Maximo Scheduler. A Revised Approach to Work Management. Vikul Banta Product Manager. Brian Downey Senior Design Architect IBM Corporation

Size: px
Start display at page:

Download "Maximo Scheduler. A Revised Approach to Work Management. Vikul Banta Product Manager. Brian Downey Senior Design Architect IBM Corporation"

Transcription

1 Maximo Scheduler A Revised Approach to Work Management Vikul Banta Product Manager Brian Downey Senior Design Architect 1

2 Our Work Management Focus Areas Planning Resource Optimization Assignment Dispatching Real-time Communication Forecast Work Identify Resource Gaps Create schedules Availability Assets Location Material Tools Labor/Crews Assign using a Graphical UI Labor and Crews Accommodate vacation/break Graphical UI Public Map Control Route Visualization Labor and Crews Assign Emergency Work Communication to Field Technicians Update Work Status and Progress Schedule Compliance 2

3 Roles We Accommodate in Managing Work 3 3

4 Maximo Scheduler Pedigree Focus Areas: 4

5 Maximo Scheduler Focus Functionality, Use Cases, and Value by Role 5

6 The Planner, Scheduler & Supervisor 6

7 Gantt Chart Visualization Use Case Planners and Schedulers want the ability to view, adjust, and publish work schedules in a graphical view They want to view forecasted Preventive Maintenance (PM) instances along with planned work They also want an illustration of the work order completion window Solution Maximo Scheduler contains a Gantt tool to schedule work orders, tasks, and forecasted PM work graphically View all planned, reactive, and forecasted work in a single, consolidated graphical view All work order, task, and forecast information available in a configurable UI Drag-and-drop capability allows for easy schedule manipulation based on real time information View completion window for appropriate work orders 7

8 View Work Orders and PMs - Intuitive view of forecasted PMs along with planned work orders - Drag and drop work orders as well as forecasted PMs 8

9 Precedence Logic and Activity Constraints Precedence logic between work orders/tasks that have the same parent SNE/FNL date constraints calculated automatically from JP/PM offsets 9

10 Schedule Compliance Use Case Mid-way through a one month project, operations has asked the maintenance manager to assess performance against plan. Maintenance uses Scheduler to open the monthly schedule and show actual work dates vs. planned dates for the 2 weeks done, and their impact on the remaining work. The maintenance director requires a weekly schedule compliance report from every maintenance manager in order to measure the effectiveness of the work scheduling process. They recognize that this metric is an indicator of planning effectiveness, reactive work and craft worker effectiveness. Solution Maximo Scheduler has the capability to graphically show work orders Target Start/End, Scheduled Start/End and Actual Start/End dates in the Gantt view. By default, Scheduler will show Scheduled Start/End dates offering the user the option of showing all other dates with a click of a button. Users have the option to calculate and store the Schedule Compliance metric. A configuration page is available, providing users the ability to set the frequency for this metric (i.e. weekly, monthly and quarterly) 10

11 Schedule Progress The ability to show Target, Scheduled and Actual Dates on the Gantt chart Allows Planners & Schedulers to get a view of how work is progressing, and the affect of the progress on related work 11

12 Visibility of Other Resources Use case Several major PMs are due at the same time due to a busy production schedule. As such, Assets are only available for maintenance at very specific dates/times. The maintenance planner needs to schedule this work during the available time slots The floor manager just found out that a turbine will be available for maintenance the next day. He would like to gather all pending work orders on that turbine and its sub assemblies and schedule them during that window of opportunity. 5 trucks are due for annual maintenance next week. The operations planner would need to know the availability of the repair bay in various locations so that he can coordinate truck routes such that they will be in the vicinity of the assigned bay in time for maintenance. The maintenance manager needs to review next week s scheduled work orders to make sure the parts are in stock. If parts are not available for the work, he will need to reschedule such work orders and replace them with other pending work orders. 12

13 Visibility of Other Resources Solution Maximo Scheduler provides a graphical view of Craft, Asset, Location, Materials, and Tools that will allow the planner to schedule work with confidence that other critical considerations can be met. Planners are able to view when equipment will not be running, and when it will be available for maintenance to be performed. Planners can avoid reworking schedules due to schedule dates that can not be met due to Asset and/or Location utilization. 13

14 Asset & Location Availability Maintenance and Operational schedules in Assets and Locations with visibility in Scheduler This determines when work can be done on the Asset/Location 14

15 Material Availability Other Resource Availability tab shows: Maintenance/Operational/Calendar availability of Asset and Location Material Availability for planned materials Shows required quantity vs available quantity Green bar shows materials are available, red bar shows materials are unavailable Planners & Schedulers know when not to schedule work based on material availability 15

16 Schedule Cost Projection & Tracking Use Case A Planner knows that he only has a given budgeted amount to devote to the project which is currently being scheduled. His management will need to know if the project can be done within budget. A capital project is partially complete, and the project planner has been asked by executive. management for a cost rundown of the scheduled project, progress, etc. Solution Maximo Scheduler provides instant means for a Planner to assess how closely they are keeping to budget with a schedule being defined. For schedules that are underway, it provides a complete breakdown of proposed, committed, and actual costs. This eliminates the need for custom reports to be defined and run, and can assist a Planner in keeping within budget long before the start of a planned project. 16

17 Schedule Cost Tab Calculate costs within schedule by week, month and year Illustrate Committed and Saved Estimated Labor, Materials, Services and Tools, as well as Actual Labor, Materials, Service and Tools Allows budget adherence 17

18 Graphical Employee Assignment Use Case Part of a maintenance supervisors role is to assign work to maintenance technicians or crews based on their skill and availability. To do this quickly and accurately, they need to view their current assignments, break time, shift and vacation time. Solution The Graphical Assignment application in Maximo Scheduler provides drag and drop capability, along with the visibility of all other critical factors (current assignments, vacation and break time) for proper assignments to be made. Illustrates unassigned work and facilitates efficient assignment of appropriate technicians or crews based on craft or crew type. Provides effortless reassignment of work from one technician/crew to another, as well as the ability to split work among technicians/crews. 18

19 Graphical Assignment Aimed at the process of assigning work to people Similar UI to Scheduler Gantt view for consistency Helps the Planner & Scheduler see non work time for a resource, as well as assignments made by other Foremen beyond the bounds of their schedule eliminates duplicate labor assignments 19

