1 Foothills Parkway Bridge No. 2 Design Build Project 2010 PTI Conference Gregory Hunsicker, P.E.

2 Foothills Parkway Bridge 2 Project Description Bridge Alignment and Geometry Post-tensioning Applications Durability Construction Method

3 Project Description Foothills Parkway Bridge 2 Design/Build Contract Bid November 2009 Bridge length approximately lane bridge ARRA

4 Project Team Owner National Park Service (NPS) EFLHD Contractor: Bell and Associates Construction Corven Engineering Palmer Engineering Hedstrom Design Dan Brown and Associates VSL

5 Project Location Northeast of the City of Townsend (Blount County, TN) Great Smoky Mountain National Park

6 Project Location

7 Scenic route paralleling the Great Smoky Mountain National Park Over 9 Million Visitors per Year Context Sensitive Solutions Project Description

8 Context Sensitive Solutions Longstanding Vision and Legacy National Parks opened to automobiles in 1907 Yellowstone opened to automobiles in 1915 NPS Established in 1916 Office of Public Roads (1916) 160 miles of Park Roads NPS (Current) >8500 miles of Roads >1700 bridges Yosemite National Park, 1903 National Park Service Historic Photograph Collection

9 Context Sensitive Solutions Longstanding Vision and Legacy National Parks opened to automobiles in 1907 Yellowstone opened to automobiles in 1915 NPS Established in 1916 Office of Public Roads (1916) 160 miles of Park Roads NPS (Current) >8500 miles of Roads >1700 bridges Yellowstone National Park, ~1920 NPS Postcard, Frank J. Haynes

10 National Parks Roads History Missing Link Authorized construction in 1944, started construction in 1965 National Park Service Centennial ( ) Completion of Foothills Parkway

11 Bridge Description Precast Segmental Bridge Balanced Cantilever Construction Access from East Abutment only Built not on, but above the Mountainside utilizing elevated work trestle

12 Bridge Layout

13 Superstructure Minimum Radius: 262 Superelevation: - 5.8% to +7.8% Grade: up to 8.0%

14 Substructure Piers: x 10 Oval - Flares to 16 Cap - Hollow Section 1 Walls - Vertical Post-Tensioning Foundations: - Elevated Footings - 5 x 20 diameter - Sub-Footing Concrete - Micropiles

15 Substructure Bridge Aesthetics Consistent Theme through other Bridges Granite Stone and Natural Rock Outcroppings to Match other Bridges and Landscape Pigmented Concrete Steel Forms Short Segments

16 Post-tensioning Layout

17 Post-tensioning Layout

18 Typical Pier Foundations Post-tensioning Foundations Micropiles

19 Durability Post-tensioned Concrete Box Girder Precast Concrete PCI B4 Deflected Strand Certification High Performance Concrete Overlay Workmanship Specification Requirements Personnel Qualifications Experience Quality Plans

20 Post-tensioning Specifications Florida DOT Specification Section 461 FHWA Post-tensioning Tendon Grouting and Installation Manual Post-Tensioning Manual, PTI

21 Post-tensioning Durability Robust PT Systems Internal Tendons Plastic Duct and Caps Transversely Posttensioned Top Slab Future Tendon Provisions

22 Post-tensioning Durability PTI Bonded Posttensioning Installer Certification ASBI Grouting Certification Prepackaged Grout Post-grout inspection

23 Geometry Control by Designer Post-tensioned Grouting by posttensioning supplier ASBI Grout Technician Integrated Team Quality

24 Construction Method Minimize Impact to the Environment Quality of Construction Aesthetics Schedule Rate of Construction Provisions for Maintaining Schedule Safety Cost

25 Construction Method Challenges Access only from Abutment 1 Rock Outcropping at Pier 3 Maintain Alignment and Geometry Challenging Geometry Steep Slopes Do Not Disturb areas Foothills Parkway Bridge 2 Rendering EFLHD, Richard McDaniel

26 Construction Method

27 Construction Method Challenges Access only from Abutment 1 Rock Outcropping at Pier 3 Maintain Alignment and Geometry Challenging Geometry Steep Slopes Do Not Disturb areas Options Considered Precast Segmental Erected in Balanced Cantilever

28 Construction Method Advance Micropile Rig

29 Construction Method Construct Trestle / Install Micropiles for Trestle

30 Construction Method Advance Crane

31 Construction Method Construct Next Trestle Span

32 Construction Method Construct Footings and Set Precast Pier Segments

33 Construction Method Mobilize Segment Loader

34 Construction Method Erect Precast Segments with Segment Loader

35 Erect Superstructure in Balanced Cantilever

36 Completed Structure

37 Project Schedule Notice to Proceed January 2010 Current Progress Scheduled Completion Fall 2011 Foothills Parkway Bridge 2 Rendering EFLHD, Richard McDaniel

38 Foothills Parkway Bridge No. 2 Design Build Project

Safe & Sound Bridge Terminology

Safe & Sound Bridge Terminology Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries

More information

Value Engineering vs. Alternate Designs in Bridge Bidding

Value Engineering vs. Alternate Designs in Bridge Bidding Value Engineering vs. Alternate Designs in Bridge Bidding Compares the advantages and disadvantages of alternate designs and value engineering in bidding of bridges as experienced in the State of Florida.

