1 FERC Order No State Siting and Construction Requirements White Paper Published by: SPP Legal/Regulatory For the SPP Strategic Planning Committee Final December 8,

2 TABLE OF CONTENTS 1. HISTORY AND BACKGROUND DEFINITIONS ORDER NO REQUIREMENTS REGARDING NONINCUMBENT TRANSMISSION DEVELOPER PARTICIPATION IN REGIONAL TRANSMISSION PLANNING OVERVIEW OF STATE CONSTRUCTION AND SITING REQUIREMENTS STATE-BY-STATE CITING LAWS AND REQUIREMENTS... 5 A. Arkansas... 5 B. Kansas... 7 C. Louisiana... 8 D. Missouri... 9 E. Nebraska F. New Mexico G. Oklahoma H. Texas CONCLUSION

3 1. HISTORY AND BACKGROUND On July 21, 2011, the Federal Energy Regulatory Commission ( FERC ) issued Order No. 1000, Transmission Planning and Cost Allocation by Transmission Owning and Operating Public Utilities. 1 Order No requires all public utility transmission providers to (among other things) facilitate nonincumbent transmission developer participation in regional transmission planning by removing from FERC-approved tariffs and agreements any language creating a federal right of first refusal ( ROFR ) for an incumbent transmission provider to construct transmission facilities selected in a regional transmission plan for cost allocation. 2 Compliance filings to address this requirement are due October 11, During its August 30, 2011 meeting, the Strategic Planning Committee ( SPC ) directed Southwest Power Pool ( SPP ) staff to develop a series of white papers examining the various compliance requirements of Order No and proposing possible modifications to the SPP Open Access Transmission Tariff ( OATT ) and other SPP documents and processes to comply with Order No This white paper examines state laws and regulations governing the construction and siting of transmission facilities in the SPP Region. As a multi-state Regional Transmission Organization ( RTO ), SPP will need to examine state laws and regulations governing siting and authority to construct transmission facilities when determining how to address the requirement to eliminate federal ROFR from the SPP OATT and agreements. 2. DEFINITIONS Order No uses the following terminology relevant to this white paper: Incumbent transmission developer/provider: An entity that develops a transmission project within its own retail distribution service territory or footprint. Nonincumbent transmission developer: An entity that either: (1) does not have a retail distribution service territory or footprint; or (2) is a public utility transmission provider that proposes a transmission project outside of its existing retail distribution service territory or footprint, where it is not the incumbent for purposes of the project. Transmission facility selected in a regional transmission plan for purposes of cost allocation: A transmission facility that has been selected, pursuant to a Commission-approved regional transmission planning process, as a more efficient or cost-effective solution to regional transmission needs. This term does not include: (1) facilities planned by local planning process that are rolled-up into regional plans; and (2) facilities for which the sponsor does not intend to FERC 61,051 (FERC Docket No. RM ). Order No indicates that the elimination of federal ROFR from FERC-approved tariffs and agreements does not: (1) apply to transmission facilities not selected in a regional transmission plan for purposes of cost allocation; (2) apply to upgrades to existing transmission facilities, such as tower change outs or reconductoring; (3) affect existing rights-of-way; and (4) affect state or local laws or regulations regarding the construction or siting of transmission facilities. 3

4 seek cost allocation under the regional cost allocation methodology (i.e., merchant transmission facilities). Transmission planning region: The region in which a public utility transmission provider, in consultation with stakeholders and affected states, has agreed to participate for purposes of regional transmission planning and development of a single regional transmission plan. For RTO members, the transmission planning region is the RTO region. 3. ORDER NO REQUIREMENTS REGARDING NONINCUMBENT TRANSMISSION DEVELOPER PARTICIPATION IN REGIONAL TRANSMISSION PLANNING Order No requires public utility transmission providers to remove from their OATTs and other FERC-jurisdictional tariffs and agreements any provisions that grant a federal ROFR to incumbent transmission owners to construct transmission facilities that are selected in a regional transmission plan for purposes of cost allocation. 3 The focus of this requirement is transmission facilities that are evaluated at the regional level and selected in the regional plan for purposes of cost allocation, as opposed to facilities that are planned exclusively in the public utility transmission provider s local planning process and simply rolled-up and listed in the regional transmission plan for informational purposes and analysis. This requirement does not apply to the right of an incumbent utility to build, own, and recover costs for upgrades to its existing transmission facilities, and does not alter an incumbent transmission provider s use and control of existing rights of way, even if such upgrades or facilities on existing rights-of-way are selected in the regional transmission plan for purposes of cost allocation. In Order No. 1000, FERC expressly indicated that its requirement to eliminate federal ROFR from all FERC-approved tariffs and agreements was not intended to limit, preempt, or otherwise affect state or local laws or regulations with respect to construction of transmission facilities, including but not limited to authority over siting or permitting of transmission facilities. Moreover, Order No does not require public utility transmission providers to remove from FERC-approved tariffs and agreements references to state or local laws or regulations that address ROFR. 4. OVERVIEW OF STATE CONSTRUCTION AND SITING REQUIREMENTS As discussed above, FERC s mandate to eliminate federal rights of first refusal for incumbent transmission owners to construct facilities selected in the regional transmission plan for cost 3 Order No at P 313. Order No continues to permit incumbent transmission providers to meet their reliability needs or service obligations by choosing to build new transmission facilities that are located solely within their retail distribution service territory or footprint and that are not included in the regional transmission plan for cost allocation. Id at P

5 allocation was not intended to affect state or local laws governing the construction, siting, or permitting of transmission facilities. In developing its compliance filing to remove ROFR for such facilities, it is useful for SPP to examine the relevant state laws and regulations governing the construction of transmission facilities in the SPP Region. Specifically, state statutes and regulations addressing the siting and/or permitting of new transmission facilities and state laws governing the types of entities that are permitted to construct transmission facilities are particularly relevant to the Order No requirement to eliminate federal ROFR. With respect to siting of transmission facilities, state laws in Arkansas, Kansas, Missouri, Nebraska, New Mexico, and Texas contain some requirements for public utilities to seek state commission approval for the siting of transmission facilities. In these states, the laws vary from requiring siting approval for each individual transmission facility to requiring that an entity obtain certification to construct in a service territory or area. Louisiana and Oklahoma do not require entities to obtain siting approval before constructing transmission facilities. Several states also place limits on the types of entities that are eligible to construct transmission facilities or require entities to obtain a certificate prior to engaging in transmission construction and ownership activities in the state. Such states include Arkansas, Kansas, Missouri, Nebraska, and Texas. Section 5 of this White Paper examines the specific state-by-state construction and siting requirements, with citation to relevant statutes and regulations. 5. STATE-BY-STATE CITING LAWS AND REQUIREMENTS A. Arkansas The Arkansas Code, as interpreted by the Arkansas Public Service Commission ( APSC ), authorizes only entities that are currently public utilities certificated by the APSC to construct and own transmission facilities in the state. 4 The Arkansas Code states that [n]ew construction or operation of equipment or facilities for supplying a public service or the extension of a public service shall not be undertaken without first obtaining from the Arkansas Public Service Commission a certificate that public convenience and necessity require or will require the construction or operation. 5 The APSC has interpreted the Arkansas Code to limit its ability to grant such certificates to public utilities, 6 and that the definition of public utility requires owning or operating in this state equipment or facilities for... transmitting... power to or for the public for compensation. 7 The APSC acknowledged the circularity involved in requiring an entity to own or operate transmission facilities prior to being able to become In re Application of Plains and Eastern Clean Line LLC for a Certificate of Public Convenience and Necessity to Construct, Own and Operate as an Electric Transmission Public Utility in the State of Arkansas, Docket No U, Order No. 9 (APSC Jan. 11, 2011) ( Clean Line Order ). Ark. Code Ann (a). Clean Line Order at 9. Id. at (citing Ark. Code Ann (9)(A)). 5

6 certificated to construct transmission facilities, but declined a nonincumbent transmission developer s request for certification based on this interpretation of its statutory authority. 8 For transmission siting authorizations, Arkansas Law distinguishes between major utility facilities (transmission lines and associated facilities with a design voltage of at least 100-kV if the transmission line is more than 10 miles in length, or transmission lines and associated facilities with a design voltage of at least 170-kV for lines more than one mile in length), 9 and other, non-major transmission facilities. Major transmission facilities undergo more rigorous review than non-major projects; however, modifications to existing facilities to replace, upgrade, or modernize existing lines and associated equipment do not require additional authorizations if they do not exceed existing rights-of-way. 10 Applicants are required to submit information showing: (1) that the proposed construction is or will be required by the public convenience and necessity; (2) the proposed location or route; (3) maps specifying the route to be followed in constructing the new transmission line, the location of nearby airports, and applicable allocation boundaries; (4) cost estimates and related data; and (5) the proposed method of financing. 11 Applicants seeking to construct major utility facilities are also required to submit information regarding: (1) a general description of the location and type of transmission line and associated facilities; (2) a general description of any reasonable alternative locations or routes considered; (3) the need and reasons for construction of the transmission line and associated facilities; (4) the estimated construction cost; (5) the method of financing and reasonable alternative methods of financing, including the comparative merits and demerits of each alternative financing method; (6) the projected economic and financial impact on the applicant and the local community; (7) the estimated effects on energy costs to the consumer; (8) an environmental impact statement setting forth the environmental impact, any adverse environmental effects that cannot be avoided, a statement of the reasons why the proposed location and production processes were chosen over the identified alternatives, and any irreversible and irretrievable commitments of resources that would be involved in the proposed construction; (9) if the facilities are to be located within a national interest electric transmission corridor, the expected interstate benefits to be achieved by the proposed transmission line and associated facilities; and (10) such other information of an economic or environmental nature that the applicant may consider relevant. 12 Applicants seeking to construct transmission lines and related facilities in a national interest electric transmission corridor are also required to submit a discussion of the interstate benefits to be achieved by the proposed construction Id. at 11. Ark. Code Ann (6)(B). Id (a)(2), (a). Arkansas Public Service Commission Rules of Practice and Procedure 7.04 (Certificates of Public Convenience and Necessity Electric Utilities). Ark. Code Ann Id (9). 6

