DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF AIR QUALITY
|
|
- Brooke Hawkins
- 7 years ago
- Views:
Transcription
1 GENERAL PLAN APPROVAL AND/OR GENERAL OPERATING PERMIT APPLICATION INSTRUCTIONS General Permit BAQ-GPA/GP-5 Natural Gas Compression and/or Processing Facilities GENERAL INFORMATION 1. The owner or operator of any natural gas compression and/or processing facility proposing to operate under the general plan approval and/or operating permit BAQ-GPA/GP-5 must comply with the terms and conditions specified therein. Failure to conform to the applicable laws, rules and regulations and terms and conditions of this permit, for any reason, are grounds for the revocation or suspension of the permittee's authorization to operate under this permit. 2. In accordance with Condition 4 of Section A of the General Permit, an authorization to construct, modify or operate cannot be issued to a facility if the total emissions from all air contamination sources located at the facility exceed the Title V major facility threshold during any consecutive a 12-month rolling period. The emissions from all sources and associated air pollution control equipment located at a natural gas compression and/or processing facility shall not equal or exceed on a 12-month rolling sum basis: (i) Nitrogen oxides (NOx), Carbon monoxide (CO), Sulfur oxides (SOx), Particulate matter with an aerodynamic diameter less than 10 microns (PM10) and 2.5 microns (PM2.5) 100 tons. (ii) Volatile organic compounds (VOCs) 50 tons. (iii) Any individual hazardous air pollutant (HAP) 10 tons. (iv) Total hazardous air pollutants (HAPs) 25 tons. (v) Greenhouse gases, expressed as carbon dioxide equivalent (CO2e) 100,000 tons. (vi) In addition, the emissions from all sources and associated air pollution control equipment located at a natural gas compression and/or processing facility in Bucks, Chester, Delaware, Montgomery, or Philadelphia counties shall not equal or exceed 25 tons of NOx and VOCs emissions. 3. BAQ-GPA/GP-5 is applicable to any of the following air contamination sources: spark ignition internal combustion engines (SI ICE), simple cycle gas turbines, centrifugal compressor, glycol dehydration unit and associated equipment including gas-condensateglycol ( GCG ), separator (flash tank separator), natural gas fractionation (such as depropanizer, de-ethanizer, de-butanizer), storage vessel(s), equipment leaks, pneumatic controllers and sweetening units used in natural gas compression and/or processing facilities. 4. Authorization to use BAQ GPA/GP-5 is valid for a fixed term of five years. The applicable fees are detailed in Condition 13 of Section A of the General Permit. An application for renewal and the renewal fee must be submitted 30 days prior to expiration of the General Permit
2 5. The application and fees specified in Condition 13 of Section A of BAQ-GPA/GP-5 shall be submitted to the appropriate Regional Office. 6. The permittee may not transfer authorization to operate under this General Permit. The new owner shall submit a new application and fees as described in Condition 13 of Section A of the General Permit. 7. If the natural gas compression and/or processing facilities cannot be regulated by the requirements of this general permit, an applicant must apply for a plan approval under Chapter 127, Subchapter B in lieu of this general plan approval BAQ-GPA/GP-5. APPLICATION INSTRUCTIONS 8. Every section of the application form for authorization to use General Permit BAQ- GPA/GP-5 must be filled completely, otherwise the application would be deemed incomplete. Any section that is not applicable must be marked as N/A. Estimated emissions must include emissions from all of the sources at the facility. This includes stack and fugitive emissions. Contents in the application form are self-explanatory. Still, for convenience of the applicant further explanations have been provided as following: SECTION A. (APPLICATION TYPES) 9. An applicant shall check the appropriate box that matches the type of authorization the applicant is seeking. Based on the application type checked by the applicant and the fees listed in Condition 13 of Section A of the General Permit, the payable amounts for the GP- 5 authorization fees may vary. The GP-5 authorization fee by means of one check, payable to the Commonwealth of Pennsylvania, Clean Air Fund, must be included with the application. 10. An owner or operator of a new or existing facility, applying for a BAQ-GPA/GP-5 authorization, shall specify the first GP-5 authorization date as asked in Section A of the application form to help ascertain the applicable Best Achievable Technology (BAT) for the source(s). 11. Department approves all ownership transfers in writing. Within thirty (30) days after a change of ownership of the facility, the new owner or operator shall submit to the Department a GP-5 Application, compliance review form, and all applicable fees. SECTION B. (OWNER INFORMATION) 12. Enter the owner information in this section. If the facility has an existing permit, use the same information. SECTION C. (OPERATOR INFORMATION) 13. Enter the operator information (if different from the owner information) in this section. SECTION D. (CONTACT INFORMATION) 14. Enter the contact information in this section
3 SECTION E. (PERMIT INFORMATION) 15. An applicant of an existing facility shall provide current and past authorization numbers as indicated in the application. Previously exempted sources have to be listed with date of exemptions. SECTION F. (APPLICANT S CHECKLIST) 16. Verify that the appropriate enclosures are included with the application by checking the boxes. 17. The GP-5 application must be submitted with the General Information Form (GIF). 18. An applicant for BAQ-GPA/GP-5 must complete compliance review forms in accordance with 25 Pa. Code Use forms 2700-PM-AQ0004 and 2700-PM-AQ0005 as appropriate from DEP s online elibrary. 19. An application fee is required each time the facility owner or operator installs or modifies an existing source at the natural gas production, compression and/or processing facilities in accordance with this General Permit. 