1 BASINGSTOKE AND NORTH HAMPSHIRE NHS FOUNDATION TRUST Environmental Control/Aspergillus Protocol IC/373/10 Owner Name Hazel Gray Job Title Senior Infection Control Nurse Final approval Name Infection Control Committee committee Date of meeting 25 August 2009 Authoriser Name Dr Nicki Hutchinson Job title Director of Infection Prevention and Control Signature Date of authorisation 09/03/2010 Review date (maximum 3 years from date March 2013 of authorisation) Audience (tick all that apply) Trust staff Contractors NHS General public Standards Standards for Better Health NHSLA Executive Summary The aim of this policy is to give guidance to Trust staff on the required actions when building work is being carried out to protect vulnerable patients from potentially fatal aspergillus infections. Any building work can lead to contamination of the air with Aspergillus spores and it is important to contact the infection control team prior to this work starting so preventative measures described in this policy can be implemented. Page 1 of 14
2 Implementation Plan Summary of changes New policy Action needed and owner of action Infection Control Team MUST be involved in all phases of any building work where there is a risk to patients. All contractors must have Health and Safety/Infection Control Training before commencement of a project. The Infection Control Team will review progress of construction in order to identify any potential problems at the earliest opportunity. Clinicians will be asked to report clinical cases of suspected hospital acquired fungal infection to the medical microbiologists. Purpose To give guidance to Trust staff when building works is being carried out to reduce the risk of contamination of the air with Aspergillus spores. Policy Statement: It is the policy of Basingstoke and North Hampshire NHS Foundation Trust that the following recommendations are adhered to when building work is being undertaken, either during construction, demolition or renovation of buildings where increased airborne particles originating from dry soil, dust or fragmenting building materials are common. Trust Application: Trust wide. Read in Conjunction with: Health and Safety Policy Contractors Policy Page 2 of 14
3 Table of Contents Page No 1. Introduction Aspergillus species Inhalation Primary route of infection Diagnosis Diameter of spores Construction and renovation activities Infection prevention and reduction 4 2. Role of the Infection Control Team 5 3. Areas requiring special environmental conditions 5 4. Risk assessment Patients at most risk of invasive aspergillosis Use of negative pressure Precautions during building work 6 5. Infection control precautions to be instituted during building works Prior to commencement of build Physical barriers Traffic control Ventilation Waste Builders clothes and equipment Health and safety of staff during renovation/construction Protection of high risk patients Monitoring Clinical Monitoring Microbiological Surveillance 8 6. Equality and Diversity 8 Appendix I: Infection Control Construction Recommendations 9 Appendix II: Infection Control Construction Checklist 10 Appendix III: Risk Assessment for Aspergillus during 11 Renovation/Construction Appendix IV: Audit 13 Appendix V: References 14 Page 3 of 14
4 1 Introduction 1.1 Aspergillus species are fungi found in soil, water and decaying vegetation. They have also been isolated from unfiltered air, ventilation systems, false ceiling dust, contamination dust dislodged during hospital renovations and construction, horizontal circulars, food, spices, dried flowers and plants. Other reported reservoirs include contaminated fire proofing materials, damp wood, indwelling catheters, in plant and contaminated bandages. Due to their size Aspergillus spores remains suspended in air for long periods of time. Once introduced into the environment the spores can persist for many months. 1.2 Aspergillus species are inhalated into the nasopharynx. In patients with severe neutropenia Aspergillus species can cause lower airway infections and brain abscess. Patients with chronic lung conditions are also pre-disposed to colonisation of the lower respiratory tract and subsequent invasive pulmonary and/or disseminated infection/disease. Cultures of both surveillance and diagnostic samples are practically always negative for Aspergillus species. It rarely infects non immuno-suppressed hospital patients and staff. While this policy refers to aspergillus the same principles apply for the prevention of infection due to other moulds, which may be released into the environment during building work. 1.3 The primary route of infection is by inhalation of fungal spores which colonise the lungs and can spread via the bloodstream to other major organs. Infection is also believed to occur directly into deep wounds during surgery, however due to the hygiene standards in theatres and the relatively short exposure times involved, this rarely poses a significant risk. 1.4 The diagnosis of Aspergillosis is often difficult involving invasive procedures. Treatment is lengthy and costly and mortality is still high despite new therapies, thus making prevention a high priority in the management of all at-risk patients. 1.5 Aspergillus spores have a diameter of between 2.5 and 3.5 microns. In practice this makes the only effective ventilation filtration system to be High Efficiency Particulate Air (HEPA) quality EU12 or above. 1.6 When hospital construction and renovation activities are in the planning stage, it is important to implement a strategy that attempts to protect patients at high risk from aspergillosis and minimise exposure to high ambient air spore levels. This will necessitate creating and maintaining an environment as free of Aspergillus spores as possible. 1.7 Infection can be prevented or reduced by: i. Identifying at risk patients ii. Surveillance using settle plates for Aspergillus species iii. Nursing high risk patients in an isolation cubicle with hepa-filtration iv. Prevention of Aspergillus inhalation by nasal amphotericin B spray v. Staff hygiene precautions and environmental cleaning Page 4 of 14
