 4" Galv Pipe Concrete Pier 3/4" Galv CTB TieRod Concrete Pier Wall Pier Wall Pier Foundation Obstruction 10

11 11" min Space Even Course Three Unit Compac Assembly Grouted with #4 bar Odd Course Plan View Cut in Half 12" Layers Typical Trim to Fit 18" Compac Unit Cut Compac Unit Front Elevation Slip Joint Installation 11

12 12" cut into existing wall Even Course Three Unit Assembly - Grouted with #3 bars Odd Course Plan View Installation 1. Cut out wall in 3-4 unit segments. 2. Drive anchor into backfill and lock. 3. Install three unit slip joint segment. 4. Repeat as required. 8" Cut Off 11" 9.5" 1" Hole for threadbar MR-88 Manta Ray Drive Anchor and 6' Threadbar 12" 2" Recess for Nut and Washer 18" Three Cut Units One Cut Unit with Hole 3 Unit Assembly Anchored 3 Unit Assembly In-Situ Slip Joint 12

The minimum reinforcement for the stem wall is the placement of:

The minimum reinforcement for the stem wall is the placement of: PolySteel creates an ideal insulated stem wall for concrete slabs that can make this part of your project easier and faster, in addition to making your finished project more energy-efficient. Figures 3.20

More information

Chapter 3 Pre-Installation, Foundations and Piers

Chapter 3 Pre-Installation, Foundations and Piers Chapter 3 Pre-Installation, Foundations and Piers 3-1 Pre-Installation Establishes the minimum requirements for the siting, design, materials, access, and installation of manufactured dwellings, accessory

More information

PTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE

PTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE FORM A PTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE The following suggested specifications are written as a guide to assist the specifier in writing his own specifications. Specific circumstances

More information

Designed and Engineered to Perform

Designed and Engineered to Perform History EARTH CONTACT PRODUCTS, L.L.C., is a family owned company, based in Olathe, Kansas. This company was built upon Don May s U.S. Patented fourth-generation Steel Piering System that has led to the

More information

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel

More information

RESIDENTIAL FOUNDATION GUIDELINE Johnson County, KS

RESIDENTIAL FOUNDATION GUIDELINE Johnson County, KS RESIDENTIAL FOUNDATION GUIDELINE Johnson County, KS Johnson County Building Officials Association January 2008 Residential Foundation Guideline Foundation designs for one-and two-family dwellings may use

More information

Residential Deck Safety, Construction, and Repair

Residential Deck Safety, Construction, and Repair Juneau Permit Center, 4 th Floor Marine View Center, (907)586-0770 This handout is designed to help you build your deck to comply with the 2006 International Residential Building code as modified by the

More information

SECTION 02630 STORM DRAINAGE SYSTEM

SECTION 02630 STORM DRAINAGE SYSTEM SECTION 02630 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for storm drainage systems including modifications and connections to existing storm drainage systems. 1.02 REFERENCE

More information

SECTION 1 GENERAL REQUIREMENTS

SECTION 1 GENERAL REQUIREMENTS Page 1 of 6 SECTION 1 GENERAL REQUIREMENTS 1. SCOPE OF WORK: The work to be performed under the provisions of these documents and the contract based thereon includes furnishing all labor, equipment, materials,

More information

METHOD OF STATEMENT FOR STATIC LOADING TEST

METHOD OF STATEMENT FOR STATIC LOADING TEST Compression Test, METHOD OF STATEMENT FOR STATIC LOADING TEST Tension Test and Lateral Test According to the American Standards ASTM D1143 07, ASTM D3689 07, ASTM D3966 07 and Euro Codes EC7 Table of Contents

More information

June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL

June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL 7.0 7.1 GENERAL For the purpose of this manual, culverts are defined as structures that are completely surrounded by soil and located below the surface of the roadway parallel to the general direction

More information

Superform Products Ltd.

