PBN Implementation Plan Norway ICAO EUR PBN TF & EUROCONTROL RAiSG Brussel March 2014

Size: px
Start display at page:

Download "PBN Implementation Plan Norway ICAO EUR PBN TF & EUROCONTROL RAiSG Brussel March 2014"

Transcription

1 PBN Implementation Plan Norway ICAO EUR PBN TF & EUROCONTROL RAiSG Brussel March 2014

2 PBN Implementation Plan - NORWAY PBN Implementation plan Norway PBN organization in Norway Status PBN implementation PBN planning PBN requirements and reversionary modes Challenges

3 - Edition 1.0 (December 2009) - Revision 2.0 (February 2012) - Revision 3.0 (June 2013) AVAILABLE FOR DOWNLAD AT:

4 PBN Organization in Norway National regulation (BSL G 4-1): Implement APV procedures at all instrument RWY ends within 31 December 2016 PBN project Group (CAA) Stakeholder meetings (CAA) CAA PBN-plan PBN Project PBN plan working group (CAA and Avinor) PBN Group Avinor input to PBN plan AIM Prioritized/documented APV/LNAV and RNAV 1 SID/STAR procedures from airport divisions (Avinor airports) Non- Avinor airports Coordination meeting ATM/AIM AIRAC-plan

5 P-RNAV (RNAV 1) SID og STAR ATC airports Status AIRAC 06 MAR 2014 TMA ATC airports SID STAR Infrastructure (RNAV) Oslo ENGM P-RNAV P-RNAV GNSS or DME/DME Farris ENTO P-RNAV P-RNAV GNSS or DME/DME ENRY P-RNAV P-RNAV Kjevik ENCN P-RNAV P-RNAV GNSS Sola ENZV Conventional P-RNAV GNSS (DME/DME planned) ENHD Conventional P-RNAV GNSS Flesland ENBR Conventional P-RNAV GNSS (DME/DME planned) Vigra ENAL Conventional P-RNAV GNSS Kvernberget ENKB Conventional P-RNAV GNSS Conventional Ørland ENOL Conventional None Vaernes ENVA P-RNAV P-RNAV GNSS Røros ENRO None None - Bodø ENBO P-RNAV P-RNAV GNSS Evenes ENEV Conventional Conventional Bardufoss ENDU Conventional Conventional Andøya ENAN None Conventional Tromsø ENTC P-RNAV P-RNAV GNSS Alta ENAT Conventional Conventional Banak ENNA Conventional Conventional Kirkenes ENKR RNAV 1 RNAV 1 GNSS

6 APV Instrument Runway ends Instrument RWY end where an APV (LPV and/or LNAV/VNAV) procedure can be established based upon the valid Pans Ops criteria LPV: Max +- 5º offset from the extended centreline and with Vertical Path angle (VPA) up to 6,3º Some RWY ends which are LPV capable by design can not have the procedure implemented due lack of EGNOS coverage north of 70N LNAV/VNAV (Baro-VNAV): No offset from extended centreline and with a VPA limit of 3º - 3,5º 77 APV Instrument RWY ends (+8 RWY ends possible APV candidates) Total 108 RWY ends.

7 Status pr. AIRAC 06 MAR 2014 ATS RWY ends APV RWY ends LNAV APV RNP AR A-RNP SCAT-1 (GBAS) ATC (20) 46 39* AFIS (33) 62 38* Total * * Possible 5 more ATC RWY ends and 3 more AFIS RWY ends. Analysis required RNP AR and A-RNP procedures will be implemented as necessary in close cooperation with airport and operator

8 PBN Implementation Safety Assesments for LNAV and APV under development (Q2 2014) RNAV 1 (P-RNAV) SID/STAR at all airports with ATC/AFIS medio 2015 LNAV /APV procedures LNAV/VNAV and 13 LPV planned on AIRAC 13 NOV 2014 Implementation plan 2015/2016 under development RNP AR /Advanced RNP as necessary

