1 Modelling the Evacuation of People from a Train on Fire in a Railway Tunnel P. KUČERA, I. BRADÁČOVÁ Faculty of Safety Engineering VŠB Technical University of Ostrava Lumírova 13/630, Ostrava - Výškovice, CZECH REPUBLIC petr.kucera@vsb.cz, isabela.bradacova@vsb.cz Abstract: Fire safety of each structure consists in the creation of conditions for rapid and safe people evacuation, in the limitation of spread of fire and combustion products in the structure and the surroundings of the structure, and in the creation of conditions for rapid, effective and safe response actions of rescue units. In case of fire on a passenger train standing in a tunnel, a top priority task is to evacuate a relatively high number of passengers. The article presents the simulation of conditions in the tunnel during the fire using a program FDS. The program makes it possible to verify the conditions of evacuation in relation to tunnel geometry, to take into account the specifics of the movement of people, to assess the temperature and smoke hazards to people, and to carry out the check of visibility along escape routes. Key words: railway tunnel, fire modelling, evacuation, simulation, safe conditions 1 Introduction The developing trans-european road and rail networks with effects on regional transport routes require increasingly the construction of tunnels both in the rural and built-up areas. In a case of railway tunnels, the construction of tunnels is connected with the modernisation of railway corridors. For the design and construction of them many reasons exist. They are related to a necessity of locating a transport route in a geographically complicated area, passing below settlement units and watercourses; tunnels make it possible to shorten transport routes and speed up traffic, and provide protection to the environment especially by noise and gas emission reduction. To negatives, above all risk factors manifesting themselves during the operation of transport tunnels (transport of dangerous substances and dangerous goods, exceeding of design traffic intensity and/or traffic speed) should be added besides high time and financial requirements of the construction and equipment. They lead, under certain conditions, even to the occurrence of an incident in the tunnel (vehicle collision, fire, explosion, serious technical faults, and others). The consequences of an incident in a tunnel as an element of critical infrastructure with reference to the specific features of the tunnel structure are then usually more severe than those of an open traffic road accident. Human lives and the environment are at risk, material damage to the means of transport and also to the goods being transported, damage to the tunnel structure, installations and security equipment occur, and transport is interrupted, which affects the wider environment and other entities. 2 Fire Safety in Railway Tunnels The evacuation of people from a tunnel in case of incident (e.g. fire) is affected by many factors that depend, among other matters, on the behaviour and physical as well as mental abilities of human beings. The reactions of people in tunnel fires are influenced by panic, poor visibility due to spreading smoke and by insufficient knowledge of the environment. Evacuation is assessed for the case of a socalled cold incident not involving a fire or for the case of a hot incident involving directly a fire or a subsequent fire. By comparing the probability of a fire and the probability of a hazard to people in road and railway tunnels, a conclusion can be drawn that the probability of a fire in road tunnels is of ISBN:

2 order higher than that in railway tunnels. Nevertheless, the level of hazard to people and fire consequences are higher in passenger train fires in railway tunnels. In the evaluation of statistical data, the fact that only the relatively small number of railway tunnels are operated in the Czech Republic and that the observation of tunnel incidents has been carried out for a relatively short time has to be considered. However, some incidents that happened in railway tunnels [1998, 2008] contradict the statement that thanks to the system protection of transport in railway tunnels and to the decreased influence of erroneous human actions during the passing of a train set through a tunnel, it is not necessary to take into account a failure in the transport system. The most tragic ICE train accident happened in the vicinity of the town of Eschede in June An express train running from Munich to Hamburg was derailed here at the speed of 200 km/h; in the accident, 101 people died and eighty people were injured. That time, 14 coaches of the train set hit a bridge near the track. The cause was the broken frame of a train wheel. The third generation of ICE express trains can travel at a speed of up to 300 km/h. The trains run not only throughout Germany but also to Zurich, Vienna, Brussels, Amsterdam, Paris, etc. A German ICE high-speed train was derailed near the town of Fulda in the year When exiting the tunnel, the train collided with a herd of sheep. The train hit the herd at full speed, 10 of 12 coaches were derailed, 23 people were injured, 3 of them seriously. At the time of the accident, 170 passengers travelled on the Hamburg to Munich express train. The accident took place before exiting the 11 km Landrücken Tunnel, which is the longest railway tunnel in Germany. 3 Detailed Assessment of the Evacuation of People from Railway Tunnels The aim of the detailed assessment of evacuation is to identify evacuation critical points in any railway tunnel and to verify that proposed evacuation routes (escape walkways) will make it possible to leave the fire-affected tunnel tube through portals, cross-passages and escape shifts in a sufficiently short time. In contrast to the standard procedure, some of simulation models (e.g. program FDS+Evac), in which evacuation is interconnected with a fire and smoke spread model, can be used, and thus the real evacuation of the given number of people from a specific railway tunnel can be proved. The evacuation time influences the requirement for ensuring the conditions for fire safety in the tunnel tube. It is required to let people leave the tunnel before spreading the smoke into escape routes; simultaneously the danger of a radiation heat hazard will be eliminated. The first task of the detailed assessment is the modelling of spread of fire and combustion products. Subsequently, the evacuation under conditions corresponding to the given tunnel will be assessed. 4 Modelling the Spread of Fire and Combustion Products The analysis of the spread of fire and combustion products in a railway tunnel was carried out by means of a fire model. It is used for the verification of conditions of the evacuation of people from a train on fire (locomotive on fire) to the place of safety in the presented example, only tunnel portals can be used for exiting to an open area. For the proper analysis of the spread of smoke the program FDS (Fire Dynamics Simulator program), utilizing the method CFD for modelling the dynamics of flow of hot gases and combustion products, was used. As an example a bi-directional railway tunnel having a length of 700 m, inner width of 12.2 m and clear height of 8 m was selected for modelling. The tunnel is double-tracked with bi-directional traffic. A simplified tunnel lining cross-section is illustrated in Fig. 1. The model considers a standing train set near the exit portal, in the point of the smallest height and the greatest distance from the other portal. Evacuating people can escape along both walkways. As the place of origin of the fire lasting 20 minutes the locomotive was chosen; owing to a moderate slope gradient in the longitudinal direction (about 5.), the movement of combustion products will be in case of fire supported by the stack effect. Other input parameters of the assumed fire scenario are the flow velocity in the tunnel of 1 m/s and the initial temperature of 10 C. ISBN:

