TERMS OF REFERENCE Final external evaluation of an extra budgetary project

Size: px
Start display at page:

Download "TERMS OF REFERENCE Final external evaluation of an extra budgetary project"

Transcription

1 TERMS OF REFERENCE Final external evaluation of an extra budgetary project Improvement of teacher qualification and setting up of system for the management of learning outcomes in Guinea Bissau TITLE Final external evaluation of the extra budgetary project on Improvement of teacher qualification and setting up of system for the management of learning outcomes in Guinea Bissau. BACKGROUND The large number of unqualified teachers in the basic education system in Guinea Bissau results from the interruption of the teacher training system during the period of political tension, which led to the integration of many teachers without adequate initial training or without any training in the system. To tackle this problem, UNESCO Office in Dakar initiated a project in 2009 to assist the Ministry of Education in the reconstruction of the education system in Guinea Bissau that aimed at developing effective in service and pre service teacher training systems to sustain a body of highly qualified teachers capable of delivering quality education. This $ project was funded by the Italian Funds in Trust (IFIT) and because of a smooth running of the operations, the donor allocated additional $ for the period between 2011 and December 2012, allowing not only to continue the work already initiated, but also to support the Ministry in elaborating a long term teaching policy (TTISSA). See the Phase II project document. PURPOSE AND USE OF THE EVALUATION The main objectives of this final evaluation are: to assess the effectiveness, relevance and sustainability of the project; to measure the degree of implementation of the project and the quality of the process, products and achievements in relation to what was originally intended or subsequently formally amended; to develop a better understanding of how and to what extent this project is contributing to facilitating teachers in achieving better qualification and the Ministry of Education in improving in service and pre service teacher training systems and policies; and 1 P age

2 to formulate recommendations that will be useful for designing and implementing future similar interventions. The expected uses of the evaluation by key stakeholders are: - For accountability purposes: generating evidence of key achievements and challenges will inform decision making processes of the donor, Ministry of Education, UNESCO Dakar as executing agency, UNESCO s Senior Management, and the Executive Board, as well as programming staff. - For learning purposes: o informing Guinea Bissau Ministry of Education (MoE), beneficiaries, UNESCO Dakar as executing agency and other relevant stakeholders about the results so that they can consider whether and to what extent their engagements have been useful and complementary with the interventions of key partners, as well as what further efforts need to be made in the future to build on and sustain the achievements made so far o generating a clear understanding of teachers issue in the country and how and to what extent this project has delivered the adequate mechanisms to improve the status quo in a progressive and sustainable matter, as well as identifying main challenges, obstacles and how these were overcome, and lessons learned will inform the development of future similar interventions and implementation mechanisms by UNESCO and other key stakeholders. This evaluation was planned according to the standard requirements for extrabudgetary project implementation. It constitutes the final evaluation, which builds on monthly (internal) and annual reports (submitted to the donor), and the first phase of the project and its mid term evaluation. SCOPE This evaluation covers mainly the phase two of the project (from 2012 present), while it builds on the evaluation for the phase one that took place in 2011, as an overall assessment regarding the extent to which the intended objectives had been achieved and the level of sustainability of the results. The evaluation will be based on 4 following standard evaluation criteria according to the definition by OECD DAC (2002): relevance, efficiency, effectiveness and sustainability. However, relevance, effectiveness and sustainability criteria should be given more importance in the evaluation. The following are indicative evaluation questions that shall be refined during the inception phase of the evaluation, based on the theory of change that is expected be developed in the initial phase of the evaluation. 2 P age

3 1) Relevance: The extent to which the project is aligned to the priorities and policies of UNESCO, target group(s), donor(s) and other stakeholders. Indicative questions to consider while conducting the evaluation: 1. Are the 3 components on pre service and in service training and pilot bilingual education consistent with the political orientations in Guinea Bissau? 2. Is the project consistent with the C/5 and C/4 1 (including the relevant expected results, Strategic Objectives and UNESCO s Global Priorities), the Millennium Development Goals and other international development goals? 3. Are the project interventions adapted to the local context, including the model used for the training of teachers on bilingual education? 4. To what extent are the components of this intervention aligned with complementary to/or overlapping with those of other education actors, implementing agencies or development partners? 5. To what extent is the pre service teacher training programme proposals relevant to the pressing demand of increasing teacher s body, taking into account the high number of unqualified in service teachers in the country while considering their competence level 2) Effectiveness: The extent to which a project attains its objectives. It has to do with the immediate effects of project outputs on target groups (and beyond). Indicative questions to consider while conducting the evaluation: 1. To what extent were the in service and pre service teacher trainings (grades 1 to 6) improved at policy level, at implementing level, and at the teachers level? 2. To what extent were the national capacities reinforced through the implementation of this project? 3. Does the model used for the training of teachers on bilingual education prove to be useful to improve learning and is it scalable? 4. What were the major factors influencing the achievement or non achievement of the objectives of the project? 5. Did the project have effective monitoring mechanisms in place? 1 37C/5: UNESCO s Programme and Budget C/4 : UNESCO s Medium-Term Strategy P age

4 6. Has the project been cost effective, i.e. could the outcomes have been achieved at lower cost through adopting a different approach and/or using alternative delivery mechanisms? 7. To what extent have the project interventions been taking gender equality aspects into consideration? 3) Sustainability: This concerns the issue of whether the benefits of a project are likely to continue after (UNESCO) support/funding has been withdrawn. Indicative questions to consider while conducting the evaluation: 1. To what extent did UNESCO involve targeted beneficiaries (teachers, MoE, INDE, etc.) in the design, delivery, and monitoring of the project? 2. To what extent will national appropriation of the project results be ensured and more specifically by the Ministry of Education? In particular: a. How the 5 developed training modules and guides for in service teachers grades 1 to 6 will be used as reference at national level to deliver quality teaching in alignment with the curricular reform and the competencebased approach adopted by the Ministry? b. How the pilot in service teacher training on the 5 revised modules and guides can be extended nationally to reinforce the capacities of all the inservice teachers grade 1 to 6? c. How the proposal of pre service teacher training programmes will be used as a reference standard by the Ministry of Education? 3. To what extent will the benefits of national capacity reinforcement continue after UNESCO s support ceased? 4. Are any potential donors/partners interested in maintaining/further building upon the project outputs of the components on pre and in service trainings and on bilingual education? 4) Efficiency: This concerns the relation between the outputs (qualitative and quantitative) and the inputs. An efficient project uses the least costly resources to generate its planned outputs. Indicative questions to consider while conducting the evaluation: a. Have UNESCO s organizational structure, managerial support and coordination mechanisms adequately performed in function of timely delivery? b. Could more activities and outputs have been delivered with the same resources? c. Has UNESCO been focusing on the areas where it is best equipped to intervene, while aligning/coordinating with other developing partners? 4 P age

