September 23, 2016 CAPITAL PROJECT AND PLANNING UPDATE. OLD NORTH Phase III and West Campus Entry: Bid Set I and II (Interiors)

Size: px
Start display at page:

Download "September 23, 2016 CAPITAL PROJECT AND PLANNING UPDATE. OLD NORTH Phase III and West Campus Entry: Bid Set I and II (Interiors)"

Transcription

1 September 23, 2016 CAPITAL PROJECT AND PLANNING UPDATE OLD NORTH Phase III and West Campus Entry: Bid Set I and II (Interiors) Start Date: Aug Completion: Nov Size: 41,803 sq ft Total Project Budget: $8,450,000 Interior work on-going, schedule for completion is 1 st Floor, 3 rd Floor, 2 nd Floor, 4 th Floor Walls, sheetrock, electrical, plumbing and HVAC on-going floors 2 and 4. 1 st Floor painting almost complete 3 rd Floor painting progressing well 2 nd Floor sheetrock and electrical wall Fire separation work at perimeter of existing building at 2 nd, 3 rd, and 4 th floors, 3 rd floor in progress Additional Fire separation solutions have been proposed and will be priced by CMSW Change Order # 4 is included in the September RUSO agenda for approval Bid Set III (Exterior West Campus Entry) Start Date: May 2016 Completion: Oct/Nov Size: NA Total Project Budget: $1,600,000 On- going work in Lot 24 for irrigation (PP) and electrical CMSW has been notified that Lot 24 Lighting cannot be interupted Sidewalks for Evans Hall area to begin week of September 19, weather permitting LED lighting has been ordered, goal is for operational 11/3/16 Site clean- up work on North side to be scheduled upon completion of storm drain Request for bumper blocks and walkways from south row cars in process Sitework to begin for Chicksaw Plaza Bid Set IV (Exterior and Interior Completion Elements) RUSO approved Start Date: July 2016 Completion: Oct/Nov Size: NA Total Project Budget: $350,000 Final images for Donor signage is ready for review and AES has requested meeting for review and approvals Donor Wall Images and format Individual Donor recognition plaques (various sizes) A meeting will be set up to review all Donor Wall and Donor sign images Campus Entry Signage under modification and will be presented for review Options to include two signs, one on north and one on south, linear low elements West Campus Entry Signs rendering being modified to reflect requested changes Chickasaw Plaza seals are in production NOTE: weekly meetings will begin with campus entities and contractors to coordinate remaining details and to ensure timely move-in. 1

2 MITCHELL HALL: Start Date: Dec Completion: April 2017 Size: 20,000 sq ft Total Project Budget: $5,750,000 Upcoming work will include exterior wall framing and placement of the 2 nd floor slab and remaining elements of 1 st floor slab OIT Budget of $300k has been established with goal to receive quotes prior to the end of the fall semester Change Order will be presented at the September RUSO to include purchase and installation of Heating/Cooling equipment that will operate the building until the point in time when the new South Central Plant is on line. Once the South Plant is on line the additional capacity will allow Mitchell Hall to be connected to the existing north central loop. As noted earlier, this was planned for in the initial project budget based upon the timelines for completion of the two projects. Grand Opening on May 3, 2017 SCENE SHOP: Start Date: Occupancy of Mitchell Hall Demolition the Scene Shop upon completion and occupancy of Mitchell Backstage Facility and relocation of stored elements. MURDAUGH HALL: Start Date: May 2016 Completion: May 2017 Size: 79,432 sq ft Total Project Budget: $9,000,000 Demolition is on-going Utilities re-installation is on-going AHJ requesting additional Fire Code review and has requested that additional interior fire doors be either installed to code or replaced to meet code. This is a reasonable request and enhances safety within the building. AES and FSB (project consultants) will review with UCO EHS Review of vertical and horizontal shaft walls continues. As requested, the UCO AHJ continues to attend the weekly job meetings Housing is to coordinate with OIT for systems such as wireless for the students. Minor modifications were noted for the Mock up room and anticipate the room will be ready for final review and approval late September Fire Sprinkler installation is becoming a critical path issue for the project. AES is pushing our consultants and contractor to move this forward Work is on-going in other wings South Ramp excavation work continues 2

3 SOFTBALL COMPLEX: Start Date: June 2016 Completion: March 2017 Size: 2,709 sq ft Total Project Budget: $2,190,000 A contract award will be made for approximately $2,150,000 Contract has been forwarded to Legal Counsel for review and forward to VP Administration for execution Information Item September RUSO An initial purchase order for $1.45M has been issued to allow initial work to proceed A second PO will be issued for approximately $668,000 Site demolition complete Site utilities relocation to begin week of 9/19/16 Site grading for concrete footings and pads is complete and anticipate footings to pour 9/22/16 TCI states that the current completion date will be March 11, 2017 AES will continue to work with TCI to reduce construction time as possible Start Date: July 2016 Completion: February 2017 Size: NA Total Project Budget is $465,000 PO issued to Field Turf for approximately $440K on 8/24/16 Timberlake and other project costs will remain at approximately $25K Field Turf has modified that their earlier price quote and has offered to perform additional scope of work items within their scope of work. Information Item for September RUSO Payment and Performance Bonds submitted 9/13/16 Site survey completed by FT (to establish grading plan and soils quantities) Soils testing completed by FT 9/9/16 SOUTH CENTRAL PLANT: Start Date: Jul Completion: Fall 2017 Size: 6,500 sq ft Total Project Budget: $18,500,000 Three major components: $3M building to house the plant equipment start date: 11/15/16 completion: 6/1/17 $12M chiller plant equipment and controls start date: 2/24/17 completion: 8/30/17 $3.5M underground piping Project start dates have moved as a response to university concerns about disruption to campus In December 2016, following the end of the fall semester, work will take place on the site of the upcoming STEM project. Including the STEM project, this entire site will be under construction until summer of 2018 Bond Funds were issued August 24, 2016 JCI has begun work on the piping that will eventually connect Mitchell Hall and Health and Physical Education to the North Plant Loop. The final connections cannot occur until after the completion of the South Loop. JCI will mobilize within the next 30 days. 3