5 2 Role of the Infection Control Team (ICT) The ICT must be involved in: All phases of any building work where there is a risk to patients e.g. of aspergillus or other fungal spores, whether demolition, construction or internal refurbishment from planning to final hand over of the project. Planning, agreement of work programme and duration. Documentary evidence must be completed. Undertaking a risk assessment for the area involved. Education sessions for contractors. Attending all Estates progress meetings and will be available for advice and consultation throughout the project. The provision of written documentation on precautions, which need to be instituted. 3 Areas requiring special environmental conditions i. Operating Theatres ii. Clinical areas with Hepa filtration iii. PICU, NNSU, TSSU, Oncology Department, Pharmacy, Cyto-toxic Suite, CIVAS iv. Any other areas identified by risk assessment to have immunosuppressed patients All maintenance work or renovation in the above clinical areas must be discussed to the ICT prior to implementation. A formal risk assessment should be carried out by the ICT in conjunction with the appropriate Facilities Project Manager and Estates Manager prior to all renovations/construction (See Appendix I and II). 4 Risk Assessment 4.1 Patients at most risk of invasive aspergillosis are those who are immunocompromised or immunosuppressed for extended periods of time. These include the following patients: Haematopoietic stem cell transplant Solid organ transplant Oncology Haematological malignancy patients especially those with acute leukaemia SCIDS (Severe combined immunodeficiency syndrome) Other patient groups who are at an increased level of risk are: ICU/PICU Patients on high dose steroids Burns HIV positive patients Patients after major surgery if other factors are present Taking into account the prevalence of aspergillus in the environment and the patients that require protection a two stage protocol is required: 4.2 Use of negative pressure in the construction area, exhausted outside if possible and away from clinically susceptible patient areas. Hepa filtration will be considered depending on level of risk. Page 5 of 14
6 4.3 Precautions during building work; these are detailed below and involve minimising the release of spores into the environment and methods to reduce contamination of the patients environment. 5 Infection control precautions to be instituted during building works 5.1 Prior to commencement of build Before any building work is undertaken all contractors must have an education session with the Health and Safety and Infection Control Team. (Please refer to BNHFT Contractors Policy) 5.2 Physical Barriers These are required to minimise spores contaminating clinical areas and may include: Plastic sheeting: Fire-rated with a > 2 feet overlap for entry. Rigid barriers i.e. White washable plywood, which is dust-proof and fire-rated. Provision of an entry vestibule for change of clothing, tool storage etc. Sealing of windows with adhesive strips. Sealing of the area of building work if possible. Sealing of doors. Sealing of roof space. Taking care to minimise dust when dismantling barriers. Controlling of dust accumulation by regular damping down with water. 5.3 Traffic Control This can also reduce the dissemination of spores by: Directing patients, staff and visitors away from construction area. (Ensure signage is clear and visible). Designated entry/exit for contract staff. Using separate routes for patients, staff and visitors including separate lifts if appropriate. Using routes for removal of building materials and waste which are away from clinical areas. For immunocompromised patients, planning journeys avoiding potentially heavily contaminated areas and considering additional precautions e.g. face masks, for patients moving around and visiting the hospital. Contractual staff must only use designated routes to work area and change before accessing trust communal catering areas 5.4 Ventilation The direction and movement of air as a vehicle for dissemination of aspergillus spores needs to be considered including the following: Use of a negative pressure in the construction area, exhausted outside if possible and away from clinically susceptible patient areas. Direct airflow should go from clean to dirty areas. Protection of the ventilation units of clinical areas: Most important for high risk areas with immunocompromised patients or specialised units. Enhance plant maintenance will be put in place Waste Spore contaminated waste may also pose a risk. This can be minimised by: Page 6 of 14
7 Removing waste through a designated route avoiding clinical areas as far as practically possible. Removing debris in tightly sealed, lidded container. Heavy duty Bags may need to be used. Alternatively, cover it with a suitable covering e.g. tarpaulin. Removing waste regularly, at least on a daily basis. Do not allow waste to accumulate remove at quiet times e.g. end of day, end of session. If construction activity is above ground level, remove bagged waste in a sealed lidded container. 5.6 Builders Clothing and Equipment Construction workers and their equipment should be free of debris and dust on exiting the building area, particularly if they are passing through clinical areas. The use of the following strategies may be recommended: Hoovers containing a HEPA filter for clinical areas. Change of clothing in an airlock if available. Overshoes to be put on when entering a construction area and removed on leaving. Overalls. Tacky mats. Wiping down equipment before it leaves the area. 5.7 Health and Safety of staff during renovation/construction Aspergillus species is not normally a risk to healthy staff. However, due to the likelihood of the increase of dust and possible inhalation, masks such as PRF95, should be provided for any staff that may come into contact with areas where they are likely to inhale dust. Temperature regulation of areas or windows may have to be sealed should also be considered and any renovation/construction work should be avoided in summer wherever possible. 5.8Protection of High-Risk Patients The risk for individual patients needs to be considered including: The possibility of delaying admission, admitting elsewhere or deferring elective immunosuppression if the patient cannot be nursed in a clean environment. This needs to be discussed between the named Consultant, Infection Control and the patient. Planning movements of susceptible patients, including access to hospital for outpatients and admission of inpatients, to avoid high risk areas if possible. The use of high efficiency face masks if the patient may potentially be exposed to dust. Prophylactic antifungal agents (itraconazole) may be considered in extremely vulnerable patients. If water supply may be compromised, consider the risk to patients. Ensuring appropriate physical barriers are in place. Seal windows, doors and ceiling space. (Solid ceilings are preferred to false ceilings in units with high risk patients). 5.9 Monitoring During construction, the ICT will review its progress in order to identify any potential problems at the earliest opportunity. Inspection will include considerations such as: Dust and debris. Traffic control. Barriers. Cleanliness of adjacent sites. Formal monitoring may be appropriate under some circumstances e.g. Airflow. Page 7 of 14
8 Air sampling. Particle counting. Water testing. Temperature. Humidity. A construction monitoring form will be used by the Infection Control team. A thorough check of the area by Infection Control and Estates will be made at the time of commissioning. Following completion of the work, a project appraisal should be completed within 1 month Clinical Monitoring Clinicians will be asked to report clinical cases of suspected hospital acquired fungal infection to the medical microbiologists. The ICT will then investigate possible causes Microbiological Surveillance During the summer months ( ) transmission of Aspergillus species is higher compared with the winter months. Both settle plates and air sampling is required to monitor the level of Aspergillus species contamination. 6. Equality and Diversity The Trust is committed to an environment that promotes equality and embraces diversity both within our workforce and in service delivery. This policy should be implemented with due regard to this commitment. Page 8 of 14