3 Fig. 1: Simplified cross-section of bidirectional tunnel tube The passenger train set has the following technical data: train set 8 coaches + locomotive length of train set: 225 m (1 coach 25 m) external width of coaches: height (pantograph locked down): material of body: 2.8 m 4.3 m steel welded body In the model, the shape of the train set is simplified to one elongated rectangle divided into the locomotive and 8 passenger coaches divided from each other by partitions (Fig. 2). Along the sides of the passenger coaches, window openings are distributed evenly. The front of the train (locomotive) is placed 15 m from the exit portal. As already mentioned above, the locomotive fire is assumed and is defined by means of a heat release rate determined for electric and diesel locomotives on the basis of experimentally determined values. For both the types of locomotives, these values are comparable and in the 20 th minute of the fire correspond to the output of 12 MW. For the calculation of fire development thus the electric locomotive fire at the height of 1.5 m above level of the walkway with the duration of 20 minutes is considered. Fig. 2: Train set geometry The computing results obtained by the program FDS can include a wide scale of observed values (temperature, thermal flow, flow velocity, visibility, and others). In this case, especially temperatures at the heights of 2 and 2.5 m above level of the escape walkway, the height level of a boundary between the upper hot and the lower cooler layer and smoke production in the tunnel in the course of fire development were recorded. In Figs. 3 and 4 are illustrated selected isotherms and smoke layer movement in the tunnel at the flow velocity inside the tunnel of 1 m/s using the visualization program Smokeview. Fig. 3: Isotherms just behind the train set at tunnel internal temperatures of 40 C (violet), 50 C (grey) and 60 C (green) in the 20 th minute Note: These limit temperatures will not occur at heights less than 2.5 m on the escape walkway and will not endanger in any way escaping people. ISBN:

4 distance between the first coach and the entry portal 660 m width of the escape walkway 1.5 m length of the train set 225 m (length of one coach is about 25 m + locomotive) number of people in the train set (8 passenger coaches) 8 80 persons = 640 persons. Fig. 4: Smoke production in the tunnel near the locomotive in the 20 th minute 5 Simulation of Railway Tunnel Evacuation A sample situation is as follows the evacuation of people from a train set is to be simulated; the train set stands in the vicinity of the exit portal, from where the movement of combustion products is supported, owing to a gradient of the tunnel in the longitudinal direction, by the stack effect, and escaping people thus may be exposed directly to the combustion products. People from the train set will escape merely along escape walkways leading to the exit tunnel portals. For this variant, it is assumed that the escape of people along the walkway in the immediate vicinity of the locomotive on fire will not be possible. For modelling, an evacuation simulation module FDS+Evac for the program FDS can be used, by means of which not only the effects of fire action can be taken into account, but also the positions and physical conditions of individual evacuees can be set. In this module, every person is regarded as an independent unit and moves according to the person-specific equation of motion. The speed of movement of escaping people is influenced decisively, from the point of view of orientation and visibility, by the action of smoke. 5.1 Input Data for Simulation of People s Evacuation distance between the portals (= tunnel length) 700 m distance between the exit portal and the front of the locomotive 15 m In all passenger coaches, a ratio between adults and children is identical, namely 85 % adults, 15 % children, i.e. 68 adults, 12 children. The distribution of people in individual passenger coaches is even. The space is divided into quarters; each of them has its own exit from the coach, which makes the directing of evacuation easier. The speed of movement of people is based on the proportional representation of adults and children in each coach and is variable. 5.2 Description of Evacuation from the Train Set People escape from the train set in both the directions, and for this reason, the evacuation is proposed in the program FDS+Evac according to a diagram illustrated in Fig. 5 as follows: exit A a smaller portion of the passengers from the right half of the train set (120 persons) are evacuated towards the closer (exit) portal along the farther escape walkway to avoid the thermal effects of the locomotive fire, exit B a larger portion of the passengers from the right half of the train set (200 persons) are evacuated towards the farther (entry) portal along the farther escape walkway, exit C all the passengers from the left half of the train set (320 persons) are evacuated merely towards the farther (entry) portal along the escape walkway that is closer to the train set. The escape towards the closer portal is impossible owing to the locomotive on fire from the very beginning. ISBN:

5 Human response to toxic exposure is determined in the FDS+Evac program by means of a concept of fractional effective dose, so-called FDS, which uses only the concentrations of CO, CO 2 and O 2 for the calculation of total FED. The CO 2 concentration is considered here exclusively with regard to faster than normal breathing (hyperventilation). However, it is not assumed that the CO 2 concentration would be so high that this gas would be unbreathable and would cause acidosis in the human body. The results of simulation of evacuation according to the time dependence of the number of people evacuated through specific exits were as follows: exit A - 5:04 minutes, exit B - 16:44 minutes and exit C - 18:32 minutes. The resultant dependence of the number of people evacuated through all the exits on time is shown in Graph 1. Graph 1: Resultant time dependence of the number of people evacuated through all exits (A, B and C) Fig. 5: Evacuation diagram in program FDS+Evac Before starting the evacuation of people, a 110 to 120 s time delay, which expresses the time required for informing the passengers by the train crew about the necessity of initiating the evacuation and the time required by people to react to the alarm, is considered. Into this delay the time required for going down the steps from the coach is partly included. The distribution of people in individual passenger coaches is even. The space is divided into quarters, each of which has its own exit from the coach, which makes directing the evacuation easier. Fig. 6 Graphical representation of evacuation situation at the farther portal in the 10 th minute Note: Blue little figures (agents) represent adults, white ones represent children. ISBN:

6 6 Evaluation of the Simulation of Evacuation from a Selected Railway Tunnel The evacuation was carried out in two directions along the proposed escape walkways through the portal exits designated, according to the diagram in Fig. 5, A, B and C. Owing to the uneven distribution of people and different distances from the emergency exits from the tunnel, the evacuation took place markedly differently in these two directions. The evacuation of a part of people towards the closer exit A (right part of the exit tunnel) lasted only about 5 minutes, whereas the evacuation towards the farther exits B and C in the farther entry portal took more time and was a factor decisive of the determination of total evacuation time 18:32 minutes (Graph 1). The cause of the time delay was above all the distance that had to be overcome by people along the unprotected escape route. This proposed escape variant can be designated as the most unfavourable variant. On the basis of simulation using the program FDS for the selected fire scenario (12 MW output in the 20 th minute at 1 m/s flow velocity), it is possible to state that the isotherm of 40 C below the upper hot layer will not shift during the evacuation below the height of 2.5 m above the escape walkway even for the selected most unfavourable evacuation variant. The temperature of 40 C was chosen as acceptable temperature for the short-term stay of people in the course of evacuation in the affected tunnel tube. Toxic combustion products were accumulated mainly in the upper hot layer; on the basis of data acquired by the module FDS+Evac, it can be stated that during the evacuation, any influence of toxicity of combustion products on escaping persons was not observed. With regard to a gradual increase in considered fire intensity and with regard to the tunnel dimensions, the observed parts of escape routes were filled with smoke only after the escape of all people. By means of the program FDS, visibility was verified as well. The acceptable limit of visibility is 10 m. In the course of simulation, visibility at the height of 2 m above level of the escape walkway changed minimally. The initial value of visibility of 30 m decreased merely at the end of simulation of the fire at the 1 m/s flow velocity in the tunnel to the value of about 25 m. The limit of visibility along the escape walkway thus was not exceeded. The acquired data on the evacuation thus was immediately confronted with the development of the fire. It was found that in the whole duration of the evacuation, none of the critical conditions of evacuation, under which the ability of people to escape from the structure would have been reduced (e.g. temperature effects on people, decreased visibility, action of toxic combustion products) had been exceeded. 7 Conclusions The simulation-based demonstration of escape route safety makes it possible to consider more factors tunnel geometry, escape route widths, number of people and their physical and mental abilities, fire heat output and development, temperature effects on people, smoke generation, action of toxic combustion products, and conditions to maintain visibility. Various situations can be relatively quickly solved and the proposed solution can be optimized. Acknowledgement ledgements: This work was supported by the project of the Ministry of the Interior of the Czech Republic No. VG Specific Assessment of High Risk Conditions for Fire Safety by Fire Engineering Procedures. References: [1] MCGRATTAN, K., et al. Fire Dynamics Simulator (Version 5) User s Guide. Washington: U.S. Government Printing Office, NIST, Special Publication [2] HOSTIKKA, S., et al. Development and validation of FDS+Evac for evacuation simulations: Project summary report. Finland: VTT Technical research Centre of Finland, ISBN [3] KORHONEN, T.; HOSTIKKA, S. Fire Dynamics Simulator with Evacuation: FDS+Evac: Technical Reference and User s Guide. VTT Technical research Centre of Finland, ISBN ISBN:

UPGRADING OF THE AUSTRIAN TUNNEL RISK MODEL TURISMO METHODICAL AND PRACTICAL ASPECTS

UPGRADING OF THE AUSTRIAN TUNNEL RISK MODEL TURISMO METHODICAL AND PRACTICAL ASPECTS - 170 - UPGRADING OF THE AUSTRIAN TUNNEL RISK MODEL TURISMO METHODICAL AND PRACTICAL ASPECTS B. Kohl 1, C. Forster 1, S. Wiesholzer 2 1 ILF Consulting Engineers, Linz, Austria 2 BMVIT Federal Ministry

More information

WITH HIGH SPEED TO A SAFE EMERGENCY HANDLING - VIENNA - ST. PÖLTEN TUNNEL HIGH-SPEED LINE

WITH HIGH SPEED TO A SAFE EMERGENCY HANDLING - VIENNA - ST. PÖLTEN TUNNEL HIGH-SPEED LINE - 20 - WITH HIGH SPEED TO A SAFE EMERGENCY HANDLING - VIENNA - ST. PÖLTEN TUNNEL HIGH-SPEED LINE F. Diernhofer 1, C. Sommerlechner 2, B. Fößleitner 2 1 ILF Consulting Engineers, Austria 2 ÖBB-Infrastruktur

More information

CFD STUDY OF TEMPERATURE AND SMOKE DISTRIBUTION IN A RAILWAY TUNNEL WITH NATURAL VENTILATION SYSTEM

CFD STUDY OF TEMPERATURE AND SMOKE DISTRIBUTION IN A RAILWAY TUNNEL WITH NATURAL VENTILATION SYSTEM CFD STUDY OF TEMPERATURE AND SMOKE DISTRIBUTION IN A RAILWAY TUNNEL WITH NATURAL VENTILATION SYSTEM J. Schabacker, M. Bettelini, Ch. Rudin HBI Haerter AG Thunstrasse 9, P.O. Box, 3000 Bern, Switzerland

More information

ON MOST schemes, the architectural design of. Flexible strategy. Case study. The Forum

ON MOST schemes, the architectural design of. Flexible strategy. Case study. The Forum Flexible strategy ON MOST schemes, the architectural design of a building is influenced by fire engineering strategy. This could be in the form of visual, physical elements such as fire doors, fire curtains,

More information

Piotr Tofiło a,*, Marek Konecki b, Jerzy Gałaj c, Waldemar Jaskółowski d, Norbert Tuśnio e, Marcin Cisek f

Piotr Tofiło a,*, Marek Konecki b, Jerzy Gałaj c, Waldemar Jaskółowski d, Norbert Tuśnio e, Marcin Cisek f Available online at www.sciencedirect.com Procedia Engineering 57 (2013 ) 1156 1165 11th International Conference on Modern Building Materials, Structures and Techniques, MBMST 2013 Expert System for Building

More information

Sensitivity Analysis of Safety Measures for Railway Tunnel Fire Accident

Sensitivity Analysis of Safety Measures for Railway Tunnel Fire Accident Sensitivity Analysis of Safety Measures for Railway Tunnel Fire Accident Sanglog Kwak, Jongbae Wang, Yunok Cho Korea Railroad Research Institute, Uiwnag City, Kyonggi-do, Korea Abstract: After the subway

More information

Fire Risk in Metro Tunnels and Stations

Fire Risk in Metro Tunnels and Stations Fire Risk in Metro Tunnels and Stations Hyder Consulting Presented by: Dr. Leong Poon Ir. Richard Lau 2 Dec 2005 Metro Tunnels and Stations General Characteristics Limited to metropolitan area (hence the

More information

Exova Warringtonfire fire safety engineering

Exova Warringtonfire fire safety engineering Consultancy - Fire Engineering Exova Warringtonfire fire safety engineering We are committed to the philosophy where the fire safety design supports the vision, innovation or imagination of the building

More information

Appendix A. About RailSys 3.0. A.1 Introduction

Appendix A. About RailSys 3.0. A.1 Introduction Appendix A About RailSys 3.0 This appendix describes the software system for analysis RailSys used to carry out the different computational experiments and scenario designing required for the research

More information

Exit Routes, Emergency Action Plans, Fire Prevention Plans, and Fire Protection. OSHA Office of Training and Education 1

Exit Routes, Emergency Action Plans, Fire Prevention Plans, and Fire Protection. OSHA Office of Training and Education 1 Exit Routes, Emergency Action Plans, Fire Prevention Plans, and Fire Protection OSHA Office of Training and Education 1 Introduction Fires and explosions kill more than 200 and injure more than 5,000 workers

More information

Learning Module 4 - Thermal Fluid Analysis Note: LM4 is still in progress. This version contains only 3 tutorials.

Learning Module 4 - Thermal Fluid Analysis Note: LM4 is still in progress. This version contains only 3 tutorials. Learning Module 4 - Thermal Fluid Analysis Note: LM4 is still in progress. This version contains only 3 tutorials. Attachment C1. SolidWorks-Specific FEM Tutorial 1... 2 Attachment C2. SolidWorks-Specific

More information

REAL SCALE TUNNEL FIRE: EXPERIMENTAL TEST INSIDE THE MORGEX TUNNEL AUTOSTRADA A5

REAL SCALE TUNNEL FIRE: EXPERIMENTAL TEST INSIDE THE MORGEX TUNNEL AUTOSTRADA A5 REAL SCALE TUNNEL FIRE: EXPERIMENTAL TEST INSIDE THE MORGEX TUNNEL AUTOSTRADA A5 F. Borghetti*, P. Gandini*, R. Iuliano*, A. Frassoldati**, A. Cuoci**, M. Derudi**, S. Tavelli**. fabio.borghetti@polimi.it

More information

Full scale tunnel fire tests of VID Fire-Kill Low Pressure Water Mist Tunnel Fire Protection System in Runehamar test tunnel, spring 2009

