1 SPECS store planning, equipment, construction and facilities services Store Construction & Outfitting Survey Annual study tracks building costs By Marianne Wilson Retail expansion is edging up, and so is the cost of construction materials and labor, according to Chain Store Age s 2012 Store Construction & Store Outfitting survey, which tracks retail building activity and construction costs. The annual survey, conducted by Leo J. Shapiro & Associates, Chicago, for Chain Store Age, is based on results from retail chains across the country. Along with construction costs, store size and expansion plans, it also examined Company Expansion Average (mean) number of: Stores in operation during New stores opened in New stores plan to open in the coming 12 months Expansion ratio: (New stores planned as a percent of stores currently in operation) 3.6% 3.7% 2.9% 2.0% 4.8% 3.4%

2 the costs of store outfitting systems including lighting, flooring, signage, fixtures, roofing heating, ventilation and air-conditioning (HVAC) and retailers plans with regard to the use of green materials, LEED and Energy Star certification. The retailers that participated in the survey were divided into five categories: convenience stores, supermarkets, home centers, specialty apparel and big box (includes department stores and other largeformat stores). CONSTRUCTION COSTS: For all retailers surveyed, 83.4% said the Quick Stats cost of construction materials was increasing. An overwhelming majority, 71.7%, also said the cost of construction labor was increasing. While retailers across the board were in agreement about the increases, two classes of trade appear to be feeling the increases the most: specialty apparel and big box. A full 100% of the specialty apparel retailers Construction costs for freestanding stores average $48.67 per square foot Fit-out costs for in-line tenants average $40.28 per square foot Cost of construction materials and labor on the rise Eight percent of all retailers pursuing LEED certification Durability and lifecycle costs are top concerns in purchasing store-outfitting equipment surveyed said the cost of construction materials was rising, and 90% of big-box retailers said the same. And 92.3% of specialty apparel retailers and 90% of big-box retailers said labor also was getting more costly. The cost of building stores was divided into two categories: tenant fit-out costs for stores in malls and other type of centers, and building shell construction costs for freestanding locations. In the freestanding category, construction costs (including concrete, structural steel, structured masonry, roof and HVAC, exterior wall assembly, and insulation but excluding interior fit-out) averaged $48.67 per square foot for all retailers surveyed. This compares with $43.48 in last year s study. (While the chains that participate in the survey vary year to year, comparisons can be used to suggest general trends.) By retail sector, specialty apparel retailers had the construction costs (per square foot) Tenant fit-out in a shopping center $40.28 $28.00 $39.30 $30.67 $43.20 $43.92 Building shell in freestanding location $48.67 $49.00 $49.69 $50.25 $55.00 $42.75 Combined average $44.48 $38.50 $44.49 $40.46 $49.10 $43.33 COST OF STORE OUTFITTING SYSTEMS (Construction costs per square foot) Flooring $2.76 $2.89 $2.83 $1.43 $3.44 $2.61 Ceilings $1.51 $2.17 $1.58 $1.14 $1.59 $0.94 Display fixtures $8.09 $6.56 $8.08 $7.93 $7.38 $10.88 Interior lighting $3.21 $4.44 $2.91 $2.16 $3.36 $3.22 Interior signage $0.84 $1.19 $1.12 $0.51 $0.29 $0.98 Roofing $3.20 $4.03 $2.89 $3.29 $2.33 $3.41 HVAC $1.81 $1.90 $1.81 $1.46 $1.72 $2.06 Exterior signage $1.11 $1.79 $0.83 $0.69 $1.38 $0.88

3 SPECS Construction Survey highest building costs, at $55.00 per square foot. (However, the overwhelming majority of stores in this category were built in centers as opposed to freestanding sites.) Home centers averaged $50.25 per square foot, followed by supermarkets at $49.69 per square foot, and convenience stores came in at $49.00 per square foot. Big-box stores had the lowest building shell construction costs, at $42.75 per square foot. The cost of tenant fit-out work, which includes drywall, ceiling, floor, wall finishes and interior construction, but excludes the fixture package, averaged $40.28 per square for all retailers surveyed. This is almost flat with 2011, when tenant fit-out costs averaged $ Big-box stores had the highest costs, at $43.92 per square foot, followed by specialty apparel, at $ Supermarkets averaged $39.30 per square foot, followed by home centers, at $ Convenience stores had the lowest costs, at $28.00 per square foot. EXPANSION: The average number of new stores planned for all participating chains for 2012 was 14 (per chain), up from 11 in the previous year. (All comparisons regarding expansion are based on information collected in this year s survey.) Looking at the individual sectors, specialty apparel retailers are on track to open an average of 29 stores this year, up from 26 last year. Supermarkets and home centers plan to open 10, compared with eight and 10, respectively, in Big-box operators plan to open nine new stores this year, up from seven last year. Convenience stores retailers plan to open eight, up from four last year. The planned expansion ratio (defined as new stores planned as a percent of stores currently in operation) averaged 3.6% for all retailers surveyed. As in past years, specialty retailers continue to outpace the other categories surveyed, with an expansion ratio of 4.8%. OUTFITTING COSTS: Store-outfitting was up in several categories and down in others compared with last year. Display fixtures held onto their longstanding status as the most expensive category, averaging $8.09 per square foot for all retailers surveyed, down from $8.24 per square foot last year. Interior lighting (including lamps, ballasts and fixtures) was the second-most costly class of equipment, averaging $3.21 per square foot, up significantly from last year ($2.54 per square foot). Roofing costs also saw a big bump, averaging $3.20 per square foot, compared with $2.67 last year. Flooring averaged $2.76 per square foot, down from $2.99 last year, Construction cost for HVAC (including ductwork) averaged $1.81 per square foot for all retailers, up from $1.54 last year. Ceilings were flat with last year, at $1.51 per square foot. As in past years, the least expensive categories were exterior signage, which averaged $1.11 per square foot, down from $1.21 last year, and interior signage, which at $0.84 per square foot was up slightly over last year ($0.79 per square foot). Durability ranked as the top concern (50%) in selecting a physical support system for all retailers, followed by lifecycle costs (41.7%). Maintenance concerns and first costs were tied at 33.3%, followed by energy efficiency (23.3%). The survey also provided details on the types of lighting, flooring, ceiling and roofing systems used by retailers. In the lighting category, for example, fluorescent lamps and LEDs are most common, used by 95% and 83% respectively, of all retailers surveyed. In flooring, ceramic tile and vinyl/resilient remain the standards, used by 80% and 70%, respectively, of all retailer surveyed. Polished concrete is another common choice, used by 61%. Costs Of Construction Materials And Labor Construction materials Increasing 83.4% 72.7% 76.5% 77.8% 100.0% 90.0% Decreasing 10.0% 18.2% 5.9% 22.2% 0.0% 10.0% Stayed the same/other 6.6% 9.1% % 0.0% 0.0% 0.0% Construction labor Increasing 71.7% 45.5% 76.5% 44.4% 92.3% 90.0% Decreasing 21.7% 45.5% 11.8% 44.4% 7.7% 10.0% Stayed the same/other 6.6% 9.0% 11.7% 11.2% 0.0% 0.0%