7 In approving an application for siting and construction of a major utility facility, the APSC is required to make findings and issue an order determining: (1) the basis of the need for the transmission project; (2) that the transmission line will serve the public interest, convenience, and necessity; (3) the nature of probable environmental impacts; (4) that construction and the location of the proposed transmission line represents an acceptable adverse environmental impact; (5) the nature and extent of probable economic impact of the construction and siting of the proposed transmission line and associated facilities; (6) that the financing method represents an acceptable economic impact; (7) that construction of the proposed project is not inconsistent with the filed and known plans of other electric utilities serving the state; (8) that the energy efficiency of the facility has been given significant weight in the decision-making process; and (9) that the proposed location or route conforms as closely as practicable to applicable state, regional, and local laws. 14 For projects proposed in national interest electric transmission corridors, the APSC is also required include in its order an assessment: (1) of the interstate benefits expected to be achieved by the proposed construction or modification of the major electric transmission facility; and (2) that any conditions attached to a certificate for construction or modification of transmission facilities to be located within a national interest electric transmission corridor do not interfere with the reduction of electric transmission congestion in interstate commerce and do not render the project economically infeasible. 15 The APSC is required hold a public hearing on an application no sooner than 40 days and no later than 180 days after the filing of the application; and is required to issue an order on the application as expeditiously as practicable. 16 B. Kansas Pubilc utilities seeking to construct transmission facilities in Kansas are required to obtain a certificate from the Kansas Corporation Commission ( KCC ) prior to transacting business in Kansas. Under the Kansas Statutes, [n]o common carrier or public utility... shall transact business in the state of Kansas until it shall have obtained a certificate from the [OCC] that public convenience will be promoted by the transaction of said business Public utilities are defined as (among other things) all companies for the production, transmission, delivery or furnishing of heat, light, water or power, 18 and the Kansas Statutes addressing the siting of transmission facilities define the term electric utility to include every public utility, as defined by K.S.A , which owns, controls, operates or manages any equipment, plant or generating machinery for the production, transmission, delivery or furnishing, of electricity or Id (b). Id (b)(11) (12). Id (a)(1). KSA Id

8 electric power. 19 The KCC has relied on these statutory provisions in granting certificates to nonincumbent transmission developers seeking authorization to operate in the state. 20 Electric utilities seeking authority for construction of transmission facilities in Kansas are required 21 to submit an application to the KCC prior to beginning site preparation or construction, detailing: (1) the proposed location; (2) the names and addresses of the landowners of record whose land is proposed to be acquired in connection with the construction of or is located within 660 feet of the center line of the easement where the line is proposed to be located; and (3) such other information as may be required by the KCC. 22 The KCC is required to conduct a public hearing in one of the counties through which the proposed transmission line is expected to traverse within 90 days after receiving an application, to determine the necessity for and reasonableness of the location of the proposed electric transmission line. 23 The KCC must issue a final order on the application within 120 days of the filing of the application, 24 taking into consideration the benefit to both consumers in Kansas and consumers outside the state, as well as economic development benefits in Kansas. 25 C. Louisiana Louisiana state law does not require a public utility 26 to obtain siting approval from the Louisiana Public Service Commission ( LPSC ) prior to constructing a transmission facility in Id. 66-1,177(a). See, e.g., In the Matter of the Application of ITC Great Plains, LLC for a Limited Certificate of Public Convenience to Transact the Business of an Electric Public Utility in the State of Kansas, Order Approving Stipulation and Agreement and Addressing Application of Statutes, KCC Docket No. 07-ITCE-380-COC, at para. 35 (June 5, 2007). The KCC has subsequently indicated that will continue to certify companies seeking to build transmission lines citing its authority under KSA and other statutory provisions. See, e.g., In the Matter of the Application of ITC Great Plains, LLC to Amend Its Certificate of Public Convenience and Authority to Transact the Business of an Electric Public Utility in the State of Kansas (Ford, Kiowa, Clark and Comanche Counties), Order Granting Joint Motion to Approve Stipulation and Agreement and Denying CURB s Objection, Kansas Corporation Commission Docket Nos. 08-ITCE-936- COC, et al., at para. 74 (Oct. 5, 2009) The Kansas Siting Act does not apply to: (1) portions of any electric transmission line to be constructed on an easement where there currently exists one or more electric transmission lines if the easement is not within the corporate limits of any city; (2) portions of any electric transmission line to be constructed on property adjacent to a right-of-way along a four-lane controlled access highway; or (3) any electric utility that complies with the provisions of the National Environmental Policy Act of 1969 regarding the siting of electric transmission lines. KSA 66-1,182. Id. 66-1,178(a). Id. 66-1,178(b). Id. 66-1,178(d). Id. 66-1,180. The KCC may issue or withhold the permit or condition the permit to protect the rights of all parties and the general public. Id. The term electric public utility refers to any person furnishing electric service within Louisiana, the parish of Orleans excepted, including any electric cooperative transacting business in this state. La. Rev. Stat. Ann. 45:121. 8

9 the state, and, while state courts have determined that the LPSC has broad plenary authority over electric utilities, 27 the LPSC has not issued regulations requiring utilities to seek approval for transmission siting. 28 However, construction of electric public utility facilities is limited by the statutory three hundred foot rule, which indicates that electric public utilities cannot construct or extend facilities, or furnish or offer to furnish electric service, to any point of connection that is being served by another electric public utility or within three hundred feet of an existing electric line of another electric public utility. 29 Additionally, public utilities are prohibited from constructing new facilities or extending existing facilities in cities unless and until the governing authority of the city certifies that public convenience and necessity require the same. 30 Although this requirement remains on the books, in practice the utility has a franchise and no certification takes place. It is rare for a city to certify a new facility. Utilities are required to obtain property or rights-of-way either from landowners through voluntary agreement or eminent domain, which could further involve state and local government agencies in the process. D. Missouri The Missouri Public Service Commission ( MoPSC ) is empowered with issuing certificates of convenience and necessity for the construction of electric plants, including electric transmission facilities ( line certificate authority ), 31 and for electric utility franchise areas ( area certificate authority ). 32 Line certificates may be granted without a local franchise being granted, and area certificates entitle the electric utility to construct transmission lines within the See, e.g., La. Power & Light Co. v. La. Pub. Serv. Comm n, 609 So. 2d 797, 800 (La. 1992) (citing La. Const. art. IV, 21(B)). Although there is no current requirement for approval, Docket No. R-26018, In Re: Determination As To Whether the Commission Should Issue A General Order Asserting Jurisdiction Over the Certification Of Utility Transmission Projects And The Determination Of Whether These Projects Are In the Public Interest, has been pending before the LPSC since January La. Rev. Stat. Ann. 45:123. Under the statute, electric line means both transmission and distribution lines. Id. 45:123(B). Given that the three hundred foot rule applies to electric service furnished to points of connection, it generally does not preclude the building of transmission lines located within three hundred feet of other existing transmission lines. Id. 33:4406. City approval for extensions of existing facilities are only required where the extension will cost over two per cent of the rate-making value of the property at the time the extension or addition is made. Id. Id (1) ( No gas corporation, electrical corporation, water corporation or sewer corporation shall begin construction of a gas plant, electric plant, water system or sewer system without first having obtained the permission and approval of the commission. ). The term electric plant includes facilities operated or used for the transmission of electricity. Id (14). An electric corporation is defined as every corporation, company.. owning, operating, controlling or managing any electric plant. Id (15). Id (2). 9

10 certificated franchise area without having to obtain separate line certificates or additional approval from the MoPSC. Upon application for a certificate of convenience and necessity, the MoPSC is authorized to grant approval if, after due hearing, it determines that the construction or exercise of the right, privilege, or franchise sought is necessary or convenient for the public service. 33 MoPSC may also impose conditions upon the certificate as it may deem reasonable and necessary. 34 The Missouri Revised Statutes do not specify any criteria for the MoPSC to consider or define what is necessary or convenient, 35 nor do they impose any deadline for MoPSC action on an application. The MoPSC s procedural rules outline certain criteria an applicant must include in its application for an area or line certificate. For area certificates, the applicant must include: (1) a statement regarding other similar utility service provided in the area; (2) information regarding the identity of landowners and residents in the proposed franchise area; (3) a legal description of the area to be certificated; (4) a plat of the proposed area; (5) a feasibility study containing plans and specifications for the utility system and estimated cost of the construction of the utility system during the first three years of construction; (6) plans for financing; and (7) proposed rates and charges and an estimate of the number of customers, revenues, and expenses during the first three years of operations. 36 For line certificates, the MoPSC requires: (1) a description of the route of construction and a list of all electric and telephone lines, railroad tracks, and underground facilities that the proposed construction will cross; (2) construction cost information and specifications; and (3) plans for financing. 37 Applications for both area and line certificates also must present facts demonstrating that the granting of the application is required by the public convenience and necessity. 38 Missouri statutory provisions do not preclude nonincumbent transmission developers from constructing new transmission facilities but require them to obtain authorization from the MoPSC before constructing such facilities. 39 The MoPSC has granted certificates of Id (3). Id. Missouri courts, however, have determined that a finding that a facility or franchise is necessary and convenient requires at least a determination that the facility or franchise is adequate, which includes assessing the relative experience of competing suppliers of the service. State ex rel. Ozark Elec. Coop. v. Pub. Serv. Comm n of the State of Mo., 527 S.W.2d 390, 394 (Mo. Ct. App. 1975). Mo. Code Regs. Ann. tit (1)(A). Id (1)(B). Id (1)(E). Section RSMo, as interpreted by case law, See State ex rel. Harline v. Public Service Commission of Missouri, 343 S.W.2d 177, (Mo. App. K.C.D. 1960); Public Service Commission v. Kansas City Power & Light Company, 31 S.W.2d 67, 71 (Mo. Banc 1930); State ex rel. Utility Consumers Council of Missouri v. Public Service Commission, 562 S.W.2d 688, 690 (Mo. App. St.L.D.1978), cert. denied, 439 U.S. 866, 99 S.Ct. 192, 58 L.Ed.2d 177 (1978). 10

