GROUND INVESTIGATION REPORT for the site at ***************** on behalf of *****************

Size: px
Start display at page:

Download "GROUND INVESTIGATION REPORT for the site at ***************** on behalf of *****************"

Transcription

1 GROUND INVESTIGATION REPORT for the site at ***************** on behalf of ***************** Land Science (Brighton) Ltd Carlton Terrace Portslade Brighton East Sussex BN41 1UR T: F: W: landscience.co.uk

2 D O C U M E N T C O N T R O L Title: GROUND INVESTIGATION REPORT Site: ***************** Client: ***************** Date: 08/12/2010 Reference: Version: LS0237 v2 (updated to incorporate CP borehole) Prepared by: SALLY REDMAN M.Sc., B.Sc. (Hons.), F.G.S., AIEMA Engineer Checked by: ELLIOT TOMS CEnv., M.Sc., B.Sc. (Hons.), F.G.S., MIEnvSci Managing Director Land Science (Brighton) Ltd is part of the Land Science Ltd group of companies, specialist consultants in Geotechnical Engineering and Contaminated Land for construction, regulation, property ownership, and due diligence. By understanding our client s needs and appreciating the role that ground issues play within a wider context, we are able to provide focused, pragmatic, and technically excellent advice. For more information on how Land Science can benefit your project, please visit Ground Investigation Page 2 of 19 *****************

3 C O N T E N T S 1.0 INTRODUCTION General The Site Form of Development Geotechnical Objectives Geo-Environmental Objectives Scope of Works Schedule of Work Standards Conditions DESK STUDY Site Walkover Survey Geology Hydrogeology Hydrology Sensitive Land Uses Industrial Land Uses Radon Ground Gases Historical Data Previous Ground Investigations CONCEPTUAL SITE MODEL Contamination Sources Identified Receptors Source-Pathway-Receptor Linkages Environmental Investigation Strategy ENCOUNTERED CONDITIONS Soils Groundwater Obstructions Geotechnical Field Testing Geotechnical Laboratory Testing ENGINEERING CONSIDERATIONS Traditional Foundations Piled Foundations Ground Floor Slabs continued Ground Investigation Page 3 of 19 *****************

4 5.4 Excavations Retaining Walls and Slope Stability Pavements Building Materials Soakaways F I G U R E S FIGURE 1: FIGURE 2: Site Location Plan Investigation Layout Plan A P P E N D I C E S APPENDIX A: APPENDIX B: APPENDIX C: Desk Study Engineering Logs Geotechnical Testing Results Ground Investigation Page 4 of 19 *****************

5 1.0 INTRODUCTION 1.1 General Land Science (Brighton) Limited was instructed by ***************** to undertake a phase I and phase II geotechnical and geo-environmental investigation in relation to the proposed redevelopment of the site at ***************** (see figure 1). 1.2 The Site In summary, the site comprised two residential development plots which were situated on a steeply sloping land within the grounds of *****************. A site walkover survey is presented in section Form of Development It was understood that the proposed development was to comprise the construction of two residential properties together with private gardens, areas of car parking, provision of utility services, and associated infrastructure. The steeply sloping nature of the site required a number of low retaining walls to be constructed. Figure 2 illustrates the layout of the proposed development. 1.4 Geotechnical Objectives A geotechnical investigation was required to provide an interpretation of ground conditions with respect to foundation design, pavement construction, soakaways, concrete specification, excavation stability, basement construction parameters, and basic slope stability considerations. 1.5 Geo-Environmental Objectives Furthermore, an investigation into geo-environmental aspects of the site was required, in order to provide a generic quantitative risk assessment (GQRA) in respect of the proposed redevelopment, adjacent land uses, and the wider environment, in the context of the planning regime and PPS Scope of Works Phase I of the investigation was to comprise a desk study of geotechnical and environmental factors pertaining to the site, in order to formulate a geo-environmental Conceptual Site Model ( CSM ), and to identify areas of geotechnical concern relevant to the proposed redevelopment. In turn, this information was used in the design of the Phase II intrusive investigation and, within the constraints of the original appointment, the investigative positions and laboratory testing were to be targeted to geotechnical and geo-environmental areas of concern as appropriate. The scope of works initially agreed with the client broadly comprised the drilling of a series of window sampler boreholes and accompanying dynamic probes, with preliminary falling head soakage tests undertaken in a number of positions. Ground Investigation Page 5 of 19 *****************

6 Soft weak Head Deposits were identified in the location of one of the proposed new dwellings (lower plot), and Land Science returned to site with the Client to excavate a two further trial holes in this location. Based on the findings, it was agreed to that a piled foundation solution was likely to be required in this location, it was agreed to return to site to drill a cable percussive borehole to obtain pile design parameters. 1.7 Schedule of Work The following table summarises the dates that the various elements of the investigation works were conducted: Element Instruction Desk Study Fieldwork Details An instruction to proceed with the investigation was received from ************ on behalf of ************ on 29 th October, The desk study was commenced immediately upon receipt of the Client s instruction to proceed. A site walkover survey was conducted as part of the field work. The initial phase of intrusive investigation was completed on 9 th November, Land Science returned on 29 th November 2010 to excavate two further trial holes with the Client on the lower plot. Based on the results, Land Science returned to site on 6 th December 2010 to drill a cable percussive borehole. Laboratory Analysis Samples were submitted to the geotechnical laboratory (K4 Soils Ltd) immediately upon completion of the first phase of fieldwork, with the analysis completed by 26 th November Schedule of completion of investigation works 1.8 Standards Where practicable, the ground investigation and subsequent geotechnical and environmental assessments were undertaken in accordance with the following documents and guidance: o CLR11: Model Procedures for the Management of Contaminated Land, DEFRA and Environment Agency 2004 o Environment Agency Guidance on Requirements for Land Contamination Reports, Version 1 dated July o o Planning Policy Statement (PPS) 23: Pollution. Building Regulations Approved Document C: Site preparation and resistance to contaminants and moisture. o NHBC Standards Chapter 4.1 Land Quality - Managing Ground Conditions, September Other technical sources have been identified in respect of specific aspects of the investigation, as referenced throughout the text. Ground Investigation Page 6 of 19 *****************

7 1.9 Conditions Geotechnical and/or environmental interpretations are inherently dependant on the conditions revealed by a limited set of data and the accepted means of interpreting that data in use at the time of the investigation. Every effort is made to ensure that such data is accurate and representative, and that any assessment is performed under current best practice. However, we do not accept any liability for the scope of the investigation, for conditions that have not been directly revealed through the investigation, or for the ultimate reliability of any published and current assessment criteria or procedures adopted in interpreting that data. Any spatial or temporal extrapolation or inference is conjectural and no liability can be accepted for its accuracy; in particular, differing conditions may be revealed between or under points of investigation, and the concentrations or levels of mobile liquid and gaseous materials are likely to vary over time. It is also an inherent aspect of any investigation that areas of concern not previously anticipated are identified as works progress, and elements of the project design may vary during or after completion of the investigation; whilst every effort is made to tailor the investigation to suit within practical constraints as works progress, it may become necessary to undertake additional investigation work. Information contained in this report is intended for the use of the Client and his agents for the purposes set-out in the text, and Land Science (Brighton) Ltd makes no warranty or representation whatsoever express or implied with respect to the use of this information by any other party or for uses other than those described. We do not indemnify the Client or any third parties against any dispute, claim or consequential losses arising from any finding or other result of this investigation report. No aspect of this report should be taken as a guarantee that a site is free of hazardous or potentially contaminative materials. Ground Investigation Page 7 of 19 *****************

8 2.0 DESK STUDY The findings of the Phase I Desk Study are summarised in the following section, with relevant information obtained presented in Appendix A. Comments made in the following section are based purely on the desk study. 2.1 Site Walkover Survey Land Science undertook two formal inspections of the site, once during the fieldwork on 9 th November 2010, and again on 29 th November 2010 to inspect excavations being made as part of site enabling works. In summary, the areas under investigation comprised two residential development plots situated on steeply sloping land within the grounds of *************. The lower plot was situated adjacent to the *************, with a flat level area (upon which the new dwelling was to be constructed) and a bank at the rear rising steeply at around 30 O to 40 O. The ground was noted to be soft under foot. The area was heavily wooded; there were numerous tall mature trees around the perimeter of the plot, and a number of old tree stumps were noted within the plot itself. Conditions in this area had broadly remained unchanged by the time of the second visit, with the exception of a small cut having been made into the toe of the existing slope revealing heavily weathered light brown Chalk putty with abundant intact Chalk fragments. Access to the plots was gained via a shared driveway with *************. The driveway transversed the slope diagonally upwards to the upper plot, before turning back on itself towards the existing dwelling. The upper plot sloped less steeply than the bank between the two plots, at an angle in the order of 10 O. This plot comprised more formal gardens of the existing dwelling, with the area being mainly laid to lawn with shrubs and the like. By the time of the second visit an excavation into the slope to create the working area for the building construction had been made, with a cut face up-slope approximately 2.00m high standing near vertically and comprising reasonably unweathered blocky chalk. 2.2 Geology British Geological Survey 1:50,000 sheet number 300 entitled "Alresford indicated the geology of the site to comprise the Lewes Nodular Chalk Member (hard nodular chalk with flints) with a thin tract of Head Deposits along the lower southern boundary (variable deposits of sandy silty clay, locally gravelly, chalky and flinty in dry valleys). 2.3 Hydrogeology The table overleaf summarises the relevant groundwater vulnerability data for the site: Ground Investigation Page 8 of 19 *****************

9 Aspect Classification Details Superficial Deposits (south of the site) Secondary Aquifer (undifferentiated) Assigned in cases where it has not been possible to attribute either category A or B to a rock type. Bedrock geology Principle Aquifer These are layers of rock or drift deposits that have high intergranular and/or fracture permeability - meaning they usually provide a high level of water storage. They may support water supply and/or river base flow on a strategic scale. Groundwater vulnerability data The site has been identified to lie within a Source Protection Zone III. An SPZ is a protection zone placed around a well or borehole that supplies groundwater of potable quality. An SPZ is divided into three zones defined as follows: o o o Zone I - Travel time (of water) of 50 days or less to the groundwater source. Zone II - Either 25% of the source area or a travel time of 400 days whichever is greater. Zone III - The total area needed to support the abstraction. There were no groundwater abstractions identified within 500m of the site. 2.4 Hydrology There are no major watercourses on site or in the immediate vicinity. The site does not lie within an area classified as being susceptible to flooding. There were no surface water abstractions, discharge licenses, or pollution incidents identified within 500m of the site. 2.5 Sensitive Land Uses No such sensitive land uses were identified within a 250m radius of the site. 2.6 Industrial Land Uses No potentially contaminative land uses were identified on site or in the immediate vicinity. 2.7 Radon In accordance with BRE 211:2007, the site lies in an area where between 1% and 3% of homes exceed the government threshold for Radon gas in residential dwellings. A BGS report obtained by Land Science confirmed that basic Radon Protection Measures are required at this site. Basic Radon Protection Measures include the use of a well-constructed damp-proof membrane through wall cavities and beneath the floor scree. Such details should be shown on proposed construction drawings, and installation should be verified by the building inspector. Ground Investigation Page 9 of 19 *****************