4 (Full survey results, including a breakdown on the types of flooring and other systems used by retailers by segment, are available at chainstoreage. com/resources.) STORE SIZE: In the big-box category, new stores (defined as locations opened during the past 12 months or currently under construction) averaged 74,000 gross sq. ft., compared with an average store size of 150,000 sq. ft. for retailers that did not build in the past year. New supermarkets averaged 49,000 sq. ft., compared with 65,000 sq. ft. for retailers who did not build in the past year. New convenience stores averaged 5,500 sq. ft., versus 6,250 sq. ft. New home centers averaged 57,000 sq. ft., which was consistent with the store size of retailers that had no new construction during the past year. New specialty apparel stores averaged 6,731 sq. ft. GREEN: Retailers interest in building green is an ongoing theme, with 78.3% of all chains reporting they use environmentally friendly materials (versus 76.7% in 2011), with another 10% planning to use them in the future. The use of green materials was strongest in supermarkets, with 100% of surveyed retailers on board, followed by home centers (88.9%) and bigbox stores (80%) and convenience stores (72.7%), Specialty stores, perhaps owing to their in-line emphasis, were the laggards, at 46.2%. As much as retailers are interested in using green materials, they are not yet as interested in LEED (Leadership in Energy and Environmental Design) certification. Eight percent (8.3%) of all retailers surveyed said they were pursuing LEED certification. The results varied widely by class of trade. None of the participating home centers or specialty apparel retailers are seeking LEED certification. But 20% of the big-box retailers are pursuing certification, and 11.8% of the supermarkets are doing the same. EPA s Energy Star certification program, which focuses on energy efficiency, has more advocates. Nearly 17% of all retailers in the survey said they were pursing Energy Star certification. Energy Star certification is most prevalent in the supermarket sector, where 29.4% of retailers are seeking it, and in convenience stores, at 18.2%. mwilson@chainstoreage.com 8 More detailed information and all the charts from the 2012 Store Construction & Outfitting Survey can be found at chainstoreage.com/resources. Top concerns in purchasing Durability 50.0% 54.5% 58.8% 44.4% 38.5% 50.0% Lifecycle costs 41.7% 27.3% 52.9% 33.3% 23.1% 70.0% First costs 33.3% 27.3% 35.3% 33.3% 46.2% 20.0% Maintenance concerns 33.3% 63.6% 17.6% 33.3% 46.2% 10.0% Energy efficiency, when applicable 23.3% 27.3% 29.4% 33.3% 0.0% 30.0% Aesthetics 18.3% 0.0% 5.9% 22.2% 46.2% 20.0% Store Size Size of existing stores: average (mean) gross square feet 36,042 5,682 48,529 51,111 6,154 73,500 Among those who Did not build in past year 48,333 6,250 65,000 57,000 5, , Built any in past year 31,944 5,357 43,462 43,750 6,250 65,000 Stores opened in past 12 months 35,896 5,500 49,000 57,000 6,731 74,000

5 SPECS Construction Survey Types Of Flooring Used Ceramic tile 80.0% 90.9% 100.0% 44.4% 92.3% 50.0% Vinyl or resilient 73.3% 45.5% 100.0% 44.4% 84.6% 70.0% Polished concrete 61.7% 36.4% 76.5% 88.9% 38.5% 70.0% Carpet 53.3% 0.0% 52.9% 44.4% 76.9% 90.0% Wood 40.0% 0.0% 47.1% 33.3% 53.8% 60.0% Stone 16.7% 0.0% 17.6% 22.2% 15.4% 30.0% Bamboo 5.0% 0.0% 5.9% 0.0% 0.0% 20.0% Other 3.3% 9.1% 0.0% 0.0% 7.7% 0.0% Types Of Ceilings Used 2 x 4 ft. acoustical panels 81.7% 81.8% 100.0% 55.6% 76.9% 80.0% Open deck ceilings 78.3% 45.5% 94.1% 88.9% 76.9% 80.0% 2 x 2 ft. acoustical panels 61.7% 54.5% 47.1% 100.0% 53.8% 70.0% Drywall/Plaster 61.7% 36.4% 47.1% 66.7% 92.3% 70.0% Other 3.3% 0.0% 0.0% 0.0% 7.7% 10.0% Types Of Roofing Used Single-Ply roofing system 61.7% 54.5% 88.2% 55.6% 15.4% 90.0% Metal 45.0% 54.5% 70.6% 66.7% 7.7% 20.0% Bur [built-up roof] 33.3% 45.5% 41.2% 33.3% 15.4% 30.0% Asphalt shingles 23.3% 36.4% 23.5% 44.4% 7.7% 10.0% Other 6.7% 9.1% 17.6% 0.0% 0.0% 0.0% None/Leased out 15.0% 0.0% 0.0% 0.0% 69.2% 0.0% Not reporting 1.7% 0.0% 0.0% 0.0% 7.7% 0.0% Types Of Lighting Used Fluorescent 95.0% 72.7% 100.0% 100.0% 100.0% 100.0% LEDs 83.3% 72.7% 100.0% 77.8% 76.9% 80.0% Track and spot lighting 70.0% 54.5% 76.5% 55.6% 92.3% 60.0% Incandescent 50.0% 45.5% 47.1% 66.7% 53.8% 40.0% Day lighting system 46.7% 36.4% 64.7% 66.7% 15.4% 50.0% Metal halide/hid 35.0% 9.1% 41.2% 33.3% 46.2% 40.0% Halogen 30.0% 0.0% 35.3% 33.3% 38.5% 40.0%

