HYDRO DECK HYDRO DECK OVERVIEW

Size: px
Start display at page:

Download "HYDRO DECK HYDRO DECK OVERVIEW"

Transcription

1 HYDRO DECK

2 HYDRO DECK Combining the very best in engineering design, mooring analysis and high-end fabrication, AG&P ALE Ventures Pty Ltd delivers an innovative solution to the offshore market to solve major logistical challenges and remove supply chain bottlenecks. The first of its kind, the Hydro Deck has been designed and built through the joint venture between AG&P, a leader in integrated industrial process outsourcing and ALE, one of the world s leading engineering and heavy lift companies. The Hydro Deck is a transition pontoon that works in conjunction with modular offloading facilities (MOF) for on-shoring modules and infrastructure. Its innovative design enables load-in operations for combined loads of up to 17,000 metric tonnes, regardless of tidal conditions or port facilities. HYDRO DECK CONTROL ROOM HYDRO DECK OVERVIEW A mobile port solution, designed to serve as a bridging platform from vessel to quayside, the Hydro Deck is utilised for global projects faced with restricted offloading delivery windows due to unpredictable high tidal variations and where local port facilities are limited by scale or capability for a project s specifications. The Hydro Deck transports and offloads fabricated modules in adverse conditions, significantly increasing the availability of delivery windows. Its unique tidal buoyancy adjustment system provides clients with a greater range of ro-ro vessels and barges, improving both availability and cost competitiveness. This feature also allows the MOF to be built at higher elevations, therefore reducing the gradient to site. The landmark innovation can be provided on lease, fully crewed with expert heavy lift operators, and, on completion of the load-in phase, it can be towed away, reducing upfront capital expenditure and environmental footprint. The Hydro Deck offers our clients continuous offloading anywhere in the world, 24/7. ON BOARD SYSTEMS: 2.1 Ballast System 2.2 Air Ballast System 2.3 Ballast Stripping System 2.4 Hydraulic Valve System 2.5 Cooling Water System 2.6 Fuel Oil System 2.7 Lubricating & Hydraulic Oil Systems 2.8 Bilge Systems 2.9 Deaeration System 2.10 Fresh Water System 2.11 Sewage System 2.12 Hydraulic Mooring system 2.13 Hydraulic Ro-Ro Ramp system 2.13 Ventilation & Air Conditioning System ELECTRICAL SYSTEMS: 3.1 Power Generation 3.2 Main Switchboard, Control & Power Distribution 3.3 Main & Emergency Lighting System 3.4 AMS Control, Alarm & Monitoring System 3.5 Impressed Current Protection System 3.6 Navigation Aids System 3.7 Communications System 3.8 CCTV System SAFETY SYSTEMS: 5.1 Fire Hydrant System 5.2 CO 2 Fire Extinguishing System 5.3 Quick-Closing Valve System, Ventilation Dampers & Emergency Stops 5.4 Fire Detection System 5.5 Fire Integrity Plan

3 HYDRO DECK SAFETY ADVANTAGES TIDE INDEPENDENT UNLOADING SOLUTION - The Hydro Deck provides a tide independent unloading solution. In the event there are problems during the ro-ro operations and the SPMT is partly on the ship or quay, the Hydro Deck can pump through the tide cycle allowing for a maximum safe situation for the problems to be rectified without compromising the operation. INTERNAL BALLAST SYSTEM - The internal ballast system has been designed with 100% redundancy. The deck of the Hydro Deck is clear of pumps, hoses and piping for flexible SPMT configurations and support stool locations. Internal ballast systems are far more reliable than external ballast systems because they are protected from the elements and permanently located, maintained and tested on regulated intervals inside the barge. External ballast systems need assembly, testing and disassembly time for each operation and are susceptible to failure due to the exposure to the elements. FIXED RAMP SYSTEM ON EACH END The ramp system has been designed for the maximum axle loads of the strongest SPMTs on the market to provide the safest possible ramp solution. Their hydraulic capability eliminates crane and/or forklift work, which are often the cause of an incident during a ro-ro operation. This feature also limits the exposure of the field personnel to the elements by eliminating tasks. HYDRO DECK GENERATORS 6X CATERPILLAR C18 480kW HYDRO DECK BALLAST PUMPS 12x AZCUE 2000m3/hour WATER BALLAST SYSTEM CONTROLS

4 HYDRO DECK COMMERCIAL ADVANTAGES HYDRO DECK AIRCOMPRESSOR UNITS 3X ATLAS COPCO ZA5 4000m 3 /hour CAPABILITY - 24 hours per day, 7 days per week, which can drastically improve the overall project schedule. Most of the Heavy Lift Vessels (HLV) are tide dependent, limiting unloading to 5-6 hours per day, sometimes only certain days of the month. The Hydro Deck eliminates the risk of costly demurrage costs and allows the HLV to focus on its role going back to the fabrication yard for another load of modules. INCREASE IN COMPETITION - The Hydro Deck makes any HLV suitable for the job. Not many HLV s are capable of compensating for these tides and their value to the project without the Hydro Deck will be at premium rates. EXTRA STORAGE AREA - The Hydro Deck provides 5600m 2 of storage space on the deck of the barge to provide for the rapid unloading and release of the delivery vessel. This operation can take top priority to eliminate the risk of demurrage and provide the maximum output of the delivery vessel. DECK STRENGTH - The Hydro Deck has been designed for the delivery and staging of modules using support stools and SPMTs. With its 20t/m 2 uniform deck loading and the high strength of the bulkheads, rarely will additional load spreading be required to self unload a module more than a normal support stool positioned by a forklift. HYDRO DECK ENVIRONMENTAL ADVANTAGES The internal ballast system is a sealed solution that enables water to be transferred from tank to tank within the pontoon. This eliminates the need to ballast water in or out of the Hydro Deck when catering for load transfer. Tide compensation is achieved by utilising the air system. HYDRO DECK SERVICE TUNNEL The service tunnel is an underdeck walkway between the two pumprooms. Utilising two pumprooms and two control rooms means that the Hydro Deck has 100% redundancy as one can take over the whole operation in case of an emergency in the other.