10 2.8 Ground Gases A search waste treatment and disposal sites was undertaken as part of the desk study. Such sites may form an artificial source of land gases, such as Carbon Dioxide and Methane, where wastes are buried or disposed of to landfill. No such waste facilities or landfill sites were identified within a 1km radius of the site. The risk to the site is likely to be generally very low in this respect. In terms of land gases generated from natural sources, it was noted that the site was underlain by Chalk. The dissolution of carbonate cements by the infiltration of acidic waters may give rise to the generation of low levels of Carbon Dioxide. 2.9 Historical Data Historical maps dating back to 1870 were obtained as part of the desk study. A summary of the apparent key features noted on the map extracts both on the site and within the local area is presented on the table below. Date On Site Off Site 1870 The site comprises open land and a small area of woodland. The surrounding area comprises open land with small areas of woodland. Beech Farm is located to the north-west. A track runs along to the south of the site No significant changes noted. No significant changes noted ************* is indicated; the dwelling is not in the same location as the present day and lies within a parcel of land larger than the present day. The development plots fall within the associated gardens An ancillary building is noted to the north of the main property and a possible garage located to the south, adjacent to the drive A further small ancillary building has been developed adjacent to the north of the main building. The driveway appears to have been realigned onto land to the east Insufficient coverage. Insufficient coverage The dwelling appears to have been demolished and replaced with a new structure, commensurate with the present day house. Summary of Historical Map extracts Residential properties have been developed to the east and west. Further residential properties have been developed to the north and east. Beech Farm is now known as The Old Farm. Further residential properties are indicated in the immediate vicinity. The track to the south is now labelled *************. One residential property has been developed adjacent to the site. Ground Investigation Page 10 of 19 *****************

11 In summary, the site appeared to initially comprise open fields and woodland until c.1910, whereby the land fell within the grounds of *************. The dwelling was located to the west of the current existing property, close to the proposed location of the new dwelling on the upper plot. A number of outbuildings and a garage were shown on subsequent maps. The 1997 map shows the old dwelling to have been replaced with the current dwelling. The surrounding area comprised open land with small woodland/scrubland areas, with a farm (Beech Farm) located to the north-west up until c.1910 (later Beech Place). By c.1910, residential properties had been developed within the immediate vicinity of the site, with further dwellings being built after this date Previous Ground Investigations Land Science (Brighton) Ltd was not aware of any previous investigation that may have been undertaken on the site. Ground Investigation Page 11 of 19 *****************

12 3.0 CONCEPTUAL SITE MODEL The following sections summarise the anticipated environmental factors likely to impact upon the site in the context of the proposed redevelopment, in order to provide a justification and rationale for the subsequent phase II ground investigation. 3.1 Contamination Sources Possible sources of contamination identified or discounted as part of the desk study are summarised on the following table: Source Description Notes Land Gases Carbon Dioxide generated from the dissolution of carbonate cements Possible trace levels of Carbon Dioxide (CO 2 ). within the New Pit Chalk Formation. Radon Gas Naturally occurring Radon gas Basic Radon Protection Measures are required for new dwellings at this site. Possible Sources of Contamination 3.2 Identified Receptors Furthermore, potential receptors associated with the site and its redevelopment, identified or otherwise discounted, are summarised on the following table: Receptor Description Notes Site Workers Persons involved in construction and Major ground works are proposed future maintenance. including foundation excavation. End Users Occupants of the proposed redevelopment. Soft Landscaping Areas of planting including lawns, shrubs, trees, etc. Building Materials Elements of the built environment in direct contact with the ground. Adjacent Land Users Ground Water Possible Receptors of Contamination Sensitive land uses identified within the immediately vicinity Controlled Waters contained within the aquifer(s) beneath the site Residential development with private domestic gardens. Substantial areas of private soft landscaping are proposed. Buried plastics (e.g. water supplies) and concrete (e.g. foundations) may be laid. Residential gardens were identified immediately adjacent to the site. The site overlies a major aquifer and the site lies within a groundwater SPZ III (total catchment). Surface water and ecological receptors have not been identified as significant receptors. Ground Investigation Page 12 of 19 *****************

13 3.3 Source-Pathway-Receptor Linkages Whilst the various possible sources and receptors have been identified, the following matrix illustrates the identified pathways by which a contaminant linkage might plausibly exist: Source Land Gases Radon Gases Site Workers Asphyxiation None End Users None None Receptors Soft Landscaping None None Building Materials None None Adjacent Land Users Not applicable Not applicable Ground Water None None Identified Source-Pathway-Receptor linkages The proposed dwellings will include basic Radon Protection Measures. Such measures are also sufficient to protect against low concentrations of Carbon Dioxide. No other sources have been identified. As such no risks are posed to End Users. Radon Gas and Land Gases (Carbon Dioxide) will not pose a risk to soft landscaping, building materials, or groundwater, and pathways between off-site receptors and ubiquitous sources of contamination that exist both on-site and off-site are not applicable to this assessment. The concentrations of Radon Gas at this site are such that the workplace exposure limit set at 200Bq.m -3 is unlikely to be exceeded; thus no significant risk is posed in this respect. Whilst a plausible risk may exist with respect to trace levels of Carbon Dioxide and site personnel working in confined spaces such as deep excavations, pre-entry monitoring in accordance with Health and Safety requirements should ensure that any risks posed in this respect are adequately dealt with. 3.4 Environmental Investigation Strategy On the basis that no significant plausible source-pathway-receptor linkages have been identified, no environmental investigation was considered necessary. Deep excavation must be pre-monitored for Carbon Dioxide and Oxygen (amongst any other gases as identified by a confined space risk assessment) prior to personnel entry. Ground Investigation Page 13 of 19 *****************

14 4.0 ENCOUNTERED CONDITIONS A factual record of the conditions encountered during the physical investigation of the site is presented in the following sections. 4.1 Soils According to published information the anticipated geological succession beneath the site was indicated to comprise Lewes Nodular Chalk with a thin tract of Head Deposits in the southern lower part of the site. The investigation generally confirmed the anticipated geological succession. Topsoil was encountered in all window sampler boreholes, to depths in the range of 0.30m and 0.50mbgl. In summary, these materials generally comprised dark brown clayey sandy gravelly silt with rootlets. Head Deposits were encountered on the lower plot within WS2, WS3, the two further trial holes, and BH1, and were proved to a maximum depth of 2.70mbgl (within the trial holes). Generally these materials were identified as brown silty, sandy very gravelly CLAY (the gravel being fine to coarse angular flint). A further zone of similar materials was also encountered within WS6 to a depth of 2.80mbgl, close to the location of the garage at the upper plot. These materials may represent localised weathering of the underlying Chalk. The Lewes Nodular Chalk was encountered across the site from depths in the range of 0.30m to 2.80mbgl, and was proved to a maximum depth of 15.50mbgl within the cable percussive borehole. In the lower plot, the Chalk was noted to comprise white to light brown putty CHALK with limited proportions of gravel sized medium density Chalk fragments. In the upper plot, these materials were recovered as weak off-white gravel to cobble sized intact CHALK with horizons bearing limited proportions of weathered Chalk putty; the in-situ Chalk exposed in the ongoing excavation at the upper plot inspected during the second site visit was noted to be blocky and structured with widely spaced and open (<3mm) joints and occasional flint beds. 4.2 Groundwater Groundwater was not encountered during excavation of any of the investigative positions, and was not anticipated at shallow depth. 4.3 Obstructions No below ground artificial impenetrable solid obstructions were encountered during the fieldwork. 4.4 Geotechnical Field Testing Super Heavy Dynamic Probes were undertaken at positions WS1 and WS4. Ground Investigation Page 14 of 19 *****************

15 Generally the results from WS1 ranged between DP N =1 to DP N =13, (predominantly less than DP N =9, and averaging DP N =4); the values increased considerably between at 5.70m and 5.90m, and the probe was terminated at 5.90m upon a flint or similar. The results from WS4 generally ranged between DP N =3 to DP N =20 (predominantly less than DP N =12, averaging approximately DP N =8); the values increased considerably between 5.50m to 6.00m with the position being terminated at 6.00m. In-situ SPT tests were undertaken at 1.5m centres within the cable percussive borehole. A test result of SPT N =9 was obtained for the Head Deposits. For the Chalk, two identical results of SPT N =16 were obtained for the more weathered putty, increasing to between SPT N =18 and SPT N =41 within the more intact Chalk below 6.00m. 4.5 Geotechnical Laboratory Testing The results of two Particle Size Distribution determinations undertaken on the New Pit Chalk indicated the proportion of gravel was 32.9%-38.4%, sand 19.5%-24.6%, and silt/clay 36.9%-47.6 %. The laboratory description of this material was off white putty CHALK with occasional fine to medium intact chalk fragments. The results of two Particle Size Distribution determinations undertaken on the Head Deposits indicated the proportion of gravel was 43.3%-55.1%, sand 10.7%-12.5%, and silt/clay 34.2%-44.2%. The laboratory description of this material was brown sandy gravelly CLAY with occasional fine to medium chalk fragments (gravel is fine to medium and sub rounded to angular). Atterberg Limit analysis on a sample of the New Pit Chalk gave a plasticity index of 6% (or 3.1% when modified to account for the proportion passing the 425µm sieve). Within the Head Deposits, plasticity indexes ranged between 20% and 40%, or between 11.8% and 21.2% when modified to account for the proportion passing the 425µm sieve. Water soluble Sulphate determination were undertaken on a total of two samples of soil, with the results ranging between 0.09g/l and 0.10g/l; the accompanying ph results ranged between ph7.4 and 7.6. Elevated Sulphate and highly acidic soil is not generally associated with Chalk strata. Ground Investigation Page 15 of 19 *****************