More information

Bridge Type Selection

Bridge Type Selection Bridge Type Selection The major consideration for bridge type selection for bridges on the State Aid system is initial cost. Future maintenance costs, construction time, and location are considered when

More information

Virginia Approach Spans

Virginia Approach Spans Virginia Concrete Conference 2009 Woodrow Virginia Approach Spans David Tackoor, HNTB Formerly of URS Corp for Potomac Crossing Consultants Woodrow 1 Second Severn Crossing 2 Medway Crossing (Channel Tunnel

More information

3.1 Historical Considerations

3.1 Historical Considerations 3. Recommended Scope of Bridge improvements 3.1 Historical Considerations In the fall of 2000, an outside consultant, Fraser Design, suggested that the existing 4 th St. Bridge is potentially eligible

More information

IH-635 MANAGED LANES PROJECT, SEG. 3.2

IH-635 MANAGED LANES PROJECT, SEG. 3.2 IH-635 MANAGED LANES PROJECT, SEG. 3.2 Location: Dallas, Texas Owner: Texas Department of Transportation Client: Ferrovial Agroman Construction Cost: $1 Billion Construction Completion Date: December,

More information

PENNDOT 3D MODELING FOR STRUCTURES WORKSHOP. Presented by: Steven Pletcher and Chris Daniels, P.E. October 21, 2014

PENNDOT 3D MODELING FOR STRUCTURES WORKSHOP. Presented by: Steven Pletcher and Chris Daniels, P.E. October 21, 2014 PENNDOT 3D MODELING FOR STRUCTURES WORKSHOP Presented by: Steven Pletcher and Chris Daniels, P.E. October 21, 2014 Agenda Introduction G.A. & F.C. Wagman History Process used to prepare 3D models Estimating

More information

USE OF MICROPILES IN TEXAS BRIDGES. by John G. Delphia, P.E. TxDOT Bridge Division Geotechnical Branch

USE OF MICROPILES IN TEXAS BRIDGES. by John G. Delphia, P.E. TxDOT Bridge Division Geotechnical Branch USE OF MICROPILES IN TEXAS BRIDGES by John G. Delphia, P.E. TxDOT Bridge Division Geotechnical Branch DEFINITION OF A MICROPILE A micropile is a small diameter (typically less than 12 in.), drilled and

More information

Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation

Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation Jeff R. Hill, P.E. Hayward Baker Inc. 111 W. Port Plaza Drive Suite 600 St. Louis, MO 63146 314-542-3040 JRHill@HaywardBaker.com

More information

1.2 Advantages and Types of Prestressing

1.2 Advantages and Types of Prestressing 1.2 Advantages and Types of Prestressing This section covers the following topics. Definitions Advantages of Prestressing Limitations of Prestressing Types of Prestressing 1.2.1 Definitions The terms commonly

More information

Peer Review Scope of Work

Peer Review Scope of Work 1.0 PROJECT OVERVIEW The St. Croix River Crossing Project has been developed in response to traffic congestion, operation deficiencies, safety concerns, and structural deficiencies of the Stillwater Lift

More information

Quality Control and Quality Assurance Guide

Quality Control and Quality Assurance Guide Quality Control and Quality Assurance Guide Bridge Division, Design Section October 2013 Table of Contents Chapter 1 About this Guide... 3 Chapter 2 Goals and Objectives... 5 Chapter 3 Participants...

More information

San Francisco Oakland Bay Bridge East Span Seismic Safety Project

San Francisco Oakland Bay Bridge East Span Seismic Safety Project San Francisco Oakland Bay Bridge East Span Seismic Safety Project Presented To: Society of American Military Engineers May 16, 2013 Brian Maroney, P.E. Dr. Engr. Karen Wang, P.E. Pier E9 Following the

More information

Informational Workshop Public Meeting Kanawha Falls Bridge Project

Informational Workshop Public Meeting Kanawha Falls Bridge Project Informational Workshop Public Meeting Kanawha Falls Project WV Department of Transportation Division of Highways in Cooperation with the Federal Highway Administration State Project S310-13-0.02 00 Federal

More information

Design of Bridges. Introduction. 3 rd to 4 th July 2012. Lecture for SPIN Training at the University of Dar es Salaam

Design of Bridges. Introduction. 3 rd to 4 th July 2012. Lecture for SPIN Training at the University of Dar es Salaam Design of Bridges Introduction 3 rd to 4 th July 2012 1 FUNCTION OF A BRIDGE To connect two communities which are separated by streams, river, valley, or gorge, etc. 2 EVOLUTION OF BRIDGES 1. Log Bridge

More information

2015 ODOT Bridge Design Conference May 12, 2014. DeJong Rd Bridge High- Seismic Zone Case Study: Bridge Rehab vs. Replacement.

2015 ODOT Bridge Design Conference May 12, 2014. DeJong Rd Bridge High- Seismic Zone Case Study: Bridge Rehab vs. Replacement. 2015 ODOT Bridge Design Conference May 12, 2014 DeJong Rd Bridge High- Seismic Zone Case Study: Bridge Rehab vs. Replacement Mary Ann Triska 2015 HDR, all rights reserved. Presentation Outline Project

More information

Analysis of the Response Under Live Loads of Two New Cable Stayed Bridges Built in Mexico

Analysis of the Response Under Live Loads of Two New Cable Stayed Bridges Built in Mexico Analysis of the Response Under Live Loads of Two New Cable Stayed Bridges Built in Mexico Roberto Gómez, Raul Sánchez-García, J.A. Escobar and Luis M. Arenas-García Abstract In this paper we study the

More information

Source: Port Mann Bridge Plans Unveiled Today, CBC News, February 4, 2009.