5 Technical Specifications Type of vessel Build 2013 Class notation FLAG Ro-ro ramps Principal dimensions Draft minimum (empty) Ro-ro pontoon for use in extreme tidal waters Lloyd s Register, unmanned pontoon Singapore Hydraulic operated ro-ro ramps on bow and stern 140/40/12m 1.7/2.7m Draft maximum 11.1m Light weight Dead weight capacity 8500t 32000t Max deck load 20t/m 2 Ballast system Mooring system :12 x 2000m 3 /hour water pumps :3 x 4000m 3 /hour air compressors :2/60t winches :mooring cylinders HYDRO DECK AFT PUMPROOM Key 1 - Fuel Oil Day Tank 2 - Exhaust Silencer 3 - Main Generator 4 - Harbour Service Generator 5 - Air Ballast Compressor 6 - Starter Board Ballast Air Compressor (Aft) 7 - Hydraulic Oil Tank 8 - Plate Cooler 9 - Sea Water Pumps 10 - Fresh Water Tank 11 - Fuel Oil Overflow Tank 12 - Fuel Oil Bunker Tank 13 - Sea Chest 14 - Sea Strainer 15 - Sludge Tank 16 - Ballast Pump V Ballast and Starter Switchboard (Aft) 18 - Bilge Holding Tank 19 - Solenoid Box for Values 20 - Hydraulic Power Unit for Valves 21 - Sewage Tank 22 - Start Battery Cabinet 23 - Hydraulic Power Unit Mooring 24 - General 24V Supply Cabinet 25 - Control Room Switchboard 26 - Fuel Oil Transfer Pumps 27 - Hydrophore 28 - Bilge Pump 29 - Sewage Pump 30 - Fire Pump Certified to operate in Australian Territorial Waters Fabricated under DAFF Biosecurity requirements. Compliant with Australian AS 3000 and other design and use-of-materials rules. Designed and fabricated under Lloyd s Register Class certification to the highest safety and quality standards. AG&P ALE Ventures offer the Hydro Deck and its team of specialists as part of the full service solution available to clients worldwide. Contact details: Derek Thomas derek.thomas@agp.ph James Dunn j.dunn@ale-heavylift.com HYDRO DECK FWD PUMPROOM Key 1 - Fuel Oil Day Tank 2 - Exhaust Silencer 3 - Main Generator 4 - Air Ballast Compressor 5 - Starter Board Ballast Air Compressor (Forward) 6 - Plate Cooler 7 - Sea Water Pump 8 - Hydraulic Power Unit for Vales 9 - Solenoid Box for Valves 10 - Ballast Pump V Ballast and Starter Switchboard (Forward) 12 - Sea Strainer 13 - Sea Chest 14 - Sludge Tank 15 - Bilge Holding Tank 16 - Start Battery Cabinet 17 - Hydraulic Power Unit Mooring 18 - General 24V Supply Cabinet 19 - Control Room Switchboard 20 - Bilge Pump and Oily Bilge Pump 21 - Fire Pump V/230V Transformer 23 - Fresh Water Cooling Pumps

Competency Framework for Marine Engineer Class 6. Competency Framework for Marine Engineer Class 6

Competency Framework for Marine Engineer Class 6. Competency Framework for Marine Engineer Class 6 Table of Contents (MEC 6)... 1 Function: Operate Vessel Machinery and Systems... 1 Diesel engines.... 1 Operational procedures.... 3 Operate and monitor a vessel s engines and auxiliary equipment.... 4

More information

Floating. Diesel power stations

Floating. Diesel power stations Floating Diesel power stations MAN Diesel & Turbo The responsible way in leading technology MAN Diesel & Turbo is the world s leading designer and manufacturer of low and medium speed engines. Our involvement

More information

Part 0 - Classification and Surveys Classification and Surveys I-0 2016-01

Part 0 - Classification and Surveys Classification and Surveys I-0 2016-01 Code Edition I - Ship Technology Part 0 - Classification and Surveys Classification and Surveys I-0 2016-01 Part 1 - Seagoing Ships Chapter 1 - Hull Structures I-1-1 2016-01 Chapter 1 - Hull Structures

More information

ATL 10.2 R/V ATLANTIS MAINTENANCE OF CRITICAL SYSTEMS

ATL 10.2 R/V ATLANTIS MAINTENANCE OF CRITICAL SYSTEMS 1. Purpose The purpose of this procedure is to set forth the identity and procedures associated with the critical systems and equipment to ensure their reliability on R/V Atlantis. 2. Reference Safety

More information

PROJECT CARGO RISK MANAGEMENT

PROJECT CARGO RISK MANAGEMENT Loss Prevention Bulletin - AVA/2013/0007 June 10, 2013 PROJECT CARGO RISK MANAGEMENT AVA MARINE GROUP INC Member: AIMU - CMBU - MIABC Head Office: World Trade Center Suite 404 999 Canada Place Vancouver

More information

ST. VINCENT AND THE GRENADINES

ST. VINCENT AND THE GRENADINES ST. VINCENT AND THE GRENADINES MARITIME ADMINISTRATION CIRCULAR N POL 008 - Rev 1 MARPOL ANNEX I OIL RESIDUE (SLUDGE) AMENDMENTS - MEPC 59 TO: SHIPOWNERS, SHIPS OPERATORS AND MANAGERS, MASTERS APPLICABLE

More information

M/V TAMARITA/FERMITA/ ROSITA/FAVORITA

M/V TAMARITA/FERMITA/ ROSITA/FAVORITA M/V TAMARITA/FERMITA/ ROSITA/FAVORITA OWNER: OPERATOR: BUILT BY: YEAR BUILT: UGLAND SHIPPING AS FLAG: NORWEGIAN (NIS REGISTER) PORT OF REGISTRY: GRIMSTAD CALL SIGNS: LADV6 / LACV6 / LACB6 / LAGM6 UGLAND

More information

Technical Bulletin. Oil Record Book entries: Machinery space operations (Part 1) Including January 2011 amendments to Technical Bulletin 24

Technical Bulletin. Oil Record Book entries: Machinery space operations (Part 1) Including January 2011 amendments to Technical Bulletin 24 UK P&I CLUB Technical Bulletin NUMBER 35 2011 (revised from Bulletin 24) Oil Record Book entries: Machinery space operations (Part 1) Including January 2011 amendments to Technical Bulletin 24 The Club

