1 Haddonfield Public School District School Facilities Referendum Community Meeting

2 Tonight s goals School Facilities Referendum 2016 Presentation of BOE s referendum recommendations Discuss specific issues and projects for each school Present timeline for completion and cost impact for residents Show how the BOE is planning to address improving building inspection and maintenance processes

3 School Facilities Referendum 2016 All referendum information including by building details, cost projections, frequently asked questions, and this presentation can be found at:

4 Architecture and Engineering Services: Becica Associates Vendor and other District Consultants: Mechanical, Electrical, and Plumbing Engineers: Wick Fisher White HVAC: Mack Industries Roof: Manufacturer representatives from Garland, Siplast, Carlisle Chimneys: AAA Chimney Corp Masonry Exploration and Restoration: Dugan Masonry Cost Estimator: Preferred Construction Management Bond Counsel: Parker McCay P.A. Pre-Referendum Consultants 4

5 Becica Associates Architecture + Engineering Cherry Hill Pre-Referendum Consultants Steven Becica, AIA, LEED AP Principal in charge of architectural services since 1989 and Haddonfield School District project lead Services include building investigation, design, forensic architecture, and engineering Extensive public school experience serving as consultant for more than 50 school districts NJ Schools Development Authority (SDA) certified firm completing renovation and new construction projects utilizing SDA s 21 st Century School Design Manual that includes sustainable design features and best practices for safe and secure schools Architect of Record for Cherry Hill School District completing similar projects including façade restoration and building renewal 5

6 Facilities Challenges Building age Multiple additions Patchwork upgrades and varying educational conditions Limited capital reserve 2% cap on yearly budget increase HMHS MS Haddon Haddon Tatem Haddon Central HMHS Tatem Haddon MS Central HMHS Tatem Haddon Tatem Central Taft Coolidge Truman Eisenhower Kennedy Johnson Nixon GH Bush GW Bush

7 Building Envelope Summary of Critical Facilities Issues Damaged masonry with eroding mortar joints and corroded lintels Stability issues masonry walls, stone elements, parapets Deteriorating wood trim with peeling paint Problem roof areas Windows past useful life, not compliant with current thermal performance code standards, and with upper sash stability issues

8 Summary of Critical Facilities Issues HVAC Inefficient and outdated heating plant controls Select HVAC units with outdated technology and multiple repairs operating past life cycle expectancy Inoperative existing Air Handling Units in some locations

9 Special Systems Summary of Critical Facilities Issues Obsolete telephone system, public address, and master clock systems 3 generations behind current technology Complete inability to replace broken parts

10 Summary of Critical Facilities Issues Accessibility and Current Code Compliance Non-ADA compliant barrier-free route to main building entrance at HMHS Uneven sidewalks along accessible routes at all schools Chimneys not in compliance with National Fire Protection Associates 211 Industry Standards guidelines Non-accessible toilet rooms or not provided on each floor with classrooms

11 School Facilities Referendum 2016 Overview of Question Organization Question 1: critical work Question 2A: Complete air-conditioning in all schools in rooms not currently air-conditioned Question 2B: stadium restoration and running track replacement

12 Cost estimates: School Facilities Referendum 2016 Developed by Becica and Associates, Preferred Construction Management, Hill International and state-contract vendors Includes allowance for hazardous materials abatement, and 25% project soft costs per industry standards for renovation work in old buildings State debt service aid estimated at 34% Illegal to use any surplus funds after construction to fund projects not approved in referendum excess funds will not be bonded

13 Criteria for scope inclusion: Referendum Question 1 Non-functional and/or deteriorating conditions requiring immediate attention Deteriorating components in danger of requiring upgrades that cannot be addressed within constraints of operating budget Security and safety considerations Select program needs at HMHS based on enrollment demands, existing conditions, and coordination with other upgrades

14 Referendum Question 1: Elizabeth Haddon Building Envelope All proposed exterior masonry and wood trim repairs New windows and doors in pre-2000s wings, incl. lintel restoration and door hardware and electrical prep for future installation of controlled access devices Site Work Rainwater drainage upgrades (1913, 1952 wings) Barrier-free accessible route upgrades, incl. signage, sidewalks, and student drop-off Special Systems Intercom, telephone, master clock, and data system upgrades HVAC Replacement of (3) multi-purpose room roof top units Boiler upgrades, incl. burner gas train components, indoor/outdoor reset controls, and chimney repairs and liner restoration (excl. automatic controls)

15 Referendum Question 1: Tatem Building Envelope All proposed exterior masonry and structural repairs EPDM roof replacement (1923 wing) and repairs (1990 wing), incl. decking New windows and doors, incl. lintel restoration and electrical prep for future installation of controlled access devices (1913, 1954 wings) Site Work Regrading and restoration of front yard to address drainage issues Repair and waterproof foundation wall Barrier-free accessible route upgrades, incl. signage, sidewalks, curb ramp at rear parking lot Sidewalk upgrades for student drop-off Special Systems (same as Haddon) Intercom, telephone, master clock, and data system upgrades HVAC (same as Haddon) Boiler upgrades (excl. automatic controls)

16 Building Envelope Referendum Question 1: Central/HMS New modified bitumen roof, incl. roof deck repair and related work (1964 wing) All proposed exterior masonry and wood trim repairs, incl. portico Skylight removal, incl. ceiling/lighting replacement and plaster repairs at MS rotunda (1964 wing) Site Work Repairs to exterior concrete steps, cheek walls, railings, and sidewalks (1964 wing) Barrier-free accessible route and site upgrades, incl. widening of sidewalk along Lincoln Ave. for student drop-off Special Systems (same as Haddon and Tatem) Intercom, telephone, master clock, and data system upgrades HVAC Installation of A/C in MS cafeteria Boiler upgrades (excl. automatic controls) Chimney repairs and liner restoration

