Rothenberger Roweld P 160 B Welding parameters for egeplast SLM 3.0 pipes - butt fusion jointing without cutting back the coating
|
|
- Bernard Bond
- 7 years ago
- Views:
Transcription
1 Rothenberger Roweld P 160 B Welding parameters for egeplast SLM 3.0 pipes - butt fusion jointing without cutting back the coating Welding takes place according to the relevant DVS guidelines DVS 2207 and 2208 The following parameters apply to the machine type listed above only Reference value for the heating element temperature is 220 C Changeover should be kept as short as possible Additionally to the given bead-up force and welding force, the moving force of the support must be added! Schematic presentation of the welding process OD SDR Bead-up Heat-up Changeover (max) Joining pressure buildup SDR bar s 5 s 5 s 1.90 bar 6 min SDR bar s 5 s 5 s 1.90 bar 6 min 40 SDR bar s 5 s 5 s 2.20 bar 6 min SDR bar 1 50 s 5 s 5 s 2.50 bar 6 min SDR bar 1 58 s 5 s 5 s 2.90 bar 8 min SDR bar 1 69 s 5 s 5 s 3.30 bar 9 min SDR bar s 5 s 5 s 2.80 bar 6 min SDR bar s 5 s 5 s 2.90 bar 6 min 50 SDR bar 1 52 s 5 s 5 s 3.30 bar 7 min SDR bar 1 61 s 5 s 5 s 3.80 bar 8 min SDR bar s 6 s 6 s 4.40 bar 10 min SDR bar s 6 s 6 s 5.10 bar 11 min 47
2 Heat-up Changeover Joining pressure build SDR Bead-up (max) -up SDR bar 1 52 s 5 s 5 s 4.20 bar 7 min SDR bar 1 54 s 5 s 5 s 4.40 bar 7 min 63 SDR bar 1 63 s 5 s 5 s 5.10 bar 8 min SDR bar s 6 s 6 s 5.90 bar 10 min SDR bar s 6 s 6 s 6.80 bar 12 min SDR bar s 7 s 7 s 7.70 bar 14 min SDR bar 1 59 s 5 s 5 s 5.70 bar 8 min SDR bar 1 61 s 5 s 5 s 5.90 bar 8 min 75 SDR bar s 6 s 6 s 6.90 bar 10 min SDR bar s 6 s 6 s 7.90 bar 11 min SDR bar s 7 s 7 s 9.30 bar 13 min SDR bar s 8 s 8 s bar 16 min SDR bar 1 69 s 5 s 5 s 7.90 bar 9 min SDR bar s 6 s 6 s 8.30 bar 10 min 90 SDR bar s 6 s 6 s 9.60 bar 11 min SDR bar s 7 s 7 s bar 13 min SDR bar s 8 s 8 s bar 16 min SDR bar s 8 s 9 s bar 18 min SDR bar s 6 s 6 s bar 11 min SDR bar s 6 s 6 s bar 12 min 110 SDR bar s 7 s 7 s bar 14 min SDR bar s 8 s 8 s bar 16 min SDR bar s 8 s 9 s bar 19 min SDR bar s 9 s 10 s bar 22 min SDR bar s 6 s 6 s bar 12 min SDR bar s 7 s 7 s bar 13 min 125 SDR bar s 7 s 7 s bar 15 min SDR bar s 8 s 8 s bar 18 min SDR bar s 9 s 9 s bar 21 min SDR bar s 10 s 11 s bar 24 min SDR bar s 7 s 7 s bar 13 min SDR bar s 7 s 7 s bar 14 min 140 SDR bar s 8 s 8 s bar 16 min SDR bar s 8 s 9 s bar 19 min SDR bar s 9 s 10 s bar 23 min SDR bar s 10 s 12 s bar 27 min 48
3 Rothenberger Roweld P 250 B Welding parameters for egeplast SLM 3.0 pipes - butt fusion jointing without cutting back the coating Welding takes place according to the relevant DVS guidelines DVS 2207 and 2208 The following parameters apply to the machine type listed above only Reference value for the heating element temperature is 220 C Changeover should be kept as short as possible Additionally to the given bead-up force and welding force, the moving force of the support must be added! Schematic presentation of the welding process OD Heat-up Changeover Joining pressure buildup SDR Bead-up (max) SDR bar 1 69 s 5 s 5 s 4.50 bar 9 min SDR bar s 6 s 6 s 4.70 bar 10 min 90 SDR bar s 6 s 6 s 5.50 bar 11 min SDR bar s 7 s 7 s 6.40 bar 13 min SDR bar s 8 s 8 s 7.40 bar 16 min SDR bar s 8 s 9 s 8.60 bar 18 min SDR bar s 6 s 6 s 6.80 bar 11 min SDR bar s 6 s 6 s 7.00 bar 12 min 110 SDR bar s 7 s 7 s 8.10 bar 14 min SDR bar s 8 s 8 s 9.50 bar 16 min SDR bar s 8 s 9 s bar 19 min SDR bar s 9 s 10 s bar 22 min 49
4 Heat-up Changeover Joining pressure buildup SDR Bead-up (max) SDR bar s 6 s 6 s 8.40 bar 12 min SDR bar s 7 s 7 s 8.70 bar 13 min 125 SDR bar s 7 s 7 s bar 15 min SDR bar s 8 s 8 s bar 18 min SDR bar s 9 s 9 s bar 21 min SDR bar s 10 s 11 s bar 24 min SDR bar s 7 s 7 s bar 13 min SDR bar s 7 s 7 s bar 14 min 140 SDR bar s 8 s 8 s bar 16 min SDR bar s 8 s 9 s bar 19 min SDR bar s 9 s 10 s bar 23 min SDR bar s 10 s 12 s bar 27 min SDR bar s 7 s 7 s bar 15 min SDR bar s 8 s 8 s bar 16 min 160 SDR bar s 8 s 9 s bar 19 min SDR bar s 9 s 10 s bar 22 min SDR bar s 10 s 11 s bar 26 min SDR bar s 11 s 13 s bar 31 min SDR bar s 8 s 8 s bar 17 min SDR bar s 8 s 8 s bar 18 min 180 SDR bar s 9 s 10 s bar 21 min SDR bar s 10 s 11 s bar 25 min SDR bar s 11 s 13 s bar 29 min SDR bar s 13 s 15 s bar 35 min SDR bar s 8 s 9 s bar 19 min SDR bar s 8 s 9 s bar 19 min 200 SDR bar s 9 s 10 s bar 23 min SDR bar s 10 s 12 s bar 27 min SDR bar s 12 s 14 s bar 32 min SDR bar s 14 s 16 s bar 38 min SDR bar s 9 s 9 s bar 21 min SDR bar s 9 s 10 s bar 21 min 225 SDR bar s 10 s 11 s bar 25 min SDR bar s 11 s 13 s bar 30 min SDR bar s 13 s 15 s bar 36 min SDR bar s 15 s 18 s bar 42 min 50
