Cost estimate for renovating city owned rental building located on 2 nd Ave. SW

Size: px
Start display at page:

Download "Cost estimate for renovating city owned rental building located on 2 nd Ave. SW"

Transcription

1 Summary Cost estimate for renovating city owned rental building located on 2 nd Ave. SW For the past year city crews have been battling water infiltration issues at the rental building currently being rented by Krista Squires for use as a Health and Wellness center. Numerous holes and cracks have been repaired in the roof and sidewalls. Three weeks ago city crews investigated the presence of mold in the building entryway. They removed sections of drywall and found a substantial amount of black mold and termite damage. Due to the health hazards associated with breathing black mold spores, I contacted Duraclean to investigate. The city requested Duraclean remove the mold damaged building materials from rear entryway and perform mold post-test on building. Test came back positive for high levels of black mold spores. Based on test results, Duraclean believes the mold could be widespread throughout the entire building. Below is estimate of costs for removing and replacing mold damaged building materials, repairing the building to acceptable standards, and bringing the building up to current electrical codes. Building currently has an antiquated electrical system. Cost estimates assume city crews will perform installation of drywall, insulation, subfloor, and windows. Several other issues with the building addressed in the cost breakdown are the roof and exterior structure. The roof has several main roof joists that are rotten and require replacement, and some water damage is present on the roof sheeting. This spring city crews placed a shingle overlay on the roof to cover some fairly large holes in the roof. These holes were letting substantial amounts of rain water into the building and appear to have been there for several years, which would account for damage to the roof joists and sheeting. The exterior block walls also are showing signs of separation and cracking on the east side of building. A few weeks ago we had a brick mason look at structure and give a ballpark estimate for repair. Overall the structure of the exterior walls are in acceptable condition, however the thin layer of masonry overlay is cracked and damaged, and should to be repaired to prevent water infiltration and future damage to structure.

2 Cost Breakdown Mold mitigation Duraclean estimate $6,500 to $8,500 Electrical Esco Electric ballpark estimate not including light fixtures $5,000 Electrical Fixtures - Menards, $450 Building Materials Gordon Lumber: Drywall, Insulation, Subfloor, Windows $5,839 Exterminator Quality Pest Control ballpark estimate for Termites $600 to $1,000 Roof Repair - Building materials plus rough estimate of labor time $9,500 Crack Repair Exterior Masonry Stucco - Al Allsup Masonry $5,600 Finish flooring - Carpet King estimate for high traffic vinyl $2,250 to $3,600 Unknowns 5% of total cost $1,200 Total Lowest Estimate $36,939 Total Highest Estimate $40,689

3 Summary Cost estimate for renovating city owned rental building located on 2 nd Ave. SW For the past year city crews have been battling water infiltration issues at the rental building currently being rented by Krista Squires for use as a Health and Wellness center. Numerous holes and cracks have been repaired in the roof and sidewalls. Three weeks ago city crews investigated the presence of mold in the building entryway. They removed sections of drywall and found a substantial amount of black mold and termite damage. Due to the health hazards associated with breathing black mold spores, I contacted Duraclean to investigate. The city requested Duraclean remove the mold damaged building materials from rear entryway and perform mold post-test on building. Test came back positive for high levels of black mold spores. Based on test results, Duraclean believes the mold could be widespread throughout the entire building. Below is estimate of costs for removing and replacing mold damaged building materials, repairing the building to acceptable standards, and bringing the building up to current electrical codes. Building currently has an antiquated electrical system. Cost estimates assume city crews will perform installation of drywall, insulation, subfloor, and windows. Several other issues with the building addressed in the cost breakdown are the roof and exterior structure. The roof has several main roof joists that are rotten and require replacement, and some water damage is present on the roof sheeting. This spring city crews placed a shingle overlay on the roof to cover some fairly large holes in the roof. These holes were letting substantial amounts of rain water into the building and appear to have been there for several years, which would account for damage to the roof joists and sheeting. The exterior block walls also are showing signs of separation and cracking on the east side of building. A few weeks ago we had a brick mason look at structure and give a ballpark estimate for repair. Overall the structure of the exterior walls are in acceptable condition, however the thin layer of masonry overlay is cracked and damaged, and should to be repaired to prevent water infiltration and future damage to structure.

4 Cost Breakdown Mold mitigation Duraclean estimate $6,500 to $8,500 Electrical Esco Electric ballpark estimate not including light fixtures $5,000 Electrical Fixtures - Menards, $450 Building Materials Gordon Lumber: Drywall, Insulation, Subfloor, Windows $5,839 Exterminator Quality Pest Control ballpark estimate for Termites $600 to $1,000 Roof Repair - Building materials plus rough estimate of labor time $9,500 Crack Repair Exterior Masonry Stucco - Al Allsup Masonry $5,600 Finish flooring - Carpet King estimate for high traffic vinyl $2,250 to $3,600 Unknowns 5% of total cost $1,200 Total Lowest Estimate $36,939 Total Highest Estimate $40,689

5 Summary Cost estimate for renovating city owned rental building located on 2 nd Ave. SW For the past year city crews have been battling water infiltration issues at the rental building currently being rented by Krista Squires for use as a Health and Wellness center. Numerous holes and cracks have been repaired in the roof and sidewalls. Three weeks ago city crews investigated the presence of mold in the building entryway. They removed sections of drywall and found a substantial amount of black mold and termite damage. Due to the health hazards associated with breathing black mold spores, I contacted Duraclean to investigate. The city requested Duraclean remove the mold damaged building materials from rear entryway and perform mold post-test on building. Test came back positive for high levels of black mold spores. Based on test results, Duraclean believes the mold could be widespread throughout the entire building. Below is estimate of costs for removing and replacing mold damaged building materials, repairing the building to acceptable standards, and bringing the building up to current electrical codes. Building currently has an antiquated electrical system. Cost estimates assume city crews will perform installation of drywall, insulation, subfloor, and windows. Several other issues with the building addressed in the cost breakdown are the roof and exterior structure. The roof has several main roof joists that are rotten and require replacement, and some water damage is present on the roof sheeting. This spring city crews placed a shingle overlay on the roof to cover some fairly large holes in the roof. These holes were letting substantial amounts of rain water into the building and appear to have been there for several years, which would account for damage to the roof joists and sheeting. The exterior block walls also are showing signs of separation and cracking on the east side of building. A few weeks ago we had a brick mason look at structure and give a ballpark estimate for repair. Overall the structure of the exterior walls are in acceptable condition, however the thin layer of masonry overlay is cracked and damaged, and should to be repaired to prevent water infiltration and future damage to structure.

6 Cost Breakdown Mold mitigation Duraclean estimate $6,500 to $8,500 Electrical Esco Electric ballpark estimate not including light fixtures $5,000 Electrical Fixtures - Menards, $450 Building Materials Gordon Lumber: Drywall, Insulation, Subfloor, Windows $5,839 Exterminator Quality Pest Control ballpark estimate for Termites $600 to $1,000 Roof Repair - Building materials plus rough estimate of labor time $9,500 Crack Repair Exterior Masonry Stucco - Al Allsup Masonry $5,600 Finish flooring - Carpet King estimate for high traffic vinyl $2,250 to $3,600 Unknowns 5% of total cost $1,200 Total Lowest Estimate $36,939 Total Highest Estimate $40,689

7 Summary Cost estimate for renovating city owned rental building located on 2 nd Ave. SW For the past year city crews have been battling water infiltration issues at the rental building currently being rented by Krista Squires for use as a Health and Wellness center. Numerous holes and cracks have been repaired in the roof and sidewalls. Three weeks ago city crews investigated the presence of mold in the building entryway. They removed sections of drywall and found a substantial amount of black mold and termite damage. Due to the health hazards associated with breathing black mold spores, I contacted Duraclean to investigate. The city requested Duraclean remove the mold damaged building materials from rear entryway and perform mold post-test on building. Test came back positive for high levels of black mold spores. Based on test results, Duraclean believes the mold could be widespread throughout the entire building. Below is estimate of costs for removing and replacing mold damaged building materials, repairing the building to acceptable standards, and bringing the building up to current electrical codes. Building currently has an antiquated electrical system. Cost estimates assume city crews will perform installation of drywall, insulation, subfloor, and windows. Several other issues with the building addressed in the cost breakdown are the roof and exterior structure. The roof has several main roof joists that are rotten and require replacement, and some water damage is present on the roof sheeting. This spring city crews placed a shingle overlay on the roof to cover some fairly large holes in the roof. These holes were letting substantial amounts of rain water into the building and appear to have been there for several years, which would account for damage to the roof joists and sheeting. The exterior block walls also are showing signs of separation and cracking on the east side of building. A few weeks ago we had a brick mason look at structure and give a ballpark estimate for repair. Overall the structure of the exterior walls are in acceptable condition, however the thin layer of masonry overlay is cracked and damaged, and should to be repaired to prevent water infiltration and future damage to structure.

