1 Nordplus Adult Guidelines and requirements for budgeting in Nordplus Adult In the following the guidelines and requirements for budgeting Nordplus Adult projects are presented. A separate guide for reporting, documentation of costs and financial management of grants will be provided for all Nordplus Adult grant beneficiaries. The guidelines presented here should be discussed among the project organisations already at application stage, as the financial framework in Nordplus Adult involves specific procedures to be adopted and implemented from the very beginning and has implications on the type of activities that can be carried out. The grants for mobility (flat rates) are different from that of collaboration projects (budgets) and the two set of activities are therefore presented in two separate sections. For general information on the Nordplus Adult programme, please see the Nordplus Handbook Danish Agency for Higher Education, December

2 Content 1. General framework for budgeting Eligible costs Sound financial management Mobility projects Collaboration projects Costs of time invested Use of external expertise Administrative expenses

3 1. General framework for budgeting The Nordplus Adult grant is a contribution to a transnational partnership working towards a specific purpose and towards achieving a specific aim within a limited period of time. The nature of this particular type of project has effect on budgeting within a Nordplus Adult project. Please make note of the following points before submitting an application: 1.1 Eligible costs The following eligible (and ineligible) costs in Nordplus Adult apply to mobility projects and collaboration projects alike: only costs directly related to the project and its activities are eligible costs for non-nordic or non-baltic participants or costs for activities outside the Nordic or Baltic countries are not eligible. For collaboration projects these costs are not eligible: indirect costs, e.g. overheads or general costs costs for office equipment, such as IT equipment Furthermore costs involving participants with special needs may be met by a grant of up to 100 per cent. Additional funds may be provided to cover cost for e.g. escorts and interpreters. The extra funds may be applied for after the ordinary application deadline directly to the Danish Agency for Higher Education. A doctor s certificate is usually required. Further specifications of eligible and not eligible costs are given in the sections for mobility projects and collaboration projects respectively. 1.2 Sound financial management When planning and carrying out a Nordplus Adult project the principles of sound financial management should always be observed. This means that the spending should be reasonable and justified, not excessive or reckless. Costs must be identifiable and verifiable and the spending must secure value for money and be cost-effective. There must be an appropriate balance between quantity and quality and the best price. Overall, the best relationship between resources used and the results achieved must exist. 2. Mobility projects - Exchange of adult learners and teachers and preparatory visits. Grants for mobility projects are contributions to the costs related to transnational exchanges/stays and specifically include contributions to travel 3

4 costs and costs for board and accommodation while staying in another country. In Nordplus Adult, mobility grants are considered as lump sums and not based on actual costs incurred. They are based on a set of flat rates for travel and for board and accommodation respectively, and the actual grant is calculated by multiplication of the approved number of participants, the duration of stay(s) and the applicable rates. There are different travel rates for different groups of countries and different board rates for different target groups listed in the tables below. Travel rates per participant To and from Greenland euro To and from the Faroe Islands and Iceland 660 euro Between Denmark, Estonia, Finland, Latvia, Lithuania, Norway, Sweden and Åland 330 euro Domestic, more than 500 km (both ways) 150 euro The rate for domestic travelling is an addition to the rates for transnational travel. Grants for domestic travel can be applied for when the distance between the participant s hometown and the nearest international airport, train or bus station in home country is more than 250 km. Accommodation/board rates per participant Per day Per week Per month Folk high school students 20 euro 70 euro 200 euro Adult learners (students) 40 euro 160 euro 480 euro Teachers/other pedagogical staff 70 euro 355 euro euro The fact that mobility grants are lump sums and not based on actual costs incurred means that it is the number of participants, the duration of the stays and the sending/host country which must be reported and documented at final report stage and not the actual costs of the exchanges/stays. Put differently, beneficiaries are entitled to the full grant amount if the total number of mobilities is carried out in accordance with the aims outlined in the application even if the expenses are lower than the granted amount. 4

5 By the same account, the final grant will be reduced in the following cases: if fewer participants have taken part in the exchanges and/or if the stays have been shorter than foreseen in the grant decision, the final grant amount will be reduced accordingly changes in sending/host country may in some cases lead to a reduction of grant as different travel rates apply to different groups of countries the minimum duration for the type of stay/exchange in question must be kept. Shorter stays than the required minimum are ineligible and cannot be part of the reporting. See the Nordplus Handbook for the various types of exchanges and their minimum duration. Any change in sending/host country must be justified and approved by the administration and cannot lead to an increase in grant. If exchanges/stays are fulfilled and carried out as indicated in the grant decision, the actual use of the grant can take place with full flexibility, for instance: grant amounts originally allocated to travel costs can be used for board accommodation and vice versa, e.g. in case travel rates are higher than the actual travel costs and unused travel grant amounts are generated - and vice versa grant amounts originally allocated to stays in one country/organisation can be used for costs of stays in another country/organisation of the exchange program, e.g. when the travel and subsistence rates for one country are higher than the actual costs and unused grant amounts for a country are generated - and vice versa in carrying out the exchanges/stays foreseen in the grant decision, any unused grant amount can be used to include more participants or to cover other costs specifically incurred from the exchanges foreseen. 3. Collaboration projects - thematic networks, development projects and mapping projects. Grants for collaboration projects are contributions to costs incurred by organisations of different countries collaborating on a systematic basis for a limited period of time aiming to exchange knowledge and experience, develop teaching materials, methods, concepts or carry out studies on adult learning. Grants for collaboration projects are based on a specified budget of the estimated, actual costs of the project. Grants from Nordplus Adult can cover up to 75% of approved costs, while at least 25% of the costs must be cofinanced, covered by either the participating organisations themselves (selffinancing) and/or other external sources. 5