4 STEM BUILDING: Phase 1 Start Date: Jan Completion: Summer 2018 Size: 55,000 sq ft Total Project Budget: $27,000,000 Construction Drawings ready for bid due: (Issued by Elliott+) Advertise for Bids week of October 31, 2016 Receive Bids week of December 5, 2016 Bond Funds are available as of August 24, 2016 and must be expended prior to August 22, 2019 Construction scheduled to begin January Open for fall semester, SPORTS PERFORMANCE CENTER: Phase 1 Start Date: Mar Completion: Jun Size: 44,000 sq ft Total Project Budget: $14,000,000 Athletic Department approved schematic design floor plans. Bond Funds were available as of August 24, 2016 and must be expended prior to August 22, Construction is scheduled to begin March This is contingent upon the delivery and bidding an early site work bid package. SPORTS PERFORMANCE CENTER: Phase 2 Start Date: TBD Completion: TBD Size: TBD Total Project Budget: $9-$10 million Kick-Off meeting scheduled for COLLEGE OF BUSINESS: (KT) Start Date: TBD Completion: TBD Size: TBD Total Project Budget: TBD A&E Services will work with the college to integrate their planning into the Master Plan. LIBERAL ARTS ADDITION: Start Date: Dec Completion: Jun Size: 48,500 sqft Total Project Budget: $17,000,000 An outline of the project is to be presented at 11:30 am President s Conference Room. The objective of the meeting is to update the group on the project status as well as review any needed information prior to agenda item submittal to RUSO at their November meeting Intent is to seek full project approval at the November 2016 RUSO meeting (President s discretion) for 2017 Master Lease Revenue Bond funding. September 2016 RUSO transfer of $1.1M from 290 to 295 funds for Liberal Arts Renovation and Addition 4

5 DINING FACILITY: Start Date: Dec Completion: Jun Size: TBD Total Project Budget: TBD UCO Consultant selection will likely be presented at the November RUSO as Information item 21 RFQ s were submitted for UCO selection of 5 for interview (Rees, FSB, ADG, Elliott + and Hornbeek & Blatt) Interviews will be held Sept. 15, 2016 and a recommendation will be made to the President following the tabulations CMR Selection process will be requested at the September RUSO meeting Site visits are complete. Josh Overocker and A&E Services visited Chartwells locations on two campuses 8/29-9/1/16. Request approval at the November 2016 RUSO meeting for 2017 Master Lease Revenue Bond funding (Total scope of project/total project budget needs to be identified by Campus Enterprises) ALLIED HEALTH CENTER: College of Education and College of Math and Science Start Date: TBD Completion: TBD Size: TBD Total Project Budget: TBD A&E Services will work with the college to integrate their planning into the Master Plan. PERFORMING ARTS CENTER: Start Date: TBD Completion: TBD Size: TBD Total Project Budget: TBD The City has provided a Request for Qualifications for design services for establishment of programming needs from the City UCO is to review the proposal and provide comments back to the City WELLNESS CENTER EXPANSION: Start Date: Initial Meetings May 2016 Completion: Goal Fall 2019 Total Project Budget: TBE Student Affairs/Wellness provided initial planning concepts for review Administrative review during Fall 2016 The first design/program review meeting was July 18, 2016 Hastings and Chivetta provided documentation, however additional modifications have been requested to the program and H/C will return documents late September. Current planning is for approximately 70,000 gross square feet and includes both Wellness Center and OARC at Lake Arcadia Goal is to seek RUSO approval for Consultant Selection at the appropriate times with goal of 2018 Master Lease CAMPUS MASTER PLAN: 5

6 Start Date: Dec Completion: Aug Size: NA Total Project Budget: $250,000 Multiple Group Listening Session dates were conducted during June, July and August Prepare interim study results for January 2017 RUSO presentation (RUSO at UCO) Current schedule of sessions: Student sessions will be established for October Prior Listening sessions included: College of Business, College of Education, FSI on 6/21/16 Provost Office, College of Liberal Arts, College of Fine Arts and Design, Athletics, Development and UCO Foundation on 7/12/16 OIT, Public Affairs, University Communications, Campus Enterprises and Housing on 7/19/16 Student Affairs, DPS and Transportation and Parking on 7/25/16 City of Edmond City Manager and Staff 8/29/16 Mayor, City of Edmond 9/7/16 Edmond Public Schools 9/19/16 Additional listening sessions being scheduled for the second review process with all groups CAPITAL PROJECT AND PLANNING UPDATE: SMALL PROJECTS ACM Window Replacement: (Brown & Root) Start Date: May 16 Completion: Jan 2017 Size: NA Total Project Budget: $550,000 B&R met with AES 9/20/16 and presented two options for review 1. Resolve installation issues and maintain current windows 2. Replace all windows with correct type and installation methods AES will meet with B&R week of to review sample for modification UCO still retains $250K for the systems installation NIGH UNIVERSITY CENTER: NUC Grand Stair-Rail: (Alpha Building) Start Date: Nov. 23, 2016 Completion: Jan Size: --- Total Project Budget: $225,000 Major new glass and aluminum railing system plus floor repairs *Awaiting shop drawings and fabrication. Per NUC request, installation to begin Nov for completion mid-january 2017 NUC Tech Store: (Brown & Root) Start Date: Jun. 20 Completion: Aug. 30 Size: 1300 Sq. Ft Total Project Budget: $200,000 Construction has been completed Furniture to be delivered for installation week of 9/12/16 Grand Opening scheduled for 9/30/16 6

Capital Projects Town Hall Meeting

Capital Projects Town Hall Meeting Capital Projects Town Hall Meeting Planning, Architectural & Engineering Services September 15, 2014 Agenda Project Updates Recently Completed and in Construction Projects in Design Projects in Planning

More information

MONTHLY PROJECT CONSTRUCTION PROGRESS REPORT #5

MONTHLY PROJECT CONSTRUCTION PROGRESS REPORT #5 Rendering Provided by McKissick Associates MONTHLY PROJECT CONSTRUCTION PROGRESS REPORT #5 Additions and Alterations to Williamsport Area Middle School Williamsport Area School District 17 July 2012 Geo-Thermal