8 Cost Breakdown Mold mitigation Duraclean estimate $6,500 to $8,500 Electrical Esco Electric ballpark estimate not including light fixtures $5,000 Electrical Fixtures - Menards, $450 Building Materials Gordon Lumber: Drywall, Insulation, Subfloor, Windows $5,839 Exterminator Quality Pest Control ballpark estimate for Termites $600 to $1,000 Roof Repair - Building materials plus rough estimate of labor time $9,500 Crack Repair Exterior Masonry Stucco - Al Allsup Masonry $5,600 Finish flooring - Carpet King estimate for high traffic vinyl $2,250 to $3,600 Unknowns 5% of total cost $1,200 Total Lowest Estimate $36,939 Total Highest Estimate $40,689

9 Summary Cost estimate for renovating city owned rental building located on 2 nd Ave. SW For the past year city crews have been battling water infiltration issues at the rental building currently being rented by Krista Squires for use as a Health and Wellness center. Numerous holes and cracks have been repaired in the roof and sidewalls. Three weeks ago city crews investigated the presence of mold in the building entryway. They removed sections of drywall and found a substantial amount of black mold and termite damage. Due to the health hazards associated with breathing black mold spores, I contacted Duraclean to investigate. The city requested Duraclean remove the mold damaged building materials from rear entryway and perform mold post-test on building. Test came back positive for high levels of black mold spores. Based on test results, Duraclean believes the mold could be widespread throughout the entire building. Below is estimate of costs for removing and replacing mold damaged building materials, repairing the building to acceptable standards, and bringing the building up to current electrical codes. Building currently has an antiquated electrical system. Cost estimates assume city crews will perform installation of drywall, insulation, subfloor, and windows. Several other issues with the building addressed in the cost breakdown are the roof and exterior structure. The roof has several main roof joists that are rotten and require replacement, and some water damage is present on the roof sheeting. This spring city crews placed a shingle overlay on the roof to cover some fairly large holes in the roof. These holes were letting substantial amounts of rain water into the building and appear to have been there for several years, which would account for damage to the roof joists and sheeting. The exterior block walls also are showing signs of separation and cracking on the east side of building. A few weeks ago we had a brick mason look at structure and give a ballpark estimate for repair. Overall the structure of the exterior walls are in acceptable condition, however the thin layer of masonry overlay is cracked and damaged, and should to be repaired to prevent water infiltration and future damage to structure.

10 Cost Breakdown Mold mitigation Duraclean estimate $6,500 to $8,500 Electrical Esco Electric ballpark estimate not including light fixtures $5,000 Electrical Fixtures - Menards, $450 Building Materials Gordon Lumber: Drywall, Insulation, Subfloor, Windows $5,839 Exterminator Quality Pest Control ballpark estimate for Termites $600 to $1,000 Roof Repair - Building materials plus rough estimate of labor time $9,500 Crack Repair Exterior Masonry Stucco - Al Allsup Masonry $5,600 Finish flooring - Carpet King estimate for high traffic vinyl $2,250 to $3,600 Unknowns 5% of total cost $1,200 Total Lowest Estimate $36,939 Total Highest Estimate $40,689

11 Summary Cost estimate for renovating city owned rental building located on 2 nd Ave. SW For the past year city crews have been battling water infiltration issues at the rental building currently being rented by Krista Squires for use as a Health and Wellness center. Numerous holes and cracks have been repaired in the roof and sidewalls. Three weeks ago city crews investigated the presence of mold in the building entryway. They removed sections of drywall and found a substantial amount of black mold and termite damage. Due to the health hazards associated with breathing black mold spores, I contacted Duraclean to investigate. The city requested Duraclean remove the mold damaged building materials from rear entryway and perform mold post-test on building. Test came back positive for high levels of black mold spores. Based on test results, Duraclean believes the mold could be widespread throughout the entire building. Below is estimate of costs for removing and replacing mold damaged building materials, repairing the building to acceptable standards, and bringing the building up to current electrical codes. Building currently has an antiquated electrical system. Cost estimates assume city crews will perform installation of drywall, insulation, subfloor, and windows. Several other issues with the building addressed in the cost breakdown are the roof and exterior structure. The roof has several main roof joists that are rotten and require replacement, and some water damage is present on the roof sheeting. This spring city crews placed a shingle overlay on the roof to cover some fairly large holes in the roof. These holes were letting substantial amounts of rain water into the building and appear to have been there for several years, which would account for damage to the roof joists and sheeting. The exterior block walls also are showing signs of separation and cracking on the east side of building. A few weeks ago we had a brick mason look at structure and give a ballpark estimate for repair. Overall the structure of the exterior walls are in acceptable condition, however the thin layer of masonry overlay is cracked and damaged, and should to be repaired to prevent water infiltration and future damage to structure.

12 Cost Breakdown Mold mitigation Duraclean estimate $6,500 to $8,500 Electrical Esco Electric ballpark estimate not including light fixtures $5,000 Electrical Fixtures - Menards, $450 Building Materials Gordon Lumber: Drywall, Insulation, Subfloor, Windows $5,839 Exterminator Quality Pest Control ballpark estimate for Termites $600 to $1,000 Roof Repair - Building materials plus rough estimate of labor time $9,500 Crack Repair Exterior Masonry Stucco - Al Allsup Masonry $5,600 Finish flooring - Carpet King estimate for high traffic vinyl $2,250 to $3,600 Unknowns 5% of total cost $1,200 Total Lowest Estimate $36,939 Total Highest Estimate $40,689

13 Summary Cost estimate for renovating city owned rental building located on 2 nd Ave. SW For the past year city crews have been battling water infiltration issues at the rental building currently being rented by Krista Squires for use as a Health and Wellness center. Numerous holes and cracks have been repaired in the roof and sidewalls. Three weeks ago city crews investigated the presence of mold in the building entryway. They removed sections of drywall and found a substantial amount of black mold and termite damage. Due to the health hazards associated with breathing black mold spores, I contacted Duraclean to investigate. The city requested Duraclean remove the mold damaged building materials from rear entryway and perform mold post-test on building. Test came back positive for high levels of black mold spores. Based on test results, Duraclean believes the mold could be widespread throughout the entire building. Below is estimate of costs for removing and replacing mold damaged building materials, repairing the building to acceptable standards, and bringing the building up to current electrical codes. Building currently has an antiquated electrical system. Cost estimates assume city crews will perform installation of drywall, insulation, subfloor, and windows. Several other issues with the building addressed in the cost breakdown are the roof and exterior structure. The roof has several main roof joists that are rotten and require replacement, and some water damage is present on the roof sheeting. This spring city crews placed a shingle overlay on the roof to cover some fairly large holes in the roof. These holes were letting substantial amounts of rain water into the building and appear to have been there for several years, which would account for damage to the roof joists and sheeting. The exterior block walls also are showing signs of separation and cracking on the east side of building. A few weeks ago we had a brick mason look at structure and give a ballpark estimate for repair. Overall the structure of the exterior walls are in acceptable condition, however the thin layer of masonry overlay is cracked and damaged, and should to be repaired to prevent water infiltration and future damage to structure.

14 Cost Breakdown Mold mitigation Duraclean estimate $6,500 to $8,500 Electrical Esco Electric ballpark estimate not including light fixtures $5,000 Electrical Fixtures - Menards, $450 Building Materials Gordon Lumber: Drywall, Insulation, Subfloor, Windows $5,839 Exterminator Quality Pest Control ballpark estimate for Termites $600 to $1,000 Roof Repair - Building materials plus rough estimate of labor time $9,500 Crack Repair Exterior Masonry Stucco - Al Allsup Masonry $5,600 Finish flooring - Carpet King estimate for high traffic vinyl $2,250 to $3,600 Unknowns 5% of total cost $1,200 Total Lowest Estimate $36,939 Total Highest Estimate $40,689

15 Summary Cost estimate for renovating city owned rental building located on 2 nd Ave. SW For the past year city crews have been battling water infiltration issues at the rental building currently being rented by Krista Squires for use as a Health and Wellness center. Numerous holes and cracks have been repaired in the roof and sidewalls. Three weeks ago city crews investigated the presence of mold in the building entryway. They removed sections of drywall and found a substantial amount of black mold and termite damage. Due to the health hazards associated with breathing black mold spores, I contacted Duraclean to investigate. The city requested Duraclean remove the mold damaged building materials from rear entryway and perform mold post-test on building. Test came back positive for high levels of black mold spores. Based on test results, Duraclean believes the mold could be widespread throughout the entire building. Below is estimate of costs for removing and replacing mold damaged building materials, repairing the building to acceptable standards, and bringing the building up to current electrical codes. Building currently has an antiquated electrical system. Cost estimates assume city crews will perform installation of drywall, insulation, subfloor, and windows. Several other issues with the building addressed in the cost breakdown are the roof and exterior structure. The roof has several main roof joists that are rotten and require replacement, and some water damage is present on the roof sheeting. This spring city crews placed a shingle overlay on the roof to cover some fairly large holes in the roof. These holes were letting substantial amounts of rain water into the building and appear to have been there for several years, which would account for damage to the roof joists and sheeting. The exterior block walls also are showing signs of separation and cracking on the east side of building. A few weeks ago we had a brick mason look at structure and give a ballpark estimate for repair. Overall the structure of the exterior walls are in acceptable condition, however the thin layer of masonry overlay is cracked and damaged, and should to be repaired to prevent water infiltration and future damage to structure.