9 PBN - requirements and revisionary modes Flight phase NAVapplication NAV specification NAV infrastructure NAV infra Back-up NAV appl. Fall-back En-route Bodø Oceanic ATS-ruter RNP 10 GNSS IRS/INS En-route ATS-ruter RNAV 5 (B-RNAV) GNSS VOR/DME (required) Radar TMA SID/STAR RNAV 1 (P-RNAV) GNSS DME/DME (as necessary)* Radar Conventional SID/STAR Vectoring service APP IAP APV LNAV GNSS Conventional (LS, VOR/ DME, NDB) Conventional IAP (type/number based on analysis) * DME/DME coverage will only be established as necessary in TMAs taking into account TFC/complexity. Oslo TMA and Farris TMA have DME/DME coverage. DME/DME coverage is also planned established in Sola TMA and Flesland TMA, no other plans.

10 Challenges: EGNOS coverage north of 70 N Coverage limitation north of 70 N Geometrical limitations at high latitude ( >60 N?) Barometric issues at extreme low temperatures APV / LNAV safety assessment NO users of LPV

11 Coverage beyond 70N? LPV: 13 airports outside EGNOS coverage! (10 on mainland, 3 at Svalbard) LPV is not an option until coverage is extended!!

12 High latitude Coverage calculations «Challenges» related to foilage, shadowing and reflections/multipath tend to increase at higher latitudes

13 High latitude Coverage calculations - Antenna radiation (reception) pattern: Effective view of antenna w/ antenna mask β α Where α = satellite elevation angle, and β = a/c antenna masking angle, defined as when the amplification of the antenna drops below 0 dbic.

14 High latitude Coverage calculations Conclusion; LPV will require: α β Note; β (angle where 0 dbic) is typically at 15

15 High Latitude Coverage calculations: - Other complications; crosswind - Crab or - Slip? Cross-wind: 25 G 35 α Question for the pilots in the audience; What is the preferred cross-wind approach method at «narrow and short runways» when flying a regional aircraft..?

16 LPV at high latitude Theoretical «cut off» at 70 N Practical «cut off» due to antenna reception pattern? Practical cut off due to antenna reception pattern AND 15 roll angle (side-slip during final approach)?

17 APV (Baro-VNAV): Baro-VNAV MET-conditions: In the blue er areas (plus Svalbard) we typically have dry climate conditions : Summer : + 30 C, Winter : - 45 C Develop winter and summer IAP?

18 Conclusions on the challenges: Administrative issues APV / LNAV safety assessment NO operators equipped for LPV comment Sorted Remains a PROBLEM Technical issues «Baro» issues at extreme low temperatures No EGNOS coverage north of 70 N latitude EGNOS coverage/geometrical limitations at high latitude Status Sorted Planned expanded in ? Solvable if EGNOS signals were transmittes by non-geo satellites this will be available in 20??...?

19 Thank you for your attention! Questions? Norwegian PBN Implementation team

EPN, seminar AFIS, september 2013 Instrument approach procedures, PBN, GNSS

EPN, seminar AFIS, september 2013 Instrument approach procedures, PBN, GNSS EPN, seminar AFIS, september 2013 Instrument approach procedures, PBN, GNSS By Frédéric BOISARD, AFIS-O at Cholet LFOU Thanks to Mrs Morgane BARDIEUX (DGAC DSAC/O) and to Mrs Corinne BOUSQUET (DGAC - DSNA/DTI)

More information

PBN Aeronautical Charts and Procedure Design

PBN Aeronautical Charts and Procedure Design PBN Aeronautical Charts and Procedure Design Raúl A. Martínez Díaz RO/AIM rmartinez@icao.int ICAO NACC 05 May 2015 Topics 1. AIS/AIM 2. Data flow 3. ICAO PBN Documents 4. Procedures design 5. PBN Aeronautical

More information

NORWAY AIP AIRAC SUP 14/15 EFF 20 AUG 2015. TEL:...(+47) 815 30 550 E-mail:.aim@avinor.no