5 METHODOLOGY The different steps of the evaluation will be the following: Analysis of available documentation provided electronically by the project team Analysis and refinement of the logic framework through a series of criticalthinking questions (theory of change) to confirm and to assess the causal relationships between the different project milestones and the underlying critical assumptions and to assess Submission of an inception report at the initial stage of the evaluation for developing and agreeing upon the detailed methodological approach and time schedules In person and skype/telephone interviews and as necessary, focus groups and (electronic) surveys Field mission to Dakar to meet with the project coordination team and partners (such as AfDB) Field mission to Bissau to meet with the Project Officer, the implementing institution (INDE) national experts, and General Director, the Ministry of Education, UNESCO National Commission, national consultant providing technical support, UNICEF, and other relevant education stakeholders Submission of the draft report Debriefing mission in Dakar Submission of the final evaluation report Estimated total duration of the consultancy: one month (tentative dates: 24 August to 25, 2015) Tentative dates (to be confirmed) CONSULTANT 28 August Inception report Deliverables Field work in Guinea Bissau and Dakar Draft evaluation report Final Report 3 23 UNESCO Feedback/suggestions on the Inception report Feedback/suggestions on draft evaluation report 5 P age

6 ROLES AND RESPONSIBILITIES The evaluation is expected to be conducted by a single evaluator. The evaluator will be responsible for data collection, analysis and report writing. S/he will also be responsible for logistics including office space, travel arrangements, printing of documentation, communications, laptop. The project team will provide the available documentation to the evaluator and facilitate contact with relevant stakeholders to be consulted during the evaluation. FEES AND TRAVEL ARRANGEMENTS The evaluator will be paid a fees lump sum of 7,500 USD. An additional amount not exceeding $5.000 will be included in the evaluator s contract to cover travel costs 2 according to UNESCO s Administrative Manual. S/he is expected to make his/her own travel arrangements. QUALIFICATIONS OF EVALUATOR Mandatory qualifications: Master degree or higher in Education and/or on a relevant field with at least 10 years of experience in the Education sector Extensive knowledge of, and experience in applying, qualitative and quantitative evaluation methods; Strong record in designing, planning, conducting/leading evaluations, in particular of education projects and programs; Ability to work under tight schedules with minimal supervision, excellent oral and writing skills in Portuguese (native or fluent) and in English (native or fluent), as well as working level knowledge in French (to be able to read and understand documents produced in French). Strong analytical and report writing skills Desirable qualifications: Expertise in basic education and more specifically on teacher training as well as on bilingual education. Detailed knowledge and understanding of the role of the UN and its programming Experience and knowledge of the UN gender equality and human rights mandate Previous experience in Guinea Bissau or PALOP. 2 Travel costs include economy-class air ticket and lump sum to cover all travel expenses. The consultant will be covered by UNESCO s insurance for service incurred accidents, illnesses and death, within the terms of and provisions of UNESCO s insurance policy. 6 P age

7 The candidate for this assignment shall submit a short technical and financial proposal (not exceeding $12,500, see FEES AND TRAVEL ARRANGEMENT) for the assignment, (no more than 5 7 pages), accompanied by a CV, as well as two examples of recently completed evaluation reports to Akemi Yonemura (a.yonemura@unesco.org; cc to c.collin@unesco.org and me.sagna@unesco.org) no later than July 24, The candidate should equally send a minimum of two relevant professional references. DELIVERABLES AND SCHEDULE Three main deliverables are expected: 1) An inception report which contains the (refined) intervention logic (theory of change) of the project (based on desk study), an evaluation plan and detailed methodology and a list of reviewed documents. The evaluation plan should contain the proposed data collection methods and data sources to be used for addressing each evaluation question/dimension. An evaluation matrix will connect questions to data collection methods/sources. 2) A draft evaluation report including preliminary evaluation findings and conclusions 3) A final evaluation report of not more than 20 pages, single space, excluding annexes and that shall be structured as follows: o Title Page o Executive Summary (not more than 3 pages in Portuguese and in English) o Table of Contents o Lists of Tables, Figures (if included) o Introduction: Background of the evaluation Purpose and scope of the evaluation Methodology of evaluation, including its limitations o Project description and Theory of Change o Findings and Conclusions o Lessons learned o Recommendations o Annexes (including further details on key questions, source of data collected, meetings held, timeline, the list of stakeholders consulted, key documents reviewed, ToRs, survey forms and aggregate findings, budgetary analysis, etc. that provide further evidence for the evaluation findings) The executive summary will be produced in Portuguese and in English while the other chapters will be elaborated in English. 7 P age

8 REFERENCES/MAIN DOCUMENTS TO REVIEW Campos Bartolo; Furtado Alexandre (2009). Política Docente na Guiné Bissau. Banco Mundial. Barreto, Antónia Belchior Ferreira, Alzira Rascão Saraiva e José Brites Ferreira (2010). Volume I. Referenciais de Formação Inicial de Professores do Ensino Básico. Barreto, Antónia Belchior Ferreira, Alzira Rascão Saraiva e José Brites Ferreira (2010). Volume II. Formação inicial de Professores do Ensino Básico Documentos orientadores de desenvolvimento curricular. Harmonized modules Bilingual education materials Ministry of Education. Development program for the education sector ( ) Pole de Dakar & World Bank (2013). Rapport d état du système éducatif (RESEN): Diagnosis of the Guinea Bissau Education System (CSR). Available at: poledakar.org/sites/default/files/fields/publication_files/resen guinee_bissau 2013_0.pdf United Nations Development Assistance Framework (UNDAF) and relevant & revised documents (obtain from Resident Coordinator or UNICEF) Monthly activity reports, progress reports Evaluation reports : Rapport d évaluation à mi parcours du projet (Juillet 2010) et Rapport d évaluation du projet (Octobre 2011) 8 P age

Terms of Reference for LEAP II Final Evaluation Consultant

Terms of Reference for LEAP II Final Evaluation Consultant UNESCO Office Kabul, Afghanistan November 2015 Terms of Reference for LEAP II Final Evaluation Consultant Post Title: Final Evaluation Specialist Organization: UNESCO Office Kabul Location: Kabul, Afghanistan

More information

Guidance Note on Developing Terms of Reference (ToR) for Evaluations

Guidance Note on Developing Terms of Reference (ToR) for Evaluations Evaluation Guidance Note Series UNIFEM Evaluation Unit October 2009 Guidance Note on Developing Terms of Reference (ToR) for Evaluations Terms of Reference (ToR) What? Why? And How? These guidelines aim