11 convenience and necessity to nonincumbent public utilities for transmission lines in two uncontested dockets considering the applications of IES Utilities, Inc and Westar Generating, Inc. 40 Although the issue was not raised in either docket, the Missouri Supreme Court has held that an electrical corporation is not subject to regulation by the MoPSC unless it is offering electricity for public use. 41 The issue of the MoPSC to grant certificates of convenience and necessity is a question that has not been addressed in a contested case. In the two uncontested dockets approving the applications for a certificate of convenience and necessity of IES Utilities, Inc. and Westar Generating, Inc., the MoPSC Staff asserted that an interconnection in Missouri with a Missouri regulated utility is enough to satisfy public use and result in MoPSC jurisdiction over the proposed line. E. Nebraska Nebraska electric service is provided exclusively by public power entities, which must have defined service territories 42 and be approved by the Nebraska Power Review Board ( NPRB ). 43 Although it is not specifically prohibited for private entities to build transmission facilities in the state, the NPRB s approval statutes are designed for applications filed by public power entities, and there is no separate process or criteria for applications filed by private entities. The NPRB has jurisdiction over certain aspects of transmission facility siting, while the Nebraska Public Service Commission ( NPSC ) has jurisdiction over compliance with safety code issues. A utility seeking to construct new transmission facilities in Nebraska is expected to first reach agreement with other affected transmission owners regarding what facilities are needed. 44 If an agreement cannot be reached, the matter will be set for hearing before the NPRB. The builder must then seek approval from the NPRB by applying for a certificate of convenience and necessity. 45 The NPRB Rules of Practice and Procedure outline the application requirements including: (1) a map showing all transmission and distribution lines within one mile of the proposed facility; (2) a statement of how the applicant will provide service at its low [sic] overall cost as possible consistent with sound business practices; and (3) construction cost In the Matter of the Application of IES Utilities, Inc. for a Certificate of Public Convenience and Necessity Authorizing it to Construct, Install, Own, Operate, Control, Manage, and Maintain Electric Transmission Facilities in Clark County, Missouri and Request for Waiver, Missouri Public Service Commission Case No. EA , April 18, 2002; and In the Matter of the Application of Westar Generating, Inc. for a certificate of Public Convenience and Necessity Authorizing it to Construct, Install, Own, Operate, Control, Manage, and Maintain Electric Transmission Facilities in Jasper County, Missouri Pursuant to the terms of A July 26, 1999, Agreement for the Construction, Ownership and Operation of a State Line Combined Cycle Generating Facility, Missouri Public Service Commission Case No. EA (consolidated with EA ), June 13, State ex rel. Danciger v. PSC of Missouri, 205 S.W. 36 (Mo. 1918). Neb. Rev. Stat. Ann (1). Id Id Id Utilities are not required to apply for certificates to extend facilities within the supplier s own service area or within one-half mile outside its service area if all of the other owners of transmission facilities within one-half mile consent to the extension in writing. Id. 11

12 information, whether the cost will be paid in part by any customer, and if so, the amount of the customer s contribution. 46 The NPRB must schedule a hearing within 60 days (or within not more than 120 days if the applicant requests an extension and demonstrates good cause), and must render its decision within 60 days of the hearing. 47 To issue a certificate, the NPRB must determine that the facilities will serve the public convenience and necessity and that the applicant can most economically and feasibly supply the electric service without unnecessary duplication of facilities or operations. 48 NPSC approval is required for all transmission lines located outside of incorporated cities where the line crosses a highway or railroad track or is to be located within a certain distance (depending on the voltage of the proposed line) of existing electrical, communication, or railroad signal lines or airports. 49 In such instances, the applicant is required to provide maps and engineering specifications regarding the proposed facility. 50 F. New Mexico The New Mexico Public Utility Act 51 excludes entities that engage solely in interstate commerce from the definition of public utility and utility. 52 The New Mexico Public Regulation Commission ( PRC ) only has jurisdiction over public utilities. 53 In addition, the New Mexico Public Utility Act provides that [t]he business of any public utility other than of the character defined in Subsection G of Section NMSA 1978 [which defines the retail activities of public utilities] is not subject to provisions of the Public Utility Act. 54 However, the New Mexico Public Utility Act grants the PRC location control authority over 300 MW or more of generation and 230 kv or more of transmission lines in connection with such generation, whether or not owned or operated by a public utility subject to regulation by the Neb. Admin. Code Neb. Rev. Stat Id The NPRB is responsible for approving the siting of transmission facilities but has no jurisdiction over rates. Id Id Neb. Admin. Code N.M. Stat. Ann , et seq. Id G ( [P]ublic utility and utility means every person not engaged solely in interstate business... may own, operate, lease or control: (1) any plant, property or facility for the generation, transmission or distribution, sale or furnishing to or for the public of electricity for light, heat or power or other uses. ). Id A. Id

13 PRC. 55 Thus, there is a process requiring PRC approval for a nonincumbent transmission developer seeking to build an interstate transmission facility of 230 kv or more. 56 Unless the Commission finds that the location will unduly impair important environmental values, the Commission is required to approve an application for transmission line location. 57 The Public Utility Act lists the criteria the commission may consider in reaching this determination. 58 The PRC may approve an application filed without a formal hearing if no protest is filed within sixty days of the date of notice of the application and is required to issue an order within six month from the date the application is filed with the Commission. 59 Additionally, unless otherwise agreed to by the parties, the Public Utility Act prohibits any person from beginning the construction of any transmission line requiring a width for right of way of greater than one hundred feet without first obtaining from the Commission a determination of the necessary right of way width to construct and maintain the transmission line. 60 In this case, transmission is not limited to any threshold voltage. Thus there is a process requiring PRC approval for a nonincumbent transmission developer seeking to build an interstate transmission facility requiring right of way of greater than one hundred feet if width is not agreed to. An application, notice to property owners and hearing are required and the Commission is required to act upon an application within sixty days from the date the application is filed with the Commission or the application is deemed approved Id B ( No person, including any municipality, shall begin the construction of any plant designed for or capable of operation at a capacity of three hundred thousand kilowatts or more for the generation of electricity for sale to the public within or without this state, whether or not owned or operated by a person that is a public utility subject to regulation by the commission, or of transmission lines in connection with such plant, on a location within this state unless the location has been approved by the commission. For purposes of this section, transmission line means any electric transmission line and associated facilities designed for or capable of operations at a nominal voltage of two hundred thirty kilovolts or more, to be constructed in connection with and to transmit electricity from a new plant for which approval is required. ) 56 Id. 57 Id (F). 58 Id (M). 59 Id (K) Id (A). Id (D), (E) and (F). 13

14 With regard to public utilities regulated by the PRC, a certificate from the PUC is required prior to construction of any public utility plant or system outside that utility s service territory. 62 The PRC is required to act on an application for a certificate of public convenience and necessity and a location permit within nine months of submission of the application, but may grant itself a six-month extension for good cause shown. 63 Utilities are required to comply with all local permitting requirements; however, if the local authority does not act within 240 days or does not approve the permit application, the applicant may file for approval with the PRC. 64 The PRC cannot approve a permit for a project that violates existing state, county, or municipal land use statutes or administrative regulations unless the PRC finds that the regulation is unreasonably restrictive and compliance with the regulation is not in the interest of the public convenience and necessity. 65 G. Oklahoma The Oklahoma Corporation Commission ( OCC ) is a body of limited jurisdiction, with regulatory powers and responsibilities regarding public utilities. 66 Oklahoma Statutes do not require nonincumbent transmission developers to obtain certification or approval prior to developing and building transmission facilities in Oklahoma. The Oklahoma Statutes also do not require that a nonincumbent entity first obtain authorization from the OCC to operate as a public utility. 67 In 2008, in reviewing a request by a nonincumbent transmission developer for authority to operate as a transmission-only electric utility, the OCC adopted Administrative Law Judge ( ALJ ) findings that the nonincumbent transmission developer was not required to obtain OCC approval to start constructing, owning, operating, and maintaining transmission facilities in Oklahoma. 68 The nonincumbent transmission developer did not have an obligation to demonstrate that there will be a significant public benefit prior to its application being granted. 69 However, the OCC s decision in that case does not have precedential effect, 70 and Id Id (C) and (K). Id (H). Id (G). Okla. Const. Art. 9, 18 and 34, and Okla. Stat. Tit Public utilities include entities that now or hereafter may own, operate, or manage any plant of equipment, or any part thereof, directly or indirectly, for public use, or may supply any commodity to be furnished to the public... (c) For the production, transmission, delivery or furnishing electric current for light, heat or power. Okla. Stat. Tit (c). However, retail electric suppliers are allocated and restricted to specific territories and consumers in furnishing electric service, pursuant to the Retail Electric Supplier Certified Territory Act. Okla. Stat. Tit et seq. In addition, public utilities selling power in the retail market, must have approved tariffs. Okla. Stat. Tit. 17, 152 and Okla. Admin. Code 165: See In the Matter of the Application of ITC Great Plains, LLC to Conduct Business as an Electric Public Utility in the State of Oklahoma, Cause No. PUD , Final Order, Report and Recommendation of the Administrative Law Judge, at 9 (Okla. Corp. Comm n Sept. 11, 2008) ( ITC Great Plains Oklahoma Order ) Id. 14

15 the sitting Commission members as of late October 2001 are/were deliberating a subsequent case brought by a non-incumbant transmission developer. 71 Additionally, the OCC does not oversee the siting of transmission facilities in the state. Under Oklahoma law, companies authorized to furnish electricity service in the state have the same right of eminent domain as applies to railroads operating in the state. 72 A party seeking to exercise eminent domain must petition the district court for the district in which the property is located, 73 and must include in its petition a statement indicating: (i) that it is authorized to exercise the power of eminent domain and it has been unable to make a voluntary purchase of the property or right-of-way in question; (ii) the owner of the property and the specific property in question; and (iii) that the specific property sought to be taken is necessary for a purpose for which the power of eminent domain may be exercised, (i.e., a public purpose and for public use). 74 Additionally, the OCC also has adopted ALJ findings that no determination by the [OCC] that additional transmission capacity is needed in Oklahoma is required, prior to any company building transmission lines in Oklahoma. 75 In 2010, the Oklahoma Legislature by statute declared the Legislature and OCC shall work with SPP to develop plans to expand transmission capacity in Oklahoma and to monitor construction of new transmission facilities in Oklahoma, indicating the State has not ceded any of its authority in this area to SPP and will participate in the process. 76 H. Texas Texas does not limit construction of transmission facilities to existing electric utilities; however, the Public Utility Regulatory Act ( PURA ) requires that an electric utility or other person may not directly or indirectly provide service... unless the utility or other person first obtains from the [Public Utilities Commission of Texas] a certificate. 77 The Public Utilities (... continued) Okla. Stat. Tit. 75, 302(C). In the Matter of the Application of Plains and Eastern Clean Line, LLC, to Conduct Business as an Electric Utility in the State of Oklahoma, Cause No. PUD Okla. Stat., tit. 27, 7. Id. at tit. 66, 53. See, e.g., McCrady v. W. Farmers Elec. Coop., 323 P.2d 356, 359 (Okla. 1958). Necessity has been determined by the Oklahoma Supreme Court to be reasonable necessity as opposed to absolute necessity. See Pub. Serv. Co. of Okla. v. Willis, 941 P.2d 995, 1000 (Okla. 1997). See ITC Great Plains Oklahoma Order, Report and Recommendation of the Administrative Law Judge, at 11. Okla. Stat., titl Tex. Util. Code Ann (a). 15

