Submission. New planning framework including the Capital Master Plan, its table of contents and the chapter on the Capital s urban lands.

Size: px
Start display at page:

Download "Submission. New planning framework including the Capital Master Plan, its table of contents and the chapter on the Capital s urban lands."

Transcription

1 No.: 2014-P94e To: Board of Directors For: DECISION Date: 2015/01/20 1. TITLE New planning framework including the Capital Master Plan, its table of contents and the chapter on the Capital s urban lands. 2. PURPOSE OF THE SUBMISSION Obtain approval for the new Capital planning framework and inform the members regarding: The content of the new Capital Master Plan; The progress being made on the Capital's urban lands chapter 3. AUTHORITY National Capital Act, sections 10, 11 and 12 National Capital Commission (NCC) by-laws, section RECOMMENDATION That the new Capital planning framework be approved, as presented in Appendix A of the proposal. 5. BACKGROUND Renewed Planning Framework and Capital Master Plan A renewed planning framework has been developed following an analysis by the NCC s new executive management committee of the framework that has been in existence now for some thirty years, which encompasses four levels of plans, presented in the form of a pyramid, going from the most general to the very specific. In addition to maintaining the strengths of the current framework to be in line with the mandate, being visionary, protecting the key attributes of the lands for future generations, basing ourselves on the solid and holistic planning principles and supporting the Capital s stewardship portfolios, the new framework offers the following benefits: o More direct support of the accomplishments of the Corporate Plan; o More flexibility in order to respond to current issues; o Easier to understand and interpret; o Be attainable with the available resources; : 2014-P94e Page 1 of/de 6

2 o More transparency for the public; o Avoids redundancies or contradictions that are currently in the existing master plans given their approval date; o Facilitates updates based on needs that manifest over the lifespan of a plan without having to amend the master plan as a whole. The framework was presented to the Board of Directors (BOD) in September 2014 and was given informal approval. It is presented in Appendix 1. The BOD s formal approval of the planning framework would be preferable, thereby demonstrating a corporate willingness to pursue the planning mandate using a known logic. This new framework consists of a single plan, the Capital Master Plan, which will give effect to the general policy statements of the new Plan for Canada s Capital. The Master Plan will consolidate over several chapters in a single document all of the NCC's long-term planning, as presented in Appendix 2. Some chapters will present the planning in separate geographic sectors and others will consolidate the policies that are common within all geographic sectors. A draft table of contents for the new Master Plan is presented in Appendix 3. The table of contents will be further developed as needed. This new approach will make it possible to promptly secure approval for the items of the master plan, chapter by chapter and policy by policy. Public consultations will be more focused, making public feedback simpler and better customized. This approach would also make it possible to promptly move ahead with obtaining approval for land use designations and directions for the Capital s urban lands, the vast majority of which are owned by the federal government. Federal Urban Lands Planning Public consultations were held in the spring of 2014 on the major policies regarding federal urban lands, the identification of lands that are part of the Capital Realm and land use designations for these lands. Generally speaking, the public was in favour of the Plan s proposals. Lands that are not part of the Capital Realm were however the subject of some questions. Since then, the team has been working on the concept of the regional interest land mass that would respond in part to the concerns raised. Detailed planning for certain geographic sectors has been initiated over the short term, including the plan for the Sir John A. Macdonald Linear Park and the plan for the north shore of the Ottawa River. Implementation of the new planning framework will make it possible to finalize the chapter on land use designations for federal urban lands. The content of the urban lands plan was presented to the Advisory Committee on Planning, Design and Realty (ACPDR) in October 2013 and few substantial changes have been made since. The Committee s recommendations were included. As a first step towards the completion of this plan, the Board of Directors will approve, through a separate proposal, the map showing the urban lands that are part of the Capital Realm. 6. ANALYSIS OF OPTIONS AND RISK N/A : 2014-P94e Page 2 of/de 6

3 7. STRATEGIC LINKS NCC s mandate: To prepare plans for and assist in the development, conservation, and improvement of the National Capital Region in order that the nature and character of the seat of the Government of Canada may be in accordance with its national significance. Corporate plans: Complete the Capital Urban Lands Master Plan and review the National Interest Land Mass (NILM). Plan for Canada's Capital that is under development 8. CONSULTATIONS & COMMUNICATIONS June 2014: Presentation of the new planning framework to the BOD The following consultations were held throughout the development of the plan for the Capital's urban lands: o 2013 and 2014: targeted consultations with federal partners and the cities of Ottawa and Gatineau o October 2013: Presentation to the ACPDR o March 2014: Public consultations on urban lands and the Parkway policy o June 2014: Summary presentation to the BOD on the results of the public consultation. 9. NEXT STEPS January 2015: Approval by the BOD of the urban lands that are part of the Capital Realm Winter 2015: Uploading to the Web the public consultation report that was held in March 2014 Winter 2015: Final targeted consultations with partners on urban lands March 2015: Final presentation to the ACPDR of the content of the chapter on the Capital's urban lands April 2015: Approval by the BOD of the chapter on the Capital's urban lands and uploading it to the Web 10. LIST OF APPENDICES Appendix 1: Proposed planning framework Appendix 2: Proposed table of contents 11. SUBMISSION AUTHORS Stephen Willis, Executive Director, Capital Planning Lucie Bureau, Chief, Planning and Transportation : 2014-P94e Page 3 of/de 6

