1 Implementation of EFQM Excellence Model in Housing Department 9 November 2012 Ir Dr Mckey Ho DCD Management Model
2 EFQM Model We started with the 2003 EFQM model in Evolution of EFQM in DCD 2008 Introduction of EFQM ExModel in Development & Construction Division (DCD) 2009 RESULTS ENABLERS (Reverse approach) 2010 ENABLERS RESULTS (Traditional approach) 2011 Participated in APBEST Award based on EFQM Excellence Model criteria What s next?
3 Why EFQM ExModel? The State of Quality in the UK 30% org. adopting early quality philosophies (TQM, zero-defects, integrated systems) 23% org. using other tool based approaches (QC, problem solving, risk-based approach) 22% org. based on recent quality philosophies (six-sigma, lean sigma) 12% org. using self-assessment auditing tools (EFQM model) All the above categories encompass a variety of initiatives, including the running of international standard ISO 9001 in parallel Source: Quality World (October 2007)
4 Connections between ISO 9001:2008 and EFQM Model QC vs. QA vs. TQM & EFQM Model
5 A Simple Reason 不進則退 Evolution of quality management in DCD
6 The Approaches Approaches Approach Typical process Advantage Disadvantage 1. Award simulation Using a team of trained assessors drawn from the whole organization using the written report approach. High accuracy More time and resources required 2. Peer involvement Similar to the award simulation but with the trained assessors drawn from a business unit. High accuracy Difficult in getting the right people 3. Workshop A management-led approach with data and evidence gathered during the workshop. Shorten time-scale for data collection Less accurate Matrix chart Questionnaire Hybrid or others Use of an organization-specific achievement matrix based on the EFQM Model on a point scale of 1 to 10 or similar. Questionnaire based on EFQM Model criteria for scoring. Quick & simple A good method for getting widespread feedback Over-simplified, low accuracy Very dependent on the skill in drawing up the questionnaire Which approach? Award simulation model is recommended for mature organizations with a higher invested effort. For organizations at the beginning of the excellence journey, less complex designs of the questionnaire and matrix chart approaches with a lower effort are suggested.
7 The Matrix Chart Approach The Matrix Chart Approach
8 The Matrix Chart Approach The Matrix Chart Approach
9 The Matrix Chart Approach Synopsis of differences between Award- Like assessments and Diagnosis Self- Assessment
10 Figures that matter Case study Use of EFQM Model (Survey findings in the UK) Resource used: A 15%; B 3%; C 30%; D 6% of the organization staff involved in selfassessment and improvement teams. Most effective implementation of the EFQM Model: Case D
11 ext... Training for the EFQM ExModel 20 senior management board members received 1-day EFQM briefing 40 professional, technical & site staff received 2-day EFQM internal assessor training 7 professional staff received 3-day European Excellence Assessor training Over 4% of works staff in DCD been trained Visited two EFQM applied organizations in the UK: London Probation Office, CIMA HQ
12 Diagnostic self assessment Enablers Results RESULTS ENABLERS Enablers Results COST TIME
13 RESULTS ENABLERS RESOURCE 1 team on TIME 1 team on COST Each team 1 Chief + 20 members 20 members 3 sub-teams Each sub-team study 3 projects (recently completed) 1 project good result 1 project just met target 1 project poor result Took 4 months RESULTS ENABLERS 1. Aspect critical issues affecting RESULT 2. Strength (+1 to +5) / AFI (-1 to -5) 3. Related EFQM ENABLER (criteria) 4. Proposed APPROACH 5. Proposed DEPLOYMENT 6. Proposed ASSESSMENT & REVIEW
14 Award-Like self assessment Enablers Results
15 C3 C7 C2 C6 C1 C4 C5 C8 C9 Enablers Results Full scale self assessment for the 32 EFQM subcriteria RESOURCE 1 Facilitator 40 assessors in 5 groups Each group led by a EEA Half-day session per week Total 20 weeks A 120 pages self assessment document was prepared
16 Preparation before start RESULTS Measurement CUSTOMER Results Perceptions: customer survey Performance Indicators: quality, reliability PEOPLE Results Perceptions: staff survey Performance Indicators: people turnover, no. of training days, no. of sick leave, no. of grievance cases. SOCIETY Results Perceptions: society survey, external recognition Performance Indicators: environmental performance, no. of community engagement activities, safety performance KEY Results Key Strategic Outcomes: Financial, Performance vs Budget, Effectiveness of Output. Key Performance Indicators: Balanced Scorecard (financial, customer, internal business process, learning & growth), Project Management Performance (time, cost, quality), Reliability