20. An applicant for BAQ-GPA/GP-5 shall complete Attachment-A (the Questionnaire and Checklist for Single Source Determination) of the Application for Authorization to Use GP A facility owner or operator proposing to use the General Permit shall notify the local municipality and county governments where the air pollution source is to be located that the applicant has applied for the authorization to use GP-5. The notification shall clearly describe the proposed sources and/or modifications. The owner or operator shall also submit to the Department proof of submittal of the municipal notification along with a copy of the Application for Authorization to Use GP An applicant for BAQ-GPA/GP-5 shall review the Department issued Guidance for Performing Single Stationary Source Determinations for Oil and Gas Industries, Document number: and Fact Sheet, Document number 2700-FS-DEP4349 prior to generating the Map/Layout of the facilities under common control required in Section F of the application form. 23. An applicant for BAQ-GPA/GP-5 shall provide map/layout of adjacent facilities under common control with SIC code, permit number of each source, and distances between boundaries of compressor station(s), the well(s), and associated natural gas processing plant(s) printed clearly on the map/layout required in Section F of the application form. 24. An applicant for BAQ-GPA/GP-5 authorization must obtain Erosion and Sediment Control General Permit (ESCGP-1) before conducting any earth disturbance activities. An applicant also shall obtain Pennsylvania Natural Diversity Inventory (PNDI) review receipt and if required a clearance letter. The clearance letter should be provided if the search indicates a potential impact. The clearance letter is not required for administrative completeness, but must be provided prior to issuance of the authorization. See the - 3 -
4 following website for the PNDI search tool and DEP PNDI policy: SECTION G. (AFFIDAVIT) 25. Provide a signature, date, and print name of the responsible official as defined in 25 Pa. Code Section (relating to definitions) certifying this GP-5 application. Applications without a signed certification will be returned as incomplete. SECTION H. (FACILITY INFORMATION) 26. The physical location of each stack must be provided by latitude and longitude measures in appropriate degrees, minutes, and seconds. 27. An applicant seeking BAQ-GPA/GP-5 authorization shall list all sources of the facility that the application would cover. Enter the information requested in Sections H1 through H8 for the equipment and control devices being installed or modified as part of this General Permit. SECTION H1 and H2 (INTERNAL COMBUSTION (IC) ENGINE(S) & SIMPLE CYCLE NATURAL GAS TURBINE(S) INFORMATION) 28. Calculations for Estimated Atmospheric Emissions (under Emissions Data table) for engines and turbines shall be based on Post Control Emissions Rates, maximum hours of operation of 8760 hrs. and maximum rated capacity (BHP) of the engine or turbine. Attach calculations with the application. 29. Provide all engine and turbine control information in sections H1 and H2. Use section H8 only for providing information for control equipment that are associated with other process equipment like Dehydrator, Regenerator, Tank (s) etc. SECTION H3. (DEHYDRATOR AND ASSOCIATED EQUIPMENT INFORMATION) 30. Provide detailed control equipment information using appropriate form(s) under section H8. Estimated Atmospheric Emissions, in TPY units for Dehydrator and associated equipment (under Emissions Data table), shall be calculated using controlled emission rates and maximum hours of operation of 8760 hrs. Describe how the estimated emission values were determined. Attach calculations. SECTION H4. (FLASH TANK and/or REGENERATOR INFORMATION) 31. See SECTION H3 above. SECTION H5. (FRACTIONATOR INFORMATION) 32. See SECTION H3 above. SECTION H6. (CONDENSATE OR MISCELLANEOUS STORAGE TANK INFORMATION) - 4 -
5 33. See SECTION H3 above. SECTION H7. (STORAGE TANK (Pressure vessel)) 34. If the pressure relief valve discharges to an overflow tank, provide information of the overflow tank and control equipment (if any) by filling out Sections H6 and H8 separately. SECTION H8. (AIR POLLUTION CONTROL EQUIPMENT INFORMATION) 35. Provide information about various air pollution control equipment in Sections H8.1 through H8.4. Do not use this section for engine and turbine controls information. Use sections H1 and H2 for engine and turbine controls. Sections H8.5 for Other Air Pollution Control Equipment may include any other devices not specified anywhere in the application form. SECTION H9. (FUGITIVE EMISSIONS FROM COMPONENT LEAKS) 36. An applicant for BAQ-GPA/GP-5 shall use Leak Emission Factors from EPA Protocol or other Department approved methods for calculating fugitive emissions due to leaks from component types covered under this GP-5 application. Estimated Atmospheric Emissions from component leaks will be estimated based on maximum hours of operation of 8760 hrs. SECTION H10. (ESTIMATED ATMOSPHERIC EMISSIONS FROM EACH SOURCE COVERED UNDER THIS GENERAL PERMIT) 37. Provide Estimated Atmospheric Emissions from each individual source including control equipment and component leaks. Use controlled/outlet emission rates and maximum hours of operation of 8760 hrs to estimate atmospheric emissions (TPY). SECTION H11. (TOTAL ESTIMATED EMISSIONS FROM ALL SOURCES COVERED UNDER THIS GENERAL PERMIT) 38. Provide total Estimated Atmospheric Emissions for each pollutant from all sources in the facility including component leaks
Oil and Gas Air Quality Regulations and Permitting
Oil and Gas Air Quality Regulations and Permitting Adam Berig Olsson Associates Colorado Springs Oil and Gas Committee Presentation February 2012 Who Regulates Air Quality? United States Environmental
More informationSTATE OF MISSOURI, DEPARTMENT OF NATURAL RESOURCES MISSOURI AIR CONSERVATION COMMISSION PERMIT TO CONSTRUCT
--.--~.-------------------------------- STATE OF MISSOURI, DEPARTMENT OF NATURAL RESOURCES MISSOURI AIR CONSERVATION COMMISSION PERMIT TO CONSTRUCT Under the authority of RSMo 643 and the Federal Clean
More informationSite Identification No.: 197809AAO Application No.: 15030051
Project Summary for a Construction Permit Application from Midwest Generation for a Natural Gas Conversion Project for the Joliet Electric Generating Station Joliet, Illinois Site Identification No.: 197809AAO
More informationClass II General Permit G35-C Registration to (Construct, Modify, etc.)