16 Cost Breakdown Mold mitigation Duraclean estimate $6,500 to $8,500 Electrical Esco Electric ballpark estimate not including light fixtures $5,000 Electrical Fixtures - Menards, $450 Building Materials Gordon Lumber: Drywall, Insulation, Subfloor, Windows $5,839 Exterminator Quality Pest Control ballpark estimate for Termites $600 to $1,000 Roof Repair - Building materials plus rough estimate of labor time $9,500 Crack Repair Exterior Masonry Stucco - Al Allsup Masonry $5,600 Finish flooring - Carpet King estimate for high traffic vinyl $2,250 to $3,600 Unknowns 5% of total cost $1,200 Total Lowest Estimate $36,939 Total Highest Estimate $40,689

17 Summary Cost estimate for renovating city owned rental building located on 2 nd Ave. SW For the past year city crews have been battling water infiltration issues at the rental building currently being rented by Krista Squires for use as a Health and Wellness center. Numerous holes and cracks have been repaired in the roof and sidewalls. Three weeks ago city crews investigated the presence of mold in the building entryway. They removed sections of drywall and found a substantial amount of black mold and termite damage. Due to the health hazards associated with breathing black mold spores, I contacted Duraclean to investigate. The city requested Duraclean remove the mold damaged building materials from rear entryway and perform mold post-test on building. Test came back positive for high levels of black mold spores. Based on test results, Duraclean believes the mold could be widespread throughout the entire building. Below is estimate of costs for removing and replacing mold damaged building materials, repairing the building to acceptable standards, and bringing the building up to current electrical codes. Building currently has an antiquated electrical system. Cost estimates assume city crews will perform installation of drywall, insulation, subfloor, and windows. Several other issues with the building addressed in the cost breakdown are the roof and exterior structure. The roof has several main roof joists that are rotten and require replacement, and some water damage is present on the roof sheeting. This spring city crews placed a shingle overlay on the roof to cover some fairly large holes in the roof. These holes were letting substantial amounts of rain water into the building and appear to have been there for several years, which would account for damage to the roof joists and sheeting. The exterior block walls also are showing signs of separation and cracking on the east side of building. A few weeks ago we had a brick mason look at structure and give a ballpark estimate for repair. Overall the structure of the exterior walls are in acceptable condition, however the thin layer of masonry overlay is cracked and damaged, and should to be repaired to prevent water infiltration and future damage to structure.

18 Cost Breakdown Mold mitigation Duraclean estimate $6,500 to $8,500 Electrical Esco Electric ballpark estimate not including light fixtures $5,000 Electrical Fixtures - Menards, $450 Building Materials Gordon Lumber: Drywall, Insulation, Subfloor, Windows $5,839 Exterminator Quality Pest Control ballpark estimate for Termites $600 to $1,000 Roof Repair - Building materials plus rough estimate of labor time $9,500 Crack Repair Exterior Masonry Stucco - Al Allsup Masonry $5,600 Finish flooring - Carpet King estimate for high traffic vinyl $2,250 to $3,600 Unknowns 5% of total cost $1,200 Total Lowest Estimate $36,939 Total Highest Estimate $40,689

19 Summary Cost estimate for renovating city owned rental building located on 2 nd Ave. SW For the past year city crews have been battling water infiltration issues at the rental building currently being rented by Krista Squires for use as a Health and Wellness center. Numerous holes and cracks have been repaired in the roof and sidewalls. Three weeks ago city crews investigated the presence of mold in the building entryway. They removed sections of drywall and found a substantial amount of black mold and termite damage. Due to the health hazards associated with breathing black mold spores, I contacted Duraclean to investigate. The city requested Duraclean remove the mold damaged building materials from rear entryway and perform mold post-test on building. Test came back positive for high levels of black mold spores. Based on test results, Duraclean believes the mold could be widespread throughout the entire building. Below is estimate of costs for removing and replacing mold damaged building materials, repairing the building to acceptable standards, and bringing the building up to current electrical codes. Building currently has an antiquated electrical system. Cost estimates assume city crews will perform installation of drywall, insulation, subfloor, and windows. Several other issues with the building addressed in the cost breakdown are the roof and exterior structure. The roof has several main roof joists that are rotten and require replacement, and some water damage is present on the roof sheeting. This spring city crews placed a shingle overlay on the roof to cover some fairly large holes in the roof. These holes were letting substantial amounts of rain water into the building and appear to have been there for several years, which would account for damage to the roof joists and sheeting. The exterior block walls also are showing signs of separation and cracking on the east side of building. A few weeks ago we had a brick mason look at structure and give a ballpark estimate for repair. Overall the structure of the exterior walls are in acceptable condition, however the thin layer of masonry overlay is cracked and damaged, and should to be repaired to prevent water infiltration and future damage to structure.

20 Cost Breakdown Mold mitigation Duraclean estimate $6,500 to $8,500 Electrical Esco Electric ballpark estimate not including light fixtures $5,000 Electrical Fixtures - Menards, $450 Building Materials Gordon Lumber: Drywall, Insulation, Subfloor, Windows $5,839 Exterminator Quality Pest Control ballpark estimate for Termites $600 to $1,000 Roof Repair - Building materials plus rough estimate of labor time $9,500 Crack Repair Exterior Masonry Stucco - Al Allsup Masonry $5,600 Finish flooring - Carpet King estimate for high traffic vinyl $2,250 to $3,600 Unknowns 5% of total cost $1,200 Total Lowest Estimate $36,939 Total Highest Estimate $40,689

21 Summary Cost estimate for renovating city owned rental building located on 2 nd Ave. SW For the past year city crews have been battling water infiltration issues at the rental building currently being rented by Krista Squires for use as a Health and Wellness center. Numerous holes and cracks have been repaired in the roof and sidewalls. Three weeks ago city crews investigated the presence of mold in the building entryway. They removed sections of drywall and found a substantial amount of black mold and termite damage. Due to the health hazards associated with breathing black mold spores, I contacted Duraclean to investigate. The city requested Duraclean remove the mold damaged building materials from rear entryway and perform mold post-test on building. Test came back positive for high levels of black mold spores. Based on test results, Duraclean believes the mold could be widespread throughout the entire building. Below is estimate of costs for removing and replacing mold damaged building materials, repairing the building to acceptable standards, and bringing the building up to current electrical codes. Building currently has an antiquated electrical system. Cost estimates assume city crews will perform installation of drywall, insulation, subfloor, and windows. Several other issues with the building addressed in the cost breakdown are the roof and exterior structure. The roof has several main roof joists that are rotten and require replacement, and some water damage is present on the roof sheeting. This spring city crews placed a shingle overlay on the roof to cover some fairly large holes in the roof. These holes were letting substantial amounts of rain water into the building and appear to have been there for several years, which would account for damage to the roof joists and sheeting. The exterior block walls also are showing signs of separation and cracking on the east side of building. A few weeks ago we had a brick mason look at structure and give a ballpark estimate for repair. Overall the structure of the exterior walls are in acceptable condition, however the thin layer of masonry overlay is cracked and damaged, and should to be repaired to prevent water infiltration and future damage to structure.

22 Cost Breakdown Mold mitigation Duraclean estimate $6,500 to $8,500 Electrical Esco Electric ballpark estimate not including light fixtures $5,000 Electrical Fixtures - Menards, $450 Building Materials Gordon Lumber: Drywall, Insulation, Subfloor, Windows $5,839 Exterminator Quality Pest Control ballpark estimate for Termites $600 to $1,000 Roof Repair - Building materials plus rough estimate of labor time $9,500 Crack Repair Exterior Masonry Stucco - Al Allsup Masonry $5,600 Finish flooring - Carpet King estimate for high traffic vinyl $2,250 to $3,600 Unknowns 5% of total cost $1,200 Total Lowest Estimate $36,939 Total Highest Estimate $40,689

23 Summary Cost estimate for renovating city owned rental building located on 2 nd Ave. SW For the past year city crews have been battling water infiltration issues at the rental building currently being rented by Krista Squires for use as a Health and Wellness center. Numerous holes and cracks have been repaired in the roof and sidewalls. Three weeks ago city crews investigated the presence of mold in the building entryway. They removed sections of drywall and found a substantial amount of black mold and termite damage. Due to the health hazards associated with breathing black mold spores, I contacted Duraclean to investigate. The city requested Duraclean remove the mold damaged building materials from rear entryway and perform mold post-test on building. Test came back positive for high levels of black mold spores. Based on test results, Duraclean believes the mold could be widespread throughout the entire building. Below is estimate of costs for removing and replacing mold damaged building materials, repairing the building to acceptable standards, and bringing the building up to current electrical codes. Building currently has an antiquated electrical system. Cost estimates assume city crews will perform installation of drywall, insulation, subfloor, and windows. Several other issues with the building addressed in the cost breakdown are the roof and exterior structure. The roof has several main roof joists that are rotten and require replacement, and some water damage is present on the roof sheeting. This spring city crews placed a shingle overlay on the roof to cover some fairly large holes in the roof. These holes were letting substantial amounts of rain water into the building and appear to have been there for several years, which would account for damage to the roof joists and sheeting. The exterior block walls also are showing signs of separation and cracking on the east side of building. A few weeks ago we had a brick mason look at structure and give a ballpark estimate for repair. Overall the structure of the exterior walls are in acceptable condition, however the thin layer of masonry overlay is cracked and damaged, and should to be repaired to prevent water infiltration and future damage to structure.

24 Cost Breakdown Mold mitigation Duraclean estimate $6,500 to $8,500 Electrical Esco Electric ballpark estimate not including light fixtures $5,000 Electrical Fixtures - Menards, $450 Building Materials Gordon Lumber: Drywall, Insulation, Subfloor, Windows $5,839 Exterminator Quality Pest Control ballpark estimate for Termites $600 to $1,000 Roof Repair - Building materials plus rough estimate of labor time $9,500 Crack Repair Exterior Masonry Stucco - Al Allsup Masonry $5,600 Finish flooring - Carpet King estimate for high traffic vinyl $2,250 to $3,600 Unknowns 5% of total cost $1,200 Total Lowest Estimate $36,939 Total Highest Estimate $40,689

25 Summary Cost estimate for renovating city owned rental building located on 2 nd Ave. SW For the past year city crews have been battling water infiltration issues at the rental building currently being rented by Krista Squires for use as a Health and Wellness center. Numerous holes and cracks have been repaired in the roof and sidewalls. Three weeks ago city crews investigated the presence of mold in the building entryway. They removed sections of drywall and found a substantial amount of black mold and termite damage. Due to the health hazards associated with breathing black mold spores, I contacted Duraclean to investigate. The city requested Duraclean remove the mold damaged building materials from rear entryway and perform mold post-test on building. Test came back positive for high levels of black mold spores. Based on test results, Duraclean believes the mold could be widespread throughout the entire building. Below is estimate of costs for removing and replacing mold damaged building materials, repairing the building to acceptable standards, and bringing the building up to current electrical codes. Building currently has an antiquated electrical system. Cost estimates assume city crews will perform installation of drywall, insulation, subfloor, and windows. Several other issues with the building addressed in the cost breakdown are the roof and exterior structure. The roof has several main roof joists that are rotten and require replacement, and some water damage is present on the roof sheeting. This spring city crews placed a shingle overlay on the roof to cover some fairly large holes in the roof. These holes were letting substantial amounts of rain water into the building and appear to have been there for several years, which would account for damage to the roof joists and sheeting. The exterior block walls also are showing signs of separation and cracking on the east side of building. A few weeks ago we had a brick mason look at structure and give a ballpark estimate for repair. Overall the structure of the exterior walls are in acceptable condition, however the thin layer of masonry overlay is cracked and damaged, and should to be repaired to prevent water infiltration and future damage to structure.

