1 Savannah Harbor Expansion Project Presentation To The Propeller Club 14 March 2013 By LTC Thomas Woodie Deputy Commander, Savannah District US Army Corps of Engineers

2 Agenda Quick Overview of SHEP Next Steps Designs for First Features Construction Timeline Questions 2

3 Existing Project 42-ft Navigation Channel 32.7 miles long 7 Turning Basins 7 Confined Disposal Facilities, 5,305 ac Offshore Dredged Material Disposal Site, 4.26 sq mi Freshwater Control System Depth and tide restricted Garden City Terminal 4th largest container port in US 2nd largest container port on East Coast US Largest single terminal in North America 3 Fastest growing container port in the Nation since 2001

4 SHEP Bottom Line Up Front NED & Selected Plan is the 47-foot alternative Yields $174 M in total annual net benefits Project First Cost $652 M at FY 12 price levels Benefit to Cost Ratio of 5.5 to 1 Annual O&M costs increase from $22 M to $27 M Environmental impacts can be mitigated to an acceptable level The CMA CGM FIGARO (8500 TEUs) 4

5 Project Objectives Improve the efficiency of moving goods through Savannah Harbor Reduce tidal constraints Avoid, minimize and mitigate impacts to maximum practicable extent 4,600 TEUs 8,200 TEUs 5

6 Engineering Overview Individual Studies Were Conducted 6

7 Summary of Environmental Effects Project features adequately mitigate for: Loss of 16 AC brackish marsh (0.85 in SC) Conversion of tidal marshes 223 AC freshwater marsh to brackish marsh (none in SC) 740 AC salt marsh to brackish marsh (563 in SC) Loss of fish habitat 7% loss in shortnose sturgeon winter habitat 10% loss in striped bass spawning habitat Impacts to dissolved oxygen Impacts to drinking water Other project effects: Gain in southern flounder habitat (57%) Gains in dissolved oxygen 7

8 Economics Overview TEU Projections 2030 Container Fleet (6,500,000 TEUs) Garden City Terminal Reaches Maximum TEU through-put Capacity in 2030 With deepening, increased proportions of more efficient Post-Panamax Generation II vessels call at Savannah 8

9 47 NED Selected Plan Value to the Nation - 4th largest container port in US - Largest single terminal operation in North America - Fastest growing container port in the Nation for the last 10 years M TEU through-put in Supports in GA over 352,000 jobs, $18.5B in income and $2.5B in state and local taxes annually - Supports in SC over 19,700 jobs, $959M in income, $147M in state and local taxes annually - $66.9B in GA revenue (9% of GA total sales) annually - $4.3B in SC revenue (1.3% of SC total sales) annually Project Information - Deepen from 42 to 47 NED selected plan - $652M Total First Cost (FY 12 Price Levels) - $311M Total Mitigation Cost - 70% Federal 29% Non-Federal Cost Share: - $174M Annual Net Benefits -Benefits Derived From Increased Transportation Efficiencies - 4% (discount rate) Benefit to Cost Ratio - Projected to create 11,000+ jobs nationwide 9

10 Cost Summary 47 NED Selected Plan Cost Amount in Millions Channel modification and dredged material placement $257 Fish, Wildlife & Wetlands mitigation features $221 Other mitigation features $71 Lands Easements Rights of Way Relocations (LERRs) $19 Pre-Eng and Design (including $41M sunk costs) $69 Construction Management $15 Total $652 Note: The project has a Benefit Cost Ratio of 5.5 to 1 and mitigation and environmental features are 47% of the Project First Cost. 10

11 Navigation Features FEATURE Program Value Outer Harbor Dredging $81M Inner Harbor Dredging 157M USCG Navigation Aids $5M Disposal Area 14A & B Dike Raising $12M Additional Dike Raising $8M

12 Mitigation Features FEATURE Program Value Fish Passage $30M 1S Marsh Restoration $18M Raw Water Storage Impoundment $26M Striped Bass Stocking Payment $3M Dissolved Oxygen Injection System $72M Monitoring $42M CSS Georgia Removal $14M McCoy s Cut Work $15M Sediment Basin Work $52M 12

13 Progress to Date April 2012: Release of Final Report August 2012: Chief of Engineers signs Final Report October 2012: Record of Decision signed

14 What s Next? Complete designs for first features Legal challenges by SELC and SC SRMC Congressional Approval for Cost Increase (902 limit fix) Cost Share Agreement (PPA with Georgia) FY14 is earliest we can expect funding

15 Disposal Area 14A & 14B Dike Raisings Work performed by USACE 15

16 Up River Site Upper River Site Dissolved Oxygen Injection Work performed by Down River Site 16

17 Injection Concept 17

18 CSS Georgia Recovery Work performed by U.S. Navy 18 BUILDING STRONG

19 CSS Georgia Ordnance 1863 Inventory of Guns 1 EA - 6 Pounder 3 EA 8-Inch Shell Guns 2 EA 9-Inch Shell Guns 1 EA 24-Pounder 4 EA 32-Pounder Rifles 1986 Dive Operations Recovered Items 1 EA 24-Pounder 1EA 32 Pounder Rifle Assorted Brooke Projectiles, Percussion Fuses and Spherical Shot Known Remaining Guns in the Debris Field 2 EA 32 Pounder Rifles 1 EA No. 1 Cannon (On Inventory Listed as an 8-Inch Shell Gun) 19