5 Rothenberger Roweld P 355 B Welding parameters for egeplast SLM 3.0 pipes - butt fusion jointing without cutting back the coating Welding takes place according to the relevant DVS guidelines DVS 2207 and 2208 The following parameters apply to the machine type listed above only Reference value for the heating element temperature is 220 C Changeover should be kept as short as possible Additionally to the given bead-up force and welding force, the moving force of the support must be added! Schematic presentation of the welding process OD Heat-up Changeover Joining pressure buildup SDR Bead-up (max) SDR bar 1 69 s 5 s 5 s 4.50 bar 9 min SDR bar s 6 s 6 s 4.70 bar 10 min OD 90 SDR bar s 6 s 6 s 5.50 bar 11 min SDR bar s 7 s 7 s 6.40 bar 13 min SDR bar s 8 s 8 s 7.40 bar 16 min SDR bar s 8 s 9 s 8.60 bar 18 min SDR bar s 6 s 6 s 6.80 bar 11 min SDR bar s 6 s 6 s 7.00 bar 12 min OD 110 SDR bar s 7 s 7 s 8.10 bar 14 min SDR bar s 8 s 8 s 9.50 bar 16 min SDR bar s 8 s 9 s bar 19 min SDR bar s 9 s 10 s bar 22 min 51
6 Heat-up Changeover Joining pressure build SDR Bead-up (max) -up SDR bar s 6 s 6 s 8.40 bar 12 min SDR bar s 7 s 7 s 8.70 bar 13 min OD 125 SDR bar s 7 s 7 s bar 15 min SDR bar s 8 s 8 s bar 18 min SDR bar s 9 s 9 s bar 21 min SDR bar s 10 s 11 s bar 24 min OD 140 OD 160 OD 180 OD 200 OD 225 SDR bar s 7 s 7 s bar 13 min SDR bar s 7 s 7 s bar 14 min SDR bar s 8 s 8 s bar 16 min SDR bar s 8 s 9 s bar 19 min SDR bar s 9 s 10 s bar 23 min SDR bar s 10 s 12 s bar 27 min SDR bar s 7 s 7 s bar 15 min SDR bar s 8 s 8 s bar 16 min SDR bar s 8 s 9 s bar 19 min SDR bar s 9 s 10 s bar 22 min SDR bar s 10 s 11 s bar 26 min SDR bar s 11 s 13 s bar 31 min SDR bar s 8 s 8 s bar 17 min SDR bar s 8 s 8 s bar 18 min SDR bar s 9 s 10 s bar 21 min SDR bar s 10 s 11 s bar 25 min SDR bar s 11 s 13 s bar 29 min SDR bar s 13 s 15 s bar 35 min SDR bar s 8 s 9 s bar 19 min SDR bar s 8 s 9 s bar 19 min SDR bar s 9 s 10 s bar 23 min SDR bar s 10 s 12 s bar 27 min SDR bar s 12 s 14 s bar 32 min SDR bar s 14 s 16 s bar 38 min SDR bar s 9 s 9 s bar 21 min SDR bar s 9 s 10 s bar 21 min SDR bar s 10 s 11 s bar 25 min SDR bar s 11 s 13 s bar 30 min SDR bar s 13 s 15 s bar 36 min SDR bar s 15 s 18 s bar 42 min 52
7 SDR Bead-up Heat-up Changeover (max) Joining pressure buildup OD 250 OD 280 OD 315 SDR bar s 9 s 10 s bar 22 min SDR bar s 9 s 10 s bar 23 min SDR bar s 10 s 12 s bar 27 min SDR bar s 12 s 14 s bar 32 min SDR bar s 14 s 16 s bar 39 min SDR bar s 16 s 16 s bar 47 min SDR bar s 10 s 11 s bar 24 min SDR bar s 10 s 11 s bar 25 min SDR bar s 11 s 13 s bar 30 min SDR bar s 13 s 15 s bar 36 min SDR bar s 15 s 18 s bar 43 min SDR bar s 17 s 18 s bar 52 min SDR bar s 10 s 12 s bar 27 min SDR bar s 11 s 12 s bar 28 min SDR bar s 12 s 14 s bar 33 min SDR bar s 14 s 17 s bar 40 min SDR bar s 15 s 18 s bar 42 min SDR bar s 19 s 21 s bar 58 min 53
8 Rothenberger Roweld P 500 B Welding parameters for egeplast SLM 3.0 pipes - butt fusion jointing without cutting back the coating Welding takes place according to the relevant DVS guidelines DVS 2207 and 2208 The following parameters apply to the machine type listed above only Reference value for the heating element temperature is 220 C Changeover should be kept as short as possible Additionally to the given bead-up force and welding force, the moving force of the support must be added! Schematic presentation of the welding process OD SDR Bead-up Heat-up Changeover (max) Joining pressure buildup SDR bar s 8 s 9 s 9.60 bar 19 min SDR bar s 8 s 9 s 9.90 bar 19 min 200 SDR bar s 9 s 10 s bar 23 min SDR bar s 10 s 12 s bar 27 min SDR bar s 12 s 14 s bar 32 min SDR bar s 14 s 16 s bar 38 min SDR bar s 9 s 9 s bar 21 min SDR bar s 9 s 10 s bar 21 min 225 SDR bar s 10 s 11 s bar 25 min SDR bar s 11 s 13 s bar 30 min SDR bar s 13 s 15 s bar 36 min SDR bar s 15 s 18 s bar 42 min 54
9 Heat-up Changeover Joining pressure build SDR Bead-up (max) -up SDR bar s 9 s 10 s bar 22 min SDR bar s 9 s 10 s bar 23 min 250 SDR bar s 10 s 12 s bar 27 min SDR bar s 12 s 14 s bar 32 min SDR bar s 14 s 16 s bar 39 min SDR bar s 16 s 16 s bar 47 min SDR bar s 10 s 11 s bar 24 min SDR bar s 10 s 11 s bar 25 min 280 SDR bar s 11 s 13 s bar 30 min SDR bar s 13 s 15 s bar 36 min SDR bar s 15 s 18 s bar 43 min SDR bar s 17 s 18 s bar 52 min SDR bar s 10 s 12 s bar 27 min SDR bar s 11 s 12 s bar 28 min 315 SDR bar s 12 s 14 s bar 33 min SDR bar s 14 s 17 s bar 40 min SDR bar s 15 s 18 s bar 42 min SDR bar s 19 s 21 s bar 58 min SDR bar s 11 s 13 s bar 30 min SDR bar s 11 s 13 s bar 31 min 355 SDR bar s 13 s 16 s bar 37 min SDR bar s 16 s 16 s bar 45 min SDR bar s 18 s 19 s bar 54 min SDR bar s 21 s 22 s bar 64 min SDR bar s 12 s 14 s bar 33 min SDR bar s 12 s 14 s bar 34 min 400 SDR bar s 14 s 17 s bar 41 min SDR bar s 17 s 18 s bar 50 min SDR bar s 20 s 20 s bar 60 min SDR bar s 22 s 25 s bar 70 min SDR bar s 13 s 16 s bar 37 min SDR bar s 14 s 16 s bar 38 min 450 SDR bar s 16 s 16 s bar 46 min SDR bar s 18 s 20 s bar 56 min SDR bar s 21 s 23 s bar 66 min SDR bar s 24 s 29 s bar 78 min 55