Source: Port Mann Bridge Plans Unveiled Today, CBC News, February 4, 2009. Total project cost $2.5 billion (Canadian) Financed by tolls about $3 each direction. Total project length 37 km (McGill St in Vancouver to 216 th in Langley) The new Port Mann bridge 10 lanes (existing

More information

Elevated Roads for Sri Lanka

Elevated Roads for Sri Lanka Elevated Roads for Sri Lanka M.T.R. Jayasinghe (Senior Professor, Structural Engineering, University of Moratuwa) Senior Professor M.T.R. Jayasinghe is a Professor of Structural Engineering, University

More information

Rehabilitation of the Red Bank Road Bridge over Hoover Reservoir. Presented By: Doug Stachler, P.E.

Rehabilitation of the Red Bank Road Bridge over Hoover Reservoir. Presented By: Doug Stachler, P.E. Rehabilitation of the Red Bank Road Bridge over Hoover Reservoir Presented By: Doug Stachler, P.E. Project Organization Owner Delaware County Engineers Office Design Consultant CH2M HILL Contractor Double

More information

4B-2. 2. The stiffness of the floor and roof diaphragms. 3. The relative flexural and shear stiffness of the shear walls and of connections.

4B-2. 2. The stiffness of the floor and roof diaphragms. 3. The relative flexural and shear stiffness of the shear walls and of connections. Shear Walls Buildings that use shear walls as the lateral force-resisting system can be designed to provide a safe, serviceable, and economical solution for wind and earthquake resistance. Shear walls

More information

Investigation of the November 2, 2013 collapse of concrete beams at Fort Lauderdale-Hollywood Airport runway project

Investigation of the November 2, 2013 collapse of concrete beams at Fort Lauderdale-Hollywood Airport runway project Investigation of the November 2, 2013 collapse of concrete beams at Fort Lauderdale-Hollywood Airport runway project U.S. Department of Labor Occupational Safety and Health Administration Directorate of

More information

DUDERSTADT FOUNDATION & CONSTRUCTION, LLC.

DUDERSTADT FOUNDATION & CONSTRUCTION, LLC. DUDERSTADT FOUNDATION & CONSTRUCTION, LLC. Drilling since 1916 2215 Belknap Place Phone (210) 824-3800 San Antonio, TX 78212-1904 Fax (210) 824-9525 www.duderstadtfoundation.com ABOUT THE COVER: Drilled

More information

The International Workshop on Micropiles, 2007

The International Workshop on Micropiles, 2007 MICROPILE FOUNDATION REPAIR AND UNDERPINNING, ARTS AND SCIENCE MUSEUM, UNIVERSITY OF PUERTO RICO, MAYAGUEZ Presented at: International Society of Micropiles (ISM) The International Workshop on Micropiles,

More information

Dulles Corridor Metrorail Project

Dulles Corridor Metrorail Project Dulles Corridor Metrorail Project MONTHLY COST AND SCHEDULE UPDATE FOR PHASE 2 AS OF JULY 31, 2015 SEPTEMBER 2015 Phase 2 Cost Summary July Expenditures $ 19.2 Million Total Expenditures $ 508.7 Million

More information

Precast Concrete Elements for Accelerated Bridge Construction

Precast Concrete Elements for Accelerated Bridge Construction Precast Concrete Elements for Accelerated Bridge Construction Volume 1-1. Laboratory Testing of Precast Substructure Components: Boone County Bridge Volume 1-2. Laboratory Testing of Full-Depth Precast,

More information

Challenging Skew: Higgins Road Steel I-Girder Bridge over I-90 OTEC 2015 - October 27, 2015 Session 26

Challenging Skew: Higgins Road Steel I-Girder Bridge over I-90 OTEC 2015 - October 27, 2015 Session 26 2014 HDR Architecture, 2014 2014 HDR, HDR, Inc., all all rights reserved. Challenging Skew: Higgins Road Steel I-Girder Bridge over I-90 OTEC 2015 - October 27, 2015 Session 26 Brandon Chavel, PhD, P.E.,

More information

US 51 Ohio River Bridge Engineering and Environmental Study

US 51 Ohio River Bridge Engineering and Environmental Study US 51 Ohio River Bridge Engineering and Environmental Study ITEM NOS. 1-100.00 & 1-1140.00 Prepared by: Michael Baker Jr., Inc. 9750 Ormsby Station Rd Louisville, KY 40223 August 16, 2013 Table of Contents

More information

FEBRUARY 2014 LRFD BRIDGE DESIGN 4-1

FEBRUARY 2014 LRFD BRIDGE DESIGN 4-1 FEBRUARY 2014 LRFD BRIDGE DESIGN 4-1 4. STRUCTURAL ANALYSIS AND EVALUATION The analysis of bridges and structures is a mixture of science and engineering judgment. In most cases, use simple models with

More information

CSXT Emergency Response for May 2010 Flood Repairs

CSXT Emergency Response for May 2010 Flood Repairs CSXT Emergency Response for May 2010 Flood Repairs 11 th Annual Geohazards Forum Chattanooga, Tennessee Christopher Ramsey, PE AMEC Project Overview Record rainfalls affecting greater Nashville. Some areas

More information

EXECUTIVE SUMMARY CHAPTER 6

EXECUTIVE SUMMARY CHAPTER 6 EXECUTIVE SUMMARY CHAPTER 6 This Bridge Development Report was prepared to document the decision process and recommendations for constructing a bridge carrying Maitland Boulevard (eastbound) over I-4 as

More information

The new Twisp River Bridge is a spliced single-span

The new Twisp River Bridge is a spliced single-span COVER FEATURE New Deep WSDOT Girders Used for the Twisp River Bridge John A. Van Lund, P.E. Bridge Projects Manager Bridge and Structures Office Washington State Department of Transportation Olympia, Washington

More information

NAME: East Grade Big Fill Big Trestle Abatement LOCATION: Golden Spike National Historic Site, Utah DATE: Fall 1985 LOCATION OF NEGATIVE: National

NAME: East Grade Big Fill Big Trestle Abatement LOCATION: Golden Spike National Historic Site, Utah DATE: Fall 1985 LOCATION OF NEGATIVE: National vv* NAME: East Grade Big Fill Big Trestle Abatement LOCATION: Golden Spike National Historic Site, Utah DATE: Fall 1985 LOCATION OF NEGATIVE: National Park Service, Rocky Mountain Regional Office, Denver,

More information

The Rehabilitation Alternative Huey P. Long Bridge Case Study. Bruce E. Peterson, P.E. Project Manager Modjeski and Masters, Inc.

