1 NS194 Protection Requirements of Embedded Generators >30kW December 2013 Amendments from: NSA1746 Jan 2014

2 SUMMARY Network Standard NS194 outlines the requirements an Embedded Generator should fulfil when connecting to the Ausgrid s network. ISSUE For issue to all Ausgrid and Accredited Service Providers staff involved with the connection of Embedded Generators to the network, and is for reference by field, technical and engineering staff. Ausgrid maintains a copy of this and other Network Standards together with updates and amendments on Where this standard is issued as a controlled document replacing an earlier edition, remove and destroy the superseded document. DISCLAIMER As Ausgrid s standards are subject to ongoing review, the information contained in this document may be amended by Ausgrid at any time. It is possible that conflict may exist between standard documents. In this event, the most recent standard shall prevail. This document has been developed using information available from field and other sources and is suitable for most situations encountered in Ausgrid. Particular conditions, projects or localities may require special or different practices. It is the responsibility of the local manager, supervisor, assured quality contractor and the individuals involved to ensure that a safe system of work is employed and that statutory requirements are met. Ausgrid disclaims any and all liability to any person or persons for any procedure, process or any other thing done or not done, as a result of this Standard. Note that compliance with this Network Standard does not automatically satisfy the requirements of a Designer Safety Report. The designer must comply with the provisions of the WHS Regulation 2011 (NSW - Part 6.2 Duties of designer of structure and person who commissions construction work) which requires the designer to provide a written safety report to the person who commissioned the design. This report must be provided to Ausgrid in all instances, including where the design was commissioned by or on behalf of a person who proposes to connect premises to Ausgrid s network, and will form part of the Designer Safety Report which must also be presented to Ausgrid. Further information is provided in Network Standard (NS) 212 Integrated Support Requirements for Ausgrid Network Assets. INTERPRETATION In the event that any user of this Standard considers that any of its provisions is uncertain, ambiguous or otherwise in need of interpretation, the user should request Ausgrid to clarify the provision. Ausgrid s interpretation shall then apply as though it was included in the Standard, and is final and binding. No correspondence will be entered into with any person disputing the meaning of the provision published in the Standard or the accuracy of Ausgrid s interpretation.

3 CONTENTS Network Standard NS194 Protection Requirements of Embedded Generators >30kW December SCOPE REFERENCES APPLICATION FOR CONNECTION EARTHING PROTECTION REQUIREMENTS Network and LoM Protection System Redundancy Neutral Voltage Displacement (NVD) Network and LoM Circuit Breaker Fail Over and Under Voltage Protection Over and Under Frequency Protection Parallel Operation and Check Synchronisation (CS) Fault Levels and Ausgrid Scheduling Loss of Mains (LoM) /Anti-Islanding Intertrip Communications Link Automatic Switching and Reclosing Generator Automatic Reconnection Relay and Tripping Supplies Sydney Triplex Network Connection arrangement examples Relay Requirements Approval of Protection Schemes COMMISSIONING AND AUSGRID WITNESS TESTING APPENDIX 1 SAMPLE PROTECTION SCHEMES APPENDIX 2 AUSGRID APPROVED PROTECTION RELAYS... 18

4

5 1 December SCOPE This document outlines the protection system requirements for connection of Embedded Generation of greater than 30kW* to the Ausgrid network. It does not deal with the protection requirements for network connected micro size generators less than 30kW 3-phase or 10kW per phase or synchronised close transfer systems which should comply with AS and the 2007 Service and Installation Rules of NSW particularly Section 8, Alternative Sources of Low Voltage Supply. For example, an installation which consists of 4 separate arrays of PV, each having a capacity of 10kW would be subject to the requirements of this Network Standard, as the total electrical output of the installation is 40kW. *The size of generator is defined as the combined total electrical output of all generating units at the point of connection. 2 REFERENCES Electrical construction works on Ausgrid s low voltage and high voltage distribution systems must be carried out in accordance with Ausgrid s Supply Connection and Network Standards and Australian Standards which include but are not limited to the following: ES 1 ES 3 ES 11 ENOS Premises Connection Requirements Metering Installations Requirements for the Connection of Embedded Generators Electricity Network Operating Standards Policy for ASP/1 Premises Connection Connection Policy Connection Charges NS116 NS 194A NS 194B Design Standards for Distribution Earthing Guidelines for Photovoltaic installations up to 200kW connected via inverters to the Ausgrid network Guidelines for synchronous and asynchronous machines connected to the Ausgrid network. Generator Connection Agreement: General Conditions The latest edition of the Service & Installation Rules of NSW Ausgrid s Electrical Safety Rules Australian Standards such as: AS/NZS Electrical Installations (Wiring Rules), 3010 Electrical Installations Generating Sets, 3017 Testing Guidelines AS/NZS Electrical Installations Selection of Cables AS Grid Connection of Energy Systems via Inverters, Parts1, 2, 3

6 2 December 2013 AS5033: Installation of Photovoltaic Arrays AS 2467 Maintenance of Electrical Switchgear AS Standard Voltages AS/NZS 4853:2012- Electrical Hazards on metallic pipelines AS/NZS 3835:2006 Earth Potential Rise Protection of telecommunications network users, personnel and plant. Part 1 Code of Practice AS : Electromagnetic Compatibility Limits for Harmonic Current Emissions AS/NZS Electromagnetic Compatibility (EMC) Limits Assessment of emission limits for distorting loads in MV and HV power systems. AS/NZS Electromagnetic Compatibility (EMC) Limits Assessment of emission limits for fluctuating loads in MV and HV power systems Other references: ENA DOC National Electricity Network Safety Code ENA EG-0:2012 Power System Earthing Guide Pt:1 Management Principles IEEE PSRC IEEE 1547 BCSE IEC IEC ENA Intertie protection of consumer-owned sources of generation, 3MVA or less IEEE Standard for interconnecting Distributed Resources with Electric Power Systems Technical Guide for Connection of Renewable Generators to the local Electricity Network Assessment of emission limits for the connection of disturbing installations to LV power system Measuring Relays and Protection Equipment Requirements ENA Guideline for the preparation for connection of Embedded Generation within Distribution Networks May 2011 Legislative and Electricity Market requirements: NER National Electricity Rules, including Central despatch and Integration of Wind and Other Intermittent Generation Rule 2007.

7 3 December APPLICATION FOR CONNECTION For procedure regarding the application for connection of generator greater than 30kW refer to ES-11 Requirements for Connection of Embedded Generators. 4 EARTHING The customer is required to ensure that the generator installation has an earthing system that has been designed to limit any step, touch and transferred potentials to safe values using the principles detailed in ENA EG-0:2012 Power System Earthing Guide Pt1: Management Principles. Equipment used to interface to the distribution network (e.g. step up transformer or circuit breaker) must comply with NS116 Design Standards for Distribution Earthing. Additionally the earthing system of the Generator must be designed to limit the voltages impressed onto surrounding utility infrastructure under earth fault conditions. For metallic pipelines the tolerable voltages are listed in AS/NZS 4853:2012 and for telecommunications assets the voltage limits are found in AS/NZS 3835:2006. Generation schemes working in parallel with the distribution network in effect become an integral part of the electricity distribution network. Therefore neutral earthing arrangements for the private generators and any interconnection transformers must be designed to suit the requirements of both the distribution network and the customer s generation installation and details provided to Ausgrid. High Voltage Generators The generator s high voltage star point must be effectively isolated from earth (i.e. isolated or earthed via a high impedance) to avoid any earth fault contributions flowing into the Ausgrid system and to inhibit the flow of harmonic currents through the neutral. Each case will be discussed with the Customer on its merits. Low Voltage Generators Generators connected to the network via a delta/star transformer with the delta on the network side may have their neutral directly connected to earth (i.e. via an MEN link). Effective isolation of this neutral may be required to inhibit the flow of harmonics through the neutral and the generator s method to limit harmonics must be discussed and agreed to by Ausgrid. The use of 4-pole switching may be required if the generator can operate in standby mode.