Full scale tunnel fire tests of VID Fire-Kill Low Pressure Water Mist Tunnel Fire Protection System in Runehamar test tunnel, spring 2009 Full scale tunnel fire tests of VID Fire-Kill Low Pressure Water Mist Tunnel Fire Protection System in Runehamar test tunnel, spring 2009 By Carsten Palle, VID Fire-Fill, www.vid.eu Presented at ISTSS

More information

The risk of derailment and collision, and safety systems to prevent the risk

The risk of derailment and collision, and safety systems to prevent the risk The risk of derailment and collision, and safety systems to prevent the risk Tomohisa NAKAMURA Transport safety department East Japan Railway Company Introduction Since our establishment in 1987, we have

More information

Challenges for Use of Fixed Fire Suppression Systems in Road Tunnel Fire Protection

Challenges for Use of Fixed Fire Suppression Systems in Road Tunnel Fire Protection Challenges for Use of Fixed Fire Suppression Systems in Road Tunnel Fire Protection Z. G. Liu *, A. Kashef, G. Lougheed, and A. K. Kim Fire Research Program, Institute for Research in Construction National

More information

Investigations of a Long-Distance 1000 MW Heat Transport System with APROS Simulation Software

Investigations of a Long-Distance 1000 MW Heat Transport System with APROS Simulation Software th International Conference on Structural Mechanics in Reactor Technology (SMiRT ) Espoo, Finland, August 9-4, 9 SMiRT -Division 3, Paper 56 Investigations of a Long-Distance MW Heat Transport System with

More information

Hybrid shunter locomotive

Hybrid shunter locomotive Hybrid shunter locomotive 1 Hervé GIRARD, Presenting Author, 2 Jolt Oostra, Coauthor, 3 Joerg Neubauer, Coauthor Alstom Transport, Paris, France 1 ; Alstom Transport, Ridderkerk, Netherlands 2 ; Alstom

More information

Andrea Basti* Italian National Institute of Nuclear Physics (INFN) Gran Sasso National Laboratory (LNGS) *Research Grant Holder

Andrea Basti* Italian National Institute of Nuclear Physics (INFN) Gran Sasso National Laboratory (LNGS) *Research Grant Holder Evaluation of the possibility to use waterscreen for people evacuation from the Gran Sasso National Laboratory inside the Gran Sasso highway tunnel in case of fire The case of The Gran Sasso National Laboratory

More information

An Overview of the International Road Tunnel Fire Detection Research Project

An Overview of the International Road Tunnel Fire Detection Research Project An Overview of the International Road Tunnel Fire Detection Research Project Introduction Z. Liu 1, A. Kashef, G. Lougheed, J. Z. Su and N. Benichou Fire Research Program, Institute for Research in Construction

More information

INITIAL ASSESSMENT OF THE IMPACT OF JET FLAME HAZARD FROM HYDROGEN CARS IN ROAD TUNNELS AND THE IMPLICATION ON HYDROGEN CAR DESIGN

INITIAL ASSESSMENT OF THE IMPACT OF JET FLAME HAZARD FROM HYDROGEN CARS IN ROAD TUNNELS AND THE IMPLICATION ON HYDROGEN CAR DESIGN INITIAL ASSESSMENT OF THE IMPACT OF JET FLAME HAZARD FROM HYDROGEN CARS IN ROAD TUNNELS AND THE IMPLICATION ON HYDROGEN CAR DESIGN Wu, Y Department of Chemical and Process Engineering, University of Sheffield,

More information

Modelling of fire spread in car parks

Modelling of fire spread in car parks Modelling of fire spread in car parks Leander Noordijk TNO Centre for Fire Research, Delft, the Netherlands Tony Lemaire TNO Centre for Fire Research, Delft, the Netherlands Currently, design codes assume

More information

Risk Assessment for visits by schools and other groups including children.

Risk Assessment for visits by schools and other groups including children. Perrygrove Railway Risk Assessment for visits by schools and other groups including children. Page 1 Risk Assessment for visits by schools and other groups including children. Introduction Perrygrove Railway

More information

Work Permits. A Health and Safety Guideline for Your Workplace. When is a Work Permit Needed? What is a Work Permit? Why use a Work Permit?

Work Permits. A Health and Safety Guideline for Your Workplace. When is a Work Permit Needed? What is a Work Permit? Why use a Work Permit? A Health and Safety Guideline for Your Workplace What is a Work Permit? A work permit is a written form used to authorize jobs that expose workers to serious hazards. It identifies the work to be done,

More information

Module M3. Managing incidents, floods and snow. GE/RT8000/M3 Rule Book. Issue 2. September 2015

Module M3. Managing incidents, floods and snow. GE/RT8000/M3 Rule Book. Issue 2. September 2015 GE/RT8000/M3 Rule Book Module M3 Managing incidents, floods and snow Issue 2 September 2015 Comes into force 5 December 2015 Published by: RSSB The authoritative version of this document is available at

More information

1. The Kinetic Theory of Matter states that all matter is composed of atoms and molecules that are in a constant state of constant random motion

1. The Kinetic Theory of Matter states that all matter is composed of atoms and molecules that are in a constant state of constant random motion Physical Science Period: Name: ANSWER KEY Date: Practice Test for Unit 3: Ch. 3, and some of 15 and 16: Kinetic Theory of Matter, States of matter, and and thermodynamics, and gas laws. 1. The Kinetic

More information

Basics of vehicle aerodynamics

Basics of vehicle aerodynamics Basics of vehicle aerodynamics Prof. Tamás Lajos Budapest University of Technology and Economics Department of Fluid Mechanics University of Rome La Sapienza 2002 Influence of flow characteristics on the

More information

EMERGENCY ACTION PLAN (FIELD)

EMERGENCY ACTION PLAN (FIELD) GHILOTTI CONSTRUCTION COMPANY EMERGENCY ACTION PLAN (FIELD) Ghilotti Construction Company has developed the following Emergency Action Plan (EAP), in compliance with Title 8 of the California Code of Regulations,

More information

QUALIFICATION HANDBOOK

QUALIFICATION HANDBOOK QUALIFICATION HANDBOOK Level 2 and 3 NVQ Certificate in Rail Engineering Traction and Rolling Stock (7597-05/10) September 2011 Version 1.1 (September 2011) Qualification at a glance Subject area Rail

More information

Emergency Lighting Practices in the UAE. Richard Caple MSc MSLL Lighting Applications Manager SLL Vice President

Emergency Lighting Practices in the UAE. Richard Caple MSc MSLL Lighting Applications Manager SLL Vice President Emergency Lighting Practices in the UAE Richard Caple MSc MSLL Lighting Applications Manager SLL Vice President Agenda UAE emergency lighting requirements Emergency systems and luminaires Emergency lighting

More information

SAM Teachers Guide Heat and Temperature

SAM Teachers Guide Heat and Temperature SAM Teachers Guide Heat and Temperature Overview Students learn that temperature measures average kinetic energy, and heat is the transfer of energy from hot systems to cold systems. They consider what