10 Rothenberger Roweld P 630 B Welding parameters for egeplast SLM 3.0 pipes - butt fusion jointing without cutting back the coating Welding takes place according to the relevant DVS guidelines DVS 2207 and 2208 The following parameters apply to the machine type listed above only Reference value for the heating element temperature is 220 C Changeover should be kept as short as possible Additionally to the given bead-up force and welding force, the moving force of the support must be added! Schematic presentation of the welding process OD Heat-up Changeover Joining pressure buildup SDR Bead-up (max) SDR bar s 10 s 12 s bar 27 min SDR bar s 11 s 12 s bar 28 min 315 SDR bar s 12 s 14 s bar 33 min SDR bar s 14 s 17 s bar 40 min SDR bar s 15 s 18 s bar 42 min SDR bar s 19 s 21 s bar 58 min SDR bar s 11 s 13 s bar 30 min SDR bar s 11 s 13 s bar 31 min 355 SDR bar s 13 s 16 s bar 37 min SDR bar s 16 s 16 s bar 45 min SDR bar s 18 s 19 s bar 54 min SDR bar s 21 s 22 s bar 64 min 56
11 Heat-up Changeover Joining pressure SDR Bead-up (max) build-up SDR bar s 12 s 14 s bar 33 min SDR bar s 12 s 14 s bar 34 min 400 SDR bar s 14 s 17 s bar 41 min SDR bar s 17 s 18 s bar 50 min SDR bar s 20 s 20 s bar 60 min SDR bar s 22 s 25 s bar 70 min SDR bar s 13 s 16 s bar 37 min SDR bar s 14 s 16 s bar 38 min 450 SDR bar s 16 s 16 s bar 46 min SDR bar s 18 s 20 s bar 56 min SDR bar s 21 s 23 s bar 66 min SDR bar s 24 s 29 s bar 78 min SDR bar s 14 s 17 s bar 40 min SDR bar s 15 s 18 s bar 42 min 500 SDR bar s 17 s 18 s bar 51 min SDR bar s 20 s 20 s bar 61 min SDR bar s 23 s 26 s bar 72 min SDR bar s 16 s 19 s bar 45 min 560 SDR bar s 16 s 16 s bar 46 min SDR bar s 19 s 20 s bar 56 min SDR bar s 21 s 23 s bar 67 min 57
12 Rothenberger Roweld P 630 B plus Welding parameters for egeplast SLM 3.0 pipes - butt fusion jointing without cutting back the coating Welding takes place according to the relevant DVS guidelines DVS 2207 and 2208 The following parameters apply to the machine type listed above only Reference value for the heating element temperature is 220 C Changeover should be kept as short as possible Additionally to the given bead-up force and welding force. the moving force of the support must be added! Schematic presentation of the welding process OD Heat-up Changeover Joining pressure build-up SDR Bead-up (max) SDR bar s 10 s 12 s bar 27 min SDR bar s 11 s 12 s bar 28 min 315 SDR bar s 12 s 14 s bar 33 min SDR bar s 14 s 17 s bar 40 min SDR bar s 15 s 18 s bar 42 min SDR bar s 19 s 21 s bar 58 min SDR bar s 11 s 13 s bar 30 min SDR bar s 11 s 13 s bar 31 min 355 SDR bar s 13 s 16 s bar 37 min SDR bar s 16 s 16 s bar 45 min SDR bar s 18 s 19 s bar 54 min SDR bar s 21 s 22 s bar 64 min 58
13 Heat-up Changeover Joining pressure SDR Bead-up (max) build-up SDR bar s 12 s 14 s bar 33 min SDR bar s 12 s 14 s bar 34 min 400 SDR bar s 14 s 17 s bar 41 min SDR bar s 17 s 18 s bar 50 min SDR bar s 20 s 20 s bar 60 min SDR bar s 22 s 25 s bar 70 min SDR bar s 13 s 16 s bar 37 min SDR bar s 14 s 16 s bar 38 min 450 SDR bar s 16 s 16 s bar 46 min SDR bar s 18 s 20 s bar 56 min SDR bar s 21 s 23 s bar 66 min SDR bar s 24 s 29 s bar 78 min SDR bar s 14 s 17 s bar 40 min SDR bar s 15 s 18 s bar 42 min 500 SDR bar s 17 s 18 s bar 51 min SDR bar s 20 s 20 s bar 61 min SDR bar s 23 s 26 s bar 72 min SDR bar s 16 s 19 s bar 45 min 560 SDR bar s 16 s 16 s bar 46 min SDR bar s 19 s 20 s bar 56 min SDR bar s 21 s 23 s bar 67 min 59
Butt Fusion Welding of HDPE Pipes Work Procedure
Butt Fusion Welding of HDPE Pipes Work Procedure A pipeline is as good as its weakest point. Accordingly it is not only important that quality pipes and components are used in a piping system, but also
More informationA World Class Manufacturer of Induction Bends
A World Class Manufacturer of Induction Bends COFELY FABRICOM BENDING A leading position in bending High Flexibility and Close Tolerances As a world leading manufacturer of pipe bends, produced by induction
More informationGAS DISTRIBUTION PRODUCTS STEEL SERVICE TEES
GAS DISTRIBUTION PRODUCTS STEEL SERVICE TEES CONTINENTAL INDUSTRIES ABOUT US THE ULTIMATE CONNECTION Our Company Continental Industries, headquartered in Tulsa, Oklahoma, was formed in 1958 and is today
More informationSocket Heat Fusion Techniques. A Guide for Instruction and Training in Vanguard Socket Heat Fusion