The Rehabilitation Alternative Huey P. Long Bridge Case Study. Bruce E. Peterson, P.E. Project Manager Modjeski and Masters, Inc. The Rehabilitation Alternative Huey P. Long Bridge Case Study Bruce E. Peterson, P.E. Project Manager Modjeski and Masters, Inc. March 22, 2010 Replacement vs. Rehabilitation Project Background Introduction

More information

REHABILITATION OF THE FIGUEIRA DA FOZ BRIDGE

REHABILITATION OF THE FIGUEIRA DA FOZ BRIDGE REHABILITATION OF THE FIGUEIRA DA FOZ BRIDGE A.Rito Proponte, Lda, Lisbon, Portugal J. Appleton A2P Consult, Lda, Lisbon, Portugal ABSTRACT: The Figueira da Foz Bridge includes a 405 m long cable stayed

More information

BRIDGE RESTORATION AND LANDSLIDE CORRECTION USING STRUCTURAL PIER AND GRADE BEAM

BRIDGE RESTORATION AND LANDSLIDE CORRECTION USING STRUCTURAL PIER AND GRADE BEAM BRIDGE RESTORATION AND LANDSLIDE CORRECTION USING STRUCTURAL PIER AND GRADE BEAM Swaminathan Srinivasan, P.E., M.ASCE H.C. Nutting/Terracon David Tomley, P.E., M.ASCE KZF Design Delivering Success for

More information

UNDERPINNING OF NEW STUDENT HOUSING BUILDING USING MICROPILES, NORTH CAROLINA USA

UNDERPINNING OF NEW STUDENT HOUSING BUILDING USING MICROPILES, NORTH CAROLINA USA UNDERPINNING OF NEW STUDENT HOUSING BUILDING USING MICROPILES, NORTH CAROLINA USA John R. Wolosick, P.E.,D.GE 1, Michael W. Terry, P.E. 2, W. David Kirschner 3 and Robert F. Scott Jr. P.E. 4 SYNOPSIS In

More information

Pent Up Load and Its Effect on Load Test Evaluation

Pent Up Load and Its Effect on Load Test Evaluation Nicholson Construction Company 12 McClane Street Cuddy, PA 15031 Telephone: 412-221-4500 Facsimile: 412-221-3127 Pent Up Load and Its Effect on Load Test Evaluation by T.D. Richards Jr., P.E. Nicholson

More information

COMPETENCY ANALYSIS PROFILE. Rodworker 452A. (All unshaded skill sets must be demonstrated/ completed) Lift equipment and materials

COMPETENCY ANALYSIS PROFILE. Rodworker 452A. (All unshaded skill sets must be demonstrated/ completed) Lift equipment and materials COMPETENCY ANALYSIS PROFILE Rodworker 452A (All unshaded skill sets must be demonstrated/ completed) PROTECT SELF AND OTHERS Wear personal protective (PPE) Lift and Apply housekeeping rules Interpret warning

More information

Introduction to Minimal Excavation Foundations

Introduction to Minimal Excavation Foundations Introduction to Minimal Excavation Foundations What is a minimal excavation foundation? A construction technique that minimizes disturbance of the natural soil profile within the footprint of the structure

More information

Rapid Short and Medium Span Bridge Construction Using Innovative. Precast Structural Systems

Rapid Short and Medium Span Bridge Construction Using Innovative. Precast Structural Systems Rapid Short and Medium Span Bridge Construction Using Innovative Precast Structural Systems By: Derek M. Scullion A thesis in partial fulfillment of the requirements for the degree of Master of Science

More information

1,045 m length of the Deh Cho Bridge

1,045 m length of the Deh Cho Bridge Innovative Design Features: Lightweight truss: The principles of lightweight design led to a saving of 25% in the use of structural steel. State of the art deck system: Designed as a four-way slab, it

More information

How To Build A Luxury Apartment Complex In London

How To Build A Luxury Apartment Complex In London Post Tensioning Awards 2009 Project Summary Type of structure Location Architects Structural Engineer Residential with leisure suites including Swimming pool, Cinema, Virtual Golf, Wine Cellars, and Parking

More information

Kingsbury Run Greenway Project

Kingsbury Run Greenway Project Kingsbury Run Greenway Project Slavic Village Development & Burton, Bell, Carr Project Goals Create Conceptual Plans and Cost Estimate. Coordinate with other ongoing and future projects in the area. Description

More information

National Council of Examiners for Engineering and Surveying. Principles and Practice of Engineering Structural Examination

National Council of Examiners for Engineering and Surveying. Principles and Practice of Engineering Structural Examination Structural Effective Beginning with the April 2011 The structural engineering exam is a breadth and exam examination offered in two components on successive days. The 8-hour Vertical Forces (Gravity/Other)