17 Results-Strategy/Process Link Performance focus RADAR, W-H approach, KPIs. Customer Focus ISO 9001, 6Ω, innovation. People Focus 5S, OHSAS 18001, Investor in People (IiP). Society Focus ISO 26000, ISO 14001, ISO 50001, community engagement. Strategy-Process Link (policy delivery) Multi-dimensional matrix Level analysis
18 C-1: Leadership Motivation & Encouragement The Caring & Collaborative Culture Business Partners Stakeholders Staff Support and Recognition Visible Involvement Seminars/Talks at National/Int l Arena Seminars/Talks at Local Arena C-2: Strategy Customer, Quality & Safety Vision, Mission, Guiding Principles and 4C Values Balancing Social, Economical & Environmental Needs Site Safety Strategy 3-pronge approach Business Plan Deployment Regular updating and improve Strategy Communication
19 C-3: People Management Professionalism & Commitment Work-Life-Balance Staff Engagement Tea gathering, grade management focus group meetings, works group consultative committee, People-oriented goal Job rotation, career development, employability skills enhancement, mutual respect & creativity Performance Management & Development System (PMDS) Buddy Scheme, Staff Incentive Scheme, Extra Mile Award, Appreciation Letter, training programme, Empowerment People that Matter Tea gatherings Grade management focus group meetings Works Group Consultative Committee (meets at quarterly intervals) Buddy Scheme z z New recruits Newly cross-posted staff from other divisions Staff Incentive Scheme z z z Professional Project award (Grand award) Team award Individual staff award Extra Mile Award z z Technical Team award Individual staff award We give letters of appreciation to staff. We consult and engage staff if we launch new procurement mode and new systems Site Admin & Support
20 C-4: Partnership & Resources Win-Win & Prudence Procurement System Risk Management List Management Performance Assessment Scoring System (PASS) Project Partnering Disputes Resolution Advisor System ICT PDA, Project e-collaboration System, KM Portal, RFID, GIS, Building Information Modeling (BIM), Enterprise Resource Planning (ERP) system,. Resource Sharing C-5: Processes, Products & Services Quality & Innovation ISO 9001 for quality management ISO for environmental management ISO for energy management PASS as a performance management and training tool for main contractors, subcontractors, and workers Product certification for materials quality assurance 3-Pronge approach for health and safety Distributed R&D for process, technology and material innovation.
21 C-6: : Customer Results Quality-home & Green-living Perceptions Customer Satisfaction Index (through Survey) External Appreciation & Recognition Performance Indicators No. of Defects per Completed Flat No. of Complaints per 1000 Flats C-7: : People Results Talent & Satisfaction Perceptions Staff Barometer Survey Performance Indicators No. of Sick Leave taken per year No. of Grievance Cases per year No. of Disciplinary Cases per year No. of Training Days per staff per year
22 People Results 1. Attitude at work 2. Workplace culture 3. Workplace environment 4. Training & development 5. Teamwork & involvement 6. Communication 7. Management effectiveness 8. Leadership No. of training days per staff per year DCD average z = 32 hours Private sector average z = 17.8 hours 7 N o. o f tra in in g d a y s p e r sta ff Staff barometer survey 6 Target 5 Prof 4 3 Tech 2 Site / / /10 C-8: Society Results Caring and Harmony Perceptions HKQAA-HSBC CSR Index Performance Indicators Site Safety Performance Securing Wages Payment to Workers Energy Savings in Buildings
23 C-9: Key Results Sustainable, Customer, Cost-effective, Stakeholder-value Key Strategic Outcomes Construction Cost Budget vs Expenditure Volume of Public Housing Production Average Waiting Time for Eligible Public Housing Applications Key Performance Indicators Time - Project Slippage Cost - Cost Variation Quality - Defects per Flat Self Assessment - Scoring
24 DCD-EFQM-Self Assessment Overall Score Summary Typical Excellence Journey Level of Excellence
25 DCD s Excellence Journey will Continue Established the ISO risk management system framework Verified to HKQAA-HSBC CSR Index in accordance with ISO criteria Certification to ISO DCD awarded the APBEST (EFQM) Grand Award Certified to ISO 9001: Certified to ISO 9001:1987 Certified to ISO 9001:1994 Established the ISO 9001:1987 QMS Certified to ISO 14001:2004 Certified to ISO 9001: Implementation of Performance Assessment Scoring System (PASS) Thank You
Quick Check. User Guide EFQM Model 2013 Version
Quick Check User Guide EFQM Model 2013 Version User Guide: Quick Check EFQM Shares what works EFQM is committed to help organisations drive improvement through the use of the EFQM Excellence Model, a comprehensive