20 Making an Assignment Allows the Foreman to: Split Work According to Shifts, might be used if extending duration of the assignment across an end of shift Split Work, once split can drag second assignment to add a time gap Split Work into Three Records, creates two additional assignments Create/Delete Assignment 20

21 The Dispatcher 21

22 Dispatching Use Case The dispatcher is notified at the start of the shift that Crew1 will not be available today, so all of their priority 1 work needs to be rerouted and reassigned to other crews in order for that work to be completed today. The Dispatcher has received an emergency work order for the northeast part of the city that needs to be worked on within the next 2 hours. Problem There is no easy way for the Dispatcher to view all of the current routes and where the work or resources are located throughout the city in an efficient manner. The Dispatcher needs to have a single view showing all of the today s routes on a map along with their work locations. They also need to have the ability to quickly assign new work to a crew and re-optimize their work route. Solution The Dispatching application in Maximo Scheduler allows the Dispatcher to: Utilize maps to show street-level routes (SLRs) on a map, location of labor or crew resources. Quickly drag and drop new work to a crew at the beginning of the shift scramble when time is limited to rearrange schedules for the day. 22

23 Dispatching Dispatcher monitors and responds to on-going work out in the field : Dispatching View provides clients the ability view Work Order assignments in a calendar and map view to spatially understand the dynamic work day. Dispatcher has the ability to view geo-location data from mobile devices and locate resources on a map to determine current location. Ability to view spatially which resource can be rescheduled based on location and travel time when new unassigned work orders come in throughout the day. 23

24 Dispatch Map View Shows the sequence of work assigned to each resource based on a route color. Ability to view nearby Labor and Crews, Unassigned Work, Prioritized work, Work Types and Status. Map View of Work Order Priority 24

25 The Mobile Field Technician 25

26 Field Technician Use Case The field technician is assigned work from the Dispatcher, and needs a way of acknowledging receipt, taking ownership, and knowing where the work needs to be performed. The field technician has finished his assigned work order early and has time available for other work, but does not know where any nearby work may be. An apprentice field technician is working on a job, but encounters a problem that they know can be resolved by a Journeyman Mechanic. They are fairly certain that a nearby resource exists, but unsure where and how best to reach them. The Foreman is made aware of a new work order assigned to his team, and needs to see where his resources Solution are located and the work which they are engaged in so that he may appropriately assign the work. The existing Maximo Everyplace mobile offering has 4 new templates provided as part of the Maximo Scheduler: Everyplace Technician (Tablet) Large Screen Heavy Technician Functionality Everyplace Technician (Phone) Small Screen Heavy Technician Functionality Everyplace Technician (Lite) Small Screen Light Technician Functionality (Inspector, Break/Fix, Rapid Dispatch) Everyplace Supervisor Small Screen Supervisor Functionality Enable Field Technicians and Foremen to view maps displaying current and assigned work, location of nearby resources, unassigned work, turn by turn directions to next assignment, feedback on assigned work 26

27 Field Technician Application Field Technician s Work Order Route 27

28 Field Technician Application My Work Field Technician s Street Level Route Field Technician s Material Requirements Field Technician s Tool Requirements 28

29 What s new in Scheduler 7.5.2? 29

30 New: Graphical Crew Management New Crew application to help with the Daily Morning shuffle of Crew Assignments Drag and drop labor and tools to make up a qualified crew 30

31 New: Adding Optimization to our Focus Areas Planning Resource Optimization Assignment Dispatching Real-time Communication Forecast Work Identify Resource Gaps Create schedules Availability Assets Location Material Tools Labor/Crews Assign using a Graphical UI Labor and Crews Accommodate vacation/break Graphical UI Public Map Control Route Visualization Labor and Crews Assign Emergency Work Communication to Field Technicians Update Work Status and Progress Capacity Planning Resource Leveling Resource Assignment Spatial Scheduling Dynamic Scheduling Schedule Compliance 31

32 Resource Leveling Problem definition: Work Orders have to be scheduled based on availability of labor, crew, asset, and location. Goals: Schedule work orders based on its priority in such a way that the available labor/crew resources are optimally used. Additionally work orders will be scheduled with minimal interruption and when asset/location are available for maintenance. Work Attributes Considered Skill level of the Craft Priority Direction Asset s Operational and Maintenance availability Location s Operational and Maintenance availability External Labor Schedule Window (Date Constraints) Resource Availability Variables Partial availability of labor/crew Time Interval Precision 32

33 Capacity Planning Problem definition: Work Orders have to be scheduled based on availability of labor, crew, asset, and location and completed within a defined time period. For e.g. 2 week shutdown, turbine overhaul (4 weeks), maintenance in remote locations with seasonal restrictions etc.. Goals: Schedule work orders based on its priority in such a way that the available labor/crew resources are optimally used within the given time period. If the available resources are insufficient then identify the required resources to complete the work. Work Attributes Considered Skill level of the Craft Priority Direction Asset s Operational and Maintenance availability Location s Operational and Maintenance availability External Labor Schedule Window (Date Constraints) Time period Resource Availability Variables Partial availability of labor/crew Time Interval Precision 33

34 Resource Assignment Problem definition: Daily work assignments are tedious to create manually when there are numerous work orders and labor/crews. Goals: Automatically assign labor and crews to work orders by matching skill, crew type and availability between the work order resource requirements and the resources. This allows the manager to manage exceptions rather than manually build the entire list. Work Attributes Considered Craft and Skill requirement of the jobs Crew Type requirement of the jobs Operational and Maintenance availability Location s Operational and Maintenance availability External Labor Schedule Window (Date Constraints) Resource Attributes Considered Craft and skill of the labor persons Crew type of the crews Standard shift availability Calendar breaks Modified person availability (vacation/sick/overtime/personal) 34

35 Spatial Scheduling Problem definition: Daily crew assignments need to consider the location of the work as well as distance and travel time, and be optimized into daily routes for each crew. Goals: Automatically create daily street routes for the crews by matching crews to work orders within geographic work zones, considering the type of work to be performed and the capabilities of the crew. Work Attributes Considered Service Address of the work, asset or location Work zone of the work Type of crew required for the job Travel time between locations External Labor Resource Attributes Considered Crew type of the crews Work zone of the crews Daily composition of the crews Start location for a daily route Finish location for a daily route Standard shift availability Calendar breaks 35