TAX APPRAISAL DISTRICT OF BELL COUNTY STORES & COMMERCIAL IMPROVEMENT CLASSIFICATION GUIDE

TAX APPRAISAL DISTRICT OF BELL COUNTY STORES & COMMERCIAL IMPROVEMENT CLASSIFICATION GUIDE TAX APPRAISAL DISTRICT OF BELL COUNTY STORES & COMMERCIAL IMPROVEMENT CLASSIFICATION GUIDE 1/22/2008 1 STORES & COMMERCIAL BUILDINGS 1. General Construction Class Descriptions 2. Types a. Class A - Fireproofed

More information

Inspecting to a higher standard.

Inspecting to a higher standard. Inspecting to a higher standard. Rob Hopkin Silver Spring, MD 20902 Monday, June 2, 2014 ProTec Inspection Services Inc. 19736 Selby Ave Poolesville, MD 20837 301-972-8531 www.protec-inspections.com rob@protec-inspections.com

More information

Repair and Remodeling Estimating Methods. 4th Edition. RSMeans

Repair and Remodeling Estimating Methods. 4th Edition. RSMeans Brochure More information from http://www.researchandmarkets.com/reports/2214808/ Repair and Remodeling Estimating Methods. 4th Edition. RSMeans Description: This estimating guide for repair and remodeling

More information

LITITZ MUTUAL INSURANCE COMPANY 2 North Broad Street Lititz, Pennsylvania - MAIN OFFICE -

LITITZ MUTUAL INSURANCE COMPANY 2 North Broad Street Lititz, Pennsylvania - MAIN OFFICE - The original section of this building was constructed in 1941. The exterior walls are built of good quality stone. In the early 1980 s a similar addition was added to the north elevation. The exterior

More information

Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year

Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year Printed On: 2003/04/03 St Patrick CES, 7932 Study [03.3-050 Plumbing Piping Systems] Study condition, remaining service

More information

Sub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders

Sub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders INTRODUCTORY INFORMATION TABLE OF CONTENTS 00 0101 PROJECT TITLE PAGE PROCUREMENT REQUIREMENTS (PROJECT MANUAL) Tab A - Invitation for Bids Tab B - Instructions to Bidders Tab C Bid Form for General Bids

More information

KIEWIT CM/GC Enabling/Utilities

KIEWIT CM/GC Enabling/Utilities South Terminal Redevelopment Program KIEWIT CM/GC Enabling/Utilities Contract Value $50 million M/WBE Goal 20 percent Contact John Todd, LEED AP Project Manager 303.930.9046 john.todd@kiewit.com General

More information

Executive Flight Office & Hangar

Executive Flight Office & Hangar ONE CAMPBELL PARKWAY, EAST WENATCHEE, WASHINGTON 98802 Exceptional value for world class 64,305 sq. ft. hangar facility in Eastern Washington ONE CAMPBELL PARKWAY, EAST WENATCHEE, WASHINGTON 98802 THE

More information

TechPractices: Home Front Homes:

TechPractices: Home Front Homes: TechPractices: Home Front Homes: PATH's Technologies in Practice are large scale housing projects throughout the U.S. where innovative technologies are being installed and used. Information is presented

More information

Special Use Commercial Properties

Special Use Commercial Properties Contents Overview of Special Use Commercial Properties...3 Understanding Fast Food Restaurants...3 Understanding Gasoline Service Stations...4 Understanding Self-Service Cashier Booths...5 Understanding

More information

Print Shop/Mail Room

Print Shop/Mail Room Chapter XVIII Print Shop/Mail Room Page 110 CHAPTER XVIII Print Shop/Mail Room ARCHITECTURAL/STRUCTURAL A. BUILDING EXTERIOR 1.0 EXTERIOR WALLS The exterior walls are comprised of stone veneer. There were

More information

Table C33. Total fuel oil consumption and expenditures, 2012

Table C33. Total fuel oil consumption and expenditures, 2012 Release date: May 2016 Table C33. fuel oil consumption and, 2012 ) gallons) dollars) Building ( 1,001 to 5,000 204 604 3.0 21 151 522 5,001 to 10,000 74 559 7.6 10 74 253 10,001 to 25,000 67 1,123 16.7

More information

INDUSTRIALS COLD STORAGE FACILITIES

INDUSTRIALS COLD STORAGE FACILITIES CAL 98 INDUSTRIALS COLD STORAGE FACILITIES AVERAGE CLASS C LOW/AVERAGE CLASS S OCCUPANCY DESCRIPTION: Cold storage facilities are designed to keep stored commodities at various temperature levels. Some