More information

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE INDIVIDUAL CONSULTANT PROCUREMENT NOTICE ADVERTISEMENT Coordinator Early recovery and Livelihoods Specialist/Post-disaster Needs Assessment Coordinator Date: 15.12.2014 Country: CABO VERDE Description

More information

INTERNSHIP ANNOUNCEMENT

INTERNSHIP ANNOUNCEMENT Ref. Internship Date: 9 June 2015 Announcement No. BKK/INTERNSHIP/2015/04 INTERNSHIP ANNOUNCEMENT Post Title: Monitoring, Evaluation and Research Intern Organization Unit: Decent Work Team in Bangkok Duration:

More information

TERMS OF REFERENCE. National Business Operations Strategy (BoS) Consultant. PROCUREMENT NOTICE No. UNDP/IC/2013/008

TERMS OF REFERENCE. National Business Operations Strategy (BoS) Consultant. PROCUREMENT NOTICE No. UNDP/IC/2013/008 TERMS OF REFERENCE National Business Operations Strategy (BoS) Consultant PROCUREMENT NOTICE No. UNDP/IC/2013/008 Country: Monrovia, Liberia with travel to UN joint field offices at the county level where

More information

REQUEST FOR PROPOSALS SERVICES FOR

REQUEST FOR PROPOSALS SERVICES FOR REQUEST FOR PROPOSALS SERVICES FOR Evaluation of a A Protection Project: Supporting governmental and non-governmental partners to protect migrants human rights along the East African Route IOM Cairo 47C

More information

Key Considerations for MANAGING EVALUATIONS

Key Considerations for MANAGING EVALUATIONS Key Considerations for MANAGING EVALUATIONS Authors: (Brief Reference Guide) Dr. Rita Sonko, Addis Berhanu and Rodwell Shamu Pact South Africa June 2011 1 P age This publication is made possible by the

More information

Empowerment of Teacher Education Institutions in Africa: Supporting Teacher Policy Development and Implementation, School Leadership and Supervision

Empowerment of Teacher Education Institutions in Africa: Supporting Teacher Policy Development and Implementation, School Leadership and Supervision Complementary Additional Programme 2014-2015 / Concept note Insert Empowerment of Teacher Education Institutions in Africa: Supporting Teacher Policy Development and Implementation, School Leadership and

More information

pg. 1 1. Summary Title Purpose

pg. 1 1. Summary Title Purpose 1. Summary Title Purpose Expected fee Location Duration Start Date Reporting to Budget Code/PBA No Project and activity codes Education Management Information System (EMIS) consultant Support the Libyan

More information

Islamic Republic of Afghanistan, Post Disaster Need Assessment (PDNA) Training Manual

Islamic Republic of Afghanistan, Post Disaster Need Assessment (PDNA) Training Manual Islamic Republic of Afghanistan, Ministry of Rural Rehabilitation and Development (MRRD) Ministry of Rural Rehabilitation & Development Post Disaster Need Assessment (PDNA) Training Manual Social Protection

More information

Capacity Development for Education for All (CapEFA) Programme

Capacity Development for Education for All (CapEFA) Programme Complementary Additional Programme 2014-2015 / Concept note Capacity Development for Education for All (CapEFA) Programme Empowering Ministries of Education and public agencies of countries furthest from

More information

REPORT 2016/066 INTERNAL AUDIT DIVISION. Audit of management of technical cooperation projects in the Economic Commission for Africa

REPORT 2016/066 INTERNAL AUDIT DIVISION. Audit of management of technical cooperation projects in the Economic Commission for Africa INTERNAL AUDIT DIVISION REPORT 2016/066 Audit of management of technical cooperation projects in the Economic Commission for Africa Overall results relating to the effective management of technical cooperation

More information

Contract for Individual Consultant (other Specialists) Request for written proposal. Net-Med youth Project in Jordan

Contract for Individual Consultant (other Specialists) Request for written proposal. Net-Med youth Project in Jordan Contract for Individual Consultant (other Specialists) Request for written proposal Net-Med youth Project in Jordan Date: 7 January 2015 1 Request to submit a written proposal for a work assignment with

More information

NCBS DATA ANALYST EXPERT COACH TERMS OF REFERENCE. National Capacity Building Secretariat

NCBS DATA ANALYST EXPERT COACH TERMS OF REFERENCE. National Capacity Building Secretariat NCBS DATA ANALYST EXPERT COACH TERMS OF REFERENCE Position Type Organization Partner organization Duration Type of contract Data Analyst Expert Coach Consultancy contract National Capacity Building Secretariat

More information

REQUEST FOR EXPRESSION OF INTEREST FOR HIRING THREE(3) EXPERT COACHES NO. 010/NCBS-BTC/S/2015-2016

REQUEST FOR EXPRESSION OF INTEREST FOR HIRING THREE(3) EXPERT COACHES NO. 010/NCBS-BTC/S/2015-2016 REPUBLIC OF RWANDA NATIONAL CAPACITY BUILDING SECRETARIAT- NCBS P. O. Box 7367 Kigali Rwanda Email: info@ncbs.gov.rw Web site: www.ncbs.gov.rw REQUEST FOR EXPRESSION OF INTEREST FOR HIRING THREE(3) EXPERT

More information

Terms of reference - INDIVIDUAL CONSULTANT PROCUREMENT NOTICE

Terms of reference - INDIVIDUAL CONSULTANT PROCUREMENT NOTICE Terms of reference - INDIVIDUAL CONSULTANT PROCUREMENT NOTICE Position: Senior Specialist for the Survey of Public Satisfaction on Court Service in Judiciary Support to the Justice Sector Reform in Indonesia

More information

The project was implemented in the period of November 2013 March 2015.