More informationMTAT.03.243 Software Engineering Management
MTAT.03.243 Software Engineering Management Lecture 17: Other SPI Frameworks and QM Systems Dietmar Pfahl Spring 2014 email: dietmar.pfahl@ut.ee Structure of Lecture 17 Other SPI Frameworks People CMM
More informationUnit purpose and aim. The Learner will: 1 Understand the structure of their organisation
Unit Title: Understanding the employing organisation OCR unit number 7 Sector unit number EA3-3 Level: Level 3 Credit value: 3 Guided learning hours: 23 Unit accreditation number R/600/1764 Unit purpose
More informationInvestors in People Assessment Report. Presented by Alli Gibbons Investors in People Specialist On behalf of Inspiring Business Performance Limited
Investors in People Assessment Report for Bradstow School Presented by Alli Gibbons Investors in People Specialist On behalf of Inspiring Business Performance Limited 30 August 2013 Project Reference Number
More informationThe Body of Quality Knowledge
Introduction According to Dr. Juran every profession needs a body of knowledge as one of the foundations that defines the profession and provides the basis for regulation of the profession. The Body of
More informationINVESTORS IN PEOPLE REVIEW REPORT
INVESTORS IN PEOPLE REVIEW REPORT Kenard Engineering (Dartford) Company Ltd Presented by Samantha Kitney Assessor - Investors in People On behalf of Inspiring Business Performance Limited 17 th February
More informationEnvironment Sustainability & Highways
Job Title: ICT Contract Manager Job Grade: Band 5 Directorate: Environment Sustainability & Highways Job Reference Number: P01265 The Role The ideal candidate for this role would be a perceptive, technically
More informationInternal Audit Division
Internal Audit Division at the Financial Conduct Authority Information Pack April 2013 Contents of Information Pack A. Introduction B. Internal Audit Terms of Reference C. Organisation D. Skills and Competencies
More informationWorkplace Productivity Snapshot
Workplace Productivity Snapshot 2 WORKPLACE PRODUCTIVITY SNAPSHOT How To Use This Tool This self-assessment productivity tool is designed for the owners and managers of small-to-medium businesses. It is
More informationPRCA Communications Management Standard (CMS) for In-House Teams
PRCA Communications Management Standard (CMS) for In-House Teams PRCA Communications Management Standard (CMS) for In-House Teams Contents Introduction 4 The Communications Management Standard for In-House
More information1. LEADERSHIP 90 INFORMATION & ANALYSIS STRATEGIC QUALITY PLANNING 4. HUMAN RESOURCE DEVELOPMENT & MANAGEMENT 150
MANAGEMENT EFFECTIVENESS If you are interested in achieving quality management, service excellence and customer satisfaction, this is the audit used by Ritz Carlton to earn the national quality award.
More informationCamber Quality Assurance (QA) Approach
Camber Quality Assurance (QA) Approach Camber s QA approach brings a tested, systematic methodology, ensuring that our customers receive the highest quality products and services, delivered via efficient
More informationDEVELOPING AN EFFECTIVE PERFORMANCE MANAGEMENT SYSTEM. Ross Fraser HouseMark
DEVELOPING AN EFFECTIVE PERFORMANCE MANAGEMENT SYSTEM Ross Fraser HouseMark Raising the Bar on Performance and Sector Revitalization July 5 and 6, 2007 Contents Page 1. Introduction 2 2. What should a
More informationBriefing on ISO 9001, ISO. requirements
Briefing on ISO 9001, ISO 14001 & OHSAS 18001 requirements Going for ISO 9001 ISO 14001 OHSAS 18001 Quality, Environment, Health & Safety Certification IMS: Integrated Management System ISO 9001 -Quality
More informationCompetence Criteria for Member (MCIBSE)
Competence Criteria for Member (MCIBSE) FACTSHEET M21 The competence criteria for the Member grade of CIBSE (MCIBSE) is directly aligned to the Competence Statements issued by the Engineering Council,
More informationAPPRAISAL POLICY 1. BACKGROUND
APPRAISAL POLICY 1. BACKGROUND 1.1 Appraisals are part of performance management. Within the School appraisal is about motivating and developing employees and supporting them in performing their roles
More informationInvestors in People First Assessment Report
Investors in People First Assessment Report K.H.Construction Cambridge Assessor: Lesley E Ling On-site Date/s: 3 rd September 2008. Recognition Date: Contents 1. Introduction Page 2 2. Assessment and Client
More informationExecution and Control
Project Lifecycle Proposal and Initiation Design and Appraisal Execution and Control Finalisation & Follow-up Operation Project Excellence Operational Excellence PLAN Inputs Process Outputs Feedback &
More informationQUALITY MANAGEMENT POLICY & PROCEDURES