More information

Exhibit C: Scope of Work and Schedule of Deliverables

Exhibit C: Scope of Work and Schedule of Deliverables Exhibit C: Scope of Work and Schedule of Deliverables Project Scope of Work Phases: A City Hall Envelope Renovations B City Hall Skylight Replacement C City Hall Chiller Replacement D City Hall Annex Plaza

More information

REGIONAL UNIVERSITY SYSTEM OF OKLAHOMA

REGIONAL UNIVERSITY SYSTEM OF OKLAHOMA REGIONAL UNIVERSITY SYSTEM OF OKLAHOMA AGENDA REGULAR BOARD MEETING June 21, 2012 University of Central Oklahoma Nigh University Center 3 rd Floor, Robert S. Kerr Room Edmond, Oklahoma REG IONAL UNIVERSITY

More information

REQUEST FOR BOARD ACTION HENDERSON COUNTY BOARD OF COMMISSIONERS. ATTACHMENTS: 1. Construction Management Update

REQUEST FOR BOARD ACTION HENDERSON COUNTY BOARD OF COMMISSIONERS. ATTACHMENTS: 1. Construction Management Update REQUEST FOR BOARD ACTION HENDERSON COUNTY BOARD OF COMMISSIONERS MEETING DATE: March 16, 2011 SUBJECT: PRESENTER: ATTACHMENTS: Construction Management Update David Berry Yes 1. Construction Management

More information

Every Student I Every Day I Every Possibility

Every Student I Every Day I Every Possibility For the Facilities Master Plan March 4, 2015 1 Introduction This has been prepared to describe a proposed process to be implemented in order to develop comprehensive Facility Master Plans for all schools

More information

OHLONE COMMUNITY COLLEGE BOND MEASURE G

OHLONE COMMUNITY COLLEGE BOND MEASURE G Monthly Report OHLONE COMMUNITY COLLEGE BOND MEASURE G Fremont, California June 2014 TABLE OF CONTENTS 1. Executive Summary 2. Safety Status 3. Schedule Status 4. Design Progress 5. Construction Progress

More information

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal. 2.02 DESIGN DEVELOPMENT PHASE GENERAL The Architect shall prepare the Design Development Documents from the approved Schematic Design. The Design Development Documents shall consist of drawings and other

More information

Board of Regents Meeting August 14-15, 2008 Item # 20 EXECUTIVE SUMMARY Page 1 of 7

Board of Regents Meeting August 14-15, 2008 Item # 20 EXECUTIVE SUMMARY Page 1 of 7 EXECUTIVE SUMMARY Page 1 of 7 ACTION ITEM: Project and Budget Increase for Residence Life Building Renewal, Phase 3 and Phase 4 (UA) ISSUE: The University of Arizona seeks Project and Budget Increase for

More information

TD AMERITRADE Park Omaha

TD AMERITRADE Park Omaha TD AMERITRADE Park Omaha November 19, 2009 Report No. 6 MONTHLY CONSTRUCTION PROGRESS REPORT METROPOLITAN ENTERTAINMENT & CONVENTION AUTHORITY MONTHLY CONSTRUCTION PROGRESS REPORT Metropolitan Entertainment

More information

2012 BIM Guidelines and Standards (Rev. 00) University at Albany

2012 BIM Guidelines and Standards (Rev. 00) University at Albany A. Building Information Modeling (BIM) Guidelines: The Office of AECM will require the submission of BIM modeling files as part of an electronic file submission to the AECM project manager as requested

More information

Project Management Division

Project Management Division CAPITAL PROJECTS DEPARTMENT MONTHLY ACTIVITY REPORT February 2015 Project Management Division BELOW: Collins Construction crews complete recent exterior work and await delivery of exterior siding. Collins

More information

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components Infrastructure Facility Condition Summary Weighted Avg Condition Score Facility Components Systems Surveyor/ Date Done Comments G Sitework.9 Site Improvements Parking Pedestrian Paving Site Development

More information

Chicago Public Schools

Chicago Public Schools Ames Middle School 1920 N Hamlin Ave 1997 Completed The scope of this project is to construct a new school $16,913,379 2014 Construction The intent of this project is to expand existing Ames middle school

More information

County Of Sonoma Agenda Item Summary Report

County Of Sonoma Agenda Item Summary Report County Of Sonoma Agenda Item Summary Report Department: General Services Contact: Rob Kambak Phone: (707) 565-3211 Board Date: 10/27/2009 4/5 Vote Required Deadline for Board Action: AGENDA SHORT TITLE:

More information

Newtown and Holland Middle Schools Construction Project Bid Review

Newtown and Holland Middle Schools Construction Project Bid Review Newtown and Holland Middle Schools Construction Project Bid Review *Includes clarifications requested at 30MAR16 FACCOM Meeting (italicized) Facilities Committee Meeting March 30, 2016 (Updated March 31,

More information

CONSTRUCTION MANAGEMENT REPORT NO. 1

CONSTRUCTION MANAGEMENT REPORT NO. 1 CONSTRUCTION MANAGEMENT REPORT NO. 1 Expansion and Renovation Prepared for: HOLLAND PUBLIC SCHOOL BOARD Date September 20, 2011 HOLLAND PUBLIC SCHOOLS HIGH SCHOOL EXPANSION AND RENOVATION TABLE OF CONTENTS

More information

MULTI-FAMILY, COMMERCIAL, INDUSTRIAL, AS GOVERNED BY THE BC BUILDING CODE PART 3

MULTI-FAMILY, COMMERCIAL, INDUSTRIAL, AS GOVERNED BY THE BC BUILDING CODE PART 3 TOWN OF SIDNEY Multi-Family, Commercial, Industrial and Institutional Building Permit Guide The information provided is intended as a guide only and does not replace current bylaws and regulations. Complete

More information

CONSTRUCTION PROGRESS MONITORING REPORT

CONSTRUCTION PROGRESS MONITORING REPORT CONSTRUCTION PROGRESS MONITORING REPORT Windermere Memory Care 1060 Tomyn Boulevard Ocoee, FL 34787 Partner Project Number: 15-133494.16 Prepared for: ORIX USA Corporation 1717 Main Street, Suite 1100

More information

CAPITAL PROJECTS DEPARTMENT MONTHLY ACTIVITY REPORT. January 2014. Project Management Division

CAPITAL PROJECTS DEPARTMENT MONTHLY ACTIVITY REPORT. January 2014. Project Management Division CAPITAL PROJECTS DEPARTMENT MONTHLY ACTIVITY REPORT RIGHT: the proposed conceptual profile of the new Joe Redington Sr. JR/SR High School January 2014 Project Management Division New Knik Area Middle/High

More information

The work has continued on final Phase 4 and is nearing completion.