16 5.0 ENGINEERING CONSIDERATIONS Subsequent to intrusive investigation of the site and receipt of the laboratory results, the following interpretative assessments have been made with respect to engineering considerations. 5.1 Traditional Foundations Based on the ground and groundwater conditions encountered within the boreholes on the upper (northern) plot, it is considered that traditional foundations are appropriate for the proposed development in that location. However, on account of the deep Head Deposits and soft weathered putty nature of the underlying Chalk, and on account of potential requirements for trench stability and heave precautions, it is recommended that an alternative foundation such as the use of piles is considered for the Lower (southern) plot. The following recommendations in respect of traditional foundations apply to the northern plot only. The Chalk should be treated as not being susceptible to volume change as defined by the NHBC Standards 4.2 (i.e. non shrinkable). Based on the in-situ testing results and typical settlement parameters for the types of soil encountered, a maximum net allowable bearing capacity of 150kPa is applicable to trench foundations taken through any Made Ground, soft or loose zones, or disturbed soils, and wholly into or onto the intact blocky Chalk of the Lewes Nodular Chalk Formation. This assessment includes an appropriate factor of safety against shear failure, and total settlements should remain within tolerable limits. A zone of Head Deposits was identified at WS6, outside the footprint of the proposed main dwelling structure but in close proximity to the nearby garage. The foundation excavations for the garage should be carefully inspected, and where Head Deposits are encountered it is recommended that either the widths are increased based on a maximum net allowable bearing capacity of 50kPa and foundation nominally reinforced, or that they are taken down onto the less weathered blocky Chalk. It should also be noted that the Head Deposits corresponded to a medium volume change potential as defined by the NHBC Standards, and that heave precautions would be required within the zone of influence of trees. It might be prudent to set out the foundations in this area and excavate a number of strategically placed trial holes prior to construction to assess ground conditions in this area. No evidence of solution features was noted on the site during the investigation. The site lies within an area where solution features may be present, and care should be taken during construction to identify any possible suspect soil conditions. Special precautions may be required where evidence of solution features is identified. Ground Investigation Page 16 of 19 *****************

17 5.2 Piled Foundations Piled foundations are recommended for the lower (southern) plot on account of the significant thicknesses of soft shrinkable Head Deposits and weathered Chalk. The construction of piled foundations is a specialist job and the advice of a reputable local contractor familiar with the type of ground and groundwater conditions encountered on this site should be sought prior to finalising the design. The actual working load for proposed piles will depend on the particular type of pile and method of installation adopted. The contractor should design piles in accordance with CIRIA Project Report 11, and in particular should adopt factors of safety of 2.5 and 5 on the skin friction and end bearing working loads respectively. For pile groups, the bearing value of each individual pile should be reduced by a factor of 0.8 and a calculation made to check for the factor of safety against block failure. All piles should be taken at least five times their diameter into the founding strata. Where bored piles are adopted, casing may be required in the upper sections to prevent necking. In accordance with the NHBC Standards, heave precautions may be required on the upper portions of piles and on ground beams within the zone of influence of trees, and the piles should be designed to resist uplift forces that may develop. 5.3 Ground Floor Slabs Ground floor slabs on the upper dwelling may be constructed as ground bearing, with a maximum net allowable bearing capacity of 25kN/m 2. The sub-grade should be carefully proof rolled and any soft or loose zones replaced with compacted granular engineering fill. The use of a ground bearing floor slab for the garage at the upper plot will depend on ground conditions exposed at the formation level; where significant thicknesses of Head Deposits are encountered it would be necessary to adopt a suspended ground floor slab. On account of the soil conditions at the lower plot, ground floor slabs should be fully suspended. 5.4 Excavations Excavations within the Head Deposits may be generally stable in the short term, being susceptible to possible localised spalling and collapse; shallow trenches to be left open for short periods may simply be battered back to a safe angle, whilst appropriate trench support should be considered for deeper trenches to be left open for prolonged periods. Excavations within the Chalk should remain generally stable. 5.5 Retaining Walls and Slope Stability A number of retaining walls are proposed, independent of the building construction, in order to accommodate the new dwellings. A full engineering assessment of slope stability issues was outside the scope of this report, although the following advice is given for preliminary purposes. Ground Investigation Page 17 of 19 *****************

18 The excavations for the retaining walls at the upper plot had already been commenced at the time of the second site visit by Land Science. The cut face was up to approximately m in height, and exposed blocky and structured Chalk with broadly horizontal widely spaced and open (<3mm) joints and occasional flint beds. Whilst cut faces in structured blocky Chalk can stand near vertically, there are issues with long-term instability associated with spalling, issues related to weathering and surface protection, and issues associated with serviceability. Where a cut slope is to be incorporated into the final landscaping design, the angle should not exceed 60 O and faces should be provided with a basic surface protection to prevent spalling and weathering; above this angle, it is recommended that a basic form of retaining wall is constructed. Retaining walls approximately 1.50m in height are also required at the rear of the lower plot, involving excavation along the toe of the slope, and special care and consideration should be given when designing the associated temporary and permanent works. Materials in this area comprise a mixture of weathered putty Chalk and soft Head Deposits, and it is likely that some form of embedded retaining wall would be most appropriate. With reference to BS8002:2004, parameters for retaining wall design in Head Deposits have been assessed as follows: Parameter Value Co-efficient of active earth pressure (K a ) 0.28 Co-efficient of passive earth pressure (K p ) 5.0 Saturated bulk density (γ) 18.0 Angle of shearing resistance of the soil (φ ) Preliminary retaining wall design parameters These values are based on a number of critical assumptions, which must be checked and verified as part of the actual retaining wall design: 30 O o o o Angle of shearing resistance between the ground and the wall, δ = 20 O The surface of the ground level to the rear of the wall is inclined at an angle, ß = 30 O The retained soil may be characterised as a firm clay 5.5 Pavements Given the variability of the likely sub-grade, it is recommended that the formation should be treated as being frost susceptible for pavement design purposes, and therefore a minimum pavement thickness of 450mm adopted. The formation should be carefully proof rolled and any soft or loose zones replaced with well compacted granular fill. 5.6 Building Materials The results of the Sulphate and ph analyses fell into Class DS-1 of the current revision of BRE Special Digest 1. An ACEC class of AC-1 is appropriate based on the ph results and known site history. The advice of this publication should be taken for the design and specification of all sub surface concrete. Ground Investigation Page 18 of 19 *****************

19 5.7 Soakaways Preliminary falling head soakage tests were undertaken within WS3 and WS6, which gave infiltration rates of 1.4x10-4 m.s -1 and 5.8x10-6 m.s -1 respectively. Both boreholes were drilled through Head Deposits with Chalk towards the base; the higher result in WS3 may be on account of more granular materials within the Head Deposits. Given this variability, soakaways constructed into the Head Deposits should be designed based on the more conservative lower infiltration rate of 5.8x10-6 m.s -1. Higher infiltration rates may be realised within the blocky fissured Chalk. Should improve infiltration rates be required, it would be necessary to conduct full-scale soakage tests in accordance with BRE365. Given the sites location within a groundwater Source Protection Zone, and in order to protect groundwater resources, the Environment Agency might have special requirements for the design of soakaways including water seals, closed surface entries or interceptors. The consideration of the Agency should be sought in this respect. Concentrated discharges into the Chalk from surface water drainage may cause the dissolution of carbonate cements within rock matrix, which may in turn lead to voiding, instability, and surface collapse. Such discharges may also potentially reactivate any inactive dissolution features. It is therefore recommended that all soakaways be located a minimum of 10m distant from any sensitive structures. Finally, soakaways should be carefully positioned so as to avoid concentrated point discharges close to the existing slope, as this may cause instability. Ground Investigation Page 19 of 19 *****************

20 TITLE: Site Location Plans REF: LS0237 PROJECT: VERSION v1 CLIENT: FIGURE: 1 PREPARED: CHECK: DATE: SHEET No: SR ET 29/10/2010 page: 1 of 1 CARLTON HOUSE, CARLTON TERRACE, PORTSLADE, BRIGHTON, BN41 1UR TEL: FAX: BRIGHTON@LANDSCIENCE.CO.UK

21 WS4 WS5 WS6 WS1 BH1 WS2 WS3 TITLE: Investigation Layout Plans REF: LS0237 PROJECT: ************************** VERSION v1 CLIENT: ************************** FIGURE: 1 PREPARED: CHECK: DATE: SHEET No: SR ET 29/10/2010 page: 1 of 1 CARLTON HOUSE, CARLTON TERRACE, PORTSLADE, BRIGHTON, BN41 1UR TEL: FAX: BRIGHTON@LANDSCIENCE.CO.UK

22 APPENDIX A

23 TITLE: 1870 Historical Map 1:2500 REF: LS0237 PROJECT: ************** VERSION v1 CLIENT: ************** FIGURE: 1 PREPARED: CHECK: DATE: SHEET No: SR ET 30/11/2010 page: 1 of 1 CARLTON HOUSE, CARLTON TERRACE, PORTSLADE, BRIGHTON, BN41 1UR TEL: FAX: BRIGHTON@LANDSCIENCE.CO.UK

24 TITLE: PROJECT: CLIENT: 1896 Historical Map 1:2500 REF: LS0237 ************** VERSION v1 ************** FIGURE: 1 PREPARED: CHECK: DATE: SHEET No: SR ET 30/11/2010 page: 1 of 1 CARLTON HOUSE, CARLTON TERRACE, PORTSLADE, BRIGHTON, BN41 1UR TEL: FAX: BRIGHTON@LANDSCIENCE.CO.UK

25 TITLE: PROJECT: CLIENT: 1910 Historical Map 1:2500 REF: LS0237 ************** VERSION v1 ************** FIGURE: 1 PREPARED: CHECK: DATE: SHEET No: SR ET 30/11/2010 page: 1 of 1 CARLTON HOUSE, CARLTON TERRACE, PORTSLADE, BRIGHTON, BN41 1UR TEL: FAX: BRIGHTON@LANDSCIENCE.CO.UK

26 TITLE: PROJECT: CLIENT: PREPARED: REF: 1939 Historical Map 1:2500 VERSION ************** FIGURE: ************** SR LS0237 CHECK: ET DATE: 30/11/2010 v1 1 SHEET No: page: 1 of 1 CARLTON HOUSE, CARLTON TERRACE, PORTSLADE, BRIGHTON, BN41 1UR TEL: FAX: BRIGHTON@LANDSCIENCE.CO.UK

