1 Prefeasiblity Northern Future Access Road & Flood Management Huntley Golf Course / Residential Development Considerations of a Flood Management Strategy for Future Access Road to Site 1 29 July 2014 Our Ref: S B

2 Contents 1 Introduction Available Flooding Information Existing Flood Behaviour Potential Flood Management Measures Incorporate a culvert / bridge design into future access road Provide Additional Floodplain Storage Road & Bridge Design Levels Flood Impacts Stay in Place Policy Conclusion... 6 GRINSELL & JOHNS PTY LTD Consulting Surveyors 2

3 1 INTRODUCTION The following pre-feasibility report has been prepared for Urbis to address flooding at the future access road to be located at the northeast corner of the proposed Huntley development. This future access road is proposed to connect the residential area, Site 1, to Cleveland Road as part of the proposed Huntley development (refer Appendix A). Due to the existing flood affectation of the subject site, the future access road will incorporate measures to allow vehicle access to Site 1 during all flood events up to and including the 100-year ARI flood event. This report identifies opportunities and flood management measures that may complement the future access route design and provide an effective flood management strategy for the northern extent of the subject site. Additional opportunities / design measures not identified in this report may also become apparent during subsequent planning / design phases and should be included in any subsequent assessments. 2 AVAILABLE FLOODING INFORMATION The subject site is located in the Mullet and Brooks Creek Catchment. A Floodplain Risk Management Study and Plan of Mullet Creek and Brooks Creek has been developed for Wollongong City Council by Bewsher Consulting (FRMS&P, 2010). A key component of this study was to define existing flood behaviour with the establishment of flood models. Council subsequently identified the need to extend these flood models to include areas adjacent to the foothills of the escarpment and engaged Bewsher Consulting to complete the Mullet Creek, West Dapto Extension of Flood Model (2011). The subject site and location of the future access road to Site 1 is included within the extents of the extended flood model (2011). Flooding behaviour in the vicinity of the future access road has been reviewed using flood maps provided in the Mullet Creek, West Dapto Extension of Flood Model (2011). Due to the scale of these flood maps (catchment-wide) at relatively low resolution, it is difficult to accurately define flood behaviour at this location. Nevertheless, these flood maps provide an indicative understanding of the flood behaviour at the site and allow for a general understanding of potential flood management measures that should be considered in the design of the future access road. 3 EXISTING FLOOD BEHAVIOUR Flood extents for both the 100-year ARI and PMF events are observed to inundate a portion of the area proposed for future access road location and surroundings. The approximate 100 year ARI flood extents provided in the Extended Flood Model (2011), have been superimposed onto a plan that includes the proposed Site 1 and the future access road (refer Appendix A). Flood contours during the 100-year ARI flood event range from approximately +40m AHD to +41mAHD in the vicinity of the future access road location (refer to the Mullet Creek, West Dapto Extension of Flood Model, 2011). Site specific detailed 2D flood modelling of the site will need to be undertaken to more accurately define these flood levels and extents at the future access road location. GRINSELL & JOHNS PTY LTD Consulting Surveyors 3

4 Results of site specific modelling undertaken by BRS as part of Trunk Drainage Proposal (2014), demonstrate the 100-year ARI flood event to inundate a portion of the site area proposed for future access road. However, it is understood that this additional flood modelling is yet to be approved by Council. Flooding in the vicinity of the access road during the 100 year ARI (and PMF) event, may be due to a combination of flooding from a minor convergent tributary and overland flooding of the main watercourse which traverses the site. Floodwaters during the 100 year ARI and PMF events inundate a portion of Cleveland Road. It appears that some attenuation of 100 year ARI floodwaters occurs immediately upstream of Cleveland Road, before weir flows overtop a substantial portion of Cleveland road adjacent to the bridge. A backwater effect resultant from the under-capacity bridge on Cleveland Road may influence flood levels at the location of the future access road. Site specific detailed 2D flood modelling would be required to confirm this to be the case. 4 POTENTIAL FLOOD MANAGEMENT MEASURES Based on results of existing flood models relevant to the subject site, the future access road will need to incorporate design measures to provide a trafficable access road to Site 1 during a 100-year ARI flood event. Ensuring the future access road is trafficable in the 100 year ARI flood event is consistent with the West Dapto Section 94 Development Contributions Plan (2011), which identifies Cleveland Road (adjoining the future access road) to be trafficable in the 100 year ARI flood event. Consideration of the following design measures will be reviewed during future planning / design phases as part of an overall flood management strategy at the northern extent of the site: - Incorporate a bridge / culvert structure exceeding 6m diagonal opening into the future access road - Design new bridge decks to be elevated above the 100 year ARI level with freeboard - Incorporate additional floodplain storage using excavated areas / potential watercourse modifications - Incorporate bunding to contain flood extents and flooding impacts - Possible road raising and upgrading of the Bridge capacity at Cleveland Road - Ensure no adverse flooding impacts off-site. - Stay in place policy for flood events exceeding the 100 year ARI flood event Each of the above-listed measures may influence the design parameters of a future access road to Site 1 and is discussed in further detail under the headings below INCORPORATE A CULVERT / BRIDGE DESIGN INTO FUTURE ACCESS ROAD Due to an existing minor tributary at the location of the future access road to Site 1, a culvert / bridge design will be required. Hydrologic / hydraulic modelling will be required to determine the capacity required to convey flows & subsequently provide a trafficable route during the 100 year ARI flood event. It is noted in accordance with Council s DCP 2009 ChE14, a bridge / culvert span exceeding 6m diagonal opening would be required for the future access road to prevent a 100% blockage factor being applied (with a 25% blockage factor applied for diagonal openings exceeding 6m). GRINSELL & JOHNS PTY LTD Consulting Surveyors 4