Superform Products Ltd. TYPICAL CORNER REINFORCING NOTE : SEE ENGINEERED REBAR SCHEDULES SUPPLIED BY THE MANUFACTURER STEEL REINFORCEMENT WALL CORNER 90 Copyright 2012 Sept. 2012 5.1.1 Rebar Spacing 6" 12" Max. Load LB./FT. 2000

More information

LEGACY REPORT ER-5110. www.icc-es.org. ICC Evaluation Service, Inc. Reissued November 1, 2003. Legacy report on the 1997 Uniform Building Code

LEGACY REPORT ER-5110. www.icc-es.org. ICC Evaluation Service, Inc. Reissued November 1, 2003. Legacy report on the 1997 Uniform Building Code LEGACY REPORT Reissued November 1, 2003 ICC Evaluation Service, Inc. www.icc-es.org Business/Regional Office # 5360 Workman Mill Road, Whittier, California 90601 # (562) 699-0543 Regional Office # 900

More information

The unit costs are based on the trend line of the 3 low bids for the average quantity.

The unit costs are based on the trend line of the 3 low bids for the average quantity. Page 1 of 8 COST ESTIMATE GENERAL INSTRUCTIONS The unit costs are based on the trend line of the 3 low bids for the average quantity. Apply the Unit Costs to ordinary structures. Unit Costs should generally

More information

Embedded Parts Introduction - Anchors

Embedded Parts Introduction - Anchors In the plant construction or process plants such as chemical, petrochemical, gas or power plants various disciplines are brought into contact and built on each other. Civil, mechanical, electro technical

More information

TYPES OF PIERS USED IN NORTH AND EAST TEXAS RESIDENTIAL FOUNDATION REPAIR

TYPES OF PIERS USED IN NORTH AND EAST TEXAS RESIDENTIAL FOUNDATION REPAIR TYPES OF PIERS USED IN NORTH AND EAST TEXAS RESIDENTIAL FOUNDATION REPAIR If you listen to the hype, it sounds like there must be 20 or 30 different types of piers out there. Company A says they have an

More information

How to secure your property after a disaster

How to secure your property after a disaster How to secure your property after a disaster The Red Guide to Recovery HOuse secured properly Board-Up of Windows, Doors and Roof Hole. Lot secured with Perimeter Fencing. Fires, floods, tornadoes, hurricanes,

More information

Section 2100-Trenching and Tunneling

Section 2100-Trenching and Tunneling SECTION 5200 - STORM SEWER PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of storm sewer mains and culverts. Topics include permits and fees, trench widths, pipe laying, bedding, initial

More information

Lighthouse Engineering, L.L.C.

Lighthouse Engineering, L.L.C. Registered Engineering Firm (F: 9334) Phone: 214-577-1077 Fax: 214-224-0549 Website: www.lighthouseeng.com Email: Office@LighthouseEng.com Thursday, September 04, 2014 TO: Our Client RE: Initial Engineering

More information

STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.

STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL. STRUCTURES 1. General. Critical structures may impact the integrity of a flood control project in several manners such as the excavation for construction of the structure, the type of foundation, backfill

More information

Chapter 36 - STRAW BALE CONSTRUCTION SECTION 3601 - PURPOSE. SECTION 3602 - SCOPE. SECTION 3603 - DEFINITIONS.

Chapter 36 - STRAW BALE CONSTRUCTION SECTION 3601 - PURPOSE. SECTION 3602 - SCOPE. SECTION 3603 - DEFINITIONS. Austin City Code - Volume II TITLE 25 LAND DEVELOPMENT\CHAPTER 25-12 TECHNICAL CODES\ARTICLE 1: UNIFORM BUILDING CODE\25-12-3 LOCAL AMENDMENTS TO THE BUILDING CODE Chapter 36 - STRAW BALE CONSTRUCTION

More information

NEW HAMPSHIRE DEPARTMENT OF TRANSPORTATION BUREAU OF BRIDGE DESIGN BRIDGE DETAILS - REVISION HISTORY

NEW HAMPSHIRE DEPARTMENT OF TRANSPORTATION BUREAU OF BRIDGE DESIGN BRIDGE DETAILS - REVISION HISTORY 1 of 10 10/1/2015 Revised note #3 to: Joint (behind backwall, brush Expansion joint opening shall be adjusted to curb) temperature anticipated just prior to pouring deck blockout. Final setting in the

More information

Guidelines for Earthquake Bracing of Residential Water Heaters

Guidelines for Earthquake Bracing of Residential Water Heaters Guidelines for Earthquake Bracing of Residential Water Heaters Department of General Services Division of the State Architect 1102 Q Street, Suite 5100 Sacramento, CA 95814 Phone: (916) 324-7099 Fax: (916)