NORWAY AIP AIRAC SUP 14/15 EFF 20 AUG 2015. TEL:...(+47) 815 30 550 E-mail:.aim@avinor.no TEL:(+47) 815 30 550 E-mail:aim@avinorno NORWAY AERONAUTICAL INFORMATION MANAGEMENT PO BOX 150 NO-2061 GARDERMOEN AIP AIRAC SUP 14/15 EFF 20 AUG 2015 Publication date: 09 JUL 2015 14 ENTO - NYE INNFLYGINGSPROSEDYRER

More information

CAR/SAM STRATEGY FOR THE EVOLUTION OF AIR NAVIGATION SYSTEMS

CAR/SAM STRATEGY FOR THE EVOLUTION OF AIR NAVIGATION SYSTEMS CNS/ATM/SG/1 Appendix C to the Report on Agenda Item 4 4C-1 APPENDIX C CAR/SAM STRATEGY FOR THE EVOLUTION OF AIR NAVIGATION SYSTEMS First Edition Rev 2.0 TABLE OF CONTENTS Page 1. INTRODUCTION... 2 1.1

More information

ASIA/PACIFIC REGIONAL PERFORMANCE-BASED NAVIGATION IMPLEMENTATION PLAN

ASIA/PACIFIC REGIONAL PERFORMANCE-BASED NAVIGATION IMPLEMENTATION PLAN INTERNATIONAL CIVIL AVIATION ORGANIZATION ASIA AND PACIFIC OFFICE ASIA/PACIFIC REGIONAL PERFORMANCE-BASED NAVIGATION IMPLEMENTATION PLAN VERSION 3.0 September 2011 1 RECORD OF AMENDMENT Version Activity

More information

IMPLEMENTATION OF PERFORMANCE BASED NAVIGATION (PBN)

IMPLEMENTATION OF PERFORMANCE BASED NAVIGATION (PBN) REPUBLIC OF CYPRUS MINISTRY OF COMMUNICATIONS AND WORKS CHARTING, OBSTACLES AND PROCEDURES UNIT DEPARTMENT OF CIVIL AVIATION NICOSIA 1429 IMPLEMENTATION OF PERFORMANCE BASED NAVIGATION (PBN) ROADMAP FOR

More information

A. Amendments to AMC/GM to Part-FCL

A. Amendments to AMC/GM to Part-FCL Anne I to ED Decision 2016/008/R Acceptable Means of Compliance and Guidance Material to Part-FCL (PBN) and Part-ARA (PBN, ARA.MED) A. Amendments to AMC/GM to Part-FCL 1. A new GM2 FCL.010 is inserted

More information

International Civil Aviation Organization South American Regional Office

International Civil Aviation Organization South American Regional Office SAM/IG/3 WP/18 08/04/09 International Civil Aviation Organization South American Regional Office THIRD WORKSHOP/MEETING OF THE SAM IMPLEMENTATION GROUP (SAM/IG/3) REGIONAL PROJECT RLA/06/901 Lima, Peru,

More information

Area Navigation (RNAV)/Wide Area Augmentation System (WAAS) Instrument Approach Procedures (IAP s) and the New Charting Format.

Area Navigation (RNAV)/Wide Area Augmentation System (WAAS) Instrument Approach Procedures (IAP s) and the New Charting Format. PURPOSE. Area Navigation (RNAV)/Wide Area Augmentation System (WAAS) Instrument Approach Procedures (IAP s) and the New Charting Format. [REVISED 1/5/00] Instrument procedures in the first half of the

More information

Area Navigation (RNAV) and Required Navigation Performance (RNP)

Area Navigation (RNAV) and Required Navigation Performance (RNP) Area Navigation (RNAV) and Required Navigation Performance (RNP) Program Overview Presented to: CDA Workshop By: Bruce Tarbert RNAV and RNP Group Date: January 19,2006 Roadmap for Performance-Based Navigation

More information

Título ponencia: RNP APCH Implementation

Título ponencia: RNP APCH Implementation Título ponencia: RNP APCH Implementation Organizado por: Index Introduction RNP APCH implementation process PBN Europe plans Introduction RNP APCH Without vertical guidance With vertical guidance LNAV