9 Appendix I Environmental Control/Aspergillus Protocol INFECTION CONTROL CONSTRUCTION RECOMMENDATIONS Class I Execute work by methods to raising dust from cons. Ceiling tiles: Immediately replace tiles displaced for visual inspection Traffic: Visitor traffic routes should contact with pts Class II In addition to points for Class I above: Class III In addition to points for Classes above: Class IV In addition to points for above Classes: Water: mist work surfaces when cutting HVAC s: Air vents blocked & sealed before starting Monitor need to change or clean filters during const Area contained to 1 room with walls from floor to ceiling: Close door & duct tape frames & door Debris: covered, sealed & taped shut during transport No elevators used for debris removal Infection Control Specialist consulted Educate staff regarding risks Examine design of operational laundry/trash chutes for potential transmission Dust Minimization: partitions must be installed prior to starting (including construction in ceilings) Dust partitions must be sealed from floor to ceiling Debris: Transport debris during activity period (night best) Site thoroughly cleaned before pt admittance: remove blockage of air vents & wet mop with disinfectant frequency of cleaning adjacent areas Barriers: Dampers closed temporarily to circulation of contaminated air Assure adjacent air filtering systems are functioning Thoroughly clean new area before pt admit Airtight plastic barrier from floor to ceiling or drywall barrier covered or sealed Plastic seams must be sealed with duct tape Remove barriers carefully: spread of dust/dirt Barriers considered debris at disposal Ceiling: Openings from removed tiles covered in plastic & sealed until replaced Infection Control Specialist consulted Relocate patients to area remote from const. areas Transportation route or storage for clean supplies not near contaminated materials Traffic: Pt movement: exposure of pts to construction Water: Schedule interruptions during low activity Dust: wet-mop & place door mats at entrance Holes in walls not exposed > 4 hrs. Cover if more. Ceiling: access panels without barriers must be closed when unattended Ceiling Tiles, Porous: Remove & replace if wet Nonporous: Remove, clean with dilute hypochlorite & dry before replacement Maintain negative pressure in construction area Increase air filter change frequency Fresh air intakes 25 feet from exhaust outlets of vent system, combustion equip. stacks, med/surg vacuum system, plumbing vents, or area near vehicular exhaust or other fumes Vent system cleaned & balanced after completion of construction Page 9 of 14
10 Appendix II Environmental Control/Aspergillus Protocol INFECTION CONTROL CONSTRUCTION CHECKLIST Location of Construction: Project Start Date: Estimated Duration: Project Manager: Name of Contractor: ICS: P.M. Phone #: Contractor Phone #: ICS Phone #: Yes No Construction Activity. See Section A Below Yes No Infection Control Risk Group See Section B Below Type A: Inspection, non-invasive activity Group 1: Least Risk Type B: Small scale, short duration, minimal dust generating Group 2: Medium Risk activity. Type C: Activity that generates moderate to high levels of dust, requires greater than one work shift for completion Type D: Major duration and construction activities requiring consecutive work shifts. Page 10 of 14 Group 3: Medium/High Risk Group 4: Highest Risk CONSTRUCTION ACTIVITY/INFECTION CONTROL MATRIX TO DETERMINE CLASS **ICS must be consulted when the tool indicates that Class III or Class IV protocols are necessary. Construction Activity Risk Level Type A Type B Type C Type D Group 1 I II II III/IV Group 2 I II III IV Group 3 I III III/IV IV Group 4 III III/IV III/IV IV A) CONSTRUCTION ACTIVITY TYPES: Type A Type B Type C Type D Inspection and Non-Invasive Activities, Includes, but is not limited to, removal of ceiling tiles for visual inspection limited to 1 tile per 50 square feet, painting (but not sanding), wall covering, electrical trim work, minor plumbing, and activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection. Small scale, short duration activities which create minimal dust. Includes, but is not limited to, installation of telephone and computer cabling, access to chase spaces, cutting of walls or ceiling where dust migration can be controlled. Any work which generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies. Includes, but is not limited to, sanding of walls for painting or wall covering, removal of floor coverings, ceiling tiles and casework, new wall construction, minor duct work or electrical work above ceilings, major cabling activities, and any activity which cannot be completed within a single work shift. Major demolition and construction projects. Includes, but is not limited to, activities which require consecutive work shifts, requires heavy demolition or removal of a complete cabling system, and new construction. B) INFECTION CONTROL RISK GROUPS Group 1 Group 2 Lowest Medium Office areas All other patient care units (Ex: Cardiac, Rehab, Neuro) General Medicine Laboratories Group 3 Medium High Emergency Room Radiology/MRI Post Anaesthesia Care Units (PACU) Outpatient Surgery All ICU s Nuclear Medicine Admission/Discharge units PT - tank areas Echocardiography Outpatient Group 4 Highest All OR s Sterile Processing Areas Cardiovascular Recovery All Cardiac Cath & Angiography Areas Dialysis Units Transplant Units Oncology Cardiology Anaesthesia All Endoscopy Areas Pharmacy Labour and Delivery Newborn Nurseries
11 Appendix III RISK ASSESSMENT FOR ASPERGILLUS DURING RENOVATION/CONSTRUCTION 1. Instruction for completion 1.1 Once EFM Department are aware of any proposed renovation/construction and work in the Trust they must complete Section A prior to sending it to the Infection Control Nurse or other member of the Infection Control Team. This included proposed work on ducting, ventilation systems and false ceiling work. 1.2 The Infection Control Nurse will complete Section B and forward completed copy to named EFM project representative. 1.3 It is the responsibility of the named EFM project representative to ensure contractors see a copy of both the MRSA Policy and completed risk assessment. Section A (for completion by facilities project representative) Date proposed renovation/construction due to commence:... Name of facilities project representative completing form:... Contact number:... Brief description of proposed renovation/construction work: Description of proposed renovation/construction area:. Any additional comments:. Page 11 of 14