36 Dynamic Scheduling Problem definition: A Scheduler user needs to be able to quickly focus on new emergency work that is entering the schedule. Goals: Identify new emergency work that has entered the schedule. Alert the user (supervisor or dispatcher) that emergency work has been found, and that there are resources identified that are available to be assigned. Allow the user to choose an appropriate available resource, or optionally make the assignments automatically on a scheduled or recurring basis. Work Attributes Considered Service Address of the work, asset or location Work zone of the work Type of craft or crew required for the job Travel time between locations External Labor Resource Attributes Considered Craft and skill of the labor persons Crew type of the crews Work zone of the crews Standard shift availability Modified labor availability Calendar breaks 36

37 Optimization Value Proposition Planner manually creates an optimal schedule Foreman manually performs assignments for all work orders and tasks Dispatcher manually adjusts resource schedules affected by new assignments Current Approach Scheduler Schedule automatically created while factoring in available capacity Capacity Planning and Resource Leveling Resources and/or Crews automatically assigned to schedules Resource Assignment and Spatial Scheduling Incoming work automatically assigned to Resources or Crews Dynamic Scheduling Benefits: Quicker schedule creation Greater schedule accuracy and compliance Huge efficiency gains by eliminating routine repetitive assignment action Major efficiency gain by freeing the Dispatcher from shuffling resource routes to accommodate incoming work Reduction in Services required to supplement resources Allows Foreman to adjust the assignments rather than make them Optimizes routes to maximize productivity Streamlines the entire work management process! 37 37

38 New: Scenario Management 70% labor availability Create scenarios to perform what if analysis. Scenario 1 80% labor availability Scenario 2 Schedule 80% labor availability Ignore Work Order priority Publish the agreed upon Scenario Scenario

39 Compare Optimization Scenarios Ability to compare different optimization scenarios before publishing the approved set of scheduled work orders. 39

40 New: Compliance Dashboard Measure labor, Work Order and schedule compliance for any user defined work period Compare planned vs unplanned hours Visibility into completed Work Orders against total Work Orders planned Calculate break-in and break-out Work Orders 40

41 Scheduler is part of Maximo Asset Management Maximo Asset Mgmt Maximo Scheduler Scheduler is an add-on product to Maximo Is installed when Maximo is installed Enabled by the Scheduler license key ODME Ships with Scheduler but Installed only when optimization is required 41

42 Why Maximo Scheduler? Lower maintenance costs by gaining operational efficiencies Optimization models transform laborious, manual and time consuming work management tasks into faster, automated processes with meaningful results Quick, easy to perform, and reliable labor assignments Send/receive updates and constantly monitor work progress Respond quickly to emergency situations Improve resource utilization Uncover shortfalls in the resource pool prior to embarking on critical projects Access to dynamic routes, directions, as well as view of nearby work and co-workers, all on a mobile device Track Crew and Labor location, sequenced dispatched work, and effectively deal with new incoming work Embedded in Maximo Manage all your asset classes through a single product No third party product integrations required 42

43 Questions 43

MAXIMO SCHEDULER 7.5.1 Bouke Spoelstra

MAXIMO SCHEDULER 7.5.1 Bouke Spoelstra MAXIMO SCHEDULER 7.5.1 Bouke Spoelstra 1 Topics To Be Covered Scheduler - Our revised view of Work Management Licensing & Pricing Target Markets & Differentiators Detailed Functionality by Role Key Contacts

More information

Configuring the Optimization Server

Configuring the Optimization Server Scheduler 7.5.2 Optimization Sr. Design Architects - Lori Pilgrim and Brian Downey Optimization Engine in Scheduler What-If Analysis 2 1 Architecture Application Server Application Server Maximo ODME Scheduler

More information

Maximo Scheduler Update

Maximo Scheduler Update Anthony Honaker, Maximo Product Strategy Maximo Scheduler Update 2012 IBM Corporation 2009 IBM Corporation Please note: IBM s statements regarding its plans, directions, and intent are subject to change

More information

Access to a unified real-time solution enables your company to make informed decisions and maximize profitability.

Access to a unified real-time solution enables your company to make informed decisions and maximize profitability. FEATURES OVERVIEW The Operational Networked Elements (ONE) platform serves as the base infrastructure and information integration for B2W Estimate and the B2W Operational Suite unifying resources across

More information

PEOPLESOFT MAINTENANCE MANAGEMENT

PEOPLESOFT MAINTENANCE MANAGEMENT PEOPLESOFT MAINTENANCE MANAGEMENT KEY BENEFITS Streamline Maintenance Operations Manage Full Asset Lifecycle Lower Total Cost of Ownership Oracle s PeopleSoft Maintenance Management completes the Enterprise

More information

Improve your Close Cycle Using Financial Close Manager

Improve your Close Cycle Using Financial Close Manager Improve your Close Cycle Using Financial Close Manager 2.28.2014 Presenters Seth Landau EVP of Consulting Services MindStream Analytics slandau@mindstreamanalytics.com www.mindstreamanalytics.com AGENDA

More information

A S S E T I N T E G R I T Y I N T E L L I G E N C E

A S S E T I N T E G R I T Y I N T E L L I G E N C E ASSET INTEGRITY INTELLIGENCE Fe atured Article BEST PRACTICES OF MAINTENANCE PLANNING & SCHEDULING MATT MIDAS, GenesisSolutions, An ABS Group Company VOLUME 21, ISSUE 2 MARCH APRIL 2015 BEST PRACTICES

More information

Mastering Microsoft Project 2010

Mastering Microsoft Project 2010 Mastering Microsoft Project 2010 Duration: 2 days Course Description This two-day instructor-led course provides students with the knowledge and skills to plan and manage projects using Microsoft Project

More information

Priori ty ... ... ...