17 Referendum Question 1: HMHS Building Envelope (excl. B-wing) A-wing asphalt shingle roof replacement and C-wing modified bitumen roof replacement, incl. roof deck repairs and related work B-wing Structural Repairs and Partial Reconstruction Gym exterior wall partial reconstruction and structural repairs, incl. new windows and doors and roof repairs (no interior work) Comprehensive reconstruction of 2-story cafeteria section on existing footprint, incl. structure for rooftop mechanical units and reconfigured cafeteria, kitchen, toilet rooms, dance studio, and remote admin. offices Site Work Reconstruction of exterior concrete steps, area ways and drains, walls, railings, and sidewalks, providing barrier-free accessible routes to A and C wings continued

18 Referendum Question 1: HMHS (continued) Special Systems Intercom, telephone, master clock, and data system upgrades HVAC A-wing auditorium HVAC replacement Boiler upgrades, incl. removal of existing chimney to roof line of stage and installation of new metal flue pipe system connecting to existing boilers Upgrades to building utilities to A-wing, including sanitary and water piping A-wing crawl space repairs and upgrades to lighting and ventilation to improve access C-wing Educational Program Alterations and Renovations Reconfiguration of faculty room, guidance office, home economics classroom into (1) a STEAM practical arts lab and (1) science lab

19 Referendum Question 1: Estimated Costs Scope Haddon Tatem Central/MS HMHS Total Building envelope $840,000 $3,347,496 $2,052,800 $2,457,736 $8,698,032 B-wing reconst. $10,531,029 $10,531,029 Site work $135,000 $214,500 $145,000 $394,000 $888,500 Special systems $99,122 $110,584 $308,794 $381,500 $900,000 HVAC $361,545 $79,125 $394,432 $1,384,572 $2,219,673 Program renovation $702,088 $702,088 HazMat + soft costs $381,417 $943,926 $750,256 $4,137,738 $6,213,337 Total project costs $1,817,083 $4,695,631 $3,651,282 $19,988,663 $30,152,660 Est. state share $617,808 $1,596,515 $1,241,436 $6,796,146 $10,251,904 Est. local share $1,199,275 $3,099,117 $2,409,846 $13,192,518 $19,900,756 Financial advisors to the district used 9 assumptions to estimate this average annual assessment for Question 1: $253.37

20 Key Assumptions Average household assessed at $484, year bond at 3.53% interest State debt service aid of 34% for eligible costs

21 Referendum Question 2A Air-conditioning, building automation system control (BASC), and electrical upgrades in all schools Scope Haddon Tatem Central/MS HMHS Total Air-conditioning, BASC and electrical upgrades 12 clrms. (Art Room), faculty room and offices 12 clrms. 2 SGIs 12 Central clrms. MS art rm. MS tech rm. A-wing $559,973 $551,403 $946,154 $779,822 $2,837,352 HazMat + soft costs $147,493 $139,851 $316,539 $219,955 $823,838 Total project costs $707,467 $691,254 $1,262,693 $999,777 $3,661,190 Est. state share $240,539 $235,026 $429,316 $339,924 $1,244,805 Est. local share $466,928 $456,227 $833,377 $659,853 $2,416,386 Financial advisors to the district used 9 assumptions $30.70

22 Referendum Question 2B Critical upgrades to stadium and track at HMHS to maintain current operations Scope Total Resurface running track $350,000 Stadium structural repair allowance $800,000 Soft costs $287,500 Total project costs $1,437,500 Est. state share $148,750 Est. local share $1,288,750 Financial advisors to the district used 9 assumptions to estimate this average annual assessment for Question 2B: $16.43

23 Referendum Summary Scope Project Total Est. State Share Est. Local Share Est. Average Annual Assessment Question 1 Building envelope (comprehensive except Central/MS and HMHS); site work; HVAC; HMHS B-wing reconstruction and program renovations Question 2A A/C, BASC and electrical upgrades Question 2B Stadium and track $30,152,660 $10,251,904 $19,900,756 $ $3,661,190 $1,244,805 $2,416,385 $30.70 $1,437,500 $148,750 $1,288,750 $16.43 Referendum Total $35,251,350 $11,645,459 $23,605,891 $300.49

24 Referendum Schedule Mid-December Project application submission to the NJDOE January 8, 2016 Notice to County Board of Elections Referendum Date March 8, 2016 Tentative milestone dates, if referendum passes November 2016 Final submission to the NJDOE (HMHS only) January 2017 Projects bid April 2017 Construction start Note: Dates are subject to final project scope of work determination and scenarios.

25 Key Referendum Regulations NJAC 6A: Local support of school facilities projects All proposed work and corresponding local and state share must be listed in referendum question(s). If construction costs are less than approved referendum budget, additional work not identified in referendum cannot be added to the project scope. Excess funds can only be used to offset shortages for other approved work if specifically stated in referendum question. If bids are higher than estimated in the referendum question, approved referendum work cannot be eliminated without another referendum. State closely monitors all bond proceeds to ensure proceeds are applied to approved projects.

26 Key Bidding Regulations Conformance with Public School Contract Law regulated by NJSA (NJSA 18A: 18A-1 et. seq). Public bids or state contract must be used. Lowest qualified bid must be accepted. All bids must be reviewed by school board solicitor per compliance with bidding requirements prior to award of contract.

27 Going Forward What is the School Board's plan for future maintenance? First, hire a part-time professional who will be responsible for conducting regular weekly walk-throughs of the District's facilities and work with the maintenance staff to develop cost-effective solutions to problems as they arise. Second, conduct a comprehensive inspection of each of the five school buildings on a rotating annual basis, so each building has a comprehensive outside independent inspection once every five years.