20 CSS Georgia Curation 20

21 CSS Georgia Curation 21

22 Work performed by Augusta, GA New Savannah Bluff Lock & Dam Fish Passage Savannah Harbor 22

23 Rendition of NSBL&D 23

24 McCoys Cut Diversion Structure Flow Re-Routing Work performed by 24

25 Raw Water Storage Impoundment Work performed by 25

26 Storage Impoundment Concept 26

27 Raw Water Storage Example 27

28 SHEP Construction Timeline 28

29 Selected Plan (47-foot alternative) is well justified Benefit to Cost Ratio of 5.5 to 1 Project First Cost $652 M at FY 12 levels yields $174 M in total annual benefits Annual O&M costs increase from $22 M to $27 M Environmental impacts would be mitigated to an acceptable level Developed a comprehensive mitigation plan ($311M or 47% of project cost) Includes extensive monitoring and adaptive management SHEP supports the Administration s priorities of being protective of the environment, improving infrastructure, creating jobs, and maintaining global competitiveness ASA(CW) signed ROD on 26 October 2012 Need Congress to adjust 902 limit and signed PPA before construction can begin Designs for first features underway Summary 29

30 Questions? 30

31 Learn more on our website: 31

DEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON, D.C. Z0314-1000

DEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON, D.C. Z0314-1000 DEPARTMENT OF THE ARMY OFFICE OF THE CHIEF OF ENGINEERS WASHINGTON, D.C. Z0314-1000 REPLY TO ATTENTION OF: CECW-PC (l0-1-7a).oi9 MAY 1996. THE SECRETARY OF THE ARMY ". 1. I submit for transmission to Congress

More information

FINAL ENVIRONMENTAL IMPACT STATEMENT SAVANNAH HARBOR EXPANSION PROJECT Chatham County, Georgia and Jasper County, South Carolina

FINAL ENVIRONMENTAL IMPACT STATEMENT SAVANNAH HARBOR EXPANSION PROJECT Chatham County, Georgia and Jasper County, South Carolina FINAL ENVIRONMENTAL IMPACT STATEMENT SAVANNAH HARBOR EXPANSION PROJECT Chatham County, Georgia and Jasper County, South Carolina January 2012 (Revised July 2012) US Army Corps of Engineers Savannah District

More information

COMPROMISE AND SETTLEMENT AGREEMENT

COMPROMISE AND SETTLEMENT AGREEMENT COMPROMISE AND SETTLEMENT AGREEMENT This Compromise and Settlement Agreement (the Agreement ) is made and entered into by and between the Parties as defined below. As used in this Agreement, the term Plaintiffs

More information

United States Army Corps of Engineers, Civil Works

United States Army Corps of Engineers, Civil Works United States Army Corps of Engineers, Civil Works Fiscal Year 2013 Federal Program Inventory May 2013 Table of Contents Introduction... 2 Program Inventory... 3 1. Navigation... 3 2. Flood Risk Management...

More information

Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013

Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013 Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013 1. Design alternatives for large capital flood projects (basinlevel water retention and Interstate

More information

Implementing the Water Resources Development Act of 2007

Implementing the Water Resources Development Act of 2007 Implementing the Water Resources Development Act of 2007 Rich Worthington U.S. Army Corps of Engineers, Headquarters December 5, 2007 WRDA 2007 (PL 110-114 ) PROVISIONS IMPORTANT TO AAPA STATUS: Passed

More information

Watershed Program: A Little Known but Powerful Solution for Integrated Estuarine Restoration

Watershed Program: A Little Known but Powerful Solution for Integrated Estuarine Restoration Watershed Program: A Little Known but Powerful Solution for Integrated Estuarine Restoration Cape Cod Water Resources Restoration Project (CCWRRP) Initial farmer, landowner, and municipal official discussions

More information

April 17, 2015 SUMMARY OF SUBJECT MATTER

April 17, 2015 SUMMARY OF SUBJECT MATTER April 17, 2015 SUMMARY OF SUBJECT MATTER TO: FROM: RE: Members, Subcommittee on Water Resources and Environment Staff, Subcommittee on Water Resources and Environment Hearing on A Review of the President

More information

Sims Bayou Federal Flood Damage Reduction Project

Sims Bayou Federal Flood Damage Reduction Project Sims Bayou Federal Flood Damage Reduction Project A. Gene Rushing, Jr., P.E., PMP HCFCD Project Manager January 15, 2014 Harris County s Watersheds Historical Flooding in Harris County 1929 1935 HCFCD

More information

ADAPTIVE MANAGEMENT OF ENVIRONMENTAL FLOW RESTORATION IN THE SAVANNAH RIVER

ADAPTIVE MANAGEMENT OF ENVIRONMENTAL FLOW RESTORATION IN THE SAVANNAH RIVER ADAPTIVE MANAGEMENT OF ENVIRONMENTAL FLOW RESTORATION IN THE SAVANNAH RIVER J.M. WARD 1 and A.W. MEADOWS 2 1 US Army Corps of Engineers, Savannah River Basin Water Management Unit, Savannah GA, 31401,

More information

RESTORATION AND ENHANCEMENT OF SOUTHERN CALIFORNIA LAGOONS

RESTORATION AND ENHANCEMENT OF SOUTHERN CALIFORNIA LAGOONS RESTORATION AND ENHANCEMENT OF SOUTHERN CALIFORNIA LAGOONS by Hany Elwany, Ph.D. Scripps Institution of Oceanography Headwaters to Oceans Conference 25 October 2003 CE Ref #03-22 San Diego County Lagoons

More information

Community Workshop 5. Overarching Goals for Machado Lake Ecosystem and Wilmington Drain Multi-Use Projects

Community Workshop 5. Overarching Goals for Machado Lake Ecosystem and Wilmington Drain Multi-Use Projects City of Los Angeles Department of Public Works Bureau of Engineering Machado Lake Ecosystem Rehabilitation Project & Wilmington Drain Multi-Use Project Community Workshop 5 February 24, 2009 In association

More information

Flood Risk Management

Flood Risk Management Flood Risk Management Value of Flood Risk Management Every year floods sweep through communities across the United States taking lives, destroying property, shutting down businesses, harming the environment

More information

Flood Risk Management

Flood Risk Management Flood Risk Management Value of Flood Risk Management Value to Individuals and Communities Every year floods sweep through communities across the United States taking lives, destroying property, shutting

More information

Record Growth: Some 22 million containerized tons moved through the Port of Savannah last year.