8 4 December PROTECTION REQUIREMENTS Protection systems for embedded generating units operating in parallel with the grid can be divided into the following two main categories as described below. This standard only covers the requirements for Network and Loss of Mains (LoM) protection systems for embedded generators and does not cover the requirements for short circuit protection systems in customer installations. As required by NER Schedule 5.2.2, a Generator must only apply settings to a control system or a protection system that are necessary to comply with performance requirements of schedule 5.2 if the settings have been approved in writing by the relevant Network Service Provider and, if the requirement is one that would involve AEMO under clause 5.3.4A(c) of the Rules, also by AEMO. A Generator must not allow its generating unit to supply electricity to the power system without such prior approval. Ausgrid will require all protection system schematics, relays and settings for the generator protection systems described within this document as listed in Tables 4.1 and 4.2 to insure the installation complies with this standard. All protection equipment must be tested and commissioned by a competent person to the agreed settings and a Certificate of Compliance issued to Ausgrid prior to connection to the Ausgrid network. The customer is to keep written records of all protection settings and test results. A copy is also required by Ausgrid. Short Circuit protection (Not covered in this standard) Systems installed to protect equipment (the generating units and the power system) against short-circuit faults. The requirements for these systems in LV installations are not covered in this standard, they are covered in AS3000. The requirements for these systems in HV installations will be determined on a case by case basis depending on the connection arrangement. Requirements for short circuit protection are covered elsewhere in Australian and Ausgrid Standards. Protection dealing with normal short-circuit faults is required, as for any customer connection, but may need some special treatment to allow for multiple sources of active power onto the network. Even if the generator is not a source of short-circuit current, adequate short circuit protection is necessary as for any Customer installation. Network and Loss of Mains (LoM) protection (Covered by this standard) Systems installed to ensure the network is operating within the limits of its design and that uncontrolled islands can not be formed between the generator and the local or interconnected network. This standard specifically covers the requirements for these types of protection schemes. Protection shall be designed in accordance with the applicable regulations and Ausgrid s standards and network engineering guidelines, which require a main and back-up set of protection to detect all credible Islanding Conditions. The protection systems must include sufficient redundancy to ensure that the generator/s disconnect from the network with any single protection element out of service or if any single circuit breaker fails to operate. This will require a main and backup protection scheme. The protection schemes required are dependent on the type of generating units and the point of connection to Ausgrid s network. See Tables 5.1, 5.2 following.

9 5 December 2013 Table 5.1: Inverter-connected Generator Protection Requirements Protection and Associated Reference Reference Section Low Voltage Connection Point (415V) High Voltage Connection Point (11kV and above) Common Requirements AS4777 compliant inverters (Note 2, Note 3) 5.1 M M Neutral Voltage Displacement 5.2 Refer Sect 5.2 M Under voltage and Overvoltage 5.4 M M Under frequency and Over frequency 5.5 M M Ausgrid scheduling 5.7 Refer Sect 5.7 Refer Sect. 5.7 No Export Generator Requirements (Note 1) Grid Reverse Power 5.8 M1 (P) M1 (P) Grid Low Forward Power 5.8 M2 M2 Export Generator Requirements Intertrip 5.8/9 M1 (P) M1 (P) ROCOF and Vector Shift 5.8 M2 M2 Legend M: Mandatory M1, M2 Mandatory with alternative - select either M1 or M2 to suit the connection. Option marked with (P) is preferred. Note 1: In circumstances where reverse power and low forward power are not suitable for use with No Export Generators, Intertrip or Vector Shift and ROCOF LoM protection, as per Export Generator Requirements, can be provided by agreement with Ausgrid. Note 2: Inverters which are not AS4777 compliant will be required to be assessed on a case by case basis. Note 3: The AS4777 Inverters provide the main Network and LoM protection, so the protection functions listed in Table 5.1 are the back-up protection requirements. Refer to Section 5.1.

10 6 December 2013 Table 5.2: Synchronous Machine and Asynchronous Machine Generator Protection Requirements Protection and Associated Reference Common Requirements Reference Section Low Voltage Connection Point (415V) High Voltage Connection Point (11kV and above) Neutral Voltage Displacement 5.2 Refer Sect 5.2 M Circuit Breaker Fail 5.3 M M Duplicate Under voltage and Overvoltage Duplicate Under frequency and Over frequency 5.4 M M 5.5 M M Synchronising* 5.6 M M Ausgrid scheduling 5.7 Refer Sect 5.7 Refer Sect. 5.7 No Export Generator Requirements (Note 1) Grid Reverse Power and Grid Low Forward Power 5.8 M1 (P) M1 (P) Duplicate Grid reverse power 5.8 M2 M2 Export Generator Requirements Intertrip 5.8/9 M1 (P) M1 (P) Duplicate ROCOF and Vector Shift 5.8 M2 M2 Legend M Mandatory M1, M2 Mandatory with alternative - select either M1, M2 to suit the connection. Option marked with (P) is preferred by Ausgrid. * Asynchronous machines do not require synchronising facilities. Note 1: In circumstances where reverse power and low forward power are not suitable for use with No Export Generators, Intertrip, Vector shift and ROCOF LoM protection, as per the Export Generator Requirements, can be provided by agreement with Ausgrid.

11 7 December Network and LoM Protection System Redundancy Where noted as Duplicate, it is a requirement that the Network and LoM protection systems as listed in Table 5.2 are duplicated in the form of Main and Back-up such that any single failure of the protection system, including relays, circuit breakers, power supplies etc will not prevent intended operation of the protection system. For Inverter connected generators In a large array of PV, if all inverters are compliant with AS4777, then the on board systems in the AS4777 compliant Inverters would constitute the Main Protection for the Common Requirements and No Export or Export requirements. Therefore, the AS4777 compliant Inverters only require a single overall Back-up Protection, as per Table 5.1 to meet the requirements of this standard. See Example 1 in Appendix 1. Synchronous and Asynchronous Generators Duplicate (Main and Back-up) LoM Protection as per Table 5.2 will be required to be provided. See Example 2 in Appendix Neutral Voltage Displacement (NVD) Considering the earthing arrangements and the use of delta-star transformer windings throughout Ausgrid s distribution network, detection of an 11kV (or other distribution voltage) network earth-fault on the delta-side of the transformer may be problematic for generator installations. While the fault-current contribution from Ausgrid will be interrupted by the opening of appropriate circuit-breakers, there remains the possibility that a generator may still energise the faulted distribution network without fault current flowing (due to the loss of Ausgrid s earth reference). As such, the generator must not remain connected to the system if this type of situation arises because of the safety and legal implications. The most reliable detection technique for this situation is Neutral Voltage Displacement (NVD) using voltage transformers connected to the 11kV (or other distribution voltage) system. Particular attention is needed to ensure that the voltage transformers (VTs) are of the correct configuration/type for use with this form of protection. The installation of NVD will be assessed and negotiated on the merits of the proposed generator connection point. For generators that have a low-voltage connection point, it is acknowledged that an 11kV VT connection point may not be readily available for the customer to provide NVD Protection. In such cases, the location and responsibility of the installing VTs will be negotiated during the assessment process. For example, Ausgrid may request NVD be installed and provide a VT supply to the customer to enable NVD to be implemented. Settings for NVD are to be negotiated with Ausgrid on a case by case basis. 5.3 Network and LoM Circuit Breaker Fail The LoM and anti-islanding protection systems must make allowance for circuit breaker fail (CBF) scenarios in their design. The form of CBF protection is subject to agreement with Ausgrid, but would normally require the Main LoM Protection and the Back-up LoM Protection to trip/open independent circuit breakers/contactors, or by a dedicated CBF protection scheme.

12 8 December 2013 For AS4777 Inverter connected generators The Inverters themselves provide one of the required Circuit Breakers/Contactors. Therefore the back-up LoM protection, as per table 5.1, is only required to trip a single Circuit Breaker/Contactor. For synchronous Generators It is typical for the main LoM protection and the back-up LoM protection to trip/open independent Circuit Breakers/Contactors. Alternatively a dedicated CBF scheme can be provided. 5.4 Over and Under Voltage Protection Main and Back-up Over Voltage and Under Voltage protection must be provided. All settings are to be agreed upon by Ausgrid. In the case of Low Voltage AS4777 Inverter Connected Generators, the main protection is that within the Inverter. Indicative maximum settings for the backup protection are: LV Connected Over Voltage: LV Connected Under Voltage: 467V phase to phase (270V phase to neutral) Maximum 2 second operation time 346V phase to phase (200V phase to neutral) Maximum 2 second operation time NB: Main Over Voltage protection settings should be in accordance with the Service and Installation Rules of New South Wales August 2012, which requires an Over Voltage setting of 260V. In the case of AS4777 Inverter connected generators, 260V is the Over Voltage requirements of the Inverter protection. All other main protection settings are to be at least as sensitive and at least as fast as the back-up protection settings. 5.5 Over and Under Frequency Protection Main and Back-up Over frequency and Under frequency protection must be provided. All settings are to be agreed upon by Ausgrid. In the case of AS4777 Inverter Connected Generators, the main protection is that within the Inverter. Indicative maximum settings for the backup protection are: Over Frequency: Under Frequency: 52Hz Maximum 2 second operation time 48Hz Maximum 2 second operation time Main protection settings are to be at least as sensitive and at least as fast as the back-up protection settings 5.6 Parallel Operation and Check Synchronisation (CS) It is of paramount importance that parallel operation does not present a hazard to Ausgrid staff, public or the customer utilising the generation plant. Consequently, it is necessary for a failure of supply or irregularity in any of the phases of the Ausgrid network to which the private generator is connected to result in the complete and automatic disconnection of the private generator from the Ausgrid network. The generator cannot connect to Ausgrid s network unless all phases of the network are energised in a healthy state. At the switching point to make the parallel connection between the generator and Ausgrid s network either synchronisation, or zero voltage on the generator side of the connection point must be checked before