26 Cost Breakdown Mold mitigation Duraclean estimate $6,500 to $8,500 Electrical Esco Electric ballpark estimate not including light fixtures $5,000 Electrical Fixtures - Menards, $450 Building Materials Gordon Lumber: Drywall, Insulation, Subfloor, Windows $5,839 Exterminator Quality Pest Control ballpark estimate for Termites $600 to $1,000 Roof Repair - Building materials plus rough estimate of labor time $9,500 Crack Repair Exterior Masonry Stucco - Al Allsup Masonry $5,600 Finish flooring - Carpet King estimate for high traffic vinyl $2,250 to $3,600 Unknowns 5% of total cost $1,200 Total Lowest Estimate $36,939 Total Highest Estimate $40,689

27 Summary Cost estimate for renovating city owned rental building located on 2 nd Ave. SW For the past year city crews have been battling water infiltration issues at the rental building currently being rented by Krista Squires for use as a Health and Wellness center. Numerous holes and cracks have been repaired in the roof and sidewalls. Three weeks ago city crews investigated the presence of mold in the building entryway. They removed sections of drywall and found a substantial amount of black mold and termite damage. Due to the health hazards associated with breathing black mold spores, I contacted Duraclean to investigate. The city requested Duraclean remove the mold damaged building materials from rear entryway and perform mold post-test on building. Test came back positive for high levels of black mold spores. Based on test results, Duraclean believes the mold could be widespread throughout the entire building. Below is estimate of costs for removing and replacing mold damaged building materials, repairing the building to acceptable standards, and bringing the building up to current electrical codes. Building currently has an antiquated electrical system. Cost estimates assume city crews will perform installation of drywall, insulation, subfloor, and windows. Several other issues with the building addressed in the cost breakdown are the roof and exterior structure. The roof has several main roof joists that are rotten and require replacement, and some water damage is present on the roof sheeting. This spring city crews placed a shingle overlay on the roof to cover some fairly large holes in the roof. These holes were letting substantial amounts of rain water into the building and appear to have been there for several years, which would account for damage to the roof joists and sheeting. The exterior block walls also are showing signs of separation and cracking on the east side of building. A few weeks ago we had a brick mason look at structure and give a ballpark estimate for repair. Overall the structure of the exterior walls are in acceptable condition, however the thin layer of masonry overlay is cracked and damaged, and should to be repaired to prevent water infiltration and future damage to structure.

28 Cost Breakdown Mold mitigation Duraclean estimate $6,500 to $8,500 Electrical Esco Electric ballpark estimate not including light fixtures $5,000 Electrical Fixtures - Menards, $450 Building Materials Gordon Lumber: Drywall, Insulation, Subfloor, Windows $5,839 Exterminator Quality Pest Control ballpark estimate for Termites $600 to $1,000 Roof Repair - Building materials plus rough estimate of labor time $9,500 Crack Repair Exterior Masonry Stucco - Al Allsup Masonry $5,600 Finish flooring - Carpet King estimate for high traffic vinyl $2,250 to $3,600 Unknowns 5% of total cost $1,200 Total Lowest Estimate $36,939 Total Highest Estimate $40,689

29 Summary Cost estimate for renovating city owned rental building located on 2 nd Ave. SW For the past year city crews have been battling water infiltration issues at the rental building currently being rented by Krista Squires for use as a Health and Wellness center. Numerous holes and cracks have been repaired in the roof and sidewalls. Three weeks ago city crews investigated the presence of mold in the building entryway. They removed sections of drywall and found a substantial amount of black mold and termite damage. Due to the health hazards associated with breathing black mold spores, I contacted Duraclean to investigate. The city requested Duraclean remove the mold damaged building materials from rear entryway and perform mold post-test on building. Test came back positive for high levels of black mold spores. Based on test results, Duraclean believes the mold could be widespread throughout the entire building. Below is estimate of costs for removing and replacing mold damaged building materials, repairing the building to acceptable standards, and bringing the building up to current electrical codes. Building currently has an antiquated electrical system. Cost estimates assume city crews will perform installation of drywall, insulation, subfloor, and windows. Several other issues with the building addressed in the cost breakdown are the roof and exterior structure. The roof has several main roof joists that are rotten and require replacement, and some water damage is present on the roof sheeting. This spring city crews placed a shingle overlay on the roof to cover some fairly large holes in the roof. These holes were letting substantial amounts of rain water into the building and appear to have been there for several years, which would account for damage to the roof joists and sheeting. The exterior block walls also are showing signs of separation and cracking on the east side of building. A few weeks ago we had a brick mason look at structure and give a ballpark estimate for repair. Overall the structure of the exterior walls are in acceptable condition, however the thin layer of masonry overlay is cracked and damaged, and should to be repaired to prevent water infiltration and future damage to structure.

30 Cost Breakdown Mold mitigation Duraclean estimate $6,500 to $8,500 Electrical Esco Electric ballpark estimate not including light fixtures $5,000 Electrical Fixtures - Menards, $450 Building Materials Gordon Lumber: Drywall, Insulation, Subfloor, Windows $5,839 Exterminator Quality Pest Control ballpark estimate for Termites $600 to $1,000 Roof Repair - Building materials plus rough estimate of labor time $9,500 Crack Repair Exterior Masonry Stucco - Al Allsup Masonry $5,600 Finish flooring - Carpet King estimate for high traffic vinyl $2,250 to $3,600 Unknowns 5% of total cost $1,200 Total Lowest Estimate $36,939 Total Highest Estimate $40,689

31 Summary Cost estimate for renovating city owned rental building located on 2 nd Ave. SW For the past year city crews have been battling water infiltration issues at the rental building currently being rented by Krista Squires for use as a Health and Wellness center. Numerous holes and cracks have been repaired in the roof and sidewalls. Three weeks ago city crews investigated the presence of mold in the building entryway. They removed sections of drywall and found a substantial amount of black mold and termite damage. Due to the health hazards associated with breathing black mold spores, I contacted Duraclean to investigate. The city requested Duraclean remove the mold damaged building materials from rear entryway and perform mold post-test on building. Test came back positive for high levels of black mold spores. Based on test results, Duraclean believes the mold could be widespread throughout the entire building. Below is estimate of costs for removing and replacing mold damaged building materials, repairing the building to acceptable standards, and bringing the building up to current electrical codes. Building currently has an antiquated electrical system. Cost estimates assume city crews will perform installation of drywall, insulation, subfloor, and windows. Several other issues with the building addressed in the cost breakdown are the roof and exterior structure. The roof has several main roof joists that are rotten and require replacement, and some water damage is present on the roof sheeting. This spring city crews placed a shingle overlay on the roof to cover some fairly large holes in the roof. These holes were letting substantial amounts of rain water into the building and appear to have been there for several years, which would account for damage to the roof joists and sheeting. The exterior block walls also are showing signs of separation and cracking on the east side of building. A few weeks ago we had a brick mason look at structure and give a ballpark estimate for repair. Overall the structure of the exterior walls are in acceptable condition, however the thin layer of masonry overlay is cracked and damaged, and should to be repaired to prevent water infiltration and future damage to structure.

32 Cost Breakdown Mold mitigation Duraclean estimate $6,500 to $8,500 Electrical Esco Electric ballpark estimate not including light fixtures $5,000 Electrical Fixtures - Menards, $450 Building Materials Gordon Lumber: Drywall, Insulation, Subfloor, Windows $5,839 Exterminator Quality Pest Control ballpark estimate for Termites $600 to $1,000 Roof Repair - Building materials plus rough estimate of labor time $9,500 Crack Repair Exterior Masonry Stucco - Al Allsup Masonry $5,600 Finish flooring - Carpet King estimate for high traffic vinyl $2,250 to $3,600 Unknowns 5% of total cost $1,200 Total Lowest Estimate $36,939 Total Highest Estimate $40,689

33 Summary Cost estimate for renovating city owned rental building located on 2 nd Ave. SW For the past year city crews have been battling water infiltration issues at the rental building currently being rented by Krista Squires for use as a Health and Wellness center. Numerous holes and cracks have been repaired in the roof and sidewalls. Three weeks ago city crews investigated the presence of mold in the building entryway. They removed sections of drywall and found a substantial amount of black mold and termite damage. Due to the health hazards associated with breathing black mold spores, I contacted Duraclean to investigate. The city requested Duraclean remove the mold damaged building materials from rear entryway and perform mold post-test on building. Test came back positive for high levels of black mold spores. Based on test results, Duraclean believes the mold could be widespread throughout the entire building. Below is estimate of costs for removing and replacing mold damaged building materials, repairing the building to acceptable standards, and bringing the building up to current electrical codes. Building currently has an antiquated electrical system. Cost estimates assume city crews will perform installation of drywall, insulation, subfloor, and windows. Several other issues with the building addressed in the cost breakdown are the roof and exterior structure. The roof has several main roof joists that are rotten and require replacement, and some water damage is present on the roof sheeting. This spring city crews placed a shingle overlay on the roof to cover some fairly large holes in the roof. These holes were letting substantial amounts of rain water into the building and appear to have been there for several years, which would account for damage to the roof joists and sheeting. The exterior block walls also are showing signs of separation and cracking on the east side of building. A few weeks ago we had a brick mason look at structure and give a ballpark estimate for repair. Overall the structure of the exterior walls are in acceptable condition, however the thin layer of masonry overlay is cracked and damaged, and should to be repaired to prevent water infiltration and future damage to structure.