More information

Performance-based Navigation and Data Quality

Performance-based Navigation and Data Quality ICAO APAC AAITF/8 Performance-based Navigation and Data Quality A Commercial Data Supplier View Bill Kellogg International Relations May 6-10, 2013 Ulaanbaatar, Mongolia Jeppesen Proprietary - Copyright

More information

ICAO-ENAC PBN PROCEDURE DESIGN COURSE

ICAO-ENAC PBN PROCEDURE DESIGN COURSE ICAO-ENAC PBN PROCEDURE DESIGN COURSE REFERENCE AND TITLE Performance Based Navigation Concept : Procedure design course for PBN applications: RNAV1 SID and STAR, RNP APCH (Non Precision Approach and APV

More information

NORWAY AIP AIRAC SUP 26/15 EFF 10 DEC 2015. TEL:...(+47) 815 30 550 E-mail:.aim@avinor.no

NORWAY AIP AIRAC SUP 26/15 EFF 10 DEC 2015. TEL:...(+47) 815 30 550 E-mail:.aim@avinor.no TEL:(+47) 815 30 550 E-mail:aim@avinorno NORWAY AERONAUTICAL INFORMATION MANAGEMENT PO BOX 150 NO-2061 GARDERMOEN AIP AIRAC SUP 26/15 EFF 10 DEC 2015 Publication date: 24 NOV 2015 26 ENEV NYE OG REVIDERTE

More information

ADVISORY CIRCULAR AC 08-007

ADVISORY CIRCULAR AC 08-007 CIVIL AVIATION AUTHORITY OF THE PHILIPPINES ADVISORY CIRCULAR AC 08-007 APPLICATION & PROCESS: PERFORMANCE BASED NAVIGATION SECTION 1 POLICY AND GENERAL INFORMATION 1.1 PURPOSE The purpose of this advisory

More information

ILS Replacement. ACI World Safety Seminar. 18 19 November 2008 Kempinski Hotel Beijing Lufthansa Centre

ILS Replacement. ACI World Safety Seminar. 18 19 November 2008 Kempinski Hotel Beijing Lufthansa Centre ILS Replacement Xiaosong Xiao, PhD Tetra Tech, Inc. Orlando, USA Contents: Ground-Based Navigation ILS Approach GNSS/SBAS Approach Comparisons between ILS and GNSS Example: Cost Analysis Between LAAS and

More information

Performance Based Navigation (PBN)

Performance Based Navigation (PBN) Ministry of Transport, Public Works and Water Management Performance Based Navigation (PBN) ROADMAP for the Kingdom of the Netherlands 2010-2020 Ministry of Transport, Public Works and Water Management

More information

O Copyright Civil Aviation Department 2010

O Copyright Civil Aviation Department 2010 O Copyright Civil Aviation Department 2010 The information contained in this implementation plan may be subject to change without notice. For full details of the operational requirements, please refer

More information

OPERATIONS CIRCULAR. OC NO 2 OF 2014 Date: 1 st May 2014. Continuous Descent Final Approach (CDFA) 1. PURPOSE

OPERATIONS CIRCULAR. OC NO 2 OF 2014 Date: 1 st May 2014. Continuous Descent Final Approach (CDFA) 1. PURPOSE GOVERNMENT OF INDIA CIVIL AVIATION DEPARTMENT DIRECTOR GENERAL OF CIVIL AVIATION OC NO 2 OF 2014 Date: 1 st May 2014 OPERATIONS CIRCULAR Subject: Continuous Descent Final Approach (CDFA) 1. PURPOSE This

More information

Pilot Briefing for Helsinki-Vantaa Real Flight Event

Pilot Briefing for Helsinki-Vantaa Real Flight Event Pilot Briefing for Helsinki-Vantaa Real Flight Event INTRODUCTION It is finally time for the Helsinki Real Flight Event. This event will simulate the real operations and flights that go on every day at

More information

Airports Authority of India

Airports Authority of India Airports Authority of India Performance Based Navigation(PBN) Implementation Road Map Version-1 Dt. 01.09 Directorate of Air Traffic Management 1 Table of Contents 1. Introduction 2. PBN concepts 3. Benefits