The project was implemented in the period of November 2013 March 2015. Page 1 of 11 UNICEF Moldova TERMS OF REFERENCE International Individual Consultancy Team Leader Evaluation of modelling of services for children under three. The project was implemented in the period of

More information

VOLUME 12: FEED THE FUTURE EVALUATION DESIGN TEMPLATE NOVEMBER 2015

VOLUME 12: FEED THE FUTURE EVALUATION DESIGN TEMPLATE NOVEMBER 2015 VOLUME 12: FEED THE FUTURE EVALUATION DESIGN TEMPLATE NOVEMBER 2015 The attached Feed the Future Evaluation Design Template provides guidance to third party evaluators and USAID missions on recommended

More information

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE INDIVIDUAL CONSULTANT PROCUREMENT NOTICE Date: 24.6.2011 Country: Cape Verde Description of the assignment: Protected Area Planning and Ecotourism Specialist Project name: Consolidation of Cape Verde s

More information

UNITED NATIONS CHILDREN S FUND. Office in Serbia is seeking qualified

UNITED NATIONS CHILDREN S FUND. Office in Serbia is seeking qualified UNITED NATIONS CHILDREN S FUND Office in Serbia is seeking qualified Consultants for further analysis of the Multiple Indicator Cluster Surveys (MICS) VN: OPS/BEL/2014-29 The purpose of the assignment

More information

STRATEGIC REVIEW OF HUMAN RESOURCE MANAGEMENT IN UNICEF. Terms of Reference July 20 2005

STRATEGIC REVIEW OF HUMAN RESOURCE MANAGEMENT IN UNICEF. Terms of Reference July 20 2005 1. Background STRATEGIC REVIEW OF HUMAN RESOURCE MANAGEMENT IN UNICEF Terms of Reference July 20 2005 UNICEF has decided to undertake a Strategic Review of its approach to and performance in Human Resource

More information

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE INDIVIDUAL CONSULTANT PROCUREMENT NOTICE ADVERTISEMENT Date: August 26, 2014 Country: CAPE VERDE Description of the assignment: International Consultant - Integrating climate change risks and opportunities

More information

USING THE EVALUABILITY ASSESSMENT TOOL

USING THE EVALUABILITY ASSESSMENT TOOL USING THE EVALUABILITY ASSESSMENT TOOL INTRODUCTION The ILO is committed to strengthening the Office-wide application of results-based management (RBM) in order to more clearly demonstrate its results

More information

Technical Specifications SCOPE OF WORK

Technical Specifications SCOPE OF WORK REQUEST FOR PROPOSAL FOR SERVICES (RFPS): ONE-ON-ONE TELEPHONE COACHING PROGRAMME FOR THE PARTICIPANTS OF THE NEW AND EMERGING TALENT INITIATIVE (NETI Programme) Technical Specifications SCOPE OF WORK

More information

ADVERTISEMENT. Markets for Change / M4C Communications and Monitoring & Evaluation Officer (SC SB-4)

ADVERTISEMENT. Markets for Change / M4C Communications and Monitoring & Evaluation Officer (SC SB-4) ADVERTISEMENT Vacancy Announcement No. 2016/11 The UN Women Fiji Multi Country Office (MCO) seek to recruit a suitably qualified Solomon Islands national for the following position to be based in Honiara,

More information

Final Project Evaluation

Final Project Evaluation Version 13.03.06 project UNDP 00037059 / EC 08.ACP.MOZ.014-1 Final Project Evaluation UNDP 00037059 / EC 08.ACP.MOZ.014-1 Enterprise Mozambique Project Terms of Reference 1. PROJECT S BACKGROUND INFORMATION

More information

Annex -1- Terms of Reference (TOR)

Annex -1- Terms of Reference (TOR) Annex -1- Terms of Reference (TOR) Project Name: Lebanon s First Biennial Update Report Reference Number: 00086912 Subject: Consultant in climate change and education Short-term consultancy for the preparation

More information

VACANCY ANNOUNCEMENT

VACANCY ANNOUNCEMENT INTERNATIONAL LABOUR ORGANIZATION DECENT WORK FOR ALL The ILO is a Specialised Agency of the United Nations devoted to the promotion of social justice and human rights in the world of work. The primary

More information

JOB DESCRIPTION. Program & Organizational Development (POD)- Program Manager

JOB DESCRIPTION. Program & Organizational Development (POD)- Program Manager JOB DESCRIPTION Position Title: Reports to: Line Management: Location of position: M&E (Monitoring and Evaluation) Manager Program & Organizational Development (POD)- Program Manager M&E Officer(s); Senior

More information

Communication - Terms of Reference Service contract

Communication - Terms of Reference Service contract Communication - Terms of Reference Service contract Praia, Jun 2014 I. Organizational Context Under the guidance and direct supervision of the Communications Analyst the Communications the Communications

More information

Job Profile. Component Manager, Voice and Accountability Democratic Governance Facility (DGF) (Senior Adviser (N1)) Uganda

Job Profile. Component Manager, Voice and Accountability Democratic Governance Facility (DGF) (Senior Adviser (N1)) Uganda Job Profile Component Manager, Voice and Accountability Democratic Governance Facility (DGF) (Senior Adviser (N1)) Uganda Reference number: DK-00247-2016/UGA.02 1. Preliminary 1.1. Short background: In

More information

Terms of Reference for Consultant to Support Development of Country Level Land Policy Issues Papers

Terms of Reference for Consultant to Support Development of Country Level Land Policy Issues Papers Terms of Reference for Consultant to Support Development of Country Level Land Policy Issues Papers 1. Background The Australian Government is supporting the Organization of Eastern Caribbean States (OECS)

More information

Identification. Preparation and formulation. Evaluation. Review and approval. Implementation. A. Phase 1: Project identification

Identification. Preparation and formulation. Evaluation. Review and approval. Implementation. A. Phase 1: Project identification II. Figure 5: 6 The project cycle can be explained in terms of five phases: identification, preparation and formulation, review and approval, implementation, and evaluation. Distinctions among these phases,

More information

JAMAICA JA-CC2046: IMPLEMENTATION OF BUSINESS CLIMATE REFORMS IN JAMAICA ACCESS TO CREDIT FOR PRODUCTIVE DEVELOPMENT

JAMAICA JA-CC2046: IMPLEMENTATION OF BUSINESS CLIMATE REFORMS IN JAMAICA ACCESS TO CREDIT FOR PRODUCTIVE DEVELOPMENT JAMAICA JA-CC2046: IMPLEMENTATION OF BUSINESS CLIMATE REFORMS IN JAMAICA ACCESS TO CREDIT FOR PRODUCTIVE DEVELOPMENT TERMS OF REFERENCE End of Project Evaluation and Preparation of Draft Project Completion

More information

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE INDIVIDUAL CONSULTANT PROCUREMENT NOTICE Date: 26/08/2013 Country: Timor-Leste Description of the assignment: National Database Consultant for DPBSC Library Project name: Support to the Department of Peace

More information

TERMS OF REFERENCE Health and Hygiene Promotion Approaches for Namibia Technical Assistance

TERMS OF REFERENCE Health and Hygiene Promotion Approaches for Namibia Technical Assistance 1. Summary Title Purpose TERMS OF REFERENCE Health and Hygiene Promotion Approaches for Namibia Technical Assistance Health and Hygiene Promotion (HHP) Approaches for Namibia To develop a common approach

More information

Job Profile. Component Manager, Deepening Democracy Democratic Governance Facility (Senior Adviser (N1)) Uganda

Job Profile. Component Manager, Deepening Democracy Democratic Governance Facility (Senior Adviser (N1)) Uganda Job Profile Component Manager, Deepening Democracy Democratic Governance Facility (Senior Adviser (N1)) Uganda Reference number: DK-00237-2016/UGA.01-W 1. Preliminary 1.1. Short background: In 2011, eight

More information

Annex II - Change Management Consultancy

Annex II - Change Management Consultancy Annex II - Change Management Consultancy Terms of Reference reflecting 450 working days of deliverables and outputs over a three year period wef 1 January 2014 31 December 2016 Background: As described

More information

IBIS West Africa Human Rights and Democratisation (WAHRD) Programme, Phase II Terms of Reference (TOR) for Evaluation, October 2014.