34 Cost Breakdown Mold mitigation Duraclean estimate $6,500 to $8,500 Electrical Esco Electric ballpark estimate not including light fixtures $5,000 Electrical Fixtures - Menards, $450 Building Materials Gordon Lumber: Drywall, Insulation, Subfloor, Windows $5,839 Exterminator Quality Pest Control ballpark estimate for Termites $600 to $1,000 Roof Repair - Building materials plus rough estimate of labor time $9,500 Crack Repair Exterior Masonry Stucco - Al Allsup Masonry $5,600 Finish flooring - Carpet King estimate for high traffic vinyl $2,250 to $3,600 Unknowns 5% of total cost $1,200 Total Lowest Estimate $36,939 Total Highest Estimate $40,689

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE NOTICE TO PROPERTY OWNER

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE NOTICE TO PROPERTY OWNER NOTICE TO PROPERTY OWNER Rebuilding your Home after the storm? Adding on, renovating, or remodeling your home? Here's information YOU need to know about the 50% Rule. If your home or business is below

More information

Name of course: Residential Construction Site Management (RCSM) Level 1

Name of course: Residential Construction Site Management (RCSM) Level 1 Name of course: Residential Construction Site Management (RCSM) Level 1 Core (required courses) or Optional (elective course): Required Delivery Method: This is an online course only with no classroom

More information

CONDITION OF QUALITY ITEMS

CONDITION OF QUALITY ITEMS CONDITION OF QUALITY ITEMS FOUNDATION Always look for moisture problems and any bulges or irregularities in the walls. Lines on the walls or floors may indicate water problems. Have these been cured? If

More information

201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE

201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE STRUCTURAL INSPECTION REPORT DRAFT 201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE TOWN OF PRESCOTT Date: November 2013 GENIVAR No.: 131-20617-00 2611 Queensview Drive, Suite 300, Ottawa,

More information

Rehab Inspection Report Page 1

Rehab Inspection Report Page 1 Rehab Inspection Report Page 1 Home Address: Construction Style: Number of bedrooms Square footage: Value of offer: Estimated rehab cost: Value of resale: Orientation of house: N S E W Note: orientation

More information

Important Information for Owners of Buildings in Flood Zones

Important Information for Owners of Buildings in Flood Zones Important Information for Owners of Buildings in Flood Zones Rebuilding your home after the storm? Adding on, renovating, or remodeling your home? Here is information YOU need to know about the 50 percent

More information

Notice to Property Owners

Notice to Property Owners Modification or Repair of your Flood Prone Property Notice to Property Owners Rebuilding or Remodeling Your Home If your home or business sustained damage, or if you are making improvements to the structure

More information

APPLICATION FOR NON-SUBSTANTIAL DAMAGE / IMPROVEMENT REVIEW

APPLICATION FOR NON-SUBSTANTIAL DAMAGE / IMPROVEMENT REVIEW APPLICATION FOR NON-SUBSTANTIAL DAMAGE / IMPROVEMENT REVIEW Parcel Number: Owner s Name: Co-Owner s Name: Owner s Mailing Address: Owner Phone Number: FIRM Panel: Lowest Floor Elevation (excluding garage):

More information

Building Condition Assessment Report

Building Condition Assessment Report Building Condition Assessment Report Asset C3c - Oak Terrace Cottage 121 Address Riverview Lands, 2601 Lougheed Highway, Coquitlam, BC. V5C 4J2 Construction Year Size (Gross Floor Area) 1920. 2,553 Sq.Ft.

More information

D Sample Notices to Property Owners, Sample Affidavits, and Other Material

D Sample Notices to Property Owners, Sample Affidavits, and Other Material D Sample Notices to Property Owners, Sample Affidavits, and Other Material These samples are offered to illustrate specific points in the Desk Reference. States and communities should examine them carefully

More information

SUBSTANTIAL IMPROVEMENT/DAMAGE NOTICE TO PROPERTY OWNERS

SUBSTANTIAL IMPROVEMENT/DAMAGE NOTICE TO PROPERTY OWNERS SUBSTANTIAL IMPROVEMENT/DAMAGE NOTICE TO PROPERTY OWNERS Rebuilding or repairing your home/business after the storm? Adding on, renovating, or remodeling your home/business? Here s information YOU need

More information

WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME

WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME 1 THE BUILDING PROCESS The focus of Woodland Homes building department is Quality, Service and Predictability. Through

More information

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage Property Address: Company Name: Contractor Name: Contractor Address: City: State: Zip: License Number: Phone Number

More information

COMPLETE REPORT X LIMITED REPORT SUPPLEMENTAL REPORT REINSPECTION REPORT General Description:

COMPLETE REPORT X LIMITED REPORT SUPPLEMENTAL REPORT REINSPECTION REPORT General Description: Building No. Street City Zip Date of Inspection 21680 Calero Creek Court San Jose 95128 08/31/12 1 of 6 P.O. Box 8361 San Jose, CA 95155 Phone: (408) 224-4688 Fax: (408) 224-4577 Ordered by: Property Owner

More information

Region IV 1371 Peachtree Street. N.E. Suite 700 Atlanta, GA 30309

Region IV 1371 Peachtree Street. N.E. Suite 700 Atlanta, GA 30309 Federal Emergency Management Agency Region IV 1371 Peachtree Street. N.E. Suite 700 Atlanta, GA 30309 NATIONAL FLOOD INSURANCE PROGRAM THE 50% RULE SUBSTANTIAL DAMAGE Pre-FIRM buildings must be elevated

More information

How To Prevent Water Damage To A Home

How To Prevent Water Damage To A Home Having inspected about 800 homes in the last four years, I have seen a lot of problems with many homes. Most of these problems are minor; however, there are some problems that are quite serious. One of

More information

bout your HOUSE before you start Renovating Your Basement Structural Issues And Soil conditions

bout your HOUSE before you start Renovating Your Basement Structural Issues And Soil conditions A bout your HOUSE before you start Renovating Your Basement Structural Issues And Soil conditions CE 28 b Ground slopes towards window well No granular fill or connection to footing drain Ground floor

More information

New FHA Appraisal Reporting Requirements By TJ McCarthy, SRA, IFA

New FHA Appraisal Reporting Requirements By TJ McCarthy, SRA, IFA New FHA Appraisal Reporting Requirements By TJ McCarthy, SRA, IFA I recently attended a seminar on HUD s new Appendix D Valuation Protocol. Appendix D is part of the FHA Handbook 4150.2. The revised appendix

More information

How To Repair A House

How To Repair A House Assessing Structural Damages Please note-this presentation is only intended to be used as a basic educational tool and is by no means all encompassing. Each property should be treated on a case by case

More information

REPAIRING YOUR HOME CONSTRUCTION LOAN PROCEDURES 1-800-589-8850 WWW.FIRSTFEDLORAIN.COM

REPAIRING YOUR HOME CONSTRUCTION LOAN PROCEDURES 1-800-589-8850 WWW.FIRSTFEDLORAIN.COM REPAIRING YOUR HOME CONSTRUCTION LOAN PROCEDURES 1-800-589-8850 WWW.FIRSTFEDLORAIN.COM FIRST FEDERAL SAVINGS AND LOAN ASSOCIATION OF LORAIN YOUR COMMUNITY BANK SINCE 1921 Toll Free 1-800-589-8850 3721

More information

BUILDING DEPARTMENT 8748 W. 82 nd Place - Justice, IL 60458 Phone: (708) 458-2130 Fax: (708) 458-3207

BUILDING DEPARTMENT 8748 W. 82 nd Place - Justice, IL 60458 Phone: (708) 458-2130 Fax: (708) 458-3207 BUILDING DEPARTMENT 8748 W. 82 nd Place - Justice, IL 60458 Phone: (708) 458-2130 Fax: (708) 458-3207 SELF EVALUATION CHECKLIST FOR RESIDENTIAL AND MULTI-FAMILY DWELLING INSPECTIONS The attached checklist

More information

Open House and Home Tour Checklist

Open House and Home Tour Checklist 1 The House Address: Number of floors: Listing price: Basement? Property tax: Outdoor space? Eugh closet space? Style: Eugh storage space? Square footage: Room for expansion? Number of bedrooms: What appliances

More information

COMPLETE REPORT X LIMITED REPORT SUPPLEMENTAL REPORT REINSPECTION REPORT General Description:

COMPLETE REPORT X LIMITED REPORT SUPPLEMENTAL REPORT REINSPECTION REPORT General Description: Building No. Street City Zip Date of Inspection 6080 Whitehaven Court San Jose 95138 01/09/15 1 of 6 Ordered by: Property Owner and/or Party of Interest: Report sent to: Alain Pinel Realty Rachel Rodriguez

More information

bout your HOUSE before you start Repairing And Replacing Materials Exterior Walls

bout your HOUSE before you start Repairing And Replacing Materials Exterior Walls A bout your HOUSE before you start Repairing And Replacing Materials Exterior Walls CE 28 h Exterior finish materials are expected to protect the house from the elements while providing an attractive appearance.