Socket Heat Fusion Techniques A Guide for Instruction and Training in Vanguard Socket Heat Fusion TABLE OF CONTENTS This brochure has been developed to assist those responsible for socket fusion joining
More informationTABLE OF CONTENTS 2 Heavy-Wall Seamless & Welded Carbon Steel Pipe. 4 Alloy Pipe & Tube. 6 Chrome-Moly Pipe. 7 Low-Temp Pipe
PRODUCT CATALOG TABLE OF CONTENTS 2 Heavy-Wall Seamless & Welded Carbon Steel Pipe 4 Alloy Pipe & Tube 6 Chrome-Moly Pipe 7 Low-Temp Pipe 9 Services amerpipe.com 1.800.316.5737 sales@amerpipe.com 18333
More informationStructural welding is a process by which the parts that are to be connected are heated and
CHAPTER 6. WELDED CONNECTIONS 6.1 INTRODUCTORY CONCEPTS Structural welding is a process by which the parts that are to be connected are heated and fused, with supplementary molten metal at the joint. A
More informationpvc well casing & drop pipe
CertainTeed pvc well casing & drop pipe PVC Well Products Sure Fit PVC well casing and drop pipe have gained broad acceptance since their introduction almost 40 years ago. Today, due to its outstanding
More informationSPECIFICATIONS FOR STEEL PIPE
SPECIFICATIONS FOR STEEL PIPE Published pipe standards serve three functions. 1. They dictate manufacturing and testing requirements and prescribed methods of measuring the required mechanical and physical
More informationPipe Cutting and Beveling Clamshells
Pipe Cutting and Beveling Clamshells Who We Are One Company, Total Support, Complete Solutions For more than a century, Hydratight has provided world-class bolted joint solutions and continues to set international
More informationGeneric Butt Fusion Joining Procedure for Field Joining of Polyethylene Pipe TR-33
Generic Butt Fusion Joining Procedure for Field Joining of Polyethylene Pipe TR-33 2012 105 Decker Court, Suite 825, Irving, TX 75062 Phone: 469-499-1044 Fax: 469-499-1063 www.plasticpipe.org Contents
More informationASTM A860/A860M-09 Standard Specification for Wrought High Strength. Ferritic Steel Butt Welding Fittings. 1. Scope :- 2. Reference Documents :-
Standard Specification for Wrought High Strength Ferritic Steel Butt Welding Fittings 1. Scope :- 1.1 This specification covers wrought high strength ferritic steel butt-welding fitting of seamless and
More informationSLA BARRIER PIPE SYSTEM Technical Data & Price List
SLA BARRIER PIPE SYSTEM Technical Data & Price List Introduction About Westwood Pipelines Ltd. Since its formation, Westwood Pipelines Ltd has become a leading supplier and manufacturer of polyethylene
More informationMAY WE HELP YOU BUNDLE YOUR PRODUCTS?
BUNDLING MACHINES MAY WE HELP YOU BUNDLE YOUR PRODUCTS? BP-700-CVS (+KT-1200) AVC Sealing Solutions is a dynamic company with many years of experience and a clear ambition: to be the best in our market.
More informationFord Pipe Repair Products The Ford Meter Box Company, Inc.
Section L 7/2008 Ford Pipe Repair Products The Ford Meter Box Company, Inc. 775 Manchester Avenue, P.O. Box 443, Wabash, Indiana, USA 46992-0443 Telephone: 260-563-3171 FAX: 800-826-3487 Overseas FAX:
More informationPolyethylene Pressure Pipe
-25 Pipe Systems dvantages Pipe made from polyethylene is a cost-effective solution to a broad range of piping problems in municipal, industrial, marine, mining, and agricultural applications. It has proven
More informationThermoSorb Desiccant Dryers
ThermoSorb Desiccant Dryers Sierra Why dry compressed air? Contamination reduces efficiency The air we breathe contains contamination in the form of water vapour and airborne particles. During the compression
More informationAppendix A: Acceptable pipe and fitting materials
Watercare Services Limited Water and Code of Practice Content from the NZS 4404:2010 Land development and subdivision infrastructure has been reproduced for use in the Infrastructure Design s Manual for
More informationCaps STANDARD WEIGHT Inches / Pounds
Standard Caps you are here: Home > Weldbend Catalog > Fittings > Caps Caps STANDARD WEIGHT Inches / Pounds For Metric Units >Click Here Nominal Pipe Size Outside Inside Wall Thickness (T) Length (E) Pipe
More informationNDT Procedure for Liquid Penetrant Inspection
NDT Procedure for Liquid Penetrant Inspection A Nondestructive testing (NDT) Procedure suitable for General Liquid/Dye Penetrant Inspections. This is a sample LPT procedure and may be required to be modified
More informationEuropean Welding Standards
European Welding Standards John Dyson 15 th March 2004 European Standards Harmonised Standards Not all EN Standards are Harmonised, only those that are considered to satisfy relevant ESRs in product directives.