West Virginia Department of Environmental Protection Division of Air Quality Earl Ray Tomblin Governor Randy C. Huffman Cabinet Secretary Class II General Permit G35-C Registration to (Construct, Modify,
More informationState of New Jersey. General Permit. For. Boilers and Heaters [Individually Less Than 10 MMBTU/HR]
State of New Jersey Department of Environmental Protection Air Quality Permitting General Permit For This General Permit allows for the construction, installation, reconstruction and operation of single
More informationStatement of Basis SCA Tissue North America, LLC. 701-0055
Statement of Basis SCA Tissue North America, LLC. 701-0055 On December 26, 2012, the Department received SCA Tissue North America, LLC renewal Title V application. SCA is considered a major source for
More informationPart I GENERAL CONDITIONS. 1. Any activities not identified in the application are not authorized by this permit.
Page 2 of 9 Part I GENERAL CONDITIONS 1. Any activities not identified in the application are not authorized by this permit. 2. The permittee shall at all times maintain in good working order and operate
More informationTHE BASICS Q: What is VOC? Q: What are flashing losses/voc emissions from hydrocarbon storage tanks? - 1 -
Calculation of Flashing Losses/VOC Emissions from Hydrocarbon Storage Tanks THE BASICS Q: What is VOC? A: VOC is an acronym that stands for Volatile Organic Compounds. VOC are components of hydrocarbon
More informationAir Permitting in Colorado. Martha Hyder Wind River Environmental Group LLC September 2013
Air Permitting in Colorado Martha Hyder Wind River Environmental Group LLC September 2013 Overview O Background (pollutants) O Federal permitting regulations O Colorado permitting regulations O Colorado
More information(Adopted July 7, 1989)(Amended December 7, 1990) (Amended May 13, 1994) FUGITIVE EMISSIONS OF VOLATILE ORGANIC COMPOUNDS
(Adopted July 7, 1989)(Amended December 7, 1990) (Amended May 13, 1994) RULE 1173. FUGITIVE EMISSIONS OF VOLATILE ORGANIC COMPOUNDS (a) (b) Purpose This rule is intended to control volatile organic compounds
More informationAddition of general construction conditions applicable to the portable emergency turbine because they were omitted from the original Part 70 Permit.
Ms. Heather N. Frosch Midwestern Gas Transmission P.O. Box 2511 Houston, Texas 77252-2511 Re: 153-11686 First Significant Permit Modification to Part 70 No.: T153-5975-00006 Dear Ms. Frosch: Midwestern
More informationAir Quality Regulation of the Oil and Gas Production Sector in Colorado and Beyond. Garry Kaufman Holland & Hart LLP
Air Quality Regulation of the Oil and Gas Production Sector in Colorado and Beyond Garry Kaufman Holland & Hart LLP 1 Important Information This presentation is similar to any other legal education presentation
More informationPENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION
Page 1 of 9 PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION COMPLIANCE DEMONSTRATION INSTRUCTIONS FOR THE CATEGORY NO. 38 AIR QUALITY PERMIT EXEMPTION CRITERIA The Category No. 38 exemption criteria
More informationGarry Kaufman Colorado Air Pollution Control Division May 14, 2014
Garry Kaufman Colorado Air Pollution Control Division May 14, 2014 Colorado emissions data by sector Greenhouse gas emissions (GHG) Nitrogen oxides (NO x ) Volatile organic compounds (VOC) Past efforts
More informationAddition of general construction conditions applicable to the portable emergency turbine because they were omitted from the original Part 70 Permit.