More information

GOLIATH DPIII OFFSHORE SUPPORT VESSEL. Vessel Specification - December 2011

GOLIATH DPIII OFFSHORE SUPPORT VESSEL. Vessel Specification - December 2011 Vessel Specification - December 2011 GOLIATH DPIII OFFSHORE SUPPORT VESSEL This technical specification sheet is subject to change without notice.whilst every effort has been made to ensure that accuracy

More information

GAS FLAWLESS - FORM C

GAS FLAWLESS - FORM C DESCRIPTION OF THE VESSEL 1. GENERAL 1.1 Builder and Yard HIGAKI S/Y Hull No. H/N 595 1.2 Year built 2007 1.3 Flag MALTA 1.4 Signal Letters and Normal Station Watched 9HVB8 1.5 Classification Lloyds 1.6

More information

Fourth Generation Modular Construction

Fourth Generation Modular Construction Allianz Global Corporate & Specialty Fourth Generation Modular Construction Marine Insurance Challenges: A technical report. 1 2 3 4 Foreword by Ron Johnson Modular Construction Trends Challenges and common

More information

Heat Recovery Dehumidification (HRD) system. Designed for municipal swimming pools

Heat Recovery Dehumidification (HRD) system. Designed for municipal swimming pools Heat Recovery Dehumidification (HRD) system Designed for municipal swimming pools A dehumidification and ventilation system with dynamic heat pump heat recovery to swimming pool water and air ENVIRONMENTAL

More information

Former Station 12 and SpecTec. SFI Group System. Product Description

Former Station 12 and SpecTec. SFI Group System. Product Description Former Station 12 and SpecTec SFI Group System Product Description Version 05-2001 Table of Contents 1. INTRODUCTION 2 2. BACKGROUND, PURPOSE & ADVANTAGES 2 2.1 Background 2 2.2 Purpose & Advantages 2

More information

VESSEL S TECHNICAL SPECIFICATION

VESSEL S TECHNICAL SPECIFICATION 1 VESSEL S TECHNICAL SPECIFICATION 1 General 1.1 Vessel name NOS ARIES 1.2 Vessel previous names New building 1.3 Flag Italy 1.4 Port of Registry Genoa R.I. 199 1.5 Builder Yuexin Ocean Engineering Co.

More information

Roadmap for Remote Controlled Ships

Roadmap for Remote Controlled Ships Roadmap for Remote Controlled Ships Esa Jokioinen, Head of Blue Ocean Team, E&T, Marine MUNIN Workshop Professional Insight on Unmanned Ships Norshipping, 3.6.2015 2015 Rolls-Royce plc The information

More information

OFFSHORE WIND Peter Robert

OFFSHORE WIND Peter Robert OFFSHORE WIND Peter Robert Business Development Manager Offshore Wind Damen Shipyards Group Phone: +31 (0)183 655177 Mobile: +31 (0)6 22856004 E-mail: peter.robert@damen.com ABOUT DAMEN FOUNDER: KOMMER

More information

AMOS SFI. Group System. Product Description

AMOS SFI. Group System. Product Description AMOS SFI Group System Product Description 1. INTRODUCTION 1 2. BACKGROUND, PURPOSE AND ADVANTAGES 1 2.1 Background 1 2.2 Purpose and Advantages 1 2.3 Scope 2 3. THE PROBLEMS SFI CAN SOLVE 2 3.1 Controlling

More information

Our recent customers Siemens / Statoil and Bard Offshore have experienced this. References on request.

Our recent customers Siemens / Statoil and Bard Offshore have experienced this. References on request. SweOffshore Fabriksgatan 10 SE-412 50 Gothenburg, Sweden +46(0)31 788 78 00 commercial@sweoffshore.com www.sweoffshore.com SweOffshore Accommodation concept, Supporting our Customers in achieving the most

More information

UNDERWATER ENGINEERING SERVICES. Visit Us Online At www.uesltd.net Part of the ATR Group

UNDERWATER ENGINEERING SERVICES. Visit Us Online At www.uesltd.net Part of the ATR Group UNDERWATER ENGINEERING SERVICES Visit Us Online At www.uesltd.net Part of the ATR Group PART OF THE ATR GROUP Global Equipment Specialists THE ATR DIVISIONS At ATR, we believe we re the logical choice

More information

The Engine Department

The Engine Department The Engine Department The Engine Department of a cruise ship is part of the Marine Operations Division. Although the Engine Department team is primarily responsible for the safe and smooth operation of

More information

Building an LNG driven vessel. LNG developments at Meyer Werft Viking Grace 18_09_2013

Building an LNG driven vessel. LNG developments at Meyer Werft Viking Grace 18_09_2013 1 Building an LNG driven vessel LNG developments at Meyer Werft Viking Grace 18_09_2013 Berufsbildung 13.09.2013 2 Meyer Werft Papenburg MEYER WERFT is a company with tradition, which started operations

More information

Kobelco Extended Warranty Program. www.kobelco-europe.com

Kobelco Extended Warranty Program. www.kobelco-europe.com Kobelco Extended Warranty Program www.kobelco-europe.com Kobelco Extended Warranty is a convenient, value added way to give your Kobelco customers added security and peace of mind. Benefits of the Kobelco

More information

12 November 2008 *** I:\CIRC\MEPC\01\642.DOC INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR

12 November 2008 *** I:\CIRC\MEPC\01\642.DOC INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR Telephone: 020 7735 7611 Fax: 020 7587 3210 IMO E Ref. T5/1.01 MEPC.1/Circ.642 12 November 2008 2008 REVISED GUIDELINES FOR SYSTEMS

More information

Ambient Temperature Operation and Matching MAN B&W Two-stroke Engines

Ambient Temperature Operation and Matching MAN B&W Two-stroke Engines Ambient Temperature Operation and Matching MAN B&W Two-stroke Engines Content Introduction...5 Standard ambient matched engine...5 Operating at high seawater with standard matched engine...6 Non-standard

More information

Engine Room Console 6

Engine Room Console 6 PC Maritime Engine Room Console 6 Engine Room Console 6 (ERC6) is an engine room simulator with a single desktop hardware console which models a conventional, camshaft controlled low speed diesel main