6 The budget must include costs for all project activities during the full project period, covering all organisations in all countries - both costs covered by the organisations own contributions (co-financing), other external contributions and by the applied grant from the Nordplus Adult program. For applied grants over euros a detailed budget must be attached to the application. The detailed budget should give more information on the calculated expenses under the three categories of travel, accommodation/board and other costs. The budget may include a variety of types of costs, e.g.: travel (including travel insurance) and accommodation/board costs in connection to project meetings costs for printing of reports, brochures and other printed materials costs for establishing of a project web site, e.g. with the aim to disseminate project results costs for meetings, seminars or conferences aimed at disseminating the achieved results to a broader audience. The support would e.g. cover costs related to rent of premises, equipment fees for speakers etc. 1 the value of work hours put into the project costs for translation. Please take notice of the following requirements when making the separate budget: the budget must include each applicable sub-category of costs of the budget the budget must also specify the costs to be covered by the grant and the costs to be covered by the co-financing of the participating organisations and/or external sources the co-financing must as amount to minimum 25% of the total budget, but the composition of the co-financing may vary: it can be limited to certain types of costs or be calculated as 25% of all types of cost. the budget must specify Other costs in terms of the various types of costs it includes costs for travel and board and accommodation for project meetings etc. should be given as real costs. Per diem rates given by the organisations to the employees may be included in the budget as real costs when these rates can be documented as standard rates by the organisations. Fixed mobility rates can only be used if they can be documented not to be above the actual costs VAT (Value Added Tax) can normally not be included. Only when the organisations can show that they are unable to recover VAT may it be included in the budget. As public legal organisations/entities are normally able to recover VAT, they cannot include VAT in their costs. 1 Please note that travel and accommodation/board costs for participants outside of the project group cannot be included in the budget. 6

7 3.1. Costs of time invested In support of aim to contribute to the development of the adult learning sector and provide specific results, Nordplus Adult provides grant contributions for time invested in development projects and mapping projects. As a result the value of time (work hours) directly used by the project organisations for actual development work is an eligible part of the project costs, whether as co-financing and/or as a cost covered by the grant. Please note that for thematic networks, which do not require developments and mapping, time put into the network activities can only be included in the budget as co-financing. The value of time is calculated by multiplication of the hours used specifically in the project by a person directly involved in development and mapping activities and the actual hourly rate of this person. Each partner should keep a separate account of the hours spent for the project. The following points should be observed: the hourly rate is based on the actual salary of the individual, which may include social benefit charges and other statutory costs, but not bonuses, leased cars or comparable costs indirect/general costs or overhead, e.g. contributions to costs of the project organisations premises, general management etc. cannot be calculated into the hourly rates used. If the hourly rate is calculated on the basis of the monthly salary, the following principle should be applied: the monthly salary for full time employment divided by the number of hours per month for full time employment according to national law/labour market agreement for that type of employment/employee in question. Standardised hourly rates may be used, whether as joint rate for all involved individuals in all organisations and countries or various rates for e.g. various categories of staff, various functions etc. However, the following requirements must be observed: the standardised rates used cannot be higher than the lowest of the salaries it covers/replaces the hourly rate(s) used, whether individual or standardised, must be foreseen in the project budget and cannot be changed or introduced for reporting Use of external expertise Normally, the project organisations should jointly possess the competences to carry out the activities and achieve the results described in the approved application. However, use of external expertise is accepted when: it is foreseen in the approved project and budget 7

8 it is only used to a limited extent, for specific and limited efforts and purposes the price does not exceed what is considered to be the market price for the expertise and effort in question. Furthermore, external expertise at market price cannot be provided by the project organisations themselves as general/indirect costs or overheads may not be included in the budget. Use of internal expertise from other parts or departments of the project organisations is possible, but the price or value of this must apply with the rules for project organisations and cannot include any general/indirect costs or overheads Administrative expenses The value of the project organisations general use of own facilities, materials, equipment etc. for project purposes is normally considered ineligible. However the coordinating institution may use up to a maximum of 5% of the total used grant for administrative expenses to meet the added cost of coordinating the activities. Coordinators do not need to provide supporting documentation for administrative expenses. 8

Guide for reporting, documentation of activities and financial management of grants, 2016

Guide for reporting, documentation of activities and financial management of grants, 2016 Nordplus Adult Guide for reporting, documentation of activities and financial management of grants, 2016 All beneficiaries of the Nordplus Adult programme must submit a final report to the programme administration

More information

GUIDE FOR APPLICANTS GRANTS PROGRAMME 2016/2017 TRAINING IN CONFERENCE INTERPRETING

GUIDE FOR APPLICANTS GRANTS PROGRAMME 2016/2017 TRAINING IN CONFERENCE INTERPRETING GUIDE FOR APPLICANTS GRANTS PROGRAMME 2016/2017 TRAINING IN CONFERENCE INTERPRETING The aim of this guide is to give a summary of the main points of the administrative and financial processes governing

More information

FREQUENTLY ASKED QUESTIONS Version November 2011

FREQUENTLY ASKED QUESTIONS Version November 2011 FREQUENTLY ASKED QUESTIONS Version November 2011 Composition of a Comenius Regio Partnership Which types of institutions are eligible to participate in Comenius Regio? Comenius Regio partnerships are bilateral

More information

28 September 2007 LIFELONG LEARNING PROGRAMME GUIDE FOR APPLICANTS: ADMINISTRATIVE AND FINANCIAL RULES

28 September 2007 LIFELONG LEARNING PROGRAMME GUIDE FOR APPLICANTS: ADMINISTRATIVE AND FINANCIAL RULES 28 September 2007 LIFELONG LEARNING PROGRAMME GUIDE FOR APPLICANTS: ADMINISTRATIVE AND FINANCIAL RULES 1 Table of Content 2 1. GENERAL PROVISIONS This document contains supplementary information to the

More information

How To Fund A Project

How To Fund A Project PREPARATORY ACTION IN THE FIELD OF SPORT Administrative and Financial Management Handbook The rules outlined in this Administrative and Financial Handbook apply to the projects funded by the Preparatory

More information

HANDBOOK 2015 ENGLISH EDITION

HANDBOOK 2015 ENGLISH EDITION NORDPLUS 2012 2016 HANDBOOK 2015 ENGLISH EDITION 02/12/2014 CONTACT INFORMATION 4 1 NORDPLUS 6 1.1 Nordplus objectives and introduction 6 1.2 Nordplus Administration and programme committee 7 1.3 Target

More information

EEA/Norway Grants Scholarship Programme Estonia

EEA/Norway Grants Scholarship Programme Estonia EEA/Norway Grants Scholarship Programme Estonia Guide for Applicants 2015 1. GENERAL OVERVIEW OF THE PROGRAMME By means of the European Economic Area (EEA) and Norway Grants, Iceland, Liechtenstein and