More informationMANAGEMENT AND USE OF WORK EQUIPMENT: PRESSURE SYSTEMS
Health & Safety Services Unit name goes here Safety Code of Practice 46, Part 2 1st Edition, November 2009 MANAGEMENT AND USE OF WORK EQUIPMENT: PRESSURE SYSTEMS University of Reading 2015 Page 1 Contents
More informationECOSTYLE RADIANT PANELS Installa on and Opera on Manual 2013
ECOSTYLE RADIANT PANELS Installa on and Opera on Manual 0 QUALITY 0 YEAR GUARANTEE Exclusively distributed by: Table of contents Panel radiators General / Guarantee Technical data and radiator dimensions
More information( ) = ( ) = {,,, } β ( ), < 1 ( ) + ( ) = ( ) + ( )
{ } ( ) = ( ) = {,,, } ( ) β ( ), < 1 ( ) + ( ) = ( ) + ( ) max, ( ) [ ( )] + ( ) [ ( )], [ ( )] [ ( )] = =, ( ) = ( ) = 0 ( ) = ( ) ( ) ( ) =, ( ), ( ) =, ( ), ( ). ln ( ) = ln ( ). + 1 ( ) = ( ) Ω[ (
More informationR&D Services Knowledge transfer
R&D Services Knowledge transfer Training Offer - November 2009 OCAS : a joint venture between ArcelorMittal and the Flemish Region R&D Knowledge transfer - Scope Market-oriented knowledge transfer in the
More informationHDPE Pipe Joining System
HDPE Pipe Joining System The System The fast, easy, and economical way to mechanically join HDPE pipe. Fast, easy bolted connection Faster installation Easy to remove and rotate pipe for increased pipe
More informationPIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification. 96 B. Riutta
PIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification Number: 3503-11.2.610 Rev. 2 Rubber Lined Steel Pipe and Fittings Mechanically Coupled Plain End Type System Issued Revised Approved
More informationSpecification for Rotary Drill Stem Elements
Addendum 1 March 2007 Effective Date: September 1, 2007 Specification for Rotary Drill Stem Elements ANSI/API SPECIFICATION 7-1 FIRST EDITION, MARCH 2006 EFFECTIVE DATE: SEPTEMBER 2006 ISO 10424-1:2004
More informationTECHNICAL SPECIFICATION
THOMAS - G-FLEX GFLEX TECH SPEC CONNECTING INNOVATION JOHANNESBURG TEL: +27 11 794 7594 CAPE TOWN TEL: +27 21 556 5258 POLOKWANE TEL: 015 298 9142 DESIGNER, MANUFACTURER AND DISTRIBUTOR OF PIPE CONNECTION,
More informationPolyethylene Piping Distribution Systems for Components of Liquid Petroleum Gases TR-22
Polyethylene Piping Distribution Systems for Components of Liquid Petroleum Gases TR-22 2013 105 Decker Court, Suite 825, Irving, TX 75063 P: 469-499-1044 F: 469-499-1063 www.plasticpipe.org Foreword POLYETHYLENE
More information1x90 TONS TENSIONERS TECHNICAL PROPOSAL. 1 X 90 Tons 30 m/min Tensioners TECHNICAL PROPOSAL JOB 08/059. 0 19/02/2008 Basic proposal PP GM SB
Pagina N.: 1 of 19 1 X 90 Tons 30 m/min Tensioners JOB 08/059 0 19/02/2008 Basic proposal PP GM SB Rev N Date Issue Description Prepared by Checked by Approved by Pagina N.: 2 of 19 TABLE OF CONTENTS:
More informationPolyethylene (PE) pipes Dimensions
DEUTSCHE NORM Augut 1999 Polyethylene (PE) pipe Dimenion { 8074 ICS 23.040.20 Rohre au Polyethylen (PE) PE 63, PE 80, PE 100, PE HD Maße Superede September 1987 edition. In keeping with current practice
More informationTechnical Data Manual Model Nos. and pricing: see Price List
VITOCELL-V 00 Indirect-fired domestic hot water storage tank 4 to 0 / 60 to Technical Data Manual Model Nos. and pricing: see Price List Vitocell-V 00 4 to / 60 to Vitocell-V 00 0 / Vitocell-V 00 CVA Series
More informationGeneral Guidelines for Repairing Buried PE Potable Water Pressure Pipes
515 General Guidelines for Repairing Buried PE Potable Water Pressure Pipes Introduction Traditional piping systems have gasket-sealed bell and spigot joints every 20 feet, which can be a potential maintenance
More informationHigh Power Tests of Beryllium Oxide Windows to the Lower Hybrid Current Drive Launcher in JET
JET R(98)11 A Ekedahl et al High Power Tests of Beryllium Oxide Windows to the Lower Hybrid Current Drive Launcher in JET This document is intended for publication in the open literature. It is made available
More information15/06/2005 6 - Test procedure Current 3mA +/- 0.02mA. Section 12.8 - Cathodic Disbondment of the Coating
Document Name Standard Date / Edition Applicable Section Test Type AS+4352-2005 AS 4352-2005 Australian Standard Tests for coating resistance to cathodic disbonding CSA Z245 20 02 Z245 21 02 Z245.20 External
More informationSolid Oxide Fuel Cell Gas Turbine Hybrid Power Plant. M. Henke, C. Willich, M. Steilen, J. Kallo, K. A. Friedrich
www.dlr.de Chart 1 > SOFC XIII > Moritz Henke > October 7, 2013 Solid Oxide Fuel Cell Gas Turbine Hybrid Power Plant M. Henke, C. Willich, M. Steilen, J. Kallo, K. A. Friedrich www.dlr.de Chart 2 > SOFC
More informationThe Suitability of CRA Lined Pipes for Flowlines Susceptible to Lateral Buckling SUT Global Pipeline Buckling Symposium, 23 24 February 2011
The Suitability of CRA Lined Pipes for Flowlines Susceptible to Lateral Buckling SUT Global Pipeline Buckling Symposium, 23 24 February 2011 Duncan Wilmot, Technical Manager, Cladtek International, Australia
More informationSECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS
SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS PART 1 GENERAL 1.01 SECTION INCLUDES A. The requirements for pipe material and installation in sewer and drainage collection systems. All materials
More informationFLEXWELL Safety Pipe. Pipe systems for installations Technical details
Pipe systems for installations Technical details Notes 08.04.2013 T page 2 Contents 4.0 4.0 Contents 4.1 System description 4.100 System description FLEXWELL Safety Pipe 4.105 System description FLEXWELL
More informationBackflush filter R8-30W
Backflush filter R8-30W With internal pressure segment cleaning, rated pressure to 40 bar (580 psi) Connection sizes: DN 200 to DN 500, welded design 1. Features Powerful, fully automatic filtration _