More information

Emergency Response Guide

Emergency Response Guide Emergency Response Guide Honda Fuel Cell Vehicle Prepared for Fire Service, Law Enforcement, Emergency Medical, and Professional Towing Personnel by American Honda Motor Co., Inc. Contents Key Components...2

More information

The European Fire Safety Standard CEN TS 45545. Railway Interiorsexpo Amsterdam November 2008

The European Fire Safety Standard CEN TS 45545. Railway Interiorsexpo Amsterdam November 2008 The European Fire Safety Standard CEN TS 555 Railway Interiorsexpo Amsterdam November 2008 A Introduction B History C CEN TS 555 D Impact of approved CEN TS on national standards for fire protection E

More information

Certification of construction products - Fire dampers. Certification Rules 032

Certification of construction products - Fire dampers. Certification Rules 032 Certification of construction products - Fire dampers Certification Rules 032 1 Contents Contents 1 0 Preface 1 1 Scope and intended application 2 2 Technical requirements 2 2.1 Properties 2 2.1.1 Protection

More information

Electricity. Investigating spontaneous gas discharge in air as a function of pressure. LD Physics Leaflets P3.9.2.1. 0210-Sel

Electricity. Investigating spontaneous gas discharge in air as a function of pressure. LD Physics Leaflets P3.9.2.1. 0210-Sel Electricity Electrical conduction in gases Gas discharge at reduced pressure LD Physics Leaflets P3.9.2.1 Investigating spontaneous gas discharge in air as a function of pressure Objects of the experiments

More information

siemens.com/mobility Metro Oslo Environmental Product Declaration according to ISO 14021

siemens.com/mobility Metro Oslo Environmental Product Declaration according to ISO 14021 siemens.com/mobility Metro Oslo Environmental Product Declaration according to ISO 14021 Product description One train consists of three cars in the configuration Mc-M-Mc. The cars at the front and at

More information

SINGLE TRAIN PASSING THROUGH A TUNNEL

SINGLE TRAIN PASSING THROUGH A TUNNEL European Conference on Computational Fluid Dynamics ECCOMAS CFD 2006 P. Wesseling, E. Oñate, J. Périaux (Eds) TU Delft, The Netherlands, 2006 SINGLE TRAIN PASSING THROUGH A TUNNEL Jakub Novák* *Skoda Research,

More information

HealthandSafetyOntario.ca. What is a work permit? Why use a work permit? Types of work permits. When is a work permit needed?

HealthandSafetyOntario.ca. What is a work permit? Why use a work permit? Types of work permits. When is a work permit needed? work permits What is a work permit? A work permit is a written form used to authorize jobs that expose workers to serious hazards. It identifies the work to be done, the hazards involved, and the necessary

More information

Investigation of bicycle accidents involving collisions with the opening door of parking vehicles and demands for a suitable driver assistance system.

Investigation of bicycle accidents involving collisions with the opening door of parking vehicles and demands for a suitable driver assistance system. Investigation of bicycle accidents involving collisions with the opening door of parking vehicles and demands for a suitable driver assistance system. M. Jänsch, D. Otte, H. Johannsen Abstract Vulnerable

More information

Design of heat exchangers

Design of heat exchangers Design of heat exchangers Exchanger Design Methodology The problem of heat exchanger design is complex and multidisciplinary. The major design considerations for a new heat exchanger include: process/design

More information

INTERACTION BETWEEN MOVING VEHICLES AND RAILWAY TRACK AT HIGH SPEED

INTERACTION BETWEEN MOVING VEHICLES AND RAILWAY TRACK AT HIGH SPEED INTERACTION BETWEEN MOVING VEHICLES AND RAILWAY TRACK AT HIGH SPEED Prof.Dr.Ir. C. Esveld Professor of Railway Engineering TU Delft, The Netherlands Dr.Ir. A.W.M. Kok Associate Professor of Railway Engineering

More information

Decree of the Ministry of the Environment. on fire safety of garages

Decree of the Ministry of the Environment. on fire safety of garages E4 THE NATIONAL BUILDING CODE OF FINLAND Fire safety of garages Guidelines 2005 Decree of the Ministry of the Environment on fire safety of garages Adopted in Helsinki, 22 March 2005 Pursuant to the Decision

More information

NUMERICAL ANALYSIS OF THE EFFECTS OF WIND ON BUILDING STRUCTURES

NUMERICAL ANALYSIS OF THE EFFECTS OF WIND ON BUILDING STRUCTURES Vol. XX 2012 No. 4 28 34 J. ŠIMIČEK O. HUBOVÁ NUMERICAL ANALYSIS OF THE EFFECTS OF WIND ON BUILDING STRUCTURES Jozef ŠIMIČEK email: jozef.simicek@stuba.sk Research field: Statics and Dynamics Fluids mechanics

More information

Fire and Rescue Service Operational Guidance. GRA 5.8 flashover, backdraught and fire gas ignitions

Fire and Rescue Service Operational Guidance. GRA 5.8 flashover, backdraught and fire gas ignitions Fire and Rescue Service Operational Guidance GRA 5.8 flashover, backdraught and fire gas ignitions Generic Risk Assessment 5.8 Flashover, backdraught and fire gas ignitions August 2009 London: TSO Published

More information

Guideline. Date: 12.06.2013

Guideline. Date: 12.06.2013 Guideline Detailed definition and clarification of open points in the aerodynamic requirements of TSI HS RST 2008 and TSI CR LOC&PAS 2011 in 4.2.6.2.1 passengers on platform, 4.2.6.2.2 workers at the track

More information

State of the road tunnel safety technology in Japan

State of the road tunnel safety technology in Japan State of the road tunnel safety technology in Japan H. Mashimo Public Works Research Institute, Independent Administrative Institution, Tsukuba, Japan ABSTRACT: As more and more tunnels have been constructed

More information

Safety issues of hydrogen in vehicles Frano Barbir Energy Partners 1501 Northpoint Pkwy, #102 West Palm Beach, FL 33407, U.S.A.

Safety issues of hydrogen in vehicles Frano Barbir Energy Partners 1501 Northpoint Pkwy, #102 West Palm Beach, FL 33407, U.S.A. Safety issues of hydrogen in vehicles Frano Barbir Energy Partners 1501 Northpoint Pkwy, #102 West Palm Beach, FL 33407, U.S.A. Properties of hydrogen Hydrogen is an odorless, colorless gas. With molecular

More information

DESIGN OF NATURAL VENTILATION WITH CFD CHAPTER SEVEN. Qingyan Chen. difficult to understand and model, even for simple

DESIGN OF NATURAL VENTILATION WITH CFD CHAPTER SEVEN. Qingyan Chen. difficult to understand and model, even for simple CHAPTER SEVEN L. Glicksman and J. Lin (eds), Sustainable Urban Housing in China, 116-123 2006 Springer. Printed in the Netherlands. DESIGN OF NATURAL VENTILATION WITH CFD Qingyan Chen INTRODUCTION As the

More information

our team training is simulated the

our team training is simulated the 1 our team e-technologies Solutions, Corp. e-technologies Solutions is a leading North American company, established in West Palm Beach, Florida, which specializes in providing information and tools for

