1 General Moly, Inc. NYSE MKT and TSX: GMO 1726 Cole Blvd., Suite 115 Lakewood, CO Phone: (303) Fax: (303) GENERAL MOLY ANNOUNCES UPDATED PRE-FEASIBILITY STUDY FOR LIBERTY PROJECT LAKEWOOD, COLORADO July 24, 2014, General Moly, Inc. (the "Company") (NYSE MKT and TSX: GMO), a U.S.-based molybdenum mineral development, exploration and mining company, announced today the completion of an updated Pre-Feasibility Study ( PFS ) for its 100%-owned Liberty Project. This PFS, prepared by Independent Mining Consultants, Inc. ( IMC ) with capital estimates from M3 Engineering & Technology Corporation, estimates production, capital, operating cost, and economic analysis for this more capital efficient project when compared to earlier studies. A technical report prepared in accordance with National Instrument Standards of Disclosure for Mineral Projects ( NI ) of the Canadian Securities Administration containing further information on the Liberty Project will be filed shortly with the System for Electronic Document Analysis and Retrieval ( SEDAR ), the document filing and retrieval system operated by the Canadian Securities Administrators for public companies with securities listed in Canada, under the Company s issuer profile on SEDAR at The Liberty Project is located 20 miles north of Tonopah, Nevada. KEY PRE-FEASIBILITY STUDY HIGHLIGHTS Total capital costs to construct the project are estimated at $366 million, reflecting the use of extensive existing infrastructure. Sustaining capital costs are estimated at $224 million over the Liberty Project s 32 year life of mine ( LOM ). For the first five full years of production: o annual salable production of approximately 14.0 million pounds of molybdenum and 7.5 million pounds of copper per year is expected based on a mill capacity to process 26,500 tons per day; o average on-site cash costs of $6.32 per pound are expected, using copper as a by-product credit; and o total cash costs of $7.79 per pound are expected, which includes off-site roasting, smelting, and shipping costs. The updated mine plan results in a total of 402 million pounds of molybdenum and 308 million pounds of copper to be produced during the LOM, with total contained molybdenum grade of 0.078% and total contained copper grade of 0.098%. The Liberty Project generates an after tax net present value ( NPV ) at an 8% discount rate of $325 million, and an internal rate of return ( IRR ) of 17.4%, assuming toll roasting, based on a long-term molybdenum price of $15.00 per pound and a long-term copper price of $3.25 per pound. There is the potential to increase the Liberty Project s NPV and IRR on the basis that molybdenum concentrates from the Liberty Project could be toll roasted at the Mt. Hope Project, once constructed, which could increase the after tax NPV of the Liberty Project to 18.4%, and decrease total cash costs to $7.41 per pound for the first five full years of production. 1

2 The Liberty Project has an after tax NPV breakeven molybdenum price of $11.64 per pound, at an 8% discount rate, and a non-discounted cash flow breakeven molybdenum price of $9.58 per pound. Bruce D. Hansen, Chief Executive Officer of General Moly, said, This Pre-Feasibility Study confirms the economically robust nature of the Liberty Project. In addition, there are many significant attributes including its secure Nevada jurisdiction, substantial existing infrastructure, and long life. This analysis also details our plan to build the Liberty Project at a low initial capital cost of $366 million, with 26,500 ton per day mill throughput. This represents a 39% reduction from the approximate $600 million (in 2011 dollars) capital cost estimate in our November, 2011 Liberty Pre-Feasibility Study, which had planned for a 36,000 ton per day mill throughout, while maintaining a similar ratio for after tax NPV to initial capital and slightly improved ratio of annual molybdenum production to initial capital. The updated mine plan allows us to leverage significant existing infrastructure to reduce initial capital costs while retaining the capability to expand post startup and reduce operating costs. Liberty provides significant optionality and flexibility to develop at a low entry capital investment relative to its NPV. We look forward to advancing the project through full feasibility and permitting and anticipate that these results will demonstrate, through an updated low capital scenario, the inherent value of Liberty to shareholders and potential strategic investors. Mr. Hansen added, Depending on market conditions and financing options, Liberty could be advanced through a Feasibility Study ( FS ) as early as end of year 2015, with the potential to initiate construction as early as late 2017 under Nevada state permits, with production to follow in late Full realization of the economics of this Pre-Feasibility Study are partly dependent on the ultimate receipt of a federal Environmental Impact Statement record of decision ( ROD ) at the start of production as a portion of the project is located on federal land, but a less favorable economic plan could be executed solely on private land for a few years, should there be a delay in receiving the ROD. This permitting option provides further flexibility and schedule upside. We expect the FS would focus on improving the project economics based on further drilling, sampling, and metallurgical testing to drive the potential for higher mill throughput, process recovery, and more optimal mine plan options. Mr. Hansen concluded, Even as we advance the Liberty Project, we are aggressively pursuing full financing alternatives for our 80% owned Mt. Hope Project, and continue to have substantive dialogue with potential partners who could support a debt package to provide the bulk of the capital requirements of the Mt. Hope Project. DEVELOPMENT ANALYSIS MOLYBDENUM AND COPPER PRODUCTION RATES The Liberty Project is expected to produce an annual average of 14.0 million pounds of molybdenum and 7.5 million pounds of copper over the first five years of operations and is estimated to average 12.6 million pounds of molybdenum and 9.6 million pounds of copper annually over the LOM. Additional operating parameters are set forth in the table below. 2

3 First 5 Years First 10 Years LOM Average Mill Mo Grade %tmo % 0.087% 0.078% Average Mill Cu Grade %tcu % 0.068% 0.098% Mill Molybdenum Recovery (total Mo content) % 83.5% 84.6% 84.0% Downstream Molybdenum Recovery % 99.0% 99.0% 99.0% Total Molybdenum Recovery % 82.6% 83.7% 83.2% Mill Copper Recovery (total Cu content) % 56.0% 55.5% 53.6% Downstream Copper Recovery % 95.1% 95.1% 95.1% Total Copper Recovery % 53.3% 52.7% 50.9% Salable Molybdenum M lb/y Salable Copper M lb/y Salable Molybdenum M lb Salable Copper M lb PROJECT ECONOMICS The Liberty Project remains more sensitive to changes in molybdenum price than to changes in copper price. The table below tables illustrates the after tax NPV in millions of U.S. dollars and IRR return calculated at a variety of molybdenum and copper prices. All figures are calculated at an 8% discount rate. Baseline project economics for both scenarios were calculated using $15.00 per pound molybdenum and $3.25 per pound copper. NPV (after tax) at 8% ($Millions) Molybdenum Price, $/lb $10.00 $12.50 $15.00 $17.50 $20.00 Copper $2.50 ($235) $34 $276 $511 $744 Price $2.75 ($214) $51 $292 $527 $759 $/lb $3.00 ($193) $68 $309 $543 $775 $3.25 ($172) $85 $325 $559 $791 $3.50 ($152) $102 $341 $575 $806 $3.75 ($134) $119 $358 $591 $822 IRR Molybdenum Price, $/lb $10.00 $12.50 $15.00 $17.50 $ Copper $ % 9.1% 16.2% 22.4% 28.1% Price $ % 9.6% 16.6% 22.8% 28.4% $/lb $ % 10.1% 17.0% 23.1% 28.7% $ % 10.6% 17.4% 23.4% 29.0% $ % 11.1% 17.8% 23.8% 29.3% $ % 11.6% 18.1% 24.1% 29.6% 1 Total molybdenum concentration. 2 Total copper concentration. 3