Record Growth: Some 22 million containerized tons moved through the Port of Savannah last year. GOING DEEP Proponents of the Savannah harbor expansion consider it a key component of economic development in the Southeast, but opponents are raising concerns about the cost. http://www.georgiatrend.com/february-2012/going-deep/

More information

Summary of the Proposed 2017 Nationwide Permits 1

Summary of the Proposed 2017 Nationwide Permits 1 Summary of the Proposed 2017 Nationwide Permits 1 Nationwide Permit NWP 1 Aids to Navigation 10 none PCN not no navigable waters of the U.S. none NWP 2 Structures in 10 none PCN not no navigable waters

More information

USACE Civil Works Infrastructure Investment Trends: Glide-Path to Benign Neglect?

USACE Civil Works Infrastructure Investment Trends: Glide-Path to Benign Neglect? USACE Civil Works Infrastructure Investment Trends: Glide-Path to Benign Neglect? National Waterways Conference Legislative Summit Steven L. Stockton, P.E. Director of Civil Works, U.S. Army Corps of Engineers

More information

How the Chicago District, US Army Corps of Engineers Conducts Project Management 20 November 2013

How the Chicago District, US Army Corps of Engineers Conducts Project Management 20 November 2013 How the Chicago District, US Army Corps of Engineers Conducts Project Management 20 November 2013 Lieutenant Colonel Kevin Lovell Deputy Commander Chicago District US Army Corps of Engineers US Army Corps

More information

SAME Mobile Post Industry Day

SAME Mobile Post Industry Day SAME Mobile Post Industry Day Col lalan M. Dodd District Commander US Army Corps of Engineers, Jacksonville District November 13, 2014 US Army Corps of Engineers AGENDA Introduction to Jacksonville District

More information

Rhode Island NRCS received approximately $2.4 million in ARRA funds to implement four floodplain easement projects.

Rhode Island NRCS received approximately $2.4 million in ARRA funds to implement four floodplain easement projects. American Recovery and Reinvestment Act (ARRA) Emergency Watershed Protection Program Floodplain Easements Rhode Island Natural Resources Conservation Service Rhode Island NRCS received approximately $2.4

More information

U.S. Army Corps of Engineers Tulsa District

U.S. Army Corps of Engineers Tulsa District U.S. Army Corps of Engineers Tulsa District Mike Abate, PMP. Chief, Civil Works Branch, PPMD April 17, 2015 US Army Corps of Engineers Civil Works Mission Water Supply 50% of Corps water supply contracts

More information

30-DAY PUBLIC NOTICE CHELSEA RIVER, EAST BOSTON MASSACHUSETTS EMERGENCY STREAMBANK PROTECTION PROJECT

30-DAY PUBLIC NOTICE CHELSEA RIVER, EAST BOSTON MASSACHUSETTS EMERGENCY STREAMBANK PROTECTION PROJECT PUBLIC NOTICE Engineering/Planning 696 Virginia Road Concord, MA 01742 Date: 10 November, 2015 Comment Period Ends: 10 December, 2015 In Reply, Refer To: Robert Russo Or by e-mail: Robert.S.Russo@usace.army.mil

More information

The Basics of Chapter 105 Waterways and Wetlands Permitting in PA

The Basics of Chapter 105 Waterways and Wetlands Permitting in PA The Basics of Chapter 105 Waterways and Wetlands Permitting in PA April 17, 2013 Goal To develop a basic understanding of PA Department of Environmental Protection (DEP) and US Army Corps of Engineers

More information

30 DAY PUBLIC NOTICE MAINTENANCE DREDGING OF THE FEDERAL NAVIGATION PROJECT IN COHASSET HARBOR COHASSET AND SCITUATE, MASSACHUSETTS

30 DAY PUBLIC NOTICE MAINTENANCE DREDGING OF THE FEDERAL NAVIGATION PROJECT IN COHASSET HARBOR COHASSET AND SCITUATE, MASSACHUSETTS .-ro:'j - I US Army Corps of Engineers r& New England District 696 Virginia Road Concord, MA 01742-2751 Public Notice In Reply Refer to: Mr. Craig Martin nae-pn-nav@usace.army.mil Programs/Project Management

More information

Arkansas River Corridor Vision & Master Plan

Arkansas River Corridor Vision & Master Plan A r k a n s a s R I v e r C o r r I d o r P l a n Arkansas River Corridor Vision & Master Plan July 2005 Indian Nations Council of Governments A r k a n s a s R I v e r C o r r I d o r P l a n Partnership

More information

Summary of the 2012 Nationwide Permits

Summary of the 2012 Nationwide Permits Summary of the 2012 Nationwide Permits Nationwide Permit NWP 1 Aids to Navigation 10 PCN not required NWP 2 Structures in 10 PCN not required Artificial Canals NWP 3 Maintenance 10/404 Does not authorize:

More information

South Florida Everglades Ecosystem Restoration Program

South Florida Everglades Ecosystem Restoration Program South Florida Everglades Ecosystem Restoration Program Restoration Program and Project Briefings Joint Working Group / Science Coordination Group Meeting April 2, 2014 Howie Gonzales Chief, Ecosystem Branch