5 The impact of the proposed culvert / bridge on existing flood levels will need to be considered in determining design levels for the access road & Cleveland Road / bridge. The FRMS&P states, all new bridge decks will be located above the 1% AEP flood level, with an additional freeboard likely to be required. Furthermore, design levels of the access road will need to account for the potential road raising of Cleveland road which is highlighted as a 100 year ARI flood access route in Council s West Dapto Section 94 Development Contributions Plan PROVIDE ADDITIONAL FLOODPLAIN STORAGE The FRMS&P identifies potential excavation areas immediately upstream and downstream of Cleveland Road bridge (refer Figure 7.1 in FRMS&P, 2010). Providing additional floodplain storage upstream and downstream of the Cleveland Road Bridge (and the future access road) may reduce existing 100 year ARI flood levels which currently inundate Cleveland Road. The extent to which existing flood levels are reduced (if at all) from excavation / watercourse modifications, will require detailed 2D modelling. Establishing resultant flood levels from earthwork modifications may influence design levels for the future access Road and Cleveland Road / Bridge. Bunding may be investigated as an alternative to elevating road levels along Cleveland Road (or as an interim solution until Cleveland Road / Bridge is upgraded). This alternative may also provide some additional floodplain storage while containing flood extents within the proposed Huntley development site. Using bunding as an alternative to road raising or as an interim measure should be discussed with Council to determine its feasibility ROAD & BRIDGE DESIGN LEVELS Wollongong Council s West Dapto Release Area Section 94 Contributions Plan (2011) identifies Cleveland Road as a flood access route that will be designed to be trafficable in a 100 year ARI flood event (refer to Flood Access Routes map, pg 75). This may require upgrading the existing Cleveland Road bridge to increase flood conveyance capacity in a 100 year ARI flood event. The FRMS&P states, all new bridge decks will be located above the 1% AEP flood level, with an additional freeboard likely to be required. As previously discussed, design levels of Cleveland Road (& bridge) should be determined in conjunction with other potential flood management measures to ensure cumulative impacts to flood levels are established FLOOD IMPACTS In accordance with Council s DCP ChE13, post-development flood levels for neighbouring properties are required to be maintained the same as or lower than existing flood levels. Some local increases in flood levels may be permitted within the extent of riparian corridor providing Council consider these increases acceptable. Determining a feasible access road design would use detailed flood modelling to ensure no adverse impacts to adjacent properties STAY IN PLACE POLICY Where flood free access to Site 1 is restricted during flood events exceeding the 100 year ARI flood event, it may be considered appropriate that the occupants are provided the safe alternative of staying in place (Site 1is elevated above the PMF). It is noted that because flood durations in the GRINSELL & JOHNS PTY LTD Consulting Surveyors 5

6 Illawarra are short, people could stay in place during a large flood event. The Floodplain Development Manual (2005) advises that complete isolation may be acceptable during a flood, particularly where floods typically recede within hours. 5 CONCLUSION A flood access route to site 1 would be developed in conjunction with a flood management strategy for the northern extent of the proposed Huntley development. This flood management strategy would take into account a range of measures to ensure the future access road to Site 1 remains trafficable in a 100-year ARI flood event. Opportunities and flood management measures that may complement/ influence the future access road design and provide an effective flood management strategy for the subject site, include: - Incorporate a bridge / culvert structure exceeding 6m diagonal opening into the future access road - Design new bridge decks to be elevated above the 100 year ARI level with freeboard - Incorporate additional floodplain storage using excavated areas / potential watercourse modifications - Incorporate bunding to contain flood extents and flooding impacts - Possible road raising and upgrading of the Bridge capacity at Cleveland Road - Ensure no adverse flooding impacts off-site. - Stay in place policy for flood events exceeding the 100 year ARI flood event Each of the above-listed measures may influence the design parameters of a future access road to Site 1 and will be investigated in further detail during future planning / design phases. Where necessary, proposed flood management measures will be assessed using site specific detailed 2D flood modelling to quantify design parameters and flooding impacts. A cumulative impacts assessment is recommended to ensure no adverse flooding impacts resultant from the proposed development areas. Any proposed works within the watercourse will require consent from the NSW Office of Water and should be discussed at an early stage during the planning process. GRINSELL & JOHNS PTY LTD Consulting Surveyors 6

7 LOCAL GOVERNMENT AREA :WOLLONGONG APPROXIMATE 100 YEAR ARI FLOOD EXTENTS BASED ON MULLET CREEK, WEST DAPTO EXTENSION OF FLOOD MODEL (2011) AVONDALE ROAD, HUNTLEY PLAN No. S1021/29 AMEND: A DRAWN: JP CHECKED: AB CAD.REF: S (B) DATUM: AHD SCALE: APPROVED: RG SURVEY DATE: 8 OCT 2013 SHEET 1 OF 1

The site is Lot 1 DP 837271. Survey of this lot and Willarong Road and Koonya Circuit is given in Figure 2.

The site is Lot 1 DP 837271. Survey of this lot and Willarong Road and Koonya Circuit is given in Figure 2. Our Ref : NA49913151-019-L02:BCP/bcp Contact: Dr Brett C. Phillips 8 th May 2015 Cardno (NSW/ACT) Pty Ltd ABN 95 001 145 035 The Manager Bunnings Group Limited, c/- C&M Consulting Engineers 1/142 James

More information

FLOOD INFORMATION SERVICE EXPLANATORY NOTES

FLOOD INFORMATION SERVICE EXPLANATORY NOTES FLOOD INFORMATION SERVICE EXPLANATORY NOTES Part 1 About the flood maps Limitations of the mapping What the maps don t show Where to find more information Definitions of words used to describe flooding.

More information

Mission Creek Flood Control & Restoration Project. City of Fremont, Alameda County

Mission Creek Flood Control & Restoration Project. City of Fremont, Alameda County Mission Creek Flood Control & Restoration Project City of Fremont, Alameda County Agenda Background Why are proposed improvements necessary? Proposed project components Challenges Construction schedule/phasing

More information

Floodplain Development Land Use Review

Floodplain Development Land Use Review COMMUNITY DEVELOPMENT DEPARTMENT Planning Division P.O. Box 490 333 Broadalbin Street SW Albany, OR 97321 Phone 541-917-7550 Fax 541-791-0150 www.cityofalbany.net Floodplain Development Land Use Review

More information

Objective 4: Enhanced community education, flood awareness and preparedness

Objective 4: Enhanced community education, flood awareness and preparedness Objective 4: Enhanced community education, flood awareness and preparedness Understanding the extent and full impacts of flooding is essential for planning for potential future pressures on the drainage

More information

Appendix C Asset Risk Model Data

Appendix C Asset Risk Model Data Appendix C Asset Risk Model Data S:\ADV JOBS\48305 ENV WAIKATO\027 THAMES COAST FLOOD RISK\6000 - DELIVERABLES\FINAL REPORT\APPENDIX C.DOC\16-JUL-03 Contents Appendix C Asset Risk Model Data Asset Risk