QUALITY MANAGEMENT POLICY & PROCEDURES Policy Statement Cotleigh Engineering Co. Limited specialises in the recruitment of engineering & technical personnel in the oil & energy, rail, civil engineering,
More informationIntroduction... 1. Assessment Tools... 2
There are a number of self-assessment tools available to support organisations on their journey towards excellence, using the EFQM Excellence Model 2013. As with any tool, knowing what to use and when
More informationThe Management System Track
The Management System Track 1. What Is It? 2. How Does It Relate to Certification Bodies? 3. How to Implement It? 1 Presenters Paul Grace, MS, CAE Executive Director, NBCOT Dale Cyr, MBA, CAE Executive
More informationThe way from ISO/TS 16949:2002 Model to EFQM Excellence Modelcomparisons
51 st EOQ Congress, Prague 2007 The way from ISO/TS 16949:2002 Model to EFQM Excellence Modelcomparisons & consequences. Jan HNÁTEK IATF Reg. Auditor, EEA Assessor Vicepresident Czech Society for Quality
More informationICH Q10 - Pharmaceutical Quality System
WCC PDA Dinner Meeting Jan 2012 ICH Q10 - Pharmaceutical Quality System Neil Wilkinson NSF-DBA www.nsf-dba.com ICHQ10.1 WCC PDA Dinner Meeting Jan 2012 Your Presenter Partner at NSF-DBA USA Training, Consultancy,
More informationLeadership Competency Self Assessment
USDA Virtual University School of Talent Management Leadership Essentials Certificate Program Leadership Competency Self Assessment Building Blocks for Workforce Development Based on OPM Competencies Updated:
More informationSurvey of ISO 9001 Implementation in Greek Software Companies
16-ICIT & 8-C&C: 11-13/7/12 in Sweden ST-2: ISO 9000 / 14001 / 50001, etc. Paper #: 2-3 P- 81 Survey of ISO 9001 Implementation in Greek Software Companies Theodore Amygdalas Computer Lab Assistant at
More informationPerformance Management and Service Improvement Framework
Performance Management and Service Improvement Framework Author Marcus Evans, Operational Director - Performance and Customer Insight Date: September 2014 Contents Page 1. Introduction 3 2. Strategic ning
More informationStudy of Productivity Improvement Using Lean Six Sigma Methodology
International Review of Applied Engineering Research. ISSN 2248-9967 Volume 4, Number 1 (2014), pp. 33-38 Research India Publications http://www.ripublication.com/iraer.htm Study of Productivity Improvement
More informationOur Framework Summary
Our Framework Summary REVIEW Evaluate and improve P Develop str improve Take action to improve DO We believe organisations succeed by realising the potential of their people. Because good people make a
More informationSTRATEGIC ALIGNMENT AND CAPACITY BUILDING FOR THE HR COMMUNITY
STRATEGIC ALIGNMENT AND CAPACITY BUILDING FOR THE HR COMMUNITY An Overview Designing, driving and implementing people management strategies, processes and projects for real business value HR Strategic
More informationAssessment Criteria The learner can: 1.1 Describe the purpose of a team
Unit Title: Set objectives and provide support for team members OCR Unit No: 50 Sector Unit No: MSC B5 Level: 3 Credit value: 5 Guided learning hours: 35 Unit purpose and aim This purpose of this unit
More informationNeed to protect your business from potential disruption? Prepare for the unexpected with ISO 22301.
Need to protect your business from potential disruption? Prepare for the unexpected with. Why BSI? Keep your business running with and BSI. Our knowledge can transform your organization. For more than
More informationOperational Improvement Using specialist skills in specific functional areas to enhance your own capabilities
Page 1 of 10 About FMEA We are a network of diverse, practical and experienced senior business consultants who have worked in small and world renowned Consultancy Organisations. We believe in working co
More informationImplementing the European Foundation for Quality Management Excellence Model
Implementing the European Foundation for Quality Management Excellence Model Dr. Paul WATSON, United Kingdom Key words: Total Quality Management, Continuous Improvement. ABSTRACT The European Foundation
More informationThe Baldrige Model. Prof. Yacov Kedem Dr. Edna Benshalom Mofet Institute, Israel
Quality Management in Institutes of Higher Education The Baldrige Model Prof. Yacov Kedem Dr. Edna Benshalom Mofet Institute, Israel The 4 th International Conference Education, Research and Development
More informationQUALITY ASSURANCE GUIDE FOR GREEN BUILDING RATING TOOLS
World Green Building Council Rating Tools Task Group: QUALITY ASSURANCE GUIDE FOR GREEN BUILDING RATING TOOLS Version 1.0 _ 2013 /(DRAFT_01 /Sept_13) INTRODUCTION This guide has been developed as a part
More informationAUDITOR GUIDELINES. Responsibilities Supporting Inputs. Receive AAA, Sign and return to IMS with audit report. Document Review required?