27 TITLE: PROJECT: CLIENT: 1977 Historical Map 1:2500 REF: LS0237 ************** VERSION v1 ************** FIGURE: 1 PREPARED: CHECK: DATE: SHEET No: SR ET 30/11/2010 page: 1 of 1 CARLTON HOUSE, CARLTON TERRACE, PORTSLADE, BRIGHTON, BN41 1UR TEL: FAX: BRIGHTON@LANDSCIENCE.CO.UK

28 TITLE: PROJECT: CLIENT: 1997 Historical Map 1:2500 REF: LS0237 ************** VERSION v1 ************** FIGURE: 1 PREPARED: CHECK: DATE: SHEET No: SR ET 30/11/2010 page: 1 of 1 CARLTON HOUSE, CARLTON TERRACE, PORTSLADE, BRIGHTON, BN41 1UR TEL: FAX: BRIGHTON@LANDSCIENCE.CO.UK

29 APPENDIX B

30 DESCRIPTION TESTING SAMPLING Dark brown SILT with fine to coarse angular gravel and cobbles, and rootlets. (TOPSOIL) D D WATER FILL Weak white and occasional light brown putty CHALK with layers of gravel sized medium density chalk fragments. (LEWES NODULAR CHALK MEMBER) D D D D D D D D D Continued on next page REMARKS TITLE: REFERENCE: POSITION: Stability: No instability encountered Borehole log LS0237 Groundwater: No groundwater encountered PROJECT: ELEVATION: CO-ORDINATES: Chiselling: Not applicable ************** N/A Not to scale CLIENT: METHOD: Casing/dia: Not recorded ************** Archway "Dart" Windowless Sampler Backfilling: Position backfilled with arisings DRILLED BY: LOGGED BY: STARTED: SCALE: Obstructions: No obstructions encountered AA DRILLING SR 09/11/2009 Not to scale INPUTTED BY: CHECKED BY: COMPLETED: SHEET No: Others: Hand excavated to 0.40mbgl SR ET 09/11/2009 Page: 1 of 2 WS1 CARLTON HOUSE, CARLTON TERRACE, PORTSLADE, BRIGHTON, BN41 1UR TEL: FAX: BRIGHTON@LANDSCIENCE.CO.UK

31 DESCRIPTION TESTING SAMPLING WATER Continued..Weak white and occasional light brown putty CHALK with layers of gravel sized medium density chalk fragments. (LEWES NODULAR CHALK MEMBER) D FILL D Borehole complete at 6.00m REMARKS TITLE: REFERENCE: POSITION: Stability: No instability encountered Borehole log LS0237 WS1 Groundwater: No groundwater encountered PROJECT: ELEVATION: CO-ORDINATES: Chiselling: Not applicable ************** N/A Not to scale CLIENT: METHOD: Casing/dia: Not recorded ************** Archway "Dart" Windowless Sampler Backfilling: Position backfilled with arisings DRILLED BY: LOGGED BY: STARTED: SCALE: Obstructions: No obstructions encountered AA DRILLING SR 09/11/2009 Not to scale INPUTTED BY: CHECKED BY: COMPLETED: SHEET No: Others: Hand excavated to 0.50mbgl SR ET 09/11/2009 Page: 2 of 2 CARLTON HOUSE, CARLTON TERRACE, PORTSLADE, BRIGHTON, BN41 1UR TEL: FAX: BRIGHTON@LANDSCIENCE.CO.UK

32 DESCRIPTION Dark brown clayey SILT with rootlets. (TOPSOIL) TESTING SAMPLING D WATER FILL Brown silty, sandy gravelly CLAY. (HEAD DEPOSITS) D D Off white slightly weathered CHALK, very weak. Structurless mélange composed of 70% subangular medium to coarse gravel sized fragments set in 30% soft, off white chalk matrix; Grade Dc. (LEWES NODULAR CHALK MEMBER) Off white CHALK, medium to high density. Discontinuities very closely spaced (20mm), open (<3mm); medium to high density Grade B5. (LEWES NODULAR CHALK MEMBER) D D D D D Borehole complete at 3.00m REMARKS TITLE: REFERENCE: POSITION: Stability: No instability encountered Borehole log LS0237 WS2 Groundwater: No groundwater encountered PROJECT: ELEVATION: CO-ORDINATES: Chiselling: Not applicable ************** N/A Not to scale CLIENT: METHOD: Casing/dia: Not recorded ************** Archway "Dart" Windowless Sampler Backfilling: Position backfilled with arisings DRILLED BY: LOGGED BY: STARTED: SCALE: Obstructions: No obstructions encountered AA DRILLING SR 09/11/2009 Not to scale INPUTTED BY: CHECKED BY: COMPLETED: SHEET No: Others: Hand excavated to 0.30mbgl SR ET 09/11/2009 Page: 1 of 1 CARLTON HOUSE, CARLTON TERRACE, PORTSLADE, BRIGHTON, BN41 1UR TEL: FAX: BRIGHTON@LANDSCIENCE.CO.UK

33 DESCRIPTION TESTING SAMPLING WATER D Dark brown wood chippings. (TOPSOIL) FILL Brown silty, sandy slighty gravelly CLAY with fine to medium angular chalk. (HEAD DEPOSITS) Light brown silty sandy very gravelly CLAY. Gravel is fine to coarse angular flint. (HEAD DEPOSITS) D D D Brown clayey silty sandy GRAVEL. Gravel is fine to coarse angular flint. (HEAD DEPOSITS) D Brown silty sandy very gravelly CLAY. Gravel is fine to coarse angular flint. (HEAD DEPOSITS) D Off white slightly weathered. CHALK, weak. Structureless D mélange composed of 80% subangular to rounded medium to coarse high density grzel sized fragments set in 20% soft, off 3.00 white, silt sized chalk matrix; Grade Dc. (LEWES NODUALR CHALK MEMBER) Borehole complete at 3.00m. REMARKS TITLE: REFERENCE: POSITION: Stability: No instability encountered Borehole log LS0237 WS3 Groundwater: No groundwater encountered PROJECT: ELEVATION: CO-ORDINATES: Chiselling: Not applicable ************** N/A Not to scale CLIENT: METHOD: Casing/dia: Not recorded ************** Archway "Dart" Windowless Sampler Backfilling: Position backfilled with arisings DRILLED BY: LOGGED BY: STARTED: SCALE: Obstructions: No obstructions encountered AA DRILLING SR 09/11/2009 Not to scale INPUTTED BY: CHECKED BY: COMPLETED: SHEET No: Others: Hand excavated to 0.40mbgl SR ET 09/11/2009 Page: 1 of 1 CARLTON HOUSE, CARLTON TERRACE, PORTSLADE, BRIGHTON, BN41 1UR TEL: FAX: BRIGHTON@LANDSCIENCE.CO.UK

34 DESCRIPTION TESTING SAMPLING WATER Loose dark brown clayey sandy SILT with rootlets and occasional fine to coarse gravel sized angular chalk. (TOPSOIL) Off white CHALK, weak with high density chalk fragments. Discontinuities closely spaced (20-60mm), open (<3mm); high D density Grade B5. (LEWES NODUALR CHALK MEMBER) D FILL D White CHALK, medium density. Discontinuities very closely spaced (<20mm), open (<3mm); medium density Grade B5. (LEWES NODUALR CHALK MEMBER) D D Off white CHALK, weak. Structureless mélange composed of 80% subangular to rounded, low density chalk fragments set in 20% soft, off white, silt size chalk matrix; Grade Dc. (LEWES NODUALR CHALK MEMBER) D D White CHALK, very weak. Structureless mélange composed of 20% subangular to rounded medium sized fragments set in 80% soft, off white/brown silt size chalk matrix; Grade Dm. (LEWES NODUALR CHALK MEMBER) D D Continued on next page 5.00 REMARKS TITLE: REFERENCE: POSITION: Stability: No instability encountered Borehole log LS0237 WS4 Groundwater: No groundwater encountered PROJECT: ELEVATION: CO-ORDINATES: Chiselling: Not applicable ************** N/A Not to scale CLIENT: METHOD: Casing/dia: Not recorded ************** Archway "Dart" Windowless Sampler Backfilling: Position backfilled with arisings DRILLED BY: LOGGED BY: STARTED: SCALE: Obstructions: No obstructions encountered AA DRILLING SR 09/11/2009 Not to scale INPUTTED BY: CHECKED BY: COMPLETED: SHEET No: Others: Hand excavated to 0.30mbgl SR ET 09/11/2009 Page: 1 of 2 CARLTON HOUSE, CARLTON TERRACE, PORTSLADE, BRIGHTON, BN41 1UR TEL: FAX: BRIGHTON@LANDSCIENCE.CO.UK

35 DESCRIPTION TESTING SAMPLING WATER Continued White CHALK, very weak. Structureless mélange composed of 20% subangular to rounded medium sized fragments set in 80% soft, off white/brown silt size chalk matrix; Grade Dm. (LEWES NODUALR CHALK MEMBER) D FILL Borehole complete at 6.00m REMARKS TITLE: REFERENCE: POSITION: Stability: No instability encountered Borehole log LS0237 WS4 Groundwater: No groundwater encountered PROJECT: ELEVATION: CO-ORDINATES: Chiselling: Not applicable ************** N/A Not to scale CLIENT: METHOD: Casing/dia: Not recorded ************** Archway "Dart" Windowless Sampler Backfilling: Position backfilled with arisings DRILLED BY: LOGGED BY: STARTED: SCALE: Obstructions: No obstructions encountered AA DRILLING SR 09/11/2009 Not to scale INPUTTED BY: CHECKED BY: COMPLETED: SHEET No: Others: Hand excavated to 0.30mbgl SR ET 09/11/2009 Page: 2 of 2 CARLTON HOUSE, CARLTON TERRACE, PORTSLADE, BRIGHTON, BN41 1UR TEL: FAX: BRIGHTON@LANDSCIENCE.CO.UK