4 CAPITAL AND OPERATING COSTS Constructing the Liberty Project is anticipated to cost approximately $366 million (2014 dollars), as set forth in the table below. Area Capital $000s Mine Civil and Equipment $36,055 Plant Equipment, Construction, EPCM, and Contingency $279,521 Pre-production Stripping $16,956 Owner's Cost $26,666 Subtotal $359,198 Reclamation Bond Collateral $5,800 Pre-paid Power $1,400 Subtotal $7,200 Total Initial Capital $366,398 The capital estimate contains $51 million in contingency. Sustaining capital costs for the Liberty Project are expected to be $224 million over the LOM, primarily for mining equipment replacement and tailings dam expansions. On the basis of salable molybdenum, the cash cost for the first five years of production (net of copper credit) is expected to be $7.79 per pound of salable molybdenum. $/lb Molybdenum First 5 First 10 LOM Years Years Mining $3.52 $3.84 $3.75 Milling $3.88 $3.90 $4.34 Laboratory $0.10 $0.10 $0.11 Site G&A (includes reclamation bond policy) $0.55 $0.55 $0.58 Copper Credit ($1.73) ($1.60) ($2.49) At Site Operating Cost $6.32 $6.80 $6.29 Roasting, Shipping, Marketing, Copper TC/RCs $1.47 $1.44 $1.65 Total Operating Cost Net of Copper Credit $7.79 $8.25 $7.94 MINERAL RESERVES AND MINERAL RESOURCES The Liberty's Project s Mineral Reserves and Mineral Resources, determined in accordance with NI , are set forth in the tables below. These tables reflect material changes to the previous Mineral Reserves and Mineral Resource that were announced by the Company in November, The changes to Mineral Reserves and Mineral Resources are due to: 1) updated geologic interpretation; 2) more detailed incorporation of a copper zone that is included within the Liberty Project s molybdenum pit; 4

5 3) conversion to 40 foot benches rather than the previous 50 foot benches; 4) updated estimates of mine and process costs; and 5) updated estimates of process recoveries, particularly for contained copper. MINERAL RESERVES, AS PER NI DEFINITIONS Category Ktons Total Mo Grade (%) Total Cu Grade (%) Lb Moly Lb Cu Saleable Moly Lb Saleable Copper Lb Proven 92, NA NA Probable 216, NA NA Proven & Probable 309, Notes: 1) Cutoff Grade is $8.83 NSR / ton, based on metal prices of $12.00 per pound molybdenum and $3.00 per pound copper. 2) Mineral Reserves are based on the total of all Proven and Probable Material Reserves planned for processing within the mine plan. 3) Table figures may not add due to rounding. 4) Tons are U.S. short tons. MINERAL RESOURCES, AS PER NI DEFINITIONS: MINERAL RESOURCES DO CONTAIN THE ABOVE MINERAL RESERVES Category Ktons Total Mo Grade (%) Total Cu Grade (%) Lb Moly Lb Cu Measured 125, Indicated 440, Measured & Indicated 566, Inferred 148, Notes: 1) Cutoff Grade is $7.05 NSR / ton, based on metal prices of $15.00 per pound molybdenum and $3.00 per pound copper. 2) Mineral Resources on the table above include the mineral reserve. 3) Mineral Resources are contained within a computer generated pit and meet the requirements for reasonable expectation of economic extraction. 4) Table figures may not add due to rounding. 5) Tons are U.S. short tons. 6) Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. The scientific and technical information contained in this news release has been approved and verified by John M. Marek, P.E., President of Independent Mining Consultants Inc., for matters relating to Mineral Reserves, Mineral Resources, and mine production as well as Gabriel A. Secrest, P.E., Project Manager at M3 Engineering and Technology Corp., for matters relating to project capital cost, infrastructure and plant production. Mr. Marek and Mr. Secrest are independent Qualified Persons for the purposes of National Instrument

6 ABOUT THE LIBERTY PROJECT The Liberty Project has significant infrastructure already in place, including a truck shop, offices, tailing dam, laboratory, and previously mined open pit. The site is accessed through paved roads, has fully permitted water rights, and sits adjacent to utility power. The previous mining operations, by Anaconda and Cyprus Minerals, provided significant operating history to validate mining and metallurgical performance. The site is largely on privately held ground, has no royalties, and provides an opportunity for initial permitting under Nevada State agencies, potentially avoiding lengthier federal upfront permitting. However, federal permits will be required to fully exploit the mineral potential due to Bureau of Land Management holdings near the mine and stockpiles. PROPERTY MAP General Moly is a U.S.-based molybdenum mineral development, exploration and mining company listed on the NYSE MKT (formerly the NYSE AMEX) and the Toronto Stock Exchange under the symbol GMO. The Company s primary asset is our interest in the Mt. Hope Project located in central Nevada, is considered one of the world's largest and highest grade molybdenum deposits. Combined with the Company s second project, the Liberty Project, a molybdenum and copper property also located in central Nevada, our goal is to become the largest pure play primary molybdenum producer in the world. For more information on the Company, please visit our website at Contact Information General Moly 6

7 Investors - Scott Kozak (303) skozak@generalmoly.com Media - Zach Spencer (775) zspencer@generalmoly.com Website: info@generalmoly.com Forward-Looking Statements Statements herein that are not historical facts are forward-looking statements within the meaning of Section 27A of the Securities Act, as amended and Section 21E of the Securities Exchange Act of 1934, as amended and are intended to be covered by the safe harbor created by such sections. Such forward-looking statements involve a number of risks and uncertainties that could cause actual results to differ materially from those projected, anticipated, expected, or implied by the Company. These risks and uncertainties include, but are not limited to, metals price and production volatility, global economic conditions, currency fluctuations, increased production costs and variances in ore grade or recovery rates from those assumed in mining plans, exploration risks and results, political, operational and project development risks, including the Company s ability to maintain required permits to continue construction, commence production and its ability to raise required project financing, adverse governmental regulation and judicial outcomes, including appeal of the Record of Decision and appeal of water permits and estimates related to cost of production, capital, operating and exploration expenditures. For a detailed discussion of risks and other factors that may impact these forward looking statements, please refer to the Risk Factors and other discussion contained in the Company s quarterly and annual periodic reports on Forms 10-Q and 10-K, on file with the SEC. The Company undertakes no obligation to update forward-looking statements. Cautionary Note to U.S. Investors Concerning Estimates of Reserves and Resources Calculations with respect to "proven reserves" and "probable reserves" referred to above have been made in accordance with, and using the definitions of NI , as required by Canadian securities regulatory authorities. For United States reporting purposes, the U.S. SEC applies a different standard in order to classify mineralization as a "reserve". Under SEC standards, mineralization may not be classified as a "reserve" unless the determination has been made that the mineralization could be economically and legally extracted or produced at the time the reserve determination is made. No such determinations have been made with respect to any mineralization at the Liberty project, and it cannot be assured that such a determination will be made. This release also uses the terms measured, indicated and inferred resources. We caution U.S. investors that while such terms are recognized and required by Canadian Securities Administrators pursuant to the NI , the SEC does not recognize them. U.S. investors are cautioned not to assume that any part of or all mineral deposits in these categories will ever be converted into reserves. Inferred Resources, in particular, have a great amount of uncertainty as to their existence, and great uncertainty as to their economic and legal feasibility. It cannot be assumed that all or any part of an Inferred Mineral Resource will ever be upgraded to a higher category. Under Canadian Securities Administration rules, estimates of Inferred Mineral Resources may not form the basis of feasibility or pre-feasibility studies. U.S. investors are cautioned not to assume that part or all of an inferred resource exists, or is economically or legally minable. 7