28 Questions The Bond Referendum website also has a collection of frequently asked questions

School Facilities Referendum Recommendations

School Facilities Referendum Recommendations Haddonfield Public School District LONG RANGE PLANNING COMMITTEE School Facilities Referendum Recommendations NOVEMBER 19, 2015 School Facilities Referendum Recommendations Tonight s goals Presentation

More information

Haddonfield Public School District. Proposed Referendum Update October 1, 2015

Haddonfield Public School District. Proposed Referendum Update October 1, 2015 Haddonfield Public School District Proposed Referendum Update October 1, 2015 Facilities Condition Assessment Background Tonight s goals Review critical infrastructure and educational needs Present BOE

More information

BUNKER HILL ELEMENTARY SCHOOL

BUNKER HILL ELEMENTARY SCHOOL INITIAL YEAR BUILT 1970 BUILDING AREA 98,200 SF CURRENT PROGRAM CAPACITY 332 ENROLLMENT 2008 387 WARD 5 PROPOSED PROGRAM CAPACITY 750 Site Plan BUNKER HILL - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

DRAPER ELEMENTARY SCHOOL

DRAPER ELEMENTARY SCHOOL INITIAL YEAR BUILT 1953 BUILDING AREA 54,000 SF CURRENT PROGRAM CAPACITY 250 ENROLLMENT 2008 84 WARD 8 PROPOSED PROGRAM CAPACITY 325 Site Plan DRAPER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

PLUMMER ELEMENTARY SCHOOL

PLUMMER ELEMENTARY SCHOOL INITIAL YEAR BUILT 1959 BUILDING AREA 69,400 SF CURRENT PROGRAM CAPACITY 481 ENROLLMENT 2008 228 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan PLUMMER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Springfield Township Board of Education March 10, 2015 Referendum Questions and Answers (updated 2/19/2015)

Springfield Township Board of Education March 10, 2015 Referendum Questions and Answers (updated 2/19/2015) Springfield Township Board of Education March 10, 2015 Referendum Questions and Answers (updated 2/19/2015) What is a referendum? New Jersey school districts hold public referendum votes to seek approval

More information

DAVIESS COUNTY SCHOOLS DISTRICT FACILITIES PLAN

DAVIESS COUNTY SCHOOLS DISTRICT FACILITIES PLAN DISTRICT "SHELL" SUBMISSION DATE: 11/13/12 questions 11/26/12 (delete following Hearing) KDE "SHELL" RESUBMISSION DATE: 11/19/12 revised 11/26/12 (delete following Hearing) KBE APPROVAL DATE: FEBRUARY

More information

November 3, 2015 Bond and District Additional Assistance Election Information

November 3, 2015 Bond and District Additional Assistance Election Information November 3, 2015 Bond and District Additional Assistance Election Information Proposition 432 - $22 million General Obligation Bond 150+ facility projects across all schools Building renovations and improvements

More information

Schematic Design Presentation S. Dallas Dance, Superintendent October 22, 2013 OVERLEA HIGH SCHOOL

Schematic Design Presentation S. Dallas Dance, Superintendent October 22, 2013 OVERLEA HIGH SCHOOL Schematic Design Presentation S. Dallas Dance, Superintendent October 22, 2013 0 Overlea High School - Facility Summary Facility Opened: Auditorium Addition: Activity Room Addition: School Rated Capacity

More information

PARKVILLE HIGH SCHOOL LIMITED RENOVATION

PARKVILLE HIGH SCHOOL LIMITED RENOVATION PARKVILLE HIGH SCHOOL LIMITED RENOVATION DESIGN BRIEFING For Dr. Joe A. Hairston BALTIMORE COUNTY PUBLIC SCHOOLS August 11, 2009 Smolen 3 Emr + Associates Architects 1355 Piccard Drive, Suite 200 Rockville,

More information

HAMILTON SCHOOL. 1401 Brentwood Parkway, N.E., Washington, DC INITIAL YEAR BUILT 1968 BUILDING AREA

HAMILTON SCHOOL. 1401 Brentwood Parkway, N.E., Washington, DC INITIAL YEAR BUILT 1968 BUILDING AREA INITIAL YEAR BUILT 1968 BUILDING AREA 187,700 SF CURRENT PROGRAM CAPACITY N/A ENROLLMENT 2008 129 WARD 5 PROPOSED PROGRAM CAPACITY N/A Site Plan HAMILTON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Building Condition Assessment: 215-219 West Lexington Street Baltimore, Maryland

Building Condition Assessment: 215-219 West Lexington Street Baltimore, Maryland KPA The Joint Venture of EBA Engineering, Inc. and Kennedy Porter & Associates, Inc. 4813 Seton Drive, Baltimore, MD 21215 Phone: (410-358-7171) Fax: (410)358-7213 Building Condition Assessment: Baltimore,

More information

Seattle Public Schools Building Excellence IV Projects Under Construction

Seattle Public Schools Building Excellence IV Projects Under Construction Seattle Public Schools Building Excellence IV Projects Under Construction Project Slide Number Arbor Heights Elementary School 2 Cascadia Elementary School & Robert Eagle Staff Middle School 13 Genesee

More information

MURCH ELEMENTARY SCHOOL

MURCH ELEMENTARY SCHOOL INITIAL YEAR BUILT 1929 BUILDING AREA 47,700 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 491 WARD 3 PROPOSED PROGRAM CAPACITY 500 Site Plan MURCH - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule

Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule Homestead HS Sept.'15 Oct'15 Nov'15 Dec'15 Jan'16 Feb'16 Repair Asphalt @ Main Garage Replace Exterior Hollow Metal

More information

CALLOWAY COUNTY SCHOOLS DISTRICT FACILITIES PLAN

CALLOWAY COUNTY SCHOOLS DISTRICT FACILITIES PLAN DISTRICT "SHELL" SUBMISSION DATE: 4/17/13 (delete following Hearing) KDE "SHELL" RESUBMISSION DATE: 4/19/13 (delete following Hearing) KBE APPROVAL DATE: JUNE 2013 CALLOWAY COUNTY SCHOOLS DISTRICT FACILITIES

More information

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT 1. SAFETY, HEALTH, CODE 1.1 Structural Requirements, Seismic Stability 1.1.1 Primary Structure 1.1.2 Ceilings 1.1.3 Cabinets, Equipment 1.1.4 Portables 1.2 Fire / Life Safety 1.2.1 Corridor, Separation

More information

Repair Project for April 7, 2009

Repair Project for April 7, 2009 Repair Project for April 7, 2009 Scope of the Project HVAC Upgrades Roof Replacement Window Replacement/Exterior Openings Science Lab Renovations New Fire Alarm/Electrical AAB (accessibility) Upgrades

More information

Building Condition Assessment Report

Building Condition Assessment Report C2 - Nurses Resident (aka Administration) Building Condition Assessment Report Asset Address Address Construction Year Size (Gross Floor Area) Asset Type Floors Above Ground Inspection Date C2 - Nurses