More information

The Buffalo River Restoration Project Frequently Asked Questions

The Buffalo River Restoration Project Frequently Asked Questions The Buffalo River Restoration Project Frequently Asked Questions The Buffalo River Restoration Partnership is a public-private collaborative effort to clean up sediment in the Buffalo River. Although discharges

More information

Briefing Paper on Lower Galveston Bay and Bayou Watersheds Lower Bay I: Armand Bayou to Moses Lake and Adjacent Bay Waters

Briefing Paper on Lower Galveston Bay and Bayou Watersheds Lower Bay I: Armand Bayou to Moses Lake and Adjacent Bay Waters Briefing Paper on Lower Galveston Bay and Bayou Watersheds Lower Bay I: Armand Bayou to Moses Lake and Adjacent Bay Waters Jim Lester, PhD. and Lisa Gonzalez Houston Advanced Research Center Galveston

More information

Appendix A. Lists of Accomplishments and Project Costs. UMRWD 10 Year Plan Update. Appendix A UPPER MINNESOTA RIVER WATERSHED DISTRICT

Appendix A. Lists of Accomplishments and Project Costs. UMRWD 10 Year Plan Update. Appendix A UPPER MINNESOTA RIVER WATERSHED DISTRICT UPPER MINNESOTA RIVER WATERSHED DISTRICT Lists of Accomplishments and Project Costs 10 Year Plan Update UMRWD 10 Year Plan Update Page A 1 UMRWD LIST OF ACCOMPLISHMENTS Since its inception in 1967, the

More information

Civil Works - FY 2015 CROmnibus & FY 2016 Budget

Civil Works - FY 2015 CROmnibus & FY 2016 Budget Civil Works - FY 2015 CROmnibus & FY 2016 Budget Mark L. Mazzanti Chief, Programs Integration Division Civil Works Directorate, HQUSACE US Army Corps of Engineers BUILDING STRONG 1 BUILDING STRONG USACE

More information

US Army Corps of Engineers Authorities and Programs

US Army Corps of Engineers Authorities and Programs US Army Corps of Engineers Authorities and Programs Section 206; Flood Plain Management Services Program Section 22; Planning assistance to States General Investigations (large-scale flood risk reduction)

More information

2011 Operations, Maintenance, Monitoring and Rehabilitation Plan

2011 Operations, Maintenance, Monitoring and Rehabilitation Plan State of Louisiana Coastal Protection and Restoration Authority of Louisiana 2011 Operations, Maintenance, Monitoring and Rehabilitation Plan for East Marsh Island Marsh Creation State Project Number TV-21

More information

Facing an Uncertain Future: Increasing Resilience at Marinas and Harbors. Recreational Boating Educational Conference December 11, 2014

Facing an Uncertain Future: Increasing Resilience at Marinas and Harbors. Recreational Boating Educational Conference December 11, 2014 Facing an Uncertain Future: Increasing Resilience at Marinas and Harbors Recreational Boating Educational Conference December 11, 2014 Operators Face Change and Challenges Environmental Conditions Fluctuating

More information

Plan Groundwater Procurement, Implementation and Costs, prepared for the Brazos River Authority, July 2005.

Plan Groundwater Procurement, Implementation and Costs, prepared for the Brazos River Authority, July 2005. 6 Conjunctive Use 6.1 Lake Granger Augmentation 6.1.1 Description of Option Rapid population growth and development in Williamson County require additional water supplies throughout the planning period.

More information

New Orleans Hurricane Storm Damage Risk Reduction System Tour March 23 24, 2012

New Orleans Hurricane Storm Damage Risk Reduction System Tour March 23 24, 2012 New Orleans Hurricane Storm Damage Risk Reduction System Tour March 23 24, 2012 Host: Falcolm E. Hull, Vice President/Technical Expert, ARCADIS, U.S. Inc. Attending: Cherie Coffman, Coastal Projection

More information

SECTION 404 OF THE CLEAN WATER ACT

SECTION 404 OF THE CLEAN WATER ACT SECTION 404 OF THE CLEAN WATER ACT A. The Secretary may issue permits, after notice and opportunity for public hearings for the discharge of dredged or fill material into the navigable waters at specified

More information

consulting engineers and scientists

consulting engineers and scientists consulting engineers and scientists Incorporating Sustainable Principles into Cleanups June 2014 Presented by: Rich Truax, PE GEI Consultants, 650 Personnel Nationwide Rich Truax, P.E. Sr. Program Manager

More information

APPENDIX K COASTAL RESOURCES

APPENDIX K COASTAL RESOURCES APPENDIX K COASTAL RESOURCES Delaware Consistency Determination Statement of Consistency The Federal Aviation Administration (FAA) has determined that the proposed New York/New Jersey Philadelphia Metropolitan

More information

A. Flood Management in Nevada

A. Flood Management in Nevada Nevada Division of Water Planning A. Flood Management in Nevada Introduction Flooding has been a concern for Nevada communities since the first settlers moved to the territory in the mid-1800 s. Fourteen

More information

Design And Construction Of The South San Diego Bay Western Salt Pond Restoration Project. 2012 Headwaters To Ocean Conference

Design And Construction Of The South San Diego Bay Western Salt Pond Restoration Project. 2012 Headwaters To Ocean Conference Design And Construction Of The South San Diego Bay Western Salt Pond Restoration Project 2012 Headwaters To Ocean Conference David Cannon, M.C.E., P.E. President/Principal Engineer Everest International

More information

A Cost Analysis of Stream Compensatory Mitigation Projects in the Southern Appalachian Region 1

A Cost Analysis of Stream Compensatory Mitigation Projects in the Southern Appalachian Region 1 A Cost Analysis of Stream Compensatory Mitigation Projects in the Southern Appalachian Region 1 J. Bonham 2 and K. Stephenson Abstract Recently the US Army Corps of Engineers (the Corps) has increased