4 APPENDIX 1: Proposed planning framework : 2014-P94e Page 4 of/de 6

5 Appendix 2: Proposed table of Content 1.0 Introduction and Background Mandate Relationship to PFCC Structure of the Master Plan 2.0 General Policies This section covers all policies that apply to all NCC Lands. It will evolve over the years to include new issues that need a policy Definition of NILM Lands Definition of RILM Lands Commemoration o 2006 Canada s Capital Commemoration Strategic Plan and it s updated version when completed o Toponymy o Military Commemoration o Site inventory document Stormwater management Built Heritage, Cultural Landscape Heritage and Archaeology Parkways Capital Arrivals, Scenic Routes and Gateways Public utilities infrastructure Views and vistas policy Community Gardens Shared regional planning objectives Urban Forest Management Strategy Others as needed 3.0 Core Area This section absorbs the June 2005 Core Area Sector Plan It implements any changes coming from the Capital Urban Lands Master Plan This section absorbs the November 2007 Canada s Capital Views Protection This section will include the Capital Illumination Plan 4.0 Capital Urban Lands This section is the new Capital Urban Lands policies and land use designations to be approved in Gatineau Park This section absorbs the May 2005 Gatineau Park Master Plan It implements any amendments coming out of the review commencing in Greenbelt This section absorbs the November 2013 Canada s Capital Greenbelt Master Plan : 2014-P94e Page 5 of/de 6

6 7.0 Shorelines This section will be for the policies to be developed for Shorelines 8.0 Official Residences This section will be for the policies to be developed for Official Residences 9.0 Environmental Strategy This section will absorb the NCC Environmental Strategy It will absorb any updates in Interpretation and Implementation Overview of NCC Federal Land Use, Design and Transaction Approval Process NCC Property Ownership Terms and conditions of existing and future agreements Overview of Design Guidelines NCC Committees: o ACPDR o ACORC o ACUA Commissioning of sections of the Plan Monitoring and Performance Management Review and Amendment Process 11.0 Definitions 12.0 Site specific planning This section will be for specific demonstration plans, as needed SJAM linear Park Plan Ottawa River North shoreline Plan Federal sites Tunney s Pasture Other : 2014-P94e Page 6 of/de 6

Submission. 2. PURPOSE OF THE SUBMISSION To inform the NCC Board of Directors on the approach to implement the 2013 Greenbelt Master Plan.

Submission. 2. PURPOSE OF THE SUBMISSION To inform the NCC Board of Directors on the approach to implement the 2013 Greenbelt Master Plan. Public Submission No.: 2014-I17e To: Board of Directors For: INFORMATION Date: 2014-11-19 1. TITLE Greenbelt Master Plan Implementation 2. PURPOSE OF THE SUBMISSION To inform the NCC Board of Directors

More information

NATIONAL CAPITAL COMMISSION. 2014 2015 to 2018 2019 Summary of the Corporate Plan

NATIONAL CAPITAL COMMISSION. 2014 2015 to 2018 2019 Summary of the Corporate Plan NATIONAL CAPITAL COMMISSION 2014 2015 to 2018 2019 Summary of the Corporate Plan www.ncc-ccn.gc.ca 202 40 Elgin Street, Ottawa, Canada K1P 1C7 Email: info@ncc-ccn.ca Fax: 613-239-5063 Telephone: 613-239-5000

More information

City Planning Heritage Preservation

City Planning Heritage Preservation 1. Planning and Heritage This theme is examining the current built form, policy framework and zoning in the Study Area to help inform the larger Revitalization Initiative. Staff will bring forward recommendations

More information

Preparing a Green Wedge Management Plan

Preparing a Green Wedge Management Plan Preparing a Green Wedge Management Plan Planning Practice Note 31 JUNE 2015 This practice note provides a guide for the preparation of Green Wedge Management Plans and sets out the general requirements

More information

Peninsular Florida Landscape Conservation Cooperative. Charter. Background

Peninsular Florida Landscape Conservation Cooperative. Charter. Background Charter Background The Peninsular Florida Landscape Conservation Cooperative (Conservation Cooperative) is part of a national network of Landscape Conservation Cooperatives (LCCs). LCCs are applied conservation

More information

Planning should achieve high quality urban design and architecture that: Contributes positively to local urban character and sense of place.

Planning should achieve high quality urban design and architecture that: Contributes positively to local urban character and sense of place. 15 BUILT ENVIRONMENT AND HERITAGE 15/07/2013 VC100 Planning should ensure all new land use and development appropriately responds to its landscape, valued built form and cultural context, and protect places

More information

What is the Register?

What is the Register? What is the Register? The Register of Property of Cultural Heritage Value or Interest, also known as the Register. A heritage conservation management tool under the Ontario Heritage Act. An administrative

More information

cultural planning definitions

cultural planning definitions cultural planning definitions Battlefield House Museum and Park - Hamilton Civic Museums 1. cultural planning definitions 22 lm Festivals Craft Festivals ural Festivals Arts Festivals ounty Fairs m Programs

More information

TO: Nomination Grand Pré Advisory Board. From: Christophe Rivet, Project Manager. Date: September 9 th, 2010

TO: Nomination Grand Pré Advisory Board. From: Christophe Rivet, Project Manager. Date: September 9 th, 2010 TO: Nomination Grand Pré Advisory Board From: Christophe Rivet, Project Manager Date: September 9 th, 2010 RE: Project Manager s and Progress Report 16 (for discussion) OVERVIEW A formal review by the

More information

Mayor and Members of Council Cynthia Beach, Commissioner, Corporate & Strategic Initiatives

Mayor and Members of Council Cynthia Beach, Commissioner, Corporate & Strategic Initiatives CITY OF KINGSTON REPORT TO COUNCIL Report No.: 14-073 TO: FROM: RESOURCE STAFF: Mayor and Members of Council Cynthia Beach, Commissioner, Corporate & Strategic Initiatives Peter Huigenbos, Manager, Real