More information

Innovative Approaches in Flood Damage Reduction

Innovative Approaches in Flood Damage Reduction Innovative Approaches in Flood Damage Reduction Solutions for the Stormwater Management High Level Results 3D geospatial model of storm water management pond (GRCA, 2013) Enhanced understanding of storm

More information

Essex County Council Flood Investigation Report

Essex County Council Flood Investigation Report Essex County Council Stock City of Chelmsford Rev Date Details Author Checked and Approved By 01 February 2015 Draft report for stakeholder consultation Ed Clarke Flood Investigation Engineer Lucy Shepherd

More information

NYSDEC Optional Additional Language Model Local Law for Flood Damage Prevention Optional Additional Language

NYSDEC Optional Additional Language Model Local Law for Flood Damage Prevention Optional Additional Language NYSDEC General Comments. The contains language that complies with the floodplain management requirements of the National Flood Insurance Program (NFIP) contained in federal regulations 44 CFR 60.3 through

More information

ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION. Lower Carmel River Floodplain Restoration and Enhancement Project

ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION. Lower Carmel River Floodplain Restoration and Enhancement Project ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION Lower Carmel River Floodplain Restoration and Enhancement Project I. Description of the Project and its Relationship to Other Projects in the Proposal The Lower

More information

Guideline: Works that interfere with water in a watercourse watercourse diversions. September 2014

Guideline: Works that interfere with water in a watercourse watercourse diversions. September 2014 Guideline: Works that interfere with water in a watercourse watercourse diversions September 2014 This publication has been compiled by the Department of Natural Resources and Mines. State of Queensland,

More information

11.4 Voluntary Purchase. 11.5 House Raising and Flood Proofing

11.4 Voluntary Purchase. 11.5 House Raising and Flood Proofing 11.4 Voluntary Purchase As mentioned in Section 10 in certain high hazard areas of the floodplain, it may be impractical or uneconomic to mitigate flood hazard to existing properties at risk, or flood

More information

APPENDIX 9 INFRASTRUCTURE SERVICING REPORT

APPENDIX 9 INFRASTRUCTURE SERVICING REPORT APPENDIX 9 INFRASTRUCTURE SERVICING REPORT Lot 50 Cockram Street, Mundijong Infrastructure Servicing Report Peet Ltd August 2012 LOT 50 COCKRAM STREET, MUNDIJONG-INFRASTRUCTURE SERVICING REPORT Project

More information

Acknowledgments. Feedback and enquiries

Acknowledgments. Feedback and enquiries Acknowledgments Melbourne Water prepared the Guidelines with the assistance of a specially appointed Reference Committee of experienced people who provided valuable comment and advice on the contents of

More information

R enfrewshire Local Plan. Safe Environment. Page. Flooding & Sustainable Urban Drainage 163 Contaminated Land 175 Noise 177 Major-Accident Hazards 179

R enfrewshire Local Plan. Safe Environment. Page. Flooding & Sustainable Urban Drainage 163 Contaminated Land 175 Noise 177 Major-Accident Hazards 179 R enfrewshire Local Plan Safe Environment Page Flooding & Sustainable Urban Drainage 163 Contaminated Land 175 Noise 177 Major-Accident Hazards 179 16 Flooding and Sustainable Urban Drainage OVERVIEW Flooding

More information

Planning for Casey s Community

Planning for Casey s Community 2 July 2013 ITEM 2 ATTACHMENT 1 Council Report from Meeting This information is circulated separately. Council Meeting Page 9 Amendment C143 to the Casey Planning Scheme Revisions to various areas within

More information

Appendix C - Risk Assessment: Technical Details. Appendix C - Risk Assessment: Technical Details

Appendix C - Risk Assessment: Technical Details. Appendix C - Risk Assessment: Technical Details Appendix C - Risk Assessment: Technical Details Page C1 C1 Surface Water Modelling 1. Introduction 1.1 BACKGROUND URS Scott Wilson has constructed 13 TUFLOW hydraulic models across the London Boroughs

More information

Action plans for hotspot locations - Ash Study

Action plans for hotspot locations - Ash Study Appendix 9 Action plans for hotspot locations - Ash Study Ash Vale North 1. Local evidence indicates the culvert could not discharge during December 2013 because the outlet was blocked on the western side

More information

UPDATED FUNCTIONAL SERVICING and STORMWATER MANAGEMENT REPORT

UPDATED FUNCTIONAL SERVICING and STORMWATER MANAGEMENT REPORT TRAFALGAR ENGINEERING LTD. #1-481 Morden Road Oakville Ontario L6K 3W6 UPDATED FUNCTIONAL SERVICING and STORMWATER MANAGEMENT REPORT Fernbrook Homes (Bronte 15) Limited 3059/3047 Lakeshore Road West TOWN

More information

Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers

Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers Flood Risk Assessment and Drainage Impact Assessment: Planning Guidance for Developers Development and Regeneration Services Glasgow City Council 229 George Street Glasgow G1 1QU May 2011 1. Introduction...-

More information

1 in 30 year 1 in 75 year 1 in 100 year 1 in 100 year plus climate change (+30%) 1 in 200 year

1 in 30 year 1 in 75 year 1 in 100 year 1 in 100 year plus climate change (+30%) 1 in 200 year Appendix C1 Surface Water Modelling 1 Overview 1.1 The Drain London modelling was designed to analyse the impact of heavy rainfall events across each London borough by assessing flow paths, velocities

More information

Appendix 3: Glossary. Queensland Floods Commission of Inquiry Interim Report

Appendix 3: Glossary. Queensland Floods Commission of Inquiry Interim Report Appendix 3: Glossary ABC means the Australian Broadcasting Corporation. ACCESS forecast means a Bureau of Meteorology forecast obtained from the Australian Community Climate and Earth-System Simulator.