More information

LONDON SOUTHEND AIRPORT AIRSPACE CHANGE PROPOSAL. Executive Summary and About the Consultation Documents and Document Contents

LONDON SOUTHEND AIRPORT AIRSPACE CHANGE PROPOSAL. Executive Summary and About the Consultation Documents and Document Contents LONDON SOUTHEND AIRPORT AIRSPACE CHANGE PROPOSAL Introduction of Standard Instrument Departure Procedures to Routes in the London Terminal Control Area Sponsor Consultation 2016 Executive Summary and About

More information

Development and Validation of Procedures. ICAO PBN Seminar Development and Validation of Procedures

Development and Validation of Procedures. ICAO PBN Seminar Development and Validation of Procedures Development and Validation of Procedures 1 Overview From Procedure design to Database -The steps needed to ensure RNAV systems follow the procedure correctly Learning Objectives The translation of procedure

More information

HUNGARY. HungaroControl Pte. Ltd. Co. Hungarian Air Navigation Services Aeronautical Information Service H-1675 Budapest, POB 80

HUNGARY. HungaroControl Pte. Ltd. Co. Hungarian Air Navigation Services Aeronautical Information Service H-1675 Budapest, POB 80 HUNGARY Phone:+361 293 4354 Fax:+361 293 4239 AFS:LHBPYNYN Email:ais@hungarocontrol.hu URL:www.hungarocontrol.hu HungaroControl Pte. Ltd. Co. Hungarian Air Navigation Services Aeronautical Information

More information

Pilot Briefing Stockholm/Arlanda

Pilot Briefing Stockholm/Arlanda Pilot Briefing Stockholm/Arlanda INTRODUCTION Thank you for taking time to read the briefing for Stockholm/Arlanda Airport. The purpose of this document is not to teach pilots basic procedures and how

More information

YART Yet Another Route Tool!

YART Yet Another Route Tool! Follow an up-to-date flight plan with MFS ATC 8 th of December 2013 Revision 3 What is YART Yet Another Route Tool!?...2 How it works...3 Getting started...4 Advanced mode...5 Validation of a european

More information

CIVIL AVIATION AUTHORITY - NORWAY VFR GUIDE

CIVIL AVIATION AUTHORITY - NORWAY VFR GUIDE CIVIL AVIATION AUTHORITY - NORWAY 2013 VFR GUIDE 1 INTRODUCTION TABLE OF CONTENTS Welcome to Norway and Norwegian Airspace! This booklet is made for the purpose of assisting you, as a VFR pilot, in your

More information

LOG OF REVISIONS Revision Page FAA Date of Number Number(s) Description Approved Approval A All Initial Release K.

LOG OF REVISIONS Revision Page FAA Date of Number Number(s) Description Approved Approval A All Initial Release K. LOG OF REVISIONS Revision Page FAA Date of Number Number(s) Description Approved Approval A All Initial Release K. Campbell* 4/4/00 B 5, 10 Remove SKYWATCH and add GTX 330 TIS G. Baker* 11/21/02 C All

More information

09 FLIGHT MANAGEMENT, NAVIGATION

09 FLIGHT MANAGEMENT, NAVIGATION Course overview N E X T G E N E R A T I O N Airplane General Air Systems Warning Systems, Communications, Ice & Rain Protection Electrical Engines, APU, Fuel System Hydraulics, Flight Controls, Landing

More information

Avionics requirements for civil aircraft Edition 30/10/2013

Avionics requirements for civil aircraft Edition 30/10/2013 Avionics requirements for civil aircraft Edition 30/10/2013 Civil aircraft Communication requirements Domain Programme Area VHF Com 8.33 KHZ Equipment The probability of the loss of voice communication

More information

Ref.: AN 13/2.5-09/45 19 June 2009

Ref.: AN 13/2.5-09/45 19 June 2009 International Civil Aviation Organization Organisation de l aviation civile internationale Organización de Aviación Civil Internacional Международная организация гражданской авиации Tel.: +1 (514) 954-6711