More informationNDT Procedure for Liquid Penetrant Inspection TRINITY NDT. An ISO 9001:2008 Certified Company
NDT Procedure for Liquid Penetrant Inspection A Nondestructive testing (NDT) Procedure suitable for General Liquid/Dye Penetrant Inspections. This is a sample LPT procedure and may be required to be modified
More informationSimmerring BA.../SL to DIN 3760 A/AS
Simmerring BA.../SL to DIN 3760 A/AS Simmerring BA.../SL to DIN 3760 A/AS Simmerring BAUX2, BAUSLX2, BAFUDX7, BAFUDSLX7, BA, BASL, BAU, BAUSL Product advantages Broad range of applications in every sector
More informationKONRAD. Hybrid Fancoil Series
KONRAD Hybrid Fancoil Series Konrad is an innovative radiator which cools you down and warms you up. Indeed, it cools in summer and heats in winter; but it makes it with an incomparable quietness. Thanks
More informationVrtné trubky Drill Pipe
Vrtné trubky Drill Pipe VRTNÉ ROURY - zušlechtěné závity - vysoká kvalita těla roury - svařeno třením - vysoká přímost vrtných tyčí - závity dle STN, API, DIN a GOST - délky dle přání zákazníka Průměr
More informationSTRAUB-PLAST-PRO Technical Manual
STRAU-PLAST-PRO Technical Manual Contents STRAU-PLAST-PRO 3 Properties 3 Example 3 The full set 4 components 5 Conntectors 5 Pipe dimensions and tolerances 5 straub-plast-pro l Coupler 6 straub-plast-pro
More informationSTRAIN GAGE INSTALLATION HOLE DRILLING
Via Delle Calandre 63 50041 Calenzano (Florence) Italy Tel: +39.055.8826-302 Fax: -303 www.sintechnology.com info@sintechnology.com STRAIN GAGE INSTALLATION HOLE DRILLING How to install strain gages for
More informationrbital Fields of application Variants
Fields of application Based on more than 30 years experience of engineering and fabrication of Air and Flue Gas dampers, NOVAL makes available to its customers this welded design, in particular in the
More informationScraper Passage Indicator. Electrical Indicator. Features
IV Scraper Passage Indicator Bulletin No: 5110.001.03 Date: June 2008 Cross Indexing No: n/a Supersedes: 5110.001.02 (1/06) Flag Indicator Electrical Indicator Options Description TDW s IV Scraper Passage
More information14. Tools and Software
14. Tools and Software System overview: Geberit welding machine MEDIA 160 and tools... 364 System overview: Geberit welding machine UNIVERSAL 315 and tools... 365 14.1 Tools for Geberit Silent-db20 / Geberit
More information53.03 MATERIALS FOR SEWER LINER PIPE AND FITTINGS: The following materials are approved for installation in sanitary sewer lines:
Division 53: Slip-Lining of Existing Sewer Line 53.01 GENERAL: This section includes all labor, materials, transportation, equipment necessary to rehabilitate by means of Instituform deteriorated sections
More informationSpecification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe
Specification for Pipe Bursting Gravity Sewer Mains with HDPE Pipe 1. GENERAL The following supplemental sewer main specifications are intended to address the installation of high-density polyethylene
More informationHeat. Investigating the function of the expansion valve of the heat pump. LD Physics Leaflets P2.6.3.2. Thermodynamic cycle Heat pump
Heat Thermodynamic cycle Heat pump LD Physics Leaflets P2.6.3.2 Investigating the function of the expansion valve of the heat pump Objects of the experiment g To study the operational components of the
More informationBypass level indicator With magnetic display Model BNA
Level measurement Bypass level indicator With magnetic display Model BNA WIKA data sheet LM 10.01 Applications Continuous level indication without power supply Indication of the level proportional to height
More informationKEYSTONE. Stainless steel hygienic butterfly valves F250 for imperial tubing F251 for metric tubing
KEYSTONE Stainless steel hygienic butterfly valves F0 for imperial tubing F for metric tubing Features Keystone technology. Quarter turn operation. Isolation or regulation control. Equal percentage characteristics.
More informationMetal Pressfitting Pipe Systems
VdS Guidelines for water extinguishing systems VdS 2100-26-3en Requirements and test methods Part 3: Additional provisions for Pipe Systems made of galvanized steel VdS 2100-26-3en : 2012-04 (01) Publishing
More informationSchlatter WeldAnalyzer
General description and main features + Improvements compared to WeldMonitor V4.0 RB0045en WA Specification Rev2.6-1008 1. General description The Schlatter WeldAnalyzer program records, analyzes and
More informationRING JOINT SYSTEMS 207
RING JOINT SYSTEMS 07 08 Table of Contents Model R-88 Pages 10-11 Model R-88 Large Diameter Page 1 Model RH-1000 1000 PSI Coupling Page 13 Model RX-3000 3000 PSI Coupling Page 1 Model RX-3770 3770 PSI
More informationTRENCHLESS TECHNOLOGY GUIDELINES CLOSE FIT THERMOPLASTIC LINING
TRENCHLESS TECHNOLOGIES RESOURCE CENTRE TRENCHLESS TECHNOLOGY GUIDELINES SECOND EDITION CLOSE FIT THERMOPLASTIC LINING NEW VERSION AUGUST 2005 1. OVERVIEW The use of liners that are deliberately deformed
More informationHOSE, TUBE, AND PIPE CLAMPS
hose, tube & clamp B/W pages 24/6/08 9:28 AM Page 2 HOSE, TUBE, AND PIPE CLAMPS TABLE OF CONTENTS Introduction 3 Construction 3 Application 3 Mounting 3 Standard Duty Clamps (HRL) Arrangements 4 Dimensions
More informationJIS G3445 Carbon steel tubes for machine structural purposes
JIS G3445 arbon steel tubes for machine structural purposes 1. Scope This Japanese Industrial Standard specifies the carbon steel tubes, hereinafter referred to as the "tubes", used for machinery, automobiles,
More informationAutomatic Bypass Control AVDO