More information

General Insurance - Domestic Insurance - Home Contents Storm water damage policy exclusion flood damage

General Insurance - Domestic Insurance - Home Contents Storm water damage policy exclusion flood damage Determination Case number: 227307 General Insurance - Domestic Insurance - Home Contents Storm water damage policy exclusion flood damage 4 April 2011 Background 1. The Applicants insured their home contents

More information

Prattsville Berm Removal Project. 1.0 Project Location

Prattsville Berm Removal Project. 1.0 Project Location Prattsville Berm Removal Project 1.0 Project Location The project site is located between the New York State Route 23 Bridge over the Schoharie Creek and the Schoharie Reservoir. The restoration plan encompassed

More information

San Diego Integrated Regional Water Management Implementation Grant Proposal Economic Analysis Flood Damage Reduction Costs and Benefits

San Diego Integrated Regional Water Management Implementation Grant Proposal Economic Analysis Flood Damage Reduction Costs and Benefits Attachment 9 San Diego Integrated Regional Water Management Economic Analysis Flood Damage Reduction Costs and Benefits Attachment 9 consists of the following items: Flood Damage Reduction Costs and Benefits.

More information

URBAN DRAINAGE CRITERIA

URBAN DRAINAGE CRITERIA URBAN DRAINAGE CRITERIA I. Introduction This division contains guidelines for drainage system design and establishes a policy for recognized and established engineering design of storm drain facilities

More information

Policy. Flood Risk Management Version 1.0. Adopted by Council at its meeting on 18 December 2012 Minute No: 201

Policy. Flood Risk Management Version 1.0. Adopted by Council at its meeting on 18 December 2012 Minute No: 201 Policy Flood Risk Management Version 1.0 Adopted by Council at its meeting on 18 December 2012 Minute No: 201 Division: Engineering and Operations Section: Planning and Infrastructure File Reference: Council

More information

SEYMOUR FLOOD MITIGATION PROJECT PRELIMINARY DESIGN REPORT

SEYMOUR FLOOD MITIGATION PROJECT PRELIMINARY DESIGN REPORT SEYMOUR FLOOD MITIGATION PROJECT PRELIMINARY DESIGN REPORT Report prepared for the SHIRE OF MITCHELL October 2009 1 TABLE OF CONTENTS 1. Executive Summary 4 2. Background 9 2.1 Previous Studies 9 2.2 Modelled

More information

ADDING VALUE TO BOM FLOOD PREDICTIONS (WITHOUT MESSING AROUND WITH MODELS)

ADDING VALUE TO BOM FLOOD PREDICTIONS (WITHOUT MESSING AROUND WITH MODELS) ADDING VALUE TO BOM FLOOD PREDICTIONS (WITHOUT MESSING AROUND WITH MODELS) Mark Babister Steve Opper Peter Cinque Matthew Chadwick Belinda Davies Director, Webb McKeown & Associates Director, Emergency

More information

City of West Linn Public Works Design Standards 2010. Table of Contents

City of West Linn Public Works Design Standards 2010. Table of Contents City of West Linn Public Works Design Standards Table of Contents SECTION TWO STORM DRAIN REQUIREMENTS... 1 2.0000 STORM DRAINS... 1 2.0010 General Design Requirements...1 2.0011 Site Drainage Plans...2

More information

Flood Protection in Garland Past, Present, and Future. Presented by: R. Lyle Jenkins, P.E., CFM City of Garland, Texas

Flood Protection in Garland Past, Present, and Future. Presented by: R. Lyle Jenkins, P.E., CFM City of Garland, Texas Flood Protection in Garland Past, Present, and Future Presented by: R. Lyle Jenkins, P.E., CFM City of Garland, Texas A few facts about Garland: Originally incorporated in 1891 Population 226,876 (2010

More information

Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans

Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans APPENDIX IV Version: February 2, 2015 Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans Please fill in all blanks and please reference the plan sheets/pages where the information may

More information

1.7.0 Floodplain Modification Criteria

1.7.0 Floodplain Modification Criteria 1.7.0 Floodplain Modification Criteria 1.7.1 Introduction These guidelines set out standards for evaluating and processing proposed modifications of the 100- year floodplain with the following objectives:

More information

3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN

3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN 3.4 DRAINAGE PLAN This section describes the existing onsite drainage characteristics and improvements proposed within this Specific Plan. Following this description, drainage plan development standards

More information

The 2011 Queensland Floods

The 2011 Queensland Floods The 2011 Queensland Floods Bill Syme FMA Conference, San Diego September 2011 Why were Qld Floods Surprising? Different types Flash floods Long duration floods [The Chronicle] Repeat floods (Dalby 5 times!)

More information

FLOOD PROTECTION BENEFITS

FLOOD PROTECTION BENEFITS IV. (340 points) Flood Protection Benefits A. Existing and potential urban development in the floodplain (50) 1. Describe the existing and potential urban development at the site and the nature of the

More information

Project Manager. Geoff Masotti, P.Eng. T. 905.940.6161 Ext. 254 T. 905.940.6161 416.987.6161

Project Manager. Geoff Masotti, P.Eng. T. 905.940.6161 Ext. 254 T. 905.940.6161 416.987.6161 Rainbow Creek Master Plan Update Study The City of Vaughan june 2014 COLE ENGINEERING GROUP LTD. 70 Valleywood Drive Project Manager. Geoff Masotti, P.Eng. Markham, ON CANADA L3R 4T5 T. 905.940.6161 Ext.

More information

DRAFT SOUTH FORK SKYKOMISH RIVER

DRAFT SOUTH FORK SKYKOMISH RIVER DRAFT SOUTH FORK SKYKOMISH RIVER 9 levees and revetments / Approximately 1.1 miles of river bank are armored Revetments provide limited, localized erosion protection, but impact habitat Frequent and costly

More information

CHAPTER 7 STORM WATER DESIGN

CHAPTER 7 STORM WATER DESIGN CITY OF BOULDER DESIGN AND CONSTRUCTION STANDARDS CHAPTER 7 STORM WATER DESIGN TABLE OF CONTENTS Section Page 7.01 GENERAL...4 (A) INTENT... 4 (B) STORM WATER AND GREENWAYS MASTER PLANS... 4 (C) REFERENCE

More information

Victoria Planning Provisions

Victoria Planning Provisions August 2000 APPLYING FOR A PLANNING PERMIT UNDER THE FLOOD PROVISIONS A guide for councils, referral authorities and applicants This VPP Practice Note provides guidance about making an application for

More information

Frequently-Asked Questions about Floodplains and Flood Insurance FLOOD INSURANCE

Frequently-Asked Questions about Floodplains and Flood Insurance FLOOD INSURANCE Frequently-Asked Questions about Floodplains and Flood Insurance What is a floodplain? The floodplain is any area covered by water during normal water flows, and which could be inundated as a result of