More information

9.3 Two-way Slabs (Part I)

9.3 Two-way Slabs (Part I) 9.3 Two-way Slabs (Part I) This section covers the following topics. Introduction Analysis and Design Features in Modeling and Analysis Distribution of Moments to Strips 9.3.1 Introduction The slabs are

More information

REHABILITATION PACKAGE 1-a

REHABILITATION PACKAGE 1-a 1-a WINONA BRIDGE (BRIDGE 5900) REHABILITATION PACKAGE 1-a Rehab option 1-a is a rehabilitation package whereby all spans of the existing structure would be rehabilitated to the degree feasible and strengthened

More information

Cable-Stayed Bridge Uses New Post-Tensioning System

Cable-Stayed Bridge Uses New Post-Tensioning System Stretching over the Ohio River Cable-Stayed Bridge Uses New Post-Tensioning System By William B. Caroland, PE, and Jorge M. Suarez, PE Located approximately 2.8 miles downstream from the suspension bridge

More information

FUTURE SLAB. PENETRATIONS and. DEMOLITION of POST-TENSIONED FLOORS

FUTURE SLAB. PENETRATIONS and. DEMOLITION of POST-TENSIONED FLOORS FUTURE SLAB PENETRATIONS and DEMOLITION of POST-TENSIONED FLOORS 1.0 INTRODUCTION Post-tensioned floor slabs in Australia and South East Asia are now universally regarded as the most cost effective form

More information

COLUMN-FREE OFFICE SPACE RISES IN CHICAGO S LOOP

COLUMN-FREE OFFICE SPACE RISES IN CHICAGO S LOOP COLUMN-FREE OFFICE SPACE RISES IN CHICAGO S LOOP 30 x45 bay provides maximum tenant flexibility and increases leasing marketability By David E. Eckmann AIA, S.E. P.E. SURGING DEMANDS FOR RENTABLE OFFICE

More information

SECTION 5 ANALYSIS OF CONTINUOUS SPANS DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE LEAD AUTHOR: BRYAN ALLRED

SECTION 5 ANALYSIS OF CONTINUOUS SPANS DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE LEAD AUTHOR: BRYAN ALLRED SECTION 5 ANALYSIS OF CONTINUOUS SPANS DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE LEAD AUTHOR: BRYAN ALLRED NOTE: MOMENT DIAGRAM CONVENTION In PT design, it is preferable to draw moment diagrams

More information

KOSCIUSZKO BRIDGE PROJECT BRIDGE PRIMER

KOSCIUSZKO BRIDGE PROJECT BRIDGE PRIMER KOSCIUSZKO BRIDGE PROJECT BRIDGE PRIMER The New York State Department of Transportation (NYSDOT) is preparing an Environmental Impact Statement (EIS) to evaluate alternatives for the rehabilitation or

More information

ENGINEERED FOUNDATIONS. Department of Public Works Jeff Hill, PE

ENGINEERED FOUNDATIONS. Department of Public Works Jeff Hill, PE ENGINEERED FOUNDATIONS Department of Public Works Jeff Hill, PE What is an engineered foundation. A Foundation Design Developed by a Trained Professional (Engineer) Types of Foundations (All of which can

More information

Structure Design Manual

Structure Design Manual Structure Design Manual MARCH 2015 ILLINOIS STATE TOLL HIGHWAY AUTHORITY The Structure Design Manual dated March 2015 replaces the Structure Design Manual issued March 2014. Revision Summary Article 1.1:

More information

STRUCTURAL ASSESSMENT. Full Metal Jacket Building 0 Prince Street, Alexandria, VA

STRUCTURAL ASSESSMENT. Full Metal Jacket Building 0 Prince Street, Alexandria, VA STRUCTURAL ASSESSMENT FOR Full Metal Jacket Building 0 Prince Street, Prepared by: ALPHA CORPORATION (Alpha) 1850 S. Loudoun Street, Suite 200 Winchester, VA 22601 540-723-0704 September 22, 2010 J. Michael

More information

SECOND PENANG BRIDGE PROJECT

SECOND PENANG BRIDGE PROJECT INTRODUCTION PROJECT PARTICULARS Jambatan Kedua (JKSB), a wholly-owned company of the Minister of Finance, Incorporated (MoF Inc.) was appointed as the concessionaire for the Second Penang Bridge Project

More information

Stone Arch Bridges of Washington County, MD

Stone Arch Bridges of Washington County, MD Stone Arch Bridges of Washington County, MD Presentation for the County Engineers Association of Maryland (CEAM) 2009 Spring Conference May 14, 2009 Scott Hobbs, P.E. Capital Projects Engineering John

More information

Construction Laborer Dies after Falling off Collapsed Precast Concrete Floor Slab

Construction Laborer Dies after Falling off Collapsed Precast Concrete Floor Slab STATE OF NEW YORK DEPARTMENT OF HEALTH FATALITY ASSESSMENT AND CONTROL EVALUATION Construction Laborer Dies after Falling off Collapsed Precast Concrete Floor Slab Case Report: 07NY015 SUMMARY In February

More information

SUPPLEMENTAL SPECIFICATIONS CROSS SLOPE VERIFICATION:

SUPPLEMENTAL SPECIFICATIONS CROSS SLOPE VERIFICATION: September 22, 2009 Updated November 16, 2009 SUPPLEMENTAL SPECIFICATIONS CROSS SLOPE VERIFICATION: 1. DESCRIPTION: The cross slopes of the roadway are to be constructed as detailed in the plans and within

More information

Foundations 65 5 FOUNDATIONS. by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. Seismic Retrofit Training