12 Section B (to be completed by Infection Control Nurse/Member of Infection Control Team) Date form received from EFM project representative: Date.../.../... Section B completed by:... Date.../.../... High risk areas identified by Infection Control Team: (1) (2) (3) Other at risk areas identified: (1) (2) (3) (4) Comments: Appropriate Operational Manager of high risk areas informed: (1) (2) (3) (4) Have above been given/sent policy on Aspergillus: Yes ( ) No ( ) Other hospital services informed: (1) (2) (3) Microbiology informed of proposed work: Yes ( ) No ( ) Previously yearly Aspergillus spp. Data reviewed by Infection Control Nurse Yes ( ) No ( ) Appropriate clinicians informed of any prophylaxis necessary during work. If yes who? Yes ( ) No ( ) Date arranged for Infection Control Nurse and facilities project officer to visit proposed site of renovation/construction if appropriate: Date:../../.. Additional comments: Page 12 of 14
13 Appendix IV: Audit TOPIC: OUTCOME: Cleaning during building, upgrading and demolition work in health care premises Dust and building debris is kept to a minimum to reduce the risk of hospital acquired infection STATEMENT AUDIT CRITERIA YES NO N/A The additional cleaning requirements are clearly defined prior to the commencement of any building, upgrading or demolition work. TARGET.. ACTUAL.. VARIANCE.. Formula for calculating actual performance Number of Yes responses divided by number of applicable responses multiplied by 100 equals percentage of actual performance. 1. A risk assessment is carried out prior to work commencement, involving the Infection Control Team, Domestic Services Manager and Estates Department. 2. There is written communication of the requirement for additional cleaning during building or demolition work. 3. The Domestic Services Manager monitors the provision and standard of the additional cleaning. 4. Responsibility for clear communication is defined prior to the commencement of work. 5. The standard of cleanliness, agreed following the risk assessment, is maintained during the building, upgrading or demolition work. 6. The Domestic Services Manager documents deficiencies in the standard of cleanliness. 7. There is evidence to show that action to remedy deficiencies in the standard of cleanliness has been taken. Action plan (including timescales) Signature of Auditor: Job Title: Location of Audit: Date of Audit: Review Date: Date of Follow up Audit: Page 13 of 14
14 Appendix V References Ayliffe G.A.J, Lowbury,E.J.L., Gedds, A.M. Williams GD 1992, Control of Hospital Infection 3rd Edition. Chapman and Hall Medical, London. Page Centres for Disease Control Issues on Prevention of Nosocomial Pneumonia. American Journal of Infection Control Volume 22, Page Fitzpatrick F Prowt S, Gilleec, E.A. Fenlan LE, and Murphy OM, 1999, Nosocomial Aspergillus During Building Work - Multi-disciplinary approach (letter). Journal of Hospital Infection Volume 42 No. 2 Page Wenzel RP, Hospital Environment for Higher Risk Patients, Prevention and Control of Nosocomial Infection. Williams and Wilkins 3rd Edition 1997, Pg Advisory Committee on Dangerous Pathogens. Department of Health Control of Substances Hazardous to Health Regulations 2002 Health and Safety at Work Act 1974 Management of Health and Safety at Work Regulations Page 14 of 14
Infection Control Risk Assessment Matrix of Precautions for Construction & Renovation
Infection Control Risk Assessment Matrix of Precautions for Construction & Renovation Step One: Using the following table, identify the Type of Construction Project Activity (Type A-D) TYPE A TYPE B TYPE
More informationInfection Control Risk Assessment Matrix of Precautions for Construction & Renovation
Infection Control Risk Assessment Matrix of Precautions for Construction & Renovation Step One: Using the following table, identify the Type of Construction Project Activity (Type A-D) TYPE A TYPE B TYPE
More informationCSA Z317-13-12 Infection Control during Construction, Renovation and Maintenance of Health Care Facilities Overview and Case Studies
CSA Z317-13-12 Infection Control during Construction, Renovation and Maintenance of Health Care Facilities Overview and Case Studies Grant Rogers, BSc. Principal 1 North West Environmental Group Industrial
More informationInfection Control Risk Assessment : the Infection Preventionist s Role in Construction
Infection Control Risk Assessment : the Infection Preventionist s Role in Construction Key Concepts Use of ICRA is an important element in an infection prevention program Should be an integral part of
More informationConstruction Drawings and Terminology for the Infection Prevention Professional. Objectives. Disclaimer
Construction Drawings and Terminology for the Infection Prevention Professional APIC Greater St. Louis Chapter 073 October 2012 Objectives Define the terms and descriptions of airborne engineering controls
More informationGuidelines for Mold Remediation (Removal)
Guidelines for Mold Remediation (Removal) Indoor mold growth, water damage, or musty odors should be addressed quickly. Removing mold growth and correcting the underlying cause of water accumulation can
More informationSTATEMENT OF WORK (SOW) 2. Contract Title. HEPA Supply/Exhaust fans for Clean room USP 797 Compliance
1. Contracting Officer s Representative (COR). STATEMENT OF WORK (SOW) Name: Oscar Garcia Section: Engineering Address: 3350 La Jolla Village Dr. 92161 Phone Number: Fax Number: E-Mail Address: Oscar.garcia2@va.gov
More informationDESERT RESEARCH INSTITUTE MOLD ASSESSMENT AND REMEDIATEION PROCEDURE
1.0 Introduction DESERT RESEARCH INSTITUTE This Desert Research Institute (DRI) Mold Assessment and Remediation Procedure was established to assure that consistent and uniform information is provided to
More informationPresented by Harlan Nelson 952-237-4644 Harlan.nelson@comcast.net
Construction Risk Assessment Presented by Harlan Nelson 952-237-4644 Harlan.nelson@comcast.net Statistics to Consider Hospital acquired infections Over 100,000 deaths per year Majority are failure to comply
More informationMould Mould A Basic Guide
Mould A Basic Guide Summary Mould is a fact of life. Moulds will grow practically everywhere people live and work. Mould is recognized as an occupational hazard for indoor workers as well as outdoor workers
More informationASBESTOS SCIENCE TECHNOLOGIES, INC.
ASBESTOS SCIENCE TECHNOLOGIES, INC. P.O. Box 505 Bangor, CA 95914 Phone (530) 518-0934 Email - astinc17@yahoo.com Report for Lincoln Elementary School 1582 Lincoln Road Yuba City, Ca. 95993 Mold Report
More informationAsbestos Work Permit Procedures
These procedures are to be followed by all persons required to perform the following work: Handling, installation or removal of non-friable manufactured products known to contain asbestos provided no sanding,
More informationStachybotrys chartarum a mold that may be found in water-damaged homes
Stachybotrys chartarum a mold that may be found in water-damaged homes November 2000 Environmental Health Investigations Branch California Department of Health Services Stachybotrys chartarum ecology Stachybotrys
More informationUAMS Representative: The person who is most directly responsible for aspects on location where renovation and construction will occur.