More information

ATLAS RESISTANCE Pier Foundation Systems

ATLAS RESISTANCE Pier Foundation Systems ATLAS RESISTANCE Pier Foundation Systems Foundation Repair Systems for Civil Construction Applications: Residential, Commercial, Industrial Atlas Resistance Piers have been used to restore and/or stabilize

More information

Residential Foundations and Basements

Residential Foundations and Basements Residential Foundations and Basements Disclaimer All of the following information is based on the 2006 International Residential Code with Kentucky Amendments. As some information is paraphrased, article

More information

City of Tucson and Pima County Arizona Building Code Appendix Chapter 72 Straw-Bale Structures

City of Tucson and Pima County Arizona Building Code Appendix Chapter 72 Straw-Bale Structures City of Tucson and Pima County Arizona Building Code Appendix Chapter 72 Straw-Bale Structures SECTION 7201 - PURPOSE The purpose of this appendix chapter is to establish minimum prescriptive standards

More information

SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors.

SUBDRAINS AND FOOTING DRAIN COLLECTORS. A. Construct subdrains, subdrain cleanouts and outlets, and footing drain collectors. SUBDRAINS AND FOOTING DRAIN COLLECTORS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Subdrains B. Subdrain Cleanouts and Outlets C. Footing Drain Collectors D. Storm Sewer Service and Connections 1.02 DESCRIPTION

More information

Specifications for Residential Property Owners Connection to New Public Sewer

Specifications for Residential Property Owners Connection to New Public Sewer Specifications for Residential Property Owners Connection to New Public Sewer Spalding Tract property owners are required to connect to the community sewer system when construction is complete and the

More information

Wisconsin Building Products Evaluation

Wisconsin Building Products Evaluation Safety & Buildings Division 201 West Washington Avenue P.O. Box 2658 Madison, WI 53701-2658 Evaluation # 200813-O Wisconsin Building Products Evaluation Material Best Management Standards for Foundation

More information

Section 02702 SEWER PIPE INSTALLATION AND TESTING

Section 02702 SEWER PIPE INSTALLATION AND TESTING PART 1 - GENERAL Section 02702 SEWER PIPE INSTALLATION AND TESTING 1-1. SCOPE. This section covers the installation and testing of all sewer pipe furnished under the following specification sections: Concrete

More information

MANUFACTURED HOME INSTALLATION FOR PERMANENT FOUNDATIONS (TRANSVERSE FLOORS) (SUPPLEMENT TO MANUFACTURED HOME INSTALLATION MANUAL)

MANUFACTURED HOME INSTALLATION FOR PERMANENT FOUNDATIONS (TRANSVERSE FLOORS) (SUPPLEMENT TO MANUFACTURED HOME INSTALLATION MANUAL) MANUFACTURED HOME INSTALLATION FOR PERMANENT FOUNDATIONS (TRANSVERSE FLOORS) (SUPPLEMENT TO MANUFACTURED HOME INSTALLATION MANUAL) NOTE: THIS MANUAL IS INTENDED TO INSTRUCT AND TO ASSIST ALREADY QUALIFIED

More information

High Capacity Helical Piles Limited Access Projects

High Capacity Helical Piles Limited Access Projects High Capacity Helical Piles Limited Access Projects Tel 403 228-1767 Canada, USA, Russia Brendan ODonoghue 519 830-6113 Presentation Summary 1. Helical piles Background on large diameter shafts and helices

More information

Detailing of Reinforcment in Concrete Structures

Detailing of Reinforcment in Concrete Structures Chapter 8 Detailing of Reinforcment in Concrete Structures 8.1 Scope Provisions of Sec. 8.1 and 8.2 of Chapter 8 shall apply for detailing of reinforcement in reinforced concrete members, in general. For

More information

Safe & Sound Bridge Terminology

Safe & Sound Bridge Terminology Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries

More information

Designed and Engineered to Perform

Designed and Engineered to Perform History EARTH CONTACT PRODUCTS, L.L.C., is a family owned company, based in Olathe, Kansas. This company was built upon Don May s U.S. Patented fourth-generation Steel Piering System that has led to the

More information

INSTALLATION GUIDE. americanwick.com 800.242.WICK (9425)

INSTALLATION GUIDE. americanwick.com 800.242.WICK (9425) INSTALLATION GUIDE americanwick.com 800.242.WICK (9425) American Wick Drain SITEDRAIN prefabricated drainage products may be installed in a variety of civil construction applications including: retaining