1 Overview of Audit Process The flow chart below shows the overall process for auditors carrying out audits for IMS International. Stages within this process are detailed further in this document. Scheme
More informationHDI Support Center Certification: A Pragmatic Approach to Verifying Core ITIL Process Maturity
White Paper HDI Support Center Certification: A Pragmatic Approach to Verifying Core ITIL Process Maturity Paul M. Dooley Optimal Connections, LLC www.optimalconnections.com Sept 21, 2006 The Situation
More informationCareers Advisers Day 16 September 2010. Internal Use Only - Not to be disclosed outside Standard Life group
Careers Advisers Day 16 September 2010 Introduction to Careers Advisers Day Sandy Begbie Group People & Transformation Director Standard Life context Standard Life is a leading long term savings and investment
More informationQuality Manual ISO 9001:2015 Quality Management System
Quality management input comprises the standard requirements from ISO 9001:2015 which are deployed by our organization to achieve customer satisfaction through process control. Quality Manual ISO 9001:2015
More informationISO/TS 16949:2002 Guidance Document
ISO/TS 16949:2002 Guidance Document Introduction ISO/TS 16949:2009 emphasizes the development of a process oriented quality management system that provides for continual improvement, defect prevention,
More informationHealth and safety a priority? Our BS OHSAS 18001 should come first.
Health and safety a priority? Our should come first. Why BSI? Because we know a good when we see one. We can help give you a competitive advantage because: 1. We have a proven track record, having worked
More informationQuality Assurance and Quality Control in Surveys
Quality Assurance and Quality Control in Surveys Lars Lyberg Statistics Sweden and Stockholm University PSR Conference on Survey Quality April 17, 2009 Email: lars.lyberg@scb.se The survey process revise
More informationBusiness Sustainability Challenge The United Illuminating Company
Business Sustainability Challenge The United Illuminating Company Introduction Umbrella approach to support businesses becoming more sustainable - charts a course toward sustainability Makes sustainability:
More informationHUMAN RESOURCES. Management & Employee Services Organizational Development
Management & Employee Services Organizational Development Human Resources Department FY 2014-15 BUDGETED POSITIONS DIRECTOR.90 FTE * Human Resources Business Partner 1 FTE Human Resources Business Partner
More informationPerformance Measures for Internal Auditing
Performance Measures for Internal Auditing A simple question someone may ask is Why measure performance? An even simpler response would be that what gets measured gets done. McMaster University s discussion
More informationSix Sigma, ISO 9001 and Baldrige
Six Sigma, ISO 9001 and Baldrige Many organizations ask How Do these programs, processes and standards support each other? These initiatives are not mutually exclusive, in fact, understanding and applying
More informationCertification criteria for. Internal QMS Auditor Training Course
Certification criteria for Internal QMS Auditor Training Course CONTENTS 1. INTRODUCTION 2. LEARNING OBJECTIVES 3. ENABLING OBJECTIVES KNOWLEDGE & SKILLS 4. TRAINING METHODS 5. COURSE CONTENT 6. COURSE
More informationPROPOSAL TO DEVELOP AN EMPLOYEE ENGAGEMENT PROGRAMME
PROPOSAL TO DEVELOP AN EMPLOYEE ENGAGEMENT PROGRAMME DEFINITIONS OF ENGAGEMENT The concept of employee engagement has received growing interest recently, with a range of research into what engagement is
More informationBawden Contracting Services Ltd Job Profile. Contracts Manager. Purpose of the Job
Contracts Manager Purpose of the Job As Contracts Manager you will manage all aspects of the Grounds Maintenance contracting business safely and efficiently, maximising profitability through the completion
More informationISO Revisions Whitepaper
ISO Revisions ISO Revisions Whitepaper What is the difference between a procedures and a process approach? Approaching change Process vs procedures: What does this mean? The concept of process management