36 DESCRIPTION TESTING SAMPLING WATER Loose light brown clayey sandy gravelly SILT with rootlets. Gravel is fine to coarse chalk and brick. (MADE GROUND) D FILL Off white, slightly weathered CHALK, weak. Structureless mélange composed of 80% medium to coarse high density chalk fragments set in 20% soft, brown silt size chalk matrix; Grade Dc. (LEWES NODUALR CHALK MEMBER) Off white CHALK, strong, high density. Discontinuities closely spaced (20-60mm), open (<3mm); High density Grade B4. (LEWES NODUALR CHALK MEMBER) D D D Off white/grey very high density gravel of CHALK. (LEWES NODUALR CHALK MEMBER) D 2.30 Off white CHALK, strong, high density. Discontinuities very closely spaced (<20mm), open (<3mm); High density Grade B4. (LEWES NODUALR CHALK MEMBER) D Borehole complete at 3.00m REMARKS TITLE: REFERENCE: POSITION: Stability: No instability encountered Borehole log LS0237 WS5 Groundwater: No groundwater encountered PROJECT: ELEVATION: CO-ORDINATES: Chiselling: Not applicable ************** N/A Not to scale CLIENT: METHOD: Casing/dia: Not recorded ************** Archway "Dart" Windowless Sampler Backfilling: Position backfilled with arisings DRILLED BY: LOGGED BY: STARTED: SCALE: Obstructions: No obstructions encountered AA DRILLING SR 09/11/2009 Not to scale INPUTTED BY: CHECKED BY: COMPLETED: SHEET No: Others: Hand excavated to 0.50mbgl SR ET 09/11/2009 Page: 1 of 1 CARLTON HOUSE, CARLTON TERRACE, PORTSLADE, BRIGHTON, BN41 1UR TEL: FAX: BRIGHTON@LANDSCIENCE.CO.UK

37 DESCRIPTION TESTING SAMPLING WATER Loose dark brown silty sandy gravelly CLAY with rootlets. Gravel is fine to coarse chalk. (TOPSOIL) D FILL Brown silty sandy very gravelly CLAY with rootlets. Gravel is fine to coarse angular and sub rounded flint and chalk. (HEAD DEPOSITS) D Brown very silty sandy slightly gravelly CLAY. Gravel is fine to coarse angular to sub rounded flint and chalk. (HEAD DEPOSITS) D D Brown silty sandy very gravelly CLAY with rootlets. Gravel is fine to coarse angular and sub rounded flint and chalk. (HEAD DEPOSITS) D Off white, slightly weathered CHALK, low density. Discontinuities very closely spaced (<20mm), open (<3mm); Low density Grade B5. (LEWES NODULAR CHALK MEMBER) Borehole complete at 3.00m D 3.00 REMARKS TITLE: REFERENCE: POSITION: Stability: No instability encountered Borehole log LS0237 WS6 Groundwater: No groundwater encountered PROJECT: ELEVATION: CO-ORDINATES: Chiselling: Not applicable ************** N/A Not to scale CLIENT: METHOD: Casing/dia: Not recorded ************** Archway "Dart" Windowless Sampler Backfilling: Position backfilled with arisings DRILLED BY: LOGGED BY: STARTED: SCALE: Obstructions: No obstructions encountered AA DRILLING SR 09/11/2009 Not to scale INPUTTED BY: CHECKED BY: COMPLETED: SHEET No: Others: Hand excavated to 0.50mbgl SR ET 09/11/2009 Page: 1 of 1 CARLTON HOUSE, CARLTON TERRACE, PORTSLADE, BRIGHTON, BN41 1UR TEL: FAX: BRIGHTON@LANDSCIENCE.CO.UK

38 Interval DP N 100 Interval DP N 100 m blows/100mm m blows/100mm * fell under own weight * to 0.40m * * position terminated at 5.9m TITLE: PROJECT: CLIENT: Hammer mass 63.5 kg Rod weight 6 kg Date Completed 09/11/2010 Gravity constant 9.8 N/kg Base of cone m 2 Ground level Not available height of fall m Friction correction None Drilling rig Archway Dart Anvil weight 30 kg Friction precautions None Contractor AA Drilling Methodology EN DD1997-3:1999 "Eurocode 7 : Geotechnical Design - design assisted by field testing", Clause 6 Remarks No interuptions. No calibration data. Super Heavy Dynamic Probing (SHDP) record POSITION: *********** WS1 GRID REF: *********** N/A OPERATIVES: CHECKED: DATE: SHEET: AJ/TR ET 18/11/ of 1 REF: LS0237 CARLTON HOUSE, CARLTON TERRACE, PORTSLADE, BRIGHTON, BN41 1UR TEL: FAX: BRIGHTON@LANDSCIENCE.CO.UK

EARTHWORKS COMPLETION REPORT ELLEN STIRLING PARADE, ELLENBROOK. Ellenbrook, W.A. Georgiou Group Pty Ltd

EARTHWORKS COMPLETION REPORT ELLEN STIRLING PARADE, ELLENBROOK. Ellenbrook, W.A. Georgiou Group Pty Ltd EARTHWORKS COMPLETION REPORT ELLEN STIRLING PARADE, ELLENBROOK Ellenbrook, W.A. Georgiou Group Pty Ltd GEOTPERT08050AZ-AH 27 March 2013 EARTHWORKS COMPLETION REPORT ELLEN STIRLING PARADE, ELLENBROOK Ellenbrook,

More information

Eurocode 7 - Geotechnical design - Part 2 Ground investigation and testing

Eurocode 7 - Geotechnical design - Part 2 Ground investigation and testing Brussels, 18-20 February 2008 Dissemination of information workshop 1 Eurocode 7 - Geotechnical design - Part 2 Ground investigation and testing Dr.-Ing. Bernd Schuppener, Federal Waterways Engineering

More information

FACTUAL GROUND INVESTIGATION

FACTUAL GROUND INVESTIGATION FACTUAL GROUND INVESTIGATION REPORT COMMERCIAL/INDUSTRIAL REDEVELOPMENT OF LAND AT STEADMAN S WELTON CUMBRIA Web: www.geoenvironmentalengineering.com Telephone: 08456 768 895 Project Ref: 2013-657 Site

More information

Geotechnical Investigation Test Report

Geotechnical Investigation Test Report Geotechnical Investigation Test Report Report No. htsc/rcd/ 3457 Dated: - 20/03/2010 Asphalt Standard Penetration Test as per IS 2131 ------------- IS 6403 Soil Job Card No - 1649 Cement Client/Department

More information

WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED

WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED WLPS BUNCEFIELD REBUILD Flood Risk Assessment Green Lane Hemel Hempstead Hertfordshire HP2 7HZ September 2009 Prepared

More information

CIVL451. Soil Exploration and Characterization

CIVL451. Soil Exploration and Characterization CIVL451 Soil Exploration and Characterization 1 Definition The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally

More information

SERVICES 2015 ISO 18001

SERVICES 2015 ISO 18001 SERVICES 2015 A family business with a solid foundation of experience, we handle all aspects of site investigation.... Phase 1 Environmental Studies Phase 2 Intrusive Investigations Phase 3 Remediation

More information

GUIDELINES FOR GEOTECHNICAL INVESTIGATION OF BRIDGE STRUCTURES. Materials Engineering Report No. 2009-8M (Supersedes Report No.

GUIDELINES FOR GEOTECHNICAL INVESTIGATION OF BRIDGE STRUCTURES. Materials Engineering Report No. 2009-8M (Supersedes Report No. GUIDELINES FOR GEOTECHNICAL INVESTIGATION OF BRIDGE STRUCTURES Materials Engineering Report No. 2009-8M (Supersedes Report No. 21) F CHOWDHURY GEOMECHANICS AND STRUCTURAL MATERIALS ENGINEER S REHMAN GEOTECHNICAL

More information

EVALUATING THE IMPROVEMENT FROM IMPACT ROLLING ON SAND

EVALUATING THE IMPROVEMENT FROM IMPACT ROLLING ON SAND EVALUATING THE IMPROVEMENT FROM IMPACT ROLLING ON SAND D.L. Avalle, Broons Hire (SA) Pty Ltd, Australia J.P. Carter, The University of Sydney, Australia Abstract Impact rolling, utilising a non-circular

More information

FINAL REPORT ON SOIL INVESTIGATION

FINAL REPORT ON SOIL INVESTIGATION FINAL REPORT ON SOIL INVESTIGATION FOR PROPOSED CONSTRUCTION AT SS-6B AREA AT HPCL VISAKH REFINERY VISAKHAPATNAM ANDHRA PRADESH J.J. ASSOCIATES(VISAKHAPATNAM) AETP(P) LIMITED #11-6-3, RockDale Layout,

More information

FREDERICK SHERRELL LTD

FREDERICK SHERRELL LTD FREDERICK SHERRELL LTD CONSULTING ENGINEERING GEOLOGISTS AND GEOTECHNICAL ENGINEERS 66 WEST STREET TAVISTOCK DEVON PL19 8AJ Your Ref: Our Ref: 2962.NS.JR Telephone: 01822 612915 Facsimile: 01822 617394

More information

1 Mobilisation and demobilisation 1 Deep boring sum 2 Cone penetration tests sum 3 Miscellenous tests sum

1 Mobilisation and demobilisation 1 Deep boring sum 2 Cone penetration tests sum 3 Miscellenous tests sum Malaysian Civil Engineering Standard Method of Measurement (MyCESMM) CLASS D: SITE INVESTIGATION WORK Measurement covered under other classes: Excavation not carried out for the purpose of soil investigation

More information

STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.

STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL. STRUCTURES 1. General. Critical structures may impact the integrity of a flood control project in several manners such as the excavation for construction of the structure, the type of foundation, backfill

More information

90 Brighton Road, Surbiton, Surrey

90 Brighton Road, Surbiton, Surrey 90 Brighton Road, Surbiton, Surrey Civil and Structural Engineering Basement Feasibility Report Mixed Use Scheme 108802-REP-002 March 2015 Contents 1. Executive Summary... 3 2. Site Description and Constraints...