Foundations 65 5 FOUNDATIONS. by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. Seismic Retrofit Training Foundations 65 5 FOUNDATIONS by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. 66 Foundations Foundations 67 FOUNDATIONS Let's assume that the retrofit has been done correctly from the roofline

More information

Draft Table of Contents. Building Code Requirements for Structural Concrete and Commentary ACI 318-14

Draft Table of Contents. Building Code Requirements for Structural Concrete and Commentary ACI 318-14 Draft Table of Contents Building Code Requirements for Structural Concrete and Commentary ACI 318-14 BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE (ACI 318 14) Chapter 1 General 1.1 Scope of ACI 318

More information

Session 3: Guardrail Design and Sitespecific. Considerations

Session 3: Guardrail Design and Sitespecific. Considerations FHWA Roadway Departure Technology Transfer Roadside Safety Systems Installer Training : Guardrail Design and Sitespecific Installation Considerations 3-1 Course Topics Session 2 Testing Requirements and

More information

Remote Monitoring of Soil Pressures on Bridge Footings

Remote Monitoring of Soil Pressures on Bridge Footings More Info at Open Access Database www.ndt.net/?id=18252 Remote Monitoring of Soil Pressures on Bridge Footings Michael DAVIDSON 1, Zhihui ZHU 2, Issam HARIK 3, Charlie SUN 4, Kevin SANDEFUR 5 1 Bridge

More information

ROTATED-ELLIPSE ARCH PEDESTRIAN BRIDGE FOR THE CALGARY WEST LIGHT RAIL TRANSIT EXTENSION PROJECT

ROTATED-ELLIPSE ARCH PEDESTRIAN BRIDGE FOR THE CALGARY WEST LIGHT RAIL TRANSIT EXTENSION PROJECT ROTATED-ELLIPSE ARCH PEDESTRIAN BRIDGE FOR THE CALGARY WEST LIGHT RAIL TRANSIT EXTENSION PROJECT Edmund Ho, P.Eng. MMM Group Limited, Canada Monty Knaus, P.Eng. MMM Group Limited, Canada Paper prepared

More information

DESIGN OF PRESTRESSED BARRIER CABLE SYSTEMS

DESIGN OF PRESTRESSED BARRIER CABLE SYSTEMS 8601 North Black Canyon Highway Suite 103 Phoenix, AZ 8501 For Professionals Engaged in Post-Tensioning Design Issue 14 December 004 DESIGN OF PRESTRESSED BARRIER CABLE SYSTEMS by James D. Rogers 1 1.0

More information

I-25/ARAPAHOE INTERCHANGE RECONSTRUCTION PROJECT

I-25/ARAPAHOE INTERCHANGE RECONSTRUCTION PROJECT MANDATORY PRE-BID SIGN IN CDOT Carrie DeJiacomo, Program Engineer John Hall, Resident Engineer Telecia McCline, Project Manager Tammy Maurer, Assistant Project Manager David Evans/Hartwig Design Consultant

More information

How To Check For Scour At A Bridge

How To Check For Scour At A Bridge Case Studies Bridge Scour Inspection and Repair Edward P. Foltyn, P.E. Senior Hydraulic Engineer ODOT Bridge Unit 2013 PNW Bridge Inspectors Conference April 2013 REFERENCES Stream Stability at Highway

More information

Section 2100-Trenching and Tunneling

Section 2100-Trenching and Tunneling SECTION 5200 - STORM SEWER PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of storm sewer mains and culverts. Topics include permits and fees, trench widths, pipe laying, bedding, initial

More information

BRIDGE DESIGN MANUAL

BRIDGE DESIGN MANUAL BRIDGE DESIGN MANUAL 2003 Edition (U.S. Customary Units) State of Connecticut Department of Transportation Revisions: 7/04, 11/04, 1/05, 3/05, 1/09, 3/09, 2/11 PREFACE The Connecticut Department of Transportation

More information

I-676 (Vine Expressway) Bridge Reconstruction Project 22 nd - 18 th Streets Philadelphia, PA. PSPE Presentation, December 3, 2015

I-676 (Vine Expressway) Bridge Reconstruction Project 22 nd - 18 th Streets Philadelphia, PA. PSPE Presentation, December 3, 2015 I-676 (Vine Expressway) Bridge Reconstruction Project 22 nd - 18 th Streets Philadelphia, PA PSPE Presentation, December 3, 2015 Location Map N PROJECT LOCATION 22 nd 18 th Streets PHILADELPHIA, PA General

More information

CIRCULAR LETTER 2007-20 Page 2 of 5 November 30, 2007

CIRCULAR LETTER 2007-20 Page 2 of 5 November 30, 2007 CIRCULAR LETTER 2007-20 PPC DECK BEAM NEW SHAPE IMPLEMENTATION, STANDARD BRIDGE PLAN RETIREMENT, AND PPC DECK BEAM INSPECTION COUNTY ENGINEERS/SUPERINTENDENTS OF HIGHWAYS MUNICIPAL ENGINEERS/DIRECTORS

More information

The Impact of Market Demands on Residential Post-Tensioned Foundation Design: An Ethical Dilemma

The Impact of Market Demands on Residential Post-Tensioned Foundation Design: An Ethical Dilemma The Impact of Market Demands on Residential Post-Tensioned Foundation Design: An Ethical Dilemma Bart B. Barrett, B.S., P.E.1 Kerry S. Lee, M.B.A., P.E., M. ASCE2 Erik L. Nelson, Ph.D., P.E., M. ASCE3

More information

Overhang Bracket Loading. Deck Issues: Design Perspective

Overhang Bracket Loading. Deck Issues: Design Perspective Deck Issues: Design Perspective Overhang Bracket Loading Deck overhangs and screed rails are generally supported on cantilever brackets during the deck pour These brackets produce an overturning couple