13 9 December 2013 allowing closure of the switching point to parallel the generator with Ausgrid s network or energise the customers equipment from the switching point. This is of particular importance at any switching point which can be configured to provide automatic reconnection of the generator as per Section Fault Levels and Ausgrid Scheduling Since existing Ausgrid network and substations were designed and constructed without consideration for embedded generation, additional sources of supply will affect the fault-level on the Ausgrid network. As the penetration of embedded generation continues, a point may be reached where additional sources of supply will result in the fault-level being greater than the switchgear and equipment rating. Ausgrid therefore reserves the right to inhibit the output of a generator to ensure that the system is not compromised under high-fault level or abnormal conditions. This may be provided via a control signal from Ausgrid such that the generating unit is either taken off-line (i.e. a soft-trip ) or inhibited from starting up. Upon assessment of the proposed connection, Ausgrid will advise the customer if any fault level exist whereby scheduling may be required as part of the installation. 5.8 Loss of Mains (LoM) /Anti-Islanding The generator must be disconnected whenever the local network is disconnected from the grid. Anti-islanding devices are required to operate quicker than 1 second less than the connected feeder automatic reclosing time to a maximum of 4 seconds (see Sect. 4.10). There must be two independent LoM Protection schemes, i.e. duplicate schemes (or Main and Back-up schemes) as per Table 5.1 and 5.2. and Section 5.1 Non-exporting generators: For generators which are not intended to export power to the Ausgrid network, Grid Low Forward Power (GLFP) and/or Grid Reverse Power (GRP) Protection is preferred, however alternate LoM Protection, as per Table 5.1 and 5.2, can be provided as agreed by Ausgrid. Settings and details of Grid Low Forward/Reverse Power Protection are to be negotiated with Ausgrid on case by case basis. NOTE: Grid Reverse Power Protection is not the same as Generator Reverse Power Protection. Exporting generators: For generators that intend to export power to Ausgrid s Network, it is preferred for intertripping to be implemented. Alternatively a combination of Vector Shift (VS) and ROCOF LoM protection can be provided as per Table 5.1 and 5.2. All settings are to be agreed upon by Ausgrid. Indicative maximum settings for the main and backup protection are: Vector Shift: ROCOF: 8 degrees for strong city/urban networks, up to 12 degrees for weak rural networks 1.0 Hz/sec 1 second definite time delay (Main protection settings are to be at least as sensitive and at least as fast). NOTE: Primary testing of the LoM Protection schemes will be required to confirm the adequacy of the VS and ROCOF settings chosen, this may result in alteration of settings to be more sensitive in some cases. See Section 5.

14 10 December 2013 Ausgrid will be required to approve all Loss of Mains/anti-islanding protection systems, including which protection trips which circuit breakers to ensure the CBF requirements of this standard have been met. When the sensitivity of LoM protection (as per Table 5.1 or 5.2) can not be demonstrated to be adequate, or where the LoM protection is inappropriate, another form of LoM will be required to be installed. Any LoM scheme shall be implemented on a three-phase basis to ensure adequate performance. Regardless of the type of LoM installed, the generator proponent and customer must accept that LoM/anti-islanding protection may not be able to be set to discriminate with other protection systems on the Ausgrid network. Therefore the generator proponent and customer must accept that the generating units may trip for system disturbances and fault events both within and external to the local network that the generator is connected to. This is particularly relevant for Vector Shift and Rate of Change of Frequency (ROCOF) protection where experience has shown setting of these schemes to be difficult to avoid nuisance tripping while providing adequate protection. It is recommended that proponents design protection and control systems where the main and backup LoM protection trips circuit breakers/contactors which only control the generator and do not control other loads within the system. Therefore, any nuisance tripping as described above will not cause a loss of supply to the customer, in particular to any critical loads. 5.9 Intertrip Communications Link If a communication link is installed between the embedded generator and Ausgrid to facilitate an intertrip or scheduling it must be continuously monitored for integrity. In the event that the communication link fails then the generator must be automatically disconnected from Ausgrid s network until the link is restored. This provides a fail safe design which requires no back-up LoM type protection. The provisions of the NER may require some diversity in communication depending upon the installation Automatic Switching and Reclosing The majority of Ausgrid feeders are programmed for automatic re-closing after a period of between 3 seconds and 10 seconds after the successful clearance of a feeder fault depending on the specific fault location. Ausgrid Zone Substations are generally fitted with auto-closing to cover for loss of Zone Transformers and related plant with an automatic restoration time of between 5 and 10 seconds. Failure of the customer s equipment to disconnect prior to automatic switching may result in damage not only to Ausgrid s equipment but also the generation equipment unless it is adequately protected Generator Automatic Reconnection Where the customer has proved automatic reconnection is safe and that generator state is monitored, then automatic reconnection to the network is permitted. The device controlling the automatic reconnection must be able to verify normal supply conditions on the grid for all connected phases (i.e. all three phases for a three phase connection) for a period of at least 1 minute prior to the device enabling an automatic reconnection. Where there are multiple points of automatic reconnection in the installation, each point must independently be able to monitor and verify normal supply conditions on the grid for all connected phases for a total period of at least 1 minute before enabling automatic reconnection of the Generator to Ausgrid s network.

15 11 December 2013 In some installations, as will be nominated by Ausgrid, a manual reset may be required and the generator will not be allowed to be automatically reconnected to the network. Ausgrid will negotiate the requirements of these proposals on a case by case basis with the proponent Relay and Tripping Supplies Unless the requirements outlined in points 1) and 2) below are met, the relay power supplies, tripping and circuitry associated with the Network and LoM protection systems must be fail safe. That is any failure of any part of the system must result in the generator being disconnected and unable to be re-connected to Ausgrid s network. Therefore, circuit breakers with shunt trips will not be acceptable. Where ac (or dc) supplies are proposed to be used, normally open contactors held in by healthy ac (or dc) volts or undervoltage release of circuit breakers on loss of ac (or dc) supply, relay fail and system fail will be required. Alternate arrangements, usually only associated with HV connections, such as a DC system utilising shunt trip circuit breakers for the Network and LoM systems may be accepted with approval by Ausgrid, providing the following 2 points are met. 1) The customer has an approved Installation Safety Management Plan as per Ausgrid Premises Connection Requirements document ES1. 2) Requirements for the ongoing inspection, maintenance and testing of the Network and LoM protection systems are defined within the Generator Connection Agreement applicable to that site Sydney Triplex Network It should be noted that Sydney CBD Triplex network is different to other parts of the Ausgrid distribution area and, due to its complexity will impose different restrictions on the installation of embedded generation. In particular, there are legacy devices installed at some CBD substations (network protectors) that may prohibit export. Particular attention will need to be paid to synchronisation as there are schemes that remotely initiate the opening and closing of low-voltage circuit-breakers Connection arrangement examples Examples to illustrate some indicative protection arrangements are provided in Appendix 1. There are a large number of possible combinations of generation type, size and connection voltage hence only a representative sample is illustrated. These examples are for information only, and details may be modified as required for specific site conditions Relay Requirements Where applied as per the requirements of this standard, the Network and LoM relays listed in Appendix 2 are approved for use by Ausgrid. For Inverter connected generators and Synchronous/Asynchronous connected generators with a High Voltage Connection Point (11kV and above), at least one of the required duplicate Network and LoM relays must be compliant with the severity class (of IEC60255) corresponding to the part of the installation in which it is located.

16 12 December Approval of Protection Schemes The following protection drawings must be submitted to Ausgrid for approval: (a) (b) (c) (d) (e) A 3 phase ac schematic diagram of protection and control systems A DC schematic diagram of all control and protection schemes and associated logic Details of primary and secondary interfaces to the network. Details of all protection and metering CTs and VTs and their connections. Details of Protection Relay and circuit breakers being proposed Ausgrid will be required to approve all protection relay settings on the installation and to witness testing by the customer of LoM protection in additional to normal AS3000, AS2067 and NSW Service Rules equipment and protection testing by Ausgrid Installation Inspectors. Input and outputs of LoM protection relays must be provided with suitable facilities (e.g. isolating links) to allow testing of the LoM relay to be undertaken without the need to disconnect and re-terminate wires. Failure to provide these facilities may cause delays and problems with LoM witness testing.