IBIS West Africa Human Rights and Democratisation (WAHRD) Programme, Phase II Terms of Reference (TOR) for Evaluation, October 2014. IBIS West Africa Human Rights and Democratisation (WAHRD) Programme, Phase II Terms of Reference (TOR) for Evaluation, October 2014. 1. IBIS Introduction and Change Agenda IBIS is a Danish International

More information

TERMS OF REFERENCE FOR THE EVALUATION OF SECTOR SUPPORT IN THE WATER SECTOR.

TERMS OF REFERENCE FOR THE EVALUATION OF SECTOR SUPPORT IN THE WATER SECTOR. TERMS OF REFERENCE FOR THE EVALUATION OF SECTOR SUPPORT IN THE WATER SECTOR. 1. Background information 1.1. Sector-wide approach in Dutch bilateral aid The sector-wide approach has been developed as a

More information

TEMPORARY JOB OPENING ANNOUNCEMENT

TEMPORARY JOB OPENING ANNOUNCEMENT UNITED NATIONS NATIONS UNIES Ref. No.: TJO-2014- UNMEER New York Liaison Office-GTA-LO- P4-1 TEMPORARY JOB OPENING ANNOUNCEMENT P-4 Liaison Officer TJO Grade Level Functional Title Ebola Response Liaison

More information

Terms of Reference (TOR): Film production One day in the life of a UN Volunteer. First part: UNRWA refugee camp

Terms of Reference (TOR): Film production One day in the life of a UN Volunteer. First part: UNRWA refugee camp Terms of Reference (TOR): Film production One day in the life of a UN Volunteer First part: UNRWA refugee camp Location: Type of Contract: Post Level: filming in UNWRA schools/lebanon/ editing home-based

More information

TERMS OF REFERENCE. Establishment of Technical Competency Standards for Emergency Response Professionals Providing Care in a Mass Casualty Event

TERMS OF REFERENCE. Establishment of Technical Competency Standards for Emergency Response Professionals Providing Care in a Mass Casualty Event TERMS OF REFERENCE Establishment of Technical Competency Standards for Emergency Response Professionals Providing Care in a Mass Casualty Event 1.0 INTRODUCTION Effective disaster management relies more

More information

EUROPEAN EXTERNAL ACTION SERVICE

EUROPEAN EXTERNAL ACTION SERVICE EUROPEAN EXTERNAL ACTION SERVICE Annex 1 European Union Maritime Capacity Building Mission in the Horn of Africa (EUCAP Nestor Horn of Africa) Organisation: Job Location: Availability: Staff Regime: European

More information

ASSESSMENT OF DEVELOPMENT RESULTS

ASSESSMENT OF DEVELOPMENT RESULTS ASSESSMENT OF DEVELOPMENT RESULTS UNDP Evaluation Office, January 2007 GUIDELINES FOR AN ASSESSMENT OF DEVELOPMENT RESULTS (ADR) CONTENTS A. WHAT IS THE ASSESSMENT OF DEVELOPMENT RESULTS (ADR)? An introduction

More information

United Nations Children s Fund (UNICEF) Phnom Penh, Cambodia Vacancy Nº COMM/15/008. Terms of Reference

United Nations Children s Fund (UNICEF) Phnom Penh, Cambodia Vacancy Nº COMM/15/008. Terms of Reference United Nations Children s Fund (UNICEF) Phnom Penh, Cambodia Vacancy Nº COMM/15/008 Terms of Reference Individual Consultancy: DIGITAL AND CONTENT LEAD Closing date: 17 June 2015 1. Background and Rationale:

More information

Terms of Reference (ToR) To Conduct Media Monitoring during the Parliamentary Elections July 2013

Terms of Reference (ToR) To Conduct Media Monitoring during the Parliamentary Elections July 2013 1.0 Introduction Terms of Reference (ToR) To Conduct Media Monitoring during the Parliamentary Elections July 2013 On 16-18 September 2013, Rwanda will be conducting her legislative elections. Over the

More information

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE. Description of the assignment: National Expert on Public Finance (Open to Thai National only)

INDIVIDUAL CONSULTANT PROCUREMENT NOTICE. Description of the assignment: National Expert on Public Finance (Open to Thai National only) INDIVIDUAL CONSULTANT PROCUREMENT NOTICE Date: 1 July 2015 Country: UNDP CO Thailand Description of the assignment: National Expert on Public Finance (Open to Thai National only) Project name: UNDP CO-Thailand

More information

Annex II: Terms of Reference for Management and Implementation Support Consultant (Firm)

Annex II: Terms of Reference for Management and Implementation Support Consultant (Firm) Annex II: Terms of Reference for Management and Implementation Support Consultant (Firm) a. Background: 1. The GoB in accordance with its Public Financial Management (PFM) Strategy & Vision and Medium

More information

Preparations for 2012 Quadrennial comprehensive policy review of the General Assembly

Preparations for 2012 Quadrennial comprehensive policy review of the General Assembly Terms of Reference Preparations for 2012 Quadrennial comprehensive policy review of the General Assembly Study on Results-Based Management Office for ECOSOC Support and Coordination Department for Economic

More information

Organization for Security and Co-operation in Europe

Organization for Security and Co-operation in Europe Organization for Security and Co-operation in Europe Aide-Mémoire on Gender Mainstreaming Projects 1. Purpose This Aide-Mémoire aims to provide you with a practical tool to gender mainstream the OSCE programmes

More information

We are currently looking for a REACH Assessment Officer to support our REACH team in Chad.