Ms. Heather N. Frosch Midwestern Gas Transmission P.O. Box 2511 Houston, Texas 77252-2511 Re: 125-11685 First Significant Permit Modification to Part 70 No.: T 125-5976-00004 Dear Ms. Frosch: Midwestern
More information(2) The Compliance Determination Requirements in Section D of this permit; (3) The Compliance Monitoring Requirements in Section D of this permit;
Mr. Alan Brittingham Arvin Exhaust, OEM, Technical Center Route 450 South Walesboro, IN 47201 Re: AT 005-11038-00080 First Administrative Amendment to Part 70 005-7482-00080 Dear Mr. Brittingham: Arvin
More informationControl Device Requirements Charts For Oil and Gas Handling and Production Facilities
Device Charts For Oil and Gas Handling and Production Facilities Purpose/Scope: The purpose of this document is to provide standardized guidance for use by the regulated community and air permit reviewers,
More informationADEM Form 103 01/10 m5
ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT AIR DIVISION INSTRUCTIONS FOR COMPLETION OF FACILITY IDENTIFICATION FORM ADEM 103 This form is to be completed in duplicate for each facility operated by
More informationClean Up Your Fleet. Introducing a practical approach to cleaner, more efficient fleet operation
Clean Up Your Fleet Introducing a practical approach to cleaner, more efficient fleet operation The value of clean fleet management Reduce air pollution from your fleet Reduce greenhouse gas emissions
More informationAddressing Air Emissions from Marcellus Shale Natural Gas Production. Joe Osborne Lauren Burge Group Against Smog & Pollution Pittsburgh, PA
Addressing Air Emissions from Marcellus Shale Natural Gas Production Joe Osborne Lauren Burge Group Against Smog & Pollution Pittsburgh, PA Pitt Environmental Law Council September 25, 2012 Why Air? Natural
More informationCOMMONWEALTH OF MASSACHUSETTS DEPARTMENT OF ENVIRONMENTAL PROTECTION 310 CMR 7.00 AIR POLLUTION CONTROL REGULATIONS
COMMONWEALTH OF MASSACHUSETTS DEPARTMENT OF ENVIRONMENTAL PROTECTION 310 CMR 7.00 AIR POLLUTION CONTROL REGULATIONS 310 CMR 7.00 APPENDIX B U EMISSION BANKING, TRADING AND AVERAGING 310 CMR 7.00: Appendix
More informationENVIRONMENTAL STANDARDS FOR PETROLEUM OIL REFINERIES EMISSIONS. Standards for emissions from furnaces, boilers and Power Plant
ENVIRONMENTAL STANDARDS FOR PETROLEUM OIL REFINERIES EMISSIONS Standards for emissions from furnaces, boilers and Power Plant S. Parameter Limiting concentration in mg/nm 3, unless stated Existing refineries
More informationColorado Oil and Gas Emissions Rules
Colorado Oil and Gas Emissions Rules GREEN COMPLETION PRACTICES shall mean those practices intended to reduce emissions of salable gas and condensate vapors during cleanout and flowback operations prior
More informationFixing the Leaks: What Would it Cost to Clean Up Natural Gas Leaks?
FACT SHEET AND ANALYSIS Fixing the Leaks: What Would it Cost to Clean Up Natural Gas Leaks? About the Authors: The study was designed, carried out, and written by Carbon Limits, a Norwegian consulting
More informationFAC 7.1: Generators. EPA Impacts on Emergency Gensets for 2015 Installations
FAC 7.1: Generators EPA Impacts on Emergency Gensets for 2015 Installations Speaker: Bob Stelzer, CTO Safety Power Inc bob.stelzer@safetypower.ca Speaker: Randy Sadler, SME, Safety Power Inc. randy.sadler@safetypower.ca
More informationNSPS Subpart OOOO: Applicability and Compliance Basics
NSPS Subpart OOOO: Applicability and Compliance Basics Kentucky Oil & Gas Association 2013 Western Kentucky Meeting September 12, 2013 Roy Rakiewicz All4 Inc. Rob Flynn Environmental Standards, Inc. www.all4inc.com
More informationSTATE OF CONNECTICUT DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF AIR MANAGEMENT
Page 1 of 7 STATE OF CONNECTICUT DEPARTMENT OF ENVIRONMENTAL PROTECTION NEW SOURCE REVIEW PERMIT TO CONSTRUCT AND OPERATE A STATIONARY SOURCE Issued pursuant to Title 22a of the Connecticut General Statutes
More informationHighlights of Colorado s New Oil and Gas Hydrocarbon Emission Reduction Rules - Adopted February 2014
Highlights of Colorado s New Oil and Gas Hydrocarbon - Adopted February 2014 Presentation to the Colorado Counties, Inc. June 3, 2014 Mike Silverstein Colorado Department of Public Health and Environment
More informationWest Virginia Department of Environmental Protection Division of Air Quality. Fact Sheet
West Virginia Department of Environmental Protection Division of Air Quality Fact Sheet For Final Renewal Permitting Action Under 45CSR30 and Title V of the Clean Air Act Permit Number: R30-10700001-2009
More informationTexas Commission on Environmental Quality Page 1 Chapter 117 - Control of Air Pollution from Nitrogen Compounds
Texas Commission on Environmental Quality Page 1 SUBCHAPTER G: GENERAL MONITORING AND TESTING REQUIREMENTS DIVISION 1: COMPLIANCE STACK TESTING AND REPORT REQUIREMENTS 117.8000, 117.8010 Effective June
More informationSTATE OF MISSOURI DEPARTMENT OF NATURAL RESOURCES MISSOURI AIR CONSERVATION COMMISSION PERMIT TO CONSTRUCT
STATE OF MISSOURI flle COPl DEPARTMENT OF NATURAL RESOURCES MISSOURI AIR CONSERVATION COMMISSION PERMIT TO CONSTRUCT Under the authority of RSMo 643 and the Federal Clean Air Act the applicant is authorized
More information(b) One (1) natural gas-fired boiler identified as B1, with a maximum heat input rate of 4.6 million (MM) British thermal units (Btu) per hour;
Brandon S. Erlacher Elkhart Truth Publishing Company 421 South Second Street Elkhart, IN 46516 Re: Registered Operation Status, 039-11783-00269 Dear Mr. Erlacher: The application from Elkhart Truth Publishing
More information4. The role of fleets and fleet managers
4. The role of fleets and fleet managers 79% 5% 44% To grow by 50% by 2010 over 1998 Role of Fleets - Changing operating environment: national, local government incentives, disincentives - Economies of
More informationMEMORANDUM March 7, 2013. Phillip Fielder, P.E., Permits and Engineering Group Manager
DRAFT OKLAHOMA DEPARTMENT OF ENVIRONMENTAL QUALITY AIR QUALITY DIVISION MEMORANDUM March 7, 2013 TO: THROUGH: THROUGH: THROUGH: FROM: SUBJECT: Phillip Fielder, P.E., Permits and Engineering Group Manager
More informationPopulation Density, Traffic Density and Nitrogen Oxides (NOx) Emission Air Pollution Density in Major Metropolitan Areas of the United States
Population Density, Traffic Density and Nitrogen Oxides (NOx) Emission Air Pollution Density in Major Metropolitan Areas of the United States This report summarizes the latest Environmental Protection
More informationTesoro Savage Vancouver Energy Distribution Terminal August 2013 Application No. 2013-01 Page 2-162
Crude Oil Storage Tanks The Facility includes six 360,000-bbl capacity crude oil storage tanks, each with a working capacity of approximately 340,000 bbl These tanks are subject to an NSPS that applies
More information4. The role of fleets and fleet managers Role of REC?