More information

Chaudière Crossing Bridge Rehabilitation

Chaudière Crossing Bridge Rehabilitation Chaudière Crossing Bridge Rehabilitation Douglas K. Lowry P. Eng., Armtec Infrastructure Incorporated David Delicate, P.Eng. Public Works and Government Services Canada (Retired) Prepared for presentation

More information

New construction Repairing failed or old foundations Retrofit foundations Permanent battered piers Machinery/equipment foundations

New construction Repairing failed or old foundations Retrofit foundations Permanent battered piers Machinery/equipment foundations from New construction foundations don t have to be a headache. The CHANCE Helical Pier Foundation System gives you the performance of concrete without the drawbacks and liabilities of driven piles and

More information

October 30, 2014. Mr. & Mrs. Daniel Vick 101 Southwind Cove Benton, AR. Report of Findings, Structural Investigation, Benton, Arkansas, Dear Mr.

October 30, 2014. Mr. & Mrs. Daniel Vick 101 Southwind Cove Benton, AR. Report of Findings, Structural Investigation, Benton, Arkansas, Dear Mr. 117 S. Market St. Benton, AR 72015 * 501-315-2626 * Fax 501-315-0024 October 30, 2014 Mr. & Mrs. Daniel Vick 101 Southwind Cove Benton, AR Re: Report of Findings,, Benton, Arkansas, Dear Mr. Vick: This

More information

Department of Main Roads Chapter 22. Chapter 22. Bridges and Retaining Walls. June 2006 i

Department of Main Roads Chapter 22. Chapter 22. Bridges and Retaining Walls. June 2006 i Chapter Bridges and Retaining Walls i Manual Contents Chapter 1 Framework of the Road Planning and Design Manual Chapter 2 Design Philosophy Chapter 3 Road Planning and Design Fundamentals Chapter 4 Application

More information

The unit costs are based on the trend line of the 3 low bids for the average quantity.

The unit costs are based on the trend line of the 3 low bids for the average quantity. Page 1 of 8 COST ESTIMATE GENERAL INSTRUCTIONS The unit costs are based on the trend line of the 3 low bids for the average quantity. Apply the Unit Costs to ordinary structures. Unit Costs should generally

More information

Presentation Goals and Outline. Introduction to Post-Tensioning. The Precast Show 2014 NPCA 1. Post-Tensioning Institute.

Presentation Goals and Outline. Introduction to Post-Tensioning. The Precast Show 2014 NPCA 1. Post-Tensioning Institute. Presentation Goals and Outline Develop understanding for: PT Basics: Prestressed concrete; advantages; modern PT systems; encapsulation and durability Application Concepts: Facts vs. myths; shortening

More information

SECTION 3 DESIGN OF POST TENSIONED COMPONENTS FOR FLEXURE

SECTION 3 DESIGN OF POST TENSIONED COMPONENTS FOR FLEXURE SECTION 3 DESIGN OF POST TENSIONED COMPONENTS FOR FLEXURE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE LEAD AUTHOR: TREY HAMILTON, UNIVERSITY OF FLORIDA NOTE: MOMENT DIAGRAM CONVENTION In PT design,

More information

EXHIBIT "A" CONSTRUCTION ENGINEERING AND INSPECTION SCOPE OF SERVICES FOR. Project Description(s):

EXHIBIT A CONSTRUCTION ENGINEERING AND INSPECTION SCOPE OF SERVICES FOR. Project Description(s): EXHIBIT "A" CONSTRUCTION ENGINEERING AND INSPECTION SCOPE OF SERVICES FOR Project Description(s): US 41 (SR 45) At CR 776 (Harborview Rd) US 41 (SR 45) At Tarpon Boulevard US 41 (SR 45) At Kings Highway-Parmely

More information

GEORGE J. CAMBOURAKIS, P.E., C. ENG. PRESIDENT & CHIEF STRUCTURAL ENGINEER

GEORGE J. CAMBOURAKIS, P.E., C. ENG. PRESIDENT & CHIEF STRUCTURAL ENGINEER GEORGE J. CAMBOURAKIS, P.E., C. ENG. PRESIDENT & CHIEF STRUCTURAL ENGINEER Professional Experience: Pride and Passion in the Art of Structural Engineering since 1979. Professional Registration: Professional

More information

Evaluating. A Case Study

Evaluating. A Case Study A Case Study Evaluating by Richard B. Stoddard, Washington State Department of Transportation In December 2002, a railroad tanker collision caused a fire under a prestressed concrete girder bridge crossing

More information

MEMORANDUM. 1509 West Swann Avenue, Suite 225 Tampa, Florida 33606 Phone (813) 258-8818 Fax (813) 258-8525

MEMORANDUM. 1509 West Swann Avenue, Suite 225 Tampa, Florida 33606 Phone (813) 258-8818 Fax (813) 258-8525 1509 West Swann Avenue, Suite 225 Tampa, Florida 33606 Phone (813) 258-8818 Fax (813) 258-8525 To: From: Date: Subject: Mr. Thomas Gibson, City of St. Petersburg Jeffrey D. Malyszek, PE and Deborah C.