UAMS ADMINISTRATIVE GUIDE NUMBER: 11.2.08 DATE: 5/21/2002 REVISION: 10/03/2005, 09/18/2008, 10/05/2011, 07/10/2013 PAGE: 1 of 15 SECTION: CAMPUS OPERATIONS AREA: GENERAL SUBJECT: INTERIM LIFE SAFETY MEASURES
More informationGuidelines for Cleaning Staff on Managing Mould Growth in State Buildings
Guidelines for Cleaning Staff on Managing Mould Growth in State Buildings Prepared by the State Claims Agency 2 Index 1. Background 2. What are moulds? 3. What are the possible health effects? 4. How do
More informationOakland Unified San Jose Unified Stanford University Santa Ana Unified Newhall Unified Clovis Unified Merced Union High School Grossmont Union High
Oakland Unified San Jose Unified Stanford University Santa Ana Unified Newhall Unified Clovis Unified Merced Union High School Grossmont Union High School District Industry Standards Damage Assessments
More informationMold Response and Remediation Plan
1.0 Policy Statement The University of New Haven has developed a mold response and remediation plan in accordance with best practices set forth by the Environmental Protection Agency (EPA), Occupational
More informationMOLD RESPONSE AND REMEDIATION PLAN
MOLD RESPONSE AND REMEDIATION PLAN Prepared By: Triumvirate Environmental Developed: April 2011 Last Revised: March 2015 Program Approval Associate Vice President of Public Safety & Administrative Services
More informationhave been provided with information on whether they do or do not contain asbestos before starting work;
Health Effects of Asbestos If your work involves possible exposure to asbestos, you should: be aware of the risks from asbestos exposure; understand the importance of keeping exposure as low as possible;
More informationASBESTOS MANAGEMENT PROGRAM
ASBESTOS MANAGEMENT PROGRAM Prepared By: Triumvirate Environmental Program Approval Developed: August 2011 Updated: June 2015 Associate Vice President of Public Safety & Administrative Services Date Associate
More informationMold Questions and Answers Questions and Answers on Stachybotrys chartarum and other molds
Questions and Answers on Stachybotrys chartarum and other molds Questions and Answers 1. I heard about "toxic molds" that grow in homes and other buildings. Should I be concerned about a serious health
More informationSection # Medical Advisory Committee Charlton Campus West 5th Campus King Campus
Hamilton Hospitals Infection Prevention & Control Effective at Hamilton Health Sciences, St. Joseph s Healthcare (This is a Hamilton Region Infection Control policy and procedure.) St. Joseph s Healthcare
More informationBritish Columbia Institute of Technology. BCIT Safety Manual ASBESTOS MANAGEMENT
BCIT Safety Manual Contents 1. Purpose... 3 2. Definitions... 3 2.1 Asbestos... 3 2.2 Asbestos Containing Material (ACM)... 3 2.3 Friable Material... 3 2.4 Low Risk Work Activity... 3 2.5 Moderate Risk
More informationQuestions & Answers (Q & A) Regarding Asbestos Treatment with the Fire Suppression and Renovation Project
Questions & Answers (Q & A) Regarding Asbestos Treatment with the Fire Suppression and Renovation Project The Watergate Community is currently in the process with the fire suppression and interior renovations
More informationBuilding and Grounds Maintenance Checklist
Building and Grounds Maintenance Checklist Name: School: Room or Area: Date Completed: Signature: Instructions 1. Read the IAQ Backgrounder and the Background Information for this checklist. 2. Keep the
More informationAsbestos in the Workplace: A Guide to Removal of Friable Asbestos Containing Material
Asbestos in the Workplace: A Guide to Removal of Friable Asbestos Containing Material Revised November 21, 2013 Application Code of Practice Where asbestos is present or believed to be present in a workplace
More informationBird and bat droppings
Bird and bat droppings Introduction While the hazards of bird and bat droppings are generally exaggerated, there is some risk of disease wherever there are large populations of roosting birds or bats.
More informationPolicy for the Management of Asbestos in Buildings
in Buildings Health and Safety Services 1 A1. Introduction If asbestos fibres enter the lungs they can cause cancer or incurable disease. Consequently the University is committed to ensure that all reasonably
More informationMOLD REMEDIATION PROCEDURES
Page: 1 of 5 1.0 PROGRAM OBJECTIVE The purpose of this procedure is to define the responsibilities, methods, procedures and training required to safely and effectively remove or clean mold-contaminated
More informationASBESTOS AND THE HOME RENOVATOR. A basic guide on what you need to know about asbestos
ASBESTOS AND THE HOME RENOVATOR A basic guide on what you need to know about asbestos DISCLAIMER This publication contains information regarding occupational health and safety. It includes some of your
More informationNYU Safety Policy Manual
NYU Safety Policy Manual Page 1 of 6 Subject: Mold Prevention, Assessment, and Remediation Program Policy No. 167 ISSUE DATE REPLACES ORIGINATOR APPLICATION NYU Washington Square Campus PURPOSE The purpose
More informationAORN Recommended Practices. AORN Practices. RPs Related to Environmental Services. Joan Blanchard, RN, MSS, CNOR, CIC September 10, 2008
AORN Recommended Practices Joan Blanchard, RN, MSS, CNOR, CIC September 10, 2008 AORN Practices AORN Recommended Practices are AORN s official position on aseptic technique and technical practices. This
More informationUNIVERSITY OF TOLEDO
UNIVERSITY OF TOLEDO SUBJECT: INTERIM LIFE SAFETY MEASURES AND INFECTION Procedure No: LS-08-008 CONTROL PROCEDURE STATEMENT Interim life safety and infection control measures will be implemented to protect
More informationToday s topic is Asbestos Safety. This training is a part of OSHA s Asbestos Standard (29 CFR 1910.1001).
Today s topic is Asbestos Safety. This training is a part of OSHA s Asbestos Standard (29 CFR 1910.1001). You will learn the: About the dangers of asbestos. How to identify asbestos. How to protect yourself
More informationOld Dominion University Mold Management Plan
OFFICE OF ENVIRONMENTAL HEALTH AND SAFETY 5255 Hampton Blvd. Spong Hall, suite 2501 Norfolk, Virginia 23529 Phone: (757) 683-4495 Fax: (757) 683-6025 Occupational Safety & Health Environmental Health Laboratory
More informationASBESTOS MANAGEMENT POLICY
ASBESTOS MANAGEMENT POLICY Published : 4th Revision December 2014 1 Table of Contents INTRODUCTION... 3 DUTY TO MANAGE ASBESTOS... 3 DUTIES OF CAMPUS SERVICES... 3 1.0 POLICY OBJECTIVES... 5 2.0 RESPONSIBILITIES...