More information

Estimated Cost of Repair

Estimated Cost of Repair 1 Applicant: Property: Home: Business: Assessor: Applicant Number: Type of Loss: Hurricane Date Contacted: 1/18/2014 Date of Loss: 10/29/2012 Date Received: 1/14/2014 Date Inspected: 2/4/2014 Date Entered:

More information

HOUSTON ELEMENTARY SCHOOL

HOUSTON ELEMENTARY SCHOOL INITIAL YEAR BUILT 1962 BUILDING AREA 59,900 SF CURRENT PROGRAM CAPACITY 507 ENROLLMENT 2008 291 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan HOUSTON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

PATTERSON ELEMENTARY SCHOOL

PATTERSON ELEMENTARY SCHOOL INITIAL YEAR BUILT 1945 BUILDING AREA 78,300 SF CURRENT PROGRAM CAPACITY 368 ENROLLMENT 2008 463 WARD 8 PROPOSED PROGRAM CAPACITY 500 Site Plan PATTERSON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Lindsay Thurber Comprehensive High School Red Deer School District No. 104 School Facilities Evaluation Project Page 1

Lindsay Thurber Comprehensive High School Red Deer School District No. 104 School Facilities Evaluation Project Page 1 School Facilities Evaluation Project Page 1 Executive Summary In November 1999, Alberta Infrastructure, School Facilities Branch engaged Stephens Kozak Carr and Brown Architects to conduct evaluations

More information

DEARBORN HEIGHTS SCHOOL DISTRICT NO. 7 Sinking Fund Projects 10 Year Plan Proposal (2016 2025)

DEARBORN HEIGHTS SCHOOL DISTRICT NO. 7 Sinking Fund Projects 10 Year Plan Proposal (2016 2025) DEARBORN HEIGHTS SCHOOL DISTRICT NO. 7 Sinking Fund Projects 10 Year Plan Proposal (2016 2025) Year One $995,000.00 Polk electronic marquee Annapolis roof needs half of building replaced Phase One District

More information

SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST

SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST SODA SPRINGS HIGH SCHOOL REPAIRS AND UPGRADES SITE Construction Estimate = $100,000

More information

CAPITAL EXPENDITURES

CAPITAL EXPENDITURES CAPITAL EXPENDITURES 1 CAPITAL EXPENDITURES CAPITAL EXPENDITURES PLANNING On March 1, 2010 the AmherstPelham Regional School committee adopted a policy for developing a formal capital needs planning process.

More information

Article 11. Window Replacement Project Norman E. Day & Col. John Robinson Elementary Schools

Article 11. Window Replacement Project Norman E. Day & Col. John Robinson Elementary Schools Article 11 Window Replacement Project Norman E. Day & Col. John Robinson Elementary Schools MSBA Accelerated Repair Program Program targets replacement of roofs, windows, doors, and boilers Goal is to

More information

Structural Assessment Report

Structural Assessment Report Report Dallas Township Elementary School Dallas, Pennsylvania (JBCI Project No. 144911) 1655 Suburban Station Building 1617 John F. Kennedy Boulevard Philadelphia PA 19103 215 665 0497 5 Sandwood Drive

More information

Exhibit C: Scope of Work and Schedule of Deliverables

Exhibit C: Scope of Work and Schedule of Deliverables Exhibit C: Scope of Work and Schedule of Deliverables Project Scope of Work Phases: A City Hall Envelope Renovations B City Hall Skylight Replacement C City Hall Chiller Replacement D City Hall Annex Plaza

More information

Town of Sandwich Facilities Department Summary of Building Repairs from Prior 5 7 Years List Updated August 7, 2015

Town of Sandwich Facilities Department Summary of Building Repairs from Prior 5 7 Years List Updated August 7, 2015 Town of Sandwich Facilities Department Summary of Building Repairs from Prior 5 7 Years List Updated August 7, 2015 Town Hall Complete building restoration (state historic preservation award) High efficiency

More information

MEASURE G-2010 EXHIBIT B FULL TEXT BALLOT PROPOSITION OF THE SAN JOSE EVERGREEN COMMUNITY COLLEGE DISTRICT BOND MEASURE ELECTION NOVEMBER 2, 2010

MEASURE G-2010 EXHIBIT B FULL TEXT BALLOT PROPOSITION OF THE SAN JOSE EVERGREEN COMMUNITY COLLEGE DISTRICT BOND MEASURE ELECTION NOVEMBER 2, 2010 MEASURE G-2010 EXHIBIT B FULL TEXT BALLOT PROPOSITION OF THE SAN JOSE EVERGREEN COMMUNITY COLLEGE DISTRICT BOND MEASURE ELECTION NOVEMBER 2, 2010 To better prepare San Jose City College/ Evergreen Valley

More information

48. AQUARIUM. Aquarium. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle. Total Area: No.

48. AQUARIUM. Aquarium. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle. Total Area: No. Classification: Cluster: Location: Total Area: No. of Stories Aquarium Acreage Owned: Acquired: 1904 Most Recent Improvements: THE AQUARIUM Close to junction of Inselrhue and Loiter Way, Belle Isle Two

More information

New Jersey City University Gilligan Student Union Center

New Jersey City University Gilligan Student Union Center New Jersey City University Gilligan Student Union Center The RBA Group worked with New Jersey City University in a major renovation of their Gilligan Student Union building. We were contracted to reassess,

More information

Van Vleck ISD Bond Election

Van Vleck ISD Bond Election Van Vleck ISD Bond Election November 4, 2014 The Van Vleck ISD School Board called a bond election at their meeting on August 18 for $42.7 million. 2 School districts must ask voters for permission to

More information

Inspecting to a higher standard.