More information

LNG BUNKERING LNG AS A SHIP S FUEL GREEN SHIP TECHNOLOGY, OSLO 23-MAR-2011. Carriers & Offshore Units. Jürgen Harperscheidt Sales Manager

LNG BUNKERING LNG AS A SHIP S FUEL GREEN SHIP TECHNOLOGY, OSLO 23-MAR-2011. Carriers & Offshore Units. Jürgen Harperscheidt Sales Manager LNG BUNKERING LNG AS A SHIP S FUEL GREEN SHIP TECHNOLOGY, OSLO 23-MAR-2011 Carriers & Offshore Units Jürgen Harperscheidt Sales Manager CONTENT TGE Company Profile Small LNG carriers as part of a bunkering

More information

LP News UK P&I CLUB. Introduction JANUARY 2009

LP News UK P&I CLUB. Introduction JANUARY 2009 UK P&I CLUB LP News JANUARY 2009 Guidelines for lay-up of ships Suggestions to help minimise P&I claims, including personal injury, wreck removal and pollution and other contamination of the local environment

More information

VESSEL SAFETY INSPECTION

VESSEL SAFETY INSPECTION VESSEL SAFETY INSPECTION 1 LNG TANKER INSPECTION One of the main concerns of gas operator is to ensure throughout the transportation and distribution network a safe and efficient service with strict respect

More information

Flex separation systems, S-separators 928 988

Flex separation systems, S-separators 928 988 Flex separation systems, S-separators 928 988 Cleaning systems for heavy fuel oils* Separator EPC 60 controller Change-over valve Water block Oil block including water transducer Flex system components

More information

AN INNOVATIVE SOLUTION FOR FIXED OFFSHORE LNG REGASIFICATION TERMINALS

AN INNOVATIVE SOLUTION FOR FIXED OFFSHORE LNG REGASIFICATION TERMINALS AN INNOVATIVE SOLUTION FOR FIXED OFFSHORE LNG REGASIFICATION TERMINALS Augusto Bulte Project Manager Foster Wheeler C/Gabriel García Márquez 2 Las Rozas 28232 Madrid (Spain) ABSTRACT Several developments

More information

The Dalian Developer A new approach to oil spill response

The Dalian Developer A new approach to oil spill response The Dalian Developer A new approach to oil spill response Presenter: Jim O Sullivan, Vice President Technip USA National Ocean Industries Association Scottsdale, Arizona, October 18, 2012 Contents Introduction

More information

Regulation of 15 September 1992 No. 693 concerning the Form and Keeping of Log Books for Ships and Mobile Offshore Units

Regulation of 15 September 1992 No. 693 concerning the Form and Keeping of Log Books for Ships and Mobile Offshore Units Regulation of 15 September 1992 No. 693 concerning the Form and Keeping of Log Books for Ships and Mobile Offshore Units Laid down by the Norwegian Maritime Directorate on 15 September 1992 pursuant to

More information

About us. Remontowa reliability, quality & experience At Your Service. Worldwide

About us. Remontowa reliability, quality & experience At Your Service. Worldwide About us COMPANY KEY DATA Company established in November 2003 Employment 70 persons. 12 service engineers, IT specialists y Quality management system complaisant with ISO 9001:2000 y OHSAS 18001:2007

More information

Multipurpose Offshore Construction Vessel

Multipurpose Offshore Construction Vessel General The Vuyk Versatile Vessel (VVV) is developed by Vuyk Engineering Rotterda to anticipate on the future deand of the offshore arket. To serve the offshore industry, the vessel can be fitted with

More information

Data Realty Colocation Data Center Ignition Park, South Bend, IN. Owner: Data Realty Engineer: ESD Architect: BSA LifeStructures

Data Realty Colocation Data Center Ignition Park, South Bend, IN. Owner: Data Realty Engineer: ESD Architect: BSA LifeStructures Data Realty Colocation Data Center Ignition Park, South Bend, IN Owner: Data Realty Engineer: ESD Architect: BSA LifeStructures Project Overview Data Realty is a data center service provider for middle

More information

Flood Rescue Emergency Services First Responders Coast Guard Police

Flood Rescue Emergency Services First Responders Coast Guard Police RESCUE RESCUE RESCUE Flood Rescue Emergency Services First Responders Coast Guard Police Sealegs amphibious marine craft give rescue and patrol organizations unique multi-role capabilities which cannot

More information

SPAR s Estimating Cost Models

SPAR s Estimating Cost Models SPAR s Estimating Cost Models The SPAR Cost Models are pre-developed cost models of specific hull forms and are organized with generic CERs already installed and ready to use. These cost models can be

More information

Spare Parts Program. Parts, Consumables & Accessories. 800.837.9711 superproductsllc.com

Spare Parts Program. Parts, Consumables & Accessories. 800.837.9711 superproductsllc.com Spare Parts Program Parts, Consumables & Accessories TABLE OF CONTENTS Program Introduction 3 Body 4 5 Boom 5 6 Hydraulic 6 Lights & Accessories 7 Tubes, Nozzles & Hose Fittings 8 11 Vacuum 11 Water 12

More information

IMO WORK PROGRAMME OF THE COMMITTEE AND SUBSIDIARY BODIES

IMO WORK PROGRAMME OF THE COMMITTEE AND SUBSIDIARY BODIES INTERNATIONAL MARITIME ORGANIZATION E IMO MARINE ENVIRONMENT PROTECTION COMMITTEE 51st session Agenda item 20 MEPC 51/INF.6 23 January 2004 ENGLISH ONLY WORK PROGRAMME OF THE COMMITTEE AND SUBSIDIARY BODIES

More information

INDUSTRIAL DIRECT DRIVEN PISTON COMPRESSORS CL - CH - CK

INDUSTRIAL DIRECT DRIVEN PISTON COMPRESSORS CL - CH - CK INDUSTRIAL DIRECT DRIVEN PISTON COMPRESSORS CL - CH - CK CL - CH - CK Direct driven solution for industry Proven technology, solid construction The CL - CH - CK units are directly driven air-cooled, single

More information

LEISTRITZ PUMPEN GMBH. Leistritz Screw Pumps & Systems. Cargo and Liquid Handling

LEISTRITZ PUMPEN GMBH. Leistritz Screw Pumps & Systems. Cargo and Liquid Handling LEISTRITZ PUMPEN GMBH Leistritz Screw Pumps & Systems Cargo and Liquid Handling Leistritz Screw Pumps and Systems Leistritz Pumpen GmbH Leistritz Pumpen GmbH with its headquarters in Nuremberg/Germany

More information

Taiwan s land area is about 36,000 square kilometers. 2/3 of the lands are mountains and slope lands with cultivated land rate only 22%.