More informationJOB DESCRIPTION. Regional Human Resources Manager (RHRM) Department/Region/Section: Human Resources Based at North Region, Leeds RHQ
A JOB DESCRIPTION Job Title: Regional Human Resources Manager (RHRM) Division: Human Resources Department/Region/Section: Human Resources Location: Based at North Region, Leeds RHQ Reports to: Head of
More informationQuality Management in Purchasing
Saimaa University of Applied Sciences Faculty of Business Administration, Lappeenranta Degree Programme in International Business Olga Anisimova Quality Management in Purchasing Thesis 2014 Abstract Olga
More informationSubcontractors and Supply Chain Partners Management Fee Policy
Subcontractors and Supply Chain Partners Management Fee Policy Finance Lead Responsibility Chief Financial Officer Effective From 1st November 2015 Policy Applicable to Approved by Subcontractors and Supply
More informationLiterature Review of Business Process Improvement Methodologies: Executive Summary
Literature Review of Business Process Improvement Methodologies: Executive Summary April 2008 Researchers: Dr Zoe Radnor Associate Professor in Operations Management Warwick Business School University
More informationSOUTH TYNESIDE ADULT AND COMMUNITY LEARNING SERVICE SUPPLY CHAIN FEES AND CHARGES POLICY
SOUTH TYNESIDE ADULT AND COMMUNITY LEARNING SERVICE SUPPLY CHAIN FEES AND CHARGES POLICY 1. POLICY STATEMENT 1.1 South Tyneside Adult and Community Learning (STACL) is part of the Education, Learning and
More information360 Degree Feedback Report
Report Preview 360 Degree Feedback Report Your Organisation 360 Feedback Report Date Created : Thu 23 Aug 2007 Contribution Breakdown Peer 1 Manager 1 Self 1 Direct Report 1 Other 1 Customer 1 Stakeholder
More informationIQ Level 3 NVQ Diploma in Management (QCF) Specification
IQ Level 3 NVQ Diploma in Management (QCF) Specification Regulation No: 600/6699/4 Page 1 of 94 IQB/0.2/115 Version 1.0 10/10/2012 Author CZ Contents Page Introduction... 4 About this Qualification (Description,
More informationORGANIZATIONAL ASSESSMENT TOOL (OAT) for Full Drucker Self-Assessment Process
ORGANIZATIONAL ASSESSMENT TOOL (OAT) for Full Drucker Self-Assessment Process Please return to: United Way of Allegheny County / Agency Relations / P.O. Box 735 / Pittsburgh, PA 15230-0735 Date the Drucker
More informationThe post holder will be guided by general polices and regulations, but will need to establish the way in which these should be interpreted.
JOB DESCRIPTION Job Title: Membership and Events Manager Band: 7 Hours: 37.5 Location: Elms, Tatchbury Mount Accountable to: Head of Strategic Relationship Management 1. MAIN PURPOSE OF JOB The post holder
More informationTRANSPORT FOR LONDON (TfL) LOW EMISSIONS CERTIFICATE (LEC) GUIDANCE NOTES FOR THE COMPANY AUDIT PROCESS. LEC (Company Audit) Guidance Notes
TRANSPORT FOR LONDON (TfL) LOW EMISSIONS CERTIFICATE (LEC) GUIDANCE NOTES FOR THE COMPANY AUDIT PROCESS LEC (Company Audit) Guidance Notes Glossary of Terms Transport for London (TfL) London Low Emission
More information6 Development of feedback to QAA reviewers and providing coaching to QAA staff.
QAA Board of Directors Human Resources and Organisational Development (HROD) annual report BD 10 12 12 Item 24 BD/2012/93 Topic 1 This paper reports on Human Resources and Organisational Development achievements
More informationREPORT OF THE SERVICE DIRECTOR - HUMAN RESOURCES AND CUSTOMER SERVICE
Report to Personnel Committee 26 September 2012 Agenda Item: 6 REPORT OF THE SERVICE DIRECTOR - HUMAN RESOURCES AND CUSTOMER SERVICE INVESTORS IN PEOPLE RE-ACCREDITATION Purpose of the Report 1. The purpose
More informationDoDEA Personnel Center HR Competency Definitions
DoDEA Personnel Center HR Competency Definitions ATTACHMENT 10 Business Management Competencies Business Process Reengineering Applies business process reengineering principles and techniques to reengineer
More informationBE 2015 A BUSINESS EXCELLENCE INITIATIVE EXCELLENCE IN CUSTOMER MANAGEMENT SELF ASSESSMENT QUESTIONNAIRE
BE 2015 A BUSINESS EXCELLENCE INITIATIVE 2015 CUSTOMER MANAGEMENT SELF ASSESSMENT QUESTIONNAIRE BE 2015 Self Assessment Guidelines l l l l l l The Criterion contains questions on the Processes and Results.