17 13 December COMMISSIONING AND AUSGRID WITNESS TESTING Prior to the >30kW connection of the embedded generator to Ausgrid s network, Ausgrid will inspect those parts of the generation plant that have a direct effect on the network. Where necessary, Ausgrid may require specific tests to be carried out on the generating plant to prove the integrity of the LoM anti-islanding protection schemes. The generator proponent must develop in conjunction with Ausgrid to undertake primary testing of the LoM protection. Details of this plan will depend on the system arrangement and point of connection of the generator. As per specific contract conditions, Ausgrid will require notice to be given be given to allow: Ausgrid representation during commissioning and all tests that apply to Network and LoM anti-islanding protection Access to commissioning test results, test plans, details of test methods and protection settings Connection to network during commissioning tests Ausgrid representation during Primary testing of Loss of Mains protection including Intertrips, ROCOF, VS and Reverse Power Protection Testing under and over voltage, frequency etc, generation system protection.

18 14 December 2013 APPENDIX 1 SAMPLE PROTECTION SCHEMES The following are examples of typical connections which meet the requirements of this standard. These are examples only. The specific design will be a function of the customer network and may require different arrangements. For clarity, only the LoM type protection systems as per this standard are shown. Short Circuit type protection is not shown. Legend NVD Neutral Voltage Displacement VS Vector Shift UF Under Frequency RoCoF Rate of Change of Frequency OF Over Frequency CS Check Synchronisation UV Under Voltage GLFP Grid Low Forward Power OV Over Voltage GRP Grid Reverse Power Example 1: >30kW Export Inverter connected at 415V

19 15 December 2013 Example 2: >30kW Export Synchronous Machine connected at 11kV

20 16 December 2013 Example 3: > 30kW Export Inverter connected at 11kV Example 4: > 30kW Export Synchronous Machine connected at LV

21 17 December 2013 Example 5: > 30kW No Export Synchronous Machine connected at 11kV

22 18 December 2013 APPENDIX 2 AUSGRID APPROVED PROTECTION RELAYS When applied as per the requirements of this standard, the following relays are preapproved to provide protection functions as described in Section 5, Tables 5.1 and 5.2 for Low Voltage connected Generators. Customers may elect to use alternate relays. All relays used for the generator protection systems must be approved for use by Ausgrid. NOTE: Refer to section 5.15 for IEC60255 compliance requirements for High Voltage connected generator Network and LoM relays. Manufacturer AREVA/Schneider Woodward Com Ap Model Identifier P923*, P341 MFR11 MainsPro Table A2 Approved LoM relays for Low Voltage Connection * Does not provide Vector Surge function, additional relay may be required.

23 Ausgrid. This document must not be reproduced in whole or in part or converted to machine readable form or stored in a computer or imaging system without the written permission of Ausgrid. Revision History Initial issue: Last issue: This Issue: 29/08/ /08/ /12/2013 Document Control Authorised By: Date: 01/12/2013 Terry Lampard, Manager Standards & Communications Document Number: NS194

Advanced Protection of Distribution Networks with Distributed Generators

Advanced Protection of Distribution Networks with Distributed Generators Date:- 8 10 March 2011 Venue: University of Manchester EES-UETP Course title Advanced Protection of Distribution Networks with Distributed Generators Peter Crossley Director of the Joule Centre School

More information

Size template. Grid Connection Masterclass Energex John Lansley Senior Network Solutions Engineer

Size template. Grid Connection Masterclass Energex John Lansley Senior Network Solutions Engineer Size template Grid Connection Masterclass Energex John Lansley Senior Network Solutions Engineer The average system size has doubled since 2010 Key Network Issues Reverse power on up to 12 off 11 kv feeders

More information

ELECTRICAL INSULATION TESTING OF HV EQUIPMENT UP TO 33kV

ELECTRICAL INSULATION TESTING OF HV EQUIPMENT UP TO 33kV 1. SCOPE This document details PowerSystems requirements for electrical testing of HV Equipment up to and including 33kV. 2. ISSUE RECORD This is a Reference document. The current version of Controlled

More information

NET METERING SUB-CODE. for Connecting Renewable Energy Generating Systems to the Distribution Network in Ghana

NET METERING SUB-CODE. for Connecting Renewable Energy Generating Systems to the Distribution Network in Ghana for Connecting Renewable Energy Generating Systems to the Distribution Network in Ghana JANUARY 2015 1 Table of Contents PART A: BACKGROUND... 1 1 Introduction... 1 1.1 Objective... 1 1.2 Status... 1 2

More information

Electrical Shore Connections / Cold Ironing

Electrical Shore Connections / Cold Ironing STANDARD FOR CERTIFICATION No. 2.25 Electrical Shore Connections / Cold Ironing JULY 2014 The electronic pdf version of this document found through http://www.dnv.com is the officially binding version

More information

Distribution Operations with High-penetration of Beyond the Meter Intermittent Renewables. Bob Yinger Southern California Edison April 15, 2014

Distribution Operations with High-penetration of Beyond the Meter Intermittent Renewables. Bob Yinger Southern California Edison April 15, 2014 1 Distribution Operations with High-penetration of Beyond the Meter Intermittent Renewables Bob Yinger Southern California Edison April 15, 2014 Southern California Edison SCE provides power to: Nearly

More information

For a phase-to-phase voltage between 100 V and 1000 V. The standard ratings are: 400 V - 690 V - 1000 V (at 50 Hz)

For a phase-to-phase voltage between 100 V and 1000 V. The standard ratings are: 400 V - 690 V - 1000 V (at 50 Hz) 24 1. NETWORK CONFIGURATIONS definition Standard IEC 38 defines voltage ratings as follows: - Low voltage () For a phase-to-phase voltage between 100 V and 1000 V. The standard ratings are: 400 V - 690

More information

Connection of micro-generation to the electricity distribution network

Connection of micro-generation to the electricity distribution network Connection of micro-generation to the electricity distribution network Network recommendation YA9:09 Sivu 1(20) CONTENTS INTRODUCTION...3 1. MARKINGS AND DEFINITIONS...3 2. DEFINITION OF MICRO-GENERATION

More information

Customer Installation Safety Plan. March 2015

Customer Installation Safety Plan. March 2015 Customer Installation Safety Plan March 2015 Document History Issue No. Date Approved By Summary of Changes 1 June 2014 Chief Engineer Updated and revised in line with requirement for biennial review under

More information

LEHI CITY POWER NET METERING STANDARDS For Customer-Owned Electric Generating Systems

LEHI CITY POWER NET METERING STANDARDS For Customer-Owned Electric Generating Systems LEHI CITY POWER NET METERING STANDARDS For Customer-Owned Electric Generating Systems A. General This Net Metering Standard for Customer-Owned Grid Connected Electric Generating Systems sets forth the

More information

SPECIFICATION COG-2007

SPECIFICATION COG-2007 Cleco Power LLC SPECIFICATION COG-2007 FOR PARALLEL OPPERATION OF CUSTOMER-OWNED GENERATION ON CLECO S ELECTRICAL SYSTEM Revised: March 7, 2014 CONTENTS ITEM NO. TITLE PAGE NO. 1.0 Scope 3 2.0 Policy On

More information

Earthing Guidance Notes

Earthing Guidance Notes Central Networks Earthing Manual Section E2 Earthing Guidance Notes Version: 2 Date of Issue: September 2007 Author: Nigel Johnson Job Title: Earthing Specialist Approver: John Simpson Job Title: Head

More information

Connecting to the network information pack Version 2

Connecting to the network information pack Version 2 Connecting to the network information pack Version 2 Updated: Contents 1.0 What is a new connection or connection alteration?... 3 2.0 Connection enquiry... 3 3.0 Connection application... 3 3.1 Processing

More information

Title 20 PUBLIC SERVICE COMMISSION. Subtitle 50 SERVICE SUPPLIED BY ELECTRIC COMPANIES. Chapter 02 Engineering

Title 20 PUBLIC SERVICE COMMISSION. Subtitle 50 SERVICE SUPPLIED BY ELECTRIC COMPANIES. Chapter 02 Engineering Title 20 PUBLIC SERVICE COMMISSION Subtitle 50 SERVICE SUPPLIED BY ELECTRIC COMPANIES Chapter 02 Engineering Authority: Public Utility Companies Article, 2-121, 5-101 and 5-303, Annotated Code of Maryland.