Taiwan s land area is about 36,000 square kilometers. 2/3 of the lands are mountains and slope lands with cultivated land rate only 22%. OUTLINE 2 Taiwan s land area is about 36,000 square kilometers. 2/3 of the lands are mountains and slope lands with cultivated land rate only 22%. Taiwan, one of the primary agricultural importing countries

More information

MV EVITA. VS 485 PSV MK II - Platform Supply Vessel. Ugland Supplier AS OFFICE ADDRESS:

MV EVITA. VS 485 PSV MK II - Platform Supply Vessel. Ugland Supplier AS OFFICE ADDRESS: MV EVITA VS 485 PSV MK II - Platform Supply Vessel OWNER: OPERATOR: TECHNICAL MANAGER: OFFICE ADDRESS: Ugland Supplier AS Ugland Offshore AS Ugland Marine Services AS J.M. Uglands vei 20, N-4878 Grimstad,

More information

MERIAURA LTD >YOUR EXPERT IN MARINE TRANSPORTATION

MERIAURA LTD >YOUR EXPERT IN MARINE TRANSPORTATION Project References MERIAURA LTD >YOUR EXPERT IN MARINE TRANSPORTATION Meriaura Ltd is a Finnish shipping company specialising in demanding project cargo and transporting industrial bulk and raw materials.

More information

ANNEX 3. RESOLUTION MSC.339(91) (adopted on 30 November 2012) ADOPTION OF AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE)

ANNEX 3. RESOLUTION MSC.339(91) (adopted on 30 November 2012) ADOPTION OF AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) Annex 3, page 1 ANNEX 3 RESOLUTION MSC.339(91) (adopted on 30 November 2012) ADOPTION OF AMENDMENTS TO THE INTERNATIONAL CODE FOR FIRE SAFETY SYSTEMS (FSS CODE) THE MARITIME SAFETY COMMITTEE, RECALLING

More information

GUIDELINES FOR THE DRAINAGE OF FIRE-FIGHTING WATER FROM CLOSED VEHICLE AND RO-RO SPACES AND SPECIAL CATEGORY SPACES OF PASSENGER AND CARGO SHIPS

GUIDELINES FOR THE DRAINAGE OF FIRE-FIGHTING WATER FROM CLOSED VEHICLE AND RO-RO SPACES AND SPECIAL CATEGORY SPACES OF PASSENGER AND CARGO SHIPS INTERNATIONAL MARITIME ORGANIZATION 4 ALBERT EMBANKMENT LONDON SE1 7SR Telephone: 020 7735 7611 Fax: 020 7587 3210 IMO E Ref. T4/4.01 MSC.1/Circ.1320 11 June 2009 GUIDELINES FOR THE DRAINAGE OF FIRE-FIGHTING

More information

Exhaust Scrubbers. What you need to know. Move Forward with Confidence

Exhaust Scrubbers. What you need to know. Move Forward with Confidence Exhaust Scrubbers What you need to know Move Forward with Confidence Exhaust Scrubbers - What you need to know 1 What are the rules? From January 1, 2015 ships navigating in designated areas globally will

More information

Logistic solutions for the installation of offshore wind farms

Logistic solutions for the installation of offshore wind farms Presentation Logistic solutions for the installation of offshore wind farms Captain / Graduate Economist Andreas Wulf Agenda - German Offshore Projects - Situation today - Transportations - Installations

More information

Fee tariff for services of Port of Gdansk Authority SA

Fee tariff for services of Port of Gdansk Authority SA tariff for services of Port of Gdansk Authority SA This Tariff specifies port fees for use of port infrastructure, established and collected by Port of Gdansk Authority SA pursuant to the Act dated 20.12.1996

More information

LNG Storage and Fuel Gas Systems. LNG: Fuel for Shipping, London 15-Feb-2011. Carriers & Offshore Units. Jürgen Harperscheidt Sales Manager

LNG Storage and Fuel Gas Systems. LNG: Fuel for Shipping, London 15-Feb-2011. Carriers & Offshore Units. Jürgen Harperscheidt Sales Manager LNG Storage and Fuel Gas Systems LNG: Fuel for Shipping, London 15-Feb-2011 Carriers & Offshore Units Jürgen Harperscheidt Sales Manager CONTENT TGE Company Profile Small LNG carriers Bunkering LNG fuel

More information

Emergency Response Plan. at sea also valid in case of Flooding, where applicable

Emergency Response Plan. at sea also valid in case of Flooding, where applicable Plan 1. Grounding, Stranding at sea also valid in case of Flooding, where applicable 2. Application Shorebased Organisation All Ships prepared: approved: released: Revision 0 HLS Management 2006-11-24

More information

Engine Room Pressure Measurements onboard MT Suula

Engine Room Pressure Measurements onboard MT Suula JARI LAHTINEN KAI SAARINEN Engine Room Pressure Measurements onboard MT Suula VAASAN YLIOPISTON JULKAISUJA SELVITYKSIÄ JA RAPORTTEJA 162 VAASA 2010 III Contents 1 INTRODUCTION... 1 2 ENGINE ROOM VENTILATION...

More information

Course available 24/7 for up to six months from the date of purchase or until completion

Course available 24/7 for up to six months from the date of purchase or until completion SPED ONLINE COURSE TRAINING Piper BootCamp and Process Plant Layout BOTH Piper BootCamp and Process Plant Layout online courses contain: Approximately 25 hours of online videos Printable notes Links to

More information

Pump Controller Type ABS PC 441 Monitoring and/or Control of Pumps and Pumping Stations

Pump Controller Type ABS PC 441 Monitoring and/or Control of Pumps and Pumping Stations Pump Controller Type ABS PC 441 Monitoring and/or Control of Pumps and Pumping Stations 2 One Solution for Monitoring, Control or Both There are many ways to improve the efficiency and reliability of your

More information

Engineers at Liftech designed the structure of the first container crane and have designed and reviewed thousands of container cranes since.