More information

National and Major Developments

National and Major Developments National and Major Developments An Agency Joint Statement on Pre-application Engagement A Joint Statement by Architecture and Design Scotland, Forestry Commission Scotland, Historic Scotland, Scottish

More information

Design Guidance for Perimeter Fencing at Schools for Nottinghamshire County Council

Design Guidance for Perimeter Fencing at Schools for Nottinghamshire County Council APPENDIX 1 Design Guidance for Perimeter Fencing at Schools for Nottinghamshire County Council Introduction: The purpose of this guide is to set out some parameters for assessing planning applications

More information

2010 Salida Community Priorities Survey Summary Results

2010 Salida Community Priorities Survey Summary Results SURVEY BACKGROUND The 2010 Salida Community Priorities Survey was distributed in September in an effort to obtain feedback about the level of support for various priorities identified in the draft Comprehensive

More information

Minister s Response to the

Minister s Response to the Minister s Response to the School Review Process Study Report and Recommendations April 2014 Index Introduction 1 Response to the Recommendations 3 Appendix A: Overview of the New School Review Process

More information

DA TRACKING SYSTEM DOCUMENT NAMING

DA TRACKING SYSTEM DOCUMENT NAMING LMC Page 114 ITEM 6 DA TRACKING SYSTEM DOCUMENT NAMING Division Environment and Community Management Author Acting Director, Environment and Community Management Meeting date 8 October 2015 Strategic Plan

More information

2012-2016 Business Plan Summary

2012-2016 Business Plan Summary Owner: 2012-2016 Business Plan Summary Program Corporate, Operational & Council Services Service grouping Corporate Services Service Type Internal Service Tom Johnson, Managing Director - Corporate Assets,

More information

City of Fort Collins Water Supply and Demand Management Policy

City of Fort Collins Water Supply and Demand Management Policy City of Fort Collins Water Supply and Demand Management Policy The City of Fort Collins Water Supply and Demand Management Policy provides a foundational framework for water supply and demand management

More information

October 15, 2013. Mayor and Council City of New Westminster 511 Royal Avenue New Westminster, BC V3L 1H9

October 15, 2013. Mayor and Council City of New Westminster 511 Royal Avenue New Westminster, BC V3L 1H9 October 15, 2013 Mayor and Council City of New Westminster 511 Royal Avenue New Westminster, BC V3L 1H9 RE: Business Plan Advancing a Collaborative, Regional Approach to Flood Management in BC s Lower

More information

Chesapeake Conservation Corps Member Application Instructions 2016 2017

Chesapeake Conservation Corps Member Application Instructions 2016 2017 Chesapeake Conservation Corps Member Application Instructions 2016 2017 www.chesapeakebaytrust.org / 410-974-2941 Introduction The Chesapeake Conservation Corps is designed to engage young adults in environmental

More information

Page 1 of 24. To present the Asset Management Policy 2014 for Council adoption.

Page 1 of 24. To present the Asset Management Policy 2014 for Council adoption. Page 1 of 24 COMMUNITY AND SERVICES SPECIAL COMMITTEE REPORT 9 DECEMBER 2104 AGENDA ITEM 6.1 ASSET MANAGEMENT POLICY 2014 REVIEW Director: Manager: Ian Butterworth Director Infrastructure and Engineering

More information

Guide for the Management of Archaeological Resources. National Capital Commission February 2008

Guide for the Management of Archaeological Resources. National Capital Commission February 2008 Guide for the Management of Archaeological Resources National Capital Commission February 2008 1 Ce document est aussi disponible en français. National Capital Commission 202 40 Elgin Street Ottawa, Canada

More information

SITE PLAN APPROVAL PROCESS INTRODUCTION

SITE PLAN APPROVAL PROCESS INTRODUCTION SITE PLAN APPROVAL PROCESS INTRODUCTION File Manager System for Site Plan Approval Process Site Plan Control in the City of London The City of London utilizes site plan control to ensure high quality site

More information

NYCIDA PROJECT COST/BENEFIT ANALYSIS June 5, 2014

NYCIDA PROJECT COST/BENEFIT ANALYSIS June 5, 2014 NYCIDA PROJECT COST/BENEFIT ANALYSIS June 5, 2014 APPLICANT Skyline Restoration Inc. CGI Northeast, Inc. Spring Scaffolding LLC Metropolitan Northeast LLC 11-20 37 th Avenue Long Island City, NY 11101

More information

Position Statement regarding Offshore Wind Proposals on Lake Huron. Lake Huron Centre for Coastal Conservation

Position Statement regarding Offshore Wind Proposals on Lake Huron. Lake Huron Centre for Coastal Conservation Position Statement regarding Offshore Wind Proposals on Lake Huron Lake Huron Centre for Coastal Conservation June 2010 Lake Huron Centre for Coastal Conservation (LHCCC) Corporate Position related to:

More information

PA Trees.org The Pennsylvania Tree Resource Guide Managing Community Forests

PA Trees.org The Pennsylvania Tree Resource Guide Managing Community Forests PA Trees.org The Pennsylvania Tree Resource Guide Managing Community Forests History of Trees in Communities Records of intentional tree planting in cities extend back to 1400 BC in Egypt. In the 1500

More information

Municipal Affairs. Performance Appraisal of a Chief Administrative Officer

Municipal Affairs. Performance Appraisal of a Chief Administrative Officer Municipal Affairs Performance Appraisal of a Chief Administrative Officer Revised January 2014 Capacity Building, Municipal Services Branch Performance Appraisal of a Chief Administrative Officer Alberta

More information

Town of Ajax Heritage Property Tax Rebate Program Information Brochure

Town of Ajax Heritage Property Tax Rebate Program Information Brochure Town of Ajax Heritage Property Tax Rebate Program Information Brochure 1733 Westney Road, North circa 1856 Designation By-law 181-85 The Ontario Government has enabled local municipalities to offer tax

More information

Pendleton Solar Energy Centre COMMUNITY ENGAGEMENT PLAN

Pendleton Solar Energy Centre COMMUNITY ENGAGEMENT PLAN Pendleton Solar Energy Centre COMMUNITY ENGAGEMENT PLAN Large Renewable Procurement (LRP) I PENDLETON SOLAR ENERGY CENTRE 844.553-3336 PendletonSolar@edf-en.ca www.pendletonsolar.ca Table of Contents 1.