More information

Permit Application No. Development Address. Legal Description. A. Flood Plain and Floodway Information and Sources: (To be completed with Staff)

Permit Application No. Development Address. Legal Description. A. Flood Plain and Floodway Information and Sources: (To be completed with Staff) FLOOD PLAIN DEVELOPMENT PERMIT APPLICATION of Olathe, Department of Public Works 1385 S. Robinson Drive P.O. Box 768 Olathe, Kansas 66051-0768 (913) 971-9045 FAX (913) 971-9099 Olathe, Kansas, Community

More information

Lincoln County Floodplain Development Permit Application

Lincoln County Floodplain Development Permit Application Lincoln County Floodplain Development Permit Application Application # FP Use Permit Variance Appeal Date SECTION I: GENERAL PROVISIONS (APPLICANT to read and sign) 1. No work of any kind may start until

More information

The Basics of Chapter 105 Waterways and Wetlands Permitting in PA

The Basics of Chapter 105 Waterways and Wetlands Permitting in PA The Basics of Chapter 105 Waterways and Wetlands Permitting in PA April 17, 2013 Goal To develop a basic understanding of PA Department of Environmental Protection (DEP) and US Army Corps of Engineers

More information

London Borough of Merton Local Flood Risk Management Strategy

London Borough of Merton Local Flood Risk Management Strategy Local Flood Risk Management Strategy Summary 2014-2020 Introduction In response to the severe flooding across large parts of England and Wales in summer 2007, the Government has recently enacted the Flood

More information

Floodplain Mapping. Vision. Events: 1 in 2 year 1 in 10 year 1 in 20 year 1 in 50 year 1 in 100 year Probable Maximum Flood Climate Change Impacts

Floodplain Mapping. Vision. Events: 1 in 2 year 1 in 10 year 1 in 20 year 1 in 50 year 1 in 100 year Probable Maximum Flood Climate Change Impacts Events: 1 in 2 year 1 in 10 year 1 in 20 year 1 in 50 year 1 in 100 year Probable Maximum Flood Climate Change Impacts Floodplain Mapping 28 General Approaches to Reducing Flooding Risks Reducing Upstream

More information

6 FLOOD DAMAGES ASSESSMENT

6 FLOOD DAMAGES ASSESSMENT FLOOD DAMAGES ASSESSMENT 6-1 6 FLOOD DAMAGES ASSESSMENT Flood damage assessment is an important component of any floodplain management framework. This type of analysis enables the floodplain manager to

More information

REPORTS SUSTAINABILITY AND ENVIRONMENT 11 MAY 2015 ORDINARY COUNCIL MEETING OF COUNCIL

REPORTS SUSTAINABILITY AND ENVIRONMENT 11 MAY 2015 ORDINARY COUNCIL MEETING OF COUNCIL REPORT NO: 0.0 REPORT TITLE: SOURCE: DIVISION: FILE NO: POLICY: - STRATEGIC OBJECTIVE: Planning Scheme Amendment C202: 140-204 Western Avenue, Westmeadows Gareth Edgley, Senior Strategic Planner City Sustainability

More information

USING FLOOD CERTIFICATES TO RAISE FLOOD AWARENESS

USING FLOOD CERTIFICATES TO RAISE FLOOD AWARENESS 38th ANNUAL FLOODPLAIN MANAGEMENT CONFERENCE, USING FLOOD CERTIFICATES TO RAISE FLOOD AWARENESS Drew Bewsher, Director, Bewsher Consulting Pty Ltd Paul Grech, Director, Don Fox Planning Pty Ltd John Maddocks,

More information

Geoprocessing Tools for Surface and Basement Flooding Analysis in SWMM

Geoprocessing Tools for Surface and Basement Flooding Analysis in SWMM 3 Geoprocessing Tools for Surface and Basement Flooding Analysis in SWMM Eric White, James Knighton, Gary Martens, Matthew Plourde and Rajesh Rajan A geoprocessing routine was used for the development

More information

Lisgar District Basement Water Infiltration Investigation Answers to Residents Written Questions Received by Councillors Ward 10 Office

Lisgar District Basement Water Infiltration Investigation Answers to Residents Written Questions Received by Councillors Ward 10 Office Lisgar District Basement Water Infiltration Investigation Part A Answers to Technical Questions 1. There has been a tremendous amount of work done everywhere along the creek. If there was nothing wrong

More information

Designed and produced by geo-graphicsdesign.com DP 300 3/02

Designed and produced by geo-graphicsdesign.com DP 300 3/02 Designed and produced by geo-graphicsdesign.com DP 300 3/02 Guidance for Developers and Regulators Purpose This booklet is produced on behalf of the North East Scotland Flooding Advisory Group and is intended

More information

Final. Contact person: Colin Whittemore Aurecon Centre 1 Century City Drive Waterford Precinct, Century City Cape Town, South Africa

Final. Contact person: Colin Whittemore Aurecon Centre 1 Century City Drive Waterford Precinct, Century City Cape Town, South Africa Review Report and Recommendations for the Remediation of Flood Damage at the Berg River Causeway and the Dam Bypass Channel on Portion of Farms 1646 and 1014, Franschhoek Contact person: Colin Whittemore

More information

The EASTERN GOLF CLUB Ltd. FLOOD RESPONSE PLAN for the EASTERN GOLF CLUB 215 217 Victoria Road Yering. Michael Cawood & Associates Pty Ltd

The EASTERN GOLF CLUB Ltd. FLOOD RESPONSE PLAN for the EASTERN GOLF CLUB 215 217 Victoria Road Yering. Michael Cawood & Associates Pty Ltd The EASTERN GOLF CLUB Ltd FLOOD RESPONSE PLAN for the EASTERN GOLF CLUB 215 217 Victoria Road Yering Document No: Copy No: Version: 2.4 Date: 23 rd August 2011 Michael Cawood & Associates Pty Ltd 8 Stanley

More information

Flooding in Urban Areas - 2D Modelling Approaches for Buildings and Fences

Flooding in Urban Areas - 2D Modelling Approaches for Buildings and Fences Flooding in Urban Areas - 2D Modelling Approaches for Buildings and Fences W.J. Syme BE Civil Hons), MEngSc Res), BMT WBM Pty Ltd, 490 Upper Edward St, Brisbane, Qld, 4000, wjsyme@wbmpl.com.au Abstract:

More information

Floodplain Management and Development in NSW - A Review

Floodplain Management and Development in NSW - A Review SO JUST HOW EXCEPTIONAL IS FAIRFIELD? CONTESTING THE 100 YEAR ARI PLUS 0.5 METRE FLOOD PLANNING LEVEL Sellers, E. and Mooney, A. Fairfield City Council Abstract In August 2006, the then NSW Minister for

More information

Climate Change Case Study: Flood risk arising from future precipitation changes in Gleniti, Timaru

Climate Change Case Study: Flood risk arising from future precipitation changes in Gleniti, Timaru Climate Change Case Study: Flood risk arising from future precipitation changes in Gleniti, Timaru Prepared for the NZ Climate Change Office (Ministry for the Environment) by OPUS International Consultants

More information

FINAL TECHNICAL MEMORANDUM AWD-00002 FLOWS THROUGH FLOOD DAMAGE REDUCTION AREA July 16, 2012

FINAL TECHNICAL MEMORANDUM AWD-00002 FLOWS THROUGH FLOOD DAMAGE REDUCTION AREA July 16, 2012 FINAL TECHNICAL MEMORANDUM AWD-00002 FLOWS THROUGH FLOOD DAMAGE REDUCTION AREA July 16, 2012 Table of Contents TABLE OF CONTENTS Table of Contents... 1 Executive Summary... 2 1 Objective... 4 2 Study Approach...

More information

Tookany Creek Flood Damage Reduction Feasibility Study Section 205 Continuing Authorities Program

Tookany Creek Flood Damage Reduction Feasibility Study Section 205 Continuing Authorities Program Tookany Creek Flood Damage Reduction Feasibility Study Section 205 Continuing Authorities Program Field Inspection Notes 27 29 September 2012 Introduction The U.S. Army Corps of Engineers (Corps), in

More information

SECTION 15 FLOODPLAIN MANAGEMENT

SECTION 15 FLOODPLAIN MANAGEMENT SECTION 15 15.1 Purpose Certain areas of the City of Gardiner, Maine, are subject to periodic flooding, causing serious damages to properties within these areas. Relief is available in the form of flood

More information

I-70 EAST SUPPLEMENTAL DRAFT ENVIRONMENTAL IMPACT STATEMENT AND SECTION 4(F) EVALUATION HYDROLOGY AND HYDRAULICS TECHNICAL REPORT

I-70 EAST SUPPLEMENTAL DRAFT ENVIRONMENTAL IMPACT STATEMENT AND SECTION 4(F) EVALUATION HYDROLOGY AND HYDRAULICS TECHNICAL REPORT I-70 EAST SUPPLEMENTAL DRAFT ENVIRONMENTAL IMPACT STATEMENT AND SECTION 4(F) EVALUATION HYDROLOGY AND HYDRAULICS TECHNICAL REPORT ATTACHMENT M AUGUST 2014 I-70 East Environmental Impact Statement Hydrology

More information

Vital Earth Composting Facility Flood Risk and Drainage Statement

Vital Earth Composting Facility Flood Risk and Drainage Statement Vital Earth Flood Risk and Drainage Statement Final December 2011 Prepared for Vital Earth Ltd Revision Schedule Flood Risk and Drainage Statement December 2011 Rev Date Details Prepared by Reviewed by

More information

OURIMBAH FLOOD RESPONSE PLAN

OURIMBAH FLOOD RESPONSE PLAN OURIMBAH FLOOD RESPONSE PLAN February 2014 2 EMERGENCY CONTACT DETAILS Security Services for all Emergencies (24 Hours) Ourimbah 4348 4222 If not able to be reached please call Newcastle on Newcastle 4921

More information

London Road, Rayleigh Essex Flood Risk Assessment Addendum

London Road, Rayleigh Essex Flood Risk Assessment Addendum FINAL Countryside Properties (UK) Limited Submitted by AECOM 6-8 Greencoat Place London SW1P 1PL London Road, Rayleigh Essex Flood Risk Assessment May 2015 i Limitations AECOM Infrastructure & Environment

More information

Presentation on Flood Risk Management To Engineers Ireland 12 th February 2014. David Keane Cork County Council

Presentation on Flood Risk Management To Engineers Ireland 12 th February 2014. David Keane Cork County Council Presentation on Flood Risk Management To Engineers Ireland 12 th February 2014 David Keane Cork County Council 1 Contents 1. The Power of Water 2. Defenses 3. Flooding & Flood Types 4. Flood Mitigation

More information

APPENDIX 1 Floodplain Management Strategies & Guidelines

APPENDIX 1 Floodplain Management Strategies & Guidelines APPENDIX 1 Floodplain Management Strategies & Guidelines A. Port Phillip Flood Management Plan (2012) B. Draft Flood Management Strategy Port Phillip and Westernport (2015) C. Revised Draft Victorian Floodplain

More information

NEW SOUTH WALES STATE FLOOD SUB PLAN A SUB PLAN OF THE NEW SOUTH WALES DISASTER PLAN (DISPLAN)

NEW SOUTH WALES STATE FLOOD SUB PLAN A SUB PLAN OF THE NEW SOUTH WALES DISASTER PLAN (DISPLAN) NEW SOUTH WALES STATE FLOOD SUB PLAN A SUB PLAN OF THE NEW SOUTH WALES DISASTER PLAN (DISPLAN) AUTHORISATION This New South Wales State Flood Sub Plan is a sub-plan of the State Disaster Plan (DISPLAN).

More information

Lower Raritan Watershed Management Area Stormwater & Flooding Subcommittee Strategy Worksheet LRSW-S3C1

Lower Raritan Watershed Management Area Stormwater & Flooding Subcommittee Strategy Worksheet LRSW-S3C1 Strategy Name: Reduce Existing Potential for Flood Damages LRSW-S3C1. Develop and implement a program to: Minimize flood damages through the use of structural measures. Minimize flood damages through the

More information

Planning for sea level rise. Assessing development in areas prone to tidal inundation from sea level rise in the Port Phillip and Westernport Region

Planning for sea level rise. Assessing development in areas prone to tidal inundation from sea level rise in the Port Phillip and Westernport Region Planning for sea level rise Assessing development in areas prone to tidal inundation from sea level rise in the Port Phillip and Westernport Region Table of contents Introduction 1 New flood levels for

More information

River Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a

River Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a River Wensum Restoration Strategy Swanton Morley Restoration Scheme Reach 14a At a glance River restoration benefits: Improved planform, channel cross-section, flow variation and sediment process. Improved