Priori ty ... ... ... .Maintenance Scheduling Maintenance scheduling is the process by which jobs are matched with resources (crafts) and sequenced to be executed at certain points in time. The maintenance schedule can be prepared

More information

Mastering Microsoft Project 2010 50413B; 3 days, Instructor-led

Mastering Microsoft Project 2010 50413B; 3 days, Instructor-led Mastering Microsoft Project 2010 50413B; 3 days, Instructor-led Course Description This three-day instructor-led course provides students with the knowledge and skills plan and manage projects using Microsoft

More information

Add one or multiple jobs to your field logs with the ability to assign job-specific properties, such as unique labor and equipment rates.

Add one or multiple jobs to your field logs with the ability to assign job-specific properties, such as unique labor and equipment rates. The Operational Networked Elements platform provides the base infrastructure and shared services for B2W Estimate and the B2W Operational Suite which includes B2W Dispatch, B2W Track, and B2W Maintain

More information

The Art of the Possible Scheduling Options in SAP. Mark W. Scott Vesta Partners, LLC

The Art of the Possible Scheduling Options in SAP. Mark W. Scott Vesta Partners, LLC The Art of the Possible Scheduling Options in SAP Mark W. Scott Vesta Partners, LLC The Tool and the Challenge The Parts The Options The Results Scheduling in SAP What I ll cover: The Parts The Options

More information

NE-50413B Mastering Microsoft Project 2010

NE-50413B Mastering Microsoft Project 2010 NE-50413B Mastering Microsoft Project 2010 Summary Duration Vendor 3 Days Microsoft Audience This course is intended for both novice and experienced Project Managers and project support personnel who need

More information

Project Management: Intermediate Microsoft Project 2010

Project Management: Intermediate Microsoft Project 2010 Project Management: Intermediate Microsoft Project 2010 This document includes instructions for managing resources, updating project plans, and designing visual reports. Managing Resources in a Project

More information

Seradex White Paper A newsletter for manufacturing organizations April, 2004

Seradex White Paper A newsletter for manufacturing organizations April, 2004 Seradex White Paper A newsletter for manufacturing organizations April, 2004 Using Project Management Software for Production Scheduling Frequently, we encounter organizations considering the use of project

More information

MSD Supply Chain Programme Strategy Workshop

MSD Supply Chain Programme Strategy Workshop MSD Supply Chain Programme Strategy Workshop Day 2 APPENDIX Accenture Development Partnerships Benchmarking MSD s Current Operating Supply Chain Capability 1.0 Planning 2.0 Procurement 3.0 Delivery 4.0

More information

Oracle EBS Service Contracts Extensions for Oracle Endeca

Oracle EBS Service Contracts Extensions for Oracle Endeca Oracle EBS Service Contracts Extensions for Oracle Endeca Amit Jha Project Leader, Product Management Oracle EBS Procurement & Contracts October 02, 2014 Safe Harbor Statement The following is intended

More information

Improving Offshore Supply Chain by Predictive Asset Management Making Smarter Business Decisions

Improving Offshore Supply Chain by Predictive Asset Management Making Smarter Business Decisions Improving Offshore Supply Chain by Predictive Asset Management Making Smarter Business Decisions Aberdeen, 28 November 2013 Agenda: Asset Management as the front office of the offshore supply chain Impact

More information

NEW FEATURE OVERVIEW SPRINGCM S APPROVAL WORKFLOW TOOL (AKA ROUTING AND APPROVAL WORKFLOW)

NEW FEATURE OVERVIEW SPRINGCM S APPROVAL WORKFLOW TOOL (AKA ROUTING AND APPROVAL WORKFLOW) NEW FEATURE OVERVIEW SPRINGCM S APPROVAL WORKFLOW TOOL (AKA ROUTING AND APPROVAL WORKFLOW) SpringCM is deploying a new series of enhancements to the Approval workflow. Approval Workflows is a core platform

More information

Hands-on Sessions Each attendee will use a computer to walk-through training material.

Hands-on Sessions Each attendee will use a computer to walk-through training material. Training Guide Use our Training Guide to help find out which sessions you should attend. Hands-on Sessions Each attendee will use a computer to walk-through training material. Mobile App Content Sessions

More information

Maximo 7 Training Guide. Service Provider. 3451 NE 1 st Ave M1008 Miami, FL 33137

Maximo 7 Training Guide. Service Provider. 3451 NE 1 st Ave M1008 Miami, FL 33137 Maximo 7 Training Guide Service Provider 3451 NE 1 st Ave M1008 Miami, FL 33137 TABLE OF CONTENTS I CHAPTER 1 SERVICE PROVIDER OVERVIEW... 3 1.1 Introduction to the Maximo Service Provider...3 1.2 Maximo

More information

Infor LN Service User Guide for Service Scheduler Workbench

Infor LN Service User Guide for Service Scheduler Workbench Infor LN Service User Guide for Service Scheduler Workbench Copyright 2015 Infor Important Notices The material contained in this publication (including any supplementary information) constitutes and contains

More information

idocuments Solutions Overview Enterprise financial management & workforce solutions www.idocuments.net June 2015

idocuments Solutions Overview Enterprise financial management & workforce solutions www.idocuments.net June 2015 idocuments Enterprise financial management & workforce solutions Solutions Overview June 2015 Sy na nt i x Ltd. All r ig ht s r es er ved. P a g e 1 17 Contents Introducing idocuments... 3 Mobile Approvals

More information

OVERVIEW. Microsoft Project terms and definitions

OVERVIEW. Microsoft Project terms and definitions PROJECT 2003 DISCLAIMER: This reference guide is meant for experienced Microsoft Project users. It provides a list of quick tips and shortcuts for familiar features. This guide does NOT replace training

More information

Generate optimal production schedules to maximize profitability and meet service levels

Generate optimal production schedules to maximize profitability and meet service levels Aspen Plant Scheduler Family Generate optimal production schedules to maximize profitability and meet service levels Aspen Plant Scheduler Family is comprised of a three-tiered scheduling solution designed

More information

Welcome to the topic on creating key performance indicators in SAP Business One, release 9.1 version for SAP HANA.