16 Commission of Texas ( PUCT ) will issue a certificate only if the commission finds that the certificate is necessary for the service, accommodation, convenience, or safety of the public. 78 Utilities are not required to obtain a certificate for: (1) extensions into contiguous territories that do not receive similar service from another electric utility and are not in another electric utility s certificated area; (2) extension in or to territory that the utility serves or is authorized to serve; or (3) operation, extension, or service in progress on September 1, Moreover, an entity does not need to be an electric utility with a defined service area, or even already a utility, to be eligible for a certificate of convenience and necessity to construct or acquire transmission facilities. 80 In reviewing a certificate application, the PUCT considers: (1) the adequacy of existing service; (2) the need for additional service; (3) the effect of granting the certificate on the recipient and any electric utility service in the proximate area; (4) impacts to community values, recreation and park areas, historic and aesthetic values, and environmental integrity; (5) the probable improvement of service or lowering of costs to consumers; and (6) the effect of granting the certificate on the ability of the state to meet renewable energy goals. 81 Under its Substantive Rules, the PUCT also considers the needs of the interconnected transmission system to support a reliable and adequate network and to facilitate robust wholesale competition, and gives great weight to recommendations from essential organizations (i.e., independent system operators) or written documentation that the proposed facility is needed to connect a new transmission service customer. 82 PUCT transmission line routing decisions are based on whether the proposed route: (1) utilizes existing compatible rights-of-way, including vacant positions on existing multiple-circuit transmission lines; (2) parallels existing compatible rights-of-way; (3) parallels property lines or other natural or cultural features; and (4) conforms with the policy of prudent avoidance, which seeks to limit exposure to electric and magnetic fields. 83 The PUCT is required to render its certificate decision within one year of the application; 84 however, the PUCT has reserved the right to extend the one-year period for good cause. 85 Projects that have been formally designated by an essential organization as critical for Id (a); see also 16 Tex. Admin. Code (b). Tex. Util. Code Ann (a). Extensions of service are only allowed to interconnect to existing facilities or solely to transmit electric utility services from an existing facility to a customer of retail electric utility service. Id (b). Pub. Utils. of Tex. v. City of Harlingen, 311 S.W.3d 610, 617 (Tex. App. Austin 2010) ( [T]he Commission has been given the power to approve a [certificate of convenience and necessity] for a utility that provides only transmission services, provided that such services meet the applicable standards. ). Tex. Util. Code Ann (c). PUCT Subst. R (b)(3)(A). 83 Id (b)(3)(B). otherwise. Id. These considerations are tempered where grid reliability or security dictate Tex. Util. Code Ann PUCT Subst. R (b). 16

17 the reliability of the transmission system must be considered on an expedited basis, with the PUCT issuing a decision within 180 days of receiving a completed application. 86 Expedited proceedings are also afforded to transmission lines serving competitive renewable energy zones designated by the PUCT 87 and to uncontested applications CONCLUSION As part of its filing to comply with the nonincumbent developer participation requirements of Order No. 1000, specifically, the elimination of federal ROFR for incumbent transmission owners to construct transmission facilities selected in the regional transmission plan for cost allocation, SPP must be mindful of the requirements and limitations on construction of transmission facilities imposed by state statutes and regulations in the SPP Region. Because FERC expressly indicated that its Order No mandate was not intended to affect state or local laws with governing construction, siting, and permitting of transmission facilities, and many states in the SPP Region impose some limitations on construction and siting, SPP should consider consulting with its Regional State Committee in determining the most appropriate approach to complying with the Order No nonincumbent transmission developer participation requirement Id (b)(3)(D). Tex. Util. Code Ann (e). PUCT Subst. R (b)(3)(C). The PUCT must act on an uncontested application that is complete and meets all filing criteria within 80 days of filing. 17

18 California Independent System Operator Corporation Fifth Replacement FERC Electric Tariff the time, and is not intended to affect any rights provided under Existing Contracts or TORs. The CAISO s forecast of Total Transfer Capability for each Balancing Authority Area Transmission Interface will depend on prevailing conditions for the relevant Trading Day, including, but not limited to, the effects of parallel path (unscheduled) flows and/or other limiting operational conditions. This information will be posted on OASIS in accordance with this CAISO Tariff. The four categories are as follows: (a) (b) transmission capacity that must be reserved for firm Existing Rights; transmission capacity that may be allocated for use as CAISO transmission service (i.e., "new firm uses"); (c) transmission capacity that may be allocated by the CAISO for conditional firm Existing Rights; and (d) transmission capacity that may remain for any other uses, such as non-firm Existing Rights for which the Responsible PTO has no discretion over whether or not to provide such non-firm service. 24. Comprehensive Transmission Planning Process 24.1 Overview The CAISO will develop a comprehensive Transmission Plan and approve transmission upgrades or additions using the Transmission Planning Process set forth in this Section 24. The CAISO will analyze the need for transmission upgrades and additions in accordance with the methodologies and criteria set forth in this Section 24, the Transmission Control Agreement, and the applicable Business Practice Manuals. The comprehensive Transmission Plan will identify transmission upgrade or addition projects associated with Approved Project Sponsors that are Merchant Transmission Facilities or are needed: (1) to maintain System Reliability; (2) to satisfy the requirements of a Location Constrained Resource Interconnection Facility; (3) to maintain the simultaneous feasibility of allocated Long-Term CRRs; and (4) as LGIP Network Upgrades identified pursuant to Section The comprehensive Transmission Plan will identify transmission addition and upgrade elements with no approved Project Sponsors needed to (1) meet state and federal policy requirements and directives that are not inconsistent with the Federal Power Act, including renewable portfolio standards policies; and (2) reduce congestion costs, production supply costs, transmission losses, or other electric supply costs resulting from improved access to cost- October 21, 2011

19 California Independent System Operator Corporation Fifth Replacement FERC Electric Tariff effective resources. For purposes of this Section 24, the term the year X/(X+1) planning cycle will refer to the Transmission Planning Process initiated during year X to complete a comprehensive Transmission Plan in year X [NOT USED] [NOT USED] [NOT USED] [NOT USED] 24.2 Nature of the Transmission Planning Process The CAISO will develop the annual comprehensive Transmission Plan and approve transmission upgrades or additions using a shall perform the CAISO s Transmission Planning Process with three (3) phases. In Phase 1, the CAISO will develop and complete the Unified Planning Assumptions and Study Plan and, in parallel, begin development of a conceptual statewide plan. In Phase 2, the CAISO will complete the comprehensive Transmission Plan. In Phase 3, the CAISO will evaluate proposals to construct and own specific transmission upgrade or addition elements specified in the comprehensive Transmission Plan on an annual cycle in accordance with the terms of this CAISO Tariff, the Transmission Control Agreement, and the Business Practice Manual. The Transmission Planning Process shall, at a minimum: (a) Coordinate and consolidate in a single plan the transmission needs of the CAISO Balancing Authority Area for into a single plan, which will be assessed on the basis of maintaining the reliability of the CAISO Controlled Grid in accordance with Applicable Reliability Criteria and CAISO Planning Standards, in a manner that promotes the economic efficiency of the CAISO Controlled Grid and considers federal and state environmental and other policies affecting the provision of Energy. (b) Reflect a planning horizon covering a minimum of ten (10) years that considers previously approved transmission upgrades and additions transmission enhancements and expansions, Demand Forecasts, Demand-side management, October 21, 2011

LEGISLATIVE RESEARCH COMMISSION PDF VERSION

LEGISLATIVE RESEARCH COMMISSION PDF VERSION CHAPTER 75 PDF p. 1 of 7 CHAPTER 75 (SB 246) AN ACT relating to construction of certain electric transmission lines. Be it enacted by the General Assembly of the Commonwealth of Kentucky: Section 1. KRS

More information

ALCOA POWER GENERATING INC. Long Sault Division. Open Access Transmission Tariff

ALCOA POWER GENERATING INC. Long Sault Division. Open Access Transmission Tariff Alcoa Power Generating Inc. Long Sault Division ALCOA POWER GENERATING INC. Long Sault Division Open Access Transmission Tariff The following sheets reflect all revisions submitted to the Federal Energy

More information

345 kv Brazos Valley Connection Project FAQs

345 kv Brazos Valley Connection Project FAQs 345 kv Brazos Valley Connection Project FAQs Overview 1. Who is CenterPoint Energy Houston Electric, LLC? CenterPoint Energy Houston Electric, LLC (CenterPoint Energy) is an electric utility that maintains

More information

S T A T E O F T E N N E S S E E OFFICE OF THE ATTORNEY GENERAL PO BOX 20207 NASHVILLE, TENNESSEE 37202. April 16, 2007. Opinion No.

S T A T E O F T E N N E S S E E OFFICE OF THE ATTORNEY GENERAL PO BOX 20207 NASHVILLE, TENNESSEE 37202. April 16, 2007. Opinion No. Cable Bill under the Contract Clause S T A T E O F T E N N E S S E E OFFICE OF THE ATTORNEY GENERAL PO BOX 20207 NASHVILLE, TENNESSEE 37202 April 16, 2007 Opinion No. 07-51 QUESTIONS House Bill 1421/Senate

More information

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Joseph T. Kelliher, Chairman; Suedeen G. Kelly, Marc Spitzer, Philip D. Moeller, and Jon Wellinghoff. Brazos Electric

More information

Pipelines & The City

Pipelines & The City Pipelines & The City Purpose of Discussion Pipeline Authority to Use or Cross City Streets Authorized Activities of City Condemnation What Entities in Texas are Authorized by Law to Operate Gas Pipelines?

More information

62-110. Certificate of convenience and necessity.