Engineers at Liftech designed the structure of the first container crane and have designed and reviewed thousands of container cranes since. Engineers at Liftech designed the structure of the first container crane and have designed and reviewed thousands of container cranes since. Liftech is the structural review engineer of record for most

More information

Wynn s Extended Care

Wynn s Extended Care Wynn s Extended Care Every car deserves to receive the very best care... especially yours. How Do You Keep Your Reliable Transportation Reliable? Count on Wynn s Because Wynn s has been caring for cars

More information

Marine Generating Sets 3.7 to 50 kva

Marine Generating Sets 3.7 to 50 kva Marine Generating Sets 3.7 to 50 kva The Marine Engineer s Preference BetaSet - Standard Marine Generators Beta Marine has considerable experience from over twenty years of manufacturing marine generating

More information

maersksupplyservice.com S-TYPE ANCHOR HANDLING TUG SUPPLY VESSEL Visit our web site at: maersksupplyservice.com

maersksupplyservice.com S-TYPE ANCHOR HANDLING TUG SUPPLY VESSEL Visit our web site at: maersksupplyservice.com maersksupplyservice.com S-TYPE ANCHOR HANDLING TUG SPLY VESSEL Visit our web site at: maersksupplyservice.com Maersk Supply Service serves the offshore industry world wide with more than 60 vessels manned

More information

(2) Various fire sections enclosed by various classes of fire divisions; (3) Arrangement of fire detectors and manual fire alarm stations;

(2) Various fire sections enclosed by various classes of fire divisions; (3) Arrangement of fire detectors and manual fire alarm stations; (1979) (Rev.1 1990) (Rev.2 1996) (Rev.3 Jan 2012) Safety features.1 Fire protection and extinction.1.1 General Fire protection arrangements and fire extinguishing systems are to be in accordance with the

More information

Design methodology and numerical analysis of a cable ferry

Design methodology and numerical analysis of a cable ferry Design methodology and numerical analysis of a cable ferry SNAME Annual Meeting; Nov 6-8, 2013, Bellevue, WA Paper #T35 Author name(s): Dean M. Steinke (M)1, Ryan S. Nicoll1 (V), Tony Thompson2 (M), Bruce

More information

Lay-up of Vessels MARCH 2012. This chapter has been amended since the main revision (March 2012), most recently in April 2012. See Changes on page 3.

Lay-up of Vessels MARCH 2012. This chapter has been amended since the main revision (March 2012), most recently in April 2012. See Changes on page 3. GUIDELINES No. 22 Lay-up of Vessels MARCH 2012 This chapter has been amended since the main revision (March 2012), most recently in April 2012. See Changes on page 3. The electronic pdf version of this

More information

GUIDANCE ON DETENTION AND ACTION TAKEN

GUIDANCE ON DETENTION AND ACTION TAKEN 1. INTRODUCTION 1.1. General GUIDANCE ON DETENTION AND ACTION TAKEN If deficiencies are found the PSCO must: decide on the appropriate action to be taken. be satisfied that they will be rectified. decide

More information

DEPARTMENT OF TRANSPORTATION UNITED STATES COAST GUARD

DEPARTMENT OF TRANSPORTATION UNITED STATES COAST GUARD DEPARTMENT OF TRANSPORTATION UNITED STATES COAST GUARD NAVIGATION AND VESSEL INSPECTION CIRCULAR NO. 1-78 US. COAST GUARD (G-MVP-5/82) WASHINGTON. D.C. 20590 PHONE:(202) 426-2240 NVIC 1-78 Subj: Automation

More information

SIMON STEVIN. 24,350kw Diesel-Electric Propulsion 19,500m 3 Capacity of Rock Storage Dynamic Positioning System DP-2

SIMON STEVIN. 24,350kw Diesel-Electric Propulsion 19,500m 3 Capacity of Rock Storage Dynamic Positioning System DP-2 SIMON STEVIN The world s largest FALL PIPE & ROCK DUMPING Vessel 24,350kw Diesel-Electric Propulsion 19,500m 3 Capacity of Rock Storage Dynamic Positioning System DP-2 The world s largest fall pipe & rock

More information

How To Prevent Over Water Activities

How To Prevent Over Water Activities Objectives Cover Contain Educate Reduce/Minimize Product Substitution Description Over-water activities occur at boat and ship repair yards, marinas, and yacht clubs. The discharge of pollutants to receiving

More information

MARINE FIRE SAFETY POCKET CHECKLIST

MARINE FIRE SAFETY POCKET CHECKLIST MARINE FIRE SAFETY POCKET CHECKLIST Reducing the risk of Port State Control detentions In conjunction with: The Lloyd s Register Group is an independent risk management organisation that works to improve

More information

FOGA ApS. Arctic Hunter Multipurpose/support vessel

FOGA ApS. Arctic Hunter Multipurpose/support vessel Arctic Hunter Multipurpose/support vessel General information Name... Arctic Hunter IMO #... 7719832 Call sign... OUWK MMSI #... 331404000 Flag state... Danish Ship Register Home port... Esbjerg Class...

More information

SECTION 5. Action for Emergency Response

SECTION 5. Action for Emergency Response SECTION 5 Action for Emergency Response Page 1 Accident and Incident Reporting Action Card No: A1 An accident is any unforeseen, uncontrolled event which has the potential for injury or loss, whether injury

More information

Rules for Classification and Construction Ship Technology

Rules for Classification and Construction Ship Technology I Rules for Classification and Construction Ship Technology 1 Seagoing Ships 19 Guidelines for the Carriage of Refrigerated Containers on Board Ships Edition 2003 The following Guidelines come into force

More information

Guidelines RULES on on Trailer. Presented by: Richard L.Krabbendam Heavy Lift Specialist

Guidelines RULES on on Trailer. Presented by: Richard L.Krabbendam Heavy Lift Specialist 1 Guidelines RULES on on Trailer Stability needed are needed!! or not?? Presented by: Richard L.Krabbendam Heavy Lift Specialist www.heavyliftspecialist.com 2 Rules on Trailer Stability OVERVIEW Introduction