Welcome to the topic on creating key performance indicators in SAP Business One, release 9.1 version for SAP HANA. Welcome to the topic on creating key performance indicators in SAP Business One, release 9.1 version for SAP HANA. 1 In this topic, you will learn how to: Use Key Performance Indicators (also known as

More information

QAD Mobile Field Service (MFS) Demonstration Guide. May 2015 EE2015 / MFS 3.7

QAD Mobile Field Service (MFS) Demonstration Guide. May 2015 EE2015 / MFS 3.7 QAD Mobile Field Service (MFS) Demonstration Guide May 2015 EE2015 / MFS 3.7 Overview This demonstration focuses on one aspect of QAD Service and Support Mobile Field Service and shows how this functionality

More information

PayPal Integration Guide

PayPal Integration Guide PayPal Integration Guide Table of Contents PayPal Integration Overview 2 Sage Accounts Setup 3 Obtaining API credentials from PayPal 4 Installing Tradebox Finance Manager 5 Creating a connection to PayPal

More information

Evaluation Guide. Sales Quota Allocation Performance Blueprint

Evaluation Guide. Sales Quota Allocation Performance Blueprint Evaluation Guide Sales Quota Allocation Performance Blueprint Introduction Pharmaceutical companies are widely recognized for having outstanding sales forces. Many pharmaceuticals have hundreds of sales

More information

Oracle Utilities Work and Asset Management

Oracle Utilities Work and Asset Management Oracle Utilities Work and Asset Management User Guide Release 2.1.0 E61870-01 May 2015 Oracle Utilities Work and Asset Management User Guide Release 2.1.0 E61870-01 May 2015 Documentation build: 4.30.2015

More information

Microsoft Project 2013

Microsoft Project 2013 CALIFORNIA STATE UNIVERSITY, LOS ANGELES INFORMATION TECHNOLOGY SERVICES Microsoft Project 2013 Summer 2014, Version 1.0 Table of Contents Introduction...2 Overview of the User Interface...2 Creating a

More information

GroupWise Calendar GroupWise Task Lists GroupWise Reminder Notes Recurring Events Proxy Access Shared Folders

GroupWise Calendar GroupWise Task Lists GroupWise Reminder Notes Recurring Events Proxy Access Shared Folders GroupWise Calendar GroupWise Task Lists GroupWise Reminder Notes Recurring Events Proxy Access Shared Folders Table of Contents Calendar Overview...1 Different Calendar Views...1 Set Default View...1 Set

More information

The power to transform your business

The power to transform your business The power to transform your business Optimus 2020 continues to be the number one choice for litho and packaging printers worldwide. What is the secret of our longevity? Constant research and forward thinking

More information

Advanced Planning and Scheduling

Advanced Planning and Scheduling Taylor Scheduler Welcome! Taylor Scheduler is our advanced planning and production scheduling software. Its many features allow Taylor Scheduler to be able to handle just about any manufacturing scheduling

More information

Mastering Microsoft Project 2013

Mastering Microsoft Project 2013 Course 55054: Mastering Microsoft Project 2013 Page 1 of 9 Mastering Microsoft Project 2013 Course 55054: 2 days; Instructor-Led Introduction This two-day, instructor-led course is intended for individuals

More information

SAP Preventive Maintenance The Core and More. Len Harms - Vesta

SAP Preventive Maintenance The Core and More. Len Harms - Vesta SAP Preventive Maintenance The Core and More Len Harms - Vesta Agenda The Core Preventive Maintenance The Core Light CBM and More The Core PM Preventive Maintenance: Forms Preventive maintenance Time-based

More information

Siebel Professional Services Automation Guide

Siebel Professional Services Automation Guide Siebel Professional Services Automation Guide Version 7.7 November 2004 Siebel Systems, Inc., 2207 Bridgepointe Parkway, San Mateo, CA 94404 Copyright 2004 Siebel Systems, Inc. All rights reserved. Printed

More information

Volunteers for Salesforce User s Guide Version 3.5

Volunteers for Salesforce User s Guide Version 3.5 Volunteers for Salesforce User s Guide Version 3.5 September 14, 2013 www.rg 1 Djhconsulting.com 1 CONTENTS 1. What is Volunteers for Salesforce?... 4 1.1 Overview... 4 1.2 How You Might Use It... 5 2.

More information

Mastering Microsoft Project 2013 Course: 55054A Course Length: 3 Days

Mastering Microsoft Project 2013 Course: 55054A Course Length: 3 Days 3 Riverchase Office Plaza Hoover, Alabama 35244 Phone: 205.989.4944 Fax: 855.317.2187 E-Mail: rwhitney@discoveritt.com Web: www.discoveritt.com Mastering Microsoft Project 2013 Course: 55054A Course Length:

More information

Software Development & Education Center. Microsoft Office 2010. (Microsoft Project 2010)

Software Development & Education Center. Microsoft Office 2010. (Microsoft Project 2010) Software Development & Education Center Microsoft Office 2010 (Microsoft Project 2010) Mastering Microsoft Project 2010 About This Course This three-day instructor-led course provides students with the

More information

Omatics User s Guide

Omatics User s Guide Omatics User s Guide Web Interface V2.1 User s Guide Table of Contents I. Introduction... 2 II. The Omatics Interface... 3 III. Omatics Functionality... 4 A. Launching Omatics... 4 B. Viewing current vehicle

More information

Microsoft Dynamics NAV

Microsoft Dynamics NAV Microsoft Dynamics NAV Maximizing value through business insight Business Intelligence White Paper November 2011 The information contained in this document represents the current view of Microsoft Corporation

More information

QAD EAM - Maintenance Demonstration Guide. August 4, 2015 EAM 2015

QAD EAM - Maintenance Demonstration Guide. August 4, 2015 EAM 2015 QAD EAM - Maintenance Demonstration Guide August 4, 2015 EAM 2015 Overview This demonstration focuses on one aspect of QAD Enterprise Asset Management (EAM) Maintenance and shows how this functionality

More information

www.fieldez.com FieldEZ for Oil and Gas

www.fieldez.com FieldEZ for Oil and Gas www.fieldez.com FieldEZ for Oil and Gas Overview Operating in a truly dynamic environment that includes fluctuating energy prices, strict government regulations and environmental pressures while balancing

More information

End-to-end Field Service Management

End-to-end Field Service Management End-to-end Field Service Management Building end-to-end field service management solutions around your unique business processes Customer Self-Service Service Desk Software Workforce Scheduling Mobile