More information

Chapter 3 FOUNDATIONS AND FOUNDATION WALLS

Chapter 3 FOUNDATIONS AND FOUNDATION WALLS Chapter 3 FOUNDATIONS AND FOUNDATION WALLS This chapter discusses foundations and foundation walls constructed using the two most common foundation materials concrete and masonry. Although the IRC permits

More information

Uncovered Decks & Porches

Uncovered Decks & Porches Uncovered Decks & Porches Building Guides for Homeowners Why Do I need a Permit? D I D Y O U K N O W? As owner-builder you are the responsible party of record on such a permit. If your work is being performed

More information

3M Mobile SkyWalk Series Horizontal Lifeline Product Return Form

3M Mobile SkyWalk Series Horizontal Lifeline Product Return Form 3M Mobile SkyWalk Series Horizontal Lifeline Product Return Form THIS FULLY COMPLETED DOCUMENT MUST BE INCLUDED WITH EACH RETURN SHIPMENT IN ORDER FOR CREDIT TO BE ISSUED. ALL CREDITS WILL BE ISSUED TO

More information

Foundations 65 5 FOUNDATIONS. by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. Seismic Retrofit Training

Foundations 65 5 FOUNDATIONS. by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. Seismic Retrofit Training Foundations 65 5 FOUNDATIONS by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. 66 Foundations Foundations 67 FOUNDATIONS Let's assume that the retrofit has been done correctly from the roofline

More information

Acceptance Codes APPENDIX - A. Acceptance Criteria

Acceptance Codes APPENDIX - A. Acceptance Criteria 1111 Receipt of a satisfactory Test Report from WSDOT Materials Laboratory is required indicating the lot (or lots) or batch of material meets the requirement of the specifications under which it is listed.

More information

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation 644-10-569 Page 1 of 9 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING

More information

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS July 14, 2015 1.0 GENERAL BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS This work shall consist of furnishing all materials, equipment, labor, and incidentals necessary for conducting bi-directional

More information

SECTION 03300 CAST-IN-PLACE CONCRETE

SECTION 03300 CAST-IN-PLACE CONCRETE SECTION 03300 PART 1 GENERAL 1.01 DESCRIPTION This section describes materials and methods for formwork, reinforcement, mixing, placement, curing and repairs of concrete, and the use of cementations materials

More information

The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs

The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs The better way to build TM Installation Manual FOUNDATION SIPs & FROST WALLS SIPs February 2016 PWF FOUNDATION & FROST WALL SIPs Installation Manual Table of Contents Topics General Requirements...................................

More information

Failing Coastal Wood Infrastructure on the Great Lakes

Failing Coastal Wood Infrastructure on the Great Lakes University of Wisconsin Sea Grant Institute Contact Gene Clark grclark@aqua.wisc.edu 715-392-3246 Failing Coastal Wood Infrastructure on the Great Lakes Gene Clark/UW Sea Grant Institute Introduction Many

More information

WILDCAT CANYON ROAD SPECIFICATION NO. 16-11001 SLIDE REPAIR BIDDER'S PROPOSAL (continued)

WILDCAT CANYON ROAD SPECIFICATION NO. 16-11001 SLIDE REPAIR BIDDER'S PROPOSAL (continued) BIDDER'S PROPOSAL (continued) Item Estimated No. Description Quantity Unit Unit Cost Total Cost BASE BID 1 Traffic Control 1 LS $ $ 2 Construction Area Signs 1 LS $ $ 3 Excavation Safety 1 LS $ $ 4 Reset

More information

ENGINEERED FOUNDATIONS. Department of Public Works Jeff Hill, PE

ENGINEERED FOUNDATIONS. Department of Public Works Jeff Hill, PE ENGINEERED FOUNDATIONS Department of Public Works Jeff Hill, PE What is an engineered foundation. A Foundation Design Developed by a Trained Professional (Engineer) Types of Foundations (All of which can

More information

Syphonic Roof Drainage

Syphonic Roof Drainage Syphonic Roof Drainage A D V A N C E D P L U M B I N G T E C H N O L O G Y Design Guide SYPHONICS Advanced Roof Drainage Technology Design, Manufacture and Installation TSB Call Centre, Cardiff. Millenium