More information

Chapter 4 Affected by the Federal Military and State EPA

Chapter 4 Affected by the Federal Military and State EPA 4-182 Chapter 4 Affected Environment 4.8 REGULATORY ENVIRONMENT The federal and state regulatory agencies participating in the LTMS effort are the U.S. Environmental Protection Agency (EPA), the U.S. Army

More information

Swannanoa River Flood Risk Management Study

Swannanoa River Flood Risk Management Study Swannanoa River Flood Risk Management Study Measures Evaluated to Reduce Future Flood Damages City of Asheville U.S. Army Corps of Engineers Flooding History Part of the 132 square mile Swannanoa River

More information

Oakwood Beach Storm Damage Prevention Project NJDEP-Bureau of Coastal Engineering Glenn Golden, Project Manager U.S. Army Corps Civil Works Programs

Oakwood Beach Storm Damage Prevention Project NJDEP-Bureau of Coastal Engineering Glenn Golden, Project Manager U.S. Army Corps Civil Works Programs Oakwood Beach Storm Damage Prevention Project NJDEP- Glenn Golden, Project Manager U.S. Army Corps Civil Works Programs Branch Dwight Pakan, Project Manager, Philadelphia District The State of New Jersey

More information

Integrating 3D Hydrodynamic Transport and Ecological Plant Models of the Savannah River Estuary Using Artificial Neural Network Models

Integrating 3D Hydrodynamic Transport and Ecological Plant Models of the Savannah River Estuary Using Artificial Neural Network Models Integrating 3D Hydrodynamic Transport and Ecological Plant Models of the Savannah River Estuary Using Artificial Neural Network Models Edwin Roehl, Advanced Data Mining, Greer, SC, ed.roehl@advdatamining.com

More information

FINAL Environmental Impact Statement (EIS) for the

FINAL Environmental Impact Statement (EIS) for the FINAL Environmental Impact Statement (EIS) for the Mississippi River-Gulf Outlet (MRGO), Louisiana, and Lake Borgne Wetland Creation and Shoreline Protection Project U.S. Army Corps of Engineers New Orleans

More information

HUDSON RIVER-BLACK RIVER REGULATING DISTRICT BOARD MEETING JUNE 10, 2014

HUDSON RIVER-BLACK RIVER REGULATING DISTRICT BOARD MEETING JUNE 10, 2014 HUDSON RIVER-BLACK RIVER REGULATING DISTRICT BOARD MEETING JUNE 10, 2014 PRESENTATION TOPICS Analysis Objectives Analysis Dam Removal Plan Dam Remediation Plan Effects Analysis Permit Requirements Decision

More information

Habitat Opportunities in the Duwamish Transition Zone

Habitat Opportunities in the Duwamish Transition Zone Duwamish Blueprint: Habitat Opportunities in the Duwamish Transition Zone November 13, 2014 Presentation to the WRIA 9 Watershed Ecosystem Forum Elissa Ostergaard, Planning and Stewardship Coordinator

More information

Liquid Capital. Cochran s Creek: A Case Study in Stream Mitigation Banking in Georgia

Liquid Capital. Cochran s Creek: A Case Study in Stream Mitigation Banking in Georgia Liquid Capital Cochran s Creek: A Case Study in Stream Mitigation Banking in Georgia Basic Bank Permitting Process Submit Prospectus to IRT. If approved then: Conduct site visit with IRT. If approved then:

More information

Potential Dredged Material Storage Facilities and Their Impact on Public Processing Facility Economic Modeling Summary Report

Potential Dredged Material Storage Facilities and Their Impact on Public Processing Facility Economic Modeling Summary Report Port of New York and New Jersey Feasibility Analysis for a Dredged Material Public Processing Facility Potential Dredged Material Storage Facilities and Their Impact on Public Processing Facility Economic

More information

TENNESSEE GAS PIPELINE COMPANY, L.L.C.

TENNESSEE GAS PIPELINE COMPANY, L.L.C. TENNESSEE GAS PIPELINE COMPANY, L.L.C. HYDROLOGIC & HYDRAULIC CALCULATIONS FOR WATERBODIES CROSSED BY CONNECTICUT PIPELINE EXPANSION PROJECT CONNECTICUT LOOP Submitted by: Tennessee Gas Pipeline Company,

More information

Gulf Intracoastal Waterway

Gulf Intracoastal Waterway TEXAS DEPARTMENT OF TRANSPORTATION Gulf Intracoastal Waterway Photo by TexasGulfCoastOnline.com Gulf Intracoastal Waterway in Texas Figure 1 - Texas GIWW Executive Summary The Texas Department of Transportation

More information

Northern Middlesex Council of Governments

Northern Middlesex Council of Governments Northern Middlesex Council of Governments The Federal Energy Commission (FERC) is the agency charged with evaluating whether the proposed route should be approved Cooperating agencies generally include

More information

Policy & Management Applications of Blue Carbon. fact SHEET

Policy & Management Applications of Blue Carbon. fact SHEET Policy & Management Applications of Blue Carbon fact SHEET Policy & Management Applications of Blue Carbon Coastal Blue Carbon - An Important Wetland Ecosystem Service Coastal Blue Carbon refers to the

More information

HCP Team Meeting. November 18, 2015. icfi.com

HCP Team Meeting. November 18, 2015. icfi.com HCP Team Meeting November 18, 2015 icfi.com 1 Welcome and Introductions Where are we in the HCP process Hydrology modeling update Native fish survey Fish translocation Finalize covered activities Next

More information

Aligning Natural and Built Infrastructure for

Aligning Natural and Built Infrastructure for Aligning Natural and Built Infrastructure for Houston Climate Resilience National Exercise Program (NEP) Houston Climate Change Preparedness & Resilience Workshop Edmond J. Russo, Jr., PhD, PE, D.CE, D.NE,