Inspecting to a higher standard. Inspecting to a higher standard. Rob Hopkin Silver Spring, MD 20902 Monday, June 2, 2014 ProTec Inspection Services Inc. 19736 Selby Ave Poolesville, MD 20837 301-972-8531 www.protec-inspections.com rob@protec-inspections.com

More information

Bond Referendum Presentation. Dr. Ralph P. Ferrie, Superintendent of Schools May 12, 2014

Bond Referendum Presentation. Dr. Ralph P. Ferrie, Superintendent of Schools May 12, 2014 Bond Referendum Presentation Dr. Ralph P. Ferrie, Superintendent of Schools May 12, 2014 Mr. David Fowler President Floral Park- Bellerose Mr. David Del Santo Vice-President New Hyde Park Garden City Park

More information

NATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES

NATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES NATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES All searches and notifications on Bid4Michigan are based on National Institute of Government Purchasing (NIGP) codes. It

More information

NORTH PENN HIGH SCHOOL RENOVATIONS

NORTH PENN HIGH SCHOOL RENOVATIONS NORTH PENN HIGH SCHOOL RENOVTIONS PRELIMINRY SCOPE, BUDGET & PHSING CONSIDERTIONS 401 EST HNCOCK STREET LNSDLE, P 19446 PREPRED BY BONNETT SSOCITES INCORPORTED 220 BLDWIN TOWER, 1510 CHESTER PIKE EDDYSTONE,

More information

201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE

201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE STRUCTURAL INSPECTION REPORT DRAFT 201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE TOWN OF PRESCOTT Date: November 2013 GENIVAR No.: 131-20617-00 2611 Queensview Drive, Suite 300, Ottawa,

More information

Maryland. American Recovery and Reinvestment Act. 158 DoD Projects ($ 65.8M) Completed or Under Way by August 31, 2009

Maryland. American Recovery and Reinvestment Act. 158 DoD Projects ($ 65.8M) Completed or Under Way by August 31, 2009 Maryland American Recovery and Reinvestment Act 158 DoD Projects ($ 65.8M) Completed or Under Way by August 31, 2009 Project Title Component Installation Repair Building 316 Electrical, HVAC, Plumbing,

More information

Facility Assessment for. 11801 East Main Street, Huntley, IL

Facility Assessment for. 11801 East Main Street, Huntley, IL Facility Assessment for 11801 East Main Street, Huntley, IL July 12, 2012 Prepared by: Dewberry Architects Inc. 25 S. Grove Avenue, Suite 500 Elgin, IL 60120 (847) 695-5840 The Village of Huntley requested

More information

Frequently Asked Questions

Frequently Asked Questions Byron Area Schools Frequently Asked Questions Bond Proposal How did this come about? For several years the Byron Area Schools Board of Education has included upgrading facilities as one of the district

More information

CONDITION OF QUALITY ITEMS

CONDITION OF QUALITY ITEMS CONDITION OF QUALITY ITEMS FOUNDATION Always look for moisture problems and any bulges or irregularities in the walls. Lines on the walls or floors may indicate water problems. Have these been cured? If

More information

DESIGN AND CONSTRUCTION DEPARTMENT - July 2014

DESIGN AND CONSTRUCTION DEPARTMENT - July 2014 DESIGN AND CONSTRUCTION DEPARTMENT - Project or 1 Elementary School 46 (Aliana) AutoArch Bartlett Cocke General ors Construct a new 850 capacity elementary school in the Aliana Master Planned Community.

More information

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components Infrastructure Facility Condition Summary Weighted Avg Condition Score Facility Components Systems Surveyor/ Date Done Comments G Sitework.9 Site Improvements Parking Pedestrian Paving Site Development

More information

Cherokee Trail High School 25901 East Arapahoe Road Aurora, Colorado 80016

Cherokee Trail High School 25901 East Arapahoe Road Aurora, Colorado 80016 Cherokee Trail High School 25901 East Arapahoe Road Aurora, Colorado 80016 Year Opened 2003 Current Square Footage 391,000 Site Acreage 86.22 cherokeetrail.cherrycreekschools.org $279,200 Asphalt and concrete

More information

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT 1. SAFETY, HEALTH, CODE 1.1 Structural Requirements, Seismic Stability 1.1.1 Primary Structure 1.1.2 Ceilings 1.1.2 Water damage in many classrooms. Replace tiles. 1.1.3 Cabinets, Equipment 1.1.4 Portables

More information

Gramercy Place Condo Association, Inc.

Gramercy Place Condo Association, Inc. Gramercy Place Condo Association, Inc. UNIT MODIFICATION REQUEST Date of Application: Name of Owner (s): Telephone: (Home) (Cell) E-Mail: Anticipated start date: Anticipated ending date: Permission is

More information

NEW YORK STATE OFFICE OF PARKS, RECREATION AND HISTORIC PRESERVATION HISTORIC HOMEOWNERSHIP REHABILITATION TAX CREDIT APPLICATION: PART 1

NEW YORK STATE OFFICE OF PARKS, RECREATION AND HISTORIC PRESERVATION HISTORIC HOMEOWNERSHIP REHABILITATION TAX CREDIT APPLICATION: PART 1 NEW YORK STATE OFFICE OF PARKS, RECREATION AND HISTORIC PRESERVATION HISTORIC HOMEOWNERSHIP REHABILITATION TAX CREDIT APPLICATION: PART 1 DISCLAIMER : The New York State Office of Parks, Recreation and

More information

Home Inspection Report

Home Inspection Report Home Inspection Report Report Number: For The Property Located On: 27713 Prepared For Exclusive Use By: Mr. Dave Jones Report Prepared By: Bret Smith; License No.: 3414 Signature: Date of Inspection: Monday,

More information

School Construction Authority Architecture & Engineering

School Construction Authority Architecture & Engineering SCOPING GUIDELINES 1.0 GENERAL GUIDELINES 2.0 BUILDING ENVELOPE SCOPING GUIDELINES 3.0 CATEGORIES AND COMPONENTS: The Flood Elimination/Below Grade Capital Category may include some or all of the following

More information

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT SAMPLE SCHEDULE OF S 1.00 General Conditions 1.01 Project Management 1.02 General Superintendent 1.03 Superintendents 1.04 Safety Engineer 1.05 Scheduling 1.06 Field Engineering 1.07 Bonds 1.08 Trailer