4. The role of fleets and fleet managers Role of REC? 79% 5% 44% To grow by 50% by 2010 over 1998 Role of Fleets - Changing operating environment: national, local government incentives, disincentives -
More informationPART 70 PERMIT TO OPERATE
G A: $ Air Pollution Control Program Missouri Dt;!partment of Natural Resources PART 70 PERMIT TO OPERATE Under the authority ofrsmo 643 and the Federal Clean Air Act the applicant is authorized to operate
More informationCertified Mail 6/23/2014. Nathan Wheldon Humphreys Compressor Station 1515 Arapahoe St Tower 1, Suite 1600 Denver, CO 80202
John R. Kasich, Governor Mary Taylor, Lt. Governor Craig W. Butler, Director 6/23/2014 Certified Mail Nathan Wheldon 1515 Arapahoe St Tower 1, Suite 1600 Denver, CO 80202 RE: FINALAIR POLLUTION PERMIT-TO-INSTALL
More information!Rl DEPARTMENT OF NATURAL RESOURCES
STATE OF MiSSOURB!Rl DEPARTMENT OF NATURAL RESOURCES MISSOURI AIR CONSERVATION COMMISSION PERMIT TO CONSTRUCT Under the authority of RSMo 643 and the Federal Clean Air Act the applicant is authorized to
More informationRESIDENTIAL AND COMMERCIAL/INSTITUTIONAL NATURAL GAS AND LIQUEFIED PETROLEUM GAS (LPG) COMBUSTION
RESIDENTIAL AND COMMERCIAL/INSTITUTIONAL NATURAL GAS AND LIQUEFIED PETROLEUM GAS (LPG) COMBUSTION DESCRIPTION This source category covers air emissions from natural gas and liquefied petroleum gas (LPG)
More informationCOLORADO REGULATION 7
COLORADO REGULATION 7 Author: Jay Christopher, Business Unit Manager, Air & Process Services, Trihydro Corporation Jane Steere, QAQC Coordinator, Air & Process Services, Trihydro Corporation ABSTRACT The
More informationEmissions from Natural Gas Production in the Barnett Shale Area and Opportunities for Cost Effective Improvements
Emissions from Natural Gas Production in the Barnett Shale Area and Opportunities for Cost Effective Improvements report by: Al Armendariz, Ph.D. Department of Environmental and Civil Engineering Southern
More informationTexas Commission on Environmental Quality Emissions Banking and Trading Programs. Office of Air Air Quality Division
Texas Commission on Environmental Quality Emissions Banking and Trading Programs Office of Air Air Quality Division Overview Introduction Voluntary Emission Reduction Credit Programs Emission Credits (EC)
More informationCONSTRUCTION PERMIT OFFICE OF AIR MANAGEMENT. Lone Star Industries, Inc. 3301 South County Road 150 West Greencastle, Indiana 46135
CONSTRUCTION PERMIT OFFICE OF AIR MANAGEMENT Lone Star Industries, Inc. 3301 South County Road 150 West 46135 (herein known as the Permittee) is hereby authorized to construct the facilities listed in
More informationCHAPTER 62-624 MUNICIPAL SEPARATE STORM SEWER SYSTEMS
CHAPTER 62-624 MUNICIPAL SEPARATE STORM SEWER SYSTEMS 62-624.100 Policy and Purpose. 62-624.200 Definitions. 62-624.300 General Provisions. 62-624.310 General Conditions, Individual Permits. 62-624.400
More informationDescription of Thermal Oxidizers
Description of Thermal Oxidizers NESTEC, Inc. is a full service equipment supplier specializing in solutions for plant emission problems. The benefit in working with NESTEC, Inc. is we bring 25+ years
More informationState of the Art (SOTA) Manual for Boilers and Process Heaters
State of the Art (SOTA) Manual for Boilers and Process Heaters Original Date: July 1997 Revision Date: February 22, 2004 State of New Jersey Department of Environmental Protection Air Quality Permitting
More informationOil and Natural Gas Sector: Standards of Performance for Crude Oil and Natural Gas Production, Transmission, and Distribution.