NEVADA COPPER FILES INTEGRATED FEASIBILITY STUDY ON SEDAR

NEVADA COPPER FILES INTEGRATED FEASIBILITY STUDY ON SEDAR NEWS RELEASE TSX: NCU NEVADA COPPER FILES INTEGRATED FEASIBILITY STUDY ON SEDAR July 9, 2015 - Nevada Copper Corp. (TSX: NCU) ("Nevada Copper") (the Company ) is pleased to announce that it has completed,

More information

Detour Gold Provides New Life of Mine Plan for Detour Lake

Detour Gold Provides New Life of Mine Plan for Detour Lake January 25, 2016 NEWS RELEASE Detour Gold Provides New Life of Mine Plan for Detour Lake Detour Gold Corporation (TSX: DGC) ( Detour Gold or the Company ) is pleased to announce a new life of mine plan

More information

NEWS RELEASE LEXAM ANNOUNCES POSITIVE PRELIMINARY ECONOMIC ASSESSMENT RESULTS FOR THE OPEN PIT PROJECTS IN TIMMINS

NEWS RELEASE LEXAM ANNOUNCES POSITIVE PRELIMINARY ECONOMIC ASSESSMENT RESULTS FOR THE OPEN PIT PROJECTS IN TIMMINS NEWS RELEASE LEXAM ANNOUNCES POSITIVE PRELIMINARY ECONOMIC ASSESSMENT RESULTS FOR THE OPEN PIT PROJECTS IN TIMMINS Project Generates 32% IRR and C$33 Million NPV After-Tax; Cash Costs of US$865 per Ounce

More information

GOLD RESOURCE CORPORATION REPORTS PRELIMINARY INDEPENDENT RESOURCE ESTIMATE; ANNOUNCES COMPANY CONFERENCE CALL

GOLD RESOURCE CORPORATION REPORTS PRELIMINARY INDEPENDENT RESOURCE ESTIMATE; ANNOUNCES COMPANY CONFERENCE CALL FOR IMMEDIATE RELEASE April 26, 2012 NEWS NYSE Amex: GORO GOLD RESOURCE CORPORATION REPORTS PRELIMINARY INDEPENDENT RESOURCE ESTIMATE; ANNOUNCES COMPANY CONFERENCE CALL COLORADO SPRINGS April 26, 2012

More information

Savannah North Scoping Study Looking into the future 3 February 2016

Savannah North Scoping Study Looking into the future 3 February 2016 Savannah North Scoping Study Looking into the future 3 February 2016 ASX: PAN Disclaimer Cautionary Statements This presentation includes information extracted from Panoramic Resources Limited ASX announcement

More information

AVINO SILVER & GOLD MINES LTD.

AVINO SILVER & GOLD MINES LTD. AVINO SILVER & GOLD MINES LTD. T 604.682.370 Suite 900, 570 Granville Street ir@avino.com F 604.682.3600 Vancouver, BC V6C 3P www.avino.com August 8, 205 NYSE - MKT: ASM TSX-V: ASM FSE: GV6 Avino Reports

More information

BACANORA MINERALS ANNOUNCES SONORA LITHIUM PROJECT UPDATE, FILING OF PRE-FEASIBILITY STUDY AND AMENDED MINERAL RESOURCE ESTIMATE

BACANORA MINERALS ANNOUNCES SONORA LITHIUM PROJECT UPDATE, FILING OF PRE-FEASIBILITY STUDY AND AMENDED MINERAL RESOURCE ESTIMATE TSX-V/AIM Symbol: BCN April 15, 2016 NEWS RELEASE BACANORA MINERALS ANNOUNCES SONORA LITHIUM PROJECT UPDATE, FILING OF PRE-FEASIBILITY STUDY AND AMENDED MINERAL RESOURCE ESTIMATE BACANORA MINERALS LTD.

More information

Copper and Gold at Our Core

Copper and Gold at Our Core Copper and Gold at Our Core November 2015 TSX: ETG NYSE MKT: EGI FRANKFURT: EKA Cautionary Statement This presentation contains forward-looking statements within the meaning of the United States Private

More information

THIRD QUARTER EARNINGS NOVEMBER 12, 2015

THIRD QUARTER EARNINGS NOVEMBER 12, 2015 THIRD QUARTER EARNINGS NOVEMBER 12, 2015 CAUTIONARY NOTES Qualified Person Brian Morris, is the non-independent Klondex Mines "qualified person" as defined by National Instrument 43-101 Standards of Disclosure

More information

NEWS RELEASE. Toronto and Swiss Stock Exchanges Symbol IMZ, Frankfurt Symbol MIW

NEWS RELEASE. Toronto and Swiss Stock Exchanges Symbol IMZ, Frankfurt Symbol MIW NEWS RELEASE February 11, 2008 Toronto and Swiss Stock Exchanges Symbol IMZ, Frankfurt Symbol MIW INTERNATIONAL MINERALS ANNOUNCES 6.2 MILLION OUNCES OF MEASURED AND INDICATED GOLD RESOURCES AND RESULTS

More information

Trading Symbol: TSX: SVM February 17, 2011 NYSE: SVM

Trading Symbol: TSX: SVM February 17, 2011 NYSE: SVM PRESS RELEASE Trading Symbol: TSX: SVM February 17, 2011 NYSE: SVM SILVERCORP ANNOUNCES POSITIVE PRELIMINARY ASSESSMENT FOR THE SILVERTIP SILVER-LEAD-ZINC PROJECT, BRITISH COLUMBIA, CANADA VANCOUVER, British

More information

(NYSE-MKT:XRA, TSX:XRC,

(NYSE-MKT:XRA, TSX:XRC, For Immediate Release: NR 15-08 Corporate Update Vancouver, B.C., December 17 th, 2015 Exeter Resource Corporation (NYSE-MKT:XRA, TSX:XRC, Frankfurt:EXB Exeter or the Company ) is pleased to provide the

More information

Acquisition of Rice Lake. December 2015

Acquisition of Rice Lake. December 2015 Acquisition of Rice Lake December 2015 CAUTIONARY NOTES Qualified Person Brian Morris, is the non-independent Klondex Mines "qualified person" as defined by National Instrument 43-101 Standards of Disclosure

More information

This discussion and analysis contains forward-looking statements. Please refer to the cautionary language on page 19.

This discussion and analysis contains forward-looking statements. Please refer to the cautionary language on page 19. This discussion and analysis of financial condition and results of operation of Thompson Creek Metals Company Inc. ( Thompson Creek or the Corporation ) is prepared as at August 7, 2008, and should be

More information

WILLAMAX PROJECT. TSX-V: DVN Reach us at 604 818 1706. Developing B.C. mining assets to create profitable gold production.