More information

STRUCTURAL ASSESSMENT

STRUCTURAL ASSESSMENT STRUCTURAL ASSESSMENT Project: 1432-1434 East Commerce St. Job. No: 122200 Location: San Antonio, TX Date: Dec. 10, 2012 Weather: Sunny, Windy,60 deg Performed by: Jeff Haughton and Frank Lamas, Alpha

More information

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE APPLICATION REVIEW

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE APPLICATION REVIEW CITY OF EDGEWATER BUILDING DEPARTMENT 104 North Riverside Drive Edgewater, Florida 32132 Phone: (386) 424-2400 X 1514 FAX: (386) 424-2423 SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE APPLICATION SUBSTANTIAL

More information

TAX APPRAISAL DISTRICT OF BELL COUNTY STORES & COMMERCIAL IMPROVEMENT CLASSIFICATION GUIDE

TAX APPRAISAL DISTRICT OF BELL COUNTY STORES & COMMERCIAL IMPROVEMENT CLASSIFICATION GUIDE TAX APPRAISAL DISTRICT OF BELL COUNTY STORES & COMMERCIAL IMPROVEMENT CLASSIFICATION GUIDE 1/22/2008 1 STORES & COMMERCIAL BUILDINGS 1. General Construction Class Descriptions 2. Types a. Class A - Fireproofed

More information

BUNKER HILL ELEMENTARY SCHOOL

BUNKER HILL ELEMENTARY SCHOOL INITIAL YEAR BUILT 1970 BUILDING AREA 98,200 SF CURRENT PROGRAM CAPACITY 332 ENROLLMENT 2008 387 WARD 5 PROPOSED PROGRAM CAPACITY 750 Site Plan BUNKER HILL - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Substantial Improvement/Damage Notice to Property Owners

Substantial Improvement/Damage Notice to Property Owners Substantial Improvement/Damage Notice to Property Owners Rebuilding, Remodeling, Adding on, or Renovating Your Home Here is infonnation YOU need to know about the 50% Rule If your home or business is below

More information

All CDBG-DR Program Subrecipients. Texas General Land Office. Date: August 20, 2014. Damage Assessment Guidelines

All CDBG-DR Program Subrecipients. Texas General Land Office. Date: August 20, 2014. Damage Assessment Guidelines To: From: All CDBG-DR Program Subrecipients Texas General Land Office Date: August 20, 2014 RE: Damage Assessment Guidelines The Texas General Land Office (GLO) has revised the Damage Assessment requirements

More information

Certificate of Appropriateness Applications

Certificate of Appropriateness Applications Certificate of Appropriateness Applications Huntsville Historic Preservation Commission August 10, 2015 Applicant: Philip Buzzetta Submission Date: 07/07/15 Architectural Style: Dutch Colonial Status:

More information

RESNET Building Performance Conference Orlando, FL March 2011

RESNET Building Performance Conference Orlando, FL March 2011 RESNET Building Performance Conference Orlando, FL March 2011 Who we are: Joint Labor-Management Training Trust Fund Est.1969 Training Arm of LIUNA Services 70+ Affiliated Training Centers in the US and

More information

WARRANTIES AND PERFORMANCE STANDARDS T A B L E O F C O N T E N T S General Provisions Introduction Warranties Effective Date of Warranties Exclusive

WARRANTIES AND PERFORMANCE STANDARDS T A B L E O F C O N T E N T S General Provisions Introduction Warranties Effective Date of Warranties Exclusive WARRANTIES AND PERFORMANCE STANDARDS T A B L E O F C O N T E N T S General Provisions Introduction Warranties Effective Date of Warranties Exclusive Warranties Time Limits for Reporting Manufacturer s

More information

SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST

SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST SODA SPRINGS HIGH SCHOOL REPAIRS AND UPGRADES SITE Construction Estimate = $100,000

More information

How To Fix A Gutter Clog

How To Fix A Gutter Clog WATER DAMAGE: 16 EXPENSIVE PROBLEMS CAUSED BY CLOGGED GUTTERS WATER DAMAGE: THE 16 EXPENSIVE PROBLEMS CAUSED BY CLOGGED GUTTERS Water damage is often hidden, discovered late and, once found, expensive

More information

Building Condition Assessment Report

Building Condition Assessment Report C2 - Nurses Resident (aka Administration) Building Condition Assessment Report Asset Address Address Construction Year Size (Gross Floor Area) Asset Type Floors Above Ground Inspection Date C2 - Nurses

More information

October 30, 2014. Mr. & Mrs. Daniel Vick 101 Southwind Cove Benton, AR. Report of Findings, Structural Investigation, Benton, Arkansas, Dear Mr.

October 30, 2014. Mr. & Mrs. Daniel Vick 101 Southwind Cove Benton, AR. Report of Findings, Structural Investigation, Benton, Arkansas, Dear Mr. 117 S. Market St. Benton, AR 72015 * 501-315-2626 * Fax 501-315-0024 October 30, 2014 Mr. & Mrs. Daniel Vick 101 Southwind Cove Benton, AR Re: Report of Findings,, Benton, Arkansas, Dear Mr. Vick: This

More information

48. AQUARIUM. Aquarium. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle. Total Area: No.

48. AQUARIUM. Aquarium. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle. Total Area: No. Classification: Cluster: Location: Total Area: No. of Stories Aquarium Acreage Owned: Acquired: 1904 Most Recent Improvements: THE AQUARIUM Close to junction of Inselrhue and Loiter Way, Belle Isle Two

More information

bout your HOUSE before you start Renovating Your Basement Moisture Problems

bout your HOUSE before you start Renovating Your Basement Moisture Problems A bout your HOUSE before you start Renovating Your Basement Moisture Problems CE 28 c Condensation of cold surfaces, efflorescence Water leak in corner on floor Mold and decay on floor joists and sill

More information

WOOD DESTROYING PESTS AND ORGANISMS INSPECTION REPORT. Termite Control COMPLETE REPORT LIMITED REPORT SUPPLEMENTAL REPORT REINSPECTION REPORT

WOOD DESTROYING PESTS AND ORGANISMS INSPECTION REPORT. Termite Control COMPLETE REPORT LIMITED REPORT SUPPLEMENTAL REPORT REINSPECTION REPORT WOOD DESTROYING PESTS AND ORGANISMS INSPECTION REPORT Building Address: 12345 Main Street, Anytown CA 12345 Date of Inspection Number of Pages Report # Termite Company Termite Control Lic. Registration

More information

FARMERS MUTUAL INSURANCE COMPANY UNDERWRITING GUIDELINES HOMEOWNER PROGRAM

FARMERS MUTUAL INSURANCE COMPANY UNDERWRITING GUIDELINES HOMEOWNER PROGRAM UNDERWRITING GUIDELINES HOMEOWNER PROGRAM The following guidelines should be considered when offering insurance for certain types of risks. When evaluating the acceptability of a risk, the company underwriter

More information

Repair and Remodeling Estimating Methods. 4th Edition. RSMeans

Repair and Remodeling Estimating Methods. 4th Edition. RSMeans Brochure More information from http://www.researchandmarkets.com/reports/2214808/ Repair and Remodeling Estimating Methods. 4th Edition. RSMeans Description: This estimating guide for repair and remodeling

More information

Superform Products Ltd.

Superform Products Ltd. TYPICAL CORNER REINFORCING NOTE : SEE ENGINEERED REBAR SCHEDULES SUPPLIED BY THE MANUFACTURER STEEL REINFORCEMENT WALL CORNER 90 Copyright 2012 Sept. 2012 5.1.1 Rebar Spacing 6" 12" Max. Load LB./FT. 2000

More information

Single Family Residential Properties Available

Single Family Residential Properties Available Vol Cert Case Number PIN Property Address City All Outstanding Taxes To Deed Estimated Taxes Due To Deed Property Description Target Pricing for Cert/Deed Property Image 22 714 COTD003128 33-31-204-010-0000

More information

6310 Lakeshore Dallas, TX 75214 214 213 8967 www.texasrehabloan.com Fax: 214 242 3753

6310 Lakeshore Dallas, TX 75214 214 213 8967 www.texasrehabloan.com Fax: 214 242 3753 Rehab/Hard Money property/deal Application www.texasrehabloan.com - Hard Money - Monty Busch 214-824-0417 YOU WILL NEED THE FOLLOWING items to close and order appraisal, very simple process for investment

More information

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT 1. SAFETY, HEALTH, CODE 1.1 Structural Requirements, Seismic Stability 1.1.1 Primary Structure 1.1.2 Ceilings 1.1.3 Cabinets, Equipment 1.1.4 Portables 1.2 Fire / Life Safety 1.2.1 Corridor, Separation

More information

Simpson Engineering A state licensed engineering firm F-1607

Simpson Engineering A state licensed engineering firm F-1607 Simpson Engineering A state licensed engineering firm F-1607 4126 Allencrest 13901 Midway Lane, Dallas, Road, Texas Ste.102-136 75244 Telephone: 214-351-1637 Dallas, - Fax: TX 214-351-1639 75244-4388 Telephone:

More information

How To Perform A Mold And Indoor Air Quality Assessment

How To Perform A Mold And Indoor Air Quality Assessment TRIANGLE Environmental Science and Engineering Inc. P.O. Box 1026 Rolla, MO 65402 Mold and Indoor Air Quality Assessment Of MARK TWAIN NATIONAL FOREST Roby Ranger Station Roby, MO MARCH 20 2015 Prepared

More information

HEDDERMAN ENGINEERING, INC. 3011 Carrie Cove Ct., Spring, TX 77386 281-355-9911, fax 281-355-9903 Tim@heddermanengineering.com

HEDDERMAN ENGINEERING, INC. 3011 Carrie Cove Ct., Spring, TX 77386 281-355-9911, fax 281-355-9903 Tim@heddermanengineering.com HEDDERMAN ENGINEERING, INC. 3011 Carrie Cove Ct., Spring, TX 77386 281-355-9911, fax 281-355-9903 Tim@heddermanengineering.com 2007 TO: Mr. REF: CONDITION OF PROPERTY SURVEY Dear Mr. : At your request,

More information

Date: March 7, 2006 Report for [removed]

Date: March 7, 2006 Report for [removed] Date: March 7, 2006 Report for [removed] The Preservation Resource Center Of New Orleans, in conjunction the National Trust for Historic Preservation, has conducted a condition survey of your property.