More information

APPLICATION INSTRUCTIONS

APPLICATION INSTRUCTIONS Version 1.1 APPLICATION INSTRUCTIONS Instructions for completing the Preparatory project call application form for the Northern Periphery and Arctic Programme 2014-2020 The application instructions are

More information

Funding for the development of Nordic Master Programmes

Funding for the development of Nordic Master Programmes CALL FOR PROPOSALS Norwegian Centre for International Cooperation in Higher Education SIU Nordic Master Programme Funding for the development of Nordic Master Programmes Each project may be awarded up

More information

PROJECT MANAGEMENT PLAN HEKLA

PROJECT MANAGEMENT PLAN HEKLA MANAGEMENT PLAN HEKLA CONTENT 1. Introduction --------------------------------------------------------------------------- 0 2. Project organisation and management --------------------------------------------

More information

Education, Audiovisual and Culture Executive Agency Financial Information Kit

Education, Audiovisual and Culture Executive Agency Financial Information Kit Education, Audiovisual and Culture Executive Agency Financial Information Kit Introduction This financial information kit helps you avoid financial pitfalls in managing your project This Financial Information

More information

Preconditions. The application

Preconditions. The application Guidelines for application forms for project funding for 2016 from the Nordic Council of Ministers Arctic Co-operation Programme 2015-17 Project framework The objective of the Arctic Co-operation Programme

More information

Nordic Master - Programme Guide 2015

Nordic Master - Programme Guide 2015 Nordic Master - Programme Guide 2015 Background of the programme In June 2007, the Nordic Prime Ministers decided upon a new Nordic globalisation initiative with the aim to create a more competent, visible

More information

Program Proposal: European Network of Young Entrepreneurs Ambassadors

Program Proposal: European Network of Young Entrepreneurs Ambassadors Program Proposal: European Network of Young Entrepreneurs Ambassadors 1. CONTEXT This is a pilot project which aims to ensure that experiences, good practices and learnt lessons are exchanged and reinforced

More information

Japan Norway Researcher mobility programme

Japan Norway Researcher mobility programme The International Scholarship Section (IS) Guidelines Japan Norway Researcher mobility programme This programme is administered jointly by the Japan Society for the Promotion of Science (JSPS) and the

More information

PREANNOUNCES RESEARCH WITHIN PRIORITY SECTORS CALL FOR PROPOSALS

PREANNOUNCES RESEARCH WITHIN PRIORITY SECTORS CALL FOR PROPOSALS THE GENERAL SECRETARIAT FOR RESEARCH AND TECHNOLOGY AS PROGRAMME OPERATOR OF THE GREEK-EEA RESEARCH PROGRAMME IMPLEMENTED UNDER THE GREEK FINANCIAL MECHANISM 2009-2014 PREANNOUNCES RESEARCH WITHIN PRIORITY

More information

1st call for proposals: Administrative and submission procedures Infoday La Valeta, Malta, June 17th 2015

1st call for proposals: Administrative and submission procedures Infoday La Valeta, Malta, June 17th 2015 1st call for proposals: Administrative and submission procedures Infoday La Valeta, Malta, June 17th 2015 SIZE OF THE PARTNERSHIP As a minimum requirement, the partnership must involve: at least 4 financing

More information

Rules and Procedures in the new Programme 14-20

Rules and Procedures in the new Programme 14-20 Rules and Procedures in the new Programme 14-20 OBJECTIVES Overview of main rules and procedures to be followed Main novelties compared to the 2007-2013 period Risky points Information to be completed

More information

FNR INTER Programme. Collaboration with SNF. Guidelines for Applicants

FNR INTER Programme. Collaboration with SNF. Guidelines for Applicants FNR INTER Programme Collaboration with SNF Guidelines for Applicants These guidelines provide practical information to potential applicants in preparing and submitting an application to the FNR CORE Thematic

More information

MANUAL FOR THE GRANT OF THE DORA PLUS SUB-ACTIVITY 1.2 STUDY MIGRATION OF DOCTORAL DEGREE STUDENTS

MANUAL FOR THE GRANT OF THE DORA PLUS SUB-ACTIVITY 1.2 STUDY MIGRATION OF DOCTORAL DEGREE STUDENTS Page 1/5 MANUAL FOR THE GRANT OF THE DORA PLUS SUB-ACTIVITY 1.2 STUDY MIGRATION OF DOCTORAL DEGREE STUDENTS Approved by: Rait Toompere Approved on 03.05.2016 No. 1-11.1/3532 PURPOSE, SCOPE, RESPONSIBILITY

More information

The Nordic Age Group Championships 2014

The Nordic Age Group Championships 2014 The Danish Swimming Federation is pleased to invite you to take part in The Nordic Age Group Championships 2014 Date and place: Venue: The championships will take place from July 12 th to July 13 th in

More information

GUIDE FOR FILLING IN THE APPLICATION FORM. Central Baltic Programme 2014-2020. Version 2.0 (21.8.2015)

GUIDE FOR FILLING IN THE APPLICATION FORM. Central Baltic Programme 2014-2020. Version 2.0 (21.8.2015) GUIDE FOR FILLING IN THE APPLICATION FORM Central Baltic Programme 2014-2020 Version 2.0 (21.8.2015) Contents INTRODUCTION... 2 Small and regular projects... 2 The emonitoring System... 2 Support when

More information

URBACT III Programme Manual

URBACT III Programme Manual URBACT III Programme Manual Fact Sheet 2A Action Planning Networks Table of contents Fact Sheet 2A 1. Main objectives and expected results... 1 2. Network s development... 2 3. Partnership... 3 4. Activities

More information

KA203 Strategic Partnerships Funding Principles and Calculation of the Budget

KA203 Strategic Partnerships Funding Principles and Calculation of the Budget Erasmus+ for Higher Ecucation KA203 Strategic Partnerships Funding Principles and Calculation of the Budget Kiira Noponen, Project Coordinator, CIMO Erasmus+ National Agency, Finland Info for Applicants,