More information

COMMONLY USED RESIDENTIAL BUILDING CODES

COMMONLY USED RESIDENTIAL BUILDING CODES COMMONLY USED RESIDENTIAL BUILDING CODES INTERNATIONAL RESIDENTIAL CODE (2009) form revised 5/10 FOUNDATION 1. DESIGN OF FORMWORK. Section 1906.1 IBC 2009, Section R404.1.2.3.6 IRC 2009, ACI 318 Section

More information

SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS

SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS PART 1 GENERAL 1.01 SECTION INCLUDES A. The requirements for pipe material and installation in sewer and drainage collection systems. All materials

More information

BEST MANAGEMENT STANDARDS FOR FOUNDATION REPAIR

BEST MANAGEMENT STANDARDS FOR FOUNDATION REPAIR BEST MANAGEMENT STANDARDS FOR FOUNDATION REPAIR MARCH 00 REVISED JANUARY 8, 008 Prepared in cooperation with the Building Inspectors Association of Southeastern Wisconsin www.biasew.org. /6/00 rev. 0/08/008

More information

PART E SPECIFICATIONS

PART E SPECIFICATIONS PART E SPECIFICATIONS Page 1 of 5 PART E - SPECIFICATIONS GENERAL E1. APPLICABLE SPECIFICATIONS, STANDARD DETAILS AND DRAWINGS E1.1 The City of Winnipeg Works and Operations Division Standard Construction

More information

TopSky DLG Installation Manual

TopSky DLG Installation Manual TopSky DLG Installation Manual Attention: Because after the compound materials solidify, there will be ammonia iris on the surface, which affect the bonding strength afterwards. Please polish with sandpaper

More information

Diameter. Swift Lift Round Recess Plug. Note: The diameter of the narrow recess plug is the same as the diameter of the round recess plug.

Diameter. Swift Lift Round Recess Plug. Note: The diameter of the narrow recess plug is the same as the diameter of the round recess plug. P-5 The P-5 is hot forged from carbon steel. The formed head provis spherical seating that the Lifting Eye engages, while a disc-shaped foot is embedd in the concrete. Due to its being a forged part, the

More information

SERIES 1385-3.8M Rx/Tx ANTENNA SYSTEM

SERIES 1385-3.8M Rx/Tx ANTENNA SYSTEM 4096-757 Revision E May 13, 2009 ASSEMBLY MANUAL SERIES 1385-3.8M Rx/Tx ANTENNA SYSTEM GENERAL DYNAMICS SATCOM Technologies 1500 Prodelin Drive Newton NC 28658USA Phone 828-464-4141 www.gdsatcom.com SERIES

More information

ROOF DRAINS TABLE OF CONTENTS

ROOF DRAINS TABLE OF CONTENTS Pictorial Index Product Recommendations Roof Drain Selection Factors Sizing Placement Material & Characteristics Pipe Connection Commonly Specified Options Typical Installations TABLE OF CONTENTS ROOF

More information

REPLACE ROOFING DENVER CENTRAL LIBRARY PHASE I CITY & COUNTY OF DENVER DENVER, COLORADO

REPLACE ROOFING DENVER CENTRAL LIBRARY PHASE I CITY & COUNTY OF DENVER DENVER, COLORADO PUBLIC LIBRARY PHASE I 4828 W. 6TH Avenue, Unit B-8 Golden, Colorado 8040 Phone: (303) 233-092 VICINITY MAP SHEET INDEX GT /26/2009 SHEET DESCRIPTION G.0 COVER SHEET R.0 COMPOSITE ROOF PLAN R. NEW ROOF

More information

Chapter. Restoration of Damaged Structures

Chapter. Restoration of Damaged Structures 5 Chapter Restoration of Damaged Structures Bringing back a damaged structure to its pre-earthquake state and original strength is called restoration. This is the first step of building rehabilitation.

More information

Stability. Security. Integrity.