More information

Fire Hazard Calculations for Hydrocarbon Pool Fires Application of Fire Dynamics Simulator FDS to the Risk Assessment of an Oil Extraction Platform

Fire Hazard Calculations for Hydrocarbon Pool Fires Application of Fire Dynamics Simulator FDS to the Risk Assessment of an Oil Extraction Platform Fire Hazard Calculations for Hydrocarbon Pool Fires Application of Fire Dynamics Simulator FDS to the Risk Assessment of an Oil Extraction Platform Stefania Benucci, Giovanni Uguccioni D Appolonia S.p.A

More information

NEW REQUIREMENTS TO THE EMERGENCY EXITS OF BUSES

NEW REQUIREMENTS TO THE EMERGENCY EXITS OF BUSES NEW REQUIREMENTS TO THE EMERGENCY EXITS OF BUSES Dr. MATOLCSY, Mátyás Scientific Society of Mechanical Engineers Hungary Paper Number: 090181 ABSTACT Based on certain assumptions, the requirements of emergency

More information

Numerical Simulation of Temperature and Stress Fields in the Rock Heating Experiment

Numerical Simulation of Temperature and Stress Fields in the Rock Heating Experiment Numerical Simulation of Temperature and Stress Fields in the Rock Heating Experiment Author P. Rálek 1*, M. Hokr 1 1 Technical University of Liberec, Liberec, Czech Republic *Corresponding author: petr.ralek@tul.cz

More information

INSTRUCTOR S GUIDE. Stay on the Right Track Highway-Railway Crossing Awareness Training for Newly Licensed Drivers

INSTRUCTOR S GUIDE. Stay on the Right Track Highway-Railway Crossing Awareness Training for Newly Licensed Drivers INSTRUCTOR S GUIDE Stay on the Right Track Highway-Railway Crossing Awareness Training for Newly Licensed Drivers WHAT WE DO Operation Lifesaver is a nationwide, non-profit public information and education

More information

Early Fire Detection & Condition Monitoring

Early Fire Detection & Condition Monitoring Early Fire Detection & Condition Monitoring Thermal Imaging Systems for Monitoring of Industrial Facilities in EX-/Non-EX-Zones Early Fire Detection of Large-Area Installations Thermal Condition Monitoring

More information

Study the following diagrams of the States of Matter. Label the names of the Changes of State between the different states.

Study the following diagrams of the States of Matter. Label the names of the Changes of State between the different states. Describe the strength of attractive forces between particles. Describe the amount of space between particles. Can the particles in this state be compressed? Do the particles in this state have a definite

More information

Influence of fire source locations on the actuation of wet-type sprinklers in an office fire

Influence of fire source locations on the actuation of wet-type sprinklers in an office fire Influence of fire source locations on the actuation of wet-type sprinklers in an office fire Ko-Jen Chen 1 Chun-Ta Tzeng 2 Chi-ming Lai 3 Abstract An experiment is conducted on a full-scale model office

More information

Improving fire safety through engineering (rational designs)

Improving fire safety through engineering (rational designs) Improving fire safety through engineering (rational designs) Johan van den Heever Fire Safety Indaba, Cape Town 2013 'Promoting responsible fire safety in Southern Africa' 1 Introduction What is fire safety

More information

Building evacuation, rules and reality

Building evacuation, rules and reality Building evacuation, rules and reality Peter van de Leur DGMR Raadgevende Ingenieurs BV, Den Haag, the Netherlands The paper discusses some of the problems surrounding the simulation of the evacuation

More information

VERIFY HARD COPY AGAINST WEB SITE IMMEDIATELY PRIOR TO USE

VERIFY HARD COPY AGAINST WEB SITE IMMEDIATELY PRIOR TO USE Nuclear Safe Work Practice 6.7 Safety Signs/Tapes/Ropes/Chains and Tags 1.0 PURPOSE/SCOPE To provide consistent standards for using safety signs, tapes, ropes and chains (barriers) to communicate existing

More information

Performance of the Boiler and To Improving the Boiler Efficiency Using Cfd Modeling

Performance of the Boiler and To Improving the Boiler Efficiency Using Cfd Modeling IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE) e-issn: 2278-1684,p-ISSN: 2320-334X, Volume 8, Issue 6 (Sep. - Oct. 2013), PP 25-29 Performance of the Boiler and To Improving the Boiler Efficiency

More information

Why build the Silvertown Tunnel?

Why build the Silvertown Tunnel? Why build the Silvertown Tunnel? Over the last 30 years east London has changed with the redevelopment of former industrial areas into major commercial and residential districts. The development of Canary

More information

Grasshoppers Rugby Football Sports and Social Club. The Fire Risk Assessment

Grasshoppers Rugby Football Sports and Social Club. The Fire Risk Assessment Grasshoppers Rugby Football Sports and Social Club The Fire Risk Assessment Revision 1 Dated: 15th February 2013 CONTENTS 1. PREMISES DETAILS 2. PREMISES PLAN 3. HAZARDS 4. HISTORY 5. MITIGATING THE EFFECTS

More information

RESPONSE TIME INDEX OF SPRINKLERS

RESPONSE TIME INDEX OF SPRINKLERS , Number l, p.1-6, 29 RESPONSE TIME INDEX OF SPRINKLERS C.K. Sze Department of Building Services Engineering, The Hong Kong Polytechnic University, Hong Kong, China ABSTRACT The Plunge test would be carried

More information

Vapor Chambers. Figure 1: Example of vapor chamber. Benefits of Using Vapor Chambers

Vapor Chambers. Figure 1: Example of vapor chamber. Benefits of Using Vapor Chambers Vapor Chambers A vapor chamber is a high-end thermal management device that can evenly dissipate heat from a small source to a large platform of area (see Figure 1). It has a similar construction and mechanism

More information

A STUDY ON WARNING TIMING FOR LANE CHANGE DECISION AID SYSTEMS BASED ON DRIVER S LANE CHANGE MANEUVER

A STUDY ON WARNING TIMING FOR LANE CHANGE DECISION AID SYSTEMS BASED ON DRIVER S LANE CHANGE MANEUVER A STUDY ON WARNING TIMING FOR LANE CHANGE DECISION AID SYSTEMS BASED ON DRIVER S LANE CHANGE MANEUVER Takashi Wakasugi Japan Automobile Research Institute Japan Paper Number 5-29 ABSTRACT The purpose of

More information

Numerical investigation of aerodynamic action on track vicinity within the electric locomotive operation

Numerical investigation of aerodynamic action on track vicinity within the electric locomotive operation Applied and Computational Mechanics 1 (2007) 215-224 Numerical investigation of aerodynamic action on track vicinity within the electric locomotive operation J. Novák a, * a Department of Fluid Mechanics,

More information

INTERNATIONAL ASSOCIATION OF CLASSIFICATION SOCIETIES. Interpretations of the FTP