We are currently looking for a REACH Assessment Officer to support our REACH team in Chad. REACH was born in 2010 as a joint initiative of two International NGOs (IMPACT Initiatives and ACTED) and the United Nations Institute for Training and Research (UNITAR) Operational Satellite Applications

More information

TERMINAL EVALUATION TERMS OF REFERENCE

TERMINAL EVALUATION TERMS OF REFERENCE TERMINAL EVALUATION TERMS OF REFERENCE BASIC INFORMATON Location: Uganda Application Deadline: July 30 th, 2015 Type of Contract: Individual Contract Post Level: International Consultant Languages Required:

More information

TERMS OF REFERENCE. Consultant - Dematerialisation and setting up of securities settlement infrastructure in Government securities

TERMS OF REFERENCE. Consultant - Dematerialisation and setting up of securities settlement infrastructure in Government securities TERMS OF REFERENCE Reference: Post Title: DMU/NXCWG0927 Consultant - Dematerialisation and setting up of securities settlement infrastructure in Government securities Project Location: Nassau, The Bahamas

More information

United Nations Associate Experts Programme. Code#: INT-022-15-P019-01-V. Submitted by: Name: Title: Duty Station: Agency/Unit: Email:

United Nations Associate Experts Programme. Code#: INT-022-15-P019-01-V. Submitted by: Name: Title: Duty Station: Agency/Unit: Email: United Nations Associate Experts Programme Code#: INT-022-15-P019-01-V Submitted by: Agency/Unit: I have no objections to share my contact information with the candidate/donor Signature: I agree Date Mandatory

More information

ACE PROJECT M&E CONSULTANCY

ACE PROJECT M&E CONSULTANCY ASSOCIATION OF AFRICAN UNIVERSITIES ASSOCIATION DES UNIVERSITÉS AFRICAINES ACE PROJECT M&E CONSULTANCY BACKGROUND The Association of African Universities has received financing from the World Bank toward

More information

REQUIRED DOCUMENTS FROM HIRING UNIT 8 - CONFIRMATION OF CATEGORY OF LOCAL CONSULTANT, please select : Senior (1) Junior Consultant

REQUIRED DOCUMENTS FROM HIRING UNIT 8 - CONFIRMATION OF CATEGORY OF LOCAL CONSULTANT, please select : Senior (1) Junior Consultant Terms of reference GENERAL INFORMATION Title: Mid-Term Review Lead Consultant for Climate Change Adaptation - SPARC Project (International) Re Advertisement Project Name: Strategic Planning and Actions

More information

USAID/Macedonia Secondary Education Activity, Monitoring and Evaluation Plan

USAID/Macedonia Secondary Education Activity, Monitoring and Evaluation Plan USAID/Macedonia Secondary Education Activity, Monitoring and Evaluation Plan January 2004 Contract Number: GDG-A-00-03-00006-00 Task Order Number: 165-00-03-00105-00 EQUIP1: Secondary Education Activity

More information

CALL FOR LSP EXPERTS. Hungary-Slovakia-Romania-Ukraine ENPI CBC Programme 2007-2013

CALL FOR LSP EXPERTS. Hungary-Slovakia-Romania-Ukraine ENPI CBC Programme 2007-2013 CALL FOR LSP EXPERTS published in the frame of Hungary-Slovakia-Romania-Ukraine ENPI CBC Programme 2007-2013 On behalf of the National Development Agency acting as the Joint Managing Authority, VÁTI Nonprofit

More information

Part 1. MfDR Concepts, Tools and Principles

Part 1. MfDR Concepts, Tools and Principles Part 1. Concepts, Tools and Principles 3 Overview Part 1. MfDR Concepts, Tools and Principles M anaging for Development Results (MfDR) is multidimensional, relating back to concepts about how to make international

More information

TEMPORARY JOB OPENING ANNOUNCEMENT

TEMPORARY JOB OPENING ANNOUNCEMENT UNITED NATIONS NATIONS UNIES TEMPORARY JOB OPENING ANNOUNCEMENT Ref. No.: DM-2014-107 (Recirculate DM-2014-48) D-1 Chief of Service TJO Grade Level 1 Functional Title DM/OICT/IMS Department/Office/Division/

More information

Tweet. Share. Applications to vacancies must be received before midnight Copenhagen time (CET) on the closing date of the announcement.

Tweet. Share. Applications to vacancies must be received before midnight Copenhagen time (CET) on the closing date of the announcement. Tweet Share DISCLAIMER: The screening of your application will be conducted based on the information in your profile. Before applying, we strongly suggest that you review your profile to ensure completeness,

More information

Options for creating working groups, task forces and editorial boards to facilitate the implementation of the work plan. Note by the secretariat

Options for creating working groups, task forces and editorial boards to facilitate the implementation of the work plan. Note by the secretariat Conference Room Paper 1 13 October 2014 ECONOMIC COMMISSION FOR EUROPE COMMITTEE ON ECONOMIC COOPERATION AND INTEGRATION Team of Specialists on Innovation and Competitiveness Policies Seventh session Geneva,

More information

Capnam, UNESS, GEQF: UNESCO tools to support education planning

Capnam, UNESS, GEQF: UNESCO tools to support education planning Capnam, UNESS, GEQF: UNESCO tools to support education planning The Paris declaration On 2 March 2005, a group of countries and multilateral organisations came together in Paris to declare that development

More information

REQUEST FOR EXPRESSIONS OF INTEREST AFRICAN DEVELOPMENT BANK CCIA BUILDING 01 BP 1387, AV. JEAN-PAUL II, ABIDJAN 01 CÔTE D IVOIRE

REQUEST FOR EXPRESSIONS OF INTEREST AFRICAN DEVELOPMENT BANK CCIA BUILDING 01 BP 1387, AV. JEAN-PAUL II, ABIDJAN 01 CÔTE D IVOIRE REQUEST FOR EXPRESSIONS OF INTEREST AFRICAN DEVELOPMENT BANK CCIA BUILDING 01 BP 1387, AV. JEAN-PAUL II, ABIDJAN 01 CÔTE D IVOIRE Expressions of interest are being requested for a Junior Consultant for

More information

PARTICIPATORY SELF-EVALUATION REPORTS: GUIDELINES FOR PROJECT MANAGERS

PARTICIPATORY SELF-EVALUATION REPORTS: GUIDELINES FOR PROJECT MANAGERS PARTICIPATORY SELF-EVALUATION REPORTS: GUIDELINES FOR PROJECT MANAGERS 1 Table of Contents Background A. Criteria B. Definition C. Rationale D. Initiator E. Timing F. Planning G. Involvement of the Independent

More information

United Nations Core Values: Integrity, Professionalism, Respect for Diversity

United Nations Core Values: Integrity, Professionalism, Respect for Diversity Vacancy Details DISCLAIMER: The screening of your application will be conducted based on the information in your profile. Before applying, we strongly suggest that you review your profile to ensure completeness,