More information

IMMUNOGEN, INC. CORPORATE GOVERNANCE GUIDELINES OF THE BOARD OF DIRECTORS

IMMUNOGEN, INC. CORPORATE GOVERNANCE GUIDELINES OF THE BOARD OF DIRECTORS IMMUNOGEN, INC. CORPORATE GOVERNANCE GUIDELINES OF THE BOARD OF DIRECTORS Introduction As part of the corporate governance policies, processes and procedures of ImmunoGen, Inc. ( ImmunoGen or the Company

More information

8.0 ENVIRONMENTAL PROTECTION MONITORING AND FOLLOW-UP

8.0 ENVIRONMENTAL PROTECTION MONITORING AND FOLLOW-UP 8.0 ENVIRONMENTAL PROTECTION MONITORING AND FOLLOW-UP 8.1 INTRODUCTION Mitigation measures, monitoring and other follow-up actions identified in Chapter 7 (Environmental Effects Assessment and Mitigation)

More information

Implementation of Regional Planning Guidelines Best Practice Guidance

Implementation of Regional Planning Guidelines Best Practice Guidance Implementation of Regional Planning Guidelines Best Practice Guidance December 2010 Contents Section Page No Minister s Foreword Chapter 1: Purpose of Regional Planning Guidelines 3 1.1 Background 1.2

More information

Town of Somers, Connecticut Geographic Information Consulting Services Request for Proposals

Town of Somers, Connecticut Geographic Information Consulting Services Request for Proposals Town of Somers, Connecticut Geographic Information Consulting Services Request for Proposals The Town of Somers invites proposals for Geographic Information System consultation/ implementation services.

More information

FINAL DRAFT City of Virginia Beach Comprehensive Plan It s Our Future: A Choice City February 24, 2016

FINAL DRAFT City of Virginia Beach Comprehensive Plan It s Our Future: A Choice City February 24, 2016 PREFACE PURPOSE AND USE OF THE COMPREHENSIVE PLAN Why does the City of Virginia Beach engage in community planning? Plans and planning are time-tested ways for communities and neighborhoods to create more

More information

Preparing A Financing Proposal

Preparing A Financing Proposal Preparing A Financing Proposal Innovation PEI 94 Euston Street, PO Box 910, Charlottetown, Prince Edward Island, Canada C1A 7L9 Telephone: 902 368 6300 Facsimile: 902 368 6301 Toll free: 1 800 563 3734

More information

Land Use and Zoning. Land Use Within the Port Madison Indian Reservation

Land Use and Zoning. Land Use Within the Port Madison Indian Reservation Land Use and Zoning Land Use Within the Port Madison Indian Reservation A portion of the Suquamish Rural Village is Trust land, owned either by the Tribe or individual tribal members. The following list

More information

DOMINGUEZ-ESCALANTE NATIONAL CONSERVATION AREA & DOMINGUEZ CANYON WILDERNESS PLANNING NEWSLETTER

DOMINGUEZ-ESCALANTE NATIONAL CONSERVATION AREA & DOMINGUEZ CANYON WILDERNESS PLANNING NEWSLETTER Canyon Clarion DOMINGUEZ-ESCALANTE NATIONAL CONSERVATION AREA & DOMINGUEZ CANYON WILDERNESS PLANNING NEWSLETTER BLM Volume 3, Issue 1 May 2013 www.blm.gov/co/st/en/nca/denca/denca_rmp.html Draft Resource

More information

2015-18 Department Business Plan. Information Technology Services

2015-18 Department Business Plan. Information Technology Services 2015-18 Department Business Plan Information Technology Services Technology is becoming increasingly important to the County. It is an important facet of almost all program delivery, and our citizens and

More information

ART ZUIDEMA CITY MANAGER IMPROVING COLLABORATION WITH LOCAL BOARDS AND COMMISSIONS AND STRATEGIC PLAN ALIGNMENT

ART ZUIDEMA CITY MANAGER IMPROVING COLLABORATION WITH LOCAL BOARDS AND COMMISSIONS AND STRATEGIC PLAN ALIGNMENT TO: CHAIR AND MEMBERS STRATEGIC PLANNING AND PRIORITIES COMMITTEE MEETING OF APRIL 18, 2016 FROM: ART ZUIDEMA CITY MANAGER SUBJECT: IMPROVING COLLABORATION WITH LOCAL BOARDS AND COMMISSIONS AND STRATEGIC

More information

FWS Cultural Resource Management Planning

FWS Cultural Resource Management Planning I. What is required? FWS Cultural Resource Management Planning A number of laws, regulations, and Fish and Wildlife Service policies address cultural resource management planning requirements and objectives.