More information

APPENDIX F GEOTECHNICAL REPORT

APPENDIX F GEOTECHNICAL REPORT The City of Winnipeg Bid Opportunity No. 101-2016 Template Version: C420150806 - RW APPENDIX F GEOTECHNICAL REPORT AECOM 99 Commerce Drive 204 477 5381 tel Winnipeg, MB, Canada R3P 0Y7 204 284 2040 fax

More information

23 Royal Avenue London. Geotechnical Assessment Report. Report No. LW25247. September 2014

23 Royal Avenue London. Geotechnical Assessment Report. Report No. LW25247. September 2014 23 Royal Avenue London Geotechnical Assessment Report Report No. LW25247 September 2014 Report prepared for the benefit of: Builtain Ltd Unit 8, Tempo House 15 Falcon Road London SW11 2PJ Document Control

More information

TECHNICAL NOTE: SI 01 SPECIFIC REQUIREMENTS FOR THE ACCREDITATION OF INSPECTION BODIES FOR SITE INVESTIGATION

TECHNICAL NOTE: SI 01 SPECIFIC REQUIREMENTS FOR THE ACCREDITATION OF INSPECTION BODIES FOR SITE INVESTIGATION ACCREDITATION SCHEME FOR INSPECTION BODIES TECHNICAL NOTE: SI 01 SPECIFIC REQUIREMENTS FOR THE ACCREDITATION OF INSPECTION BODIES FOR SITE INVESTIGATION Technical Note SI 01: 3 February 2016 The SAC Accreditation

More information

Local Authority Building Control Technical Information Note 3 Driven and In-situ Piled Foundations

Local Authority Building Control Technical Information Note 3 Driven and In-situ Piled Foundations Local Authority Building Control Technical Information Note 3 Driven and In-situ Piled Foundations Cambridge City Council - East Cambridgeshire District Council - Fenland District Council, Huntingdonshire

More information

Geotechnical Investigation Reports and Foundation Recommendations - Scope for Improvement - Examples

Geotechnical Investigation Reports and Foundation Recommendations - Scope for Improvement - Examples Geotechnical Investigation Reports and Foundation Recommendations - Scope for Improvement - Examples Prof. V.S.Raju (Formerly: Director, IIT Delhi & Professor and Dean, IIT Madras) Email: rajuvs_b@yahoo.com

More information

Appendix A Sub surface displacements around excavations Data presented in Xdisp sample file

Appendix A Sub surface displacements around excavations Data presented in Xdisp sample file Appendix A Sub surface displacements around excavations Data presented in Xdisp sample file Notation B1 = lowest level of basement slab c = cohesion E = drained Young s Modulus Eu = undrained Young s Modulus

More information

INSITU TESTS! Shear Vanes! Shear Vanes! Shear Vane Test! Sensitive Soils! Insitu testing is used for two reasons:!

INSITU TESTS! Shear Vanes! Shear Vanes! Shear Vane Test! Sensitive Soils! Insitu testing is used for two reasons:! In-situ Testing! Insitu Testing! Insitu testing is used for two reasons:! To allow the determination of shear strength or penetration resistance or permeability of soils that would be difficult or impossible

More information

SECTION 31 20 00 EARTH MOVING

SECTION 31 20 00 EARTH MOVING SECTION 31 20 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for excavating, filling, and grading for earthwork at Parking Structure, new exit stair and as required to

More information

HIGHWAYS DEPARTMENT GUIDANCE NOTES ON SOIL TEST FOR PAVEMENT DESIGN

HIGHWAYS DEPARTMENT GUIDANCE NOTES ON SOIL TEST FOR PAVEMENT DESIGN HIGHWAYS DEPARTMENT GUIDANCE NOTES ON SOIL TEST FOR PAVEMENT DESIGN Research & Development Division RD/GN/012 August 1990 HIGHWAYS DEPARTMENT GUIDANCE NOTES (RD/GN/012) SOIL TEST FOR PAVEMENT DESIGN Prepared

More information

Pavements should be well drained both during and upon completion of construction. Water should not be allowed to pond on or near pavement surfaces.

Pavements should be well drained both during and upon completion of construction. Water should not be allowed to pond on or near pavement surfaces. Project No. 208-8719 January, 2009 Ref: 2-8719BR Anthony Hudson - Broadscale Geotechnical Investigation - Proposed Commercial Development - 52 Old Pacific Highway, Pimpama Page 32 iii) Pavements should

More information

Module 7 (Lecture 24 to 28) RETAINING WALLS

Module 7 (Lecture 24 to 28) RETAINING WALLS Module 7 (Lecture 24 to 28) RETAINING WALLS Topics 24.1 INTRODUCTION 24.2 GRAVITY AND CANTILEVER WALLS 24.3 PROPORTIONING RETAINING WALLS 24.4 APPLICATION OF LATERAL EARTH PRESSURE THEORIES TO DESIGN 24.5

More information

REPORT. Earthquake Commission. Christchurch Earthquake Recovery Geotechnical Factual Report Merivale

REPORT. Earthquake Commission. Christchurch Earthquake Recovery Geotechnical Factual Report Merivale REPORT Earthquake Commission Christchurch Earthquake Recovery Geotechnical Factual Report Merivale REPORT Earthquake Commission Christchurch Earthquake Recovery Geotechnical Factual Report Merivale Report

More information

Chapter 9: Water, Hydrology and Drainage Land West of Uttoxeter

Chapter 9: Water, Hydrology and Drainage Land West of Uttoxeter Chapter 9: Water, Hydrology and Drainage Land West of Uttoxeter ENVIRONMENTAL STATEMENT: VOLUME 1 9.1 INTRODUCTION 9.1.1 This Chapter considers the effects of the Project on surface water and groundwater

More information

Defence College of Technical Training. Former RAF Lyneham Geo-Environmental Report 32655 Appendix D: Preliminary Qualitative Risk Assessment

Defence College of Technical Training. Former RAF Lyneham Geo-Environmental Report 32655 Appendix D: Preliminary Qualitative Risk Assessment Item No. Area/ Building Pathway to 1 Identified areas of / (redevelopment Ingestion Inhalation Severe Likely High SKM Enviros desk study highlights several known areas of significant historical. Areas

More information

How To Prepare A Geotechnical Study For A Trunk Sewer Project In Lincoln, Nebraska

How To Prepare A Geotechnical Study For A Trunk Sewer Project In Lincoln, Nebraska APPENDIX B Geotechnical Engineering Report GEOTECHNICAL ENGINEERING REPORT Preliminary Geotechnical Study Upper Southeast Salt Creek Sanitary Trunk Sewer Lincoln Wastewater System Lincoln, Nebraska PREPARED

More information

Trench Rescue by Buddy Martinette

Trench Rescue by Buddy Martinette Trench Rescue by Buddy Martinette SOIL TYPE AND TESTING It is imperative that rescue personnel understand soil types and testing procedures if the want to be competent at trench rescue operations. Determining

More information

The Manitoba Water Services Board SECTION 022180 Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11

The Manitoba Water Services Board SECTION 022180 Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11 Page 1 of 11 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the excavation of trenches (or excavation of tunnels); the supply and placing of bedding and backfill materials;

More information

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin PLAN SUBGRADES

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin PLAN SUBGRADES Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering Geotechnical Bulletin GB 1 PLAN SUBGRADES Geotechnical Bulletin GB1 was jointly developed by the Offices

More information

Soils, Foundations & Moisture Control

Soils, Foundations & Moisture Control Soils, Foundations & Moisture Control Soil The top loose layer mineral and/or organic material on the surface of the Earth that serves as a natural medium for the growth of plants and support for the foundations

More information

GEOTECHNICAL ENGINEERING FORMULAS. A handy reference for use in geotechnical analysis and design

GEOTECHNICAL ENGINEERING FORMULAS. A handy reference for use in geotechnical analysis and design GEOTECHNICAL ENGINEERING FORMULAS A handy reference for use in geotechnical analysis and design TABLE OF CONTENTS Page 1. SOIL CLASSIFICATION...3 1.1 USCS: Unified Soil Classification System...3 1.1.1

More information

Guidelines For Sealing Groundwater Wells

Guidelines For Sealing Groundwater Wells Guidelines For Sealing Groundwater Wells Government of Newfoundland and Labrador Department of Environment and Conservation Water Resources Management Division Government of Newfoundland and Labrador Department

More information

CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS

CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS December 2014 CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS 1. DESCRIPTION... 1 1.1 General... 1 1.2 Definitions... 1 1.3 Referenced Standard Construction Specifications...

More information

Appendix D.1. Testing Requirements for Infiltration, Bioretention and Sand Filter Subsoils

Appendix D.1. Testing Requirements for Infiltration, Bioretention and Sand Filter Subsoils Appendix D.1 Testing Requirements for Infiltration, Bioretention and Sand Filter Subsoils General Notes Pertinent to All Testing 1. For infiltration trench (I-1) and basin (I-2) practices, a minimum field

More information

Dimensional and Structural Data for Elliptical Pipes. PD 26 rev D 21/09/05

Dimensional and Structural Data for Elliptical Pipes. PD 26 rev D 21/09/05 Dimensional and Structural Data for Elliptical Pipes 21/09/05 Page 1 of 15 1. Foreword This document details a method for the structural design of Stanton Bonna Elliptical pipes for the common conditions

More information

Proposed Construction of Basement Flood Risk Assessment. 35 Edwardes Square London W8 6HH

Proposed Construction of Basement Flood Risk Assessment. 35 Edwardes Square London W8 6HH Proposed Construction of Basement Flood Risk Assessment 35 Edwardes Square London W8 6HH 1 Introduction This FRA has been carried out in accordance with the National Planning Policy Statement (NPPF), the

More information

Former Barn, Pincents Manor Hotel, Pincents Lane, Tilehurst, West Berkshire

Former Barn, Pincents Manor Hotel, Pincents Lane, Tilehurst, West Berkshire Former Barn, Pincents Manor Hotel, Pincents Lane, Tilehurst, West Berkshire An Archaeological Watching Brief For Mr M Webb by Jennifer Lowe Thames Valley Archaeological Services Ltd Site Code PMH08/105

More information

Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition. Design Guide Basis of Design This section applies to the design and installation of earthwork and backfill. Design Criteria No stockpiling of excavation materials is allowed unless the Geotechnical Engineer

More information

SHAFT CONSTRUCTION IN TORONTO USING SLURRY WALLS

SHAFT CONSTRUCTION IN TORONTO USING SLURRY WALLS SHAFT CONSTRUCTION IN TORONTO USING SLURRY WALLS Vince Luongo Petrifond Foundation Co., Ltd. PROJECT DESCRIPTION The York Durham Sanitary System (YDSS) Interceptor in the Town of Richmond Hill located

More information

Ground-borne Vibrations and Ground Settlements Arising from Pile Driving and Similar Operations

Ground-borne Vibrations and Ground Settlements Arising from Pile Driving and Similar Operations Buildings Department Practice Note for Authorized Persons, Registered Structural Engineers and Registered Geotechnical Engineers APP-137 Ground-borne Vibrations and Ground Settlements Arising from Pile

More information

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE JURISDICTION OF ALBERTA TRANSPORTATION 1.0 Application Procedures 2.0

More information

SPECIFICATION FOR DYNAMIC CONSOLIDATION / DYNAMIC REPLACEMENT

SPECIFICATION FOR DYNAMIC CONSOLIDATION / DYNAMIC REPLACEMENT SPECIFICATION FOR DYNAMIC CONSOLIDATION / DYNAMIC REPLACEMENT 1.0 SOIL IMPROVEMENT 1.1 General Soil Investigation Information are provided in Part B1 annex as a guide to the Contractor for his consideration