The work has continued on final Phase 4 and is nearing completion. Updates-January 22, 2013 29369-Rehab Plaza Deck/Drainage Budget: $18,000,000, constr. Start 8/2009 The work has continued on final Phase 4 and is nearing completion. The main plaza area of phase 4 is now

More information

The minimum reinforcement for the stem wall is the placement of:

The minimum reinforcement for the stem wall is the placement of: PolySteel creates an ideal insulated stem wall for concrete slabs that can make this part of your project easier and faster, in addition to making your finished project more energy-efficient. Figures 3.20

More information

Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals

Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals Les Butler Associate Commissioner for Business and Regional

More information

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT SAMPLE SCHEDULE OF S 1.00 General Conditions 1.01 Project Management 1.02 General Superintendent 1.03 Superintendents 1.04 Safety Engineer 1.05 Scheduling 1.06 Field Engineering 1.07 Bonds 1.08 Trailer

More information

Number Northern Arizona University Facility Services Section Page. Effective April 1, 2011

Number Northern Arizona University Facility Services Section Page. Effective April 1, 2011 Facility Services Section Page Recharge Services, Maintenance and Construction PURPOSE 1 of 6 The purpose of this policy is to set forth standards for chargeable services for maintenance and construction

More information

How to Estimate the Cost of Interior Building Finishes from Schematic Drawings. CPE Candidate No. 0714108. December 2014

How to Estimate the Cost of Interior Building Finishes from Schematic Drawings. CPE Candidate No. 0714108. December 2014 How to Estimate the Cost of Interior Building Finishes from Schematic Drawings CPE Candidate No. 0714108 December 2014 1 How to Estimate the Cost of Interior Building Finishes from Schematic Drawings Table

More information

Commission Districts Affected Facilities and Transportation Services Department

Commission Districts Affected Facilities and Transportation Services Department Fulton County Board of Commissioners Agenda Item Summary BOC Meeting Date 2/5/2014 Requesting Agency Commission Districts Affected Facilities and Transportation Services Department All Districts Requested

More information

Repair Project for April 7, 2009

Repair Project for April 7, 2009 Repair Project for April 7, 2009 Scope of the Project HVAC Upgrades Roof Replacement Window Replacement/Exterior Openings Science Lab Renovations New Fire Alarm/Electrical AAB (accessibility) Upgrades

More information

Request for Proposal for Construction Management Services

Request for Proposal for Construction Management Services Willmar Public Schools- ISD 347 611 5 th Street SW Willmar MN 56201 Dr. Jeffrey Holm, Superintendent Request for Proposal for Construction Management Services Willmar Public Schools is soliciting Construction

More information

Estimated Cost of Repair

Estimated Cost of Repair 1 Applicant: Property: Home: Business: Assessor: Applicant Number: Type of Loss: Hurricane Date Contacted: 1/18/2014 Date of Loss: 10/29/2012 Date Received: 1/14/2014 Date Inspected: 2/4/2014 Date Entered:

More information

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are: When is a Permit Required? The most common types of projects that require permits are: -New Houses or buildings -Room Additions or Expansions -Structural repairs, remodeling and alterations -Accessory

More information

QA/QC, Project Updates & Procurement

QA/QC, Project Updates & Procurement Construction Institute The Changing State of the State October 16, 2015 QA/QC, Project Updates & Procurement Laura A. Cruickshank, FAIA University Master Planner and Chief Architect Planning, Architectural

More information

Residential Adjustments. Overview 4.1

Residential Adjustments. Overview 4.1 Overview 4.1 Summary This chapter contains an overview of residential structural components, quality of construction, main dwellings, and construction types. It also provides adjustments such as wall height,

More information

How To Plan A Building

How To Plan A Building State of Nevada Department of Administration Purchasing Division Las Vegas Purchasing Warehouse Facility Condition Analysis LAS VEGAS PURCHASING WAREHOUSE 1054 South Commerce Street Las Vegas, Nevada Site

More information

Schedule A. Residential and Seasonal Dwellings. for estimating value of construction in the Township of North Kawartha

Schedule A. Residential and Seasonal Dwellings. for estimating value of construction in the Township of North Kawartha Schedule A Classification of buildings used for estimating value of construction in the Township of North Kawartha Estimated cost of Construction per square foot Residential and Seasonal Dwellings Single

More information

Electrical. This section applies to the design and installation of building power distribution systems.

Electrical. This section applies to the design and installation of building power distribution systems. Basis of Design This section applies to the design and installation of building power distribution systems. Design Criteria This section contains the architectural, structural and mechanical provisions

More information

Dancing Willows Condominium HOA, Inc.

Dancing Willows Condominium HOA, Inc. Dancing Willows Condominium HOA, Inc. October 28, 2013 C/O Stillwater Community Management 15400 W 64 th Ave Suite 9E53 Arvada, CO 80007 p. (303) 872-9224 f. (303) 309-0468 Holly.Bristol@scmhoa.com RE:

More information

Total Building Commissioning: Case Study of the U.S. District Courthouse in Salt Lake City, Utah, USA

Total Building Commissioning: Case Study of the U.S. District Courthouse in Salt Lake City, Utah, USA Total Building Commissioning: Case Study of the U.S. District Courthouse in Salt Lake City, Utah, USA Boggarm S. Setty, P.E., Fellow ASHRAE Setty & Associates, Ltd. 3040 Williams Drive, Suite 600, Fairfax,

More information

KIEWIT CM/GC Enabling/Utilities

KIEWIT CM/GC Enabling/Utilities South Terminal Redevelopment Program KIEWIT CM/GC Enabling/Utilities Contract Value $50 million M/WBE Goal 20 percent Contact John Todd, LEED AP Project Manager 303.930.9046 john.todd@kiewit.com General