More information

Best Practice Asset Management

Best Practice Asset Management Case Study Best Practice Asset Management An example of an Activity Management Plan, published by the Working Group Case Study AMP 01-2014 The Working Group was established by the Road Efficiency Group

More information

Governance Document Management Framework

Governance Document Management Framework Governance Document Management Framework Relevant Definitions: In the context of this document: AB means Academic Board Contact Officer means the position responsible for the day to day implementation

More information

Permanently preserving privately owned productive agricultural land ensures a stable land base for the future of the agricultural industry.

Permanently preserving privately owned productive agricultural land ensures a stable land base for the future of the agricultural industry. F A R M L A N D P R E S E R V A T I O N Permanently preserving privately owned productive agricultural land ensures a stable land base for the future of the agricultural industry. Farmland preservation,

More information

Office of the Chief Information Officer

Office of the Chief Information Officer Office of the Chief Information Officer Business Plan: 2012 2015 Department / Ministère: Executive Council Date: November 15, 2012 1 P a g e This Page Left Intentionally Blank 2 P a g e Contents The Business

More information

The Roaches Asset Management Review. Draft Objectives for External Consultation. Fundamental Principles

The Roaches Asset Management Review. Draft Objectives for External Consultation. Fundamental Principles The Roaches Asset Management Review Draft Objectives for External Consultation Fundamental Principles the area of land under review is the Roaches Estate and Gradbach Car Park as shown on the attached

More information

REPORT. Mayor and Members of Council. Romaine Scott, Legal Coordinator PDS-2010-0016. Heritage Property Tax Refund Program

REPORT. Mayor and Members of Council. Romaine Scott, Legal Coordinator PDS-2010-0016. Heritage Property Tax Refund Program REPORT REPORT TO: REPORT FROM: Mayor and Members of Council Romaine Scott, Legal Coordinator DATE: January 20, 2010 REPORT NO.: RE: PDS-2010-0016 Heritage Property Tax Refund Program RECOMMENDATION: THAT

More information

London Borough of Bromley LEAD LOCAL FLOOD AUTHORITY UPDATE AND GRANT DRAW-DOWN

London Borough of Bromley LEAD LOCAL FLOOD AUTHORITY UPDATE AND GRANT DRAW-DOWN Report No. ES15041 London Borough of Bromley PART ONE - PUBLIC Decision Maker: Executive Date: 9 th September 2015 Decision Type: Non-Urgent Executive Non-Key Title: Contact Officer: Chief Officer: Ward:

More information

BUSINESS PLAN 2013-2016. Library and Archives Canada

BUSINESS PLAN 2013-2016. Library and Archives Canada BUSINESS PLAN 2013-2016 Library and Archives Canada Catalogue No.: SB1-6/2013E-PDF ISSN: 2292-0021 Business plan (Library and Archives Canada) Aussi offert en français sous le titre : Plan d affaires 2013-2016

More information

JOSEPH H. MAROON. Over 30 years in senior leadership positions with premier legislative, executive branch and private conservation organizations.

JOSEPH H. MAROON. Over 30 years in senior leadership positions with premier legislative, executive branch and private conservation organizations. JOSEPH H. MAROON EXPERIENCE SUMMARY Over 30 years in senior leadership positions with premier legislative, executive branch and private conservation organizations. Recipient of several awards for outstanding

More information

COMPREHENSIVE ASSET MANAGEMENT STRATEGY

COMPREHENSIVE ASSET MANAGEMENT STRATEGY COMPREHENSIVE ASSET MANAGEMENT STRATEGY APPROVED BY SENIOR MANAGEMENT COMMITTEE ON AUGUST 23, 2012 (TO BE FINALIZED AFTER APPROVAL OF CAM POLICY BY COUNCIL) August 2012 Contents CONTENTS EXECUTIVE SUMMARY

More information

Auditor General of Canada to the House of Commons

Auditor General of Canada to the House of Commons 2010 Report of the Auditor General of Canada to the House of Commons FALL Chapter 1 Canada s Economic Action Plan Office of the Auditor General of Canada The Fall 2010 Report of the Auditor General of

More information

Our Alma Mater: The AMS Strategic Framework. Purpose

Our Alma Mater: The AMS Strategic Framework. Purpose Our Alma Mater: The AMS Strategic Framework Purpose The Alma Mater Society exists to serve the aspirations of UBC students. Being a UBC student is harder than ever before. The costs of school and living,

More information

RE-Powering America s Land Initiative Management Plan

RE-Powering America s Land Initiative Management Plan RE-Powering America s Land Initiative Management Plan EPA launched RE-Powering America s Land: Siting Renewable Energy on Potentially Contaminated Land and Mine Sites to encourage the siting of renewable

More information

Chapter 10 Historic / Cultural Preservation

Chapter 10 Historic / Cultural Preservation Chapter 10 Historic / Cultural Preservation...10-1 Actions since adoption of the 1997 Comprehensive Plan...10-1 Goals & objectives...10-2 Historic & cultural resource recognition and protection...10-2

More information

Policy Statement Goal A: Ecosystem Preservation and Protection. Discussion Draft for Public Consultation Page 1 of 10

Policy Statement Goal A: Ecosystem Preservation and Protection. Discussion Draft for Public Consultation Page 1 of 10 Discussion Draft for Public Consultation Page 1 of 10 Strategic Plan Potential Objectives and Examples of Strategies and Activities for the 2014-2018 Term Discussion Draft for Public Consultation June

More information

St Albans Local Development Framework. Core Strategy: Spatial Strategy Options

St Albans Local Development Framework. Core Strategy: Spatial Strategy Options Centre for Sustainability St Albans Local Development Framework Core Strategy: Spatial Strategy Options Sustainability Appraisal (incorporating Strategic Environmental Assessment) Working Note September

More information

Supporting high quality development in Haringey- Our pre application advice services

Supporting high quality development in Haringey- Our pre application advice services Supporting high quality development in Haringey- Our pre application advice services Charges from 1 April 2015 Thank you for taking the time to consider the pre application advice services offered by Haringey

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS PROJECT: CONSERVATION PLANNING, GIS MAPPING & ANALYSIS, AND PROJECT MANAGEMENT SERVICES REQUEST FOR PROPOSALS #RFP-2016-05 The Santa Clara Valley Open Space Authority is issuing this Request for Proposals

More information

Special Planning. What is a. What does an SPP affect?