Stability. Security. Integrity. Stability. Security. Integrity. PN #MBHPT Foundation Supportworks provides quality helical pile systems for both new construction and retrofit applications. 288 Helical Pile System About Foundation Supportworks

More information

ATLANTA MODEL SPECIFICATIONS

ATLANTA MODEL SPECIFICATIONS ATLANTA MODEL 50 SPECIFICATIONS Dimensions: Roof Dimensions (point to point) 50-0 Column Dimensions (out to out of columns) 44-0 Eave Height 8-0 Roof Height @ Peak ±21-8⅞ Hip Roof 6:12 pitch Square Feet

More information

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003) NCMA TEK National Concrete Masonry Association an information series from the national authority on concrete masonry technology CONCRETE MASONRY FOUNDATION WALL DETAILS TEK 5-3A Details (2003) Keywords:

More information

CONCRETE SEGMENTAL RETAINING WALL SYSTEM

CONCRETE SEGMENTAL RETAINING WALL SYSTEM CONCRETE SEGMENTAL RETAINING WALL SYSTEM PART 1: GENERAL SPECIFICATIONS 1.01 Work Included A. Work shall consist of furnishing and constructing a Rockwood Classic 8 with PCS unit segmental retaining wall

More information

DRAINAGE MATS For Vertical: Flow 15-P For Horizontal: Flow 18-H

DRAINAGE MATS For Vertical: Flow 15-P For Horizontal: Flow 18-H DRAINAGE MATS For Vertical: Flow 15-P For Horizontal: Flow 18-H Soil Drainage Mat with Built-In Protection Layer POLYGUARD DRAINAGE MATS are three-part prefabricated geocomposite drain consisting of a

More information

Structural Foundation System

Structural Foundation System Structural Foundation System SLABTEK, a technological advancement in foundation designs for residential and lightweight commercial structures SlabTek is a patent allowed process for concrete foundations

More information

FY08 SEWER POINT REPAIRS BID TABULATION

FY08 SEWER POINT REPAIRS BID TABULATION 6-07-831 Page 1 of 12 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING "

More information

Unit Price Averages Reports

Unit Price Averages Reports Unit Price Averages Reports 12/7/2015 UNIT PRICE AVERAGES REPORT Disclaimer The information provided in the following Unit Price Averages Report is only for the use of Alberta Infrastructure & Transportation

More information

volume of concrete occupied by the drain pipe in a cast-in-place structure or structure extension.

volume of concrete occupied by the drain pipe in a cast-in-place structure or structure extension. 715.01 430 volume of concrete occupied by the drain pipe in a cast-in-place structure or structure extension. No additional payment will be made for the repair or replacement of existing concrete damaged

More information

During severe flood events, such as those

During severe flood events, such as those Recommended Practice for Home Heating Oil Tank Flood Resistance During severe flood events, such as those occurring from Hurricane Irene and Super- Storm Sandy, many coastal and low elevation inland areas

More information

Underpinning Systems 14.1 FOUNDATION REPAIR. Helical Piles

Underpinning Systems 14.1 FOUNDATION REPAIR. Helical Piles Helical Piles Howard A. Perko Copyright 0 2009 by John Wiley & Sons, Inc. All rights reserved. C h a p t e r 14 Underpinning Systems There has been tremendous growth in the use of helical piles for underpinning

More information

Using Williams Products

Using Williams Products Using Williams Products Readers of this catalog should independently verify the efficiency of any Williams products for the purpose intended by the user. The suitability of Williams products will depend

More information

Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation

Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation Jeff R. Hill, P.E. Hayward Baker Inc. 111 W. Port Plaza Drive Suite 600 St. Louis, MO 63146 314-542-3040 JRHill@HaywardBaker.com

More information

MUNICODE SERVICES LTD.

MUNICODE SERVICES LTD. The Preserved Wood Foundation Guide MUNICODE SERVICES LTD. Prepared by MuniCode Services Ltd. Outline and Restrictions of this Guide The following information required for the construction of Preserved

More information

EZ-48-3AB-125-35 Weather Station Mounting Tripod and Mast

EZ-48-3AB-125-35 Weather Station Mounting Tripod and Mast EZ-48-3AB-125-35 Weather Station Mounting Tripod and Mast EZ-125-35M 35 Mast Extension (Optional) EZ-125-SK Stake Kit (Optional) EZ-46-3 Tar Pad Kit (Optional) EZ-GWA Guy Wire Kit (Optional) Ambient Weather

More information

Ecoflex Wall Penetration Systems: An efficient, sustainable solution for penetrating concrete or block walls

Ecoflex Wall Penetration Systems: An efficient, sustainable solution for penetrating concrete or block walls Pre- insulated pipe systems ecoflex Wall Penetration installation guide Ecoflex Wall Penetration Systems: An efficient, sustainable solution for penetrating concrete or block walls Pre-insulated Pipe Systems

More information

PERIMETER FLASHING. Table of Contents

PERIMETER FLASHING. Table of Contents FM Global Property Loss Prevention Data Sheets 1-49 February 1985 Revised September 2000 Page1of25 PERIMETER FLASHING Table of Contents Page 1.0 SCOPE... 3 1.1 Changes... 3 2.0 LOSS PREVENTION RECOMMENDATIONS...