More information

Service Management Series Realize Improved Service and Higher Profitability

Service Management Series Realize Improved Service and Higher Profitability Service Management Series Realize Improved Service and Higher Profitability Designed to meet the diverse needs of asset-based service organizations, the WennSoft Service Management Series can help effectively

More information

Planning and Managing Projects with Microsoft Project Professional 2013

Planning and Managing Projects with Microsoft Project Professional 2013 Slides Slides Slides Steps to Enter Resource Types: 1. Click View and Resource Sheet 2. In the Type column of a resource, select Work, Material, or Cost, and press Enter on your keyboard Important

More information

Leave Manager X. Basic Office Online TM Software Product Details

Leave Manager X. Basic Office Online TM Software Product Details Web-based Leave Management system, for tracking various types of Leave and Absence through-out your Company. Available as either an online hosted service (SaaS solution) or as an on site office software

More information

Planning and Managing Projects with Microsoft Project Professional 2013

Planning and Managing Projects with Microsoft Project Professional 2013 Slides Steps to Enter Duration: 1. In the Duration column of a task, enter a value, and press Enter on your keyboard Important Points: The default time unit is days, so when you enter 5, this becomes 5

More information

Top reasons why ekanban should be a key element of your lean manufacturing plan

Top reasons why ekanban should be a key element of your lean manufacturing plan Infor ERP Top reasons why ekanban should be a key element of your lean manufacturing plan Table of contents Executive summary... 3 Reactive manufacturing model... 4 Move over manual Kanban... 6 Electronic

More information

Intelligent Process Management & Process Visualization. TAProViz 2014 workshop. Presenter: Dafna Levy

Intelligent Process Management & Process Visualization. TAProViz 2014 workshop. Presenter: Dafna Levy Intelligent Process Management & Process Visualization TAProViz 2014 workshop Presenter: Dafna Levy The Topics Process Visualization in Priority ERP Planning Execution BI analysis (Built-in) Discovering

More information

SuccessFactors Learning: Scheduling Management

SuccessFactors Learning: Scheduling Management SuccessFactors Learning: Scheduling Management Classroom Guide v 6.4 For SuccessFactors Learning v 6.4 Last Modified 08/30/2011 2011 SuccessFactors, Inc. All rights reserved. Execution is the Difference

More information

Table of Contents. Revision 3.0-2 -

Table of Contents. Revision 3.0-2 - Table of Contents Introduction...3 Overview...4 Beginner Checklist...5 Account Activation...6 New Account Setup...7 Navigating Account Setup Helper...8 Configure Business Hours...9 Create Personnel Record...11

More information

Enhance Production in 6 Steps Using Preventive Maintenance

Enhance Production in 6 Steps Using Preventive Maintenance Enhance Production in 6 Steps Using Preventive Maintenance 1 Enhance Production in 6 Steps Using Preventive Maintenance Preventive Maintenance (PM) is 30% less expensive than reactive approaches Using

More information

Microsoft Project 2007 Level 1: Creating Project Tasks

Microsoft Project 2007 Level 1: Creating Project Tasks Microsoft Project 2007 Level 1: Creating Project Tasks By Robin Peers Robin Peers, 2008 ABOUT THIS CLASS Regardless of job title, most of us have needed to act as a project manager, at one time or another.

More information

ORACLE MANUFACTURING EXECUTION SYSTEM FOR DISCRETE MANUFACTURING

ORACLE MANUFACTURING EXECUTION SYSTEM FOR DISCRETE MANUFACTURING ORACLE MANUFACTURING EXECUTION SYSTEM FOR DISCRETE MANUFACTURING KEY FEATURES The Manufacturing Execution System for Discrete Manufacturing is comprised of the MES Workstation for Operators and the MES

More information

Refinery Planning & Scheduling - Plan the Act. Act the Plan.

Refinery Planning & Scheduling - Plan the Act. Act the Plan. Refinery Planning & Scheduling - Plan the Act. Act the Plan. By Sowmya Santhanam EXECUTIVE SUMMARY Due to the record high and fluctuating crude prices, refineries are under extreme pressure to cut down

More information

Copyright 2016 by the Construction Financial Management Association (CFMA). All rights reserved. This article first appeared in CFMA Building Profits

Copyright 2016 by the Construction Financial Management Association (CFMA). All rights reserved. This article first appeared in CFMA Building Profits opyright 2016 by the onstruction Financial Management Association (FMA). All rights reserved. This article first appeared in FMA uilding Profits (a member-only benefit) and is reprinted with permission.

More information

Module A2 Item Activities, Gantt Chart and Utilization Sheet

Module A2 Item Activities, Gantt Chart and Utilization Sheet Module A2 Item Activities, Gantt Chart and Utilization Sheet A2.1 Project item activities A2.2 Gantt chart A2.3 Utilization sheet 1 Module 1. Project item activities, Gantt Chart & Utilization Sheet Contents...

More information

Graphical Scheduler. Get on time All the time. For Production

Graphical Scheduler. Get on time All the time. For Production Graphical Scheduler Get on time All the time For Production Summary JobPack Graphical Scheduler provides REAL DELIVERY DATES, Instantly and in real time. At a glance late jobs are known, bottlenecks identified,

More information

IBM Tivoli Software. Maximo Business Intelligence Work Packs. Workorder, Asset Failure, Asset and Inventory Management

IBM Tivoli Software. Maximo Business Intelligence Work Packs. Workorder, Asset Failure, Asset and Inventory Management IBM Tivoli Software Maximo Asset Management Version 7.5 Releases Maximo Business Intelligence Work Packs Workorder, Asset Failure, Asset and Inventory Management Revision 4 Pam Denny Maximo Report Designer/Architect

More information

Job Management Software. Integrated Job Management Solution for Sage 100 ERP

Job Management Software. Integrated Job Management Solution for Sage 100 ERP Job Management Software Integrated Job Management Solution for Sage 100 ERP Getting The Job Done Right One Business Solution When your business data is housed in disparate systems, efficiency plummets

More information

CMU/SCS Computing Facilities. Microsoft Outlook 2010 Calendar Guide

CMU/SCS Computing Facilities. Microsoft Outlook 2010 Calendar Guide CMU/SCS Computing Facilities Microsoft Outlook 2010 Calendar Guide Table of Contents Opening Outlook... 2 Finding your Calendar... 2 Creating entries on your calendar... 2 Appointments... 2 Meetings...