More information

The St. Lucie River is 35 miles long and has two major forks, the North Fork and the South Fork. In the 1880s, the system was basically a freshwater

The St. Lucie River is 35 miles long and has two major forks, the North Fork and the South Fork. In the 1880s, the system was basically a freshwater The St. Lucie River is 35 miles long and has two major forks, the North Fork and the South Fork. In the 1880s, the system was basically a freshwater stream flowing into the Indian River Lagoon. An inlet

More information

US Army Corps of Engineers Los Angeles District. Rio Salado Oeste Salt River-Phoenix, Arizona FEASIBILITY REPORT SUMMARY

US Army Corps of Engineers Los Angeles District. Rio Salado Oeste Salt River-Phoenix, Arizona FEASIBILITY REPORT SUMMARY US Army Corps of Engineers Los Angeles District Rio Salado Oeste Salt River-Phoenix, Arizona FEASIBILITY REPORT SUMMARY U.S. Army Corps of Engineers South Pacific Division, Los Angeles District September

More information

The Dynamics of the US Container Market and Shifting Trade Patterns Implications for East Coast and Gulf Coast Ports March 15, 2012

The Dynamics of the US Container Market and Shifting Trade Patterns Implications for East Coast and Gulf Coast Ports March 15, 2012 The Dynamics of the US Container Market and Shifting Trade Patterns Implications for East Coast and Gulf Coast Ports March 15, 2012 Jeff Sweeney Martin Associates 941 Wheatland Avenue, Suite 203 Lancaster,

More information

ALTERNATIVE SOURCES OF FUNDING FOR

ALTERNATIVE SOURCES OF FUNDING FOR November 2015 ALTERNATIVE SOURCES OF FUNDING FOR Flood-Related General Water Management Water Supply Projects The following inventory contains information about a variety of funding programs offered by

More information

How to Become a Navy Engineer For $78,000 in USD

How to Become a Navy Engineer For $78,000 in USD Presentation to Associated General Contractors COL Mark Deschenes Commander US Army Corps of Engineers Rock Island District February 2014 US Army Corps of Engineers Rock Island District 78,000 Square Miles

More information

Mouth of the Columbia River Jetties Major Rehabilitation Study

Mouth of the Columbia River Jetties Major Rehabilitation Study Mouth of the Columbia River Jetties Major Rehabilitation Study PNWA Port of Vancouver January 29, 2010 US Army Corps of Engineers Project Overview Background Corps Guidance for Major Rehab Project Alternatives

More information

MARYLAND DEPARTMENT OF THE ENVIRONMENT 1800 Washington Boulevard Baltimore MD 21230 410-537-3000 1-800-633-6101 www.mde.state.md.

MARYLAND DEPARTMENT OF THE ENVIRONMENT 1800 Washington Boulevard Baltimore MD 21230 410-537-3000 1-800-633-6101 www.mde.state.md. MARYLAND DEPARTMENT OF THE ENVIRONMENT 1800 Washington Boulevard Baltimore MD 21230 410-537-3000 1-800-633-6101 www.mde.state.md.us Martin O Malley Governor Robert M. Summers, Ph.D. Secretary Anthony G.

More information

a. For all activities that would result in the discharge of fill material into any vernal pool;

a. For all activities that would result in the discharge of fill material into any vernal pool; Final Sacramento District Nationwide Permit Regional Conditions for Nevada and the Lake Tahoe Basin in California (Effective March 19, 2012 until March 18, 2017) 1.* When pre-construction notification

More information

Beach Management Funding Assistance Program

Beach Management Funding Assistance Program FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION DIVISION OF WATER RESOURCE MANAGEMENT Beach Management Funding Assistance Program Local Government Funding Requests: Ranking Criteria for Beach and Inlet

More information

Upper Des Plaines River & Tributaries, IL & WI Feasibility Study

Upper Des Plaines River & Tributaries, IL & WI Feasibility Study Upper Des Plaines River & Tributaries, IL & WI Feasibility Study Jeffrey Zuercher Project Manager Chicago District February 19, 2014 Study Partnership: US Army Corps of Engineers Agenda Background Study

More information

Henry Van Offelen Natural Resource Scientist MN Center for Environmental Advocacy hvanoffelen@mncenter.org

Henry Van Offelen Natural Resource Scientist MN Center for Environmental Advocacy hvanoffelen@mncenter.org Henry Van Offelen Natural Resource Scientist MN Center for Environmental Advocacy hvanoffelen@mncenter.org Wetland study slide Water Quality NRE goals in watershed plans Protect habitat that remains.

More information

Saving Constituents Money on Flood Insurance Under FEMA s Community Rating System (CRS)

Saving Constituents Money on Flood Insurance Under FEMA s Community Rating System (CRS) Saving Constituents Money on Flood Insurance Under FEMA s Community Rating System (CRS) Today s Discussion 1. FEMA s Flood Insurance Program: A Brief Overview 2. Flood Insurance Rates: Are they rising?