INTERNATIONAL ASSOCIATION OF CLASSIFICATION SOCIETIES. Interpretations of the FTP INTERNATIONAL ASSOCIATION OF CLASSIFICATION SOCIETIES Interpretations of the FTP CONTENTS FTP1 Adhesives used in A or B class divisions (FTP Code 3.1, Res A.754 para. 3.2.3) June 2000 FTP2 Pipe and duct

More information

Manual for simulation of EB processing. Software ModeRTL

Manual for simulation of EB processing. Software ModeRTL 1 Manual for simulation of EB processing Software ModeRTL How to get results. Software ModeRTL. Software ModeRTL consists of five thematic modules and service blocks. (See Fig.1). Analytic module is intended

More information

Introduction to the Undergraduate Physics Laboratory. Prof. Dr. Michael Ziese Head of the Undergraduate Physics Laboratory

Introduction to the Undergraduate Physics Laboratory. Prof. Dr. Michael Ziese Head of the Undergraduate Physics Laboratory Introduction to the Undergraduate Physics Laboratory Prof. Dr. Michael Ziese Head of the Undergraduate Physics Laboratory Undergraduate Physics Laboratory Prof. Dr. Michael Ziese Linnéstr. 5, R. 410 PGP,

More information

Safety signs and symbols

Safety signs and symbols Safety signs and symbols These signs are those prescribed in the Health and safety (safety signs and signals) regulations 1996, or by the CHIP regulations. They are recognised throughout the European Union

More information

Natural Convection. Buoyancy force

Natural Convection. Buoyancy force Natural Convection In natural convection, the fluid motion occurs by natural means such as buoyancy. Since the fluid velocity associated with natural convection is relatively low, the heat transfer coefficient

More information

E/M Experiment: Electrons in a Magnetic Field.

E/M Experiment: Electrons in a Magnetic Field. E/M Experiment: Electrons in a Magnetic Field. PRE-LAB You will be doing this experiment before we cover the relevant material in class. But there are only two fundamental concepts that you need to understand.

More information

Use of Decision Support Tools for Bushfire Risk Management in NSW

Use of Decision Support Tools for Bushfire Risk Management in NSW Use of Decision Support Tools for Bushfire Risk Management in NSW Presented by Stuart Midgley Director of Risk Management Performance NSW Rural Fire Service Definition Decision support tools or decision

More information

Factory owners must ensure the boiler is:

Factory owners must ensure the boiler is: Factory owners must ensure the boiler is: * Registered with the Boilers and Pressure Vessels Division, Labour Department * Examined by an appointed examiner and has a valid certificate of fitness * Supervised

More information

CFD MODELING AND EXPERIMENTAL ACTIVITY ON REAL SCALE TUNNEL FIRES

CFD MODELING AND EXPERIMENTAL ACTIVITY ON REAL SCALE TUNNEL FIRES CFD MODELING AND EXPERIMENTAL ACTIVITY ON REAL SCALE TUNNEL FIRES A. Frassoldati*, A. Cuoci*, F. Borghetti**, P. Gandini**, R. Juglair***, G. De Bacco***, M. Deffeyes****, M. Castellan**** alessio.frassoldati@polimi.it

More information

RESEARCH PAPERS FACULTY OF MATERIALS SCIENCE AND TECHNOLOGY IN TRNAVA SLOVAK UNIVERSITY OF TECHNOLOGY IN BRATISLAVA

RESEARCH PAPERS FACULTY OF MATERIALS SCIENCE AND TECHNOLOGY IN TRNAVA SLOVAK UNIVERSITY OF TECHNOLOGY IN BRATISLAVA RESEARCH PAPERS FACULTY OF MATERIALS SCIENCE AND TECHNOLOGY IN TRNAVA SLOVAK UNIVERSITY OF TECHNOLOGY IN BRATISLAVA 2010 Number 29 3D MODEL GENERATION FROM THE ENGINEERING DRAWING Jozef VASKÝ, Michal ELIÁŠ,

More information

SCBA Frequently Asked Questions

SCBA Frequently Asked Questions SCBA Frequently Asked Questions Q. WHEN SHOULD I USE SCBA? A. An SCBA is the choice when dealing with any oxygen deficient atmosphere that is IDLH (Immediately Dangerous to Life or Health), or any environment

More information

Physical Science Study Guide Unit 7 Wave properties and behaviors, electromagnetic spectrum, Doppler Effect

Physical Science Study Guide Unit 7 Wave properties and behaviors, electromagnetic spectrum, Doppler Effect Objectives: PS-7.1 Physical Science Study Guide Unit 7 Wave properties and behaviors, electromagnetic spectrum, Doppler Effect Illustrate ways that the energy of waves is transferred by interaction with

More information

Effects of Strong Cross Winds on High-Speed Trains a Risk Assessment Approach

Effects of Strong Cross Winds on High-Speed Trains a Risk Assessment Approach PSAM5 ---------- 1 Effects of Strong Cross Winds on High-Speed Trains a Risk Assessment Approach Gerd Matschke, Thorsten Tielkes, Peter Deeg and Burkhard Schulte-Werning Deutsche Bahn AG, Research and

More information

The German High Speed Rail System. DB International GmbH Ottmar Grein Bilbao, 24.02.2015

The German High Speed Rail System. DB International GmbH Ottmar Grein Bilbao, 24.02.2015 The German High Speed Rail System DB International GmbH Ottmar Grein Bilbao, 24.02.2015 High Speed Rail Senior Consultant Ottmar Grein Personal Data Professional Experience: >30 Years Position: Senior

More information

of traffic accidents from the GIDAS database until 5 seconds before the first collision. This includes parameters to describe the environment data,

of traffic accidents from the GIDAS database until 5 seconds before the first collision. This includes parameters to describe the environment data, STANDARDIZED PRE-CRASH-SCENARIOS SCENARIOS IN DIGITAL FORMAT ON THE BASIS OF THE VUFO SIMULATION Dipl.-Math. A. Schubert*, Dipl.-Ing. (FH), M. Eng. C. Erbsmehl*, Dr.-Ing. L. Hannawald* *Verkehrsunfallforschung

More information

No. Name of Legislation Applicable Issues and Requirements Demonstration of Compliance 1. Health and Safety at Work Act 1974

No. Name of Legislation Applicable Issues and Requirements Demonstration of Compliance 1. Health and Safety at Work Act 1974 The Police Treatment Centres Health and Safety Legal Compliance Register No. Name of Legislation Applicable Issues and Requirements Demonstration of Compliance 1. Health and Safety at Work Act 1974 2.