Oil and Natural Gas Sector: Standards of Performance for Crude Oil and Natural Gas Production, Transmission, and Distribution. Background Technical Support Document for Proposed Standards EPA-453/R-11-002
More informationPart 4: How to Avoid Being a Title V Major Source
Part 4: How to Avoid Being a Title V Major Source Many smaller sources of air pollution have a high PTE but have actual emissions well below the Title V major source thresholds. If your PTE makes you a
More informationDocument Control Program
Document Control 1.0 Purpose The purpose of this procedure is to provide a system and instructions of how the Document Control program is to be conducted at Hopewell Cogeneration Facility. In this way
More informationNEW SOURCE REVIEW PERMIT TO CONSTRUCT AND OPERATE A STATIONARY SOURCE
Page 1 of 9 STATE OF CONNECTICUT DEPARTMENT OF ENVIRONMENTAL PROTECTION NEW SOURCE REVIEW PERMIT TO CONSTRUCT AND OPERATE A STATIONARY SOURCE Issued pursuant to Title 22a of the Connecticut General Statutes
More informationGUIDELINE FOR THE INSTALLATION AND OPERATION OF CONTINUOUS EMISSION MONITORING SYSTEMS (CEMS) AND THEIR USE FOR REPORTING UNDER THE PROVISIONS OF
GUIDELINE FOR THE INSTALLATION AND OPERATION OF CONTINUOUS EMISSION MONITORING SYSTEMS (CEMS) AND THEIR USE FOR REPORTING UNDER THE PROVISIONS OF REGULATION O.Reg. 127/01 Ontario Ministry of the Environment
More informationSource: EIA Natural Gas Issues and Trends 1998
7.0 System Redesign Analysis 7.1 Emissions Natural gas is a clean burning fossil fuel. It consists of a mixture of hydrocarbon gases, primarily Methane (CH 4 ). In analyzing the combustion process, it
More informationAssessment of Air Emissions Martin Marietta Materials Facilities on Highway 34, Weld County, Colorado Project No.: 4572.003
April 1, 2015 Mr. James Sharn 10170 Church Ranch Way, Suite 201 Westminster, Colorado 80021 Subject: Assessment of Air Emissions Facilities on Highway 34, Weld County, Colorado Project No.: 4572.003 Dear
More informationColorado s Recent Efforts to Address Hydrocarbons from Oil and Gas Operations
Colorado s Recent Efforts to Address Hydrocarbons from Oil and Gas Operations Presentation to the Joint Meeting of the Southern Ute Indian Tribe/State of Colorado Environmental Commission and the Colorado
More informationDeveloping Colorado s s Oil and Gas Emissions Controls Overview of the Process and Requirements
Developing Colorado s s Oil and Gas Emissions Controls Overview of the Process and Requirements Presentation for the Interstate Oil & Gas Compact Commission s Annual Business Meeting May 19, 2015 Mike
More informationPoint Source Emission Inventory For Non-Electric Companies in Georgia
Improvements in the Point Source Emissions Inventory for Georgia Jaemeen Baek, Alper Unal, Di Tian, and Armistead Russell Georgia Institute of Technology, School of Civil and Environmental Engineering
More informationSubpart I Delaware. 40 CFR Ch. I (7 1 98 Edition) (10) Amendments to Section V (Surveillance)
52.420 Subpart I Delaware 52.420 Identification of plan. (a) Title of plan: State of Delaware Implementation Plans for Attainment and Maintenance of National Ambient Air Quality Standards. (b) The plan
More informationEmission Facts. The amount of pollution that a vehicle emits and the rate at which
Average Annual Emissions and Fuel for Gasoline-Fueled Passenger Cars and Light Trucks The amount of pollution that a vehicle emits and the rate at which it consumes fuel are dependent on many factors.
More informationBoiler Tune-up Guide
Boiler Tune-up Guide National Emission Standards for Hazardous Air Pollutants for Area Sources: Industrial, Commercial, and Institutional Boilers What is a boiler tune-up? 40 CFR Part 63 Subpart JJJJJJ
More informationFrequently Asked Questions
United States Environmental Protection Agency Air and Radiation EPA420-F-99-038 October 1999 Office of Mobile Sources Frequently Asked Questions MARPOL 73/78 Annex VI Marine Diesel Engine Requirements
More informationGUIDELINES FOR PROCESSING AND USING REFUSE DERIVED FUEL (RDF) IN CEMENT INDUSTRY
1 GUIDELINES FOR PROCESSING AND USING REFUSE DERIVED FUEL (RDF) IN CEMENT INDUSTRY August, 2012 Government of Pakistan Pakistan Environmental Protection Agency (Ministry of Climate Change) Islamabad 2
More informationInstrument Gas to Instrument Air Conversion Protocol October 2009 SPECIFIED GAS EMITTERS REGULATION OCTOBER 2009. Version 1.0.
SPECIFIED GAS EMITTERS REGULATION QUANTIFICATION PROTOCOL FOR INSTRUMENT GAS TO INSTRUMENT AIR CONVERSION IN PROCESS CONTROL SYSTEMS Version 1.0 OCTOBER 2009 Page 1 Disclaimer: The information provided
More informationBEST PRACTICES IN LEAK DETECTION AND REPAIR (LDAR) PROGRAMS. November 06, 2014 By: François Thibodeau, Eng.