62-110. Certificate of convenience and necessity. Article 6. The Utility Franchise. 62-110. Certificate of convenience and necessity. (a) Except as provided for bus companies in Article 12 of this Chapter, no public utility shall hereafter begin the construction

More information

130 FERC 61,013 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER AUTHORIZING DISPOSITION OF TRANSMISSION FACILITIES

130 FERC 61,013 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER AUTHORIZING DISPOSITION OF TRANSMISSION FACILITIES 130 FERC 61,013 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Jon Wellinghoff, Chairman; Marc Spitzer and Philip D. Moeller. American Electric Power Service Corporation

More information

141 FERC 61,267 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

141 FERC 61,267 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION 141 FERC 61,267 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Jon Wellinghoff, Chairman; Philip D. Moeller, John R. Norris, Cheryl A. LaFleur, and Tony T. Clark. Nevada

More information

133 FERC 61,057 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER AMENDING CERTIFICATE. (Issued October 21, 2010)

133 FERC 61,057 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER AMENDING CERTIFICATE. (Issued October 21, 2010) 133 FERC 61,057 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Jon Wellinghoff, Chairman; Marc Spitzer, Philip D. Moeller, John R. Norris, and Cheryl A. LaFleur. Southern

More information

NATURAL GAS ACT. (Note: All underlined material was added to the Natural Gas Act by the Energy Policy Act of 2005)

NATURAL GAS ACT. (Note: All underlined material was added to the Natural Gas Act by the Energy Policy Act of 2005) NATURAL GAS ACT Section 2 Section 3 Section 7 Section 15 Section 19 Section 21 Section 22 Definitions Exportation or importation of natural gas; LNG terminals Construction, extension, or abandonment of

More information

Amendments to the Rules of Practice and Procedure to Allow Each Signatory Party and the

Amendments to the Rules of Practice and Procedure to Allow Each Signatory Party and the This document is scheduled to be published in the Federal Register on 02/03/2016 and available online at http://federalregister.gov/a/2016-02048, and on FDsys.gov 6301-01-P DELAWARE RIVER BASIN COMMISSION

More information

An Act Regarding Eminent Domain Authority and Certificate of Public Convenience and Necessity Requirements for the Construction of Transmission Lines

An Act Regarding Eminent Domain Authority and Certificate of Public Convenience and Necessity Requirements for the Construction of Transmission Lines PLEASE NOTE: Legislative Information cannot perform research, provide legal advice, or interpret Maine law. For legal assistance, please contact a qualified attorney. Amend the bill by striking out the

More information

128 FERC 61,269 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER APPROVING UNCONTESTED SETTLEMENT. (Issued September 21, 2009)

128 FERC 61,269 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER APPROVING UNCONTESTED SETTLEMENT. (Issued September 21, 2009) 128 FERC 61,269 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Jon Wellinghoff, Chairman; Suedeen G. Kelly, Marc Spitzer, and Philip D. Moeller. Energy Transfer Partners

More information

1. Who is CenterPoint Energy Houston Electric, LLC?

1. Who is CenterPoint Energy Houston Electric, LLC? 1. Who is CenterPoint Energy Houston Electric, LLC? CenterPoint Energy Houston Electric, LLC (CenterPoint Energy or the Company) is an electric utility that maintains the wires, towers, poles, and electric

More information

REGULATIONS FOR CELLULAR ANTENNA TOWERS AND CELLULAR TELECOMMUNICATIONS SERVICES

REGULATIONS FOR CELLULAR ANTENNA TOWERS AND CELLULAR TELECOMMUNICATIONS SERVICES REGULATIONS FOR CELLULAR ANTENNA TOWERS AND CELLULAR TELECOMMUNICATIONS SERVICES Joint City-County Planning Commission of Barren County, Kentucky 126 East Public Square City Hall Glasgow, KY 42141 A. PURPOSE:

More information

Regulation of Natural Gas Pipelines. June 23, 2008

Regulation of Natural Gas Pipelines. June 23, 2008 Regulation of Natural Gas Pipelines June 23, 2008 Federal and State Regulations Federal: 49 United States Code 60101. et. seq. Title 49 Code of Federal Regulations The Office of Pipeline Safety (OPS),

More information

132 FERC 61,083 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER DENYING REHEARING AND INSTITUTING SECTION 206 PROCEEDING

132 FERC 61,083 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER DENYING REHEARING AND INSTITUTING SECTION 206 PROCEEDING 132 FERC 61,083 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Jon Wellinghoff, Chairman; Marc Spitzer, Philip D. Moeller, John R. Norris, and Cheryl A. LaFleur. Trans

More information

Transmission Lines. Information and Options for Landowners

Transmission Lines. Information and Options for Landowners Transmission Lines Information and Options for Landowners Join attorneys Glen Webb and Judon Fambrough for expert information on the electric transmission line process, CREZ, and options for private landowners

More information

CHAPTER 15 - TELECOMMUNICATIONS ARTICLE 1 - GENERAL PROVISIONS. 37-15-101. Short title; sunset.

CHAPTER 15 - TELECOMMUNICATIONS ARTICLE 1 - GENERAL PROVISIONS. 37-15-101. Short title; sunset. CHAPTER 15 - TELECOMMUNICATIONS ARTICLE 1 - GENERAL PROVISIONS 37-15-101. Short title; sunset. (a) This chapter shall be known as the "Wyoming Telecommunications Act." (b) This chapter is repealed effective

More information

Case 2:08-cv-01740-MLCF-DEK Document 37 Filed 05/21/08 Page 1 of 6 UNITED STATES DISTRICT COURT EASTERN DISTRICT OF LOUISIANA

Case 2:08-cv-01740-MLCF-DEK Document 37 Filed 05/21/08 Page 1 of 6 UNITED STATES DISTRICT COURT EASTERN DISTRICT OF LOUISIANA Case 2:08-cv-01740-MLCF-DEK Document 37 Filed 05/21/08 Page 1 of 6 UNITED STATES DISTRICT COURT EASTERN DISTRICT OF LOUISIANA ARTHUR MONTEGUT, SR. CIVIL ACTION v. NO. 08-1740 BUNGE NORTH AMERICA, INC.,

More information

104 FERC 61,128 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

104 FERC 61,128 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION 104 FERC 61,128 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Pat Wood, III, Chairman; William L. Massey, and Nora Mead Brownell. California Independent System Operator

More information

TEXAS COURT OF APPEALS, THIRD DISTRICT, AT AUSTIN M E M O R A N D U M O P I N I O N

TEXAS COURT OF APPEALS, THIRD DISTRICT, AT AUSTIN M E M O R A N D U M O P I N I O N TEXAS COURT OF APPEALS, THIRD DISTRICT, AT AUSTIN NO. 03-11-00005-CV Entergy Texas, Inc., Appellant v. Public Utility Commission of Texas; Cities of Beaumont, Bridge City, Conroe, Groves, Huntsville, Montgomery,

More information

CHAPTER VIII. HARDSHIP RELIEF

CHAPTER VIII. HARDSHIP RELIEF CHAPTER VIII. HARDSHIP RELIEF 8.00.00. PURPOSE A. The purpose of this Chapter is to provide for the regulation of legally nonconforming structures, lots of record, uses and signs and to specify those circumstances

More information

SIGNED this 31st day of August, 2010.

SIGNED this 31st day of August, 2010. SIGNED this 31st day of August, 2010. CRAIG A. GARGOTTA UNITED STATES BANKRUPTCY JUDGE IN THE UNITED STATES BANKRUPTCY COURT FOR THE WESTERN DISTRICT OF TEXAS AUSTIN DIVISION IN RE: ' CASE NO. 09-12799-CAG

More information

51ST LEGISLATURE - STATE OF NEW MEXICO - FIRST SESSION, 2013

51ST LEGISLATURE - STATE OF NEW MEXICO - FIRST SESSION, 2013 SENATE BILL 1ST LEGISLATURE - STATE OF NEW MEXICO - FIRST SESSION, INTRODUCED BY Joseph Cervantes 1 ENDORSED BY THE COURTS, CORRECTIONS AND JUSTICE COMMITTEE AN ACT RELATING TO CIVIL ACTIONS; CLARIFYING

More information

151 FERC 61,046 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

151 FERC 61,046 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION 151 FERC 61,046 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Norman C. Bay, Chairman; Philip D. Moeller, Cheryl A. LaFleur, Tony Clark, and Colette D. Honorable.

More information

139 FERC 61,088 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER GRANTING MARKET-BASED RATE AUTHORIZATION AND REQUEST FOR WAIVERS

139 FERC 61,088 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER GRANTING MARKET-BASED RATE AUTHORIZATION AND REQUEST FOR WAIVERS 139 FERC 61,088 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Jon Wellinghoff, Chairman; Philip D. Moeller, John R. Norris, and Cheryl A. LaFleur. Silver State Solar

More information

MEMORANDUM. Managers, Administrators, Clerks, Attorneys, and Planners

MEMORANDUM. Managers, Administrators, Clerks, Attorneys, and Planners MEMORANDUM To: From: Managers, Administrators, Clerks, Attorneys, and Planners Kimberly S. Hibbard, General Counsel Date: September 15, 2013 Re: City Authority to Regulate Wireless Telecommunications HB

More information

In the Supreme Court of the United States

In the Supreme Court of the United States NOS. 14-614, 14-623 In the Supreme Court of the United States W. KEVIN HUGHES, et al., Petitioners, v. TALEN ENERGY MARKETING, LLC (F/K/A PPL ENERGYPLUS, LLC), et al., Respondents. CPV MARYLAND, LLC, v.

More information

TEXAS RICE LAND PARTNERS, LTD. V. DENBURY GREEN PIPELINE-TEXAS, LLC: TEXAS EMINENT DOMAIN LAW AND THE NOT-SO-COMMON COMMON CARRIER STATUS

TEXAS RICE LAND PARTNERS, LTD. V. DENBURY GREEN PIPELINE-TEXAS, LLC: TEXAS EMINENT DOMAIN LAW AND THE NOT-SO-COMMON COMMON CARRIER STATUS TEXAS RICE LAND PARTNERS, LTD. V. DENBURY GREEN PIPELINE-TEXAS, LLC: TEXAS EMINENT DOMAIN LAW AND THE NOT-SO-COMMON COMMON CARRIER STATUS I. INTRODUCTION... 1 II. Background... 2 A. The Progression of

More information

CITY OF BEATRICE, NEBRASKA ECONOMIC DEVELOPMENT PROGRAM (LB840)

CITY OF BEATRICE, NEBRASKA ECONOMIC DEVELOPMENT PROGRAM (LB840) CITY OF BEATRICE, NEBRASKA ECONOMIC DEVELOPMENT PROGRAM (LB840) Effective April 1, 2013 March 31, 2023 TABLE OF CONTENTS NEED AND PURPOSE 1 SECTION I. GENERAL COMMUNITY AND ECONOMIC DEVELOPMENT STRATEGY

More information

CHAPTER 234 HOUSE BILL 2131 AN ACT AMENDING SECTIONS 12-348, 41-1007 AND 42-2064, ARIZONA REVISED STATUTES; RELATING TO TAX ADJUDICATIONS.