More information

29 Broadway- 14 th Fl Tel: 212.888.8334 New York NY 10006 Fax: 212.419.1939. Due Diligence Report. New York, New York

29 Broadway- 14 th Fl Tel: 212.888.8334 New York NY 10006 Fax: 212.419.1939. Due Diligence Report. New York, New York Due Diligence Report New York, New York Prepared for Mr. On February 8, 2010 P a g e 1 Table of Contents PAGE 3.. GENERAL INFORMATION PAGE 4 FILINGS PERMITS AND ENCUMBRANCES PAGE 6. CORE AND SHELL PAGE

More information

Building Condition Assessment: 109-111 North Howard Street Baltimore, Maryland

Building Condition Assessment: 109-111 North Howard Street Baltimore, Maryland KPA The Joint Venture of EBA Engineering, Inc. and Kennedy Porter & Associates, Inc. 4813 Seton Drive, Baltimore, MD 21215 Phone: (410-358-7171) Fax: (410)358-7213 Building Condition Assessment: Baltimore,

More information

PROPOSITION E. Associated General Contractors of America San Diego Chapter September 17, 2014

PROPOSITION E. Associated General Contractors of America San Diego Chapter September 17, 2014 PROPOSITION E Associated General Contractors of America San Diego Chapter September 17, 2014 1 Facilities Centric Bond Aging Facilities Emphasis on Technology Infrastructure School Site Safety and Security

More information

Chicago Public Schools

Chicago Public Schools Ames Middle School 1920 N Hamlin Ave 1997 Completed The scope of this project is to construct a new school $16,913,379 2014 Construction The intent of this project is to expand existing Ames middle school

More information

Bond Priorities. Repairs and Maintenance. School Safety. Capacity

Bond Priorities. Repairs and Maintenance. School Safety. Capacity Replace old windows, boilers, heating and air conditioning system. Improve accessibility for disabled persons. Keyless entry lock systems, redesign of school entrance, and wireless access throughout building.

More information

Historic Preservation Certification Application Part 2 343-345 Main Street West South Haven, Vermont NPS Project No. 12345

Historic Preservation Certification Application Part 2 343-345 Main Street West South Haven, Vermont NPS Project No. 12345 Exterior Features 1 site and drainage 2 foundation 3 wood siding and trim 4 exterior doors 5 windows / storm windows 6 porches front and rear 7 chimneys 8 roofing Interior Features 9 frame 10 basement

More information

31289 ADOPTED BOARD OF TRUSTEES COMMUNITY COLLEGE DISTRICT NO. 508 JANUARY, 5.00 12, 2012

31289 ADOPTED BOARD OF TRUSTEES COMMUNITY COLLEGE DISTRICT NO. 508 JANUARY, 5.00 12, 2012 31289 ADOPTED BOARD OF TRUSTEES COMMUNITY COLLEGE DISTRICT NO. 508 JANUARY, 5.00 12, 2012 BOARD OF TRUSTEES OF COMMUNITY COLLEGE DISTRICT NO. 508 COUNTY OF COOK AND STATE OF ILLINOIS JOB ORDER CONTRACT

More information

1. Maintenance. Mechanical, Electrical & Plumbing Improve ligh>ng control an sensoring $230,239

1. Maintenance. Mechanical, Electrical & Plumbing Improve ligh>ng control an sensoring $230,239 1. Maintenance Building Component Detail Est. Cost. Alkali Building Envelope Replace windows $40,425 Replace worn and rippling carpet $81,335 Improve ligh>ng control an sensoring $230,239 Repair and replace

More information

THIS ADDENDUM MUST BE ACKNOWLEDGED. THIS ADDENDUM SHALL BECOME A PART OF THIS SOLICITATION. Amend Invitation to Bid 14-MC-2194 as follows:

THIS ADDENDUM MUST BE ACKNOWLEDGED. THIS ADDENDUM SHALL BECOME A PART OF THIS SOLICITATION. Amend Invitation to Bid 14-MC-2194 as follows: Denver Public Schools Purchasing Department 1617 S. Acoma St. Denver, Colorado 80223 INVITATION TO BID 14-MC-2194 ADDENDUM NUMBER ONE January 24, 2014 THIS ADDENDUM MUST BE ACKNOWLEDGED. THIS ADDENDUM

More information

FRANCIS L. CARDOZO HIGH SCHOOL 1200 CLIFTON STREET NW WASHINGTON, DC 20009

FRANCIS L. CARDOZO HIGH SCHOOL 1200 CLIFTON STREET NW WASHINGTON, DC 20009 FRANCIS L. CARDOZO HIGH SCHOOL 1200 CLIFTON STREET NW WASHINGTON, DC 20009 FRANCIS L. CARDOZO HIGH SCHOOL SCHOOL HISTORY Francis L. Cardozo High School, located at 1200 Clifton Street and bounded by Florida

More information

Slavic Village Building Condition Review

Slavic Village Building Condition Review Slavic Village Building Condition Review Slavic Village Development May 8, 2015 Page 1 EXECUTIVE SUMMARY City Architecture was commissioned by Slavic Village Development to review five existing facilities

More information

Election Type: Bond, BEST, Mill Levy District. Nov. 4: Pass/Fail. Bond, BEST, Mill Levy Override, Sales Tax. Comments (optional) Dollar Amount

Election Type: Bond, BEST, Mill Levy District. Nov. 4: Pass/Fail. Bond, BEST, Mill Levy Override, Sales Tax. Comments (optional) Dollar Amount Sources: School reports to CSFP, district websites and media reports BOND / BEST - CAPITAL OPERATIONS Adams 12 Five Star Bond Fail $220,000,000 Extending the useful life of existing school buildings, renovating

More information

Instructions For RA-79 "Owner's Application for A Rent Increase Based on Major Capital Improvements (MCI)"

Instructions For RA-79 Owner's Application for A Rent Increase Based on Major Capital Improvements (MCI) Please read instructions carefully. Who May Apply For A MCI Rent Increase? State of New York Division of Housing and Community Renewal Office of Rent Administration Gertz Plaza 92-31 Union Hall Street