More informationMold Management Plan Operations & Maintenance
Document #: SAFETY_015 Revision Date: October 4, 2010 Mold Management Plan Operations & Maintenance Developed by: Environmental Health & Safety Approved by: Associate VP of Facilities & Campus Services
More informationFire Safety Risk Assessment Checklist for Residential Care Premises
Checklist for Residential Care Premises Name of Premises: Address of Premises: Name of Responsible Person: What area / location does the assessment cover? Does the assessment cover the whole site YES or
More informationATS-SOI-5910 Page: 1 of 7. Approval Block. Prepared by: Signature Date. Evan Parnell 04 AUG 2014. Reviewed by: Signature Date. Brian Flynn 04 AUG 2014
ATS-SOI-5910 Page: 1 of 7 Approval Block Prepared by: Signature Date Evan Parnell 04 AUG 2014 Reviewed by: Signature Date Brian Flynn 04 AUG 2014 Approved by: Signature Date Kristal Jewell 04 AUG 2014
More informationHow to Estimate the Cost of a. Laboratory Renovation. Candidate Number: 0714144
How to Estimate the Cost of a Laboratory Renovation Candidate Number: 0714144 December 15, 2014 1 Table of Contents Cover Page Page 1 Table of Contents Page 2 Introduction Page 3 Types & Methods of Measurements
More informationAPPENDIX B. EPA s Investigating, Evaluating, and Remediating Moisture and Mold Problems (see EPA website for complete details)
APPENDIX B. EPA s Investigating, Evaluating, and Remediating Moisture and Mold Problems (see EPA website for complete details) Table 1: Water Damage - Cleanup and Mold Prevention Table 1 presents strategies
More informationUI Procedures for Asbestos Management
UI Procedures for Asbestos Management The University of Iowa Rev.12/12/2012 These procedures apply to employees and contractors involving the identification, work on, removal, or repair of asbestos-containing
More informationSpecifications for Removal and Replacement of Water Damaged/Mold Impacted Materials
Specifications for Removal and Replacement of Water Damaged/Mold Impacted Materials Park Potomac Place 12500 Park Potomac Avenue Potomac, Maryland 20854 KEM Project # 21703 Prepared for: Park Potomac Place
More informationSprayed vermiculite ceiling coating management plan, Condell Park High School, Condell Park, NSW
Sprayed vermiculite ceiling coating management plan, Condell Park High School, Condell Park, NSW August 2006 NSW Department of Commerce Parsons Brinckerhoff Australia Pty Limited ACN 078 004 798 and Parsons
More informationSolid Organ Transplantation
Solid Organ Transplantation Infection Prevention And Control Transplant Atlantic 2011 October 13/2011 Kathy Hart Introduction In the past several years, the drugs that we use, the surgeries themselves,
More informationASBESTOS MANAGEMENT PROGRAM
ASBESTOS MANAGEMENT PROGRAM September 2015 Asbestos Management Program Table of Contents I. Purpose II. III. IV. Definitions Identification of Asbestos Asbestos Sampling V. Notification and Labeling VI.
More informationEVERYONE'S RESPONSIBILITY
EVERYONE'S RESPONSIBILITY Guidelines for an Asbestos Operations and Maintenance Program February 2007 Guidelines for an Asbestos Operations and Maintenance Program Workplace Safety & Health Division 200
More informationUBC Plant Operations Asbestos Work Procedures April 2004
UBC Plant Operations Asbestos Work Procedures April 2004 These Procedures are for use by UBC Plant Operations, Utilities, Housing & Conferences, and IT Services only and are not intended for use by other
More informationSafety Policy Manual Policy No. 112
Policy: Mold Prevention, Assessment and Remediation Program Page 1 of 9 APPLICATION NYU Langone Medical Center (NYULMC) POLICY SUMMARY NYULMC is committed to protecting employees, patients, and visitors
More informationUniversity of Pittsburgh Safety Manual. EH&S Guideline Number: 01-007 ASBESTOS
Page 1 of 5 The inhalation of asbestos fibers in excess amounts can lead to chronic lung disease. Our knowledge of these health effects comes from studies of workers exposed routinely to high concentrations
More informationFungal Assessment. Smith Recreation Community Centre 1019 Hwy 2A, Smith, Alberta
Top Q A DIVISION OF TOP QUALITY INSPECTIONS INC. Fungal Assessment Smith Recreation Community Centre 1019 Hwy 2A, Smith, Alberta 2012 P. O. B o x 8 3 0 2 4, E d m o n t o n, A B T 5 T 6 S 1 P h o n e :
More informationBed Cleaning Procedure
This is an official Northern Trust policy and should not be edited in any way Bed Cleaning Procedure Reference Number: NHSCT/10/308 Target audience: Nursing and Midwifery Staff Sources of advice in relation
More informationRadford University. Indoor Air Quality Management Plan
Radford University Indoor Air Quality Management Plan Spring 2015 Introduction Concerns with Indoor Air Quality (IAQ) have increased since energy conservation measures were instituted in office buildings
More informationLead Exposure Management Plan
Lead Exposure Management Plan 1.0. Policy CSUF has developed the Lead Exposure Management Plan to reduce occupational and environmental exposure to lead, a potent neurotoxin and carcinogen that causes
More informationDUST AND DEBRIS MANAGEMENT PROCEDURES HPD HOUSING REHABILITATION PROGRAMS
DUST AND DEBRIS MANAGEMENT PROCEDURES HPD HOUSING REHABILITATION PROGRAMS Dust and Debris Management Procedures refers to preventive measures that shall be undertaken by the contractor to prevent exposure
More informationIWU PHYSICAL PLANT SAFETY PROGRAM. Toxic and Hazardous Substances, Title 29 Code of Federal Regulations (CFR) Part 1910.1001, Subpart Z Asbestos
STANDARDS Toxic and Hazardous Substances, Title 29 Code of Federal Regulations (CFR) Part 1910.1001, Subpart Z Asbestos 1. INTRODUCTION IWU has a responsibility to provide a safe environment for students,
More informationTechnical Information Paper No. 18-001-1110
Hantavirus Prevention Cleanup of Rodent Contamination Technical Information Paper No. 18-001-1110 Purpose. Removal of rodent contamination from indoor areas will reduce the risk of personnel acquiring
More informationMarch 2007. Get The Mold Out: Mold Clean-Up Guidance for Residences. Introduction
March 2007 Connecticut Department of Public Health Environmental Health Section Environmental & Occupational Health Assessment Program 410 Capitol Avenue MS # 11EOH, PO Box 340308 Hartford, CT 06134-0308
More informationAction required (Please tick) If you answered YES, record Action Points at STEP 4
RECORD OF FIRE SAFETY RISK ASSESSMENT Building Name & Use: Address: Postcode: Name of person(s) with fire safety duties: Name and contact details of assessor: Date of Assessment: 6 th February 2011 Laurel
More informationWater Incursion Standard Operating Procedure
Water Incursion Standard Operating Procedure Purpose: To provide a standardized procedure in the event of water incursion into any Penn State University facility. References: A Brief Guide to Mold, Moisture
More informationWater should be removed as soon as possible once the safety of the structure has been verified.