More information

Block 0: Capabilities within our Grasp

Block 0: Capabilities within our Grasp Block 0: Capabilities within our Grasp 1 ICAO Block Upgrades Assumptions and Constraints Current ATM infrastructure and procedures will not support forecasted traffic growth Implementation of major ATM

More information

ICAO Amendment 1 - Australian Flight Planning Guidance

ICAO Amendment 1 - Australian Flight Planning Guidance ICAO Amendment 1 - Australian Flight Planning Guidance Amendment 1 to the 15 th Edition of ICAO Doc. 4444 introduces changes to useable identifiers and codes within the ICAO flight plan, specifically in

More information

Real Time Simulation Oslo ASAP

Real Time Simulation Oslo ASAP Real Time Simulation Oslo ASAP (Oslo Advanced Sectorization and Automation Project) EXPERIMENTAL CENTRE VALIDATION REPORT EEC Technical/Scientific Report No. 21-2 Final Version Issue Date: 29 January 21

More information

Training program for S2 (TWR) rating

Training program for S2 (TWR) rating Training program for S2 (TWR) rating Introduction This is the official Vatsim Scandinavia training program for students training for the TWR (S2) Rating. Each mentor is expected to take his student through

More information

C-130 Fleet CNS/ATM Solutions

C-130 Fleet CNS/ATM Solutions C-130 Fleet CNS/ATM Solutions Steve Knoblock Lockheed Martin Flight Operations Stephen.a.knoblock@lmco.com 770-351-6353 INFORMATION CONTAINED IN THIS BRIEFING IS FOR REFERENCE PURPOSES ONLY AND DOES NOT

More information

CNS/ATM SYSTEMS IN INDIA

CNS/ATM SYSTEMS IN INDIA CNS/ATM SYSTEMS IN INDIA Presentation at ICG02 4 th Sept-7 th Sept 2007, Bangalore M.IRULAPPAN General Manager (GNSS) Over Indian Airspace (AAI) provides Air navigation services (ANS) infrastructure Air

More information

Título ponencia: Helicopter IFP. Point-in-Space (PinS)

Título ponencia: Helicopter IFP. Point-in-Space (PinS) Título ponencia: Helicopter IFP. Point-in-Space (PinS) Organizado por: Index Introduction Helicopter IFP A/C Certification requirements GNSS Certified rotorcrafts Most relevant projects in Europe Introduction

More information

JEPPESEN AIRLINE CHART SERIES JEPPESEN AIRLINE CHART SERIES

JEPPESEN AIRLINE CHART SERIES JEPPESEN AIRLINE CHART SERIES JEPPESEN AIRLINE CHART SERIES FEATURES Extensive global chart library To-scale approach chart depiction of Minimum Sector Altitude (MSA) displayed in the plan view and heading for increased situational

More information

GNSS-EGNOS approaches to European airports

GNSS-EGNOS approaches to European airports United Nations International meeting on the Applications of Global Navigation Satellite Systems Luis Chocano Head of GNSS Division Aeronautical Directorate GNSS-EGNOS approaches to European airports December

More information

Appendice 1 al Regolamento ENAC ATSEP Basic training Shared

Appendice 1 al Regolamento ENAC ATSEP Basic training Shared Regolamento ENAC ATSEP Appendici Pag. 1 Appendice 1 al Regolamento ENAC ATSEP Basic training Shared Subject 1: INDUCTION TOPIC 1 BASIND Induction Sub-topic 1.1 BASIND Training and Assessment Overview Sub-topic

More information

ALAMEDA DO AEROPORTO Caixa Postal, 227 - Maputo REGULATIONS NEW FORMAT FLIGHT PLAN

ALAMEDA DO AEROPORTO Caixa Postal, 227 - Maputo REGULATIONS NEW FORMAT FLIGHT PLAN AERONAUTICAL INFORMATION CIRCULAR MOÇAMBIQUE INSTITUTO DE AVIAÇÃO CIVIL DE MOÇAMBIQUE DIRECÇÃO DOS SERVIÇOS DE NAVEGAÇÃO AÉREA AERONAUTICAL INFORMATION SERVICE Tel: (258) 21-465416 Fax: (258) 21-465415

More information

Direct Approach Consulting Inc.