More information

32315 ADOPTED BOARD OF TRUSTEES COMMUNITY COLLEGE DISTRICT NO. 508 JUNE 5, 2014

32315 ADOPTED BOARD OF TRUSTEES COMMUNITY COLLEGE DISTRICT NO. 508 JUNE 5, 2014 32315 ADOPTED BOARD OF TRUSTEES COMMUNITY COLLEGE DISTRICT NO. 508 JUNE 5, 2014 BOARD OF TRUSTEES OF COMMUNITY COLLEGE DISTRICT NO. 508 COUNTY OF COOK AND STATE OF ILLINOIS JOB ORDER CONTRACT (JOC) PROJECTS

More information

Building Condition Assessment Report

Building Condition Assessment Report C2 - Nurses Resident (aka Administration) Building Condition Assessment Report Asset Address Address Construction Year Size (Gross Floor Area) Asset Type Floors Above Ground Inspection Date C2 - Nurses

More information

NORWALK LA MIRADA UNIFIED SCHOOL DISTRICT Measure S Program Construction Management Progress Report For Citizens Oversight Committee Fall Quarter 2008

NORWALK LA MIRADA UNIFIED SCHOOL DISTRICT Measure S Program Construction Management Progress Report For Citizens Oversight Committee Fall Quarter 2008 NORWALK LA MIRADA UNIFIED SCHOOL DISTRICT Measure S Program Construction Management Progress Report For Citizens Oversight Committee Fall Quarter 2008 PROGRAM AND CONSTRUCTION MANAGER SEPTEMBER 30, 2008

More information

QUALIFIED SCHOOL CONSTRUCTION BONDS (QSCB) FIRST YEAR REVIEW

QUALIFIED SCHOOL CONSTRUCTION BONDS (QSCB) FIRST YEAR REVIEW QUALIFIED SCHOOL CONSTRUCTION BONDS (QSCB) FIRST YEAR REVIEW Slide 2: Quick Update Slides 3-4: Project Timeline Slides 5-19: Project Photographs Slides 20-29: Roof Photographs Slides 30-32: Budget Summary

More information

REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N

REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N PLAN REVIEW FOR: PROJECT NAME: OWNER: ARCH/DESIGNER: ADDRESS: Ph/Fx: Plans Dated: E-mail: Sealed By: Estimated Project Cost - $ REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N

More information

PROJECT CHANGE REQUEST

PROJECT CHANGE REQUEST PROJECT CHANGE REQUEST Name of Project: UAS Freshman Residence Hall, Phases 1 and 2 Project Type: New Construction Location of Project: UAS Juneau Auke Lake Campus Project Number: 2004 26 Date of Request:

More information

WORK RULES AND CONTRACTOR REQUIREMENTS FOR ALL UNIT OWNERS & UNIT OWNER CONTRACTORS PERFORMING WORK ON THE PREMISES AT HAWTHORNE PLACE CONDOMINIUMS

WORK RULES AND CONTRACTOR REQUIREMENTS FOR ALL UNIT OWNERS & UNIT OWNER CONTRACTORS PERFORMING WORK ON THE PREMISES AT HAWTHORNE PLACE CONDOMINIUMS WORK RULES AND CONTRACTOR REQUIREMENTS FOR ALL UNIT OWNERS & UNIT OWNER CONTRACTORS PERFORMING WORK ON THE PREMISES AT HAWTHORNE PLACE CONDOMINIUMS 1) GENERAL GUIDELINES a) The following rules, regulations,

More information

AGENDA COMMITTEE ON CAMPUS PLANNING, BUILDINGS AND GROUNDS

AGENDA COMMITTEE ON CAMPUS PLANNING, BUILDINGS AND GROUNDS AGENDA COMMITTEE ON CAMPUS PLANNING, BUILDINGS AND GROUNDS Meeting: 1:15 p.m., Tuesday, Glenn S. Dumke Auditorium Steven G. Stepanek, Chair John Nilon, Vice Chair Jane W. Carney Adam Day Thelma Meléndez

More information

9770 CULVER BOULEVARD CULVER CITY, CA 90232-0507 www.culvercity.org. Incidental improvements: improvements that do not qualify as minor or

9770 CULVER BOULEVARD CULVER CITY, CA 90232-0507 www.culvercity.org. Incidental improvements: improvements that do not qualify as minor or 9770 CULVER BOULEVARD CULVER CITY, CA 90232-0507 www.culvercity.org Construction Permitting Guidelines for Businesses Moving into Existing Buildings in Culver City If your business is moving into an existing

More information

The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE

The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE BUILDING SERVICES DEPARTMENT 789 Broadway Street, Box 3000 Wyoming, ON N0N 1T0 Telephone: 519 845-0801 Toll-free: 1-866-324-6912 Fax: 519

More information

REQUEST FOR QUALIFICATIONS FROM FOUNDATION REPAIR CONTRACTORS BROOMFIELD DEPOT FOUNDATION REHABILITATION PROJECT

REQUEST FOR QUALIFICATIONS FROM FOUNDATION REPAIR CONTRACTORS BROOMFIELD DEPOT FOUNDATION REHABILITATION PROJECT Project Description and Scope The City and County of Broomfield, Colorado (Broomfield) hereby solicits this Request for Qualifications (RFQ) to prequalify and shortlist up to five (5) foundation repair

More information

Gramercy Place Condo Association, Inc.