More information

Nominal Life Expectancy for Building Components

Nominal Life Expectancy for Building Components Nominal Life Expectancy for Building Components Building System Page A. HVAC 2 B. Elevator/Escalator 6 C. Plumbing 7 D. Roofing 8 E. Electrical 10 F. Fire/Life/Safety/Security System 11 G. Interior Finishes

More information

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components Infrastructure Facility Condition Summary Weighted Avg Condition Score Facility Components Systems Surveyor/ Date Done Comments G Sitework.9 Site Improvements Parking Pedestrian Paving Site Development

More information

Estimating Database Checklist

Estimating Database Checklist Estimating Database Checklist If you are creating a new estimating database for projects, the following list offers a thorough listing of Main and Sub Categories. You can also use it as a checklist to

More information

48. AQUARIUM. Aquarium. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle. Total Area: No.

48. AQUARIUM. Aquarium. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle. Total Area: No. Classification: Cluster: Location: Total Area: No. of Stories Aquarium Acreage Owned: Acquired: 1904 Most Recent Improvements: THE AQUARIUM Close to junction of Inselrhue and Loiter Way, Belle Isle Two

More information

How to Estimate the Cost of Interior Building Finishes from Schematic Drawings. CPE Candidate No. 0714108. December 2014

How to Estimate the Cost of Interior Building Finishes from Schematic Drawings. CPE Candidate No. 0714108. December 2014 How to Estimate the Cost of Interior Building Finishes from Schematic Drawings CPE Candidate No. 0714108 December 2014 1 How to Estimate the Cost of Interior Building Finishes from Schematic Drawings Table

More information

SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST

SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST SODA SPRINGS HIGH SCHOOL REPAIRS AND UPGRADES SITE Construction Estimate = $100,000

More information

BUILDING ASSESSMENT QUESTIONNAIRE. B. TENANTS Is there more than one tenant in the building? YES

BUILDING ASSESSMENT QUESTIONNAIRE. B. TENANTS Is there more than one tenant in the building? YES Department of Health and Human Services, Division of Public Health Occupational and Environmental Epidemiology Branch 1912 Mail Service Center, Raleigh, North Carolina 27699-1912 BUILDING ASSESSMENT QUESTIONNAIRE

More information

09 00 03 GENERAL PROVISIONS

09 00 03 GENERAL PROVISIONS 09 00 03 GENERAL PROVISIONS A. For renovation projects, consider the building s character and existing finishes. All material patches should blend as closely as possible. Some buildings on campus have

More information

16 2 10.3 Materials and Colors

16 2 10.3 Materials and Colors 16 2 10.3 Materials and Colors To create a harmonious and coherent image for each development, building designs shall pay close attention to choice of materials and colors. Building construction shall

More information

Substantial Improvement/Damage (FEMA 50% Rule) Frequently Asked Questions and Information

Substantial Improvement/Damage (FEMA 50% Rule) Frequently Asked Questions and Information SUBSTANTIAL IMPROVEMENT/DAMAGE WORKSHEET (FEMA 50% RULE) South County: Development Services North County: Development Services 4000 Tamiami Trail S. Room 122 1001 Sarasota Center Blvd Venice, Florida 34293-5076

More information

Building Condition Assessment Report

Building Condition Assessment Report Building Condition Assessment Report Asset C3c - Oak Terrace Cottage 121 Address Riverview Lands, 2601 Lougheed Highway, Coquitlam, BC. V5C 4J2 Construction Year Size (Gross Floor Area) 1920. 2,553 Sq.Ft.

More information

Schedule B to By-law 33-2009 Part A Fees Payable for Permits

Schedule B to By-law 33-2009 Part A Fees Payable for Permits Floor Area Calculation Floor area shall: Part A Fees Payable for Permits (Effective January 1, 2015) a) be calculated by measuring to the outer face of exterior walls and to the centre of party walls or

More information

WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME

WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME 1 THE BUILDING PROCESS The focus of Woodland Homes building department is Quality, Service and Predictability. Through

More information

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT SAMPLE SCHEDULE OF S 1.00 General Conditions 1.01 Project Management 1.02 General Superintendent 1.03 Superintendents 1.04 Safety Engineer 1.05 Scheduling 1.06 Field Engineering 1.07 Bonds 1.08 Trailer

More information

Construction Technologies Career Field Pathways and Course Structure

Construction Technologies Career Field Pathways and Course Structure Courses in Structural Systems (DD) Construction Technologies Career Field Pathways and Course Structure PATHWAY COURSES SUBJECT CODE Construction Technology-Core and Sustainable Construction 1 178000 Carpentry

More information

MURCH ELEMENTARY SCHOOL

MURCH ELEMENTARY SCHOOL INITIAL YEAR BUILT 1929 BUILDING AREA 47,700 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 491 WARD 3 PROPOSED PROGRAM CAPACITY 500 Site Plan MURCH - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

Product description NCC Data Center

Product description NCC Data Center Product description NCC Data Center Concept General As one of the largest actors in the Nordic construction industry, NCC Construction plays a leading role in shaping the future of our society. After building

More information

Energy Efficiency for Businesses: An Overview of Best Practices to Help Reduce Energy Costs

Energy Efficiency for Businesses: An Overview of Best Practices to Help Reduce Energy Costs Energy Efficiency for Businesses: An Overview of Best Practices to Help Reduce Energy Costs Presented by: Paul Spiegel, Practical Energy Solutions Courtney Lane, PennFuture Commercial Building Energy Use

More information

Designing Schools To Reduce On-Going And Future Maintenance and Repair Costs

Designing Schools To Reduce On-Going And Future Maintenance and Repair Costs Designing Schools To Reduce On-Going And Future Maintenance and Repair Costs Charles H. Johnson, Consultant School Facilities Planning Division California Department of Education March 7, 2001 1 Designing