Special Planning. What is a. What does an SPP affect? What is a Special Planning Program (SPP)? It s a detailed plan that is created when an area is undergoing or expected to undergo significant change. It sets future goals for the area and describes how

More information

Canada. July 3, 1991. Dr. John Kenward Chief Operating Officer Canadian Home Builders' Association 502-200 Elgin Street Ottawa, Ontario K2P 1L5

Canada. July 3, 1991. Dr. John Kenward Chief Operating Officer Canadian Home Builders' Association 502-200 Elgin Street Ottawa, Ontario K2P 1L5 Canada Mortgage and Housing Corporation National Office 682 Montreal Road Ottawa, Ontario K1A OP7 TEL: (613) 748-2000 Societe canadienne dhypotheques et de logement Bureau national 682 chemin Montreal

More information

Growth Management in the City of Brampton

Growth Management in the City of Brampton Growth Management in the City of Brampton Brampton introduced its Growth Management Program in 2003 to respond to the opportunities and challenges arising from rapid population and employment growth in

More information

825 Babock Court Raleigh, North Carolina 27609. March 7, 2014

825 Babock Court Raleigh, North Carolina 27609. March 7, 2014 825 Babock Court Raleigh, North Carolina 27609 March 7, 2014 LaGasse Medal Nominations Landscape Architect c/o Carolyn Mitchell 636 Eye Street, NW Washington, DC 20001-3736 To the ASLA Executive Committee

More information

1. THE INDEPENDENT STUDY PROJECT (ISP)

1. THE INDEPENDENT STUDY PROJECT (ISP) 1. THE INDEPENDENT STUDY PROJECT (ISP) 1.1. Introduction 1.2. Consulting an advisor 1.3. Deadlines 1.4. Format options 1.5. Submission and evaluation Appendix 1: Sample title page Appendix 2: Sample evaluation

More information

1200 Broadway Denver CO, 80203

1200 Broadway Denver CO, 80203 Researching the History of Your House (or Other Favorite Building) 1200 Broadway Denver CO, 80203 A Preservation Program of HISTORY COLORADO A re you the proud owner of a historic property? You may want

More information

Corridor Goals and Objectives

Corridor Goals and Objectives Corridor Goals and Objectives This chapter presents the goals and objectives, developed by the Corridor Study Committee, that serve as the purpose and intent of the Corridor Plan. This plan covers a twenty

More information

Center for Urban Ecology Strategic Plan

Center for Urban Ecology Strategic Plan January 2004 1 Center for Urban Ecology Strategic Plan Science and Service through Partnerships Mission The Center for Urban Ecology is an interdisciplinary team that provides scientific guidance, technical

More information

Create a greener community by championing strategies for reducing waste while encouraging the sustainable development and use of renewable energy.

Create a greener community by championing strategies for reducing waste while encouraging the sustainable development and use of renewable energy. Looking Back at 2009 In 2008, Common Council developed and approved 10 strategic priorities. Priorities include areas Council wanted to see action taken on during their term in office. Here is a glimpse

More information

Flood Incident Management - the next ten years

Flood Incident Management - the next ten years Flood Incident Management - the next ten years Consultation on the future of FlM in England and Wales, Aug Oct 2012 Table of Contents 1. About this consultation 3 1.1 Introduction 1.2 Why are we consulting?

More information

Aboriginal Affairs and Northern Development Canada. Internal Audit Report. Audit of Management of Negotiation Loans. Prepared by:

Aboriginal Affairs and Northern Development Canada. Internal Audit Report. Audit of Management of Negotiation Loans. Prepared by: Aboriginal Affairs and Northern Development Canada Internal Audit Report Audit of Management of Negotiation Loans Prepared by: Audit and Assurance Services Branch Project No. 12-11 February 2013 TABLE

More information

R E P O R T O F T H E. Auditor General. New Brunswick

R E P O R T O F T H E. Auditor General. New Brunswick R E P O R T O F T H E Auditor General of New Brunswick 1996 Office of the Auditor General Bureau du vérificateur général The Honourable Donald (Danny) Gay Speaker of the Legislative Assembly Province of

More information

STATEMENT OF CORPORATE GOVERNANCE GUIDELINES

STATEMENT OF CORPORATE GOVERNANCE GUIDELINES STATEMENT OF CORPORATE GOVERNANCE GUIDELINES As Approved by the Board of Directors on October 10, 2005 and Amended on January 25, 2007, April 17, 2008, October 29, 2009, June 30, 2010, August 9, 2012,

More information

ENTERPRISE RISK MANAGEMENT POLICY

ENTERPRISE RISK MANAGEMENT POLICY ENTERPRISE RISK MANAGEMENT Approved by the Audit Committee on 14 February 2003 and adopted by resolution of the Board on 28 March 2003 Revisions approved by the Audit and Risk Committee on 14 February

More information

Photo by Jeff Thibodeau, Helios Land Design

Photo by Jeff Thibodeau, Helios Land Design SECTION 11 REFERENCES Photo by Jeff Thibodeau, Helios Land Design PUBLIC REVIEW DRAFT Cape Cod Commission, Affordable Housing Funds, Memo from Paul Ruchinskas to County Commissioners, January 4, 2006.