Gramercy Place Condo Association, Inc. Gramercy Place Condo Association, Inc. UNIT MODIFICATION REQUEST Date of Application: Name of Owner (s): Telephone: (Home) (Cell) E-Mail: Anticipated start date: Anticipated ending date: Permission is

More information

CITY OF SELMA, TEXAS Inspection Checklist: Commercial

CITY OF SELMA, TEXAS Inspection Checklist: Commercial Rev Y71004 The Permits and Inspections Department welcomes you to the City of Selma. The following information is provided to you as guidance through the inspection process. The City of Selma provides

More information

July 29, 2014. Revise Section 1.1 (BACKGROUND AND CONTEXT) to the following:

July 29, 2014. Revise Section 1.1 (BACKGROUND AND CONTEXT) to the following: ADDENDUM NO. 2 TO REQUEST FOR QUALIFICATIONS FOR NEW DEVELOPMENT OF OAKLAND UNIFIED SCHOOL DISTRICT PROPERTIES, INCLUDING THE PARCELS HOUSING THE PAUL ROBESON ADMINISTRATION BUILDING AND DEWEY HIGH SCHOOL

More information

Design and Build of Passenger Terminal Building North Extension At Macau International Airport (RFQ-198) Section 6 Bill of Quantities

Design and Build of Passenger Terminal Building North Extension At Macau International Airport (RFQ-198) Section 6 Bill of Quantities At Macau International Airport (RFQ-198) Section 6 Bill of Quantities Bill Nr. 1 Preliminaries Bill Nr. 1 PRELIMINARIES NOTES : (1) The work shall be done during day time and night time according to CAM/ADA

More information

November 3, 2015 Bond and District Additional Assistance Election Information

November 3, 2015 Bond and District Additional Assistance Election Information November 3, 2015 Bond and District Additional Assistance Election Information Proposition 432 - $22 million General Obligation Bond 150+ facility projects across all schools Building renovations and improvements

More information

Using Construction Manager at Risk to Save Time and Money Laura McCluskey University Center Sioux Falls / South Dakota Board of Regents

Using Construction Manager at Risk to Save Time and Money Laura McCluskey University Center Sioux Falls / South Dakota Board of Regents Using Construction Manager at Risk to Save Time and Money Laura McCluskey University Center Sioux Falls / South Dakota Board of Regents Primary Author: Laura McCluskey 4801 N Career Ave Sioux Falls, SD

More information

Flexible Office Space Up to 66,240 Ft 2

Flexible Office Space Up to 66,240 Ft 2 Flexible Office Space Up to 66,240 Ft 2 Building Description: Wide Open Large Office Complex Numerous Perimeter Offices, Conference & Break Rooms and Wide Open Office Space Throughout Can Be Modified to

More information

Building Code Inspections and Fees

Building Code Inspections and Fees St. Mary s County Department of Land Use & Growth Management Customer Assistance Guide 22 Building Code Inspections and Fees May 10, 2014 This guide is intended to assist in the proper construction sequence

More information

CONSTRUCTION MANAGEMENT REPORT NO. 2

CONSTRUCTION MANAGEMENT REPORT NO. 2 CONSTRUCTION MANAGEMENT REPORT NO. 2 Expansion and Renovation Prepared for: HOLLAND PUBLIC SCHOOLS BOARD OF EDUCATION Date: October 31, 2011 HOLLAND PUBLIC SCHOOLS HIGH SCHOOL EXPANSION AND RENOVATION

More information

MILWAUKEE CITY HALL FOUNDATION RESTORATION. Project Update November 12, 2014

MILWAUKEE CITY HALL FOUNDATION RESTORATION. Project Update November 12, 2014 MILWAUKEE CITY HALL FOUNDATION RESTORATION Project Update November 12, 2014 Milwaukee City Hall Building History/Fast Facts - City Hall is a masonry and iron superstructure - Originally constructed from

More information

Five-Year Capital Plan Request FY 2015-16 through FY 2019-20

Five-Year Capital Plan Request FY 2015-16 through FY 2019-20 Section Contents Five-Year Capital Plan Request FY 2015-16 through FY 2019-20 Project Funding Type Total ($ 000s) Critical Maintenance for Community Colleges bonded $417,500 Health and Safety bonded $91,088

More information

HAZELWOOD HIGH SCHOOLS SCHEMATIC DESIGN PRESENTATION

HAZELWOOD HIGH SCHOOLS SCHEMATIC DESIGN PRESENTATION HAZELWOOD HIGH SCHOOLS SCHEMATIC DESIGN PRESENTATION 1 AGENDA Hazelwood 1 st Planning Process High School Program Schematic Designs Schedule 2 HAZELWOOD 1 ST GOALS Life, health and safety improvements

More information

SUCF PROJECT COST REPORTING GUIDE

SUCF PROJECT COST REPORTING GUIDE SUCF PROJECT COST REPORTING GUIDE State University Construction Fund 353 Broadway / ALBANY, NY 12246 SUCF 900 / 11 Table of Contents Page A. Preface 1 B. Area Takeoff Methodology 1. General 2 2. Net Assignable

More information

Policy on Repair and Renovation Funding

Policy on Repair and Renovation Funding Policy on Repair and Renovation Funding I. POLICY STATEMENT Auburn University s (the University s) Policy on Repair and Renovation Funding provides guidance and direction regarding the use of Repair and

More information

FORENSIC INVESTIGATION QUESTIONNAIRE

FORENSIC INVESTIGATION QUESTIONNAIRE FORENSIC INVESTIGATION QUESTIONNAIRE PSE Project Number: - - Project Name: Person(s) Interviewed: Relationship to House: Please answer the following questions to the best of your ability. Exact dates are

More information

DESIGN AND CONSTRUCTION DEPARTMENT - July 2014

DESIGN AND CONSTRUCTION DEPARTMENT - July 2014 DESIGN AND CONSTRUCTION DEPARTMENT - Project or 1 Elementary School 46 (Aliana) AutoArch Bartlett Cocke General ors Construct a new 850 capacity elementary school in the Aliana Master Planned Community.

More information

Schematic Design: Quality Management Phase Checklist Project Phase Checklist Series

Schematic Design: Quality Management Phase Checklist Project Phase Checklist Series Best Practices : Project Phase Series Contributed by Micheal J. Lough, AIA, Principal, Integral Consulting The AIA collects and disseminates Best Practices as a service to AIA members without endorsement

More information

Demolition of 50% or more of an above grade main structure requires a demolition permit.