More information

550 PIPE CULVERTS, SEWERS AND DRAINS

550 PIPE CULVERTS, SEWERS AND DRAINS 551.01 550 PIPE CULVERTS, SEWERS AND DRAINS 551 GENERAL 551.01 Description 551.02 Materials 551.03 Excavation 551.04 Protection of Excavation 551.05(a) Bedding for Rigid Pipe 551.05(b) Bedding for Non-Rigid

More information

SMarT_Foundation [Simple Modular Technology] Assembly and Installation Instructions (U.S. Patent Pending)

SMarT_Foundation [Simple Modular Technology] Assembly and Installation Instructions (U.S. Patent Pending) SMarT_Foundation [Simple Modular Technology] Assembly and Installation Instructions (U.S. Patent Pending) Southwest Windpower Skystream 3.7 Wind Turbine with Towers up to 21.3 m (70 ft.) in Height AnemErgonics

More information

CITY OF SELMA, TEXAS Inspection Checklist: Commercial

CITY OF SELMA, TEXAS Inspection Checklist: Commercial Rev Y71004 The Permits and Inspections Department welcomes you to the City of Selma. The following information is provided to you as guidance through the inspection process. The City of Selma provides

More information

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains

More information

Up-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations

Up-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations Up-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations Nathan A. Ingraffea, P.E., S.E. Associate, KPFF Consulting Engineers, Portland, Oregon, USA Abstract The use of steel sheet

More information

Rehabilitation of Locks on the Kentucky River

Rehabilitation of Locks on the Kentucky River Rehabilitation of Locks on the Kentucky River Joshua M. Repp, PE Bergmann Associates Presentation Overview River System History Evolution of Lock and Dams Structures Existing Condition of Structures Lock

More information

Geotechnical Building Works (GBW) Submission Requirements

Geotechnical Building Works (GBW) Submission Requirements Building Control (Amendment) Act 2012 and Regulations 2012: Geotechnical Building Works (GBW) Submission Requirements Building Engineering Group Building and Construction Authority May 2015 Content : 1.

More information

BUTE Department of Construction Management and Technology

BUTE Department of Construction Management and Technology BUTE Department of Construction Management and Technology 02.10.2012 Definition 1: Foundation: The structure, that transmits the load of the building to the soil Definition 2: Load bearing soil (strata):

More information

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250. 02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily

More information

A Solid Foundation Solution for Homeowners. from. Our products are made with 90% Recycled Material Down. Right. Solid. GREEN.

A Solid Foundation Solution for Homeowners. from. Our products are made with 90% Recycled Material Down. Right. Solid. GREEN. A Solid Foundation Solution for Homeowners from Our products are made with 90% Recycled Material Down. Right. Solid. GREEN. Stop the damaging effects of foundation settling... Sinking foundations, cracked

More information

Report on. Wind Resistance of Signs supported by. Glass Fiber Reinforced Concrete (GFRC) Pillars

Report on. Wind Resistance of Signs supported by. Glass Fiber Reinforced Concrete (GFRC) Pillars Report on Wind Resistance of Signs supported by Glass Fiber Reinforced Concrete (GFRC) Pillars Prepared for US Sign and Fabrication Corporation January, 2006 SUMMARY This study found the attachment of

More information

Virginia Approach Spans

Virginia Approach Spans Virginia Concrete Conference 2009 Woodrow Virginia Approach Spans David Tackoor, HNTB Formerly of URS Corp for Potomac Crossing Consultants Woodrow 1 Second Severn Crossing 2 Medway Crossing (Channel Tunnel

More information

I BEAM TRACK INSTALLATION

I BEAM TRACK INSTALLATION PDQ 0/700 FESTOON SYSTEM INSTALLATION AND MAINTENANCE INSTRUCTIONS INTRODUCTION The PDQ Festoon System was designed to run on one of three sizes of I-beams: S x., S8 x 8. and S x.. System trolleys must