CHAPTER 234 HOUSE BILL 2131 AN ACT AMENDING SECTIONS 12-348, 41-1007 AND 42-2064, ARIZONA REVISED STATUTES; RELATING TO TAX ADJUDICATIONS. Senate Engrossed House Bill State of Arizona House of Representatives Fifty-second Legislature First Regular Session 0 CHAPTER HOUSE BILL AN ACT AMENDING SECTIONS -, -00 AND -0, ARIZONA REVISED STATUTES;

More information

Minnesota Public Utilities Commission Staff Briefing Papers

Minnesota Public Utilities Commission Staff Briefing Papers Minnesota Public Utilities Commission Staff Briefing Papers Meeting Date: Wednesday, August 13, 2003... Agenda Item # **1 Company: Docket No. Vonage Holdings Corporation P-6214/C-03-108 In the Matter of

More information

Case 1:01-cv-00286-BLW Document 202-2 Filed 01/18/11 Page 111 of 152 EXHIBIT H TELECOMMUNICATIONS CABLE SYSTEM EASEMENT DEED

Case 1:01-cv-00286-BLW Document 202-2 Filed 01/18/11 Page 111 of 152 EXHIBIT H TELECOMMUNICATIONS CABLE SYSTEM EASEMENT DEED Case 1:01-cv-00286-BLW Document 202-2 Filed 01/18/11 Page 111 of 152 EXHIBIT H TELECOMMUNICATIONS CABLE SYSTEM EASEMENT DEED For and in consideration of Ten Dollars ($10.00) and other valuable consideration,

More information

RESPONSE OF THE UTILITY AIR REGULATORY GROUP TO EPA S CONSIDERATIONS IN THE DESIGN OF A PROGRAM TO REDUCE CARBON POLLUTION FROM EXISTING POWER PLANTS

RESPONSE OF THE UTILITY AIR REGULATORY GROUP TO EPA S CONSIDERATIONS IN THE DESIGN OF A PROGRAM TO REDUCE CARBON POLLUTION FROM EXISTING POWER PLANTS Introduction RESPONSE OF THE UTILITY AIR REGULATORY GROUP TO EPA S CONSIDERATIONS IN THE DESIGN OF A PROGRAM TO REDUCE CARBON POLLUTION FROM EXISTING POWER PLANTS October 2013 On September 23, 2013, the

More information

CHAPTER 23 Wireless Communication Facilities

CHAPTER 23 Wireless Communication Facilities CHAPTER 23 Wireless Communication Facilities Section 23.1 Purpose It is the general purpose and intent of this Section to comply with the requirements of the Federal Telecommunications Act of 1996, as

More information

VOLUME NO. 51 OPINION NO. 11

VOLUME NO. 51 OPINION NO. 11 VOLUME NO. 51 OPINION NO. 11 CONTRACTS - When alteration is permissible; COUNTIES - Group health plans; payments to employees in lieu of participation; COUNTY OFFICERS AND EMPLOYEES - Group health plans;

More information

118 MISSISSIPPI HEALTHCARE DATA REGISTRY SYSTEM 118.01 REPORTING REQUIREMENTS AND PROCEDURES

118 MISSISSIPPI HEALTHCARE DATA REGISTRY SYSTEM 118.01 REPORTING REQUIREMENTS AND PROCEDURES 118 MISSISSIPPI HEALTHCARE DATA REGISTRY SYSTEM 118.01 REPORTING REQUIREMENTS AND PROCEDURES 1. Authority-Mississippi Code Annotated 41-63-4 requires certain licensed health care facilities operating in

More information

The Rights of Landowners Under Wisconsin Eminent Domain Law. Procedures Under sec. 32.06 Wisconsin Statutes

The Rights of Landowners Under Wisconsin Eminent Domain Law. Procedures Under sec. 32.06 Wisconsin Statutes The Rights of Landowners Under Wisconsin Eminent Domain Law Procedures Under sec. 32.06 Wisconsin Statutes FOREWORD This pamphlet is published by the Wisconsin Department of Commerce in cooperation with

More information

September 29, 2014. Docket No. ER14- -000 Amendment to CAISO FERC Electric Tariff to Eliminate Annual External Operations Review

September 29, 2014. Docket No. ER14- -000 Amendment to CAISO FERC Electric Tariff to Eliminate Annual External Operations Review California Independent System Operator Corporation September 29, 2014 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California

More information

Inventory of Current Financial Options

Inventory of Current Financial Options Inventory of Current Financial Options for Solar Installation Practice in Kansas City and Beyond January 2013 Prepared by: Alan Claus Anderson J. Britton Gibson Luke Hagedorn Table of Contents Introduction...

More information

Texas Common Carriers May Soon Be Running In Circles

Texas Common Carriers May Soon Be Running In Circles Portfolio Media. Inc. 860 Broadway, 6th Floor New York, NY 10003 www.law360.com Phone: +1 646 783 7100 Fax: +1 646 783 7161 customerservice@law360.com Texas Common Carriers May Soon Be Running In Circles

More information

Nebraska Ethics Advisory Opinion for Lawyers No. 94-1

Nebraska Ethics Advisory Opinion for Lawyers No. 94-1 Nebraska Ethics Advisory Opinion for Lawyers No. 94-1 SINCE THE LIMITED LIABILITY COMPANY IS A NEWLY DESIGNATED ENTITY WHICH, BY STATUTE, PURPORTS TO AFFORD LIMITED LIABILITY TO ITS MEMBERS, AND RECOGNIZING

More information

AGENCY: National Telecommunications and Information Administration, U.S. Department of

AGENCY: National Telecommunications and Information Administration, U.S. Department of This document is scheduled to be published in the Federal Register on 12/15/2015 and available online at http://federalregister.gov/a/2015-31516, and on FDsys.gov Billing Code: 3510-60-P DEPARTMENT OF

More information

The Board of Zoning Appeals shall have the duty and power to:

The Board of Zoning Appeals shall have the duty and power to: Section 21-09.03. (a) Establishment and Jurisdiction. The for the City of South Bend, Indiana, is hereby re-established in accordance with Indiana Code 36-7-4-900 et seq. The for the City of South Bend,

More information

IN THE COMMONWEALTH COURT OF PENNSYLVANIA

IN THE COMMONWEALTH COURT OF PENNSYLVANIA IN THE COMMONWEALTH COURT OF PENNSYLVANIA Discovery Charter School, Petitioner v. No. 673 C.D. 2014 Argued February 10, 2015 School District of Philadelphia and School Reform Commission, Respondents BEFORE

More information

Question Presented. Brief Answer. Discussion

Question Presented. Brief Answer. Discussion To: From: Re: Public Utility Commission D.J. Powers, Attorney for the Center For Economic Justice Denial Of Basic Telephone Service For Nonpayment Of Long Distance Charges Question Presented Under PURA

More information

A BILL FOR AN ACT. 2 energy, advanced distributed energy resources, and energy. 3 efficiency in Hawaii provides significant financial, health,

A BILL FOR AN ACT. 2 energy, advanced distributed energy resources, and energy. 3 efficiency in Hawaii provides significant financial, health, HOUSE OF REPRESENTATIVES K 2570 TWENTY-EIGHTH LEGISLATURE, 2016 IN H.D. 1 STATEOFHAWAII A BILL FOR AN ACT RELATING TO ENERGY MODERNIZATION. BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII: 1 SECTION

More information

Before the PUBLIC SERVICE COMMISSION OF WISCONSIN Madison Wisconsin

Before the PUBLIC SERVICE COMMISSION OF WISCONSIN Madison Wisconsin Before the PUBLIC SERVICE COMMISSION OF WISCONSIN Madison Wisconsin Investigation of Voice over ) Case No. 5-TI-2071 Internet Protocol in Wisconsin ) Public Comments of Communications Workers of America

More information

PUC DOCKET NO. 24418 ORDER

PUC DOCKET NO. 24418 ORDER PUC DOCKET NO. 24418 COMMISSION STAFF S APPLICATION TO SET 2001 WHOLESALE TRANSMISSION SERVICE CHARGES FOR THE ELECTRIC RELIABILITY COUNCIL OF TEXAS PUBLIC UTILITY COMMISSION OF TEXAS ORDER This Order

More information

Supreme Court of Missouri en banc

Supreme Court of Missouri en banc Supreme Court of Missouri en banc AMERICAN NATIONAL LIFE INSURANCE COMPANY OF TEXAS, Appellant, v. No. SC89064 DIRECTOR OF REVENUE and DIRECTOR OF INSURANCE, Respondents. PETITION FOR REVIEW OF A DECISION

More information

IN THE MISSOURI COURT OF APPEALS WESTERN DISTRICT

IN THE MISSOURI COURT OF APPEALS WESTERN DISTRICT IN THE MISSOURI COURT OF APPEALS WESTERN DISTRICT MISSOURI PUBLIC SERVICE COMMISSION, Appellant, WD70666 vs. Opinion Filed: December 8, 2009 ONEOK, INC., et al., Respondents. APPEAL FROM THE CIRCUIT COURT

More information

Nebraska Public Schools: Statutes Related to the Construction of Improvements to Real Property

Nebraska Public Schools: Statutes Related to the Construction of Improvements to Real Property Nebraska Public Schools: Statutes Related to the Construction of Improvements to Real Property 73-101. Public lettings; how conducted. Whenever the State of Nebraska, or any department or any agency thereof,

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Rock Island Clean Line LLC ) Docket No. ER12-365-000

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. Rock Island Clean Line LLC ) Docket No. ER12-365-000 UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Rock Island Clean Line LLC ) Docket No. ER12-365-000 ROCK ISLAND CLEAN LINE LLC S ANSWER TO COMMENTS OF INTERSTATE POWER AND LIGHT

More information

CITY DEVELOPMENT BOARD[263]

CITY DEVELOPMENT BOARD[263] IAC 8/10/11 City Development[263] Analysis, p.1 CITY DEVELOPMENT BOARD[263] [Chapters 1 and 2, IAC 7/27/77, superseded by Chapters 1 to 4, effective 4/12/78] [Prior to 1/9/91, City Development Board[220]]

More information

131 FERC 61,148 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER ON COMPLIANCE FILING. (Issued May 20, 2010)

131 FERC 61,148 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER ON COMPLIANCE FILING. (Issued May 20, 2010) 131 FERC 61,148 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Jon Wellinghoff, Chairman; Marc Spitzer, Philip D. Moeller, and John R. Norris. California Independent

More information

AN ACT RELATING TO SPECIAL DISTRICTS; ENACTING THE INFRASTRUCTURE DEVELOPMENT ZONE ACT; PROVIDING FOR THE CREATION OF

AN ACT RELATING TO SPECIAL DISTRICTS; ENACTING THE INFRASTRUCTURE DEVELOPMENT ZONE ACT; PROVIDING FOR THE CREATION OF AN ACT RELATING TO SPECIAL DISTRICTS; ENACTING THE INFRASTRUCTURE DEVELOPMENT ZONE ACT; PROVIDING FOR THE CREATION OF INFRASTRUCTURE DEVELOPMENT ZONES AND ELECTED BOARDS; PROVIDING POWERS AND DUTIES; AUTHORIZING

More information

Yes. See, e.g., California-American Water Company, Decision 06-11-050 (Nov. 30, 2006). The Commission may be adjusting this policy.