Demolition of 50% or more of an above grade main structure requires a demolition permit. VILLAGE OF GLENCOE Building & Zoning Division 675 Village Court, Glencoe, Illinois 60022 847-835-4111 fax 847-835-4234 www.villageofglencoe.org BUILDING PERMIT APPLICATION Demo Application Date: VOG #

More information

MEASURE G-2010 EXHIBIT B FULL TEXT BALLOT PROPOSITION OF THE SAN JOSE EVERGREEN COMMUNITY COLLEGE DISTRICT BOND MEASURE ELECTION NOVEMBER 2, 2010

MEASURE G-2010 EXHIBIT B FULL TEXT BALLOT PROPOSITION OF THE SAN JOSE EVERGREEN COMMUNITY COLLEGE DISTRICT BOND MEASURE ELECTION NOVEMBER 2, 2010 MEASURE G-2010 EXHIBIT B FULL TEXT BALLOT PROPOSITION OF THE SAN JOSE EVERGREEN COMMUNITY COLLEGE DISTRICT BOND MEASURE ELECTION NOVEMBER 2, 2010 To better prepare San Jose City College/ Evergreen Valley

More information

SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM

SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM Shepherd University Board of Governors June 9, 2005 Agenda Item No. 9 SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM In 1994 construction began on the Byrd Science and

More information

Building Description Project Description Estimated Cost Notes Total Deferred

Building Description Project Description Estimated Cost Notes Total Deferred Building Description Project Description Estimated Cost Notes Total Deferred Athletic Fields & Grounds Baseball dugouts 125,000 Surface level/inground? Relamp Baseball field 16,000 Relamp Softball field

More information

UDRB APPLICATION URBAN DEVELOPMENT REVIEW BOARD

UDRB APPLICATION URBAN DEVELOPMENT REVIEW BOARD UDRB APPLICATION CITY OF MIAMI VISION STATEMENT: To Be an International City that Embodies Diversity, Economic Opportunity, Effective Customer Service and a Highly Rated Quality of Life OBJECTIVE: The

More information

Building Permit Application Packet. BUILDING CODES Adopted by La Plata County For Enforcement In The Unincorporated Areas Of La Plata County

Building Permit Application Packet. BUILDING CODES Adopted by La Plata County For Enforcement In The Unincorporated Areas Of La Plata County Building Permit Application Packet The purpose of Building Codes is to establish the minimum requirements to safe guard the public health, safety and general welfare through structural strength, means

More information

Schedule B to By-law 33-2009 Part A Fees Payable for Permits

Schedule B to By-law 33-2009 Part A Fees Payable for Permits Floor Area Calculation Floor area shall: Part A Fees Payable for Permits (Effective January 1, 2015) a) be calculated by measuring to the outer face of exterior walls and to the centre of party walls or

More information

City Of Portsmouth, New Hampshire REQUEST FOR QUALIFICATIONS # 30-10 For. Construction Management Services for the

City Of Portsmouth, New Hampshire REQUEST FOR QUALIFICATIONS # 30-10 For. Construction Management Services for the City Of Portsmouth, New Hampshire REQUEST FOR QUALIFICATIONS # 30-10 For Construction Management Services for the Renovation and Expansion of Portsmouth Middle School INVITATION The City of Portsmouth,

More information

Los Angeles Community College District PROGRAM MANAGEMENT SERVICES. Terri Mestas Program Director

Los Angeles Community College District PROGRAM MANAGEMENT SERVICES. Terri Mestas Program Director Los Angeles Community College District PROGRAM MANAGEMENT SERVICES Terri Mestas Program Director CMAA Southern California Chapter February 13, 2015 1 LACCD Overview Established in 1969 Governed by seven-member

More information

C I T Y O F P E A R S A L L

C I T Y O F P E A R S A L L The Largest City Between San Antonio and Laredo COMMUNITY DEVELOPMENT C I T Y O F P E A R S A L L A Business-Friendly, Family-Oriented Community Building Department Application Information (Please read

More information

ADVERTISEMENT FOR PREQUALIFICATION FOR THE FOLLOWING BID PACKAGES *RE-ADVERTISED*

ADVERTISEMENT FOR PREQUALIFICATION FOR THE FOLLOWING BID PACKAGES *RE-ADVERTISED* ADVERTISEMENT FOR PREQUALIFICATION FOR THE FOLLOWING BID PACKAGES *RE-ADVERTISED* BID PACKAGE DESCRIPTION REQUIRED LICENSE Bid Package No. 1 Asbestos Abatement C22 or B, with ASB & HAZ Certification Bid

More information

Springfield Township Board of Education March 10, 2015 Referendum Questions and Answers (updated 2/19/2015)

Springfield Township Board of Education March 10, 2015 Referendum Questions and Answers (updated 2/19/2015) Springfield Township Board of Education March 10, 2015 Referendum Questions and Answers (updated 2/19/2015) What is a referendum? New Jersey school districts hold public referendum votes to seek approval

More information

BUILDING PERMIT SPECIFICATIONS

BUILDING PERMIT SPECIFICATIONS BUILDING PERMIT SPECIFICATIONS The below noted requirements are based upon La Plata County Building Code. These specifications are not intended as a complete set of requirements, but are intended to provide

More information

SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request

SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request SECTION 00 0110 PROCUREMENT AND CONTRACTING REQUIREMENTS 1.1 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS A. 00 0101 - Project Title Page B. 00 0105 - Certifications Page C. 00 0110 - Table

More information

Fast Track A Successful Redevelopment: The Palm Beach Outlets Story

Fast Track A Successful Redevelopment: The Palm Beach Outlets Story Fast Track A Successful Redevelopment: The Palm Beach Outlets Story SPEAKERS Rick Greene, AICP City of West Palm Beach Brian Seymour, Esq. Gunster Ken Tuma, PE UDKS Josh Long, AICP Gunster Grand Opening

More information

Dulles Corridor Metrorail Project

Dulles Corridor Metrorail Project Dulles Corridor Metrorail Project MONTHLY COST AND SCHEDULE UPDATE FOR PHASE 2 AS OF JULY 31, 2015 SEPTEMBER 2015 Phase 2 Cost Summary July Expenditures $ 19.2 Million Total Expenditures $ 508.7 Million

More information

SECTION 27 05 36 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

SECTION 27 05 36 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS SECTION 27 05 36 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS PART 1 GENERAL 1.01 DESCRIPTION A. The work covered by this section of the Specifications includes all labor necessary to perform and complete such

More information

Braselton Bros. Store Redevelopment 5134 HWY 53 BRASELTON, GA 30548 LEVEL 0 - DEMO & NEW PLAN. Room. Room. Room. Room. Room. Room. Room. Room.