More information

Sustainability in construction at Creighton

Sustainability in construction at Creighton Sustainability in construction at Creighton Like many other higher education campuses and companies Creighton is striving to draft their own policies, procedures and guidelines. Through the support of

More information

ISO Types 1-6: Construction Code Descriptions

ISO Types 1-6: Construction Code Descriptions ISO 1 Frame (combustible walls and/or roof) Class 1B Buildings where the exterior walls are wood or other combustible materials, including construction where the combustible materials are combined with

More information

LogisticsCentre IV Distribution Center

LogisticsCentre IV Distribution Center KCI Intermodal BusinessCentre LogisticsCentre IV Project Advantages Lowest occupancy cost for quality development for short term and long term occupancy Platte County workforce ranks higher than metro

More information

PLUMMER ELEMENTARY SCHOOL

PLUMMER ELEMENTARY SCHOOL INITIAL YEAR BUILT 1959 BUILDING AREA 69,400 SF CURRENT PROGRAM CAPACITY 481 ENROLLMENT 2008 228 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan PLUMMER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Building Code Clarifications - 7. Fire Resistance

Building Code Clarifications - 7. Fire Resistance Building Code Clarifications - 7. Fire Resistance 7.1 (15-12-030) Use of combustibles in Type III construction roof assemblies Code Section (15-12-030) Use of Combustibles was revised on May 17, 2000,

More information

SPACE TYPE: AUTOMATED DATA PROCESSING CENTER (ADP) (MAINFRAME)

SPACE TYPE: AUTOMATED DATA PROCESSING CENTER (ADP) (MAINFRAME) SPACE TYPE: AUTOMATED DATA PROCESSING CENTER (ADP) (MAINFRAME) Construction Criteria The unit costs for ADP Mainframe space types are based on the construction quality and design features in the following

More information

OFFICE SPACE FOR LEASE THE WEST MALL TORONTO, ON

OFFICE SPACE FOR LEASE THE WEST MALL TORONTO, ON BO N $1 US.2 0 P CO M SF M /A I NN SIO UM N OFFICE SPACE FOR LEASE Up to 40,000 sf contiguous available Building under new ownership and management Currently undergoing building upgrades For more information,

More information

Saint Cloud Business Center

Saint Cloud Business Center Saint Cloud Business Center 14 7th Avenue North Saint Cloud, MN 56303 For Sale Located on 7th Avenue in the heart of downtown across from the Court House Square. A large professional reception area with

More information

HOMEOWNER S PERMIT GUIDE

HOMEOWNER S PERMIT GUIDE HOMEOWNER S PERMIT GUIDE WHEN IS A PERMIT REQUIRED? Department of Development and Permits 306 Cedar Road, City Hall 2 nd Floor P.O. Box 15225 Chesapeake, VA 23328 Phone: (757) 382-6018 Fax: (757) 382-8448

More information

Building Condition Assessment Report

Building Condition Assessment Report C2 - Nurses Resident (aka Administration) Building Condition Assessment Report Asset Address Address Construction Year Size (Gross Floor Area) Asset Type Floors Above Ground Inspection Date C2 - Nurses

More information

Insulation R-Value Comparisons

Insulation R-Value Comparisons Insulation R-Value Comparisons American Ingenuity s component panels for the 22 48 domes contains seven inch thick rigid Expanded Polystyrene (E.P.S.) insulation which has an R value of 28. American Ingenuity

More information

ST. MONICA FOOD PANTRY HOUSTON, TEXAS

ST. MONICA FOOD PANTRY HOUSTON, TEXAS PROJECT MANUAL FOR ST. MONICA FOOD PANTRY HOUSTON, TEXAS OWNER: ST. MONICA CATHOLIC CHURCH 8421 W. MONTGOMERY ROAD HOUSTON, TEXAS 77088 ARCHITECT: C SIX ARCHITECTURE, LLC 4606 F.M. 1960 WEST, STE 400 HOUSTON,

More information

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY Cost Code # Description Cost Code # Description 01 00 00.001 General Requirements 02 00 00.001 Existing Conditions 01 31 19.13.001 Preconstruction Meetings 02 21 00.001 Surveys 01 32 33.001 Photographic

More information

Schedule B to By-law 33-2009

Schedule B to By-law 33-2009 Amended by By-law 8-2016 Note: This consolidation is prepared for convenience only. For accurate reference the original by-laws should be reviewed. Floor Area Calculation Floor area shall: Schedule B to

More information

first look at GigaCrete s revolutionary new New Construction GigaHouse GigaHouse Utilizing GigaPanel

first look at GigaCrete s revolutionary new New Construction GigaHouse GigaHouse Utilizing GigaPanel first look at GigaCrete s revolutionary new New Construction GigaHouse GigaHouse Utilizing GigaPanel What is GigaCrete GigaCrete is a family of products based on low carbon footprint Green ceramic binders

More information

A1.5 Classroom Standards

A1.5 Classroom Standards A1.5 Classroom Standards Note: The following standards have been developed and adopted by KU's Instructional and Mediated Spaces Committee (IMSAC), which includes representatives from DCM, Instructional

More information

This report presents the findings and recommendations of the assessment of energy use and

This report presents the findings and recommendations of the assessment of energy use and This report presents the findings and recommendations of the assessment of energy use and environmental stewardship of Arlington Street Church, Boston, MA. As stewards of the earth it is important that

More information

Important Information for Owners of Buildings in Flood Zones

Important Information for Owners of Buildings in Flood Zones Important Information for Owners of Buildings in Flood Zones Rebuilding your home after the storm? Adding on, renovating, or remodeling your home? Here is information YOU need to know about the 50 percent