FACT SHEET Posted October 18 2005 Check List for Infection Control Concerns when Reopening Healthcare Facilities Closed due to Extensive Water and Wind Damage Prior to opening a healthcare facility that
More informationCleaning. By the end of this chapter, you will be able to: Introduction. Definitions. Chapter 9
Chapter 9 By the end of this chapter, you will be able to: l Define the terms cleaning, decontamination, disinfection l List the factors that affect disinfection l Describe the aims of a cleaning schedule
More informationASBESTOS REGULATIONS 2001. Government Notice No 155 Gazette No 23108 dated 10 February 2002
ASBESTOS REGULATIONS 2001 Government Notice No 155 Gazette No 23108 dated 10 February 2002 SUMMARY OF THE NEW PROVISIONS: More detailed and streamlined Method of assessment changed (A) INTRODUCTION Exposure
More informationEAST CAROLINA UNIVERSITY INFECTION CONTROL POLICY. Methicillin-resistant Staph aureus: Management in the Outpatient Setting
EAST CAROLINA UNIVERSITY INFECTION CONTROL POLICY Methicillin-resistant Staph aureus: Management in the Outpatient Setting Date Originated: Date Reviewed: Date Approved: Page 1 of Approved by: Department
More informationThe following standard practices, safety equipment, and facility requirements apply to BSL-1:
Section IV Laboratory Biosafety Level Criteria The essential elements of the four biosafety levels for activities involving infectious microorganisms and laboratory animals are summarized in Table 1 of
More informationThe purpose of this document is to provide guidance on the safe removal and disposal of asbestos and asbestos-containing materials.
The Administration of Norfolk Island SAFE DISPOSAL OF ASBESTOS AT THE WASTE MANAGEMENT CENTRE The purpose of this document is to provide guidance on the safe removal and disposal of asbestos and asbestos-containing
More informationSTANDARD OPERATING PROCEDURES FOR MOLD REMEDIATION
West Virginia University Environmental Health and Safety STANDARD OPERATING PROCEDURES FOR MOLD REMEDIATION Origination Date August 2013. Contents Purpose:... 2 Job Scope... 2 Definitions... 2 Roles/Responsibilities:...
More informationMOLD REMEDIATION KEY STEPS
MOLD REMEDIATION KEY STEPS The EPA has developed the following guidelines for mold remediation managers. These guidelines are generally helpful, but we believe an expert in the industry should be consulted
More informationLaboratory Biosafety Level 3 Criteria
Laboratory Biosafety Level 3 Criteria Biosafety in Microbiological and Biomedical Laboratories (BMBL) 5th Edition Section IV Biosafety Level 3 (BSL-3): Biosafety Level 3 is applicable to clinical, diagnostic,
More informationAsbestos frequently asked questions
Asbestos frequently asked questions Asbestos is the name given to a group of fibrous silicate minerals which were mined in Australia and overseas and used for a range of products. All forms of asbestos
More informationMold and Mildew Mold and mildew can be detected by sight, smell and touch.
Mold and Mildew Mold and mildew can be detected by sight, smell and touch. Molds are usually black (not unlike the molds that grow in showers and between grout), green or tan in color, but can be in various
More informationCONTROL METHODS. There are five ways to control the release of asbestos fibers:
Control Methods CONTROL METHODS When asbestos containing materials are found in a building, the owner must decide which method or methods will be used to deal with the asbestos. The decision will be based
More informationCity of Philadelphia Mold Remediation, Water Damage and Use of Biocides
City of Philadelphia Mold Remediation, Water Damage and Use of s This document provides direction for remediation of building materials in City facilities with potential, visible or laboratory verified
More informationFact Sheet on Asbestos
Fact Sheet on Asbestos WHAT IS ASBESTOS? Asbestos is a naturally occurring mineral found in certain rock formations, mined from open pit mines. Most of the asbestos used in the United States today comes
More informationwww.suttonhousingpartnership.org.uk Asbestos
www.suttonhousingpartnership.org.uk Asbestos images courtesy of www.sxc.hu and/or www.morguefile.com Asbestos Asbestos was widely used until the 1980 s to improve the performance of materials and to provide
More informationWOLVERHAMPTON WASTE SERVICES GUIDANCE FOR THE SAFE REMOVAL, COLLECTION AND DISPOSAL OF MATERIALS CONTAINING ASBESTOS OR ASBESTOS CEMENT
WOLVERHAMPTON WASTE SERVICES GUIDANCE FOR THE SAFE REMOVAL, COLLECTION AND DISPOSAL OF MATERIALS CONTAINING ASBESTOS OR ASBESTOS CEMENT IMPORTANT PLEASE ENSURE THAT YOU READ AND UNDERSTAND THE GUIDANCE
More informationASBESTOS CONTROL PLAN
ASBESTOS CONTROL PLAN POLICY It is the long term plan of Emily Carr University to have an asbestos free workplace. In the interim, The University plans to manage asbestos hazards based on prioritization
More informationABClean Frequently Asked Questions (FAQ)
ABClean Frequently Asked Questions (FAQ) 1. How can I recognize asbestos containing products during cleaning, renovation, demolition or dismantling task? Considering construction date, which buildings
More informationAsbestos in your home
Asbestos in your home How to dispose of Asbestos safely Telephone Number: 01372 732000 contactus@epsom-ewell.gov.uk www.epsom-ewell.gov.uk If you would like a copy of this document in large print, on tape
More informationMold Remediation in Occupied Homes
building science.com 2008 Building Science Press All rights of reproduction in any form reserved. Mold Remediation in Occupied Homes Research Report - 0210 January-2002 Joseph Lstiburek, Terry Brennan
More informationASBESTOS CONTAINING MATERIALS OPERATIONS & MAINTENANCE PLAN 2015