More information

Law Relating to the Prevention of Marine Pollution and Maritime Disaster

Law Relating to the Prevention of Marine Pollution and Maritime Disaster Law Relating to the Prevention of Marine Pollution and Maritime Disaster (Law No. 136 of 1970 as amended through Law No. 68 of 1998) Chapter I. General Provisions (Purpose) Article 1. The purpose of this

More information

Construction Services. Furnishing Energy Solutions

Construction Services. Furnishing Energy Solutions Construction Services Furnishing Energy Solutions Construction Services Your Complete Balance-of-Plant Solution Provider Single-point responsibility allows Construction Services to manage your entire project

More information

Bergen Engines Products and Applications

Bergen Engines Products and Applications Bergen Engines Products and Applications 1 Since 1948 Bergen Engines, a Rolls-Royce Power Systems Company, has delivered more than 6,500 four-stroke medium-speed diesel and gas engines for power generation

More information

Atlas Copco Generators

Atlas Copco Generators Atlas Copco Generators QIX 15 - QIX 540 16 kva LTP to 549 kva LTP at 50 & 60 Hz The QIX options include Earth leakage relay Qc generating set control panels for all standby and/or paralleling applications

More information

LOADING DOCK EQUIPMENT. A. Section 03100 - Concrete Forms and Accessories: Placement of anchors into concrete.

LOADING DOCK EQUIPMENT. A. Section 03100 - Concrete Forms and Accessories: Placement of anchors into concrete. LOADING DOCK EQUIPMENT PART 1 GENERAL 1.1 SECTION INCLUDES A. Loading dock equipment of the following types: 1. Dock lifts. 2. Control stations. 1.2 RELATED SECTIONS A. Section 03100 - Concrete Forms and

More information

Recognized Org: Bureau Veritas. Organization. to Detention: Ship Management:

Recognized Org: Bureau Veritas. Organization. to Detention: Ship Management: Ship Name: AGIA EKATERINIA Ship Type: Bulk Carrier Flag: Panama IMO Number: 9413078 Date of Action: 11/14/2015 Port: New Orleans, Louisiana Recognized Org: Bureau Veritas Related Nova Ship Tech SA M.A.S.

More information

> Capital Markets Day 2011

> Capital Markets Day 2011 Wilh. Wilhelmsen ASA > Capital Markets Day 2011 Jan Eyvin Wang President and CEO 8 December 2011, Lysaker > Disclaimer This presentation may contain forward- looking expectations which are subject to risk

More information

A.1 Obligations and reporting of the gaining Society. Plans to be Submitted by the Owner to the Gaining Society

A.1 Obligations and reporting of the gaining Society. Plans to be Submitted by the Owner to the Gaining Society (Rev.0 July 2009) (Rev.1 June 2012) (Rev.2 Oct 2013) (Rev.3 Jan 2015) (Rev.4 July 2015) (Rev.5 Jan 2016) Procedure for Transfer of Class TABLE OF CONTENTS Procedure for Transfer of Class Application Definitions

More information

GENERAL OCEAN TOW RECOMMENDATIONS FOR JACKUP DRILLING UNITS International Association of Drilling Contractors (I.A.D.C.) February 13, 1991

GENERAL OCEAN TOW RECOMMENDATIONS FOR JACKUP DRILLING UNITS International Association of Drilling Contractors (I.A.D.C.) February 13, 1991 GENERAL OCEAN TOW RECOMMENDATIONS FOR JACKUP DRILLING UNITS International Association of Drilling Contractors (I.A.D.C.) February 13, 1991 Manning 1. Manning should comply with U.S. Coast Guard regulations

More information

Heavy Fuel Oil supply units. The world s best selling HFO supply unit. The right choice for any conditions

Heavy Fuel Oil supply units. The world s best selling HFO supply unit. The right choice for any conditions The world s best selling supply unit. The right choice for any conditions AB-c arine Compact Heavy Fuel Oil supply unit This series of marine AB-c Heavy Fuel Oil () supply units is developed to combine

More information

Fot. Kacper Kowalski/aeromedia.pl

Fot. Kacper Kowalski/aeromedia.pl Experience in construction of the offshore wind farm installation vessels CRIST S.A. Fot. Kacper Kowalski/aeromedia.pl General Info Established in 1990 by two engineers Mr. Ireneusz Ćwirko and Mr. Krzysztof

More information

Advances in Arctic Oil-Spill Mitigation, Response Measures and Clean-up Techniques

Advances in Arctic Oil-Spill Mitigation, Response Measures and Clean-up Techniques Advances in Arctic Oil-Spill Mitigation, Response Measures and Clean-up Techniques Vince Mitchell St John s Newfoundland 28 May 2013 Looking Forward LNXG 1000 Skimming System Animation Present day status

More information

SPEEDROC D30. Surface Drill Rig for marble, granite, sandstone and limestone in the dimension stone industry.

SPEEDROC D30. Surface Drill Rig for marble, granite, sandstone and limestone in the dimension stone industry. SPEEDROC D0 Surface Drill Rig for marble, granite, sandstone and limestone in the dimension stone industry. SPEED UP YOUR PROFITS SPEEDROC D0 IS A VERSATILE AND FLEXIBLE DRILL RIG, TAILORMADE FOR THE DIMENSION

More information

Guidance for Reducing Port State Detentions. Pre-Port Arrival Quick Reference

Guidance for Reducing Port State Detentions. Pre-Port Arrival Quick Reference Guidance for Reducing Port State Detentions Pre-Port Arrival Quick Reference Our Mission The mission of ABS is to serve the public interest as well as the needs of our members and clients by promoting

More information

Module Title: General Ship Knowledge

Module Title: General Ship Knowledge CORK INSTITUTE OF TECHNOLOGY INSTITIÚID TEICNEOLAÍOCHTA CHORCAÍ Semester 1 FINAL Examinations 2009/10 School: National Maritime College of Ireland Programme Title: Bachelor of Science (Ordinary) in Nautical

More information

Company Overview. Freo has been proudly serving industry since 1974. Our Vision. Our Values. National Hotline: 1300 CRANES