More information

Background Information: The Mamquam River Floodplain Restoration Project

Background Information: The Mamquam River Floodplain Restoration Project Background Information: The Mamquam River Floodplain Restoration Project The Mamquam River Floodplain Restoration project is being undertaken in partnership with the Squamish River Watershed Society, Fisheries

More information

Bolinas Lagoon Ecosystem Restoration Feasibility Project Marin County Open Space District

Bolinas Lagoon Ecosystem Restoration Feasibility Project Marin County Open Space District Bolinas Lagoon Ecosystem Restoration Feasibility Project Marin County Open Space District With Funding from the California State Coastal Conservancy & the U.S. Army Corps of Engineers July 2006 Bolinas

More information

Navy Inactive Ships Program

Navy Inactive Ships Program EX-ARTHUR W. RADFORD (DD 968) Frequently Asked Questions STATUS OF THE SHIP AND PROJECT SUMMARY Q. What is the current status of ex-arthur W. RADFORD? A. Ex-ARTHUR W. RADFORD was decommissioned on March

More information

Wetland Creation and Restoration Cost Factors: U.S. Army Corps of Engineers

Wetland Creation and Restoration Cost Factors: U.S. Army Corps of Engineers Wetland creation and restoration Wetland Creation and Restoration Cost Factors: A presentation by PATRICIA M. OBRADOVICH 1 Portland District, P.O. Box 2946 Portland, OR 97208-2946 Session Six ABSTRACT

More information

Rachel Silverstein, Ph.D. Executive Director and Waterkeeper

Rachel Silverstein, Ph.D. Executive Director and Waterkeeper Dredging-Related Sediment Impacts on Coral Reefs near the Port of Miami Channel Rachel Silverstein, Ph.D. Executive Director and Waterkeeper As the Panama canal undergoes an expansion, shallow ports along

More information

Muddy River Restoration Project Maintenance and Management Oversight Committee 68 Harvard Street Brookline, Massachusetts 02447 www.muddyrivermmoc.

Muddy River Restoration Project Maintenance and Management Oversight Committee 68 Harvard Street Brookline, Massachusetts 02447 www.muddyrivermmoc. Muddy River Restoration Project Maintenance and Management Oversight Committee 68 Harvard Street Brookline, Massachusetts 02447 www.muddyrivermmoc.org FEDERAL FUNDING OF ENVIRONMENTAL RESTORATION IN PHASE

More information

US Army Corps of Engineers BUILDING STRONG

US Army Corps of Engineers BUILDING STRONG Fort Worth District Public Meeting 20 August 2013 US Army Corps of Engineers Lewisville Dam - Authorization Authorized by the River and Harbor Act, approved 2 March 1945 (Public Law 14, 79th Congress,

More information

Table of Contents. Introduction Guidance Permit fact sheet Completeness checklist. Introduction

Table of Contents. Introduction Guidance Permit fact sheet Completeness checklist. Introduction Instructions and Supporting Materials Table of Contents Introduction Permit fact sheet Completeness checklist Introduction MassDEP Permit Applications, as well as Instructions & Support Materials, are

More information

GROWER ADVISORY Agriculture Regulations of the Wetlands Protection Act

GROWER ADVISORY Agriculture Regulations of the Wetlands Protection Act Cape Cod Cranberry Growers Association GROWER ADVISORY Agriculture Regulations of the Wetlands Protection Act Cranberry Bogs and the Agricultural Exemption The Massachusetts Wetlands Protection Act (WPA)

More information

Restore Americas Estuaries 5 th National Conference

Restore Americas Estuaries 5 th National Conference Restore Americas Estuaries 5 th National Conference Richard Raynie Chief, LACES Division OCPR Patricia Strayer, PE Principal Engineer Dynamic Solutions, LLC KRR and LCA are bookends in progress of federal

More information

Environmental Case Study Decatur, Georgia, DeKalb County A Suburban Creek Resists Channelization

Environmental Case Study Decatur, Georgia, DeKalb County A Suburban Creek Resists Channelization Introduction A visual examination of Doolittle Creek in a highly developed suburban county in Georgia yielded telltale signs of a creek whose original streambed had been altered. Examination of official

More information

Post-Flood Assessment

Post-Flood Assessment Page 1 of 7 Post-Flood Assessment CHAPTER 4 AGENCY COORDINATION Agency coordination is an essential element for the operation of the flood management systems in the Central Valley. Due to the nature of

More information

Westerly Creek, A Poster Child for Understanding the Benefit of Stormwater Investment

Westerly Creek, A Poster Child for Understanding the Benefit of Stormwater Investment Westerly Creek, A Poster Child for Understanding the Benefit of Stormwater Investment Presented at the ASFPM Annual Conference Atlanta, GA June 1 June 5 2015 Jon Villines, EIT, CFM Aurora Water Alan Turner,

More information

The Muddy River: A Century of Change

The Muddy River: A Century of Change The Muddy River: A Century of Change Tom Brady, Brookline Conservation Administrator, Tree Warden, Town Arborist 617-730-2088 or tbrady@brooklinema.gov Muddy River Flood Damage Reduction and Environmental

More information

NEW BRUNSWICK DEPARTMENT OF SUPPLY AND SERVICES EEL RIVER DAM REMOVAL/ DECOMMISSIONING PROJECT

NEW BRUNSWICK DEPARTMENT OF SUPPLY AND SERVICES EEL RIVER DAM REMOVAL/ DECOMMISSIONING PROJECT NEW BRUNSWICK DEPARTMENT OF SUPPLY AND SERVICES EEL RIVER DAM REMOVAL/ DECOMMISSIONING PROJECT August 2006 Prepared by: NB Department of Environment Environment 1. INTRODUCTION This General Review Statement

More information

LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN

LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN 1 AUGUST 2011 LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN KEY ELEMENTS OF THE PLAN: 1. Replace the existing unsafe Ragged Mountain dam with a new dam and raise the reservoir pool level initially

More information

Tres Rios del Norte Feasibility Study

Tres Rios del Norte Feasibility Study Tres Rios del Norte Feasibility Study Santa Cruz River Pima County, Arizona February 2011 Study Area: 18 Miles of Santa Cruz River (Prince to Sanders), portions of City of Tucson, Town of Marana, and unincorporated