WILLAMAX PROJECT. TSX-V: DVN Reach us at 604 818 1706. Developing B.C. mining assets to create profitable gold production. WILLAMAX PROJECT Developing B.C. mining assets to create profitable gold production May 2014 Reach us at 604 818 1706 Management Team Akash Patel, President and CEO Mr. Patel has received a bachelor in

More information

Continental Gold Announces a Positive Preliminary Economic Assessment for the Buriticá Project

Continental Gold Announces a Positive Preliminary Economic Assessment for the Buriticá Project Continental Gold Announces a Positive Preliminary Economic Assessment for the Buriticá Project Toronto, Ontario, November 17, 2014 - Continental Gold Limited (TSX:CNL; OTCQX:CGOOF) ("Continental" or the

More information

Copper and Gold at Our Core

Copper and Gold at Our Core Copper and Gold at Our Core January 2016 TSX: ETG NYSE MKT: EGI FRANKFURT: EKA Cautionary Statement This presentation contains forward-looking statements within the meaning of the United States Private

More information

Lalor Project Base Metal Zones and Gold Mineralization January 2009

Lalor Project Base Metal Zones and Gold Mineralization January 2009 Lalor Project Base Metal Zones and Gold Mineralization January 2009 1 Forward-Looking Statements All monetary amounts in Canadian dollars unless otherwise stated.. This presentation contains forward-looking

More information

SCORPIO MINING REPORTS FIRST QUARTER 2015 FINANCIAL RESULTS

SCORPIO MINING REPORTS FIRST QUARTER 2015 FINANCIAL RESULTS SCORPIO MINING REPORTS FIRST QUARTER 015 FINANCIAL RESULTS TORONTO, ONTARIO May 13, 015 Scorpio Mining Corporation (TSX: SPM)(OTCQX: SMNPF) ( Scorpio Mining or the Company ) today reported financial and

More information

NEWS RELEASE New York - AG Toronto FR May 10, 2016 Frankfurt FMV Mexico - AG. First Majestic Reports First Quarter Financial Results

NEWS RELEASE New York - AG Toronto FR May 10, 2016 Frankfurt FMV Mexico - AG. First Majestic Reports First Quarter Financial Results FIRST MAJESTIC SILVER CORP. Suite 1805 925 West Georgia Street Vancouver, B.C., Canada V6C 3L2 Telephone: (604) 688-3033 Fax: (604) 639-8873 Toll Free: 1-866-529-2807 Web site: www.firstmajestic.com; E-mail:

More information

YAMANA GOLD ANNOUNCES SIGNIFICANT NEW DISCOVERIES AT CHAPADA AND EL PEÑÓN IMPROVE OPERATIONAL OUTLOOK

YAMANA GOLD ANNOUNCES SIGNIFICANT NEW DISCOVERIES AT CHAPADA AND EL PEÑÓN IMPROVE OPERATIONAL OUTLOOK YAMANA GOLD ANNOUNCES SIGNIFICANT NEW DISCOVERIES AT CHAPADA AND EL PEÑÓN IMPROVE OPERATIONAL OUTLOOK TORONTO, ONTARIO, December 15, 2014 YAMANA GOLD INC. (TSX:YRI; NYSE:AUY) ( Yamana or the Company )

More information

Avion will host a conference call at 10:30 AM (EST) on Monday, April 2, 2011 to discuss the results. To participate in the call please dial:

Avion will host a conference call at 10:30 AM (EST) on Monday, April 2, 2011 to discuss the results. To participate in the call please dial: March 31, 2012 A v i o n G o l d A n n o u n c e s F o u r t h Q u a r t e r 2 0 1 1 E a r n i n g s o f $ 8. 1 M i l l i o n W i t h E a r n i n g s P e r S h a r e O f $ 0. 0 2 R e c o r d 2 0 1 1 E

More information

Denver Gold Show September 24, 2013

Denver Gold Show September 24, 2013 Denver Gold Show September 24, 2013 Cautionary Notes CAUTIONARY NOTE REGARDING NON IFRS MEASURE CASH COSTS PER OUNCE THIS PRESENTATION PRESENTS INFORMATION ABOUT OUR CASH COSTS OF PRODUCTION OF AN OUNCE

More information

For Immediate Release Date: February 3, 2016 #01-2016. Orvana Announces New Mineral Resources at El Valle Mine, Villar Zone and at La Brueva

For Immediate Release Date: February 3, 2016 #01-2016. Orvana Announces New Mineral Resources at El Valle Mine, Villar Zone and at La Brueva For Immediate Release TSX:ORV Date: February 3, 2016 #01-2016 Orvana Announces New Mineral Resources at El Valle Mine, Villar Zone and at La Brueva New Villar Zone discovered within 50m of existing reserves

More information

AGNICO-EAGLE MINES LIMITED

AGNICO-EAGLE MINES LIMITED AGNICO-EAGLE MINES LIMITED Corporate Update January 2008 Agnico-Eagle Mines Limited 1 Forward Looking Statements The information in this document has been prepared as at January 15, 2007. Certain statements

More information

Richmont Increases Mineral Reserves by 187% and Island Gold Mine Increases Mineral Reserves by 206%, With a 29% Increase in Reserve Grade

Richmont Increases Mineral Reserves by 187% and Island Gold Mine Increases Mineral Reserves by 206%, With a 29% Increase in Reserve Grade PRESS RELEASE TSX NYSE MKT: RIC Richmont Increases Mineral Reserves by 187% and Island Gold Mine Increases Mineral Reserves by 206%, With a 29% Increase in Reserve Grade TORONTO, Ontario, Canada, February

More information

A Growing, Diversified

A Growing, Diversified A Growing, Diversified North American Mining Company February 2013 Cautionary Statements This document contains forward-looking statements within the meaning of the United States Private Securities Litigation

More information

FOR IMMEDIATE RELEASE

FOR IMMEDIATE RELEASE FOR IMMEDIATE RELEASE March 19, 2014 NEWS NYSE MKT: GORO GOLD RESOURCE CORPORATION REPORTS $16.2M NET INCOME AND RECORD ANNUAL METAL PRODUCTION FOR 2014; PROVIDES 2015 PRODUCTION OUTLOOK COLORADO SPRINGS

More information

Economic Highlights (In US$ unless otherwise indicated)

Economic Highlights (In US$ unless otherwise indicated) TSX.V TSX Venture Exchange Symbol: AME Suite 615-800 West Pender Street Vancouver, B.C. V6C 2V6 Canada Tel: 604.682.0301 Fax: 604.682.0307 email: info@amemining.com website: www.amemining.com Abacus announces

More information

LYDIAN ANNOUNCES $325 MILLION CONSTRUCTION FINANCING FOR AMULSAR GOLD PROJECT

LYDIAN ANNOUNCES $325 MILLION CONSTRUCTION FINANCING FOR AMULSAR GOLD PROJECT LYDIAN ANNOUNCES $325 MILLION CONSTRUCTION FINANCING FOR AMULSAR GOLD PROJECT Conference Call December 1, 2015 Lydianinternational.co.uk TSX:LYD Cautionary Statements Forward Looking Statements & Other