Application AVDO is a self-acting constant flow control primarily used either to maintain minimum flow rates through e.g. a low-capacity gas boiler or to control the differential pressure in a central
More informationsolarplus solar systems general features
SOLARPLUS solar systems solarplus Applications: expansion vessels for solar systems Zilmet, an internationally operating company with over 50 years of experience has grown to be the biggest European producer
More information1805 Series Relief Valves
October 2011 1805 Series Relief Valves P1026 1805G Type 1805-2 Type 1805-4 Figure 1. Typical 1805 Relief Valves Introduction The 1805 Series relief valves are designed for use in farm tap applications
More information725-R-599 PIPE LINING. (Revised 05-01-12) SECTION 725, BEGIN LINE 1, INSERT AS FOLLOWS: SECTION 725 SLIP LINING OF EXISTING PIPE
PIPE LINING (Revised 05-01-12) The Standard Specifications are revised as follows: SECTION 725, DELETE LINES 1 THRU 317. SECTION 725, BEGIN LINE 1, INSERT AS FOLLOWS: SECTION 725 SLIP LINING OF EXISTING
More informationDISTRIBUTION PIPING MATERIALS: BUILDING HYDRONIC SYSTEM MANAGEMENT. Jim Riley, Texas A&M University February 10, 2015
DISTRIBUTION PIPING MATERIALS: BUILDING HYDRONIC SYSTEM MANAGEMENT Jim Riley, Texas A&M University February 10, 2015 Piping at Texas A&M 2 History of Distribution Piping at Texas A&M Concrete reinforced
More informationTemperature Sensors. Accessories. for Injection Molding. Types 6192B, 6193B,
Accessories Temperature Sensors for Injection Molding Types 6192B, 6193B, 6194B, 6195B Temperature sensors for measuring the contact temperature directly in the cavity at the surface of the solidified
More informationAchim Beisiegel Fouad El-Rharbaoui Michael Wich. AREVA GmbH, Technical Center, 63791 Karlstein, Seligenstädter Strasse 100, Germany
Achim Beisiegel Fouad El-Rharbaoui Michael Wich AREVA GmbH, Technical Center, 63791 Karlstein, Seligenstädter Strasse 100, Germany 1 Introduction AREVA GmbH operates a unique Thermal-hydraulic platform
More informationBROEN UNiFlEx FiTTiNgs FOR BURNiNg gases OEN OEN ifl ifl FOR FOR BURN BURN gas gas
BROEN UNIFLEX Fittings FOR BURNIN ASES BROEN UniFlex TM Fittings for burning gases BROEN UniFlex TM Fittings for burning gases LAB Table of Contents Content Page Table of Content 2 Product Overview 3 BROEN
More informationBlowdown vessels Meeting the requirements of HSE PM60
Blowdown vessels Meeting the requirements of HSE PM60 BDV60 blowdown vessels complete range of equipment for the safe disposal of boiler blowdown Boiler blowdown Steam boilers must be blown down to remove
More informationApplication of Welding Standards in Hong Kong. S. K. Babu Laboratory Manager - Foundation Techniques Ltd
Application of Welding Standards in Hong Kong S. K. Babu Laboratory Manager - Foundation Techniques Ltd Introduction: This paper summarizes the current welding standards practiced in Hong Kong & also outlines
More informationProperty Test/Standard Description. gloss (70-85) Flash point ISO 3679 Method 1. 212 F (100 C) calculated VOC-US/Hong Kong. US EPA method 24 (tested)
Not approved 2063;2064 1,2 2063 ^(ValidationDate) 1 Product description This is a two component solvent free polyamine cured coating. It is a general purpose tank lining with good chemical resistance.
More informationSHOWER WATER HEATER MODEL BS 35 / 45 / 60 BS 35 E / 45 E / 60 E OPERATION AND INSTALLATION INSTRUCTIONS
SHOWER WATER HEATER MODEL BS 35 / 45 / 60 BS 35 E / 45 E / 60 E OPERATION AND INSTALLATION INSTRUCTIONS 2 This water heater must be installed (water and electrical installation), commissioned and serviced
More informationTG 105 ALLOWABLE PIPE SIZE, CLASS AND MATERIALS FOR WATER MAINS TECHNICAL GUIDELINE. Manager Asset Management SOUTH AUSTRALIAN WATER CORPORATION
TG 105 SOUTH AUSTRALIAN WATER CORPORATION TECHNICAL GUIDELINE ALLOWABLE PIPE SIZE, CLASS AND MATERIALS FOR WATER MAINS Issued by: Manager Asset Management Issue Date: SA WATER 2007 This document is copyright
More informationRAMAX S Prehardened stainless holder steel
T O O L S T E E L F A C T S RAMAX S Prehardened stainless holder steel Wherever tools are made Wherever tools are used This information is based on our present state of knowledge and is intended to provide
More informationHEAT FUSION JOINING PROCEDURES
HEAT FUSION JOINING PROCEDURES TABLE OF CONTENTS INTRODUCTION...1 FEDERAL REGULATIONS...1 HEAT FUSION...2 INCLEMENT WEATHER...3 NOTES ON FUSION CONFIDENCE...3 FUSION CHECKLIST...4 BUTT FUSION...5 Procedure...6
More informationINDIAN STANDARDS (BIS) ON WELDING
** IS 82:957 Glossary of terms relating to welding and cutting of Sep 2008 metals 2 IS 83:986 Scheme of symbols for welding (revised) Sep 2008 3 IS 84:2004 Covered electrodes for manual metal arc welding
More informationCorrugated Tubular Heat Exchangers
Corrugated Tubular Heat Exchangers HEAT EXCHANGERS for the 21st CENTURY Corrugated Tubular Heat Exchangers (CTHE) Corrugated Tube Heat Exchangers are shell and tube heat exchangers which use corrugated
More informationBIS Metal Pipe Clamps with Lining
A BIS Metal Pipe Clamps with Lining BIS Clamps BISMAT Flash BISMAT 2000 Ø ¼ - 2" BISMAT 2000 Ø 2½ - 4" 2 3 4 BIS Industrial Clamps BIS Heavy Duty Clamps HD1501 (1/2") (BUP1000) 5 BIS Clamps for Plastic
More informationOil Coolers New DCS Dual Fan models for 45HP and 60HP cooling performance
DC/DCS Oil Coolers New DCS Dual Fan models for 45HP and 60HP cooling performance All DC/DCS and Dual Fan models available with internal pressure bypass DC Motor Driven Cooling Fans Are A Low Cost Solution
More informationMessko. Messko. MTraB - Maintenance Free Dehydrating Breather Ordering specifications 686 - XX - XX - XXX - XX