More information

423 NORTH HOWARD ST. VISUAL STRUCTURAL ASSESSMENT

423 NORTH HOWARD ST. VISUAL STRUCTURAL ASSESSMENT Urgent Needs II City of Baltimore No. 1099 423 NORTH HOWARD ST. 423 North Howard Street (circa 1880) is a multi-story building constructed second in row south of Franklin Street and between the vacant

More information

WOOD DESTROYING PESTS AND ORGANISMS INSPECTION REPORT

WOOD DESTROYING PESTS AND ORGANISMS INSPECTION REPORT WOOD DESTROYING PESTS AND ORGANISMS INSPECTION REPORT Building Address: Date of Inspection Number of Pages 45459 Calle Los Mochis, Temecula, CA 92592 07/03/2015 5 Report # W9141 Lic. Registration # Escrow

More information

510 Madera Ave San Jose, CA 95112 (408) 993-1900 Fax (408) 993-1944

510 Madera Ave San Jose, CA 95112 (408) 993-1900 Fax (408) 993-1944 HomeGuard 510 Madera Ave San Jose, CA 95112 (408) 993-1900 Fax (408) 993-1944 Dear HomeGuard customer, Thank you for selecting HomeGuard to perform the termite inspection on your home. It is very common

More information

Memorandum. July 16, 2008. To: Plan Commission City of Madison

Memorandum. July 16, 2008. To: Plan Commission City of Madison Memorandum July 16, 2008 To: Plan Commission City of Madison From: Marc Schellpfeffer Engberg Anderson Re: Structural/Architectural Assessment of Homes for Proposed Demolition Findorff Yards Office Lofts

More information

The picture is from http://www.easywaystogogreen.com/health-and-wellness/howasbestos-can-affect-homeowners/

The picture is from http://www.easywaystogogreen.com/health-and-wellness/howasbestos-can-affect-homeowners/ The picture is from http://www.easywaystogogreen.com/health-and-wellness/howasbestos-can-affect-homeowners/ Brochure for Public Info. - Risks of Asbestos General info from Health Canada Another picture

More information

YOU VE BEEN HIRED AS A GENERAL CONTRACTOR

YOU VE BEEN HIRED AS A GENERAL CONTRACTOR CONSTRUCTION LOAN PROCEDURES 1-800-589-8850 WWW.FIRSTFEDLORAIN.COM YOU VE BEEN HIRED AS A GENERAL CONTRACTOR FIRST FEDERAL SAVINGS AND LOAN ASSOCIATION OF LORAIN YOUR COMMUNITY BANK SINCE 1921 Toll Free

More information

Historic Preservation Certification Application Part 2 343-345 Main Street West South Haven, Vermont NPS Project No. 12345

Historic Preservation Certification Application Part 2 343-345 Main Street West South Haven, Vermont NPS Project No. 12345 Exterior Features 1 site and drainage 2 foundation 3 wood siding and trim 4 exterior doors 5 windows / storm windows 6 porches front and rear 7 chimneys 8 roofing Interior Features 9 frame 10 basement

More information

EAST LYME HIGH SCHOOL

EAST LYME HIGH SCHOOL Overview: 1971 N 1966 GYM 1966 CLASSROOM WING 1966 AUD. 1971 GYM 1998 1998 POOL EAST LYME HIGH SCHOOL Original 1966 Building: The original East Lyme High School was constructed in 1966 and was composed

More information

later damage - Loss ControL

later damage - Loss ControL later damage - Loss ControL axisinsurance.ca Table of Contents EXECUTIVE SUMMARY... 1 FACILITY SYSTEMS WATER DAMAGE... 2 Frozen Pipes.....................................................................................

More information

Your Pest Company inc.

Your Pest Company inc. Building Address: WOOD DESTROYING PESTS AND ORGANISMS INSPECTION REPORT 9999 W. Lefty Ln., Rightway City, CA 90009 11/22/2011 5 Your Pest Company inc. 1234 Your Street, City, CA 90000 (800) 337-2818 -

More information

BUILDING ASSESSMENT QUESTIONNAIRE. B. TENANTS Is there more than one tenant in the building? YES

BUILDING ASSESSMENT QUESTIONNAIRE. B. TENANTS Is there more than one tenant in the building? YES Department of Health and Human Services, Division of Public Health Occupational and Environmental Epidemiology Branch 1912 Mail Service Center, Raleigh, North Carolina 27699-1912 BUILDING ASSESSMENT QUESTIONNAIRE

More information

Inspecting to a higher standard.

Inspecting to a higher standard. Inspecting to a higher standard. Rob Hopkin Silver Spring, MD 20902 Monday, June 2, 2014 ProTec Inspection Services Inc. 19736 Selby Ave Poolesville, MD 20837 301-972-8531 www.protec-inspections.com rob@protec-inspections.com

More information

COMPLETE REPORT X LIMITED REPORT SUPPLEMENTAL REPORT REINSPECTION REPORT General Description: Inspection Tag Posted: SINGLE FAMILY DWELLING

COMPLETE REPORT X LIMITED REPORT SUPPLEMENTAL REPORT REINSPECTION REPORT General Description: Inspection Tag Posted: SINGLE FAMILY DWELLING Building No. Street City Zip Date of Inspection 1795 Caloosa Court San Jose 95131 10/27/10 1 of 7 Ordered by: Property Owner and/or Party of Interest: Report sent to: MaxReal Michelle Lin 1288 Kifer Road,

More information

Homewyse 2010 Home Ownership Cost Report

Homewyse 2010 Home Ownership Cost Report November 2010 Homewyse 2010 Home Ownership Cost Report Editors and Staff Homewyse Smart Home Decisions 2010 Home Ownership Cost Report 2 SUMMARY Next to mortgage expenses, home maintenance and repair costs

More information

Western Avenue South Small Business Based on Small Business Improvement Fund (SBIF) Grant Agreements

Western Avenue South Small Business Based on Small Business Improvement Fund (SBIF) Grant Agreements Company Address TIF ID TIF District Herbert Brusso 4131 N Western Western Ave South Ken Sakamoto DDS PC 3939 N Lincoln Western Ave South P Jerome Jakubco 2224 W Irving Park Western Ave South B&G Painting

More information

Triarch Products Over Various Interior Substrates

Triarch Products Over Various Interior Substrates Triarch products work well over a variety of substrates, both for interior and exterior settings. This document will only discuss interior substrates and is not intended to be a technical discussion of

More information

CHARLOTTE COUNTY Community Development Department

CHARLOTTE COUNTY Community Development Department CHARLOTTE COUNTY Community Development Department Building Construction Services Division 18400 Murdock Circle, Port Charlotte FL 33948 Phone: 941.743.1201 Fax: 941.764.4907 www.charlottecountyfl.gov 50

More information

Inspection Item COMMENTS

Inspection Item COMMENTS APPENDIX 9 AFFORDABLE HOUSING PROGRAM INSPECTION CHECKLIST Participating Jurisdiction: Homeowner Name: Assisted Property Address: Date of Physical Inspection of Property: Total Square Footage of Property:

More information

WOOD DESTROYING PESTS AND ORGANISMS INSPECTION REPORT

WOOD DESTROYING PESTS AND ORGANISMS INSPECTION REPORT Building Address: WOOD DESTROYING PESTS AND ORGANISMS INSPECTION REPORT 1648 Sedona Terrace, San Jose, CA 95116 05/16/2011 5 First Choice Inspections 447 Chilberg Ct. San Jose CA 95133 Phone: (800) 381-6911

More information

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES ADDRESS: 123 MAIN ST MIAMI, FL CLIENT: BUYER ID No: 2014193 DATE: 5/13/2014 INSPECTION OR ASSESSMENT BY: GAIA CONSTRUCTION INC. CGC 1516136 FLORIDA HI-2792

More information

Construction Technologies Career Field Pathways and Course Structure

Construction Technologies Career Field Pathways and Course Structure Courses in Structural Systems (DD) Construction Technologies Career Field Pathways and Course Structure PATHWAY COURSES SUBJECT CODE Construction Technology-Core and Sustainable Construction 1 178000 Carpentry

More information

Substantial Improvement/ Damage Review

Substantial Improvement/ Damage Review City of St. Petersburg Construction Services & Permitting Substantial Improvement/ Damage Review Permit Application Number Parcel ID Number Property Address City & Zip Code Name of Owner Owner s Phone

More information

17,280 square feet Overview:

17,280 square feet Overview: CENTRAL OFFICE Located at 167 Boston Post Road, East Lyme, Connecticut, the Central Office was built in 1916 as the original Flanders Elementary School and remains connected to the current school. The

More information

14 September 2015. Sarah Zorn Planning and Economic Development 25 West Fourth Street, Ste. 1100 St. Paul, MN 55102

14 September 2015. Sarah Zorn Planning and Economic Development 25 West Fourth Street, Ste. 1100 St. Paul, MN 55102 Sarah Zorn Planning and Economic Development 25 West Fourth Street, Ste. 1100 St. Paul, MN 55102 Project No.: 15538.00 Re: Structural Condition Review of the building at 700 4 th St. E. Dear Sarah: We

More information

2ND CHANCE WATER RESTORATION

2ND CHANCE WATER RESTORATION 1 Client: Property: Lee 25 Burkett Drive Sumter, SC 29150 Operator: 2NDCHANC Estimator: Patrick O'Connor Business: (630) 546-2239 E-mail: 2ndchancewaterrestoration@g mail.com Reference: Business: (630)

More information

Best Basement Water Management Practices

Best Basement Water Management Practices Best Basement Water Management Practices Guide written by Patrick Sluss Sluss Construction (330) 224 5394 When a home owner is faced with a leaking basement there is a way to correct the problem and a

More information

Thank You for selecting HomeGuard Incorporated to perform the termite inspection on your home.