Yes. See, e.g., California-American Water Company, Decision 06-11-050 (Nov. 30, 2006). The Commission may be adjusting this policy. Alabama Alaska STATE RATE CONSOLIDATION No general policy, but could be permitted for a water company with systems that are close enough to interconnect, and share the same employees and a central office.

More information

AN ORDINANCE APPROVING THE PETITION OF HDH, LLC AND STL BROADWAY HOTEL, LLC AS OWNERS OF CERTAIN REAL PROPERTY, TO ESTABLISH A COMMUNITY IMPROVEMENT

AN ORDINANCE APPROVING THE PETITION OF HDH, LLC AND STL BROADWAY HOTEL, LLC AS OWNERS OF CERTAIN REAL PROPERTY, TO ESTABLISH A COMMUNITY IMPROVEMENT BOARD BILL # INTRODUCED BY ALDERWOMAN YOUNG AN ORDINANCE APPROVING THE PETITION OF HDH, LLC AND STL BROADWAY HOTEL, LLC AS OWNERS OF CERTAIN REAL PROPERTY, TO ESTABLISH A COMMUNITY IMPROVEMENT DISTRICT,

More information

BRIEF OF APPELLANT, CITY OF PORT GIBSON, MS

BRIEF OF APPELLANT, CITY OF PORT GIBSON, MS E-Filed Document Feb 19 2015 16:20:50 2014-UR-01425-SCT Pages: 20 IN THE SUPREME COURT OF THE STATE OF MISSISSIPPI CITY OF TCHULA, MISSISSIPPI VS. APPELLANT CAUSE NO. 2014-UR-1425-SCT MISSISSIPPI PUBLIC

More information

RULE 7 PROBATE CASES. RULE 7.10 Probate Courts/Session

RULE 7 PROBATE CASES. RULE 7.10 Probate Courts/Session RULE 7 PROBATE CASES RULE 7.10 Probate Courts/Session The County Courts at Law of Fort Bend County, Texas setting as Probate Courts shall be deemed in session at all times regarding probate cases as set

More information

CMS Marketing, Services and Trading Company

CMS Marketing, Services and Trading Company I. BACKGROUND CMS Marketing, Services and Trading Company Order No. EA-223 Exports of electricity from the United States to a foreign country are regulated and require authorization under section 202(e)

More information

Title 20 PUBLIC SERVICE COMMISSION. Subtitle 50 SERVICE SUPPLIED BY ELECTRIC COMPANIES. Chapter 02 Engineering

Title 20 PUBLIC SERVICE COMMISSION. Subtitle 50 SERVICE SUPPLIED BY ELECTRIC COMPANIES. Chapter 02 Engineering Title 20 PUBLIC SERVICE COMMISSION Subtitle 50 SERVICE SUPPLIED BY ELECTRIC COMPANIES Chapter 02 Engineering Authority: Public Utility Companies Article, 2-121, 5-101 and 5-303, Annotated Code of Maryland.

More information

124 FERC 61,317 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. Communication Protocols for Public Utilities ORDER NO.

124 FERC 61,317 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. Communication Protocols for Public Utilities ORDER NO. 124 FERC 61,317 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Joseph T. Kelliher, Chairman; Suedeen G. Kelly, Marc Spitzer, Philip D. Moeller, and Jon Wellinghoff.

More information

KANSAS CORPORATION COMMISSION IP-to-IP Interconnection Report

KANSAS CORPORATION COMMISSION IP-to-IP Interconnection Report KANSAS CORPORATION COMMISSION IP-to-IP Interconnection Report 2014 REPORT ON IP- TO- IP INTERCONNECTION A Summary of Status of the FCC s Internet Protocol- to- Internet Protocol Interconnection Proceeding

More information

149 FERC 61,012 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER AUTHORIZING ISSUANCES OF SECURITIES. (Issued October 3, 2014)

149 FERC 61,012 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER AUTHORIZING ISSUANCES OF SECURITIES. (Issued October 3, 2014) 149 FERC 61,012 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Cheryl A. LaFleur, Chairman; Philip D. Moeller, Tony Clark, and Norman C. Bay. Northern Pass Transmission

More information

Senate Bill No. 1665 CHAPTER 864

Senate Bill No. 1665 CHAPTER 864 Senate Bill No. 1665 CHAPTER 864 An act to amend Section 2060 of, and to add Section 2290.5 to, the Business and Professions Code, to amend Sections 1367 and 1375.1 of, and to add Sections 1374.13 and

More information

137 FERC 61,183 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

137 FERC 61,183 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION 137 FERC 61,183 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Jon Wellinghoff, Chairman; Philip D. Moeller, John R. Norris, and Cheryl A. LaFleur. City of South Daytona,

More information

CHAPTER 111 ELECTRIC FRANCHISE. 111.01 Franchise Granted 111.02 Regulatory Power of City

CHAPTER 111 ELECTRIC FRANCHISE. 111.01 Franchise Granted 111.02 Regulatory Power of City CHAPTER 111 111.01 Franchise Granted 111.02 Regulatory Power of City 111.01 FRANCHISE GRANTED. MidAmerican Energy Company, a corporation, its successors or assigns are hereby granted and vested with the

More information

LIFE AND HEALTH INSURANCE POLICY LANGUAGE SIMPLIFICATION MODEL ACT

LIFE AND HEALTH INSURANCE POLICY LANGUAGE SIMPLIFICATION MODEL ACT Model Regulation Service April 1995 LIFE AND HEALTH INSURANCE POLICY LANGUAGE SIMPLIFICATION MODEL ACT Table of Contents Section 1. Section 2. Section 3. Section 4. Section 5. Section 6. Section 7. Section

More information

Public Service Company of New Mexico ("PNM"), by and through its attorneys, hereby

Public Service Company of New Mexico (PNM), by and through its attorneys, hereby BEFORE THE NEW MEXICO PUBLIC REGULATION COMMISSION IN THE MATTER OF THE APPLICATION OF PUBLIC SERVICE COMPANY OF NEW MEXICO FOR EXPEDITED APPROVAL OF POWER PURCHASE AGREEMENTS, SPECIAL SERVICE RATE AND

More information

UNITED STATES OF AMERICA 151 FERC 62,147 FEDERAL ENERGY REGULATORY COMMISSION ORDER AUTHORIZING DISPOSITION OF JURISDICTIONAL FACILITIES

UNITED STATES OF AMERICA 151 FERC 62,147 FEDERAL ENERGY REGULATORY COMMISSION ORDER AUTHORIZING DISPOSITION OF JURISDICTIONAL FACILITIES UNITED STATES OF AMERICA 151 FERC 62,147 FEDERAL ENERGY REGULATORY COMMISSION Georgia Power Company Docket No. EC15-132-000 ORDER AUTHORIZING DISPOSITION OF JURISDICTIONAL FACILITIES (Issued June 1, 2015)

More information

IN THE SUPREME COURT OF THE STATE OF KANSAS. No. 99,491. KANSAS DEPARTMENT OF REVENUE, Appellant, JILL POWELL, Appellee. SYLLABUS BY THE COURT

IN THE SUPREME COURT OF THE STATE OF KANSAS. No. 99,491. KANSAS DEPARTMENT OF REVENUE, Appellant, JILL POWELL, Appellee. SYLLABUS BY THE COURT IN THE SUPREME COURT OF THE STATE OF KANSAS No. 99,491 KANSAS DEPARTMENT OF REVENUE, Appellant, v. JILL POWELL, Appellee. SYLLABUS BY THE COURT 1. Under the Kansas Act for Judicial Review and Civil Enforcement

More information

THE STATE OF NEW HAMPSHIRE BEFORE THE NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION. Docket No. VIVINT SOLAR, INC. PETITION FOR DECLARATORY RULING

THE STATE OF NEW HAMPSHIRE BEFORE THE NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION. Docket No. VIVINT SOLAR, INC. PETITION FOR DECLARATORY RULING THE STATE OF NEW HAMPSHIRE BEFORE THE NEW HAMPSHIRE PUBLIC UTILITIES COMMISSION Docket No. VIVINT SOLAR, INC. PETITION FOR DECLARATORY RULING I. Introduction Pursuant to N.H. Code Admin. R. Ann. PUC 203

More information

140 FERC 62,085 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER AUTHORIZING DISPOSITION OF JURISDICTIONAL FACILITIES

140 FERC 62,085 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER AUTHORIZING DISPOSITION OF JURISDICTIONAL FACILITIES 140 FERC 62,085 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Dominion Energy Salem Harbor, LLC Footprint Power Acquisitions LLC Footprint Power Salem Harbor Operations LLC Footprint Power

More information

Appendix A. Glossary. For. 2016 Request For Proposals For Long-Term Renewable Generation Resources for Entergy Louisiana, LLC

Appendix A. Glossary. For. 2016 Request For Proposals For Long-Term Renewable Generation Resources for Entergy Louisiana, LLC Appendix A Glossary For 2016 Request For Proposals For Long-Term Renewable Generation Resources for Entergy Louisiana, LLC Entergy Services, Inc. June 8, 2016 Website means the internet website https://spofossil.entergy.com/entrfp/send/2016ellrenewablerfp/index.htm.