BEST PRACTICES IN LEAK DETECTION AND REPAIR (LDAR) PROGRAMS November 06, 2014 By: François Thibodeau, Eng. 2 PRESENTATION OVERVIEW 1. Essential Components of a LDAR Program 2. LDAR Best Practices a. A
More informationBP Texas City Refinery
BP Texas City Refinery ENVIRONMENTAL STATEMENT FOR YEAR 2010 (Review of Y2009 Performance) Introduction Recognizing the complex nature of petroleum refining operations and to ensure that we meet our stated
More informationPennsylvania Marcellus Shale Short- Term Ambient Air Sampling Project
Pennsylvania Marcellus Shale Short- Term Ambient Air Sampling Project Marcellus Shale Conference November 16, 2011 Nick Lazor Chief, Air Quality Monitoring Division Bureau of Air Quality PA Department
More informationReproduction of Permit Terms and Conditions
Page 1 of 5 Facility ID: 0536010011 Issuance type: Final State Permit To Operate This version of facility specific terms and conditions was converted from a database format to an HTML file during an upgrade
More informationStandardized Process for the Development of Military-Unique Emissions Factors
Standardized Process for the Development of Military-Unique Emissions Factors Randall J. Cramer, PhD John Tominack Ordnance Environmental Support Office Naval Ordnance Safety & Security Activity 2011 Environmental
More informationPERMIT Under the Environmental Conservation Law (ECL) IDENTIFICATION INFORMATION
Facility DEC ID: 9292600158 PERMIT Under the Environmental Conservation Law (ECL) IDENTIFICATION INFORMATION Permit Type: Air State Facility Permit ID: 9-2926-00158/00002 Mod 0 Effective Date: 03/23/2012
More informationEPA Requirements for Diesel Standby Engines In Data Centers. Bob Stelzer / CTO / Safety Power Inc. For 7x24 Fall 2014 Conference. 1.
EPA Requirements for Diesel Standby Engines In Data Centers Bob Stelzer / CTO / Safety Power Inc For 7x24 Fall 2014 Conference 1.0 Introduction In order to get the Air Emissions Permit for facilities that
More informationA Guide to Calculating Your Boiler Emissions. A step-by-step manual for your convenience
A Guide to Calculating Your Boiler Emissions A step-by-step manual for your convenience Contents The Importance of Emissions Calculations... 3 Why You Need to Calculate Your Boiler Emissions... 4 The Newest
More informationAir Quality in San Diego 2013 Annual Report
Air Pollution Control Board Greg Cox District 1 Dianne Jacob District 2 Dave Roberts District 3 Ron Roberts District 4 Bill Horn District 5 Air Quality in San Diego 2013 Annual Report Protecting and improving
More informationREGULATORY ANALYSIS. February 11, 2014. Colorado Department of Public Health and Environment
REGULATORY ANALYSIS for Proposed Revisions to Colorado Air Quality Control Commission Regulation Numbers 3, 6 and 7 (5 CCR 1001-5, 5 CCR 1001-8, and CCR 1001-9) February 11, 2014 Colorado Department of
More informationENVIRONMENTAL PROTECTION AGENCY
ENVIRONMENTAL PROTECTION AGENCY Fees Requires application fees for state isolated wetlands permits to be credited to the Surface Water Protection Fund, which is used for the administration of surface water
More informationCharacterization of Greenhouse Gas Emissions Involved in Oil and Gas Exploration and Production Operations
Characterization of Greenhouse Gas Emissions Involved in Oil and Gas Exploration and Production Operations Review for the California Air Resources Board by Angela Zahniser What greenhouse gas (GHG) emissions
More informationElectronic Reporting to BTS
Electronic Reporting to BTS EPA s Electronic Reporting Tool (ERT) Software to Standardize Source Test Planning, Reporting and Assessment. http://www.epa.gov/ttnchie1/ert/ Enhancements made to improve and
More informationMethane Emissions and Colorado Coal Mines
Colorado PUC E-Filings System Methane Emissions and Colorado Coal Mines Will Allison, Director Air Pollution Control Division 7/6/2012 Colorado PUC, CIM, 7/9/2013 1 GHG GWP and CO2e Global Warming Potential
More informationAIR EMISSION PERMIT NO. 13100005-003 IS ISSUED TO MULTEK FLEXIBLE CIRCUITS INC
AIR EMISSION PERMIT NO. 13100005-003 IS ISSUED TO MULTEK FLEXIBLE CIRCUITS INC Multek Flexible Circuits Inc.-Sheldahl Road East and West Buildings 1150 Sheldahl Road and 805 North Highway 3 Northfield,
More informationDEPARTMENT OF ENVIRONMENTAL CONSERVATION AIR QUALITY CONTROL MINOR PERMIT
DEPARTMENT OF ENVIRONMENTAL CONSERVATION AIR QUALITY CONTROL MINOR PERMIT Permit AQ0183MSS02 Preliminary July 19, 2010 The Department of Environmental Conservation (Department), under the authority of
More informationof Upstream Oil and Gas Activities in the Rocky Mountain States
AC Comprehensive Emissions i Inventory of Upstream Oil and Gas Activities in the Rocky Mountain States t Amnon Bar-Ilan, Ron Friesen, John Grant, Alison Pollack, Ralph Morris ENVIRON International Corporation
More informationAGREEMENT FOR IMPLEMENTATION OF THE PHILADELPHIA COUNTY AIR POLLUTION CONTROL PROGRAM
AGREEMENT FOR IMPLEMENTATION OF THE PHILADELPHIA COUNTY AIR POLLUTION CONTROL PROGRAM THIS AGREEMENT is made this 1st day of July 1998, by and between the Commonwealth of Pennsylvania, Department of Environmental
More information2010 MARINE ENGINE GRANT PROGRAM
2010 MARINE ENGINE GRANT PROGRAM GUIDELINES FOR REQUEST FOR PROPOSALS GRANT APPLICATION June 11, 2010 San Luis Obispo County Air Pollution Control District 3433 Roberto Court San Luis Obispo, California
More informationSTATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS DEPARTMENT OF ENVIRONMENTAL MANAGEMENT OFFICE OF AIR RESOURCES NOTICE OF PUBLIC COMMENT PERIOD
STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS DEPARTMENT OF ENVIRONMENTAL MANAGEMENT OFFICE OF AIR RESOURCES NOTICE OF PUBLIC COMMENT PERIOD IN RE: Proposed revisions to Air Pollution Control Regulation
More informationMichigan Dry Cleaning Environmental Compliance Workbook
Michigan Dry Cleaning Environmental Compliance Workbook Michigan Department of Environmental Quality Environmental Science and Services Division Clean Air Assistance Program Jennifer M. Granholm, Governor
More informationEnvironmental Protection Agency 71.9
Environmental Protection Agency 71.9 (c) Waiver of notice requirements. The Administrator may waive the requirements of paragraph (a) of this section for any category of sources (including any class, type,
More informationSUBCHAPTER 2D - AIR POLLUTION CONTROL REQUIREMENTS SECTION 2D.0100 - DEFINITIONS AND REFERENCES
2D1-1 SUBCHAPTER 2D - AIR POLLUTION CONTROL REQUIREMENTS SECTION 2D.0100 - DEFINITIONS AND REFERENCES.0101 DEFINITIONS The definition of any word or phrase used in Regulations of this Subchapter is the
More informationEnvironmental Due Diligence: How Much Diligence Is Due?