ASBESTOS CONTAINING MATERIALS OPERATIONS & MAINTENANCE PLAN 2015 Prepared For: (School Name) PREPARED BY: DIOCESE OF JOLIET ENVIRONMENTAL OFFICE FOR ANY ENVIRONMENTAL RELATED EMERGENCY CONTACT: RICHARD
More informationAn Informational Pamphlet. 416 South East Street Lebanon, OH 45036
An Informational Pamphlet 416 South East Street Lebanon, OH 45036 What is Mold? Mold is a type of fungus that is present in our natural environment. Mold spores, which are tiny microscopic seeds, can
More informationNORMI Professional Guidance for DIY Projects
NORMI Professional Guidance for DIY Projects In general, a well-trained and experienced indoor mold remediation professional (CMR) should be consulted when performing remediation. You may find a NORMI
More informationWater Damage Remediation Part I. Introduction
Water Damage Remediation Part I Montana Hospital Association September 25, 2014 Larry Lee, CIH Pacific Industrial Hygiene LLC pacific.ih@comcast.net Copyright Larry Lee 2014 Larry Lee, CIH Certified Industrial
More informationSECTION 23 01 30.51 HVAC AIR-DISTRIBUTION SYSTEM CLEANING
SECTION 23 01 30.51 HVAC AIR-DISTRIBUTION PART 1 - GENERAL 1.1 SUMMARY A. Section includes cleaning of interior surfaces of HVAC equipment. The HVAC equipment cleaning work includes the following: 1. Air
More informationALVERNIA UNIVERSITY OSHA REGULATION: 29 CFR 1910.252 WELDING, CUTTING, AND BRAZING ( HOT WORK ) SECTION: 3600
OSHA REGULATION: 9 CFR 90.5 WELDING, CUTTING, AND BRAZING ( HOT WORK ) A. POLICY. This procedure follows requirements set forth in 9 CFR 90.5.. This policy applies to all Hot Work operations being done
More informationAsbestos WHAT TO DO? Studies of people who were exposed to high levels of asbestos in factories and shipyards, are at increased risk of:
Asbestos WHAT TO DO? What Is Asbestos? Asbestos is mineral fiber. It can be positively identified only with a special type of microscope. There are several types of asbestos fibers. In the past, asbestos
More informationConstruction Indoor Air Quality Management Plans for LEED. Matt Gregg, PE, LEED AP
Construction Indoor Air Quality Management Plans for LEED Matt Gregg, PE, LEED AP Agenda What is a Construction IAQ Management Plan? What are the LEED Requirements? What is the Mechanical Contractor s
More informationDepartment: Manager: Safety Coordinator: Date:
SAFETY and staff, regardless of hiring status or job position 1 1. Can staff name their department safety coordinator? 2. Is the Department Safety Binder current? 3. Do slip/trip hazards exist? 4. How
More informationEnvironmental Protection Information Sheet: 2. Advice on Asbestos
Environmental Protection Information Sheet: 2 Advice on Asbestos A s b e s t o s Asbestos is a natural mineral, which has been widely used in construction materials and in articles within the home for
More informationINFECTION CONTROL POLICY MANUAL
Page 1 of 7 POLICY MANUAL Key Words: personal protective equipment, PPE, safety equipment, infection control, standard precautions Policy Applies to: All staff employed by Mercy Hospital. Credentialed
More informationPI s Name Date Bldg./Rm# CDC Biosafety Level 3 (BSL-3)
PI s Name Date Bldg./Rm# CDC Biosafety Level 3 (BSL-3) Yes No 1. Is access to the laboratory limited or restricted at the discretion of the laboratory director when experiments are in progress? Yes No
More informationPolicy for the Management of Asbestos in the Workplace
Southwark Council Management of Asbestos in the Workplace November 2011 Page 1 of 15 CONTENTS 1. INTRODUCTION... 3 2. POLICY STATEMENT... 3 3. ASBESTOS RISK CLASSIFICATION SCHEME... 5 4. SAMPLING OF ASBESTOS
More informationAsbestos Management. 2. Introduction. Contents
Asbestos Management Contents 1. Policy 2. Introduction 3. Scope 4. Definitions 5. Asbestos Inventory and Identification 6. Inspection 7. Access Control 8. Repair and Maintenance of Asbestos-Containing
More informationGramercy Place Condo Association, Inc.
Gramercy Place Condo Association, Inc. UNIT MODIFICATION REQUEST Date of Application: Name of Owner (s): Telephone: (Home) (Cell) E-Mail: Anticipated start date: Anticipated ending date: Permission is
More informationUniversity of Nevada, Reno Facilities Services Department STANDARD OPERATING PROCEDURE. Facilities Maintenance Services
University of Nevada, Reno Facilities Services Department STANDARD OPERATING PROCEDURE Facilities Maintenance Services Indoor Flood Cleanup and Mold Prevention DATE: 6/24/15 REVISED: PURPOSE This University
More informationGet The Mold Out: Mold Clean-Up Guidance for Residences. Introduction
Connec cut Department of Public Health Environmental & Occupa onal Health Assessment Program Environmental Health Sec on 410 Capitol Avenue, MS # 11EOH, PO Box 340308 Har ord, CT 06134-0308 Telephone:
More informationASBESTOS in state and local government
ASBESTOS in state and local government Inspection campaign In 2013/14, WorkSafe WA is conducting a proactive inspection campaign focusing on the management of asbestos in state and local government buildings.
More informationASBESTOS AWARENESS IN THE WORKPLACE. This easy-to-use Leader s Guide is provided to assist in conducting a successful presentation.
ASBESTOS AWARENESS IN THE WORKPLACE This easy-to-use Leader s Guide is provided to assist in conducting a successful presentation. Featured are: INTRODUCTION: A brief description of the program and the
More informationFire Risk Assessment Safety Checklist
Fire Risk Assessment Safety Checklist This checklist has been prepared to help you comply with The Regulatory Reform Fire Safety Order 2005 What is the Regulatory Reform (Fire Safety) Order 2005? The Regulatory
More information