Company Overview. Freo has been proudly serving industry since 1974. Our Vision. Our Values. National Hotline: 1300 CRANES Freo has been proudly serving industry since 1974. Company Overview Freo Group is the foremost provider of crane hire services and project material logistics management in Australia. The company provides

More information

Rules for Classification and Construction Ship Technology

Rules for Classification and Construction Ship Technology I Rules for Classification and Construction Ship Technology 1 Seagoing Ships 15 Dynamic Positioning Systems Edition 2013 The following Rules come into force on 1 August 2013. Alterations to the preceding

More information

products 22 º C Ventilation Air Conditioning Refrigeration Energy & Cost Saving Products Inside PROVIDED BY HEINEN & HOPMAN

products 22 º C Ventilation Air Conditioning Refrigeration Energy & Cost Saving Products Inside PROVIDED BY HEINEN & HOPMAN products > Energy & Cost Saving Products OUTSIDE 35 C HUMIDITY 90% 22 º C Inside PROVIDED BY HEINEN & HOPMAN Heating Ventilation Air Conditioning Refrigeration HVAC energy & COST SAVING POSSIBILITIES A

More information

WÄRTSILÄ DYNAMIC MAINTENANCE PLANNING (DMP) AND CONDITION BASED MAINTENANCE (CBM) Wärtsilä

WÄRTSILÄ DYNAMIC MAINTENANCE PLANNING (DMP) AND CONDITION BASED MAINTENANCE (CBM) Wärtsilä WÄRTSILÄ DYNAMIC MAINTENANCE PLANNING (DMP) AND CONDITION BASED MAINTENANCE (CBM) / 18 Wärtsilä Doc.ID: Revision: Status: Condition monitoring, Dynamic Maintenance Planning and Condition Based Maintenance

More information

26 3213.13 Diesel Engine Driven Generators Page 1 of 6

26 3213.13 Diesel Engine Driven Generators Page 1 of 6 Last Update: December 8, 2014 A. Description of System Consultant s Handbook Page 1 of 6 1. Provide a diesel engine driven electric generating unit, factory assembled, tested and certified to operate at

More information

Fuel Treatment and Conditioning Systems

Fuel Treatment and Conditioning Systems RULES FOR CLASSIFICATION OF Ships PART 6 CHAPTER 14 NEWBUILDINGS SPECIAL EQUIPMENT AND SYSTEMS ADDITIONAL CLASS Fuel Treatment and Conditioning Systems JULY 2006 This chapter has been amended since the

More information

PVE Piling and Drilling Rigs Powerful, Versatile and Efficient. PVE Piling and Drilling Rigs B.V. Worldwide supply of specialized foundation machines

PVE Piling and Drilling Rigs Powerful, Versatile and Efficient. PVE Piling and Drilling Rigs B.V. Worldwide supply of specialized foundation machines PVE Piling and Drilling Rigs Powerful, Versatile and Efficient PVE Piling and Drilling Rigs B.V. Worldwide supply of specialized foundation machines Member of the PVE Piling and Drilling Rigs PVE Piling

More information

Alfa Laval PureBallast 3.1

Alfa Laval PureBallast 3.1 Alfa Laval PureBallast 3.1 Ballast water treatment system 1000 m 3 /h system Alfa Laval PureBallast 3.1 is an automated inline treatment system for the biological disinfection of ballast water. Operating

More information

Phone +44 1519332151 E-mail harbourtowage.liverpool@smit.com. Phone +31 10 4549911 E-mail harbourtowage.sales.rtm@smit.com

Phone +44 1519332151 E-mail harbourtowage.liverpool@smit.com. Phone +31 10 4549911 E-mail harbourtowage.sales.rtm@smit.com A d d r e s s e s THE NETHERLANDS / Rotterdam Phone +31 10 4549911 E-mail harbourtowage.sales.rtm@smit.com UNITED KINGDOM / Liverpool Phone +44 1519332151 E-mail harbourtowage.liverpool@smit.com ARGENTINA

More information

Rotary Screw Compressors UP-Series 4 & 5.5 kw

Rotary Screw Compressors UP-Series 4 & 5.5 kw Rotary Screw Compressors UP-Series 4 & 5.5 kw Rotary Screw Compressors UP-Series 4 & 5.5 kw Boost Your Profitability Boosting your company s profits was the main goal that Ingersoll-Rand had in mind when

More information

LNG as Ship Fuel. Effects on Ship Design, Operations and Supporting Infrastructure

LNG as Ship Fuel. Effects on Ship Design, Operations and Supporting Infrastructure LNG as Ship Fuel Effects on Ship Design, Operations and Supporting Infrastructure New Technologies for the Marine Highway TRB Marine Highways Committee (AW010(1)) January 14, 2013 LNG as a Ship s Fuel

More information

PUMP MAINTENANCE SCHEDULE AND CHECKLISTS

PUMP MAINTENANCE SCHEDULE AND CHECKLISTS PUMP MAINTENANCE SCHEDULE AND CHECKLISTS Providing a maintenance schedule defined specifically by run hours or yardage pumped serves only as a general guideline given the large amount of variables a unit

More information

LOSS PREVENTION IAT GROUP

LOSS PREVENTION IAT GROUP LOSS PREVENTION IAT GROUP CARGO SECURITY AND LOSS PREVENTION Introduction Cargo protection requires thorough planning to be effective and remain effective through changing conditions. Cargo security is

More information

Supply, storage and handling of LNG as ship s fuel Björn Munko LNG 17, Houston

Supply, storage and handling of LNG as ship s fuel Björn Munko LNG 17, Houston Supply, storage and handling of LNG as ship s fuel Björn Munko LNG 17, Houston Content Short Company Introduction Small LNGC and LNG tanks Bunker supply chain LNG fuel gas systems Conclusions LNG 17 -

More information

THE REPUBLIC OF LIBERIA LIBERIA MARITIME A

THE REPUBLIC OF LIBERIA LIBERIA MARITIME A Office of Deputy Commissioner of Maritime Affairs THE REPUBLIC OF LIBERIA LIBERIA MARITIME A 8619 Westwood Center Drive Suite 300 Vienna, Virginia 22182, USA Tel: +1 703 790 3434 Fax: +1 703 790 5655 Email:

More information