More information

News Release. n j. NovaCopper Releases Year End Results and Continues to Focus on Adding Long Term Value

News Release. n j. NovaCopper Releases Year End Results and Continues to Focus on Adding Long Term Value n j News Release TSX, NYSE-MKT Symbol: NCQ NovaCopper Releases Year End Results and Continues to Focus on Adding Long Term Value February 8, 2016 - Vancouver, British Columbia - NovaCopper Inc. (TSX, NYSE-MKT:

More information

FORWARD LOOKING STATEMENTS

FORWARD LOOKING STATEMENTS MPH Ventures Corp. (MPS: TSX.V) Advancing Gold and Molybdenum Projects in Canada June 2013 1 FORWARD LOOKING STATEMENTS This presentation may contain forward-looking statements including but not limited

More information

Focusing on Near Term Production and Exploration in Quebec

Focusing on Near Term Production and Exploration in Quebec Focusing on Near Term Production and Exploration in Quebec AGM January 2016 Forward Looking Statement Forward Looking Statement This presentation may contain forward looking statements, being statements

More information

Disclaimer TSX: WPX FSE: AHE

Disclaimer TSX: WPX FSE: AHE January 2016 Disclaimer Forward-Looking Statements and Cautionary Notes Except for statements of historical fact, this presentation contains statements that constitute forward-looking statements within

More information

News release. No. 7/2015 KATANGA MINING ANNOUNCES 2015 SECOND QUARTER RESULTS

News release. No. 7/2015 KATANGA MINING ANNOUNCES 2015 SECOND QUARTER RESULTS No. 7/2015 News release KATANGA MINING ANNOUNCES 2015 SECOND QUARTER RESULTS BAAR, SWITZERLAND, August 12, 2015 Katanga Mining Limited (TSX: KAT) ("Katanga" or the "Company") today announces its financial

More information

SECOND QUARTER 2015 CONFERENCE CALL & WEBCAST

SECOND QUARTER 2015 CONFERENCE CALL & WEBCAST SECOND QUARTER 2015 CONFERENCE CALL & WEBCAST JULY 30, 2015 TSX: FM; LSE: FQM CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENT Certain statements and information herein, including all statements that

More information

FALCO COMPLETES HORNE 5 CONFIRMATION DRILLING PROGRAM AND ANNOUNCES FINAL RESULTS

FALCO COMPLETES HORNE 5 CONFIRMATION DRILLING PROGRAM AND ANNOUNCES FINAL RESULTS For Immediate Release TSX.V - FPC FALCO COMPLETES HORNE 5 CONFIRMATION DRILLING PROGRAM AND ANNOUNCES FINAL RESULTS (November 23, 2015) Montreal, Québec Falco Resources (FPC: TSX-V) ( Falco ) is pleased

More information

Management s Discussion and Analysis and Consolidated Financial Statements. Second Quarter 2014

Management s Discussion and Analysis and Consolidated Financial Statements. Second Quarter 2014 Management s Discussion and Analysis and Consolidated Financial Statements Second Quarter 2014 For the six months ended June 30, 2014 TABLE OF CONTENTS Page Management s Discussion and Analysis INTRODUCTION...

More information

Management s Discussion and Analysis and Consolidated Financial Statements. First Quarter 2014

Management s Discussion and Analysis and Consolidated Financial Statements. First Quarter 2014 Management s Discussion and Analysis and Consolidated Financial Statements First Quarter 2014 For the three months ended March 31, 2014 TABLE OF CONTENTS Page Management s Discussion and Analysis INTRODUCTION...

More information

news release November 9, 2015

news release November 9, 2015 news release November 9, Thompson Creek Reports Third Quarter Cash Balance of $217 Million and Non-GAAP Unit Cash Cost on a By-Product Basis of Negative $0.16 per Pound of Copper Produced Denver, CO Thompson

More information

Year End 2014 Earnings Conference Call

Year End 2014 Earnings Conference Call SECOND FOURTH QUARTER OVERVIEW FINANCIAL REVIEW OPERATIONS REVIEW EXPLORATION & PRE-DEVELOPMENT REVIEW Year End 2014 Earnings Conference Call February 18, 2015 Cautionary Statements HECLA MINING COMPANY

More information

CANADA S INTERMEDIATE GOLD PRODUCER

CANADA S INTERMEDIATE GOLD PRODUCER CANADA S INTERMEDIATE GOLD PRODUCER Third Quarter 2015 Results Conference 1 Call & Webcast October 29, 2015 Forward Looking Information This presentation contains certain forward-looking information and

More information

CSE: LUX XETRA: NGO Frankfurt: NGO. Environmental Reclamation & Trading

CSE: LUX XETRA: NGO Frankfurt: NGO. Environmental Reclamation & Trading CSE: LUX XETRA: NGO Frankfurt: NGO Environmental Reclamation & Trading Cautionary Disclaimer Forward Looking Statements Certain statements contained herein regarding Newlox Gold Ventures Corp. (the Company

More information

2015 Third Quarter Results Webcast October 29, 2015

2015 Third Quarter Results Webcast October 29, 2015 2015 Third Quarter Results Webcast October 29, 2015 Speaker Randall Oliphant Executive Chairman 2 Cautionary statements ALL AMOUNTS IN U.S. DOLLARS UNLESS OTHERWISE STATED CAUTIONARY NOTE REGARDING FORWARD-LOOKING

More information

Pebble Copper Gold Molybdenum Project Alaska, USA. A First World & Top Class Mining Asset

Pebble Copper Gold Molybdenum Project Alaska, USA. A First World & Top Class Mining Asset Pebble Copper Gold Molybdenum Project Alaska, USA A First World & Top Class Mining Asset February 2008 1 Cautionary and Forward Looking Information Comments This presentation includes certain statements

More information

Mako Project, Eastern Senegal Completion of Scoping Study

Mako Project, Eastern Senegal Completion of Scoping Study Toro Gold Ltd Trafalgar Court Admiral Park, Guernsey. GY1 3EL. News Release: 18 th April 2013, Guernsey Mako Project, Eastern Senegal Completion of Scoping Study Toro Gold Ltd ( Toro Gold or the Company

More information

TASEKO ANNOUNCES SECOND QUARTER RESULTS FOR FISCAL 2007

TASEKO ANNOUNCES SECOND QUARTER RESULTS FOR FISCAL 2007 1020 800 W Pender St. Vancouver BC Canada V6C 2V6 Tel 604 684 6365 Fax 604 684 8092 Toll Free 1 800 667 2114 www.tasekomines.com TASEKO ANNOUNCES SECOND QUARTER RESULTS FOR FISCAL 2007 May 14, 2007, Vancouver,

More information

NEWS RELEASE. Centerra Gold 2015 Year-End Reserve and Resource Update

NEWS RELEASE. Centerra Gold 2015 Year-End Reserve and Resource Update NEWS RELEASE Centerra Gold 2015 Year-End Reserve and Resource Update This news release contains forward-looking information that is subject to the risk factors and assumptions set out on page 7 and in

More information

MANAGEMENT S DISCUSSION AND ANALYSIS INTRODUCTION

MANAGEMENT S DISCUSSION AND ANALYSIS INTRODUCTION MANAGEMENT S DISCUSSION & ANALYSIS FOR THE THREE AND SIX MONTHS ENDED June 30, 2014 August 11, 2014-1- MANAGEMENT S DISCUSSION AND ANALYSIS INTRODUCTION This Management's Discussion & Analysis ("MD&A")