More information

New York State Office and Historic Homeownership Rehabilitation Tax Credit

New York State Office and Historic Homeownership Rehabilitation Tax Credit NEW YORK STATE OFFICE OF PARKS, RECREATION AND HISTORIC PRESERVATION HISTORIC HOMEOWNERSHIP REHABILITATION TAX CREDIT APPLICATION: PART 1 DISCLAIMER : The New York State Office of Parks, Recreation and

More information

Memorandum. July 16, 2008. To: Plan Commission City of Madison

Memorandum. July 16, 2008. To: Plan Commission City of Madison Memorandum July 16, 2008 To: Plan Commission City of Madison From: Marc Schellpfeffer Engberg Anderson Re: Structural/Architectural Assessment of Homes for Proposed Demolition Findorff Yards Office Lofts

More information

Newtown and Holland Middle Schools Construction Project Bid Review

Newtown and Holland Middle Schools Construction Project Bid Review Newtown and Holland Middle Schools Construction Project Bid Review *Includes clarifications requested at 30MAR16 FACCOM Meeting (italicized) Facilities Committee Meeting March 30, 2016 (Updated March 31,

More information

UNIVERSITY OF CALIFORNIA, SAN DIEGO

UNIVERSITY OF CALIFORNIA, SAN DIEGO UNIVERSITY OF CALIFORNIA, SAN DIEGO UCSD BERKELEY DAVIS IRVINE LOS ANGELES MERCED RIVERSIDE SAN DIEGO SAN FRANCISCO SANTA BARBARA SANTA CRUZ UNIVERSITY CENTERS - 0076 PHONE: (858) 822-4987 9500 GILMAN

More information

School Board Proposed Capital Improvements Program. Fiscal Years 2014-2023

School Board Proposed Capital Improvements Program. Fiscal Years 2014-2023 School Board Proposed Capital Improvements Program Fiscal Years 2014-2023 TABLE OF CONTENTS Summary Page 1 Capital Projects Pages 2-6 Capital Projects Description Pages 7-14 SCHOOL BOARD PROPOSED CAPITAL

More information

A Residential Owner s Guide to PERMITS. Elgin CITY OF PLANNING & NEIGHBORHOOD SERVICES

A Residential Owner s Guide to PERMITS. Elgin CITY OF PLANNING & NEIGHBORHOOD SERVICES A Residential Owner s Guide to PERMITS CITY OF Elgin PLANNING & NEIGHBORHOOD SERVICES CITY OF Elgin A Residential Owner s Guide Welcome! This booklet has been prepared to provide residential property owners

More information

Think Of Us First! When It s Time to Distribute Your Plans

Think Of Us First! When It s Time to Distribute Your Plans Think Of Us First! When It s Time to Distribute Your Plans CONSTRUCTION NOTEBOOK WILL LIST YOUR PLANS AND SPECS FREE CALL TODAY FOR DETAILS 702-876-8660 Why use Experience We have over 60 years of experience

More information

Exterior Condition Report

Exterior Condition Report Scope of Work for Property Located at: 3918-20 West Cherry Street Date: 3/10/2014 Property is: Single Family Duplex Below is the minimum requirement to meet health and safety issues. The City of Milwaukee,

More information

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities Division 1 Requirements Design and Construction Quality Campus Master Plans Texas Tech University System Operating and Building Maintenance Project Administration Historically Underutilized Business (HUB)

More information

Why does the renovation and expansion of an EXISTING SCHOOL sometimes cost about the SAME or MORE than the construction of a NEW SCHOOL?

Why does the renovation and expansion of an EXISTING SCHOOL sometimes cost about the SAME or MORE than the construction of a NEW SCHOOL? Why does the renovation and expansion of an EXISTING SCHOOL sometimes cost about the SAME or MORE than the construction of a NEW SCHOOL? 1. BASIC FACTS: The current Abington High School building is 111,831

More information

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE NOTICE TO PROPERTY OWNER

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE NOTICE TO PROPERTY OWNER NOTICE TO PROPERTY OWNER Rebuilding your Home after the storm? Adding on, renovating, or remodeling your home? Here's information YOU need to know about the 50% Rule. If your home or business is below

More information

KIEWIT CM/GC Enabling/Utilities

KIEWIT CM/GC Enabling/Utilities South Terminal Redevelopment Program KIEWIT CM/GC Enabling/Utilities Contract Value $50 million M/WBE Goal 20 percent Contact John Todd, LEED AP Project Manager 303.930.9046 john.todd@kiewit.com General

More information

PROPERTY INSPECTION REPORT

PROPERTY INSPECTION REPORT (850) 297-1998 1716 Monticello Dr Tallahassee, Florida 32303 PROPERTY INSPECTION REPORT THIS INSPECTION IS A DETAILED LISTING OF AREAS VISUALLY INSPECTED AT:, Tallahassee FL Client Tallahassee, FL 32304

More information

Website. King County Council District # WA State Legislative District # Date Incorporated. Federal Tax ID. WA State UBI#

Website. King County Council District # WA State Legislative District # Date Incorporated. Federal Tax ID. WA State UBI# Address Shipping Address Phone Information removed for privacy Fax Website Email Information removed for privacy King County Council District # WA State Legislative District # Date Incorporated Information

More information

WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME

WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME 1 THE BUILDING PROCESS The focus of Woodland Homes building department is Quality, Service and Predictability. Through

More information

Public Building Commission of Chicago. Board Meeting August 20, 2013

Public Building Commission of Chicago. Board Meeting August 20, 2013 Public Building Commission of Chicago Board Meeting August 20, 2013 Board Meeting August 20, 2013 Recent Events Enrico Tonti Elementary School Kindergarten Modular Opening August 5, 2013 Board Meeting

More information

Facility Assessment Report, Montgomery Independent School District

Facility Assessment Report, Montgomery Independent School District THE LEARNING CENTER CAMPUS DATA THE LEARNING CENTER 700 Dr. Martin Luther King Jr. Drive, Montgomery TX 77356 Year Built 1958 Approx. Total Square Footage Grades Served Current Enrollment 22,050 n/a n/a