More information

Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013

Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013 Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013 1. Design alternatives for large capital flood projects (basinlevel water retention and Interstate

More information

HYDROLOGIC/HYDRAULIC MODELING OF WESTMINSTER WATERSHED ORANGE COUNTY, CALIFORNIA

HYDROLOGIC/HYDRAULIC MODELING OF WESTMINSTER WATERSHED ORANGE COUNTY, CALIFORNIA HYDROLOGIC/HYDRAULIC MODELING OF WESTMINSTER WATERSHED ORANGE COUNTY, CALIFORNIA James Chieh, Ph.D., P.E., Senior Hydraulic Engineer, USACE, Los Angeles, California, Shih.H.Chieh@usace.army.mil; Jay Pak,

More information

Stormwater Management Functional Servicing Report

Stormwater Management Functional Servicing Report Stormwater Management Functional Servicing Report Part of Lot 12, Concession 10 Township of Cavan Monaghan Ian Cameron Rural Subdivision Engage Project No. 14016 Engage Engineering Ltd. January 7, 2015

More information

ATTACHMENT 9. I. Description of the Project and its Relationship to Other Projects in the Proposal

ATTACHMENT 9. I. Description of the Project and its Relationship to Other Projects in the Proposal ATTACHMENT 9. ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION AND COSTS AND BENEFITS LOWER CARMEL RIVER FLOODPLAIN ENHANCEMENT I. Description of the Project and its Relationship to Other Projects in the Proposal

More information

1.1 At its meeting on 11 December 2014, Council resolved to (9.3): 1.3 This report also seeks the Council s approval to:

1.1 At its meeting on 11 December 2014, Council resolved to (9.3): 1.3 This report also seeks the Council s approval to: DUDLEY CREEK FLOOD REMEDIATION UPDATE Executive Leadership Team Member responsible: Officer responsible: Author: Director, Council Facilities and Infrastructure Unit Manager, Stormwater and Land Drainage

More information

How To Build A Road Into A Lake In The North Of The Korean Island Of Hongkoon

How To Build A Road Into A Lake In The North Of The Korean Island Of Hongkoon 3D view of intake - looking upstream from the west bank New intake access track forming upstream bund The intake is located at grid ref 204791,888654. The intake screen arrangement is a drop bar type screen

More information

CHAPTER 9 STORM DRAINAGE DESIGN AND STORMWATER QUALITY REGULATIONS

CHAPTER 9 STORM DRAINAGE DESIGN AND STORMWATER QUALITY REGULATIONS June 27, 2011 Chapter 9 Storm Drainage Design and Stormwater Quality Regulations Table of Contents CHAPTER 9 STORM DRAINAGE DESIGN AND STORMWATER QUALITY REGULATIONS Table of Contents Chapter 9 Storm Drainage

More information

DANIELS RUN STREAM RESTORATION, FAIRFAX, VIRGINIA: FLOODPLAIN ANALYSIS REPORT

DANIELS RUN STREAM RESTORATION, FAIRFAX, VIRGINIA: FLOODPLAIN ANALYSIS REPORT DANIELS RUN STREAM RESTORATION, FAIRFAX, VIRGINIA: FLOODPLAIN ANALYSIS REPORT By: Conor C. Shea Stream Habitat Assessment and Restoration Program U.S. Fish and Wildlife Service CBFO-S07-01 Prepared in

More information

CLEARWATER DAM BLACK RIVER, MISSOURI MAJOR REHABILITATION STUDY

CLEARWATER DAM BLACK RIVER, MISSOURI MAJOR REHABILITATION STUDY US Army Corps of Engineers Little Rock District CLEARWATER DAM BLACK RIVER, MISSOURI MAJOR REHABILITATION STUDY HYDROLOGIC AND HYDRAULIC ANALYSES NOTES: 1) All elevations listed in this report are referenced

More information

1.2 This technical note provides a preliminary investigation into the Flood Risk and provides outline drainage strategies.

1.2 This technical note provides a preliminary investigation into the Flood Risk and provides outline drainage strategies. ODYSSEY MARKIDES TECHNICAL NOTE PROJECT : CHAILEY HOUSE, BLEWBURY JOB NO. : 14-216 NOTE TITLE : PRELIMINARY FLOODING AND DRAIANGE AUTHOR : STEVEN ROOTH APPROVED : ANDREAS MARKIDES DATE : 02/09/2014 1.0

More information

CEQA PRACTICUM: SUPPLEMENTAL ENVIRONMENTAL REVIEW

CEQA PRACTICUM: SUPPLEMENTAL ENVIRONMENTAL REVIEW NAEP/AEP Conference Los Angeles CEQA PRACTICUM: SUPPLEMENTAL ENVIRONMENTAL REVIEW P RESENTED B Y : C URTIS E. ALLING, AICP G ARY D. JAKOBS, AICP A SCENT E NVIRONMENTAL, INC. A PRIL 2013 AEP CONFERENCE

More information

Community Outreach Kickoff Summaries. Boulder Creek and South Boulder Creek Meeting held Jan. 8, 2014, approximately 80 attendees

Community Outreach Kickoff Summaries. Boulder Creek and South Boulder Creek Meeting held Jan. 8, 2014, approximately 80 attendees Boulder Creek and South Boulder Creek Meeting held Jan. 8, 2014, approximately 80 attendees Key issues Discussed Roads & Access Damaged roads. The Oil & Gas company access roads acted like dams Public

More information

AIR QUALITY TECHNICAL MEMORANDUM

AIR QUALITY TECHNICAL MEMORANDUM AIR QUALITY TECHNICAL MEMORANDUM AIR QUALITY TECHNICAL MEMORANDUM GOLDEN GLADES INTERCHANGE PD&E STUDY Miami-Dade County, Florida Financial Management Number: 428358-1-22-01 Efficient Transportation Decision

More information

Kanawha County Floodplain Regulations Quick Guide & Overview

Kanawha County Floodplain Regulations Quick Guide & Overview Kanawha County Floodplain Regulations Quick Guide & Overview CHUCK GRISHABER, CFM KANAWHA COUNTY FLOOD PLAIN MANAGER Office: 304.357.0570 Mobile: 304-356.0979 Fax: 304.357.0572 chuckgrishaber@kanawha.us

More information

Flood Emergency Management Plan. NSW Long Term Train Support Facility (Hexham)

Flood Emergency Management Plan. NSW Long Term Train Support Facility (Hexham) Flood Emergency Management Plan NSW Long Term Train Support Facility (Hexham) Application: SSI - MP 07_0171 February 2014 Table of Contents 1.0 INTRODUCTION... 1 1.1 PURPOSE OF THIS REPORT... 1 1.2 SCOPE...