More information

RULES FOR THE REIMBURSEMENT OF TRAVEL AND SUBSISTENCE EXPENSES FOR EXCHANGE OF OFFICIALS

RULES FOR THE REIMBURSEMENT OF TRAVEL AND SUBSISTENCE EXPENSES FOR EXCHANGE OF OFFICIALS EUROPEAN COMMISSION CONSUMERS, HEALTH AND FOOD EXECUTIVE AGENCY Consumers and Food Safety Unit RULES FOR THE REIMBURSEMENT OF TRAVEL AND SUBSISTENCE EXPENSES FOR EXCHANGE OF OFFICIALS CONSUMER PROGRAMME

More information

Consolidation Act No. 68 of 21 January 2005. The Employers' and Salaried Employees' (Legal Relationship) (Consolidation) Act 1

Consolidation Act No. 68 of 21 January 2005. The Employers' and Salaried Employees' (Legal Relationship) (Consolidation) Act 1 Ministry of Employment Translation Consolidation Act No. 68 of 21 January 2005 The Employers' and Salaried Employees' (Legal Relationship) (Consolidation) Act 1 This Act consolidates the provisions of

More information

Financial management of the project, tools and reporting

Financial management of the project, tools and reporting Financial management of the project, tools and reporting Lead Partner Seminar 4th Call for Proposals Budapest, Hungary 11 December 2012 SEE Joint Technical Secretariat Financial management of the project,

More information

Frequently asked questions. FP7 Financial Guide

Frequently asked questions. FP7 Financial Guide Frequently asked questions FP7 Financial Guide Budgetary matters Eligible costs of a project What are the criteria for determining whether the costs of a project are eligible? First of all, costs must

More information

The Marie Curie Actions FP7 Financial Guidelines

The Marie Curie Actions FP7 Financial Guidelines The Marie Curie Actions FP7 Financial Guidelines SPECIFIC PROVISIONS RELATED TO MARIE CURIE ACTIONS FINANCED UNDER THE FP7 "PEOPLE" PROGRAMME Part 1: projects funded in the 2007-2010 Work Programmes calls

More information

COMMISSION DECISION. of XXX

COMMISSION DECISION. of XXX EUROPEAN COMMISSION Brussels, XXX [ ](2014) XXX draft COMMISSION DECISION of XXX authorising the use of reimbursement on the basis of unit costs for actions requiring the conduct of clinical studies under

More information

Eligibility Rules & Declaration of Expenses

Eligibility Rules & Declaration of Expenses Eligibility Rules & Declaration of Expenses Call 2 Table of contents 1 Basic eligibility rules... 2 2 Budget lines... 2 2.1 Personnel costs (incl. general costs / overheads)... 3 2.1.1 Conditions... 3

More information

Reference No: Circular 11/82; Date: 05/07/82. Circular 11/82:- Travelling and Subsistence Regulations. A Dhuine Uasail

Reference No: Circular 11/82; Date: 05/07/82. Circular 11/82:- Travelling and Subsistence Regulations. A Dhuine Uasail Reference No: Circular 11/82; Date: 05/07/82 Circular 11/82:- Travelling and Subsistence Regulations A Dhuine Uasail I am directed by the Minister for the Public Service to inform you that he has accepted

More information

The South African Council for the Project and Construction Management Professions. Guideline Scope of Services and Tariff of Fees

The South African Council for the Project and Construction Management Professions. Guideline Scope of Services and Tariff of Fees The South African Council for the Project and Construction Management Professions Guideline Scope of Services and Tariff of Fees For Persons Registered in terms of the Project and Construction Management

More information

Staff costs Fact sheet on eligibility of staff costs 1

Staff costs Fact sheet on eligibility of staff costs 1 Version: June 2015 Staff costs Fact sheet on eligibility of staff costs 1 Definition Expenditure on costs of staff members employed by the partner organisation, who are formally engaged to work on the

More information

Frequently Asked Questions to the Marie Curie Actions Financial Guidelines

Frequently Asked Questions to the Marie Curie Actions Financial Guidelines Frequently Asked Questions to the Marie Curie Actions Financial Guidelines Updated 26/06/2012 Table of contents Q1: FOR CATEGORIES A-C (1-2 AS OF WP2011), WHICH AMOUNT HAS TO BE DECLARED IN THE FORM C

More information

Circular on. Adjustment of rates for business travel as of 1 January 2014. Circular of 20 December 2013

Circular on. Adjustment of rates for business travel as of 1 January 2014. Circular of 20 December 2013 Circular of 20 December 2013 Circular on Adjustment of rates for business travel as of 1 January 2014 In the event of any inconsistency between the Danish and English language versions of the document,

More information

PROJECT MANAGEMENT HANDBOOK CHAPTER V. Stage 4: PROJECT IMPLEMENTATION

PROJECT MANAGEMENT HANDBOOK CHAPTER V. Stage 4: PROJECT IMPLEMENTATION PROJECT MANAGEMENT HANDBOOK CHAPTER V Stage 4: PROJECT IMPLEMENTATION INTERACT is co-financed by the European Regional Development Fund (ERDF) Contents 1 Project implementation... 1 1.1 Partners responsibilities

More information

CONTINUOUS TRAINING GUIDELINES SUBMISSION OF PROPOSALS TO OBTAIN FINANCIAL SUPPORT 2011-2013

CONTINUOUS TRAINING GUIDELINES SUBMISSION OF PROPOSALS TO OBTAIN FINANCIAL SUPPORT 2011-2013 CONTINUOUS TRAINING GUIDELINES SUBMISSION OF PROPOSALS TO OBTAIN FINANCIAL SUPPORT 2011-2013 FOR THE IMPLEMENTATION OF A TRAINING PROGRAMME FOR PROFESSIONALS IN THE EUROPEAN AUDIOVISUAL INDUSTRY Decision

More information

Annex X to the Model LIFE Grant Agreement Financial and Administrative Guidelines

Annex X to the Model LIFE Grant Agreement Financial and Administrative Guidelines Annex X to the Model LIFE Grant Agreement Financial and Administrative Guidelines PURPOSE OF THE GUIDELINES These guidelines have been prepared to help proposers and beneficiaries under call 2014 of the