More information

PARIS, 20 February 2009 Original: English BIENNIAL EVALUATION REPORT ON THE ACTIVITIES AND RESULTS OF ALL UNESCO DECENTRALIZED BODIES SUMMARY

PARIS, 20 February 2009 Original: English BIENNIAL EVALUATION REPORT ON THE ACTIVITIES AND RESULTS OF ALL UNESCO DECENTRALIZED BODIES SUMMARY Executive Board Hundred and eighty-first session 181 EX/20 PARIS, 20 February 2009 Original: English Item 20 of the provisional agenda BIENNIAL EVALUATION REPORT ON THE ACTIVITIES AND RESULTS OF ALL UNESCO

More information

TEMPORARY JOB OPENING ANNOUNCEMENT

TEMPORARY JOB OPENING ANNOUNCEMENT UNITED NATIONS NATIONS UNIES Ref. No.: 2015-012/P4/HRS TEMPORARY JOB OPENING ANNOUNCEMENT P-4 Human Resources Officer TJO Grade Level 1 Functional Title ECLAC/Division of Administration/Human Resources

More information

UN WOMEN WARO Communications/RM and Partnerships Programme

UN WOMEN WARO Communications/RM and Partnerships Programme UN WOMEN WEST AND CENTRAL AFRICA REGIONAL OFFICE COMMUNICATIONS & ADVOCAY SECTION TERMS OF REFERENCE Communications Associate Location : Application Deadline : Type of Contract : Post Level : Languages

More information

FOREIGN AFFAIRS PROGRAM EVALUATION GLOSSARY CORE TERMS

FOREIGN AFFAIRS PROGRAM EVALUATION GLOSSARY CORE TERMS Activity: A specific action or process undertaken over a specific period of time by an organization to convert resources to products or services to achieve results. Related term: Project. Appraisal: An

More information

CONSULTANCY. Initial Terms of Reference Outbreaks and Humanitarian Emergencies Supply Chain Development Project

CONSULTANCY. Initial Terms of Reference Outbreaks and Humanitarian Emergencies Supply Chain Development Project CONSULTANCY Initial Terms of Reference Outbreaks and Humanitarian Emergencies Supply Chain Development Project This consultancy is requested by: Unit: Outbreaks & Humanitarian Emergencies (OHE) Department:

More information

Terms of Reference. International Consultant

Terms of Reference. International Consultant Terms of Reference International Consultant Project Assignment Type Title of Assignment Division/Section Place of Work Contract Type International Consultant Marketing Communications Consultant advice

More information

Letter of Invitation to Tender for Consultancy Services for the Development of Project Proposals

Letter of Invitation to Tender for Consultancy Services for the Development of Project Proposals MDM 31.08.2013 Dear Sir/Madam Letter of Invitation to Tender for Consultancy Services for the Development of Project Proposals For implementation of Sri Lanka Comprehensive Disaster Management Programme

More information

Conducting Baseline Survey

Conducting Baseline Survey Terms of Reference for Conducting Baseline Survey ActionAid Bangladesh and its working approach ActionAid Bangladesh (AAB), an associate member of ActionAid International Federation, works with thousands

More information

CARIBBEAN EXPORT DEVELOPMENT AGENCY REQUEST FOR PROPOSALS NOTICE CONSULTANT

CARIBBEAN EXPORT DEVELOPMENT AGENCY REQUEST FOR PROPOSALS NOTICE CONSULTANT CARIBBEAN EXPORT DEVELOPMENT AGENCY REQUEST FOR PROPOSALS NOTICE TITLE: INVESTOR PERCEPTION SURVEY AND ANALYSIS FOR CARIFORUM CONSULTANT 1. Caribbean Export Development Agency (Caribbean Export), in collaboration

More information

REQUESTS FOR PROPOSAL RFP TGF-16-017. Title: Professional Services for the Implementation of the Board Governance Performance Assessment Framework

REQUESTS FOR PROPOSAL RFP TGF-16-017. Title: Professional Services for the Implementation of the Board Governance Performance Assessment Framework REQUESTS FOR PROPOSAL RFP TGF-16-017 Title: Professional Services for the Implementation of the Board Governance Performance Assessment Framework Issue Date: March, 9th 2016 RFP Submission Date: March,

More information

PRESIDENCY JOINT MANAGING AUTHORITY OF THE 2007-2013 ENPI CBC MEDITERRANEAN SEA BASIN PROGRAMME Operational Management Unit

PRESIDENCY JOINT MANAGING AUTHORITY OF THE 2007-2013 ENPI CBC MEDITERRANEAN SEA BASIN PROGRAMME Operational Management Unit PRESIDENCY JOINT MANAGING AUTHORITY OF THE 2007-2013 ENPI CBC MEDITERRANEAN SEA BASIN PROGRAMME Operational Management Unit PUBLIC NOTICE for the selection of a group of experts in charge of the definition

More information

United Nations Children s Fund (UNICEF) Supply Division, Copenhagen, Denmark

United Nations Children s Fund (UNICEF) Supply Division, Copenhagen, Denmark United Nations Children s Fund (UNICEF) Supply Division, Copenhagen, Denmark Request for proposals for individual consultancy for the Development of a Business Plan for the Implementation of Electronic

More information

Terms of Reference for Assessment of the Environment & Natural Resources Sector in Kenya

Terms of Reference for Assessment of the Environment & Natural Resources Sector in Kenya Terms of Reference for Assessment of the Environment & Natural Resources Sector in Kenya REF.NO: ACT/ESS/08/2015 1. Background Act Change Transform (Act!) is a leading Kenyan Non-Governmental Organization

More information

Terms of Reference (revised version 24 Augustus 2012 correction on description of deliverables)

Terms of Reference (revised version 24 Augustus 2012 correction on description of deliverables) Open call for tender 9 July 2012 Terms of Reference (revised version 24 Augustus 2012 correction on description of deliverables) Communication Best Practices for Renewable Energies (RE COMMUNICATE) Scoping

More information

Terms of Reference Designing a School Examination Reform Project

Terms of Reference Designing a School Examination Reform Project Terms of Reference Designing a School Examination Reform Project Purpose of the Assignment The purpose of this Technical Assistance is to contribute towards improved education quality in Nepal, through

More information

UN JOINT COMMUNICATIONS STRATEGY AND WORKPLAN

UN JOINT COMMUNICATIONS STRATEGY AND WORKPLAN UN JOINT COMMUNICATIONS STRATEGY AND WORKPLAN 2010 UNITED NATIONS LIBERIA 1 UN LIBERIA JOINT COMMUNICATIONS STRATEGY AND WORKPLAN 2010 Communications Strategy and Workplan United Nations in Liberia 2010