More information

Comparison of Seismic Retrofitting Methods for Existing Foundations in Seismological Active Regions

Comparison of Seismic Retrofitting Methods for Existing Foundations in Seismological Active Regions Comparison of Seismic Retrofitting Methods for Existing Foundations in Seismological Active Regions Peyman Amini Motlagh, Ali Pak Abstract Seismic retrofitting of important structures is essential in seismological

More information

SECTION 02845 GUARDRAILS

SECTION 02845 GUARDRAILS SECTION 02845 GUARDRAILS PART 1 - GENERAL 1.01 SCOPE OF WORK A. Furnish all labor, materials, equipment and incidentals necessary and repair, replace or install all types of guardrails as specified herein

More information

REPAIR AND STRENGTHENING OF HISTORICAL CONCRETE BRIDGE OVER VENTA RIVER IN LATVIA

REPAIR AND STRENGTHENING OF HISTORICAL CONCRETE BRIDGE OVER VENTA RIVER IN LATVIA 1 REPAIR AND STRENGTHENING OF HISTORICAL CONCRETE BRIDGE OVER VENTA RIVER IN LATVIA Verners Straupe, M.sc.eng., Rudolfs Gruberts, dipl. eng. JS Celuprojekts, Murjanu St. 7a, Riga, LV 1024, Latvia e-mail:

More information

11 Guardrail. W-Beam Guardrail Pre-Installation Inspection During Installation Basis for Use. Modified Guardrail. End Treatments and Transitions

11 Guardrail. W-Beam Guardrail Pre-Installation Inspection During Installation Basis for Use. Modified Guardrail. End Treatments and Transitions 11 Guardrail W-Beam Guardrail Pre-Installation Inspection During Installation Basis for Use Modified Guardrail End Treatments and Transitions Footings and Anchors Impact Attenuators Measurement and Payment

More information

DIVISION: 31 00 00 EARTHWORK SECTION: 31 63 00 BORED PILES REPORT HOLDER: HUBBELL POWER SYSTEMS, INC.

DIVISION: 31 00 00 EARTHWORK SECTION: 31 63 00 BORED PILES REPORT HOLDER: HUBBELL POWER SYSTEMS, INC. 0 ICC ES Report ICC ES (800) 4 6587 (56) 699 054 www.icc es.org 000 Most Widely Accepted and Trusted ESR 794 Reissued 05/05 This report is subject to renewal 05/06. DIVISION: 00 00 EARTHWORK SECTION: 6

More information

SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT

SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT The following are minimum requirements for installation of conventional trench sewage disposal systems in St. Mary s County,

More information

Moving Small Mountains Vesuvius Dam Rehab

Moving Small Mountains Vesuvius Dam Rehab Moving Small Mountains Vesuvius Dam Rehab Susan L. Peterson, P.E., regional dams engineer, Eastern Region, Bedford, IN Note: The following article, Moving Small Mountains Vesuvius Dam Rehab, by Sue Peterson,

More information

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing 1 Most basements show some signs of leaking and cracking. Through the years, problems with water, poor soils, grading, drainage and possible settling affect the integrity of a basement. Being able to recognize

More information

NEGRP TEST SUMMARY. Joseph A. Lanzoni, November 2005

NEGRP TEST SUMMARY. Joseph A. Lanzoni, November 2005 NEGRP TEST SUMMARY Joseph A. Lanzoni, November 2005 The National Electrical Grounding Research Project (NEGRP) was a project managed and sponsored by the National Fire Protection Association (NFPA) Research

More information

Mersin, TURKEY. Port extension project

Mersin, TURKEY. Port extension project Mersin, TURKEY Port extension project Mersin is situated on the Mediterranean Sea, on the southeast coast of Turkey. Several international contracting companies were invited to bid for the upgrading of

More information

Engineered, Time-Tested Foundation Repairs for Settlement in Residential and Light Commercial Structures. The Leading Edge.

Engineered, Time-Tested Foundation Repairs for Settlement in Residential and Light Commercial Structures. The Leading Edge. TM TM Engineered, Time-Tested Foundation Repairs for Settlement in Residential and Light Commercial Structures. SM The Leading Edge. 10 One Major Causes of foundation settlement or more conditions may

More information