More information

PUBLIC HEALTH APPLICATION FOR FUNDING

PUBLIC HEALTH APPLICATION FOR FUNDING EUROPEAN COMMISSION HEALTH & CONSUMER PROTECTION DIRECTORATE-GENERAL Directorate G - Public Health, Luxembourg PUBLIC HEALTH APPLICATION FOR FUNDING European Commission Directorate for Public Health DG

More information

Model Grant Agreement

Model Grant Agreement HORIZON HORIZON 2020 2020 Model Grant Agreement Horizon 2020 model Grant Agreement: Objectives Simplification Provisions Wording Flexibility To accommodate particularities Coherence Within H2020 and with

More information

Reporting transnational access and service activity costs. Version May 2011

Reporting transnational access and service activity costs. Version May 2011 Reporting transnational access and service activity costs Version May 2011 Disclaimer This guide is aimed at assisting beneficiaries. It is provided for information purposes only and its contents are not

More information

Date Ratified 03/12/2012 Human Resources Committee Review Date 01/12/2014 Director of Finance and Information Expiry Date 02/12/2015 Withdrawn Date

Date Ratified 03/12/2012 Human Resources Committee Review Date 01/12/2014 Director of Finance and Information Expiry Date 02/12/2015 Withdrawn Date Policy No: OP7 Version: 4.0 Name of Policy: Submission of Staff Expenses Policy Effective From: 18/12/2012 Date Ratified 03/12/2012 Ratified Human Resources Committee Review Date 01/12/2014 Sponsor Director

More information

Interreg Baltic Sea Region 2 nd Call for Applications Priorities 1-3. Announcement Note for Step 1: Concept Note Timeline: 1 March 2016 1 June 2016

Interreg Baltic Sea Region 2 nd Call for Applications Priorities 1-3. Announcement Note for Step 1: Concept Note Timeline: 1 March 2016 1 June 2016 Interreg Baltic Sea Region 2 nd Call for Applications Priorities 1-3 Announcement Note for Step 1: Concept Note Timeline: 1 March 2016 1 June 2016 1. Introduction Interreg Baltic Sea Region is launching

More information

FINANCIAL GUIDELINES FOR APPLICANTS VP/2012/007

FINANCIAL GUIDELINES FOR APPLICANTS VP/2012/007 Last update: February 2012 FINANCIAL GUIDELINES FOR APPLICANTS VP/2012/007 CONTENTS 1 GENERAL PRINCIPLES... 4 2 RULES RELATED TO THE GRANT REQUESTED... 4 3 THE ESTIMATED BUDGET OF THE ACTION... 5 3.1 The

More information

Community-based Heritage Grants Scheme 2015

Community-based Heritage Grants Scheme 2015 Community-based Heritage Grants Scheme 2015 The Heritage Council intends to allocate the sum of 600,000 to its Community-based Heritage Grants Scheme in 2015. Applications must be submitted using our online

More information

FP7 Rules of Participation Funding schemes Financial issues Evaluation Criteria Implementation Submission Contractual and Financial issues

FP7 Rules of Participation Funding schemes Financial issues Evaluation Criteria Implementation Submission Contractual and Financial issues National Documentation Center (EKT/NHRF) FP7 Rules of Participation Funding schemes Financial issues Evaluation Criteria Implementation Submission Contractual and Financial issues Maria Samara, Administrative

More information

Education, Audiovisual and Culture Executive Agency. Application procedures Call 2015 (EAC/A04/2014)

Education, Audiovisual and Culture Executive Agency. Application procedures Call 2015 (EAC/A04/2014) Education, Audiovisual and Culture Executive Agency SPORT, YOUTH AND EU AID VOLUNTEERS Application procedures Call 2015 (EAC/A04/2014) ERASMUS+ : SPORT COLLABORATIVE PARTNERSHIPS NOT-FOR-PROFIT EUROPEAN

More information

Eligible costs incurred by the host institution of a fellowship are subdivided into direct and indirect costs.

Eligible costs incurred by the host institution of a fellowship are subdivided into direct and indirect costs. Attachment no 3 to the POLONEZ 1 Call Text POLONEZ 1 COSTS INCURRED DURING FELLOWSHIPS FINANCED BY THE NATIONAL SCIENCE CENTRE, CARRIED OUT UNDER A. ELIGIBLE COSTS are expenditures eligible for funding

More information

The Marie Curie Actions FP7 Financial Guidelines

The Marie Curie Actions FP7 Financial Guidelines The Marie Curie Actions FP7 Financial Guidelines SPECIFIC PROVISIONS RELATED TO MARIE CURIE ACTIONS FINANCED UNDER THE FP7 "PEOPLE" PROGRAMME Part 3: projects funded in the 2007-2011 Work Programmes calls

More information

The Marie Curie Actions FP7 Financial Guidelines

The Marie Curie Actions FP7 Financial Guidelines The Marie Curie Actions FP7 Financial Guidelines. These guidelines complement and should be considered in conjunction with the FP7 Guide on Financial Issues which is available for download at ftp://ftp.cordis.europa.eu/pub/fp7/docs/financialguide_en.pdf.

More information

INTENSIVE COURSES FOR MASTER LEVEL STUDENTS AUTUMN 2015 AND SPRING 2016

INTENSIVE COURSES FOR MASTER LEVEL STUDENTS AUTUMN 2015 AND SPRING 2016 INTENSIVE COURSES FOR MASTER LEVEL STUDENTS AUTUMN 2015 AND SPRING 2016 in the fields of Agriculture, Forestry and Veterinary Medicine Nordplus courses: These courses are partly funded by the Nordic Council

More information

JLS/2007/D1/032 ANNEX 1 Terms of Reference Network of experts on the economic analysis of terrorism and anti-terror policies (NEAT)

JLS/2007/D1/032 ANNEX 1 Terms of Reference Network of experts on the economic analysis of terrorism and anti-terror policies (NEAT) JLS/2007/D1/032 ANNEX 1 Terms of Reference Network of experts on the economic analysis of terrorism and anti-terror policies (NEAT) 1. INTRODUCTION AND BACKGROUND Article 2 of the Treaty establishing the

More information

Programme Manual. for coordination of macro-regional cooperation (specific-objective 4.2) for the period 2014 to 2020