More information

UNESCO Dhaka Office. Directorate of Primary Education, Ministry of Primary and Mass Education 2 Bangladesh Bureau of Statistics

UNESCO Dhaka Office. Directorate of Primary Education, Ministry of Primary and Mass Education 2 Bangladesh Bureau of Statistics UNESCO Dhaka Office House : 122, Road : 01, Block : F Banani, Dhaka-1213, Bangladesh Tel : 9873210, 9862073 FAX : 9871150 URL : www.unesco.org/dhaka Email : dhaka@unesco.org Terms of Reference (ToR) for

More information

Procurement Performance Measurement System

Procurement Performance Measurement System Public Procurement and Disposal of Public Assets Authority Procurement Performance Measurement System User's Guide August 2008 Public Procurement and Disposal of Public Assets Authority Procurement Performance

More information

Only NDU students can apply to the following Job. PO-52-JL

Only NDU students can apply to the following Job. PO-52-JL Dear Students & Alumni, If you are interested in the below Job Offer, you are kindly asked to send your updated CV to the NDU Placement Office E: placement@ndu.edu.lb and to mention the Job Reference Number.

More information

The IIEP Advanced Training Programme in Educational Planning and Management 2014/2015 Session

The IIEP Advanced Training Programme in Educational Planning and Management 2014/2015 Session OFFICIAL ANNOUNCEMENT International Institute The IIEP Advanced Training Programme in Educational Planning and Management Application deadline: 31 May 2014 UNESCO International Institute 7-9 rue Eugène

More information

NCBS HUMAN RESOURCES EXPERT COACH TERMS OF REFERENCE. National Capacity Building Secretariat. 2. BTC Change co-manager. Signature.

NCBS HUMAN RESOURCES EXPERT COACH TERMS OF REFERENCE. National Capacity Building Secretariat. 2. BTC Change co-manager. Signature. NCBS HUMAN RESOURCES EXPERT COACH TERMS OF REFERENCE Position Type Organization Partner organization Duration Type of contract Human Resources Expert Coach Consultancy contract National Capacity Building

More information

Rationale for UNESCO involvement

Rationale for UNESCO involvement Complementary Additional Programme 2014-2015 / Concept note Title: Development of the UNESCO Inclusive Policy Lab a global space for inclusive policy analysis and policy innovation Geographical country(ies):

More information

Request for Proposal for Evaluation of the Effectiveness and Efficiency of the Trust for Social Achievement Foundation s Programs

Request for Proposal for Evaluation of the Effectiveness and Efficiency of the Trust for Social Achievement Foundation s Programs Request for Proposal for Evaluation of the Effectiveness and Efficiency of the Trust for Social Achievement Foundation s Programs Sofia February 2016 Letter of Invitation America for Bulgaria Foundation

More information

VACANCY NOTICE ICT OFFICER (IT PROJECT MANAGEMENT PROFILE) REF.: ESMA/2016/VAC10/AD6

VACANCY NOTICE ICT OFFICER (IT PROJECT MANAGEMENT PROFILE) REF.: ESMA/2016/VAC10/AD6 Date: 02/03/2016 ESMA/2016/VAC10/AD6 VACANCY NOTICE ICT OFFICER (IT PROJECT MANAGEMENT PROFILE) (F/M) REF.: ESMA/2016/VAC10/AD6 Type of contract Temporary Agent 1 Function group and grade AD6 Duration

More information

Vacancy Notice No. 2015/011

Vacancy Notice No. 2015/011 Vacancy Notice No. 2015/011 Everyone Counts: Join the UNFPA team in Myanmar Are you interested in being part of a multi-cultural team delivering a world where every pregnancy is wanted, every birth is

More information

Request of Expressions of Interest For Information Technology Consulting Firm

Request of Expressions of Interest For Information Technology Consulting Firm Election Commission Secretariat Preparation of Electoral Roll with Photographs and Facilitating the Issuance of National Identity Card Project Islamic Foundation Building Agargaon, Dhaka. No. PERP&FINIDC/Ops/040/480

More information

Forest Carbon Partnership Facility (FCPF)

Forest Carbon Partnership Facility (FCPF) Forest Carbon Partnership Facility (FCPF) Readiness Mechanism Review and Assessment of Readiness Preparation Proposals DRAFT September 4, 2009 This Program Document updates Program Document FMT 2009-1-Rev.2

More information

The purpose of this section is to identify and recommend the positions. required to achieve Sector strategic objectives.

The purpose of this section is to identify and recommend the positions. required to achieve Sector strategic objectives. A. Essential Staffing The purpose of this section is to identify and recommend the positions required to achieve Sector strategic objectives. Implementation recommendations for staffing levels are made

More information

GENERAL DESCRIPTION OF TASK(S) AND OBJECTIVES TO BE ACHIEVED

GENERAL DESCRIPTION OF TASK(S) AND OBJECTIVES TO BE ACHIEVED TERMS OF REFERENCE Consultant: Monitoring and Evaluation Consultant Division / Department: FAO Sub-regional Office for Central Africa (SFC), Libreville, Gabon Programme / Project number: Sustainable Management

More information

Checklist for Reviewing Scopes of Work for Performance Evaluations

Checklist for Reviewing Scopes of Work for Performance Evaluations Checklist for Reviewing Scopes of Work for Performance Evaluations Use the Evaluation Scope of Work (SOW) Checklist to review and strengthen SOW during the evaluation planning stage. In most cases you

More information

4 Project Implementation and Monitoring

4 Project Implementation and Monitoring 4 Project Implementation and Monitoring Version 3, 29 July 2014 Contents 4. Implementation and Monitoring... 2 4.1 Project Implementation... 3 4.1.1 Setting up project implementation... 3 4.1.2 Development

More information

IPDET Module 6: Descriptive, Normative, and Impact Evaluation Designs

IPDET Module 6: Descriptive, Normative, and Impact Evaluation Designs IPDET Module 6: Descriptive, Normative, and Impact Evaluation Designs Intervention or Policy Evaluation Questions Design Questions Elements Types Key Points Introduction What Is Evaluation Design? Connecting

More information

Annotated Agenda of the Sherpa meeting. Main features of Contractual Arrangements and Associated Solidarity Mechanisms

Annotated Agenda of the Sherpa meeting. Main features of Contractual Arrangements and Associated Solidarity Mechanisms Annotated Agenda of the Sherpa meeting 21-11-2013 Main features of Contractual Arrangements and Associated Solidarity Mechanisms At their meeting on 26 November the Sherpas are invited to discuss: General

More information