More information

The Master of Landscape Architecture (MLA) Program at. West Virginia University

The Master of Landscape Architecture (MLA) Program at. West Virginia University The Master of Landscape Architecture (MLA) Program at West Virginia University The Landscape Architecture Program of the Davis College of Agriculture, Natural Resources and Design at West Virginia University

More information

Overview of the Travel Demand Forecasting Methodology

Overview of the Travel Demand Forecasting Methodology Overview of the Travel Demand Forecasting Methodology Prepared by the Central Transportation Planning Staff (CTPS) Authors: Scott A. Peterson, Manager Ian Harrington, Chief Planner March 29, 2008 1 OVERVIEW

More information

CPE. CANADIAN CERTIFIED PHYSICIAN EXECUTIVE The Standard for Physician Leadership. Candidate Handbook A P R I L 2 0 1 0

CPE. CANADIAN CERTIFIED PHYSICIAN EXECUTIVE The Standard for Physician Leadership. Candidate Handbook A P R I L 2 0 1 0 CPE CANADIAN CERTIFIED PHYSICIAN EXECUTIVE The Standard for Physician Leadership Candidate Handbook A P R I L 2 0 1 0 CONTENTS Introduction...1 About the CCPE credential...1 The CCPE: a valuable credential...1

More information

MANAGEMENT OF POLICIES, PROCEDURES AND OTHER WRITTEN CONTROL DOCUMENTS

MANAGEMENT OF POLICIES, PROCEDURES AND OTHER WRITTEN CONTROL DOCUMENTS MANAGEMENT OF POLICIES, PROCEDURES AND OTHER WRITTEN CONTROL DOCUMENTS Document Reference No: Version No: 6 PtHB / CP 012 Issue Date: April 2015 Review Date: January 2018 Expiry Date: April 2018 Author:

More information

Application Overhaul. Key Initiative Overview

Application Overhaul. Key Initiative Overview Scott D. Nelson Research Managing Vice President This overview provides a high-level description of the Application Overhaul Key Initiative. IT leaders can use this guide to understand how to develop an

More information

Seattle Comprehensive Plan: Toward a Sustainable Seattle Evaluation

Seattle Comprehensive Plan: Toward a Sustainable Seattle Evaluation Plan Analysis for UAP 5794 Sustainability Planning Lab Seattle Comprehensive Plan: Toward a Sustainable Seattle Evaluation Kaitlen Scanlon March 26, 2011 Table of Contents City Context Information... 2

More information

North Lakeland Discovery Center Master Plan

North Lakeland Discovery Center Master Plan North Lakeland Discovery Center Master Plan Manitowish Waters, Wisconsin Analysis & Planning 2012 PROFESSIONAL AWARDS Purpose of Project The goal of the North Lakeland Discovery Center s Beyond Boundaries:

More information

Flood and Coastal Erosion Risk Management Service Delivery Plan

Flood and Coastal Erosion Risk Management Service Delivery Plan Flood and Coastal Erosion Risk Management Service Delivery Plan Document Information Title Flood and coastal erosion risk management Service Delivery Plan Owner Sefton Council Version 1.2 Status Draft

More information

Supplementary Report - Mimico-by-the-Lake Secondary Plan

Supplementary Report - Mimico-by-the-Lake Secondary Plan STAFF REPORT ACTION REQUIRED Supplementary Report - Mimico-by-the-Lake Secondary Plan Date: May 30, 2013 To: From: Etobicoke York Community Council Director, Community Planning, Etobicoke York District

More information

The Corporation of the City of London Proposed Risk Assessment and 2016 Performance-Based Audit Plan. January 13, 2016

The Corporation of the City of London Proposed Risk Assessment and 2016 Performance-Based Audit Plan. January 13, 2016 The Corporation of the City of London Proposed Risk Assessment and 2016 Performance-Based Audit Plan January 13, 2016 Agenda Team Members 3 Page Summary of Internal Audit Projects 5 Risk Assessment Summary

More information

Internal Audit Strategic and Annual Plans 2015/16

Internal Audit Strategic and Annual Plans 2015/16 Internal Audit Strategic and Annual Plans 2015/16 Financial Scrutiny and Audit Committee 10 February 2015 Agenda Item No 8 Summary: This report provides an overview of the stages followed prior to the

More information

November 2013 PLANNING PRE- APPLICATION ADVICE AND PLANNING PERFORMANCE AGREEMENT SERVICE

November 2013 PLANNING PRE- APPLICATION ADVICE AND PLANNING PERFORMANCE AGREEMENT SERVICE November 2013 PLANNING PRE- APPLICATION ADVICE AND PLANNING PERFORMANCE AGREEMENT SERVICE PRE-APPLICATION ADVICE AND PLANNING PERFORMANCE AGREEMENT SERVICE PRE-APPLICATION The Council welcomes and encourages

More information

Disclosure of Drug Promotion Expenses: The Importance of Master Data Management and Considerations for Choosing a Reporting Solution

Disclosure of Drug Promotion Expenses: The Importance of Master Data Management and Considerations for Choosing a Reporting Solution Disclosure of Drug Promotion Expenses: The Importance of Master Data Management and Considerations for Choosing a Reporting Solution April 2010 This document contains information specific to Cegedim Dendrite

More information

Project Customization Guideline May, 2016

Project Customization Guideline May, 2016 Project Customization Guideline May, 2016 Check the Capital Project Delivery website to ensure this is the current version. Table of Contents Introduction... 1 Section I: Project Customization General