More information

NOTICE TO STATE WATER PROJECT CONTRACTORS

NOTICE TO STATE WATER PROJECT CONTRACTORS State of California DEPARTMENT OF WATER RESOURCES CALIFORNIA STATE WATER PROJECT California Natural Resources Agency NOTICE TO STATE WATER PROJECT CONTRACTORS Date: FEB 0 4 2016 Number: 16-02 Subject:

More information

JACKSONVILLE DISTRICT

JACKSONVILLE DISTRICT JACKSONVILLE DISTRICT SAME Savannah Post District Overview Presented by: Mike Rogalski, PE, PMP Deputy Chief, Programs and Project Management Division (PPMD) June 17, 2015 AGENDA INTRODUCTION TO JACKSONVILLE

More information

COMPLIANCE REPORT MUDDY HOLLOW CULVERT REMOVAL FILE NUMBER 25358N

COMPLIANCE REPORT MUDDY HOLLOW CULVERT REMOVAL FILE NUMBER 25358N COMPLIANCE REPORT MUDDY HOLLOW CULVERT REMOVAL FILE NUMBER 25358N Submitted by the National Park Service Point Reyes National Seashore Point Reyes Station, California, 94956 Project Description: Muddy

More information

AQUATIC ECOSYSTEMS & BIOMES

AQUATIC ECOSYSTEMS & BIOMES AQUATIC ECOSYSTEMS & BIOMES A) Name three general types of aquatic ecosystems and describe the salinity for each. Give an example for each. 1) 2) 3) B) MATCHING In the space provided, write the letter

More information

King County, Washington Policies and Practice for the Use of Eminent Domain For Flood Risk Reduction

King County, Washington Policies and Practice for the Use of Eminent Domain For Flood Risk Reduction King County, Washington Policies and Practice for the Use of Eminent Domain For Flood Risk Reduction Introduction Eminent domain refers to the power possessed by the state over all property within the

More information

Coastal Restoration Spending in Louisiana Economic Impact Analysis

Coastal Restoration Spending in Louisiana Economic Impact Analysis Coastal Restoration Spending in Louisiana Economic Impact Analysis Louisiana Workforce Commission www.lmi.laworks.net/green September 2011 In 2009, Louisiana and Mississippi partnered to research economic

More information

DECISION DOCUMENT NATIONWIDE PERMIT 27

DECISION DOCUMENT NATIONWIDE PERMIT 27 DECISION DOCUMENT NATIONWIDE PERMIT 27 This document discusses the factors considered by the Corps of Engineers (Corps) during the issuance process for this Nationwide Permit (NWP). This document contains:

More information

INTERSTAGE ENERGY RECOVERY TURBINE APPLICATION MARCO ISLAND, FLORIDA

INTERSTAGE ENERGY RECOVERY TURBINE APPLICATION MARCO ISLAND, FLORIDA IWC-00-15 INTERSTAGE ENERGY RECOVERY TURBINE APPLICATION MARCO ISLAND, FLORIDA JULIA NEMETH, PE Harn R/O Systems, Incorporated Venice, Florida STEVEN DURANCEAU, PHD, PE Boyle Engineering Corporation Orlando,

More information

The Pantanal ---- People, Places, Priorities. Can integrated water management serve society and ecosystems?

The Pantanal ---- People, Places, Priorities. Can integrated water management serve society and ecosystems? The Pantanal ---- People, Places, Priorities Can integrated water management serve society and ecosystems? The Pantanal Program (2001-2009) U$400 Million IDB project to: a) restore ecosystem quality b)

More information

Hydrographic Survey of the Keith Lake-Salt Bayou System

Hydrographic Survey of the Keith Lake-Salt Bayou System Hydrographic Survey of the Keith Lake-Salt Bayou System April 2007 Survey Prepared by: The Texas Water Development Board December 2007 Texas Water Development Board J. Kevin Ward, Executive Administrator

More information

1. INTRODUCTION 5. THE PERMIT PROCESS

1. INTRODUCTION 5. THE PERMIT PROCESS 1. INTRODUCTION Laws of the United States and the State of Iowa have assigned the US Army Corps of Engineers and the Iowa Department of Natural Resources with specific and different regulatory roles designed

More information

UPPER COLORADO AND SAN JUAN RIVER BASINS ENDANGERED FISH RECOVERY PROGRAMS

UPPER COLORADO AND SAN JUAN RIVER BASINS ENDANGERED FISH RECOVERY PROGRAMS PUBLIC LAW 106 392 OCT. 30, 2000 UPPER COLORADO AND SAN JUAN RIVER BASINS ENDANGERED FISH RECOVERY PROGRAMS VerDate 11-MAY-2000 02:36 Nov 16, 2000 Jkt 089139 PO 00000 Frm 00001 Fmt 6579 Sfmt 6579 E:\PUBLAW\PUBL392.106

More information

COMMUNITY CERTIFICATIONS

COMMUNITY CERTIFICATIONS National Flood Insurance Program Community Rating System COMMUNITY CERTIFICATIONS Public reporting burden for this form is estimated to average 4 hours for annual recertification, per response. The burden

More information

DEPARTMENT OF THE ARMY SECTION 404 REGIONAL GENERAL PERMIT CHANNEL AND BANK PROTECTION STRUCTURES ON THE SOUTH PLATTE RIVER

DEPARTMENT OF THE ARMY SECTION 404 REGIONAL GENERAL PERMIT CHANNEL AND BANK PROTECTION STRUCTURES ON THE SOUTH PLATTE RIVER DEPARTMENT OF THE ARMY SECTION 404 REGIONAL GENERAL PERMIT CHANNEL AND BANK PROTECTION STRUCTURES ON THE SOUTH PLATTE RIVER Permit Expires: December 31, 2017 Regional General Permit No. 87-01 Issuing Office:

More information