More information

RESOLUTION NO. 2003-04-13

RESOLUTION NO. 2003-04-13 RESOLUTION NO. 2003-04-13 RESOLUTION OF THE BOARD OF TRUSTEES OF THE CITRUS COMMUNITY COLLEGE DISTRICT ORDERING AN ELECTION, AND ESTABLISHING SPECIFICATIONS OF THE ELECTION ORDER WHEREAS, the Board of

More information

Project Management Division

Project Management Division CAPITAL PROJECTS DEPARTMENT MONTHLY ACTIVITY REPORT February 2015 Project Management Division BELOW: Collins Construction crews complete recent exterior work and await delivery of exterior siding. Collins

More information

GUIDELINES FOR REHABILITATION OF TRADITIONAL COMMERCIAL BUILDINGS DESIGN GUIDELINES

GUIDELINES FOR REHABILITATION OF TRADITIONAL COMMERCIAL BUILDINGS DESIGN GUIDELINES GUIDELINES FOR REHABILITATION OF TRADITIONAL COMMERCIAL BUILDINGS DESIGN GUIDELINES PAGE 13 DESIGN GUIDELINES The following design guidelines have been developed to guide appropriate design in the Downtown

More information

A0 SHEET 1 OF 5 400 LOCUST STREET FRANKFORT, KANSAS 66427 FRANKFORT, KANSAS 66427 ROOF REPAIR OF THE 400 LOCUST STREET

A0 SHEET 1 OF 5 400 LOCUST STREET FRANKFORT, KANSAS 66427 FRANKFORT, KANSAS 66427 ROOF REPAIR OF THE 400 LOCUST STREET POYNTZ AVENUE, STE 9 MANHATTAN, KS 0..0..9 FAX WEST th STREET JUNCTION CITY, KS.... FAX 0, Bruce McMillan AIA, Architects, P.A. HERITAGE TRUST FUND GRANT PROJECT NO. 0-0 ROOF REPAIR OF THE 00 LOCUST STREET

More information

Renovations for a New 18 Bed Gero-Psych Nursing Unit August 7, 2014 Lower Bucks Hospital Second Floor 501 Bath Road, Bristol, PA 19007 Addendum No.

Renovations for a New 18 Bed Gero-Psych Nursing Unit August 7, 2014 Lower Bucks Hospital Second Floor 501 Bath Road, Bristol, PA 19007 Addendum No. Charles H. Cross III, AIA, NCARB, LEED AP Charles Cross Architecture, PC Renovations for a New 18 Bed Gero-Psych Nursing Unit Lower Bucks Hospital Second Floor 501 Bath Road, Bristol, PA 19007 Addendum

More information

Build Back Smarter: House performance improvements at the time of earthquake repairs

Build Back Smarter: House performance improvements at the time of earthquake repairs Build Back Smarter: House performance improvements at the time of earthquake repairs Lois Easton Beacon Pathway Inc Project aims To show that home performance improvements can and should be included in

More information

Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year

Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year Printed On: 2003/04/03 St Patrick CES, 7932 Study [03.3-050 Plumbing Piping Systems] Study condition, remaining service

More information

17,280 square feet Overview:

17,280 square feet Overview: CENTRAL OFFICE Located at 167 Boston Post Road, East Lyme, Connecticut, the Central Office was built in 1916 as the original Flanders Elementary School and remains connected to the current school. The

More information

Rehab Inspection Report Page 1

Rehab Inspection Report Page 1 Rehab Inspection Report Page 1 Home Address: Construction Style: Number of bedrooms Square footage: Value of offer: Estimated rehab cost: Value of resale: Orientation of house: N S E W Note: orientation

More information

Vision Home Inspection

Vision Home Inspection Vision Home Inspection 324 Rams Run Shepherdsville KY 40165-7877 Inspector: James McFadden Property Inspection Report Client(s): Property address: Inspection date: View report summary This report is the

More information

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY Cost Code # Description Cost Code # Description 01 00 00.001 General Requirements 02 00 00.001 Existing Conditions 01 31 19.13.001 Preconstruction Meetings 02 21 00.001 Surveys 01 32 33.001 Photographic

More information

CITY OF CHICAGO SMALL BUSINESS IMPROVEMENT FUND (SBIF) PROGRAM RULES

CITY OF CHICAGO SMALL BUSINESS IMPROVEMENT FUND (SBIF) PROGRAM RULES CITY OF CHICAGO SMALL BUSINESS IMPROVEMENT FUND (SBIF) PROGRAM RULES The City of Chicago s Small Business Improvement Fund is a Tax Increment Financing (TIF) program, which will reimburse building owners

More information

CHARLOTTE COUNTY Community Development Department

CHARLOTTE COUNTY Community Development Department CHARLOTTE COUNTY Community Development Department Building Construction Services Division 18400 Murdock Circle, Port Charlotte FL 33948 Phone: 941.743.1201 Fax: 941.764.4907 www.charlottecountyfl.gov 50

More information

SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request

SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request SECTION 00 0110 PROCUREMENT AND CONTRACTING REQUIREMENTS 1.1 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS A. 00 0101 - Project Title Page B. 00 0105 - Certifications Page C. 00 0110 - Table

More information

D Sample Notices to Property Owners, Sample Affidavits, and Other Material

D Sample Notices to Property Owners, Sample Affidavits, and Other Material D Sample Notices to Property Owners, Sample Affidavits, and Other Material These samples are offered to illustrate specific points in the Desk Reference. States and communities should examine them carefully

More information

The Building Group First Tuesdays First Saint Paul s Lutheran Church 1301 North LaSalle Street, Chicago, Illinois

The Building Group First Tuesdays First Saint Paul s Lutheran Church 1301 North LaSalle Street, Chicago, Illinois Wiss, Janney, Elstner Associates, Inc. 10 South LaSalle Street, Suite 2600 Chicago, Illinois 60603 312.372.0555 tel 312.372.0873 fax www.wje.com The Building Group First Tuesdays October 2, 2012 Jason

More information

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal. 2.02 DESIGN DEVELOPMENT PHASE GENERAL The Architect shall prepare the Design Development Documents from the approved Schematic Design. The Design Development Documents shall consist of drawings and other

More information

Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals

Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals Les Butler Associate Commissioner for Business and Regional

More information