More information

Unified requirements for systems with voltages above 1 kv up to 15 kv

Unified requirements for systems with voltages above 1 kv up to 15 kv (1991) (Rev.1 May 2001) (Rev.2 July 2003) (Rev.3 Feb 2015) Unified requirements for systems with voltages above 1 kv up to 15 kv 1. General 1.1 Field of application The following requirements apply to

More information

ES3. PART A Metering Installation Requirements July 2015

ES3. PART A Metering Installation Requirements July 2015 ES3 PART A Metering Installation Requirements July 2015 SCOPE This publication provides general information to assist with connection of metering equipment to Ausgrid s network. WARNING It is the responsibility

More information

Green Power Connection Net Energy Metering Engineering Review Process in Delaware and Speeding Up the Application Fee Process

Green Power Connection Net Energy Metering Engineering Review Process in Delaware and Speeding Up the Application Fee Process Green Power Connection Net Energy Metering Engineering Review Process in Delaware and Speeding Up the Application Fee Process Presented by: Marianne Mannschreck Date: Welcome A Look at the Net Energy Metering

More information

Unitil Energy Systems, Inc. Interconnection Standards For Inverters Sized Up To 100 kva

Unitil Energy Systems, Inc. Interconnection Standards For Inverters Sized Up To 100 kva Unitil Energy Systems, Inc. Interconnection Standards For Inverters Sized Up To 100 kva Issued: August 2009 SIZED UP TO 100 KVA TABLE OF CONTENTS 1.0 Introduction... 1 1.1 Applicability... 1 1.2 Definitions...

More information

TECHNICAL INTERCONNECTION REQUIREMENTS FOR DISTRIBUTED GENERATION. Micro Generation & Small Generation, 3-phase, less than 30 kw

TECHNICAL INTERCONNECTION REQUIREMENTS FOR DISTRIBUTED GENERATION. Micro Generation & Small Generation, 3-phase, less than 30 kw TECHNICAL INTERCONNECTION REQUIREMENTS FOR DISTRIBUTED GENERATION Micro Generation & Small Generation, 3-phase, less than 30 kw i COPYRIGHT 2010 HYDRO ONE NETWORKS INC. ALL RIGHTS RESERVED ii LIMITATION

More information

SOUTH CAROLINA. Standard for Interconnecting Small Generation 100 kw or Less with Electric Power Systems (EPS) (Interconnection Standard)

SOUTH CAROLINA. Standard for Interconnecting Small Generation 100 kw or Less with Electric Power Systems (EPS) (Interconnection Standard) SOUTH CAROLINA Standard for Interconnecting Small Generation 100 kw or Less with Electric Power Systems (EPS) (Interconnection Standard) 1. Overview: This Standard contains the requirements, in addition

More information

Session 10: General Overview of Interconnection Standards & Grid Codes for High Penetration PV October 21, 2015 Santiago, Chile

Session 10: General Overview of Interconnection Standards & Grid Codes for High Penetration PV October 21, 2015 Santiago, Chile Session 10: General Overview of Interconnection Standards & Grid Codes for High Penetration PV October 21, 2015 Santiago, Chile Michael Coddington National Renewable Energy Laboratory Golden, Colorado,

More information

Engineering Recommendation G59 Issue 3 Amendment 1 August 2014

Engineering Recommendation G59 Issue 3 Amendment 1 August 2014 PRODUCED BY THE OPERATIONS DIRECTORATE OF ENERGY NETWORKS ASSOCIATION Engineering Recommendation G59 Issue 3 Amendment 1 August 2014 RECOMMENDATIONS FOR THE CONNECTION OF GENERATING PLANT TO THE DISTRIBUTION

More information

Register of Completed Embedded Generation Projects (Non-registered, typically 30kW to 5000kW)

Register of Completed Embedded Generation Projects (Non-registered, typically 30kW to 5000kW) Register of Completed Embedded Generation Projects (Non-registered, typically 30kW to 5000kW) Should you have any questions in relation to this information, please contact us: Email - LCC@energex.com.au

More information

TERMS AND CONDITIONS

TERMS AND CONDITIONS Virginia Electric and Power Company TERMS AND CONDITIONS XXIV. GENERATOR INTERCONNECTION STANDARD Electric generator interconnection service includes only the ability to interconnect an electric generator

More information

TABLE OF CONTENTS 1.0 INTRODUCTION... 2 1.1 PURPOSE... 2 1.2 DEVIATION... 2 4.0 INTERTIE PROTECTION REQUIREMENTS... 4

TABLE OF CONTENTS 1.0 INTRODUCTION... 2 1.1 PURPOSE... 2 1.2 DEVIATION... 2 4.0 INTERTIE PROTECTION REQUIREMENTS... 4 Page: 1 of 14 KEY BULLETIN POINTS: THIS GUIDE OUTLINES MINIMUM REQUIREMENTS FOR CONNECTION OF CUSTOMER-OWNED EMERGENCY AND STANDBY (ESG) TO THE GEORGIA POWER COMPANY (GPC) DISTRIBUTION SYSTEM. THESE ARE

More information

Rule 5.500 Fast Track Analysis for National Life Insurance Co.

Rule 5.500 Fast Track Analysis for National Life Insurance Co. Rule 5.500 Fast Track Analysis for National Life Insurance Co. For a 500 kw Solar array to be located at 155 Northfield Street in Montpelier, Vermont Green Mountain Power Pam Allen Date: 5/31/13 SECTION

More information

POWER PURCHASE AGREEMENT FOR ROOFTOP SOLAR PV PLANTS WITH NET METERING ARRANGEMENT

POWER PURCHASE AGREEMENT FOR ROOFTOP SOLAR PV PLANTS WITH NET METERING ARRANGEMENT POWER PURCHASE AGREEMENT FOR ROOFTOP SOLAR PV PLANTS WITH NET METERING ARRANGEMENT This Power Purchase agreement is entered into at (place).. on this. day of between Electricity Supply Company Limited

More information

12 SOLAR PHOTOVOLTAIC POWER SUPPLY SYSTEMS by John Ware. PV modules are current-limiting

12 SOLAR PHOTOVOLTAIC POWER SUPPLY SYSTEMS by John Ware. PV modules are current-limiting 12 SOLAR PHOTOVOLTAIC POWER by John Ware IT IS PLANNED for BS 7671:2008 to include a new Section 712 providing additional requirements for safety applicable to solar photovoltaic (pv) power supply systems.

More information

HIGH VOLTAGE SHORE CONNECTION

HIGH VOLTAGE SHORE CONNECTION Guide for High Voltage Shore Connection GUIDE FOR HIGH VOLTAGE SHORE CONNECTION NOVEMBER 2011 American Bureau of Shipping Incorporated by Act of Legislature of the State of New York 1862 Copyright 2011

More information

FIT TIER 2 Application

FIT TIER 2 Application FIT TIER 2 Application Application Information The below information Auto-Fills from your registration information: Building Permit Application Date: Project Completion Date: Name: Address: City: State:

More information

Solar Power Plant Design and Interconnection

Solar Power Plant Design and Interconnection Solar Power Plant Design and Interconnection Wind & Solar Super Session July 27, 2011 E.H. Camm, S.E. Williams S&C Electric Company Outline Introduction Utility-scale PV power plant Grounding Reactive

More information

Residential Solar Service Agreement (RSSA) Customer Sited Solar Photovoltaic Systems

Residential Solar Service Agreement (RSSA) Customer Sited Solar Photovoltaic Systems Residential Solar Service Agreement (RSSA) Customer Sited Solar Photovoltaic Systems This Agreement is made and entered into this day of, 20, ( Effective Date ) by and between the Orlando Utilities Commission

More information

Chapter 1. Network Structures

Chapter 1. Network Structures Chapter 1 Network Structures Definition Standard IEC 60038 defines voltage ratings as follows: Low voltage (): for a phase-to-phase voltage of between 100 V and 1,000 V, the standard ratings are: 400 V

More information

Technical Requirements. For Generating Facilities Interconnecting. To The Distribution System. Salt River Project

Technical Requirements. For Generating Facilities Interconnecting. To The Distribution System. Salt River Project Technical Requirements For Generating Facilities Interconnecting To The Distribution System Salt River Project Effective June 6, 2012 1-1 TABLE OF CONTENTS 1. NOTICE OF DISCLAIMER AND USE OF REFERENCES

More information

EP 95 00 30 03 SP RAILCORP NETWORK MANAGEMENT PLAN CHAPTER 2 - CUSTOMER INSTALLATION SAFETY. Authorised by: Neal Hook Chief Engineer Electrical

EP 95 00 30 03 SP RAILCORP NETWORK MANAGEMENT PLAN CHAPTER 2 - CUSTOMER INSTALLATION SAFETY. Authorised by: Neal Hook Chief Engineer Electrical Engineering Standard Electrical RAILCORP NETWORK MANAGEMENT PLAN CHAPTER 2 - CUSTOMER INSTALLATION SAFETY Owner: Approved by: Chief Engineer, Electrical Neal Hook Chief Engineer Electrical Authorised by:

More information

How To Understand The Electrical Power Supply Of A Power Supply System

How To Understand The Electrical Power Supply Of A Power Supply System 17 Circuit diagram symbols E 18 CIRCUIT DIAGRAM SYMBOLS electrical network elements three-phase line or cable single-phase line or cable short circuit earth electrode outgoing feeder supply incoming feeder

More information

Power products and systems. Intelligent solutions for power distribution Zone concept

Power products and systems. Intelligent solutions for power distribution Zone concept Power products and systems Intelligent solutions for power distribution Zone concept Securing continuous power supply ABB is one of the world's leading power and automation technology companies whose products,

More information

What are the basic electrical safety issues and remedies in solar photovoltaic installations?