More information

Ivanhoe Mines announces an accelerated infill drilling program at the Kamoa copper project s Kakula Discovery in the D.R. Congo

Ivanhoe Mines announces an accelerated infill drilling program at the Kamoa copper project s Kakula Discovery in the D.R. Congo April 6, 2016 Ivanhoe Mines announces an accelerated infill drilling program at the Kamoa copper project s Kakula Discovery in the D.R. Congo SANTIAGO, CHILE Robert Friedland, Executive Chairman of Ivanhoe

More information

TASEKO ANNOUNCES SECOND QUARTER FISCAL 2008 RESULTS

TASEKO ANNOUNCES SECOND QUARTER FISCAL 2008 RESULTS 1020 800 West Pender Street Vancouver BC Canada V6C 2V6 Tel 604 684 6365 Fax 604 684 8092 Toll Free 1 800 667 2114 www.tasekomines.com TASEKO ANNOUNCES SECOND QUARTER FISCAL 2008 RESULTS May 13, 2008,

More information

Corporate Presentation October 2015

Corporate Presentation October 2015 TSX.V: GBB OTC PK: GBBFF THE GRANADA GOLD PROPERTY IN ROUYN - NORANDA QUEBEC a Corporate Presentation October 2015 GoldBullionDevelopmentCorp.com A Compelling Value Proposition High-grade rolling start

More information

Aurvista Gold Plans Significant Exploration Program at Douay

Aurvista Gold Plans Significant Exploration Program at Douay NEWS RELEASE For Immediate Issue June 14, 2016 Aurvista Gold Plans Significant Exploration Program at Douay Ø The main gold target is the largely untested northwestern section of the Porphyry Zone; the

More information

2015 FOURTH QUARTER REPORT BUILDING VALUE

2015 FOURTH QUARTER REPORT BUILDING VALUE 2015 FOURTH QUARTER REPORT BUILDING VALUE MANAGEMENT S DISCUSSION AND ANALYSIS of Consolidated Financial Condition and Results of Operations for the Year ended December 31, 2015 (All monetary figures are

More information

El cinturón de oro del río Narcea: el futuro de la minería de oro en España. Dr. Vern N. Rampton Presidente y CEO de Kinbauri Gold Corp.

El cinturón de oro del río Narcea: el futuro de la minería de oro en España. Dr. Vern N. Rampton Presidente y CEO de Kinbauri Gold Corp. El cinturón de oro del río Narcea: el futuro de la minería de oro en España Dr. Vern N. Rampton Presidente y CEO de Kinbauri Gold Corp. CORPORATE PRESENTATION JUNE 16, 2009 TARGETED TO BECOME ONE OF WESTERN

More information

On February 3, 2016 the Company announced the appointment of Ms. Joyce Ngo as Interim Chief Financial Officer.

On February 3, 2016 the Company announced the appointment of Ms. Joyce Ngo as Interim Chief Financial Officer. VANCOUVER, BRITISH COLUMBIA--(Marketwired - May 6, 2016) - NGEx Resources Inc. (TSX:NGQ)(OMX:NGQ) ("NGEx" or the "Company") is pleased to announce that it has filed its unaudited Consolidated Financial

More information

DUNDEE PRECIOUS METALS REPORTS FIRST QUARTER 2008 RESULTS

DUNDEE PRECIOUS METALS REPORTS FIRST QUARTER 2008 RESULTS DUNDEE PRECIOUS METALS REPORTS FIRST QUARTER 2008 RESULTS (All monetary figures are expressed in Canadian Dollars unless otherwise stated) Toronto, Ontario, May 6, 2008 Dundee Precious Metals Inc. ( DPM

More information

Second Quarter Earnings Release Conference Call. July 23, 2009

Second Quarter Earnings Release Conference Call. July 23, 2009 Second Quarter Earnings Release Conference Call July 23, 2009 Cautionary Statement This presentation contains forwardlooking statements within the meaning of Section 27A of the Securities Act of 1933,

More information

Palangana expansion fully permitted; Burke Hollow receives disposal well permit. Associate: Michael Wichterle, MBA,

Palangana expansion fully permitted; Burke Hollow receives disposal well permit. Associate: Michael Wichterle, MBA, Equity Research Price (C$) Volume (M) May 27, 2015 Research Update URANIUM ENERGY CORP. Palangana expansion fully permitted; Burke Hollow receives disposal well permit EVENT Uranium Energy Corp. announced

More information

Annual Information Form ( AIF ) Nevada Copper Corp. Suite 1238-200 Granville Street Vancouver, British Columbia, Canada V6C 1S4

Annual Information Form ( AIF ) Nevada Copper Corp. Suite 1238-200 Granville Street Vancouver, British Columbia, Canada V6C 1S4 Annual Information Form ( AIF ) Nevada Copper Corp. Suite 1238-200 Granville Street Vancouver, British Columbia, Canada V6C 1S4 Telephone: 604-683-8992 Facsimile: 604-681-0122 Website: www.nevadacopper.com

More information

Second Quarter Results 2010

Second Quarter Results 2010 1 July 28, 2010 TSX: LUN OMX: LUMI Second Quarter Results 2010 2 Cautionary Statements Caution Regarding Forward Looking Statements This presentation contains forward-looking statements. These forward-looking

More information

STARCORE INTERNATIONAL MINES LTD. TSX:SAM

STARCORE INTERNATIONAL MINES LTD. TSX:SAM STARCORE INTERNATIONAL MINES LTD. TSX:SAM DISCLAIMER The data contained herein is provided for information purposes only. Certain information has been compiled from sources believed to be reliable. No

More information

CORPORATE PRESENTATION

CORPORATE PRESENTATION Enabling green technologies through rare earth metal exploration and development CORPORATE PRESENTATION May 1, 2013 1 TSX; NYSE MKT: QRM www.questrareminerals.com DISCLAIMER FORWARD-LOOKING STATEMENTS

More information

FORWARD-LOOKING STATEMENTS

FORWARD-LOOKING STATEMENTS FORWARD-LOOKING STATEMENTS This presentation contains forward-looking information. Forward looking information contained in this presentation includes, but is not limited to, statements with respect to:

More information

ABACUS MINING & EXPLORATION CORP. Management Discussion & Analysis FORM 51-102F1. For the Period Ending. September 30, 2009. (Amended and Restated)

ABACUS MINING & EXPLORATION CORP. Management Discussion & Analysis FORM 51-102F1. For the Period Ending. September 30, 2009. (Amended and Restated) ABACUS MINING & EXPLORATION CORP. Management Discussion & Analysis FORM 51-102F1 For the Period Ending September 30, 2009 (Amended and Restated) The following management discussion and analysis of the

More information

Developing the Tanlouka Gold Project. AGM Presentation 18th November 2015

Developing the Tanlouka Gold Project. AGM Presentation 18th November 2015 Developing the Tanlouka Gold Project AGM Presentation 18th November 2015 1 Executive Summary West African Resources Ltd is an ASX and TSXV listed gold development company focussed on Burkina Faso Largest