More information

Floor level for a house on a flood-prone site

Floor level for a house on a flood-prone site Determination No 99/005 Floor level for a house on a flood-prone site 1 THE MATTER TO BE DETERMINED 1.1 The matter before the Authority is a dispute as to whether building consent should be granted for

More information

Bexar County Public Works Department Flood Control Program

Bexar County Public Works Department Flood Control Program Bexar County Public Works Department Flood Control Program SC 4 Knoll Creek Drainage Improvements February 18, 2015 Meeting Agenda Introductions Bexar County Precinct 4 Chief of Staff Office of the County

More information

FLOOD PLAIN DESIGNATION AND PROTECTION

FLOOD PLAIN DESIGNATION AND PROTECTION CITY OF RICHMOND FLOOD PLAIN DESIGNATION AND PROTECTION BYLAW NO. 8204 EFFECTIVE DATE - SEPTEMBER 8, 2008 CONSOLIDATED FOR CONVENIENCE ONLY This is a consolidation of the bylaws listed below. The amendment

More information

GENERAL PERMIT BWEW-GP-11 MAINTENANCE, TESTING, REPAIR, REHABILITATION, OR REPLACEMENT OF WATER OBSTRUCTIONS AND ENCROACHMENTS

GENERAL PERMIT BWEW-GP-11 MAINTENANCE, TESTING, REPAIR, REHABILITATION, OR REPLACEMENT OF WATER OBSTRUCTIONS AND ENCROACHMENTS COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF WATERWAYS ENGINEERING AND WETLANDS GENERAL PERMIT BWEW-GP-11 MAINTENANCE, TESTING, REPAIR, REHABILITATION, OR REPLACEMENT OF

More information

EXISTING STRUCTURES 1) FAIR MARKET VALUE OF STRUCTURE(s) BEFORE IMPROVEMENT: 2) COST OF IMPROVEMENTS:

EXISTING STRUCTURES 1) FAIR MARKET VALUE OF STRUCTURE(s) BEFORE IMPROVEMENT: 2) COST OF IMPROVEMENTS: Date Received: Received By: Project/Permit Number: Fee: (To be Completed by MOA) FLOOD HAZARD PERMIT APPLICATION (Please fill out application completely; Indicate NA if necessary. Property information

More information

Updated Federal Emergency Management Agency Flood Insurance Rate Maps and Zoning Ordinance Update. July 16, 2015 Policy Committee

Updated Federal Emergency Management Agency Flood Insurance Rate Maps and Zoning Ordinance Update. July 16, 2015 Policy Committee Updated Federal Emergency Management Agency Flood Insurance Rate Maps and Zoning Ordinance Update July 16, 2015 Policy Committee FEMA Map Update Costal Analysis and mapping study by FEMA in 2009 Changes

More information

BRIDGES ARE relatively expensive but often are

BRIDGES ARE relatively expensive but often are Chapter 10 Bridges Chapter 10 Bridges Bridg Bridges -- usually the best, but most expensive drainage crossing structure. Protect bridges against scour. BRIDGES ARE relatively expensive but often are the

More information

Procedures for No-Rise Certification For Proposed Developments in the Regulatory Floodway

Procedures for No-Rise Certification For Proposed Developments in the Regulatory Floodway US Department of Homeland Security Region X 130 228 th Street, SW Bothell, WA 98021 Procedures for No-Rise Certification For Proposed Developments in the Regulatory Floodway Section 60.3 (d) (3) of the

More information

PLANNING APPLICATION: 12/00056/APP

PLANNING APPLICATION: 12/00056/APP PLANNING APPLICATION: 12/00056/APP In the event that a recommendation on this planning application is overturned the Committee is reminded of the advice contained on the front page of the agenda for Reports

More information

Fort Dodge Stormwater Master Planning. Prepared By: Ralph C. Stark, Jr., P.E., C.F.M. Joel N. Krause, P.E., C.F.M.

Fort Dodge Stormwater Master Planning. Prepared By: Ralph C. Stark, Jr., P.E., C.F.M. Joel N. Krause, P.E., C.F.M. Fort Dodge Stormwater Master Planning Prepared By: Ralph C. Stark, Jr., P.E., C.F.M. Joel N. Krause, P.E., C.F.M. Project Location Project Background Flooding History Localized flooding and storm sewer

More information

How To Write A Watercourse Crossing

How To Write A Watercourse Crossing Code of Practice for Watercourse Crossings Made under the Water Act and the Water (Ministerial) Regulation Consolidated to include amendments in force as of June 24, 2013 Office Consolidation Published

More information

Appendix C. Project Opportunities. Middle Twisp River (RM 7.8 18.12)

Appendix C. Project Opportunities. Middle Twisp River (RM 7.8 18.12) Appendix C Project Opportunities Middle Twisp River (RM 7.8 18.12) This table describes project opportunities by project area. Locator maps of the project opportunities are included below the table. Reach

More information

2011 HYDRAULICS MANUAL

2011 HYDRAULICS MANUAL STATE OF LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT P.O. Box 94245 Baton Rouge, Louisiana 70804-9245 http://www.dotd.la.gov/ HYDRAULICS MANUAL Hydraulics (225) 379-1306 PREFACE The following

More information

Parish Flood Report: Broadwell & Kencot

Parish Flood Report: Broadwell & Kencot Parish Flood Report: Broadwell & Kencot Version 1 This report may be revised in the future to incorporate ongoing consultation results Boardwell & Kencot Flood Report 1 of 37 June 2008 Contents 1.0 INTRODUCTION...3

More information

Chapter 9: Water, Hydrology and Drainage Land West of Uttoxeter

Chapter 9: Water, Hydrology and Drainage Land West of Uttoxeter Chapter 9: Water, Hydrology and Drainage Land West of Uttoxeter ENVIRONMENTAL STATEMENT: VOLUME 1 9.1 INTRODUCTION 9.1.1 This Chapter considers the effects of the Project on surface water and groundwater

More information