More information

Tennessee 07/01/14. Contracting Class Codes with Descriptions 50-6-901(8)

Tennessee 07/01/14. Contracting Class Codes with Descriptions 50-6-901(8) Contracting s with s * NCCI Basic Manual: "The Governing ification" at a specific job or location is the classification, other 0042 LANDSCAPE GARDENING & DRIVERS 0050 FARM MACHINERY OPERATION-BY CONTRACTOR-&

More information

BUNKER HILL ELEMENTARY SCHOOL

BUNKER HILL ELEMENTARY SCHOOL INITIAL YEAR BUILT 1970 BUILDING AREA 98,200 SF CURRENT PROGRAM CAPACITY 332 ENROLLMENT 2008 387 WARD 5 PROPOSED PROGRAM CAPACITY 750 Site Plan BUNKER HILL - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Commercial Building Valuation Report

Commercial Building Valuation Report INSURED State Office of Risk Management Effective Date: 300 W 15th Street Expiration Date: Austin, TX 78701 Cost as of: 12/2013 BUILDING 1 Athletics/PCI - 206 3302 N. Ben Wilson Victoria, TX 77901 Location

More information

WARRANTIES AND PERFORMANCE STANDARDS T A B L E O F C O N T E N T S General Provisions Introduction Warranties Effective Date of Warranties Exclusive

WARRANTIES AND PERFORMANCE STANDARDS T A B L E O F C O N T E N T S General Provisions Introduction Warranties Effective Date of Warranties Exclusive WARRANTIES AND PERFORMANCE STANDARDS T A B L E O F C O N T E N T S General Provisions Introduction Warranties Effective Date of Warranties Exclusive Warranties Time Limits for Reporting Manufacturer s

More information

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE NOTICE TO PROPERTY OWNER

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE NOTICE TO PROPERTY OWNER NOTICE TO PROPERTY OWNER Rebuilding your Home after the storm? Adding on, renovating, or remodeling your home? Here's information YOU need to know about the 50% Rule. If your home or business is below

More information

Commercial Building Valuation Report

Commercial Building Valuation Report INSURED University of Houston - Victoria Effective Date: Expiration Date: Cost as of: 09/2010 BUILDING 1 217 - University Center 77901 Location Adjustments Climatic Region: High Wind Region: Seismic Zone:

More information

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities Division 1 Requirements Design and Construction Quality Campus Master Plans Texas Tech University System Operating and Building Maintenance Project Administration Historically Underutilized Business (HUB)

More information

Civil Engineering and Architecture (CEA) Detailed Outline

Civil Engineering and Architecture (CEA) Detailed Outline Civil Engineering and Architecture (CEA) Detailed Outline Unit 1: Overview of Civil Engineering and Architecture (23 days) Lesson 1.1: History of Civil Engineering and Architecture 1. Many features of

More information

Cost estimate for renovating city owned rental building located on 2 nd Ave. SW

Cost estimate for renovating city owned rental building located on 2 nd Ave. SW Summary Cost estimate for renovating city owned rental building located on 2 nd Ave. SW For the past year city crews have been battling water infiltration issues at the rental building currently being

More information

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS NOTICE TO BIDDERS BID FORM INSTRUCTIONS TO BIDDERS CONTRACTOR S BID FOR PUBLIC WORK - FORM 96 MINORITY AND WOMEN S BUSINESS ENTERPRISE PARTICIPATION

More information

DESIGN REVIEW CHECKLIST Chapter 6 Special Consideration Design Guidelines

DESIGN REVIEW CHECKLIST Chapter 6 Special Consideration Design Guidelines DESIGN REVIEW CHECKLIST Chapter 6 Special Consideration Design Guidelines A. Offices a. Office buildings should be built to the minimum required setback. b. Surface parking should be located towards the

More information

NARRATIVE REPORT. The Asbestos Bulk Sample Results Table includes asbestos sampling data.

NARRATIVE REPORT. The Asbestos Bulk Sample Results Table includes asbestos sampling data. NARRATIVE REPORT 1.0 BUILDING INFORMATION The original date of construction for Construction Management Engineering was not immediately available; the building has had no major renovations. Construction

More information

Residential Adjustments. Overview 4.1

Residential Adjustments. Overview 4.1 Overview 4.1 Summary This chapter contains an overview of residential structural components, quality of construction, main dwellings, and construction types. It also provides adjustments such as wall height,

More information

D Sample Notices to Property Owners, Sample Affidavits, and Other Material

D Sample Notices to Property Owners, Sample Affidavits, and Other Material D Sample Notices to Property Owners, Sample Affidavits, and Other Material These samples are offered to illustrate specific points in the Desk Reference. States and communities should examine them carefully

More information

Substantial Improvement/ Damage Review

Substantial Improvement/ Damage Review City of St. Petersburg Construction Services & Permitting Substantial Improvement/ Damage Review Permit Application Number Parcel ID Number Property Address City & Zip Code Name of Owner Owner s Phone

More information

WEBSTER ELEMENTARY SCHOOL New Rochelle, New York Evaluation of Collapsed Ceiling Room 204

WEBSTER ELEMENTARY SCHOOL New Rochelle, New York Evaluation of Collapsed Ceiling Room 204 WEBSTER ELEMENTARY SCHOOL New Rochelle, New York Evaluation of Collapsed Ceiling Room 204 Structural Inspection Report Client: CSArch Architecture Engineering Construction Management 19 Front Street, Newburgh,

More information

CHAPTER 11: PASSIVE SOLAR HOMES

CHAPTER 11: PASSIVE SOLAR HOMES Chapter 11: Passive Solar Homes 159 CHAPTER 11: PASSIVE SOLAR HOMES Passive solar homes capture both the beauty of the outside world and the heat coming in from the sun. They are designed with the local

More information

Estimator: Miami Estimates Business: (305) 395-4362. Date Entered: 04/30/2008

Estimator: Miami Estimates Business: (305) 395-4362. Date Entered: 04/30/2008 Insured: Property: Claim Rep.: Business: Estimator: Miami Estimates Business: (305) 395-4362 Claim Number Policy Number Type of Loss Deductible Dates: Date of Loss: 10/24/2005 Dwelling $0.00 Other structures

More information

Roofing Systems. There are many different systems, each with it's own special requirements and benefits. Browse through all the options below.