Programme Manual. for coordination of macro-regional cooperation (specific-objective 4.2) for the period 2014 to 2020 Programme Manual for coordination of macro-regional cooperation (specific-objective 4.2) for the period 2014 to 2020 version 1.0, approved by the Monitoring Committee on 26 February 2015 edited by the

More information

Temporary tax-exempt use of a vehicle in Finland

Temporary tax-exempt use of a vehicle in Finland Car Taxation Customer Bulletin No. 5 Temporary tax-exempt use of a vehicle in Finland www.tulli.fi 1 January 2015 Replaces the August 2014 bulletin Temporary tax-exempt use of a vehicle in Finland Temporary

More information

Model Grant Agreement

Model Grant Agreement HORIZON HORIZON 2020 2020 Model Grant Agreement Horizon 2020 model Grant Agreement: Objectives Simplification Provisions Wording Flexibility To accommodate particularities Coherence Within H2020 and with

More information

Scandinavian Airlines (SAS) Regulations of the SAS Credits Program

Scandinavian Airlines (SAS) Regulations of the SAS Credits Program Scandinavian Airlines (SAS) Regulations of the SAS Credits Program 1 1. Part One. Regulations of the SAS Credits Program.... 3 1.1 The Content and Scope of the Regulations.... 3 1.2 General Information

More information

Asylum, Migration and Integration Fund and Internal Security Fund 2014 2020. Eligibility Rules

Asylum, Migration and Integration Fund and Internal Security Fund 2014 2020. Eligibility Rules Asylum, Migration and Integration Fund and Internal Security Fund 2014 2020 Eligibility Rules Version 1 June 2015 Asylum, Migration and Integration Fund Internal Security Fund 2014-2020 Sustainable Management

More information

SEPA - Frequently Asked Questions

SEPA - Frequently Asked Questions SEPA - Frequently Asked Questions Contents SEPA Overview Questions... 2 What is SEPA?... 2 What is the aim of SEPA?... 3 Where did SEPA come from?... 3 What countries are included in SEPA?... 3 What currencies

More information

The education system and lifelong learning in Finland. October 2015 Petri Haltia

The education system and lifelong learning in Finland. October 2015 Petri Haltia The education system and lifelong learning in Finland October 2015 Petri Haltia FINLAND Population: year 2012: 5,421,827 density: 16/km 2 Area: total 338,424 km 2 water 10 % GDP (nominal) 2011 estimate:

More information

European Social Fund Programme for England 2014-2020. National Eligibility Rules

European Social Fund Programme for England 2014-2020. National Eligibility Rules European Social Fund Programme for England 2014-2020 National Eligibility Rules March 2016 CONTENTS 1. PURPOSE... 3 2. INTRODUCTION... 3 3. SPECIFIC RULES EUROPEAN UNION REGULATIONS... 4 4. PARTICIPANT

More information

Frequently Asked Questions Outline Proposal DIAL

Frequently Asked Questions Outline Proposal DIAL Frequently Asked Questions Outline Proposal DIAL Last updated on 11 January 2016, version 1.0 Please note that this document will be up-dated regularly. If your question is not answered here, please contact

More information

DECISION No 120/2014. on the implementing provisions for Regulations No 3/2014, No 4/2014 and No 5/2014 of the Committee of the Regions

DECISION No 120/2014. on the implementing provisions for Regulations No 3/2014, No 4/2014 and No 5/2014 of the Committee of the Regions DECISION No 120/2014 on the implementing provisions for Regulations No 3/2014, No 4/2014 and No 5/2014 of the Committee of the Regions THE SECRETARY-GENERAL, HAVING REGARD TO HAVING REGARD TO HAVING REGARD

More information

INFORMATION SESSION ON THE PART TIME REGULATIONS. ORGANISED BY THE MALTA EMPLOYERS ASSOCIATION 5 th October 2007

INFORMATION SESSION ON THE PART TIME REGULATIONS. ORGANISED BY THE MALTA EMPLOYERS ASSOCIATION 5 th October 2007 INFORMATION SESSION ON THE PART TIME REGULATIONS ORGANISED BY THE MALTA EMPLOYERS ASSOCIATION 5 th October 2007 The EU Directive 97/81EC regulating part time employment was adopted by Council on the 15

More information

control and audit guidelines Version 2.1

control and audit guidelines Version 2.1 control and audit guidelines European Territorial Cooperation 2007 2013 TABLE OF CONTENTS 1. INTRODUCTION... 3 1.1. TERMINOLOGY... 4 1.2. REGULATORY FRAMEWORK... 5 1.3. THE DIFFERENT CONTROL LEVELS...

More information

Fiche N /File Nr 1 : COM-Mob p. - 1 -

Fiche N /File Nr 1 : COM-Mob p. - 1 - Programme Subprogramme Action Category Action Objectives and description of the action LIFELONG LEARNING COMENIUS MOBILITY COMENIUS Preparatory Visits The objective of the action is to help any institution

More information

The Marie Curie Actions FP7 Financial Guidelines.

The Marie Curie Actions FP7 Financial Guidelines. The Marie Curie Actions FP7 Financial Guidelines. SPECIFIC PROVISIONS RELATED TO MARIE CURIE ACTIONS FINANCED UNDER THE FP7 "PEOPLE" PROGRAMME Part 1: projects funded in the 2007-2010 Work Programmes calls

More information

2015 Call Key Action 3 Start Up Seminar Birmingham, 10 September 2015

2015 Call Key Action 3 Start Up Seminar Birmingham, 10 September 2015 2015 Call Key Action 3 Start Up Seminar Birmingham, 10 September 2015 Erasmus+ is the European Union programme for education, training, youth and sport. The Erasmus+ UK National Agency is a partnership

More information

Evaluation of Nordplus

Evaluation of Nordplus Evaluation of Nordplus Evaluation of Nordplus Göran Melin, Miriam Terrell and Karolina Henningsson TemaNord 2015:573 Evaluation of Nordplus Göran Melin, Miriam Terrell and Karolina Henningsson ISBN

More information

Your occupational pension with Alecta

Your occupational pension with Alecta 1311:01 2011.04 Illustration Agnes Miski Török Foto Björn Keller Produktion Alecta d e f i n e d b e n e f i t p e n s i o n, i t p 2 Your occupational pension with Alecta The information in this brochure

More information

European Commission: sources of funding & modalities. Kaliningrad NCD 3rd Flagship Project Planning Meeting

European Commission: sources of funding & modalities. Kaliningrad NCD 3rd Flagship Project Planning Meeting European Commission: sources of funding & modalities Kaliningrad NCD 3rd Flagship Project Planning Meeting J.Bertrand Objectives Selection Introduction Modalities Funding Strategy Disclaimer The aim and

More information

Introduction to expenses One of the most common questions we get asked is what expenses can I claim through my limited company?