Environmental Due Diligence: How Much Diligence Is Due? Dean C. Miller Davis Graham & Stubbs LLP Lisa A. Decker Holme Roberts & Owen LLP Due Diligence Goals Identify and quantify environmental risks that
More informationTips for a Successful Diesel Retrofit Project
Tips for a Successful Diesel Retrofit Project Tips for a Successful Diesel Retrofit Project Transportation and Climate Division Office of Transportation and Air Quality U.S. Environmental Protection Agency
More informationSTATE OF MISSOURI ~1;] DEPARTMENT OF NATURAL RESOURCES MISSOURI AIR CONSERVATION COMMISSION PERMIT TO CONSTRUCT
STATE OF MISSOURI ~1;] DEPARTMENT OF NATURAL RESOURCES MISSOURI AIR CONSERVATION COMMISSION PERMIT TO CONSTRUCT Under the authority of RSMo 643 and the Federal Clean Air Act the applicant is authorized
More informationNEW SOURCE REVIEW PERMIT TO CONSTRUCT AND OPERATE A STATIONARY SOURCE
Page 1 of 7 STATE OF CONNECTICUT DEPARTMENT OF ENVIRONMENTAL PROTECTION NEW SOURCE REVIEW PERMIT TO CONSTRUCT AND OPERATE A STATIONARY SOURCE Issued pursuant to Title 22a of the Connecticut General Statues
More information(Adopted May 6, 1977)(Amended June 2, 1978) (Amended April 4, 1980)(Amended July 9, 1982) (Amended September 8, 1995)(Amended June 13, 1997)
(Adopted May 6, 1977)(Amended June 2, 1978) (Amended April 4, 1980)(Amended July 9, 1982) (Amended September 8, 1995)(Amended June 13, 1997) RULE 701. AIR POLLUTION EMERGENCY CONTINGENCY ACTIONS (a) Applicability
More informationDRAFT AIR QUALITY MANAGEMENT IN GARFIELD COUNTY: COLORADO S MOST ACTIVE ENERGY DEVELOPMENT REGION
DRAFT AIR QUALITY MANAGEMENT IN GARFIELD COUNTY: COLORADO S MOST ACTIVE ENERGY DEVELOPMENT REGION Task 3: Assessment and Analysis of Issues Facing Garfield County Prepared for: Garfield County Public Health
More informationRegulation No. 34. Emission Banking and Trading Program
Regulation No. 34 Emission Banking and Trading Program (10/6/97) Section 1. PROGRAM OVERVIEW The purpose of this regulation is to establish a voluntary emission banking and trading program. Participation
More informationLocal Business Tax Receipts Regulations and Procedures
Local Business Tax Receipts Regulations and Procedures Sec. 41-68. - Definitions. The following words, terms and phrases, when used in this section, shall have the meanings ascribed to them in this section,
More informationPART 70 PERMIT TO OPERATE
G Missouri Department of Natural Resources ~ ~ ~ Air Pollution Control Program PART 70 PERMIT TO OPERATE Under the authority of RSMo 643 and the Federal Clean Air Act the applicant is authorized to operate
More informationBirmingham City University / Students Union Aspects and Impacts Register. Waste. Impacts description
Birmingham City University / Students Union and Impacts Register Waste Production of non - hazardous waste Production of hazardous waste Storage of non - hazardous waste Potential for waste to be disposed
More informationGENERAL PERMIT WMGM043
A. Description: The approval herein granted is for the acceptance, transfer, and processing prior to beneficial use of construction and demolition waste materials as follows: a. Processing by sorting,
More informationInland Wetlands and Watercourses Permit Water Quality Certification. Attn: Mark W. Alexander, Transportation Assistant Planning Director
79 Elm Street Hartford, CT 06106-5127 www.ct.gov/deep Affirmative Action/Equal Opportunity Employer Inland Wetlands and Watercourses Permit Water Quality Certification Permittee: Connecticut Department
More informationWolverine Clean Energy Venture
Prepared for: Wolverine Power Supply Cooperative Cadillac, Michigan Supplement to CAA Section 112(g) MACT Auxiliary Boiler Amended Application No. 317-07 Wolverine Clean Energy Venture Rogers City, MI