Thank You for selecting HomeGuard Incorporated to perform the termite inspection on your home. Dear HomeGuard customer, Thank You for selecting HomeGuard Incorporated to perform the termite inspection on your home. Enclosed you will find the inspection report that includes the findings, repair recommendations

More information

Vari Inspection Services

Vari Inspection Services Cover Page Vari Inspection Services Property Inspection Report Inspection prepared for: Sample Real Estate Agent: None - Date of Inspection: 5/13/2015 Inspector: Tony Vari License # HI8047 23110 STRD 54

More information

Prestige Home Inspection LLC

Prestige Home Inspection LLC Cover Page Prestige Home Inspection LLC IAC2/ESA - Mold Assessment and Water Damage Report 555 W. Brook ave., Client's town MI, 48059 Inspection prepared for: Client's name Inspection Date: 10/15/2012

More information

YOUR COMPANY NAME HERE

YOUR COMPANY NAME HERE Client: Your customer Business: (111) 111-1111 Property: 1111 Any Street Anytown, MN 11111 Business: 310 Jackson Ave NW Elk River, MN 55330 Operator Info: Operator: DHAYES Estimator: Douglas Hayes Type

More information

Complete Application & Fax to (845) 279-7768 APPLICANT INFORMATION OPERATIONS

Complete Application & Fax to (845) 279-7768 APPLICANT INFORMATION OPERATIONS Complete Application & Fax to (845) 279-7768 Attn: Full Name of Applicant: Address: Website Address: Separately list and describe all operations: APPLICANT INFORMATION List states in which the applicant

More information

The Tabernacle: Phoenix Award Winner for Excellence in Restoration

The Tabernacle: Phoenix Award Winner for Excellence in Restoration The Tabernacle: Phoenix Award Winner for Excellence in Restoration Historical buildings face a myriad of challenges to keep them in pristine condition while maintaining their functionality. Modernizing

More information

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES ADDRESS: Somewhere, FL CLIENT: GAIA GC ID No: 2015000 DATE: 12/31/2015 INSPECTION OR ASSESSMENT BY: GAIA CONSTRUCTION INC. CGC 1516136 FLORIDA HI-2792 FLORIDA

More information

STRUCTURAL ASSESSMENT. Full Metal Jacket Building 0 Prince Street, Alexandria, VA

STRUCTURAL ASSESSMENT. Full Metal Jacket Building 0 Prince Street, Alexandria, VA STRUCTURAL ASSESSMENT FOR Full Metal Jacket Building 0 Prince Street, Prepared by: ALPHA CORPORATION (Alpha) 1850 S. Loudoun Street, Suite 200 Winchester, VA 22601 540-723-0704 September 22, 2010 J. Michael

More information

Cost Guide MARKET SUMMARY OVERVIEW REPAIRS AND MAINTENANCE ELECTRICAL ROOFING & ROOF DRAINAGE (UP TO TWO STOREYS; FIXED TO EXISTING ROOF FRAME)

Cost Guide MARKET SUMMARY OVERVIEW REPAIRS AND MAINTENANCE ELECTRICAL ROOFING & ROOF DRAINAGE (UP TO TWO STOREYS; FIXED TO EXISTING ROOF FRAME) Cost Guide < 1 > MARKET SUMMARY OVERVIEW Low interest rates and competitive construction pricing makes now a great time to renovate or build a new home. Interest rates are at historic lows and can be fixed

More information

50 Sullivan St Toronto, ON M5T 1C1

50 Sullivan St Toronto, ON M5T 1C1 50 Sullivan St Toronto, ON M5T 1C1 VINCE CARACCIOLO Tuesday, April 3, 2012 Philip Falcone Scan to download report Carson, Dunlop & Associates Ltd. 120 Carlton Street, Suite 407 Toronto, ON M5A 4K2 416-964-9415

More information

719-635-7310 Email: rcroffice14@gmail.com Central Location: 30 Buchanan Street, Colorado Springs, Co. 80907. 21 Point Roof Inspection Report + Bonus

719-635-7310 Email: rcroffice14@gmail.com Central Location: 30 Buchanan Street, Colorado Springs, Co. 80907. 21 Point Roof Inspection Report + Bonus 21 Point Roof Inspection Report + Bonus www.restorationcoloradoroofing.com 719-635-7310 Email: rcroffice14@gmail.com Central Location: 30 Buchanan Street, Colorado Springs, Co. 80907 1. Restoration Colorado

More information

PROPOSAL. Prepared for: Craig Mottram & Family, 118 Rangoon Rd. Prepared by: Carlos Andrade, Owner & Operator. Brandon Andrade, Project Coordinator

PROPOSAL. Prepared for: Craig Mottram & Family, 118 Rangoon Rd. Prepared by: Carlos Andrade, Owner & Operator. Brandon Andrade, Project Coordinator PROPOSAL Prepared for: Craig Mottram & Family, 118 Rangoon Rd. Prepared by: Carlos Andrade, Owner & Operator Brandon Andrade, Project Coordinator t. 416.652.6424 f. 416.652.3234 May 1 st, 2012 Craig Mottram

More information

Restoration Services Company

Restoration Services Company Restoration Services Company Mold Damage Mold is found naturally in all buildings and can grow anyplace there are elevated moisture levels. Left untreated, mold can quickly multiply and grow to dangerous

More information

Schedule your repairs today...

Schedule your repairs today... Dear HomeGuard Customer, Thank You for choosing HomeGuard Incorporated to inspect your home. Enclosed is your inspection report, which includes our findings, recommendations, and repair prices. Please

More information

PEPPER VINER HOMES WARRANTY GUIDELINES

PEPPER VINER HOMES WARRANTY GUIDELINES PEPPER VINER HOMES WARRANTY GUIDELINES All non-emergency warranty and customer service requests MUST be made in writing. This provides you with documentation and allows Pepper Viner to operate efficiently.

More information

WOOD DESTROYING PESTS AND ORGANISMS INSPECTION REPORT

WOOD DESTROYING PESTS AND ORGANISMS INSPECTION REPORT ` WOOD DESTROYING PESTS AND ORGANISMS INSPECTION REPORT Building No. Street City Zip Date of Inspection Number of Pages 1142 ARBOR VISTA WY. SAN JOSE 95126 10/28/2013 9 125 SOUTH CAPITOL AVENUE SAN JOSE,

More information

WOOD DESTROYING PESTS AND ORGANISMS INSPECTION REPORT

WOOD DESTROYING PESTS AND ORGANISMS INSPECTION REPORT Building : WOOD DESTROYING PESTS AND ORGANISMS INSPECTION REPORT 1621 Vineyard Ave # 2, Los Angeles, CA 90019 05/08/2014 5 Estate Termite, Inc. 2537 W. Beverly Blvd #202 Montebello CA 90640 Phone: (800)

More information

APPLICANT: ORANGE COUNTY, NEW YORK

APPLICANT: ORANGE COUNTY, NEW YORK Figure 1 Div 1 3 rd Flr Leakage in County Executives Office Figure 2 Div 1 3 rd Flr Location 067 approximately 2 SF of visible mold growth above entrance to Room 341 Figure 3 Div 1 3 rd Flr Location 067

More information

WOOD DESTROYING PESTS AND ORGANISMS INSPECTION REPORT 1942 MARTELLO DR. SAN JOSE 95122 12/11/2015 7

WOOD DESTROYING PESTS AND ORGANISMS INSPECTION REPORT 1942 MARTELLO DR. SAN JOSE 95122 12/11/2015 7 Building No. Street City Zip Date of Inspection Number of Pages 1942 MARTELLO DR. SAN JOSE 95122 12/11/2015 7 J&T Termite 48 Goldenrain Drive San Jose CA 95111 Tel: (408) 826-7573 jttermite@gmail.com Registration

More information

HOME INSPECTION CHECKLIST

HOME INSPECTION CHECKLIST CLOSING.COM LEARNING CENTER HOME INSPECTION CHECKLIST CONTENTS Attic 1 Balconies 1 Basement 1 Bathroom 2 Ceiling, Floors and Walls 2 Crawlspace 3 Decks and Porches 3 Doors and Windows 4 Drainage 4 Driveways

More information

159 Morningside Avenue, Toronto

159 Morningside Avenue, Toronto 159 Morningside Avenue, Toronto Inspection Report February 6, 2013 159 Morningside Avenue, Toronto Inspection Report Overall Condition: This 60±-year-old home was extensively renovated and extended in

More information

Self-Home Inspection Checklist

Self-Home Inspection Checklist To be used as a first home visit for note taking. Visit www.homeinspectiondirect.com for more tips and information about buying a home and hiring a home inspector. This form in no way replaces a professional

More information

bout your house before you start Renovating Your Basement Moisture Problems

bout your house before you start Renovating Your Basement Moisture Problems A bout your house CE 28c before you start Renovating Your Basement Moisture Problems Mold and decay on floor joists and sill plates Stuffy air, high humidity, poor air circulation Water draining in from

More information

Engineers, Civil Structural Survey

Engineers, Civil Structural Survey Engineers, Civil Structural Survey 317 STREET 0 6 3 6 0 886-1966 886-9165 FAX. September 1 1 Mr. Alan Bergren City Manager City of Norwich Broadway, Floor Norwich, 06360 Re: Limited Structural Condition

More information