More information

PRESS RELEASE CANADIAN ZINC REPORTS RESULTS FOR THIRD QUARTER 2015

PRESS RELEASE CANADIAN ZINC REPORTS RESULTS FOR THIRD QUARTER 2015 PRESS RELEASE CZN-TSX CZICF-OTCQB FOR IMMEDIATE RELEASE November 13, 2015 CANADIAN ZINC REPORTS RESULTS FOR THIRD QUARTER 2015 Successful drill program at Prairie Creek leads to new resource estimate with

More information

2016 TD Securities Mining Conference January 2016 TSX: LUN OMX: LUMI

2016 TD Securities Mining Conference January 2016 TSX: LUN OMX: LUMI 2016 TD Securities Mining Conference January 2016 TSX: LUN OMX: LUMI Cautionary Statements Caution Regarding Forward-Looking Information This presentation contains forward-looking information, including,

More information

Management s Discussion and Analysis. Forward Looking Statements. August 7, 2012

Management s Discussion and Analysis. Forward Looking Statements. August 7, 2012 Management s Discussion and Analysis For The Six Months Ended June 30, 2012 1 Management s Discussion and Analysis August 7, 2012 In this document: (i) unless the content otherwise requires, references

More information

Candelaria and Ojos del Salado Chile

Candelaria and Ojos del Salado Chile TSX : LUN OMX : LUMI 2016 Candelaria Key Facts Open Pit and Underground Mine Copper, gold, and silver 2016 estimate 124,000-128,000 tonnes copper Cash costs of $1.45 per lb copper after by-product credits

More information

Sabina Gold & Silver Corp.

Sabina Gold & Silver Corp. Sabina Gold & Silver Corp. Creating precious metals opportunities in the Canadian North November 2011 Hackett River Camp, looking to west 1 Forward Looking Statements This presentation includes certain

More information

K+S CANADA HOLDINGS INC. K+S AKTIENGESELLSCHAFT POTASH ONE INC.

K+S CANADA HOLDINGS INC. K+S AKTIENGESELLSCHAFT POTASH ONE INC. This document is important and requires your immediate attention. If you are in doubt as to how to deal with it, you should consult your investment dealer, stockbroker, bank manager, lawyer or other professional

More information

THE VALUATION OF ADVANCED MINING PROJECTS & OPERATING MINES: MARKET COMPARABLE APPROACHES. Craig Roberts National Bank Financial

THE VALUATION OF ADVANCED MINING PROJECTS & OPERATING MINES: MARKET COMPARABLE APPROACHES. Craig Roberts National Bank Financial THE VALUATION OF ADVANCED MINING PROJECTS & OPERATING MINES: MARKET COMPARABLE APPROACHES Craig Roberts National Bank Financial ABSTRACT While various methods are available to estimate a mining project

More information

CADILLAC VENTURES INC. MANAGEMENT S DISCUSSION AND ANALYSIS

CADILLAC VENTURES INC. MANAGEMENT S DISCUSSION AND ANALYSIS CADILLAC VENTURES INC. MANAGEMENT S DISCUSSION AND ANALYSIS Second Quarter ended November 30, 2007 Introduction This is the management discussion and analysis ( MD&A ) of the operating and financial results

More information

ACQUISITION OF TWO QUALITY MINES IN NEVADA

ACQUISITION OF TWO QUALITY MINES IN NEVADA November 12 2015 ACQUISITION OF TWO QUALITY MINES IN NEVADA 1 1 CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION All statements, other than statements of historical fact, contained or incorporated by

More information

Trilogy completed the sale of its Dunvegan oil assets in the Kaybob area for net proceeds of $45 million.

Trilogy completed the sale of its Dunvegan oil assets in the Kaybob area for net proceeds of $45 million. Calgary, Alberta November 5, 2015 News Release: Trilogy Energy Corp. Announces Financial and Operating Results for the Three and Nine Months-Ended September 30, 2015 and Provides Revised Guidance Trilogy

More information

ELECTRA GOLD LTD. MANAGEMENT DISCUSSION AND ANALYSIS QUARTER ENDED JUNE 30, 2014

ELECTRA GOLD LTD. MANAGEMENT DISCUSSION AND ANALYSIS QUARTER ENDED JUNE 30, 2014 The following Management s Discussion and Analysis, with an approval date of August 26, 2014, should be read together with the unaudited financial statements for the six months ended June 30, 2014 and

More information

MANAGEMENT DISCUSSION AND ANALYSIS FOR THE THREE MONTHS ENDED MAY 31, 2014

MANAGEMENT DISCUSSION AND ANALYSIS FOR THE THREE MONTHS ENDED MAY 31, 2014 MANAGEMENT DISCUSSION AND ANALYSIS FOR THE THREE MONTHS ENDED MAY 31, 2014 (2) INTRODUCTORY COMMENT Serengeti Resources Inc. is a junior mineral exploration company listed on the TSX Venture Exchange under

More information

Q3 2009 Conference Call - Q3 financial results - Dividend declaration - Near term growth outlook - New Royalty Acquisitions

Q3 2009 Conference Call - Q3 financial results - Dividend declaration - Near term growth outlook - New Royalty Acquisitions Q3 2009 Conference Call - Q3 financial results - Dividend declaration - Near term growth outlook - New Royalty Acquisitions November 10, 2009 David Harquail - CEO Alex Morrison - CFO Cautionary Statement

More information

Great Western Minerals Reports Second Quarter 2014 Results August 13, 2014 Page 2 of 7

Great Western Minerals Reports Second Quarter 2014 Results August 13, 2014 Page 2 of 7 NEWS RELEASE 2121 Airport Drive, Unit 201B, Saskatoon, SK S7L 6W5 FOR IMMEDIATE RELEASE Great Western Minerals Reports Second Quarter 2014 Results SASKATOON, SK, Canada, Great Western Minerals Group Ltd.

More information

NEWS RELEASE. Supplemental information: http://www.kinross.com/media/306933/111215%20supplemental%20information.pdf

NEWS RELEASE. Supplemental information: http://www.kinross.com/media/306933/111215%20supplemental%20information.pdf 25 York Street, 17th Floor Toronto, ON Canada M5J 2V5 NEWS RELEASE Kinross Acquires Strategic Nevada Assets Strengthens portfolio with two quality mines in world-class jurisdiction Large prospective land

More information

TD Securities Mining Conference JANUARY 26-27, 2016. Developing the third-largest copper mine

TD Securities Mining Conference JANUARY 26-27, 2016. Developing the third-largest copper mine TD Securities Mining Conference JANUARY 26-27, 2016 Developing the third-largest copper mine Forward-looking statements This presentation includes certain forward-looking information within the meaning

More information

Inmet Mining announces third quarter results

Inmet Mining announces third quarter results Inmet Mining announces third quarter results All amounts are in Canadian dollars, unless otherwise stated. TORONTO, Oct. 24, 2002 / - Inmet Mining Corporation reported net income in the third quarter of

More information

GOLD RESOURCE CORPORATION INTERCEPTS ADDITIONAL MULTIPLE HIGH-GRADE PARALLEL VEINS AT SWITCHBACK INCLUDING 6.32 METERS OF 5.