More information

GUIDELINES FOR SOIL FILTER MEDIA IN BIORETENTION SYSTEMS (Version 2.01) March 2008

GUIDELINES FOR SOIL FILTER MEDIA IN BIORETENTION SYSTEMS (Version 2.01) March 2008 GUIDELINES FOR SOIL FILTER MEDIA IN BIORETENTION SYSTEMS (Version 2.01) March 2008 The following guidelines for soil filter media in bioretention systems have been prepared on behalf of the Facility for

More information

Anirudhan I.V. Geotechnical Solutions, Chennai

Anirudhan I.V. Geotechnical Solutions, Chennai Anirudhan I.V. Geotechnical Solutions, Chennai Often inadequate In some cases, excess In some cases, disoriented Bad investigation Once in a while good ones Depends on one type of investigation, often

More information

ANNEX D1 BASIC CONSIDERATIONS FOR REVIEWING STUDIES IN THE DETAILED RISK ASSESSMENT FOR SAFETY

ANNEX D1 BASIC CONSIDERATIONS FOR REVIEWING STUDIES IN THE DETAILED RISK ASSESSMENT FOR SAFETY ANNEX D1 BASIC CONSIDERATIONS FOR REVIEWING STUDIES IN THE DETAILED RISK ASSESSMENT FOR SAFETY ANNEX D1: BASIC CONSIDERATIONS FOR REVIEWING STUDIES IN DRA FOR SAFETY D1-1 ANNEX D1 BASIC CONSIDERATIONS

More information

Highway 23 Paynesville Richmond Soils Borings, Soils Tests, and Reporting

Highway 23 Paynesville Richmond Soils Borings, Soils Tests, and Reporting Highway 23 Paynesville Richmond Soils Borings, Soils Tests, and Reporting MnDOT Contract No. 1003249 General Project Overview This work is located along Trunk Highway (TH) 23, for State Project (SP) 7305-124.

More information

DRAINAGE MANAGEMENT PLAN. HERTFORDSHIRE RESIDUAL WASTE TREATMENT PLANT Hertfordshire County Council

DRAINAGE MANAGEMENT PLAN. HERTFORDSHIRE RESIDUAL WASTE TREATMENT PLANT Hertfordshire County Council DRAINAGE MANAGEMENT PLAN HERTFORDSHIRE RESIDUAL WASTE TREATMENT PLANT Hertfordshire County Council EMPLOYER: Veolia Environmental Services (UK) Plc Veolia House 154A Pentonville Road London N1 9PE Copy

More information

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13)

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13) Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised ) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular blocks

More information

KWANG SING ENGINEERING PTE LTD

KWANG SING ENGINEERING PTE LTD KWANG SING ENGINEERING PTE LTD 1. INTRODUCTION This report represents the soil investigation works at Aljunied Road / Geylang East Central. The objective of the soil investigation is to obtain soil parameters

More information

S OIL C ONSULTANTS LTD

S OIL C ONSULTANTS LTD S OIL C ONSULTANTS LTD Ground Investigation Geotechnical Analysis Environmental Appraisal Tel: 01255 241639 Fax: 0871 528 9424 e-mail: harwich@soilconsultants.co.uk Haven House Albemarle Street Harwich

More information

Taylor Wimpey UK Ltd. December 2007

Taylor Wimpey UK Ltd. December 2007 Taylor Wimpey UK Ltd December 2007 QM Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks Draft For Planning Date 3 August 2007 20 December 2007 Prepared by D Gooding P Barton Signature Checked

More information

PILE FOUNDATIONS FM 5-134

PILE FOUNDATIONS FM 5-134 C H A P T E R 6 PILE FOUNDATIONS Section I. GROUP BEHAVIOR 6-1. Group action. Piles are most effective when combined in groups or clusters. Combining piles in a group complicates analysis since the characteristics

More information

Assessment. Ian Uglow Technical Director, SLR Consulting iuglow@slrconsulting.com. 7 th October 2010

Assessment. Ian Uglow Technical Director, SLR Consulting iuglow@slrconsulting.com. 7 th October 2010 Peat Stability Risk and Hazard Assessment Ian Uglow Technical Director, SLR Consulting iuglow@slrconsulting.com 7 th October 2010 What goes into a Peat Stability Risk Assessment? You will need: An understanding

More information

Settlement of Foundations on Expansive Clays Due to Moisture Demand of Trees CIGMAT 2008

Settlement of Foundations on Expansive Clays Due to Moisture Demand of Trees CIGMAT 2008 Settlement of Foundations on Expansive Clays Due to Moisture Demand of Trees CIGMAT 2008 Kenneth E. Tand, P.E. Practicing Geotechnical Engineer FRIEND OR FOE Trees are our friends. They extract carbon

More information

Geotechnical Investigation using Standard Penetration Test (SPT) in Rangamati, Bandarban and Khagrachari Towns

Geotechnical Investigation using Standard Penetration Test (SPT) in Rangamati, Bandarban and Khagrachari Towns 1. Introduction 1.1 Scope of Work The Asian Disaster Preparedness Centre (ADPC) is implementing the project Seismic Hazard and Vulnerability Mapping for Rangamati, Bandarban and Khagrachari Municipality.

More information

Site Investigation. Some unsung heroes of Civil Engineering. buried right under your feet. 4. Need good knowledge of the soil conditions

Site Investigation. Some unsung heroes of Civil Engineering. buried right under your feet. 4. Need good knowledge of the soil conditions This is an attempt to create a stand alone self learning module on site investigation. Fasten your seat belts. Sit back, relax and enjoy. 1 2 Site Investigation Some unsung heroes of Civil Engineering

More information

Weathering, Erosion, and Soils. Weathering and Erosion. Weathering and Erosion

Weathering, Erosion, and Soils. Weathering and Erosion. Weathering and Erosion Weathering, Erosion, and Soils 1 The Grand Canyon, a landscape shaped by weathering and erosion 2 Weathering vs. erosion Types of weathering Physical Chemical Rates of weathering and erosion Climate Rock

More information

building on success Trees and Basements Partial Review of the Core Strategy February 2014

building on success Trees and Basements Partial Review of the Core Strategy February 2014 building on success Trees and Basements Partial Review of the Core Strategy February 2014 Regulation 19, Town and Country Planning (Local Planning) (England) Regulations 2012. 2 Contents 1. Introduction...

More information

BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY

BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY MURRAY SHIRE COUNCIL BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY ADOPTED: 1 May 2012 1 BUILDING OVER OR NEAR WATER AND SEWER MAINS POLICY CONTENTS 1. Objective... 2 2. Requirements for Building Near

More information

APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT

APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT City of Swartz Creek 8083 Civic Drive Swartz Creek, MI 48473 810-635-4464 Fee Received: $ Date: / / Receipt No: Demolition Permit (including Right of

More information

Specification Guidelines: Allan Block Modular Retaining Wall Systems

Specification Guidelines: Allan Block Modular Retaining Wall Systems Specification Guidelines: Allan Block Modular Retaining Wall Systems The following specifications provide Allan Block Corporation's typical requirements and recommendations. At the engineer of record's

More information

APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS

APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS The following section provides descriptions, advantages, limitations, and schematics of allowable best management practices (BMPs) for

More information

INTERNATIONAL JOURNAL OF CIVIL AND STRUCTURAL ENGINEERING Volume 3, No 3, 2013

INTERNATIONAL JOURNAL OF CIVIL AND STRUCTURAL ENGINEERING Volume 3, No 3, 2013 INTERNATIONAL JOURNAL OF CIVIL AND STRUCTURAL ENGINEERING Volume 3, No 3, 2013 Copyright by the authors - Licensee IPA- Under Creative Commons license 3.0 Research article ISSN 0976 4399 Reliability of

More information

JOHNSON STREET BRIDGE REPLACEMENT PROJECT

JOHNSON STREET BRIDGE REPLACEMENT PROJECT JOHNSON STREET BRIDGE REPLACEMENT Victoria, BC GEOTECHNICAL INVESTIGATION REPORT Prepared for: City Hall No. 1 Centennial Square Victoria, BC VW 1P Prepared by: Stantec 7 Dominion Street, Suite 5 Burnaby,

More information

How To Design A Foundation

How To Design A Foundation The Islamic university - Gaza Faculty of Engineering Civil Engineering Department CHAPTER (2) SITE INVESTIGATION Instructor : Dr. Jehad Hamad Definition The process of determining the layers of natural

More information

Settlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains

Settlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains Settlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains Doug Jenkins 1, Chris Lawson 2 1 Interactive Design Services, 2 Reinforced

More information

9.00 THE USE OF HUNTER LAND DRAINAGE PERFORATED PIPES. Hunter Underground Systems

9.00 THE USE OF HUNTER LAND DRAINAGE PERFORATED PIPES. Hunter Underground Systems 9.00 THE USE OF HUNTER LAND DRAINAGE PERFORATED PIPES Hunter Underground Systems 9.01 General 9.02 Surface water Drainage 9.03 Groundwater Drainage 9.04 Dispersal of Septic Tank Effluent 9.01 The use of

More information

Property Inspection. 83A Ascot Avenue North New Brighton Christchurch STRUCTURAL REPORT

Property Inspection. 83A Ascot Avenue North New Brighton Christchurch STRUCTURAL REPORT Property Inspection 83A Ascot Avenue North New Brighton Christchurch STRUCTURAL REPORT March 2013 This document has been prepared for the benefit of Clint Marston. No liability is accepted by this company

More information

TECHNICAL SPECIFICATIONS CEMENT-BENTONITE SLURRY TRENCH CUTOFF WALL

TECHNICAL SPECIFICATIONS CEMENT-BENTONITE SLURRY TRENCH CUTOFF WALL TECHNICAL SPECIFICATIONS CEMENT-BENTONITE SLURRY TRENCH CUTOFF WALL SCOPE This section of the specifications includes requirements for the Slurry Trench Cutoff Wall and related work as indicated on the

More information

SIENA STONE GRAVITY RETAINING WALL INSTALLATION SPECIFICATIONS. Prepared by Risi Stone Systems Used by permission.