Introduction to expenses One of the most common questions we get asked is what expenses can I claim through my limited company? Guide to Expenses Introduction to expenses One of the most common questions we get asked is what expenses can I claim through my limited company? A limited company is not a panacea for claiming in all

More information

INTERNAL RULES ON TRAINEESHIPS IN THE SECRETARIAT OF THE EPP GROUP IN THE EUROPEAN PARLIAMENT

INTERNAL RULES ON TRAINEESHIPS IN THE SECRETARIAT OF THE EPP GROUP IN THE EUROPEAN PARLIAMENT INTERNAL RULES ON TRAINEESHIPS IN THE SECRETARIAT OF THE EPP GROUP IN THE EUROPEAN PARLIAMENT Table of Contents Article 1: General provisions... 3 Article 2: Types of traineeships... 3 Article 3: Conditions

More information

Social outcomes. Skills and social well-being. Nordic PIAAC Conference Copenhagen 21-22 May 2015

Social outcomes. Skills and social well-being. Nordic PIAAC Conference Copenhagen 21-22 May 2015 Social outcomes Skills and social well-being Nordic PIAAC Conference Copenhagen 21-22 May 2015 Torben Fridberg The Danish National Centre for Social Research www.sfi.dk 1 OECD PIAAC: Four dimensions of

More information

Address Institutionen Biblioteks- och Informationsvetenskap/Bibliotekshögskolan Postal code City Country 50190 Borås Sweden

Address Institutionen Biblioteks- och Informationsvetenskap/Bibliotekshögskolan Postal code City Country 50190 Borås Sweden Application Applicants Institution Institution name HÖGSKOLAN I BORÅS Institution type University Address Institutionen Biblioteks- och Informationsvetenskap/Bibliotekshögskolan Postal code City Country

More information

Membership handbook 2012 A guide to internal procedures (excerpt)

Membership handbook 2012 A guide to internal procedures (excerpt) Membership handbook 2012 A guide to internal procedures (excerpt) Equinet the European network of equality bodies With the support of the European Commission Contents 1. Introduction 1.1 Vision 3 1.3 Structure

More information

The International Office 2009/2010. Study Abroad ESBJERG FLENSBORG KOLDING SØNDERBORG WWW.SDU.DK UNIVERSITY OF SOUTHERN DENMARK

The International Office 2009/2010. Study Abroad ESBJERG FLENSBORG KOLDING SØNDERBORG WWW.SDU.DK UNIVERSITY OF SOUTHERN DENMARK The International Office 2009/2010 Study Abroad ESBJERG FLENSBORG KOLDING SØNDERBORG WWW.SDU.DK UNIVERSITY OF SOUTHERN DENMARK INTRODUCTION The International Office (part of Student Services ) in Esbjerg

More information

DATE APPROVED June 2002

DATE APPROVED June 2002 Page 1 of 9 APPROVED (S) REVISED / REVIEWED SUMMARY Version Date Comments / Changes 1.0 Initial Policy Released 2.0 February 2003 Revised 3.0 September 2003 Revised 4.0 August 2004 Revised 5.0 January

More information

R&D Fund Reference Document. Supporting market-led innovation in manufacturing and internationally traded services companies.

R&D Fund Reference Document. Supporting market-led innovation in manufacturing and internationally traded services companies. R&D Fund Reference Document Supporting market-led innovation in manufacturing and internationally traded services companies. Revision date: 28th April 2016 http://www.enterprise-ireland.com/randd 1 Reference

More information

EUROPEAN COMMISSION Directorate-General for Internal Market, Industry, Entrepreneurship and SMEs. Innovation and Advanced Manufacturing Director

EUROPEAN COMMISSION Directorate-General for Internal Market, Industry, Entrepreneurship and SMEs. Innovation and Advanced Manufacturing Director EUROPEAN COMMISSION Directorate-General for Internal Market, Industry, Entrepreneurship and SMEs Innovation and Advanced Manufacturing Director CALL FOR PROPOSALS Business transfers to employees creating

More information

Single Euro Payments Area

Single Euro Payments Area Single Euro Payments Area Overview SEPA (Single Euro Payments Area) is a European payments initiative which aims to create one single, integrated, standardised payments market in Europe. It is an area

More information

ADMINISTRATIVE PROCEDURE

ADMINISTRATIVE PROCEDURE ADMINISTRATIVE PROCEDURE ADMINISTRATIVE PROCEDURE NO: AP 611.01 RELATED TO POLICY NO. 611 BUSINESS & TRAVEL TITLE: BUSINESS & TRAVEL EXPENSE Purpose and Introduction This procedure sets forth the requirement

More information

The South African Council for the Project and Construction Management Professions (SACPCMP)

The South African Council for the Project and Construction Management Professions (SACPCMP) The South African Council for the Project and Construction Management Professions (SACPCMP) Registration Rules for Professional Construction Mentors in terms of Section 18(1) (c) of the Act, 2000 (Act

More information

Horizon 2020 Energy Calls Project Types and Funding Levels. 1. Types of Funding Actions why do I need to know this?