More informationDesign for Six Sigma +Lean Toolset
Stephan Lunau (Ed.) Christian Staudter Jens-Peter Mollenhauer Renata Meran Olin Roenpage Clemens von Hugo Alexis Hamalides Design for Six Sigma +Lean Toolset Implementing Innovations Successfully 4y Springer
More informationThe benefits of ISO certification and Total Quality Management in a radiology department
H. P. A. Geraedts 1, R. Montenarie 1 and M. J. Hendriks 2 The benefits of ISO certification and Total Quality Management in a radiology department The Departments of Radiology, Radiotherapy and Nuclear
More informationChapter 7 - Self Assessment
Chapter 7 - Self Assessment TABLE OF CONTENTS Introduction...1 High Level Must Dos...1 Completing the Self Assessment...1 Format of the Self Assessment...2 Evidence to support Self Assessment...2 Making
More informationMBA with specialisation in Human Resource Management - LM503
MBA with specialisation in Human Resource Management - LM503 1. Objectives The objectives of this MBA Programme are as follows: (i) (ii) (iii) (iv) to impart professional education and training in Modern
More informationQuality Management Principles and Guidelines on their Application
Document: ISO/TC 176/SC 2/N 376 Secretariat of ISO/TC 176/SC 2 Our ref: 97/402545 Date: 30 June 1997 To the Members of ISO/TC 176/SC 2 - Quality Management and Quality Assurance/ Quality Systems (TC176/SC2/WG15/N133)
More informationPage 1 CORPORATE PROFILE
Page 1 CORPORATE PROFILE Who we are? Blau Advisors has become a model in consulting services rendering, due to its long-term commitment with clients. Project goal achievement and succeeding in client s
More informationGovernment leadership in assuring better quality healthcare in South Africa: policy into practice
Government leadership in assuring better quality healthcare in South Africa: policy into practice Authors: Marshall CA (Dr); Msibi EB Office of Standards Compliance, National Department of Health, SOUTH
More informationThe Future of ISO 9000 Quality Management System in a Global Economy Dr. Owino A. Okwiri 1 Prof. Isaac M. Mbeche 2
1 The Future of ISO 9000 Quality Management System in a Global Economy Dr. Owino A. Okwiri 1 Prof. Isaac M. Mbeche 2 Submitted to DBA Africa Management Review on December 9. 2013 Accepted for publication
More informationOccupational Profile and Curriculum Summary
Occupational Profile and Curriculum Summary Presented for Comment OFO code 143905 Related Occupation Contact Centre Manager Table of Content Occupational Profile and Curriculum Summary... 1 Presented for
More informationQUALITY ASSURANCE POLICY
QUALITY ASSURANCE POLICY ACADEMIC DEVELOPMENT & QUALITY ASSURANCE OFFICE ALPHA UNIVERSITY COLLEGE 1. BACKGROUND The Strategic Plan of 2003-2005 E.C of Alpha University s defines the direction Alpha University
More informationThe Six Criteria for Best Practice in Credit Management. Chris Sanders, QiCM
The Six Criteria for Best Practice in Credit Management Chris Sanders, QiCM The 6 Criteria for Best Practice in Credit Management Chris Sanders MICM Head of Accreditation QICM Premium Partner Corporate
More informationSC21 Manufacturing Excellence. Process Overview
SC21 Manufacturing Excellence Process Overview Prepared by:- The SC21 Performance, Development and Quality (PDQ) Special Interest Group (SIG) Acknowledgement The scoring methodology used in the Management
More informationIslamic Relief Worldwide
Islamic Relief Worldwide Islamic Relief UK (IRUK) Human Resources (HR) Advisor BASE LOCATION: London, UK REPORTING TO: HR and Corporate Services Lead SALARY: LINE MANAGEMENT None RESPONSIBILITIES: ISLAMIC
More informationDepartment of Human Resources. Performance Management An introduction
Department of Human Resources Performance Management An introduction 1 Contents 1. What is Performance Management 3 2. Key principles 5 3. Tools and Resources 7 4. Performance Management 8 Health Check
More informationShropshire Highways Draft Asset Management and Communications Strategy and Implications of Department for Transport Incentivised funding
Committee and Date Cabinet 14 th October 2015 Shropshire Highways Draft Asset Management and Communications Strategy and Implications of Department for Transport Incentivised funding Responsible Officer
More informationPerformance Excellence Process
Performance Excellence Process The Performance Excellence Process is a resultsoriented, long-term approach to the way government does business It uses several best practice methodologies, including Strategy
More informationQSS 0: Products and Services without Bespoke Contracts.
QSS 0: Products and Services without Bespoke Contracts. Amendment History Version Date Status v.1 Dec 2014 Updated For 2015 deployment Table of Contents 1. DEFINITIONS 3 2. INTRODUCTION 3 3. WORKING WITH
More informationJob Description Strategic Projects Team Leader
Strategic Projects Team Leader Department: Group: Direct Line Manager: Responsible For: Planning & Community Relations Manager - & Community Relationships Three (3) Strategic Project Drivers Delegations:
More informationManual Guide of The Induction Program for New Employees in the Federal Government
United Arab Emirates Federal Authority For Government Human Resources Manual Guide of The Induction Program for New Employees in the Federal Government Building a Productive Institutional Culture @FAHR_UAE
More informationBody of Knowledge for Six Sigma Lean Sensei
Body of Knowledge for Six Sigma Lean Sensei What to Prepare For: The following is the Lean Six Sigma Certification Body of Knowledge that the exam will cover. We strongly encourage you to study and prepare
More informationThe Adoption of Management Systems Standards & Best Practices in Malaysia (Current and Future Trend)
Nang Yan Business Journal 1.1 2012 Paper #: 2-05 P- 105 The Adoption of Management Systems Standards & Best Practices in Malaysia (Current and Future Trend) Dr. Mohd Azman Idris SGM, SIRIM Training Services,
More informationO: Objectives Objectives are established and aligned at the organisation-wide, organisational unit and individual staff levels.