More information

Catch Basin Rehabilitation Road Commission for Oakland County, Michigan

Catch Basin Rehabilitation Road Commission for Oakland County, Michigan Date: Location: September 14, 2011, 9:45a.m. start East side of street in front of 4656 Maura Lane, West Bloomfield Participants: Oakland County Michelle Belanger, Rick Hall, Matt Mountain, Gary Flounory,

More information

BRIDGE DESIGN SPECIFICATIONS APRIL 2000 SECTION 9 - PRESTRESSED CONCRETE

BRIDGE DESIGN SPECIFICATIONS APRIL 2000 SECTION 9 - PRESTRESSED CONCRETE SECTION 9 - PRESTRESSED CONCRETE Part A General Requirements and Materials 9.1 APPLICATION 9.1.1 General The specifications of this section are intended for design of prestressed concrete bridge members.

More information

DESCRIPTION OF WORK:

DESCRIPTION OF WORK: DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works

More information

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE TECHNICAL SPECIFICATION PART 8000 - PRECAST CONCRETE TABLE OF CONTENTS Item Number Page 8100 PRECAST CONCRETE CONSTRUCTION - GENERAL 8-3 8101 General

More information

RAILROAD DAMAGE FROM THE OCTOBER 16, 1999 HECTOR MINE EARTHQUAKE

RAILROAD DAMAGE FROM THE OCTOBER 16, 1999 HECTOR MINE EARTHQUAKE RAILROAD DAMAGE FROM THE OCTOBER 16, 1999 HECTOR MINE EARTHQUAKE By: William G. Byers, P.E. Burlington Northern and Santa Fe Railway 4515 Kansas Avenue Kansas City, Kansas 66106 Phone (913) 551-4070 Fax

More information

Red Wing Bridge Project. PAC #5/TAC #8 Meeting July 18, 2013

Red Wing Bridge Project. PAC #5/TAC #8 Meeting July 18, 2013 Red Wing Bridge Project PAC #5/TAC #8 Meeting July 18, 2013 Alternatives Analysis Agenda Overview of Past Progress Progress Since April PAC Bridge 9103 Rehabilitation Study Bridge 9040 Rehab vs. Replacement

More information

Analysis of the Interstate 10 Twin Bridge s Collapse During Hurricane Katrina

Analysis of the Interstate 10 Twin Bridge s Collapse During Hurricane Katrina Analysis of the Interstate 0 Twin Bridge s Collapse During Hurricane Katrina By Genda Chen, Emitt C. Witt III, David Hoffman, Ronaldo Luna, and Adam Sevi The Interstate 0 Twin Span Bridge over Lake Pontchartrain

More information

Managing North Carolina's MSE Wall Assets through Design, Construction and Performance

Managing North Carolina's MSE Wall Assets through Design, Construction and Performance Managing North Carolina's MSE Wall Assets through Design, Construction and Performance Robert A. Gladstone, P.E. Executive Director Association for Metallically Stabilized Earth 2013 Early Earth Reinforcement

More information

Full Depth Precast Concrete Highway Bridge Decks

Full Depth Precast Concrete Highway Bridge Decks NOVEMBER 2007 STRUCTURES AND MATERIALS TEST LABORATORY Full Depth Precast Concrete Highway Bridge Decks BY PROF. M.G. OLIVA PROF. L.C. BANK Prof. J.S. Russell CIVIL ENGINEERING COLLEGE OF ENGINEERING UNIVERSITY

More information

THE STRUCTURAL ENGINEER

THE STRUCTURAL ENGINEER THE : 100 YEARS OF AN AUSTIN-CHANGING ICON By Nestor R. Rubiano, PhD, P.E., Structural Consultants, Inc., Austin, TX King Iron Bridge and Manufacturing Company of Cleveland, Ohio, and had a roadway width

More information

SECTION 3 DESIGN OF POST- TENSIONED COMPONENTS FOR FLEXURE

SECTION 3 DESIGN OF POST- TENSIONED COMPONENTS FOR FLEXURE SECTION 3 DESIGN OF POST- TENSIONED COMPONENTS FOR FLEXURE DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE LEAD AUTHOR: TREY HAMILTON, UNIVERSITY OF FLORIDA NOTE: MOMENT DIAGRAM CONVENTION In PT design,

More information

CONCRETE SEGMENTAL RETAINING WALL SYSTEM

CONCRETE SEGMENTAL RETAINING WALL SYSTEM CONCRETE SEGMENTAL RETAINING WALL SYSTEM PART 1: GENERAL SPECIFICATIONS 1.01 Work Included A. Work shall consist of furnishing and constructing a Rockwood Classic 8 with PCS unit segmental retaining wall

More information

Design and Construction of the Houston Ship Channel Bridge

Design and Construction of the Houston Ship Channel Bridge Design and Construction of the Houston Ship Channel Bridge Stephen B. Quinn, PE Project Manager Howard Needles Tammen & Bergendoff Houston, Texas M. Jack Kopetz, PE Chief Engineer Howard Needles Tammen

More information

Spon Press PRESTRESSED CONCRETE DESIGN EUROCODES. University of Glasgow. Department of Civil Engineering. Prabhakara Bhatt LONDON AND NEW YORK

Spon Press PRESTRESSED CONCRETE DESIGN EUROCODES. University of Glasgow. Department of Civil Engineering. Prabhakara Bhatt LONDON AND NEW YORK PRESTRESSED CONCRETE DESIGN TO EUROCODES Prabhakara Bhatt Department of Civil Engineering University of Glasgow Spon Press an imprint of Taytor & Francfe LONDON AND NEW YORK CONTENTS Preface xix Basic

More information

Technical Assignment 2 TABLE OF CONTENTS

Technical Assignment 2 TABLE OF CONTENTS 2 TABLE OF CONTENTS Executive Summary...3 Introduction..5 Gravity Loads......6 Design Codes......7 Materials..8 Existing Structural System.. 10 Existing Floor System 15 Alternate Floor Framing Systems...17

More information