Braselton Bros. Store Redevelopment 5134 HWY 53 BRASELTON, GA 30548 LEVEL 0 - DEMO & NEW PLAN. Room. Room. Room. Room. Room. Room. Room. Room. 1.d 2.d 3.d 4.d 1.d 2.d 3.d 4.d REMOVE, REPAIR, & REPLACE EXISTING STOREFRONT SYSTEMS D.1 D.2 REMOVE, REPAIR, & REPLACE EXISTING STOREFRONT SYSTEMS D.1 D.2 REMOVE STAIR & INFILL WALL C.1 REMOVE DOOR &

More information

OAKLAND PARK COMMUNITY REDEVELOPMENT AGENCY

OAKLAND PARK COMMUNITY REDEVELOPMENT AGENCY OAKLAND PARK COMMUNITY REDEVELOPMENT AGENCY FAÇADE AND BUSINESS SITE IMPROVEMENT PROGRAM FAÇADE & BUSINESS SITE IMPROVEMENT Program Policies and Procedures I. Purpose The Façade & Business Site Improvement

More information

Schedule B to By-law 33-2009

Schedule B to By-law 33-2009 Amended by By-law 8-2016 Note: This consolidation is prepared for convenience only. For accurate reference the original by-laws should be reviewed. Floor Area Calculation Floor area shall: Schedule B to

More information

Asbestos Procedures. Asbestos Products

Asbestos Procedures. Asbestos Products Asbestos Procedures Asbestos Products Where is asbestos known to be located on The Evergreen State College? Please see Appendix A for a list of known asbestos containing materials located on the Olympia

More information

Commercial Construction Permit Application

Commercial Construction Permit Application THIS IS NOT A CONSTRUCTION PERMIT DO NOT START CONSTRUCTION UNTIL PERMIT IS ISSUED City of Lincoln Commercial Construction Permit Application Rev. 4-14 Page 1 Commercial Permit Application THIS IS NOT

More information

WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME

WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME 1 THE BUILDING PROCESS The focus of Woodland Homes building department is Quality, Service and Predictability. Through

More information

Outline. Owner Perspective CM Definition Working Relationships Why CM? Project Approach Pre-construction Construction. Iowa League of Cities // 2011

Outline. Owner Perspective CM Definition Working Relationships Why CM? Project Approach Pre-construction Construction. Iowa League of Cities // 2011 Building the Case for Construction Management Dick Hierstein, IaCMA and Larry Gleason, CPMI Handouts and presentation are available Iowa League of online Cities // 2011 at www.iowaleague.org Outline Owner

More information

AGENDA. BUILDING AND GROUNDS COMMITTEE MEETING April 21, 2015 6:30 PM School Board Room

AGENDA. BUILDING AND GROUNDS COMMITTEE MEETING April 21, 2015 6:30 PM School Board Room AGENDA BUILDING AND GROUNDS COMMITTEE MEETING April 21, 2015 6:30 PM School Board Room 1. Call to order at 6:30 p.m. 2. Review of Three Year Life Safety Recommendations from EGM Architects 3. Review of

More information

Guernsey s Structural Engineering Experience

Guernsey s Structural Engineering Experience Guernsey s Structural Engineering Experience Foundation Settlement Issues: Trinity Valley Electric Cooperative, Kaufman, TX: Analyzed their headquarters facility for issues with soil movement that was

More information

Substantial Improvement/Damage (FEMA 50% Rule) Frequently Asked Questions and Information

Substantial Improvement/Damage (FEMA 50% Rule) Frequently Asked Questions and Information SUBSTANTIAL IMPROVEMENT/DAMAGE WORKSHEET (FEMA 50% RULE) South County: Development Services North County: Development Services 4000 Tamiami Trail S. Room 122 1001 Sarasota Center Blvd Venice, Florida 34293-5076

More information

Academic Calendar 2015-2018 Arkansas State University - Jonesboro

Academic Calendar 2015-2018 Arkansas State University - Jonesboro Shared Governance Proposal Any constituent (individual or group) may submit a proposal into the shared governance process. In order to be considered, each proposal must contain the following and be directed

More information

SMALL GAS OPERATOR OPERATION AND MAINTENANCE PLAN

SMALL GAS OPERATOR OPERATION AND MAINTENANCE PLAN SMALL GAS OPERATOR OPERATION AND MAINTENANCE PLAN Facility Name: Address: QUALIFIED PERSONNEL All tasks shall be completed by a person that is qualified to that task (see operators qualification of individuals

More information

HomeSpec REPORT SUMMARY

HomeSpec REPORT SUMMARY HomeSpec 04/25/2007 Ms. Rachel Trujeque Re: 13038 West Plum Road Lot #1225 - Peoria, AZ. 85383 - Pre Drywall Inspection Dear Ms. Trujeque, At your request, a visual pre drywall inspection of the above

More information

PROPERTY EVALUATION AND RESERVE FUND STUDY

PROPERTY EVALUATION AND RESERVE FUND STUDY PROPERTY EVALUATION AND RESERVE FUND STUDY COMPLEX NORTH & WEST AVENUES LAS VEGAS, NV Prepared for: HOMEOWNER S ASSOCIATION Prepared by: CRITERIUM ENGINEERS 22 Monument Square Portland, ME 04101 CONTENTS

More information

COMMON FOR ARCHITECTS AND ENGINEERS Excerpts from HB 2284, 82 nd R

COMMON FOR ARCHITECTS AND ENGINEERS Excerpts from HB 2284, 82 nd R Legislation passed by the 82 nd legislature has modified the Texas Engineering Practice Act and the Texas Architect Practice Act. In order to give the public a clearer understanding of these changes, the

More information

Development Services Guidelines

Development Services Guidelines Dear Customer/Developer: Balcones Heights 3300 Hillcrest San Antonio, Texas 78201 210-735-9148 ext 246 Fax: 210-735-9409 Development Services Guidelines Welcome to the City of Balcones Heights, we look

More information