More information

LONG INTERNATIONAL. Long International, Inc. 10029 Whistling Elk Drive Littleton, CO 80127-6109 (303) 972-2443 Fax: (303) 972-6980

LONG INTERNATIONAL. Long International, Inc. 10029 Whistling Elk Drive Littleton, CO 80127-6109 (303) 972-2443 Fax: (303) 972-6980 LONG INTERNATIONAL Long International, Inc. 10029 Whistling Elk Drive Littleton, CO 80127-6109 (303) 972-2443 Fax: (303) 972-6980 www.long-intl.com Scott M. Francis, P.E., PSP Table of Contents 1. INTRODUCTION...

More information

Welcome to the First Step Webinar!

Welcome to the First Step Webinar! Welcome to the First Step Webinar! Your presenter will be with you shortly. Please print out the presentation for notetaking purposes at: http://abacuslaw.com/client-center/training Working with the Calendar

More information

Guide to Using Outlook Calendar for Meeting Arrangements

Guide to Using Outlook Calendar for Meeting Arrangements Guide to Using Outlook Calendar for Meeting Arrangements Using Outlook Calendar to arrange meetings and share information on availability across the university can help to save time on administration and

More information

SAP APO SNP (Supply Network Planning) Sample training content and overview

SAP APO SNP (Supply Network Planning) Sample training content and overview SAP APO SNP (Supply Network Planning) Sample training content and overview Course Objectives At the completion of this course, you will be able to: Understand the concepts of SNP and supply chain network

More information

perspective Shrink Resolution Times with Field Service Automation (FSA) Abstract

perspective Shrink Resolution Times with Field Service Automation (FSA) Abstract perspective Shrink Resolution Times with Field Service Automation (FSA) Abstract The end goal of any organization is a satisfied customer. The process of locating, procuring, and transporting the ingredients

More information

MAXIMO Project Manager User s Guide

MAXIMO Project Manager User s Guide MAXIMO Project Manager User s Guide Release 5.2 November 2003 This document and its publication do not constitute or create a contract. MRO Software, Inc. makes no warranties, express or implied, as to

More information

PREMIER SERVICES MAXIMIZE PERFORMANCE AND REDUCE RISK

PREMIER SERVICES MAXIMIZE PERFORMANCE AND REDUCE RISK MAXIMIZE PERFORMANCE AND REDUCE RISK 1 BROCHURE COMPLEXITIES IN MISSION CRITICAL SYSTEMS CONTINUE TO INCREASE Mission critical communications systems have become increasingly complex as more features and

More information

The transition to a complete paperless system for operations process management will yield the following immediate benefits:

The transition to a complete paperless system for operations process management will yield the following immediate benefits: Solumina is designed for companies that manufacture or service complex products with multiple levels of sub-assemblies, and that are subject to frequent engineering changes. PROCESS PLANNING MANUFACTURING

More information

CPM Scheduling with Primavera Unifier

CPM Scheduling with Primavera Unifier CPM Scheduling with Primavera Unifier Don McNatty, PSP March 26, 2014 2014 Technical Webinar Series Thank you for joining today s technical webinar Mute all call in phones are automatically muted in order

More information

CMMS/EAM. Maintenance Solutions

CMMS/EAM. Maintenance Solutions CMMS/EAM Maintenance Solutions Superior Functionality. Fully Integrated Solution. Maximum System Support. Maximize Critical Assets Maintenance Software Solutions For nearly 40 years, CHAMPS has remained

More information

Pure1 Manage User Guide

Pure1 Manage User Guide User Guide 11/2015 Contents Overview... 2 Pure1 Manage Navigation... 3 Pure1 Manage - Arrays Page... 5 Card View... 5 Expanded Card View... 7 List View... 10 Pure1 Manage Replication Page... 11 Pure1

More information

Business ByDesign. The SAP Business ByDesign solution helps you optimize project management

Business ByDesign. The SAP Business ByDesign solution helps you optimize project management SAP Functions in Detail SAP Solutions for Small Businesses and Midsize Companies Efficient Project Management Drive Project Success with SAP Business ByDesign The SAP Business ByDesign solution helps you

More information

OPTIMIZING PRODUCTION

OPTIMIZING PRODUCTION REAL WORLD SCENARIOS Volume 2 Cases 7-12 OPTIMIZING PRODUCTION SQUEEZE MORE OUT OF PRODUCTION OPTIMIZING SCHEDULING PRODUCTION FLOW IMPROVEMENTS INTEGRATED MAINTENANCE PLANNING INTEGRATED PROJECT MANAGEMENT

More information

Microsoft Project 2010 builds on the Microsoft Project 2007 foundation with flexible work management solutions and the right collaboration tools for

Microsoft Project 2010 builds on the Microsoft Project 2007 foundation with flexible work management solutions and the right collaboration tools for Microsoft Project 2010 builds on the Microsoft Project 2007 foundation with flexible work management solutions and the right collaboration tools for occasional and professional project managers. Project

More information

PERCEPTION PERT-PAC Using Microsoft Project 2000

PERCEPTION PERT-PAC Using Microsoft Project 2000 PERCEPTION PERT-PAC Using Microsoft Project 2000 to Plan & Schedule A Training Tutorial (Sample Hull Block Construction) 1 This training tutorial outlines the basic features of the Microsoft Project 2000

More information

Automated Receiving. Saving Money at the Dock Door. Page 8

Automated Receiving. Saving Money at the Dock Door. Page 8 Automated Receiving Saving Money at the Dock Door Page 8 Today s warehouse management and automated sortation systems are far easier to integrate than in the past. As a result, distribution centers are

More information

SOSMobile. Intelligently Automating Your Utility s Mobile Workforce. Providing Quality Software and Service to the Utility Industry Since 1999

SOSMobile. Intelligently Automating Your Utility s Mobile Workforce. Providing Quality Software and Service to the Utility Industry Since 1999 Intelligently Automating Your Utility s Mobile Workforce www.insightatlast.com info@insightatlast.com Product Sheet Overview The SOSMobile suite of software products has a proven record of providing utilities