What are the basic electrical safety issues and remedies in solar photovoltaic installations? What are the basic electrical safety issues and remedies in solar photovoltaic installations? Presented by: Behzad Eghtesady City of Los Angeles Department of Building and Safety Topics Covered Photovoltaic

More information

Specification guide no. 9 Active harmonic conditioner from 20 to 480 A

Specification guide no. 9 Active harmonic conditioner from 20 to 480 A Active harmonic conditioner from 20 to 480 A Contents 1 - Installations concerned... 2 1.1 - New installations... 2 1.2 - Existing installations... 2 2 - General... 2 2.1 - Scope... 2 2.2 - Applicable

More information

How To Choose A Transformer

How To Choose A Transformer Consider open loop MV network as an example source 1 source 2 NC NC NC or NO main MV switchboard A B Detail design of substation NC NC NC NO NC NC switchboard 1 switchboard 2 switchboard 3 MV MV MV LV

More information

Future grid infrastructure Field tests of LVDC distribution

Future grid infrastructure Field tests of LVDC distribution Future grid infrastructure Field tests of LVDC distribution LUT LVDC Research Group: Andrey Lana, Pasi Nuutinen, Antti Pinomaa, Tero Kaipia, Pasi Peltoniemi, Aleksi Mattsson, Jarmo Partanen Introduction

More information

ES281 COMPANY-SPECIFIC APPENDICES TO ENA ENGINEERING RECOMMENDATION G81 PART 1

ES281 COMPANY-SPECIFIC APPENDICES TO ENA ENGINEERING RECOMMENDATION G81 PART 1 ES281 COMPANY-SPECIFIC APPENDICES TO ENA ENGINEERING RECOMMENDATION G81 PART 1 Design and Planning Specification for New Low Voltage Installations for Housing Developments 1. SCOPE This appendix to ENA

More information

AUSTIN ENERGY INTERCONNECTION GUIDE FOR CUSTOMER-OWNED POWER PRODUCTION FOR FACILITIES UP TO 10MW A INTERCONNECTION CLASSIFICATIONS...

AUSTIN ENERGY INTERCONNECTION GUIDE FOR CUSTOMER-OWNED POWER PRODUCTION FOR FACILITIES UP TO 10MW A INTERCONNECTION CLASSIFICATIONS... AUSTIN ENERGY INTERCONNECTION GUIDE FOR CUSTOMER-OWNED POWER PRODUCTION FOR FACILITIES UP TO 10MW TABLE OF CONTENTS PAGE INTRODUCTION... 4 A INTERCONNECTION CLASSIFICATIONS... 5 B. APPLICATION PROCESS

More information

Listed are common requirements that apply to existing solar installations when altered, added to or reconfigured.

Listed are common requirements that apply to existing solar installations when altered, added to or reconfigured. SOLAR ALTERATIONS REQUIREMENTS August 2015 These requirements address typical alterations to solar installations; they cannot address every scenario. In Victoria, an alteration to a solar installation

More information

Service and Installation Rules of New South Wales

Service and Installation Rules of New South Wales Service and Installation Rules of New South Wales The electricity industry standard of best practice for customer connection services and installations August 2012 Foreword This is the August 2012 edition

More information

SDG&E Electric Distribution System Interconnection Handbook. <Revised as of 10/21/2015>

SDG&E Electric Distribution System Interconnection Handbook. <Revised as of 10/21/2015> TABLE OF CONTENTS 1 Introduction... 1 1.1 Purposes... 1 1.2 Applicability and Related Tariffs... 1 1.3 Interconnection Agreement Required... 1 1.4 Technical Requirement... 1

More information

TECHNICAL BRIEF. Commercial PV in Australia and New Zealand Using the Enphase Microinverter System

TECHNICAL BRIEF. Commercial PV in Australia and New Zealand Using the Enphase Microinverter System TECHNICAL BRIEF Commercial PV in Australia and New Zealand Using the Enphase Microinverter System 2015 Enphase Energy Inc. All rights reserved May 2015 Table of Contents Commercial PV in Australia and

More information

Proper Application of 415V Systems in North American Data Centers. A White Paper from the Experts in Business-Critical Continuity

Proper Application of 415V Systems in North American Data Centers. A White Paper from the Experts in Business-Critical Continuity Proper Application of 415V Systems in North American Data Centers A White Paper from the Experts in Business-Critical Continuity Introduction Increasing pressure to reduce operating expenses and be more

More information

Phase Attribute Identification using GPS Technology

Phase Attribute Identification using GPS Technology Phase Attribute Identification using GPS Technology Date 11 June 2009 John Sinclair Power Quality Manager Slide 1 Topics of Discussion Remote Phase Identification How it works Principals of operation Benefits

More information

ESB Networks Response. ERGEG Consultation. Voltage Quality Regulation in Europe

ESB Networks Response. ERGEG Consultation. Voltage Quality Regulation in Europe NETWORKS ESB Networks Response to ERGEG Consultation on Voltage Quality Regulation in Europe Date: 22 February 2007 Distribution System Operator ESB Networks Page 1 of 12 Contents 1.0 INTRODUCTION...3

More information

AMFA-27 AMFA-29. Operator s Manual & Installation Instructions. Rev. 2.5

AMFA-27 AMFA-29. Operator s Manual & Installation Instructions. Rev. 2.5 AMFA-27 AMFA-29 Operator s Manual & Installation Instructions Rev. 2.5 Date: 17 July, 2010 Permanently-connected, utility Interactive, single-phase, inverters Model AMFA-27 WIND TURBINE INVERTER (240 VAC

More information

Cahier technique no. 196

Cahier technique no. 196 Collection Technique... Cahier technique no. 196 Integration of local power generation in industrial sites and commercial buildings T. Hazel "Cahiers Techniques" is a collection of documents intended for

More information

Ausgrid s Policy on Public Lighting - Contestable Projects. AUSPL CONPOL01 September 2012

Ausgrid s Policy on Public Lighting - Contestable Projects. AUSPL CONPOL01 September 2012 Ausgrid s Policy on Public Lighting - Contestable Projects AUSPL CONPOL01 September 2012 Ausgrid s Policy on Public Lighting - Contestable Projects September 2012 Contents 1 OBJECTIVE... 3 2 SCOPE AND

More information

Earth Fault Detection Basics in Theory

Earth Fault Detection Basics in Theory Earth Fault Detection Basics in Theory Author: Dipl.-Ing. Ingo Kühnen Woodward Power Solutions Krefelder Weg 47 47906 Kempen, Germany Kempen, 16.04.2010 Earth_Fault_Detection_20100416.doc page 1 1. Star

More information

Hyperlinks are Inactive

Hyperlinks are Inactive Prepared by: NIB/EOB PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES 05503 Department: Electric T&D Section: T&D Engineering and Technical Support Approved by: G.O. Duru (GOD)

More information

Interconnection of Generators to EDI s Distribution System

Interconnection of Generators to EDI s Distribution System Interconnection of Generators to EDI s Distribution System May 22, 2002 This document sets forth the guidelines for connecting a power producing facility to the Alberta Interconnected Electric System through

More information

Single-phase (220...240 V) voltage monitoring: Undervoltage Overvoltage Window mode (overvoltage + undervoltage) Voltage fault memory selectable

Single-phase (220...240 V) voltage monitoring: Undervoltage Overvoltage Window mode (overvoltage + undervoltage) Voltage fault memory selectable Features 70.11 70.31 70.41 Electronic voltage monitoring relays for single and three-phase applications Multifunctional types, providing the flexibility of monitoring Undervoltage, Overvoltage, Window

More information

Modeling of PV Based Distributed Generator Systems with Diverse Load Patterns

Modeling of PV Based Distributed Generator Systems with Diverse Load Patterns Modeling of PV Based Distributed Generator Systems with Diverse Load Patterns Mehmet H. Cintuglu, mcint015@fiu.edu, Armando Altamirano, araltami@fiu.edu Osama A. Mohammed, mohammed@fiu.edu Energy Systems

More information

..OR How To Protect your 3-Phase Equipment Investment with 3-Phase Monitors from Time Mark...