Roofing Systems. There are many different systems, each with it's own special requirements and benefits. Browse through all the options below. Roofing Systems There are many different systems, each with it's own special requirements and benefits. Browse through all the options below. BUR (Built-Up Roofing) Built-Up-Roofing, BUR is a roof that

More information

SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request

SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request SECTION 00 0110 PROCUREMENT AND CONTRACTING REQUIREMENTS 1.1 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS A. 00 0101 - Project Title Page B. 00 0105 - Certifications Page C. 00 0110 - Table

More information

REPLACEMENT COST ESTIMATOR FORM

REPLACEMENT COST ESTIMATOR FORM REPLACEMENT COST ESTIMATOR FORM GENERAL INFORMATION Policy Number: Current Coverage: Insured Name: Property Address: Property Zip: Davis, Clark & Latham Ins. Agency 1 Pleasant Street, Suite 3 Reading,

More information

May 23, 2014. Mr. Derek Sandgren Helm Properties 1520 Butte House Road, Suite 400 Yuba City, California 95993-2240

May 23, 2014. Mr. Derek Sandgren Helm Properties 1520 Butte House Road, Suite 400 Yuba City, California 95993-2240 May 23, 2014 Mr. Derek Sandgren Helm Properties 1520 Butte House Road, Suite 400 Yuba City, California 95993-2240 RE: Pre-Demolition Asbestos Survey Report 6150 Farrell Street, Marysville, California 95901

More information

Factors in Considering a Shopping Centre Location

Factors in Considering a Shopping Centre Location Factors in Considering a Shopping Centre Location Small retailers, who seek new sites for their stores, or service shops, should add the shopping centre to their lists of possible locations. When they

More information

ROOFER TRADE REGULATION

ROOFER TRADE REGULATION Province of Alberta APPRENTICESHIP AND INDUSTRY TRAINING ACT ROOFER TRADE REGULATION Alberta Regulation 301/2000 With amendments up to and including Alberta Regulation 1/2011 Office Consolidation Published

More information

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage Property Address: Company Name: Contractor Name: Contractor Address: City: State: Zip: License Number: Phone Number

More information

Moisture Control. System Solutions to Prevent Mold

Moisture Control. System Solutions to Prevent Mold System Solutions to Prevent Mold How a systems approach to managing moisture is the most effective strategy for minimizing the growth of mold. Moisture Control Architects, designers, contractors and maintenance

More information

R-Value and Densities Chart

R-Value and Densities Chart R-Value and Densities Chart Material R-Value Per Inch R-Value Per Unit Inside Air Film 0.68 Air Space between Studs 0.95 Building Pa 0.06 ½ in. Fiberboard Sheathing 1.52 Gypsum Wallboard or Drywall 0.90

More information

FOR SALE Office Building

FOR SALE Office Building 1712 West State Street Bristol, Tennessee 37620 State TR # 13-11-003 Open house on April 26, 2016 from 1:00-3:00pm EST FOR SALE Office Building OFFERING MEMORANDUM Contact Information Jeff Jones 615-445-9984

More information

The Cabin Shell Series

The Cabin Shell Series The Columbia 816 sq ft 1 Story 2 Bedrooms 1 Bathroom Effective June 2014 The Columbia EXAMPLE FINISH STANDARD FLOORPLAN Options Pricing Description Retail UoM Deck Wood Floor - Exterior 2x6 Pressure Treated

More information

Property Condition Assessment

Property Condition Assessment Property Condition Assessment Business, Wisconsin Inspection Date: 8/2009 Prepared For: Business Owner Report Number: TD999909 Prepared By: Shamrock Building Inspection Consultants LLC N29 W29951 Shel-Mar

More information

Students were surveyed by Brailsford & Dunlavey in the fall of 2000 to determine their priorities for Commons program spaces.

Students were surveyed by Brailsford & Dunlavey in the fall of 2000 to determine their priorities for Commons program spaces. I-1 2.0 INTRODUCTION 2.1 BACKGROUND Located in the rapidly growing Inland Empire area of Southern California (Riverside and San Bernardino Counties), the University of California, Riverside is well positioned

More information

VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10

VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10 VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10 SECTION B1: PREPARATION GUIDE B1.1 INTRODUCTION... B1-1

More information

Building Owners Guide to a Duro-Last System!

Building Owners Guide to a Duro-Last System! Building Owners Guide to a Duro-Last System Table of Contents Section 1: Introduction to Duro-Last Roofing Systems Section 2: Benefits of a Duro-Last Roofing System Section 3: Comparing a Duro-Last Roof

More information

InfoforBuilding.com Owner-Builder Spreadsheet

InfoforBuilding.com Owner-Builder Spreadsheet InfoforBuilding.com Owner-Builder Spreadsheet 2002 InfoforBuilding.com. All rights reserved. www.infoforbuilding.com *Please see notes for directions KEY to boxes Required input Indicates owner-builder

More information

2015-2016 Design Scenario Interior Design STAR Event

2015-2016 Design Scenario Interior Design STAR Event 2015-2016 Design Scenario Interior Design STAR Event The Pocono s Children s Camp Developed with input by professional members of The American Society of Interior Designers (ASID) Project Overview and