More information

SAP Multiresource Scheduling Solution Brief. Aug / 2015

SAP Multiresource Scheduling Solution Brief. Aug / 2015 SAP Multiresource Scheduling Solution Brief Aug / 2015 Introduction SAP Multiresource Scheduling Functionality, Integration and Technology as enabler SAP Multiresource Scheduling is the resource management

More information

QAD Field Service Scheduler Demonstration Guide. May 2015 EE2015

QAD Field Service Scheduler Demonstration Guide. May 2015 EE2015 QAD Field Service Scheduler Demonstration Guide May 2015 EE2015 Overview This demonstration focuses on one aspect of QAD SSM Field Service Scheduler and shows how this functionality supports the vision

More information

MONITORING PERFORMANCE IN WINDOWS 7

MONITORING PERFORMANCE IN WINDOWS 7 MONITORING PERFORMANCE IN WINDOWS 7 Performance Monitor In this demo we will take a look at how we can use the Performance Monitor to capture information about our machine performance. We can access Performance

More information

The Resource Management Life Cycle

The Resource Management Life Cycle The Resource Management Life Cycle Resource Planning for 2013 Revised November 2012 http://epmlive.com Contents Introduction...2 What is Resource Management?...2 Who Participates in Resource Management?...2

More information

WORKFORCE MANAGEMENT HAS NEVER BEEN SO EASY

WORKFORCE MANAGEMENT HAS NEVER BEEN SO EASY WORKFORCE MANAGEMENT HAS NEVER BEEN SO EASY INTRODUCTION TO TIMETARGET TimeTarget is a market leading Workforce Management, Time and Attendance and Rostering solution. It allows you to streamline and automate

More information

CA Clarity PPM. Project Management User Guide. v13.0.00

CA Clarity PPM. Project Management User Guide. v13.0.00 CA Clarity PPM Project Management User Guide v13.0.00 This documentation, which includes embedded help systems and electronically distributed materials, (hereinafter referred to as the Documentation )

More information

for Sage 100 ERP Work Order Overview Document

for Sage 100 ERP Work Order Overview Document for Sage 100 ERP Work Order Document 2012 Sage Software, Inc. All rights reserved. Sage Software, Sage Software logos, and the Sage Software product and service names mentioned herein are registered trademarks

More information

ELECTRO-MECHANICAL PROJECT MANAGEMENT

ELECTRO-MECHANICAL PROJECT MANAGEMENT CHAPTER-9 ELECTRO-MECHANICAL PROJECT MANAGEMENT Y K Sharma,SDE(BS-E), 9412739241(M) E-Mail ID: yogeshsharma@bsnl.co.in Page: 1 Electro-mechanical Project Management using MS Project Introduction: When

More information

Distribution Training Guide. D110 Sales Order Management: Basic

Distribution Training Guide. D110 Sales Order Management: Basic Distribution Training Guide D110 Sales Order Management: Basic Certification Course Prerequisites The combined D110 Sales Order Management certification course consists of a hands- on guide that will walk

More information

Agenda. Copyright 2012 2013 Acuity Business Solutions, LLC All Rights Reserved

Agenda. Copyright 2012 2013 Acuity Business Solutions, LLC All Rights Reserved Agenda Understand the reasons your firm purchased Vision analyzing your company s pain points What is an ERP and how is it different? Project Lifecycle Reasons why firms fail at implementation or user

More information

Nortel Networks Symposium Call Center Web Client Supervisor s Reference Guide

Nortel Networks Symposium Call Center Web Client Supervisor s Reference Guide 297-2183-918 Nortel Networks Symposium Call Center Web Client Supervisor s Reference Guide Product release 4.5/SU02 Standard 2.0 December 2003 Nortel Networks Symposium Call Center Web Client Supervisor

More information

Product Documentation SAP Business ByDesign 1302. Supply Chain Planning and Control

Product Documentation SAP Business ByDesign 1302. Supply Chain Planning and Control Product Documentation PUBLIC Supply Chain Planning and Control Table Of Contents 1 Supply Chain Planning and Control.... 6 2 Business Background... 8 2.1 Demand Planning... 8 2.2 Forecasting... 10 2.3

More information

Service Desk Edition

Service Desk Edition Service Desk Edition isupport - Overview isupport helps you to perform functions such as creating and managing incidents, entering and searching for knowledge entries and FAQs, tracking assets, customers,

More information

abf Avercast Business Forecasting The Trusted Name in Demand Management. Software Features: Enterprise Level Software Solutions for: The Cloud

abf Avercast Business Forecasting The Trusted Name in Demand Management. Software Features: Enterprise Level Software Solutions for: The Cloud Avercast Business Forecasting Avercast Business Forecasting (ABF) is powered by an industry leading 187 forecasting algorithms. ABF systematically measures each algorithm against up to five years of historical

More information

Chapter 9 Computer Scheduling Projects should be scheduled one byte at a time

Chapter 9 Computer Scheduling Projects should be scheduled one byte at a time Chapter 9 Computer Scheduling Projects should be scheduled one byte at a time Computer Scheduling Critical path method (CPM) requires numerous computations to determine activity start and finish dates,

More information

Sonatype CLM Server - Dashboard. Sonatype CLM Server - Dashboard

Sonatype CLM Server - Dashboard. Sonatype CLM Server - Dashboard Sonatype CLM Server - Dashboard i Sonatype CLM Server - Dashboard Sonatype CLM Server - Dashboard ii Contents 1 Introduction 1 2 Accessing the Dashboard 3 3 Viewing CLM Data in the Dashboard 4 3.1 Filters............................................

More information

Project Portfolio Management (PPM) IT Project and Portfolio Management. State: New York. Department of Taxation and Finance

Project Portfolio Management (PPM) IT Project and Portfolio Management. State: New York. Department of Taxation and Finance Project Portfolio Management (PPM) IT Project and Portfolio Management State: New York Department of Taxation and Finance Section B - Executive Summary In the spring of 2003, formal Project Portfolio Management

More information

workforceiq Job Despatch and Workforce Management software for Smartphones

workforceiq Job Despatch and Workforce Management software for Smartphones workforceiq Job Despatch and Workforce Management software for Smartphones 1 What it does workforceiq is a pioneering workforce management and mobile job despatch system. Using existing smartphones, you

More information