More information

(2) For production of public records or hospital medical records. Where the subpoena commands any custodian of public records or any custodian of hosp

(2) For production of public records or hospital medical records. Where the subpoena commands any custodian of public records or any custodian of hosp Rule 45. Subpoena. (a) Form; Issuance. (1) Every subpoena shall state all of the following: a. The title of the action, the name of the court in which the action is pending, the number of the civil action,

More information

1 VERGERONT, J. 1 Daniel Stormer was convicted of operating a motor vehicle while intoxicated, third offense, contrary to WIS. STAT.

1 VERGERONT, J. 1 Daniel Stormer was convicted of operating a motor vehicle while intoxicated, third offense, contrary to WIS. STAT. COURT OF APPEALS DECISION DATED AND FILED May 31, 2001 Cornelia G. Clark Clerk, Court of Appeals of Wisconsin NOTICE This opinion is subject to further editing. If published, the official version will

More information

In the Missouri Court of Appeals Eastern District

In the Missouri Court of Appeals Eastern District In the Missouri Court of Appeals Eastern District DIVISION TWO KEVIN COOPER, ) ) No. ED96549 Plaintiff/Appellant, ) ) Appeal from the Circuit Court v. ) of St. Louis County ) CHRYSLER GROUP, LLC, ) Honorable

More information

In The Court of Appeals Fifth District of Texas at Dallas. No. 05-13-01351-CV IN THE INTEREST OF S.J.G. AND J.O.G., CHILDREN

In The Court of Appeals Fifth District of Texas at Dallas. No. 05-13-01351-CV IN THE INTEREST OF S.J.G. AND J.O.G., CHILDREN AFFIRM; and Opinion Filed April 9, 2015. S In The Court of Appeals Fifth District of Texas at Dallas No. 05-13-01351-CV IN THE INTEREST OF S.J.G. AND J.O.G., CHILDREN On Appeal from the 302nd Judicial

More information

June 22, 2015. Via Electronic Submission

June 22, 2015. Via Electronic Submission Via Electronic Submission Christopher Kirkpatrick, Secretary Commodity Futures Trading Commission Three Lafayette Center 1155 21 st Street, N.W. Washington, D.C. 20581 Re: Comments of the Joint Trade Association

More information

JURISDICTION: OKLAHOMA TAX COMMISSION DECISION 2009-03-24-02 / NON-PRECEDENTIAL P-08-055-H DATE: MARCH 24, 2009

JURISDICTION: OKLAHOMA TAX COMMISSION DECISION 2009-03-24-02 / NON-PRECEDENTIAL P-08-055-H DATE: MARCH 24, 2009 JURISDICTION: DECISION CITE: 2009-03-24-02 / NON-PRECEDENTIAL ID: P-08-055-H DATE: MARCH 24, 2009 DISPOSITION: DENIED TAX TYPE: IRS LEVY APPEAL: ON APPEAL / OK S.CT. 107,003 AMENDED FINDINGS OF FACT AND

More information

143 FERC 61,245 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

143 FERC 61,245 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION 143 FERC 61,245 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Jon Wellinghoff, Chairman; Philip D. Moeller, John R. Norris, Cheryl A. LaFleur, and Tony Clark. Kinder

More information

F I S C A L I M P A C T R E P O R T

F I S C A L I M P A C T R E P O R T Fiscal impact reports (FIRs) are prepared by the Legislative Finance Committee (LFC) for standing finance committees of the NM Legislature. The LFC does not assume responsibility for the accuracy of these

More information

MODEL REGULATION TO REQUIRE REPORTING OF STATISTICAL DATA BY PROPERTY AND CASUALTY INSURANCE COMPANIES

MODEL REGULATION TO REQUIRE REPORTING OF STATISTICAL DATA BY PROPERTY AND CASUALTY INSURANCE COMPANIES Model Regulation Service June 2004 MODEL REGULATION TO REQUIRE REPORTING OF STATISTICAL DATA Table of Contents Section 1. Section 2. Section 3. Section 4. Section 5. Section 6. Section 7. Section 8. Section

More information

152 FERC 61,028 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

152 FERC 61,028 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION 152 FERC 61,028 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Norman C. Bay, Chairman; Philip D. Moeller, Cheryl A. LaFleur, Tony Clark, and Colette D. Honorable.

More information

148 FERC 61,143 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER AUTHORIZING ISSUANCE OF SECURITIES. (Issued August 27, 2014)

148 FERC 61,143 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER AUTHORIZING ISSUANCE OF SECURITIES. (Issued August 27, 2014) 148 FERC 61,143 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Cheryl A. LaFleur, Chairman; Philip D. Moeller, Tony Clark, and Norman C. Bay. AEP Generating Company

More information

LAFAYETTE TOWNSHIP SUSSEX COUNTY, NEW JERSEY ORDINANCE 2015-12

LAFAYETTE TOWNSHIP SUSSEX COUNTY, NEW JERSEY ORDINANCE 2015-12 LAFAYETTE TOWNSHIP SUSSEX COUNTY, NEW JERSEY ORDINANCE 2015-12 AN ORDINANCE GRANTING MUNICIPAL CONSENT TO THE ISSUANCE OF A FRANCHISE TO SERVICE ELECTRIC CABLE T.V. OF NEW JERSEY, INC., TO CONSTRUCT, OWN,

More information

NONJUDICIAL TRANSFER OF TRUST SITUS CHART 1

NONJUDICIAL TRANSFER OF TRUST SITUS CHART 1 NONJUDICIAL TRANSFER OF TRUST SITUS CHART 1 This chart provides a survey of the State statutory provisions for all States and the District of Columbia relating to the nonjudicial transfer of the principal

More information

COMPLAINT PARTIES. 2. COGA promotes the expansion of oil and gas supplies, markets, and transportation infrastructure.

COMPLAINT PARTIES. 2. COGA promotes the expansion of oil and gas supplies, markets, and transportation infrastructure. DISTRICT COURT, BOULDER COUNTY, COLORADO 1777 Sixth Street Boulder, CO 80302 Plaintiff: COLORADO OIL & GAS ASSOCIATION v. Defendant: COURT USE ONLY Case No. Division/Courtroom: CITY OF LAFAYETTE, COLORADO

More information

THREE MILE PLAN/URBAN GROWTH BOUNDARY INTERGOVERNMENTAL AGREEMENT

THREE MILE PLAN/URBAN GROWTH BOUNDARY INTERGOVERNMENTAL AGREEMENT THREE MILE PLAN/URBAN GROWTH BOUNDARY INTERGOVERNMENTAL AGREEMENT THIS INTERGOVERNMENTAL AGREEMENT, entered into by and between the BOARD OF COUNTY COMMISSIONERS OF THE COUNTY OF GUNNISON, COLORADO, a

More information

Applications to provide Local Exchange, Basic Local Exchange and Interexchange Telecommunications Service in Missouri

Applications to provide Local Exchange, Basic Local Exchange and Interexchange Telecommunications Service in Missouri Applications to provide Local Exchange, Basic Local Exchange and Interexchange Telecommunications Service in Missouri Applications to provide Local Exchange and Interexchange Telecommunications Service

More information

City of Alva, Oklahoma Board of Adjustments Meeting Application. Property Address. Owner Address. Owner Name. Owner Phone Number

City of Alva, Oklahoma Board of Adjustments Meeting Application. Property Address. Owner Address. Owner Name. Owner Phone Number City of Alva, Oklahoma Board of Adjustments Meeting Application (Note that this application must be completed to be considered) Property Address Owner Address Owner Name Owner Phone Number Legal Description

More information

or refusal to grant or to continue assistance under such program or activity to any recipient as to whom there has been an express finding on the

or refusal to grant or to continue assistance under such program or activity to any recipient as to whom there has been an express finding on the CITE 42 USC Sec. 2000d 01/06/97 TEXT Sec. 2000d. Prohibition against exclusion from participation in, denial of benefits of, and discrimination under federally assisted programs on ground of race, color,

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Southwest Power Pool, Inc. ) ) Docket No. ER12-1179-000 MOTION FOR LEAVE TO INTERVENE AND PROTEST OF THE ELECTRIC POWER SUPPLY ASSOCIATION

More information

IN THE COURT OF APPEALS OF INDIANA

IN THE COURT OF APPEALS OF INDIANA FOR PUBLICATION ATTORNEY FOR APPELLANTS: JENNIFER TUCKER YOUNG Tucker and Tucker, P.C. Paoli, Indiana ATTORNEYS FOR APPELLEE: CHARLES W. RITZ III MICHAEL L. SCHULTZ Lebanon, Indiana IN THE COURT OF APPEALS

More information

135 FERC 61,068 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER GRANTING PETITION FOR TEMPORARY WAIVER. (Issued April 22, 2011)

135 FERC 61,068 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER GRANTING PETITION FOR TEMPORARY WAIVER. (Issued April 22, 2011) 135 FERC 61,068 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Jon Wellinghoff, Chairman; Marc Spitzer, Philip D. Moeller, John R. Norris, and Cheryl A. LaFleur. Hydrogen

More information

S T A T E O F T E N N E S S E E OFFICE OF THE ATTORNEY GENERAL 425 FIFTH AVENUE NORTH NASHVILLE, TENNESSEE 37243. April 9, 2002. Opinion No.

S T A T E O F T E N N E S S E E OFFICE OF THE ATTORNEY GENERAL 425 FIFTH AVENUE NORTH NASHVILLE, TENNESSEE 37243. April 9, 2002. Opinion No. S T A T E O F T E N N E S S E E OFFICE OF THE ATTORNEY GENERAL 425 FIFTH AVENUE NORTH NASHVILLE, TENNESSEE 37243 April 9, 2002 Opinion No. 02-042 Duration of the Revocation of Driving Privileges for DUI

More information

UTILITY COMPLAINT HANDLING PROCEDURES OF THE NEW YORK STATE PUBLIC SERVICE COMMISSION

UTILITY COMPLAINT HANDLING PROCEDURES OF THE NEW YORK STATE PUBLIC SERVICE COMMISSION UTILITY COMPLAINT HANDLING PROCEDURES OF THE NEW YORK STATE PUBLIC SERVICE COMMISSION New York s Utility Project Law Manual 6th Edition 2013 New York s Utility Project P.O. Box 10787 Albany, NY 12201 1-877-669-2572

More information