More information

metal Duil~ing manufacturers Association

metal Duil~ing manufacturers Association metal Duil~ing manufacturers Association ApplicatiDns metal Building Systems Conventional Buildings Retrofit Roofing Projects l~e Perfect Cover.One of the most important technological advances in building

More information

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE APPLICATION REVIEW

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE APPLICATION REVIEW CITY OF EDGEWATER BUILDING DEPARTMENT 104 North Riverside Drive Edgewater, Florida 32132 Phone: (386) 424-2400 X 1514 FAX: (386) 424-2423 SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE APPLICATION SUBSTANTIAL

More information

Solving Persistent Moisture Problems and Moisture Damage

Solving Persistent Moisture Problems and Moisture Damage B etter buildings Solving Persistent Moisture Problems and Moisture Damage Summary This three-storey, 15-unit, 1,300 square metre (13,993 sq. ft) walk-up was built in 1958. In the 1980s, the building started

More information

How To Design A Post Tensioned Deck For A Building

How To Design A Post Tensioned Deck For A Building SAMUEL ÁVILA STRUCTURAL OPTION FACULTY CONSULTANT: THOMAS BOOTHBY UNIVERSITY OF CENTRAL FLORIDA S ACADEMIC VILLAGES ORLANDO, FL THESIS PROPOSAL EXECUTIVE SUMMARY DECEMBER 12, 2005 Introduction: The University

More information

An Introductory Overview of Green/Sustainable Retrofitting of Existing Buildings in the U.S. May 2010 THE CHEAPEST ENERGY IS SAVED ENERGY 1

An Introductory Overview of Green/Sustainable Retrofitting of Existing Buildings in the U.S. May 2010 THE CHEAPEST ENERGY IS SAVED ENERGY 1 An Introductory Overview of Green/Sustainable Retrofitting of Existing Buildings in the U.S. May 2010 THE CHEAPEST ENERGY IS SAVED ENERGY 1 Executive Summary The word Retrofit today, has many connotations

More information

While RS Means is a useful estimating tool, it must be used as intended, coupled with regional knowledge.

While RS Means is a useful estimating tool, it must be used as intended, coupled with regional knowledge. Judicial Branch Capital Construction Program White Paper Courthouse Construction Costs The purpose of this White Paper is to summarize the independent reviews of seven different estimating firms responding

More information

CASE STUDY SERIES CASE # 0001. Columbus, OH. UTILITIES DYNAMICS, INC. and ENERGY IMPACT. Specialty Retail LED Lighting Case Study

CASE STUDY SERIES CASE # 0001. Columbus, OH. UTILITIES DYNAMICS, INC. and ENERGY IMPACT. Specialty Retail LED Lighting Case Study CASE STUDY SERIES CASE # 0001 Columbus, OH UTILITIES DYNAMICS, INC. and ENERGY IMPACT Specialty Retail LED Lighting Case Study Client and General Overview At the time of our roll-out, The Limited had 4,500

More information

Movie star Brad Pitt helps Make It Right rebuild the Lower Ninth Ward with affordable LEED Platinum homes

Movie star Brad Pitt helps Make It Right rebuild the Lower Ninth Ward with affordable LEED Platinum homes Make It Right Movie star Brad Pitt helps Make It Right rebuild the Lower Ninth Ward with affordable LEED Platinum homes Few can forget the horrific images from Hurricane Katrina. In 2005, the hurricane

More information

C-2 Construction, Inc. - NAICS Codes

C-2 Construction, Inc. - NAICS Codes C-2 Construction, Inc. - NAICS Codes 212313 - Crushed and Broken Granite Mining and Quarrying This U.S. industry comprises: (1) establishments primarily engaged in developing the mine site, and/or mining

More information

Commercial And Industrial Steel Buildings

Commercial And Industrial Steel Buildings Commercial And Industrial Steel Buildings Arco Building Systems, Inc. Since 1979 Arco has been providing the highest quality steel buildings to contractors and owners throughout the United States. Leadership

More information

How To Plan A Building

How To Plan A Building State of Nevada Department of Administration Purchasing Division Las Vegas Purchasing Warehouse Facility Condition Analysis LAS VEGAS PURCHASING WAREHOUSE 1054 South Commerce Street Las Vegas, Nevada Site

More information

Asbestos Survey Form (See Instructions)

Asbestos Survey Form (See Instructions) Asbestos Survey Form (See Instructions) 777 12th Street, 3rd Floor Sacramento, CA 95814 Office (916) 874-4800 Fax (916) 874-4899 Email: asbestos@airquality.org 1. Purpose of Survey Renovation Demolition

More information

Roof Inspection. Summary Report

Roof Inspection. Summary Report Phone: (561) 866 9956 www.real-estate-inspections.com Roof Inspection Summary Report Subject Property File Number: 05-15-RF-002 Inspector: Craig Milliken, PE CPM Real Estate Inspections, Inc. Date of Inspection:

More information

Estimated Cost of Repair

Estimated Cost of Repair 1 Applicant: Property: Home: Business: Assessor: Applicant Number: Type of Loss: Hurricane Date Contacted: 1/18/2014 Date of Loss: 10/29/2012 Date Received: 1/14/2014 Date Inspected: 2/4/2014 Date Entered:

More information

CITY OF CHICAGO SMALL BUSINESS IMPROVEMENT FUND (SBIF) PROGRAM RULES

CITY OF CHICAGO SMALL BUSINESS IMPROVEMENT FUND (SBIF) PROGRAM RULES CITY OF CHICAGO SMALL BUSINESS IMPROVEMENT FUND (SBIF) PROGRAM RULES The City of Chicago s Small Business Improvement Fund is a Tax Increment Financing (TIF) program, which will reimburse building owners

More information