..OR How To Protect your 3-Phase Equipment Investment with 3-Phase Monitors from Time Mark... ..OR How To Protect your 3-Phase Equipment Investment with 3-Phase Monitors from Time Mark... TIME MARK CORPORATION 11440 EAST PINE STREET TULSA, OK 74116 USA tel 918 438-1220 fax 918 437-7584 www.time-mark.com

More information

Supply Standards: Electricity Supply Standard July 2011 4 JULY 2011 ISSUE 6 UNCLASSIFIED UNCONTROLLED COPY IF PRINTED

Supply Standards: Electricity Supply Standard July 2011 4 JULY 2011 ISSUE 6 UNCLASSIFIED UNCONTROLLED COPY IF PRINTED s: Electricity Supply Standard July 2011 4 JULY 2011 ISSUE 6 OPERATIONAL PROCEDURE - s: Electricity PREPARED BY: Power Quality Manager AUTHORISED BY: General Manager Network Support DOCUMENT NUMBER: -

More information

The Electrical Safety Regulation (pre and post 1 January 2014)

The Electrical Safety Regulation (pre and post 1 January 2014) The Electrical Safety Regulation (pre and post 1 January 2014) The following table provides an overview comparison between the Electrical Safety Regulation 2002 (the ESR 2002) current as at 1 July 2013

More information

Interfacing electrification and system reliability. Earthing of AC and DC railways 4,10,13

Interfacing electrification and system reliability. Earthing of AC and DC railways 4,10,13 Interfacing electrification and system reliability Roger White Professional Head of Electrification and Plant Rail Abstract Integration is the term given to ensuring that the different elements of an electrified

More information

Fundamentals of Power

Fundamentals of Power Fundamentals of Power Fundamentals of Power 2008 American Power Conversion Corporation. All rights reserved. All trademarks provided are the property of their respective owners. Learning Objectives At

More information

CHECKING AND TESTING ELECTRICAL INSTALLING WORK

CHECKING AND TESTING ELECTRICAL INSTALLING WORK CHECKING AND TESTING ELECTRICAL INSTALLING WORK Department of Consumer and Employment Protection Energy Safety Preface It is a requirement of the Electricity (Licensing) Regulations 1991 that all electrical

More information

N.J.A.C. 14:8-4 NET METERING FOR CLASS I RENEWABLE ENERGY SYSTEMS

N.J.A.C. 14:8-4 NET METERING FOR CLASS I RENEWABLE ENERGY SYSTEMS N.J.A.C. 14:8-4 NET METERING FOR CLASS I RENEWABLE ENERGY SYSTEMS 14:8-4.1 Scope This subchapter sets forth net metering requirements that apply to electric power suppliers, basic generation service providers

More information

SPECIAL TOPICS ON GROUND FAULT PROTECTION AND PROTECTION COORDINATION IN INDUSTRIAL AND COMMERCIAL POWER SYSTEMS

SPECIAL TOPICS ON GROUND FAULT PROTECTION AND PROTECTION COORDINATION IN INDUSTRIAL AND COMMERCIAL POWER SYSTEMS SPECIAL TOPICS ON GROUND FAULT PROTECTION AND PROTECTION COORDINATION IN INDUSTRIAL AND COMMERCIAL POWER SYSTEMS Claudio S. Mardegan claudio.mardegan@engepower.com www.engepower.com Phone: 55 3579-8777

More information

Electricity Service Standards

Electricity Service Standards CODE OF PRACTICE Electricity Service Standards Revised August 2015 Contents 1. Preface... 1 Format... 1 2. Application and Objectives... 2 3. Service Standards... 3 3.1 General... 3 3.2 Particular... 3

More information

White Paper SolarEdge Three Phase Inverter System Design and the National Electrical Code. June 2015 Revision 1.5

White Paper SolarEdge Three Phase Inverter System Design and the National Electrical Code. June 2015 Revision 1.5 White Paper SolarEdge Three Phase Inverter System Design and the National Electrical Code June 2015 Revision 1.5 Shalhevet Bar-Asher; SolarEdge Technologies, Inc. Bill Brooks, PE; Brooks Engineering LLC

More information

Integration of Distributed Generation in the Power System. IEEE Press Series on Power Engineering

Integration of Distributed Generation in the Power System. IEEE Press Series on Power Engineering Brochure More information from http://www.researchandmarkets.com/reports/2171489/ Integration of Distributed Generation in the Power System. IEEE Press Series on Power Engineering Description: A forward

More information

Arc Terminator Active Arc-Resistant Switchgear

Arc Terminator Active Arc-Resistant Switchgear Arc Terminator Active Arc-Resistant Switchgear Increasing safety and productivity by extinguishing internal arcing faults within the switchgear. The Square D Arc Terminator from Schneider Electric offers

More information

LIMITING SHORT-CIRCUIT CURRENTS IN MEDIUM-VOLTAGE APPLICATIONS

LIMITING SHORT-CIRCUIT CURRENTS IN MEDIUM-VOLTAGE APPLICATIONS LIMITING SHORT-CIRCUIT CURRENTS IN MEDIUM-VOLTAGE APPLICATIONS Terence Hazel Senior Member IEEE Schneider Electric 38050 Grenoble France Abstract The power requirements for large industrial sites is increasing.

More information

Secure your electrical network. PACiS The Safety Solution for Healthcare Institutions

Secure your electrical network. PACiS The Safety Solution for Healthcare Institutions Secure your electrical network The Safety Solution for Healthcare Institutions Fast Secure : the solution for fault isolation and electrical network restoration in less than 500 ms 03 A Real Time System

More information

Electrical safety of grid-connected solar installations in Western Australia December 2011

Electrical safety of grid-connected solar installations in Western Australia December 2011 Electrical safety of grid-connected solar installations in Western Australia December 2011 Level 1, 303 Sevenoaks Street (cnr Grose Avenue) Cannington, Western Australia 6107 PO Box 135 Cannington WA 6987

More information

2016 Santee Cooper Solar Home & Solar Share Home Program Manual

2016 Santee Cooper Solar Home & Solar Share Home Program Manual 2016-17 2016 Santee Cooper Solar Home & Solar Share Home Program Manual Version 03232016 This Program Manual is intended to serve as a reference for Santee Cooper s residential Customers that are interested

More information

Document No Amendment No Approved By Approval Date Review Date NS112 DESIGN STANDARDS FOR INDUSTRIAL AND COMMERCIAL DEVELOPMENTS

Document No Amendment No Approved By Approval Date Review Date NS112 DESIGN STANDARDS FOR INDUSTRIAL AND COMMERCIAL DEVELOPMENTS Network Standard NETWORK Document No Amendment No Approved By Approval Date Review Date : : : : : NW000-S0041 1 Chief Engineer 26/10/2015 13/04/2018 NW000-S0041 NS112 DESIGN STANDARDS FOR INDUSTRIAL AND

More information

Medium Voltage (MV) & High Voltage (HV) Training Module 6. Date of the presentation

Medium Voltage (MV) & High Voltage (HV) Training Module 6. Date of the presentation Medium Voltage (MV) & High Voltage (HV) Training Module 6 Date of the presentation Electrical System Basics MV vs. HV - Definitions Differences between USA and the rest of the world IEC define a high voltage

More information

Generation Interconnection System Impact Study Report. For. PJM Generation Interconnection Request Queue Position X1-114.