More information

The soot and scale problems

The soot and scale problems Dr. Albrecht Kaupp Page 1 The soot and scale problems Issue Soot and scale do not only increase energy consumption but are as well a major cause of tube failure. Learning Objectives Understanding the implications

More information

Influence of alcohol on reliability and safety driver during driving on vehicle simulators

Influence of alcohol on reliability and safety driver during driving on vehicle simulators Influence of alcohol on reliability and safety driver during driving on vehicle simulators ROMAN PIEKNÍK Department of Control Engineering and Telematics Joint Laboratory of System Reliability Driving

More information

. Address the following issues in your solution:

. Address the following issues in your solution: CM 3110 COMSOL INSTRUCTIONS Faith Morrison and Maria Tafur Department of Chemical Engineering Michigan Technological University, Houghton, MI USA 22 November 2012 Zhichao Wang edits 21 November 2013 revised

More information

Advanced Train Technology and Train Design Creating New Value

Advanced Train Technology and Train Design Creating New Value Hitachi Review Vol. 59 (2010), No. 1 23 Advanced Train Technology and Train Design Creating New Value Satoshi Sakata Daisuke Muto Tokuichiro Oku Yasunori Tanii Shingo Hirose Kenji Okuma OVERVIEW: As a

More information

FLA S FIRE SAFETY INITIATIVE

FLA S FIRE SAFETY INITIATIVE Improving Workers Lives Worldwide FLA S FIRE SAFETY INITIATIVE Preventing fires and saving lives by empowering workers and factory managers SCENARIO 1 OCCURS AT FACTORY ABC, WHICH HAS NOT IMPLEMENTED NECESSARY

More information

CONVERGE Features, Capabilities and Applications

CONVERGE Features, Capabilities and Applications CONVERGE Features, Capabilities and Applications CONVERGE CONVERGE The industry leading CFD code for complex geometries with moving boundaries. Start using CONVERGE and never make a CFD mesh again. CONVERGE

More information

TEACHER BACKGROUND INFORMATION THERMAL ENERGY

TEACHER BACKGROUND INFORMATION THERMAL ENERGY TEACHER BACKGROUND INFORMATION THERMAL ENERGY In general, when an object performs work on another object, it does not transfer all of its energy to that object. Some of the energy is lost as heat due to

More information

INTERACTIONS BETWEEN ACCIDENT RATE AND TRAFFIC VOLUME

INTERACTIONS BETWEEN ACCIDENT RATE AND TRAFFIC VOLUME INTERACTIONS BETWEEN ACCIDENT RATE AND TRAFFIC VOLUME Algis Pakalnis, Deputy Director, Mindaugas Dimaitis, Head of Road Division, Andrius Gužys, Road Division Group Leader, Transport and Road Research

More information

Computational Fluid Dynamic Investigation of Liquid Rack Cooling in Data Centres

Computational Fluid Dynamic Investigation of Liquid Rack Cooling in Data Centres School of something School of Mechanical Engineering FACULTY OF OTHER ENGINEERING Computational Fluid Dynamic Investigation of Liquid Rack Cooling in Data Centres A. Almoli 1, A. Thompson 1, N. Kapur 1,

More information

CZECH PILOT STUDY OF ROAD HORIZONTAL ALIGNMENT OPTIMIZATION

CZECH PILOT STUDY OF ROAD HORIZONTAL ALIGNMENT OPTIMIZATION The XXVIII International Baltic Road Conference CZECH PILOT STUDY OF ROAD HORIZONTAL ALIGNMENT OPTIMIZATION Jiří Ambros 1, Veronika Valentová 2 1,2 Centrum dopravního výzkumu, v.v.i., Brno, Czech Republic

More information

Rail Accident Report. Passenger train collision with a road vehicle at Swainsthorpe level crossing, Norfolk 13 November 2005

Rail Accident Report. Passenger train collision with a road vehicle at Swainsthorpe level crossing, Norfolk 13 November 2005 Rail Accident Report Passenger train collision with a road vehicle at Swainsthorpe level crossing, Norfolk 13 November 2005 Report 03/2006 This investigation was carried out in accordance with: The Railway

More information

GAS LEAKAGE DETECTION & AUTO ON-OFF GAS SYSTEM

GAS LEAKAGE DETECTION & AUTO ON-OFF GAS SYSTEM GAS LEAKAGE DETECTION & AUTO ON-OFF GAS SYSTEM This system helps you to upgrade your safety standards, comply statutory requirements on environmental commitments and most important and basic function being

More information

usage of these types of fuels with production price far higher then diesel and petrol, is also a measure. We can say that in Bulgaria there are

usage of these types of fuels with production price far higher then diesel and petrol, is also a measure. We can say that in Bulgaria there are TRANSPORT The basic goals of the national transport policy are focused on sustainable development of the road and railway infrastructure of national and international importance, improvement of the transport

More information

Flow in data racks. 1 Aim/Motivation. 3 Data rack modification. 2 Current state. EPJ Web of Conferences 67, 02070 (2014)

Flow in data racks. 1 Aim/Motivation. 3 Data rack modification. 2 Current state. EPJ Web of Conferences 67, 02070 (2014) EPJ Web of Conferences 67, 02070 (2014) DOI: 10.1051/ epjconf/20146702070 C Owned by the authors, published by EDP Sciences, 2014 Flow in data racks Lukáš Manoch 1,a, Jan Matěcha 1,b, Jan Novotný 1,c,JiříNožička

More information

When the fluid velocity is zero, called the hydrostatic condition, the pressure variation is due only to the weight of the fluid.

When the fluid velocity is zero, called the hydrostatic condition, the pressure variation is due only to the weight of the fluid. Fluid Statics When the fluid velocity is zero, called the hydrostatic condition, the pressure variation is due only to the weight of the fluid. Consider a small wedge of fluid at rest of size Δx, Δz, Δs

More information

Part IV. Conclusions

Part IV. Conclusions Part IV Conclusions 189 Chapter 9 Conclusions and Future Work CFD studies of premixed laminar and turbulent combustion dynamics have been conducted. These studies were aimed at explaining physical phenomena

More information

Fire Protection Of Ventilation Systems DAMPERS & AIR TRANSFER GRILLES A PRESENTATION BY PHILLIP HORTON OF FIRE ENGINEERING SOLUTIONS

Fire Protection Of Ventilation Systems DAMPERS & AIR TRANSFER GRILLES A PRESENTATION BY PHILLIP HORTON OF FIRE ENGINEERING SOLUTIONS Fire Protection Of Ventilation Systems DAMPERS & AIR TRANSFER GRILLES A PRESENTATION BY PHILLIP HORTON OF FIRE ENGINEERING SOLUTIONS THE AIM OF THE WORKSHOP: Provide assistance in the selection, installation

More information

CFD SIMULATION OF SDHW STORAGE TANK WITH AND WITHOUT HEATER

CFD SIMULATION OF SDHW STORAGE TANK WITH AND WITHOUT HEATER International Journal of Advancements in Research & Technology, Volume 1, Issue2, July-2012 1 CFD SIMULATION OF SDHW STORAGE TANK WITH AND WITHOUT HEATER ABSTRACT (1) Mr. Mainak Bhaumik M.E. (Thermal Engg.)

More information

How To Powertrain A Car With A Hybrid Powertrain

How To Powertrain A Car With A Hybrid Powertrain ELECTRIFICATION OF VEHICLE DRIVE TRAIN THE DIVERSITY OF ENGINEERING CHALLENGES A3PS Conference, Vienna Dr. Frank Beste AVL List GmbH 1 Motivation for Powertrain Electrification Global Megatrends: Urbanization

More information