Ordering specifications MTraB -Series Maintenance Free Dehydrating Breather Part no.: 686 - - - - Form your part number by selecting the individual parameters: For example: 686-10--103- Part no.: Parameter
More informationORC TURBOGENERATOR TYPE CHP - Organic Rankine Cycle Turbogenerator fed by thermal oil, for the combined production of electric energy and heat -
Doc. : 08C00031_e Date : 10.02.2009 Page : 1 / 9 ORC TURBOGENERATOR TYPE CHP - Organic Rankine Cycle Turbogenerator fed by thermal oil, for the combined production of electric - (Preliminary) Doc. : 08C00031_e
More informationCONTOIL DFM 8EDM. Table of contents. Mounting and operating instructions
Mounting and operating instructions CONTOIL DFM 8EDM Table of contents Safety instructions 2 - Designed use - Installation, commissioning and operation - Operational safety - Return of the instruments
More informationEfficient distribution of district heating and cooling. LOGSTOR pre-insulated pipe technology
Efficient distribution of district heating and cooling LOGSTOR pre-insulated pipe technology LOGSTOR pre-insulated pipe technology LOGSTOR has 50 years of experience in the development, production and
More informationAccessories for GF and RA machines
Orbital cutting & beveling machines for high-purity process piping www.orbitalum.com Accessories for GF and RA machines A brand of ITW Orbital Cutting & Welding 23 www.orbitalum.com Orbital cutting & beveling
More informationApproved. Property Test/Standard Description. matt (0-35) Flash point ISO 3679 Method 1 28 C calculated VOC-US/Hong Kong. US EPA method 24 (tested)
Approved 735;739 1 735 phenolic/novolac epoxy ^(ValidationDate) 1 Product description This is a two component polyamine cured phenolic/novolac epoxy coating. It is a specially designed tank lining with
More informationPressure Relief Valves SPV, SPVF
Pressure Relief Valves SPV, SPVF Construction of the Pressure Relief Valves SPV, SPVF Symbol Description The direct spring, sliding piston Pressure Relief Valve SPV/SPVF is intended for inline mounting
More informationTARGET TARGET PROGRESS PROGRESS REPORT REPORT
BASIC KAIZEN TOOLS 1. 1. TARGET PROGRESS REPORT 2. 2. STANDARDIZED WORK SHEET 3. 3. TIME OBSERVATION SHEET 4. 4. CYCLE TIME // TAKT TIME BAR BAR CHART 5. 5. YAMAZUMI (STACK) CHART 6. 6. STANDARDIZED WORK
More informationTECHNICAL SPECIFICATION FOR PROJECTION WELDING MACHINE (Qty. 2 Nos.)
TECHNICAL SPECIFICATION FOR PROJECTION WELDING MACHINE (Qty. 2 Nos.) 1. Requirement: Two (02) Nos. DC Type, 3 phase, 3 wire Projection Welding Machine is required for welding of ventilation M.S. / Stainless
More informationThermal Expansion and Your Water Heater. Bradford White Explains What it is and How to Protect Yourself and Your Family From it.
Thermal Expansion and Your Water Heater Bradford White Explains What it is and How to Protect Yourself and Your Family From it. Ask your representative for more details about the benefits of expansion
More informationSeawater corrosion resistant piping systems for large diameters up to 100 / 2.5 metres O.D.
OSNA -10 Copper-Nickel Lined Pipes Seawater corrosion resistant piping systems for large diameters up to 100 / 2.5 metres O.D. KME Germany AG & Co. KG Copper-Nickel Lined Pipes [GB] Member of the KME Group
More informationGE Oil & Gas. Air cooled heat exchangers Robust and reliable for all loads and applications
GE Oil & Gas Air cooled heat exchangers Robust and reliable for all loads and applications What it is Air cooled heat exchangers are commonly used in industrial applications where a reliable source of
More informationWWER Type Fuel Manufacture in China
WWER Type Fuel Manufacture in China Yang Xiaodong P.O. Box 273, CJNF, YiBin City, Sichuan, China, [Fax: (+86)8318279161] Abstract: At CJNF, a plan was established for implementation of technical introduction
More informationkymanual or Automatic - it s your Choice
. kymanual or Automatic - it s your Choice ky LKB Automatic or Manual Butterfly Valve Application LKB is a sanitary automatically or manually operated butterfly valve for use in stainless steel pipe systems.
More informationUniPlate. Solar Collectors SOLAR SYSTEMS. www.solarico.eu
UniPlate Solar Collectors SOLAR SYSTEMS www.solarico.eu keep the sun in mind Solar energy has by far the highest theoretical potential of the earth s renewable energy sources. It is the most abundant energy
More informationStainless steel grade chart
Stainless steel grade chart ATLAS STEELS METAL DISTRIBUTION Chemical analysis (%) specified C Si Mn P S Cr Mo Ni Other Austenitic stainless steels 253MA S30815 0.05 1.1-2.0 0.8 0.040 0.030 20.0-22.0 10.0-12.0
More informationPressure switches and thermostats, type KPS
Description KPS units are pressure-controlled switches. The position of the contacts depends on the pressure in the inlet connection and the set scale value. In this series, special attention has been
More information1.1 DIMENSIONS AND WEIGHT PAG. 2 1.2 LOAD CENTRE FOR LIFTING PAG. 2 1.3 STORAGE CONDITIONS PAG. 2
TRANSPORT AND INSTALLATION. DIMENSIONS AND WEIGHT PAG.. LOAD CENTRE FOR LIFTING PAG..3 STORAGE CONDITIONS PAG. STARTING. INSTALLATION PAG.. SPACE REQUIREMENTS PAG. 3.3 ELECTRIC CONNECTION PAG. 3 3 DESCRIPTION
More informationAustralian/New Zealand Standard
AS/NZS ISO 3834.5:2008 ISO 3834-5:2005 AS/NZS ISO 3834.5:2008 Australian/New Zealand Standard Quality requirements for fusion welding of metallic materials Part 5: Documents with which it is necessary
More informationRADIATOR VALVES / MANIFOLD ASSEMBLIES AND DIVERTERS
RADIATOR VALVES / MANIFOLD ASSEMBLIES AND DIVERTERS MANIFOLD ASSEMBLIES ONE-PIPE Compatible with most radiators on the market, this pre-assembled manifold for one-pipe radiator systems delivers balancing
More information