SIENA STONE GRAVITY RETAINING WALL INSTALLATION SPECIFICATIONS. Prepared by Risi Stone Systems Used by permission. SIENA STONE GRAVITY RETAINING WALL INSTALLATION SPECIFICATIONS Prepared by Risi Stone Systems Used by permission. 1-800-UNILOCK www.unilock.com FOREWORD This outline specification has been prepared for

More information

DESIGNING STRUCTURES IN EXPANSIVE CLAY

DESIGNING STRUCTURES IN EXPANSIVE CLAY DESIGNING STRUCTURES IN EXPANSIVE CLAY A GUIDE FOR A RCHITECTS AND E NGINEERS Table of Contents 1. Introduction Page 1 2. Common Foundation Systems Page 2 3. Drilled Piers Page 3 a. Skin Friction Piers

More information

patersongroup Geotechnical Investigation Proposed Residential Development 590 Hazeldean Road - Ottawa Prepared For 2118356 Ontario Inc.

patersongroup Geotechnical Investigation Proposed Residential Development 590 Hazeldean Road - Ottawa Prepared For 2118356 Ontario Inc. Geotechnical Engineering patersongroup Environmental Engineering Hydrogeology Geological Engineering Materials Testing Building Science Proposed Residential Development 590 Hazeldean Road - Ottawa Archaeological

More information

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003) NCMA TEK National Concrete Masonry Association an information series from the national authority on concrete masonry technology CONCRETE MASONRY FOUNDATION WALL DETAILS TEK 5-3A Details (2003) Keywords:

More information

ARCHITECTURAL TECHNOLGY 4 ADVANCED CONSTRUCTION TECHNOLOGY BASEMENT CONSTRUCTION YEAR 3 SEMESTER 1 AIDAN WALSH R00060057. Lecturer: Jim Cahill

ARCHITECTURAL TECHNOLGY 4 ADVANCED CONSTRUCTION TECHNOLOGY BASEMENT CONSTRUCTION YEAR 3 SEMESTER 1 AIDAN WALSH R00060057. Lecturer: Jim Cahill ARCHITECTURAL TECHNOLGY 4 ADVANCED CONSTRUCTION TECHNOLOGY BASEMENT CONSTRUCTION YEAR 3 SEMESTER 1 AIDAN WALSH R00060057 Lecturer: Jim Cahill 29 th November 2011 TABLE OF CONTENTS SUMMARY 1 MAIN BODY SECTION

More information

c. Borehole Shear Test (BST): BST is performed according to the instructions published by Handy Geotechnical Instruments, Inc.

c. Borehole Shear Test (BST): BST is performed according to the instructions published by Handy Geotechnical Instruments, Inc. Design Manual Chapter 6 - Geotechnical 6B - Subsurface Exploration Program 6B-2 Testing A. General Information Several testing methods can be used to measure soil engineering properties. The advantages,

More information

CONSTANT HEAD AND FALLING HEAD PERMEABILITY TEST

CONSTANT HEAD AND FALLING HEAD PERMEABILITY TEST CONSTANT HEAD AND FALLING HEAD PERMEABILITY TEST 1 Permeability is a measure of the ease in which water can flow through a soil volume. It is one of the most important geotechnical parameters. However,

More information

SikaProof A Technology

SikaProof A Technology SikaProof A Technology The fully bonded waterproofing system Keep your basements durably and securely watertight What is SikaProof A? How does it work? Where can it be used? What are the advantages of

More information

Determination of Thermal Conductivity of Coarse and Fine Sand Soils

Determination of Thermal Conductivity of Coarse and Fine Sand Soils Proceedings World Geothermal Congress Bali, Indonesia, - April Determination of Thermal Conductivity of Coarse and Fine Sand Soils Indra Noer Hamdhan 1 and Barry G. Clarke 2 1 Bandung National of Institute

More information

This leaflet gives advice on sensible precautions to help avoid the problem and the first steps to take if damage still occurs.

This leaflet gives advice on sensible precautions to help avoid the problem and the first steps to take if damage still occurs. PROTECTING YOUR HOME FROM SUBSIDENCE DAMAGE The shortage of rain experienced by much of the country during recent years has caused an increase in the amount of damage to buildings by subsidence. In extreme

More information

INDIRECT METHODS SOUNDING OR PENETRATION TESTS. Dr. K. M. Kouzer, Associate Professor in Civil Engineering, GEC Kozhikode

INDIRECT METHODS SOUNDING OR PENETRATION TESTS. Dr. K. M. Kouzer, Associate Professor in Civil Engineering, GEC Kozhikode INDIRECT METHODS SOUNDING OR PENETRATION TESTS STANDARD PENETRATION TEST (SPT) Reference can be made to IS 2131 1981 for details on SPT. It is a field edtest to estimate e the penetration e resistance

More information

QUESTION TO AUDIENCE

QUESTION TO AUDIENCE Site investigation some aspects of EN1997 Part 2 David Norbury David Norbury Limited BGA Symposium Eurocode 7 Today and Tomorrow, Cambridge, England, March 2011 QUESTION TO AUDIENCE How many of you have

More information

NUMERICAL ANALYSIS OF SEEPAGE THROUGH EMBANKMENT DAMS (CASE STUDY: KOCHARY DAM, GOLPAYEGAN)

NUMERICAL ANALYSIS OF SEEPAGE THROUGH EMBANKMENT DAMS (CASE STUDY: KOCHARY DAM, GOLPAYEGAN) NUMERICAL ANALYSIS OF SEEPAGE THROUGH EMBANKMENT DAMS (CASE STUDY: KOCHARY DAM, GOLPAYEGAN) *Reza Naghmehkhan Dahande 1 and Ahmad Taheri 2 1 Department of Civil Engineering-Water Management, Islamic Azad

More information

Permeable Pavement Construction Guide

Permeable Pavement Construction Guide Permeable Pavement Construction Guide Permeable pavement at Olympic Park, Waitakere Final Construction result What are permeable pavements? Permeable pavements are hard surface paving systems that reduce

More information

CHAPTER 2 HYDRAULICS OF SEWERS

CHAPTER 2 HYDRAULICS OF SEWERS CHAPTER 2 HYDRAULICS OF SEWERS SANITARY SEWERS The hydraulic design procedure for sewers requires: 1. Determination of Sewer System Type 2. Determination of Design Flow 3. Selection of Pipe Size 4. Determination

More information

A guide to preventing structural damage

A guide to preventing structural damage A guide to preventing structural damage Home owners guide to planning landscaping and maintenance of foundations Structural damage can result from movement in clay soils caused by varying moisture conditions

More information

Aggregates for Path Construction

Aggregates for Path Construction Aggregates for Path Construction Technical Information Note No. 7 October 2011 About Sustrans Sustrans makes smarter travel choices possible, desirable and inevitable. We re a leading UK charity enabling

More information

Series 600: Earthworks

Series 600: Earthworks Series 600: Volume 4 home page 1 General Where the Contractor has obligations in respect of classification of earthworks materials then these obligations include sampling and testing in accordance with

More information

Groundwater Flooding: a UK Perspective

Groundwater Flooding: a UK Perspective Groundwater Flooding: a UK Perspective David Macdonald British Geological Survey Maclean Building Crowmarsh Gifford Wallingford OX10 8BB Tel 01491 838800 NERC All rights reserved Talk outline Definition

More information

A study on the Effect of Distorted Sampler Shoe on Standard Penetration Test Result in Cohesionless soil

A study on the Effect of Distorted Sampler Shoe on Standard Penetration Test Result in Cohesionless soil ISSN: 319-53 (An ISO 39: 00 Certified Organization) A study on the Effect of Distorted Sampler Shoe on Standard Penetration Test Result in Cohesionless soil Utpal Kumar Das Associate Professor, Department

More information

SECTION 1 GENERAL REQUIREMENTS

SECTION 1 GENERAL REQUIREMENTS Page 1 of 6 SECTION 1 GENERAL REQUIREMENTS 1. SCOPE OF WORK: The work to be performed under the provisions of these documents and the contract based thereon includes furnishing all labor, equipment, materials,

More information

Treatment Practice for Controlling Water Damage in the Annular Space of Shaft Freezing Hole

Treatment Practice for Controlling Water Damage in the Annular Space of Shaft Freezing Hole An Interdisciplinary Response to Mine Water Challenges - Sui, Sun & Wang (eds) 2014 China University of Mining and Technology Press, Xuzhou, ISBN 978-7-5646-2437-8 Treatment Practice for Controlling Water

More information

HAULBOWLINE, CORK STATIC CONE PENETRATION TESTS FACTUAL REPORT

HAULBOWLINE, CORK STATIC CONE PENETRATION TESTS FACTUAL REPORT HAULBOWLINE, CORK STATIC CONE PENETRATION TESTS FACTUAL REPORT CONE PENETRATION TESTS Cone resistance Local friction Porewater pressure Dissipations REPORT NO: RRM CONTRACT NO: GLOVER SITE INVESTIGATIONS

More information

Introduction. The vision of the West Yorkshire Combined Authority (WYCA) Flood Risk Partnership

Introduction. The vision of the West Yorkshire Combined Authority (WYCA) Flood Risk Partnership WYCA SuDS Guidance Introduction As part of the government s continuing commitment to protect people and property from flood risk, the Department for Communities and Local Government and the Department

More information

EFFECT OF GEOGRID REINFORCEMENT ON LOAD CARRYING CAPACITY OF A COARSE SAND BED

EFFECT OF GEOGRID REINFORCEMENT ON LOAD CARRYING CAPACITY OF A COARSE SAND BED International Journal of Civil Engineering and Technology (IJCIET) Volume 7, Issue 3, May June 2016, pp. 01 06, Article ID: IJCIET_07_03_001 Available online at http://www.iaeme.com/ijciet/issues.asp?jtype=ijciet&vtype=7&itype=3

More information

Up-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations

Up-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations Up-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations Nathan A. Ingraffea, P.E., S.E. Associate, KPFF Consulting Engineers, Portland, Oregon, USA Abstract The use of steel sheet

More information

Cavity Drain R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high.

Cavity Drain R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high. CI/SfB Tn6 L6813 September 2013 RIW CAVITY DRAIN R20 R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high. Other systems are available for specific uses,

More information

GUIDANCE NOTES FOR DEVELOPMENTS OR ENGINEERING WORKS IN THE VICINITY OF SPT SUBWAY INFRASTRUCTURE JULY 2005

GUIDANCE NOTES FOR DEVELOPMENTS OR ENGINEERING WORKS IN THE VICINITY OF SPT SUBWAY INFRASTRUCTURE JULY 2005 GUIDANCE NOTES FOR DEVELOPMENTS OR ENGINEERING WORKS IN THE VICINITY OF SPT SUBWAY INFRASTRUCTURE JULY 2005 CONTENTS 1.0 INTRODUCTION 2.0 OVERVIEW OF SPT APPROACH TO DEVEOPMENTS/WORKS IN THE VICINITY OF

More information