More information

Iowa Smart Planning. Legislative Guide March 2011

Iowa Smart Planning. Legislative Guide March 2011 Iowa Smart Planning Legislative Guide March 2011 Rebuild Iowa Office Wallace State Office Building 529 East 9 th St Des Moines, IA 50319 515-242-5004 www.rio.iowa.gov Iowa Smart Planning Legislation The

More information

TERMS OF REFERENCE RIVERSIDE FOREST PRODUCTS LIMITED SUSTAINABLE TOTAL RESOURCE MANAGEMENT PROJECT

TERMS OF REFERENCE RIVERSIDE FOREST PRODUCTS LIMITED SUSTAINABLE TOTAL RESOURCE MANAGEMENT PROJECT TERMS OF REFERENCE RIVERSIDE FOREST PRODUCTS LIMITED SUSTAINABLE TOTAL RESOURCE MANAGEMENT PROJECT 1. PURPOSE The purpose of the Riverside Forest Products Limited (Riverside) Project (the Project) is to

More information

2007 Follow-Up Report on the Audit of Information Technology January 2005

2007 Follow-Up Report on the Audit of Information Technology January 2005 2007 Follow-Up Report on the Audit of Information Technology January 2005 Natural Sciences & Engineering Research Council of Canada & Social Sciences & Humanities Research Council of Canada October 2007

More information

Consolidated I&T Data Centre - P3 Canada Fund

Consolidated I&T Data Centre - P3 Canada Fund STAFF REPORT ACTION REQUIRED Consolidated I&T Data Centre - P3 Canada Fund Date: January 16, 2012 To: From: Wards: Reference Number: Government Management Committee Deputy City Manager & Chief Financial

More information

Cultural Resource Management Policy

Cultural Resource Management Policy Cultural Resource Management Policy Introduction to Parks Canada s Policies Parks Canada is privileged in its role as the steward of outstanding cultural and natural treasures that represent the richness

More information

WPAD Ad Hoc Vegetation Management Task Force April 16. 2015

WPAD Ad Hoc Vegetation Management Task Force April 16. 2015 Recommendations for Key Elements to be included in RFP For WPAD Proposed Vegetation Management Plan 1. Goal of the Vegetation Management Plan (VMP): Develop a ten-year Vegetation Management Plan and accompanying

More information

Guidelines for Planning Authorities. Development Plans

Guidelines for Planning Authorities. Development Plans 15 Guidelines for Planning Authorities June, 2007 Development Plans Government of Ireland BAILE ÁTHA CLIATH ARNA FHOILSIÚ AG OIFIG AN TSOLÁTHAIR Le ceannach díreach ón OIFIG DHÍOLTA FOILSEACHÁN RIALTAIS,

More information

Finance Sub-Committee 30 November 2015

Finance Sub-Committee 30 November 2015 Agenda Item 8 88 Finance Sub-Committee 30 November 2015 Land at Ditchford Lakes Purpose of report The purpose of this report is to obtain Councillors agreement to enter into a 35-year lease of Council-owned

More information

EXECUTIVE SUMMARY. Advancing Excellence in Technological Literacy: Student Assessment, Professional Development, and Program Standards

EXECUTIVE SUMMARY. Advancing Excellence in Technological Literacy: Student Assessment, Professional Development, and Program Standards EXECUTIVE SUMMARY Advancing Excellence in Technological Literacy: Student Assessment, Professional Development, and Program Standards 1 The International Technology Education Association and its Technology

More information

COMPLIANCE PROCEDURES MANUAL. I. Permit Compliance System Database Description...1. II. Procedures for PCS Maintenance...7

COMPLIANCE PROCEDURES MANUAL. I. Permit Compliance System Database Description...1. II. Procedures for PCS Maintenance...7 COMPLIANCE PROCEDURES MANUAL I. Permit Compliance System Database Description...1 II. Procedures for PCS Maintenance...7 A. Permit Facility Level Data...8 B. Permit Pipe Schedule/Limits Data....9 C. Discharge

More information

Amalgamation Plan. April 2012. Proposal for the Amalgamation of Community Credit Union of Cumberland Colchester & Valley Credit Union

Amalgamation Plan. April 2012. Proposal for the Amalgamation of Community Credit Union of Cumberland Colchester & Valley Credit Union Proposal for the Amalgamation of Community Credit Union of Cumberland Colchester & Valley Credit Union April 2012 Prepared for the members of Community Credit Union of Cumberland Colchester & Valley Credit

More information

VALIDATION REQUIREMENTS FOR PLANNING APPLICATIONS

VALIDATION REQUIREMENTS FOR PLANNING APPLICATIONS Planning Services, Civic Offices, New Road, Grays, Essex RM17 6SL VALIDATION REQUIREMENTS FOR PLANNING APPLICATIONS Checklists to ensure prompt validation: Checklist 1 for ALL applications for planning

More information

Carlsbad Springs Solar Project

Carlsbad Springs Solar Project Date: July 16, 2015 Qualified Applicant: Invenergy LLC 120 Front Street East, Suite 201 Toronto, ON M5A 4L9 Registered Proponent: Carlsbad Springs Solar Energy Partnership Email: carlsbadspringssolarinfo@invenergyllc.com

More information

FEDERAL DATA CENTER CONSOLIDATION TASK FORCE CHARTER

FEDERAL DATA CENTER CONSOLIDATION TASK FORCE CHARTER FEDERAL DATA CENTER CONSOLIDATION TASK FORCE CHARTER PURPOSE The charter establishes the Data Center Consolidation Task Force (Task Force) and consigns that Task Force work in support of the Federal Data

More information