Embedding a Quality Management Framework (QMF) Organisational units across a university, from faculties to service centres and institutes to divisions, have differing functions and responsibilities. For
More informationCunningham Centre Strategy and Performance Plan using a Balanced Score Card approach 2014 16
Cunningham Strategy and Performance Plan using a Balanced Score Card approach 2014 16 Cunningham Strategy and Performance Plan 2014 16 The Cunningham s Strategy and Performance Plan clearly outlines the
More informationLEADERSHIP DEVELOPMENT FRAMEWORK
LEADERSHIP DEVELOPMENT FRAMEWORK February 13, 2008 LEADERSHJP PERSPECTIVE I consider succession planning to be the most important duty I have as the Director of the NOAA Corps. As I look toward the future,
More informationOrganisational Development Improvement Strategy 2009-2011 Delivering results through our people
Organisational Development Improvement Strategy 2009-2011 Delivering results through our people 1 Index Page No Foreword 3 What is Organisational Development? 4 Organisational Development- Driving change
More informationBalanced Scorecard: & Challenges. 23rd July 2007. Organized by: SMR
Balanced Scorecard: Implementation & Challenges 23rd July 2007 Organized by: SMR 1 Program Schedule» 9.00 am 10.30am» 2.00pm 3.30pm > Introduction PMS > BSC Terminology & Principles > Understanding BSC
More informationPPM Competency Profiling
PPM Competency Profiling 1 What we do... Our strength comes from the expertise of our people, the structure of our processes, the scale of our operation and our years of experience in providing learning
More informationDelivering Efficiency Through Collaborative Working
Delivering Efficiency Through Collaborative Working CWC Products and Services CWC Products and Services Leadership organisational development Project and business excellence through collaborative working
More informationVolunteer Managers National Occupational Standards
Volunteer Managers National Occupational Standards Contents 00 Forward 00 Section 1 Introduction 00 Who are these standards for? 00 Why should you use them? 00 How can you use them? 00 What s in a Standard?
More informationProject Management for Process Improvement Efforts. Jeanette M Lynch CLSSBB Missouri Quality Award Examiner Certified Facilitator
Project Management for Process Improvement Efforts Jeanette M Lynch CLSSBB Missouri Quality Award Examiner Certified Facilitator 2 Project and Process Due to the nature of continuous improvement, improvement
More informationA Strategic Vision for Human Resources
DISCUSSION DOCUMENT A Strategic Vision for Human Resources Organizational Possibilities Fitting the Pieces Together November 7, 2007 Costa Mesa, CA Framework Systems Theory Strategic Vision for Human Resources
More informationRIBA PROFESSIONAL SERVICES. 2008 BUSINESS PLAN V1-2 Jan 2008. Approval by PSB on 6 November 2007. Professional Services 2008 Business Plan V1
RIBA PROFESSIONAL SERVICES 2008 BUSINESS PLAN V1-2 Jan 2008 Approval by PSB on 6 November 2007 PLEASE NOTE: This draft is to be developed with allocated costings/resources to each objective once the 2008
More informationReport of Don McLure, Corporate Director of Resources
AUDIT COMMITTEE 29 June 2015 Annual Review of the System of Internal Audit 2014 / 2015 Report of Don McLure, Corporate Director of Resources Purpose of the Report 1. The purpose of this report is for members
More informationTaking a holistic QMS approach to enhancing productivity
Taking a holistic QMS approach to enhancing productivity Harnek Singh 9 th March 2012 Enhancing Productivity and Business Growth Through Quality Management Systems Rationale for the QMS A response to the
More informationIntroductory Level Management Training Programme
Introductory Level Management Training 2016 Foreword January 2016 Managers and supervisors across the career development sector, be this in the context of career education, career guidance/development,
More informationQuality Assurance Program
Quality Assurance Program Table of Contents 1.1 Introduction... 1 1.2 Purpose... 2 1.3 Compliance and Maintenance... 2 1.4 Organization, Authority and Responsibilities... 2 1.5 Method of Assuring All Contract
More information