Horizon 2020 Energy Calls Project Types and Funding Levels. 1. Types of Funding Actions why do I need to know this? Horizon 2020 Energy Calls Project Types and Funding Levels This document sets out the types of activity that will be funded under Horizon 2020. In the Energy Work Programme there are five types of projects,

More information

ABA Section of International Law 2006 Spring Meeting 5 8 April 2006, New York

ABA Section of International Law 2006 Spring Meeting 5 8 April 2006, New York ABA Section of International Law 2006 Spring Meeting 5 8 April 2006, New York CROSS-BORDER EMPLOYMENT AND GLOBAL MOBILITY ISSUES IN EUROPE AND LATIN AMERICA: A CLOSER LOOK AT INTERNATIONAL ASSIGNMENTS

More information

Higher Education studies in Sweden

Higher Education studies in Sweden Higher Education studies in Sweden HIGHER EDUCATION STUDIES IN SWEDEN Published by Swedish Council for Higher Education 2014, Hylte tryck PHOTO: Erik Lundback (cover, p. 5, 6, 11, 13) Eva Dalin (p. 8-9,

More information

Administration and Finances under H2020 in MSCA Helsinki 21/4/2015

Administration and Finances under H2020 in MSCA Helsinki 21/4/2015 Administration and Finances under H2020 in MSCA Helsinki 21/4/2015 Marcela Groholova Research Executive Agency Overview 1. EU contribution 2. Eligible costs 3. Cost categories 4. Parental and maternity

More information

Linguistic minority children and young people at school in their parents country of origin

Linguistic minority children and young people at school in their parents country of origin Norwegian Directorate for Education and Training Guidelines 2007 To parents, teachers, consultants and managers in schools and kindergartens Linguistic minority children and young people at school in their

More information

CREATIVE EUROPE. MEDIA Sub-programme SUPPORT FOR TRAINING GUIDELINES -1-

CREATIVE EUROPE. MEDIA Sub-programme SUPPORT FOR TRAINING GUIDELINES -1- CREATIVE EUROPE MEDIA Sub-programme SUPPORT FOR TRAINING GUIDELINES -1- TABLE OF CONTENTS 1. INTRODUCTION 2. OBJECTIVES - PRIORITIES 2.1. Objectives and Priorities 2.2. Targeted Projects 3. TIMETABLE 4.

More information

2014-2020 CENTRAL BALTIC PROGRAMME

2014-2020 CENTRAL BALTIC PROGRAMME CENTRAL BALTIC PROGRAMME 2014-2020 EU-rahoitus aluekehityksen tukena / Pori 5.6.2014 Linda Talve, viestintävastaava, Central Baltic -ohjelma / Varsinais-Suomen liitto INDICATIVE TIMETABLE 2013 2014 April

More information

skatteetaten.no Information for foreign employees The tax return 2015

skatteetaten.no Information for foreign employees The tax return 2015 skatteetaten.no Information for foreign employees The tax return 2015 This brochure contains a highly simplified explanation of the items in the tax return that are most relevant to foreign employees staying

More information

GUIDE TO STUDENTSHIP ELIGIBILITY

GUIDE TO STUDENTSHIP ELIGIBILITY BBSRC GUIDE TO STUDENTSHIP ELIGIBILITY 1. General Information 2. Residence Criteria 3. Qualifications Criteria 4. Enquiries Issued February 2005 (revised October 2015) BBSRC GUIDE TO STUDENTSHIP ELIGIBILITY

More information

H2020 Model Grant Agreement for Lump sum grants (H2020 MGA Lump sum Multi)

H2020 Model Grant Agreement for Lump sum grants (H2020 MGA Lump sum Multi) H2020 Model Grant Agreement for Lump sum grants (H2020 MGA Lump sum Multi) Version 1.0 9 June 2015 HISTORY OF CHANGES Version Publication date Changes 1.0 09.06.2015 Initial version 1 EUROPEAN COMMISSION

More information

Facilitating transnational low season tourism exchanges in Europe encouraging Senior Citizens to travel 75/G/ENT/CIP/13/B/N03S01

Facilitating transnational low season tourism exchanges in Europe encouraging Senior Citizens to travel 75/G/ENT/CIP/13/B/N03S01 EUROPEAN COMMISSION Enterprise and Industry Directorate E : Service Industries E1 Tourism Policy CALL FOR PROPOSALS Facilitating transnational low season tourism exchanges in Europe encouraging Senior

More information

Nordea Bank AB Lithuania branch Price List for corporate customers Valid from 1 st of September, 2016. Contents

Nordea Bank AB Lithuania branch Price List for corporate customers Valid from 1 st of September, 2016. Contents Contents DAILY BANKING... 2 BANK ACCOUNTS...2 ELECTRONIC SERVICES...2 Nordea Electronic Banking... 2 Nordea Internetbank for... 2 Package of daily banking services for corporate... 2 Web Service channel...

More information

GUIDANCE NOTE 1.5.2 Cost Control: Price Variation Clauses

GUIDANCE NOTE 1.5.2 Cost Control: Price Variation Clauses GUIDANCE NOTE 1.5.2 Cost Control: Price Variation Clauses Office of Government Procurement Cost Control: Price Variation Clauses Document Reference GN 1.5.2 v1.0 22 January 2016 2016 Department of Public

More information

PROCUREMENT GUIDELINES FOR PROJECTS FINANCED BY THE NORDIC INVESTMENT BANK

PROCUREMENT GUIDELINES FOR PROJECTS FINANCED BY THE NORDIC INVESTMENT BANK Adopted by the Board of Directors on 1 September 2011 with entry into force as of 20 September 2011 PROCUREMENT GUIDELINES FOR PROJECTS FINANCED BY THE NORDIC INVESTMENT BANK Contents Definitions... 1

More information

DEFLECT Project Expert Conference

DEFLECT Project Expert Conference Forced Labour Exploitation and Counter Trafficking in the Baltic Sea Region DEFLECT Project Expert Conference Holmenkollen Park Hotel Rica, Oslo, 7 8 June 2011 Invitation The Council of the Baltic Sea

More information

VAT guide should I register for VAT?

VAT guide should I register for VAT? VAT guide should I register for VAT? associates ltd Should I register for VAT? This guide will give you an understanding as to whether you should register, what the various schemes are for small businesses

More information

RULES FOR PARTICIPATION IN THE IMI JU COLLABORATIVE PROJECTS

RULES FOR PARTICIPATION IN THE IMI JU COLLABORATIVE PROJECTS Innovative Medicines Initiative IMI-GB-DEC-2012-12 RULES FOR PARTICIPATION IN THE IMI JU COLLABORATIVE PROJECTS OUTLINE 1. Definitions 2. Participation in an IMI JU collaborative project 2.1 General provisions

More information