Generation Interconnection System Impact Study Report. For. PJM Generation Interconnection Request Queue Position X1-114. Generation Interconnection System Impact Study Report For PJM Generation Interconnection Request Queue Position X1-114 Sandyston January 2012 Preface The intent of the System Impact Study is to determine

More information

High Voltage (HV) Electricity System Safety Rules and Associated Safety Guidance

High Voltage (HV) Electricity System Safety Rules and Associated Safety Guidance Annex I To Loughborough University (LU) Facilities Management (FM) Health and Safety Policy High Voltage (HV) Electricity System Safety Rules and Associated Safety Guidance 1. Introduction a. These Safety

More information

CONSULTATION PAPER FOR PROPOSED MODIFICATIONS TO THE TRANSMISSION CODE

CONSULTATION PAPER FOR PROPOSED MODIFICATIONS TO THE TRANSMISSION CODE CONSULTATION PAPER FOR PROPOSED MODIFICATIONS TO THE TRANSMISSION CODE Closing date for submission of representations: 30 th Sep 2014, 5 pm 18 AUG 2014 ENERGY MARKET AUTHORITY 991G Alexandra Road #01-29

More information

Technical Requirements for Renewable Energy Systems Connected to the Low Voltage (LV) Network via Inverters

Technical Requirements for Renewable Energy Systems Connected to the Low Voltage (LV) Network via Inverters Technical Requirements for Renewable Energy Systems Connected to the Low Voltage (LV) Network via Inverters Specification Number: HPC-9FJ-12-0001-2012 CONTENTS 1 Introduction... 6 1.1 Context... 6 1.2

More information

Engineering innovation

Engineering innovation Eaton's Electrical Engineering Services & Systems Solutions Focus Seamless Solutions for Reliable, Efficient and Safe Power Systems Engineering innovation Progressive solutions for today s power systems

More information

G8 - Contracts for Difference Metering

G8 - Contracts for Difference Metering PUBLIC G8 - Contracts for Difference Metering EMRS Guidance EMR Settlement Limited Version 1.0 12 October 2015 CONTENTS Change Amendment Record...4 1. Introduction...5 2. Purpose...5 3. What is the Electrical

More information

DESCRIPTION DWG DESCRIPTION DWG

DESCRIPTION DWG DESCRIPTION DWG DESCRIPTION DWG DESCRIPTION DWG Ferroresonance 3451/1 3451/2 3451/3 Electro-magnetic Fields (EMF) 3462/1 HV & LV Insulators (Links) 3463/1 A ORIGINAL ISSUE B 14.07.09 APPROVED DATE J. Brooks 25.02.03 INDEX

More information

TA Kahraman Yumak ELK412 - Distribution of Electrical Energy Lab. Notes v1.0 2013 Spring web.itu.edu.tr/yumakk. Distance Protection

TA Kahraman Yumak ELK412 - Distribution of Electrical Energy Lab. Notes v1.0 2013 Spring web.itu.edu.tr/yumakk. Distance Protection Distance Protection Announcement: You are not supposed to prepare a pre-report. But there will be an oral examination, so you are strongly advised to study this note regarding to the pre-study questions

More information

Technical requirements for connections to Orion s electricity distribution network

Technical requirements for connections to Orion s electricity distribution network Technical requirements for connections to Orion s electricity distribution network About Orion Orion New Zealand Limited owns and operates the electricity distribution network in central Canterbury between

More information

Requirements for Offshore Grid Connections. in the. Grid of TenneT TSO GmbH

Requirements for Offshore Grid Connections. in the. Grid of TenneT TSO GmbH Requirements for Offshore Grid Connections in the Grid of TenneT TSO GmbH Bernecker Straße 70, 95448 Bayreuth Updated: 21 December 2012 1/10 Requirements for Offshore Grid Connections in the Grid of TenneT

More information

415V DISTRIBUTION FOR GREEN DATA CENTERS

415V DISTRIBUTION FOR GREEN DATA CENTERS White Paper: HMRP-WP001-A5 June 5, 2012 415V DISTRIBUTION FOR GREEN DATA CENTERS Prepared by: Anthony (Tony) Hoevenaars, P. Eng President and CEO Mirus International Inc. Copyright 2012 Mirus International

More information

PSEG-LONG ISLAND SMART GRID SMALL GENERATOR INTERCONNECTION SCREENING CRITERIA FOR OPERATING IN PARALLEL WITH LIPA S DISTRIBUTION SYSTEM

PSEG-LONG ISLAND SMART GRID SMALL GENERATOR INTERCONNECTION SCREENING CRITERIA FOR OPERATING IN PARALLEL WITH LIPA S DISTRIBUTION SYSTEM PSEG-LONG ISLAND SMART GRID SMALL GENERATOR INTERCONNECTION SCREENING CRITERIA FOR OPERATING IN PARALLEL WITH LIPA S DISTRIBUTION SYSTEM PSEG-LI SGSGIP DG Screening Criteria 5-29-14 Table of Contents I.

More information

IEEE Smart Grid Series of Standards IEEE 2030 TM (Interoperability) and IEEE 1547 TM (Interconnection) Status. #GridInterop

IEEE Smart Grid Series of Standards IEEE 2030 TM (Interoperability) and IEEE 1547 TM (Interconnection) Status. #GridInterop IEEE Smart Grid Series of Standards IEEE 2030 TM (Interoperability) and IEEE 1547 TM (Interconnection) Status #GridInterop Smart Grid (IEEE 2030): the integration of power, communications, and information

More information

ESB Networks Perspective on Microgeneration

ESB Networks Perspective on Microgeneration ESB Networks Perspective on Microgeneration Presentation to DIT Seminar 13 th November 2009 Tony Hearne Manager, Generation Planning ESB networks Brendan O Connor Commercial Policy ESB networks Micro-generation

More information

100% Stator Ground Fault Detection Implementation at Hibbard Renewable Energy Center. 598 N. Buth Rd 3215 Arrowhead Rd

100% Stator Ground Fault Detection Implementation at Hibbard Renewable Energy Center. 598 N. Buth Rd 3215 Arrowhead Rd 100% Stator Ground Fault Detection Implementation at Hibbard Renewable Energy Center Introduction Roger Hedding Steven Schoenherr, P.E. ABB Inc. Minnesota Power 598 N. Buth Rd 3215 Arrowhead Rd Dousman,

More information

CO-ORDINATION OF PARALLEL AC-DC SYSTEMS FOR OPTIMUM PERFORMANCE

CO-ORDINATION OF PARALLEL AC-DC SYSTEMS FOR OPTIMUM PERFORMANCE CO-ORDINATION OF PARALLEL AC-DC SYSTEMS FOR OPTIMUM PERFORMANCE Ana Diez Castro & Rickard Ellström Ying Jiang Häfner Christer Liljegren Vattenfall Utveckling AB ABB Power Systems Gotlands Energiverk AB

More information

System Grounding and Ground-Fault Protection Methods for UPS-Supplied Power Systems

System Grounding and Ground-Fault Protection Methods for UPS-Supplied Power Systems System Grounding and Ground-Fault Protection Methods for -Supplied Power Systems Bill Brown, P.E., Square D Critical Power Competency Center 1. INTRODUCTION The use of solid grounding for -supplied power

More information

VOLTAGE REGULATOR AND PARALLEL OPERATION

VOLTAGE REGULATOR AND PARALLEL OPERATION VOLTAGE REGULATOR AND PARALLEL OPERATION Generator sets are operated in parallel to improve fuel economy and reliability of the power supply. Economy is improved with multiple paralleled generators by

More information

415V DISTRIBUTION FOR GREEN DATA CENTERS

415V DISTRIBUTION FOR GREEN DATA CENTERS White Paper: HMRP-WP001-A1 October 1, 2010 415V DISTRIBUTION FOR GREEN DATA CENTERS Prepared by: Anthony (Tony) Hoevenaars, P. Eng President and CEO Mirus International Inc. Copyright 2005 Mirus International

More information

APPLICATION NOTE USING A MODEL 3060-MS SERIES AS A REGENERATIVE AC SOURCE FOR PV INVERTER TEST APPLICATIONS. Abstract.

APPLICATION NOTE USING A MODEL 3060-MS SERIES AS A REGENERATIVE AC SOURCE FOR PV INVERTER TEST APPLICATIONS. Abstract. USING A MODEL 3060-MS SERIES AS A REGENERATIVE AC SOURCE FOR PV INVERTER TEST APPLICATIONS Abstract This application note describes the necessary procedure to use a standard Pacific Power Source Model

More information

30 ms High Speed Transfer System (HSTS) Product Description

30 ms High Speed Transfer System (HSTS) Product Description 30 ms High Speed Transfer System (HSTS) Product Description 2 30 ms High Speed Transfer System (HSTS) Product Description Content Page 1 General 5 1.1 Description of the 30 ms high speed transfer system

More information

Application of Four-Pole Circuit Breakers within Data Centers

Application of Four-Pole Circuit Breakers within Data Centers Application of Four-Pole Circuit Breakers within Data Centers December 2013/AT324 by Frank Waterer, Fellow Engineer, Schneider Electric Engineering Services Make the most of your energy SM Revision #1

More information

Distributed Generation Interconnection Manual

Distributed Generation Interconnection Manual Distributed Generation Interconnection Manual Public Utility Commission of Texas Prepared by: Distributed Utility Associates Endecon Engineering 1062 Concannon Blvd. 347 Norris Court Livermore, CA 94550

More information

SELECTION OF FINAL CIRCUIT PROTECTION

SELECTION OF FINAL CIRCUIT PROTECTION SELECTION OF FINAL CIRCUIT PROTECTION By Phil Williams, Product Marketing Manager, Power Distribution Components, Eaton Executive summary The selection of devices for final circuit protection in electrical

More information