GOLD RESOURCE CORPORATION INTERCEPTS ADDITIONAL MULTIPLE HIGH-GRADE PARALLEL VEINS AT SWITCHBACK INCLUDING 6.32 METERS OF 5. FOR IMMEDIATE RELEASE JANUARY 26, 2016 NEWS NYSE MKT: GORO GOLD RESOURCE CORPORATION INTERCEPTS ADDITIONAL MULTIPLE HIGH-GRADE PARALLEL VEINS AT SWITCHBACK INCLUDING 6.32 METERS OF 5.87 G/T GOLD Colorado

More information

TORONTO STOCK EXCHANGE COMPANY MANUAL APPENDIX B DISCLOSURE STANDARDS FOR COMPANIES ENGAGED IN MINERAL EXPLORATION, DEVELOPMENT & PRODUCTION

TORONTO STOCK EXCHANGE COMPANY MANUAL APPENDIX B DISCLOSURE STANDARDS FOR COMPANIES ENGAGED IN MINERAL EXPLORATION, DEVELOPMENT & PRODUCTION B-1 APPENDIX B DISCLOSURE STANDARDS FOR COMPANIES ENGAGED IN MINERAL EXPLORATION, DEVELOPMENT & PRODUCTION 1.0 INTRODUCTION The disclosure of the results of exploration and development activity on mineral

More information

AFRICAN GOLD GROUP, INC. DEFINITIVE FEASIBILITY STUDY FOR KOBADA GOLD PROJECT GENERATES ROBUST ECONOMIC OUTCOME

AFRICAN GOLD GROUP, INC. DEFINITIVE FEASIBILITY STUDY FOR KOBADA GOLD PROJECT GENERATES ROBUST ECONOMIC OUTCOME African Gold Group, Inc. TSX-V: AGG Yonge & Richmond Centre 151 Yonge Street, 11th Floor. Toronto Canada M5C 2W7 Tel: +1 647 775 8538 website : www.africangoldgroup.com AFRICAN GOLD GROUP, INC. DEFINITIVE

More information

Galahad Gold plc (Galahad)

Galahad Gold plc (Galahad) 23 January 2007 Galahad Gold plc (Galahad) 2006 Drilling Expands Northern Dynasty's Pebble East Deposit Pebble East Deposit Now Over 7000 Ft By 4000 Ft With Grades Exceeding 1% Cueq Galahad sets out below

More information

CENTURY ENERGY LTD. FORM 51-102F1 MANAGEMENT DISCUSSION AND ANALYSIS FOR THE YEAR ENDED AUGUST 31, 2014

CENTURY ENERGY LTD. FORM 51-102F1 MANAGEMENT DISCUSSION AND ANALYSIS FOR THE YEAR ENDED AUGUST 31, 2014 CENTURY ENERGY LTD. FORM 51-102F1 MANAGEMENT DISCUSSION AND ANALYSIS FOR THE YEAR ENDED AUGUST 31, 2014 The following management s discussion and analysis ( MD&A ), prepared as of December 11, 2014, should

More information

Inter Pipeline Fund Announces Strong Third Quarter 2009 Results

Inter Pipeline Fund Announces Strong Third Quarter 2009 Results News Release Inter Pipeline Fund Announces Strong Third Quarter 2009 Results CALGARY, ALBERTA, NOVEMBER 5, 2009: Inter Pipeline Fund ( Inter Pipeline ) (TSX: IPL.UN) announced today its financial and operating

More information

Investor Presentation

Investor Presentation Investor Presentation December 2015 HBM Cautionary Information This presentation contains "forward-looking statements" and "forward-looking information" (collectively, "forward-looking information") within

More information

RAGING RIVER EXPLORATION INC. ANNOUNCES 2015 YEAR END RESERVES AND UPDATED 2016 GUIDANCE

RAGING RIVER EXPLORATION INC. ANNOUNCES 2015 YEAR END RESERVES AND UPDATED 2016 GUIDANCE February 3, 2016 RAGING RIVER EXPLORATION INC. ANNOUNCES 2015 YEAR END RESERVES AND UPDATED 2016 GUIDANCE CALGARY, ALBERTA (February 3, 2016) Raging River Exploration Inc. ("Raging River" or the "Company")

More information

China Gold International Resources Corp. Ltd.

China Gold International Resources Corp. Ltd. Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness

More information

Lydianinternational.co.uk TSX:LYD. Corporate Presentation June 2016 1

Lydianinternational.co.uk TSX:LYD. Corporate Presentation June 2016 1 Lydianinternational.co.uk TSX:LYD Corporate Presentation June 2016 1 Cautionary Statements Certain information contained in this presentation, including any information relating to Amulsar's expected future

More information

Cautionary Statement

Cautionary Statement Cautionary Statement This presentation contains certain "forward-looking statements", including, but not limited to, the statements regarding each of Minera Andes Inc., US Gold Corporation, Lexam Explorations

More information

Q3 Highlights. Company earnings during the quarter totaled $3.3 million ($0.01 per share).

Q3 Highlights. Company earnings during the quarter totaled $3.3 million ($0.01 per share). MCEWEN MINING Q3 2013 RESULTS 36,494 Gold Eq. Produced Cash Cost $749/oz All-In Sustaining Cost $1,081/oz El Gallo 1 Mine Expansion Ahead of Schedule & Below Budget (All Amounts in US Dollars Unless Otherwise

More information

Abacus Mining & Exploration Corporation (an exploration stage company) Condensed Interim Financial Statements March 31, 2013.

Abacus Mining & Exploration Corporation (an exploration stage company) Condensed Interim Financial Statements March 31, 2013. Abacus Mining & Exploration Corporation (an exploration stage company) Condensed Interim Financial Statements 2013 (Unaudited) (Expressed in Canadian dollars) Index Page Notice to reader 2 Financial statements:

More information

Q4 & FY2015 OPERATING HIGHLIGHTS. January 29, 2016

Q4 & FY2015 OPERATING HIGHLIGHTS. January 29, 2016 Q4 & FY2015 OPERATING HIGHLIGHTS January 29, 2016 1 FORWARD-LOOKING STATEMENTS This presentation contains certain statements that constitute forward-looking information within the meaning of applicable

More information

Amerigo Announces 2011 Financial Results

Amerigo Announces 2011 Financial Results March 5, 2012 N.R. 2012-02 Amerigo Announces Financial Results Net earnings of $8.7 million Operating cash flow of $20 million Dividends of $6.8 million paid in VANCOUVER, BRITISH COLUMBIA March 5, 2012/Amerigo

More information

Technical Presentation The Star-Orion South Diamond Project George Read P.Geo. Senior VP Exploration & Development. 16 June 2015

Technical Presentation The Star-Orion South Diamond Project George Read P.Geo. Senior VP Exploration & Development. 16 June 2015 Technical Presentation The Star-Orion South Diamond Project George Read P.Geo. Senior VP Exploration & Development 16 June 2015 Safe Harbour Statement This presentation contains forward-looking statements

More information

First Quarter 2015 Investor Conference Call May 7, 2015

First Quarter 2015 Investor Conference Call May 7, 2015 NYSE:TC NYSE:TC TSX:TCM TSX:TCM First Quarter 2015 Investor Conference Call May 7, 2015 Webcast Information Webcast: This Webcast can be accessed on the Thompson Creek Metals Company website under the

More information