Direct Approach Consulting Inc. Direct Approach Consulting Inc. Flight Procedure Design Your best approach for: safety operational efficiency maximizing revenue Direct Approach Direct Approach is a Canadian based company providing instrument

More information

IP2 PBN data collection

IP2 PBN data collection Ref: NSG/NSG18/IP2 NSG18 - Agenda Item 5.1.2 IP2 PBN data collection Submitted by Eurocontrol Summary With ICAO FPL 2012 provisions introduced in November 2012, field 10 and 18 provides both information

More information

ICAO 2012 Change Summary

ICAO 2012 Change Summary ICAO 2012 Change Summary This dcument prvides an verview f the ICAO 2012 s. See the cmplete set f ICAO instructins here. ICAO FPL 2012 Change Overview Starting n vember 15, 2012, Filed Flight Plans must

More information

ICAO FLIGHT PLAN MODIFICATIONS 2012

ICAO FLIGHT PLAN MODIFICATIONS 2012 Aeronautical Information Circular Series A - 02/12 Page 1 Contact Post: Air Traffic Control the Netherlands Aeronautical Information Service P.O. Box 75200 1117 ZT Schiphol The Netherlands Tel: +31 (0)20

More information

Local Single Sky ImPlementation (LSSIP) NORWAY

Local Single Sky ImPlementation (LSSIP) NORWAY EUROCONTROL Local Single Sky ImPlementation (LSSIP) NORWAY Year 2012 Level 1 DOCUMENT IDENTIFICATION SHEET Local Single Sky ImPlementation document for NORWAY Infocentre Reference: 13/01/02-30 Document

More information

FAA Familiarization Briefing

FAA Familiarization Briefing FAA Familiarization Briefing Presented by: Kathryn Vernon Presented to: Regional Administrator Northwest Mountain Region Oregon Congressional Staff Presented on: March 13, 2015 FAA Statistics National

More information

Michael Harrison Aviation Management Associates Alternative PNT Public Meeting Stanford University August 10-11. Federal Aviation Administration

Michael Harrison Aviation Management Associates Alternative PNT Public Meeting Stanford University August 10-11. Federal Aviation Administration Michael Harrison Aviation Management Associates Alternative PNT Public Meeting Stanford University Suspending Current Belief Current practices for air traffic control, procedures and separation will not

More information

TP 308 IMPACT STUDY TORONTO BILLY BISHOP/TORONTO CITY AIRPORT. for

TP 308 IMPACT STUDY TORONTO BILLY BISHOP/TORONTO CITY AIRPORT. for TP 308 IMPACT STUDY TORONTO BILLY BISHOP/TORONTO CITY AIRPORT for May, 2013 TABLE OF CONTENTS Report TAB 1 Map1: Runway 08-26 Extension TAB 2 Maps 2 & 3: Runway 08-26 Obstacle Assessment TAB 3 Canada Air

More information

Written by Sverre H. Falkenberg Layout by Erlend Våge Questions about this publication can be directed to: Norsk Aero Klubb, Motorflyseksjonen

Written by Sverre H. Falkenberg Layout by Erlend Våge Questions about this publication can be directed to: Norsk Aero Klubb, Motorflyseksjonen Written by Sverre H. Falkenberg Layout by Erlend Våge Questions about this publication can be directed to: Norsk Aero Klubb, Motorflyseksjonen P.O.Box 383 Sentrum N-0102 OSLO NORWAY Tel. +47 23 01 04 50

More information

NORWAY AERONAUTICAL INFORMATION MANAGEMENT P.O. BOX 150 NO-2061 GARDERMOEN

NORWAY AERONAUTICAL INFORMATION MANAGEMENT P.O. BOX 150 NO-2061 GARDERMOEN TEL:(+47) 815 30 550 E-mail:aim@avinorno NORWAY AERONAUTICAL INFORMATION MANAGEMENT PO BOX 150 NO-2061 AIP AIRAC SUP 15/16 EFF 21 JUL 2016 Publication date: 02 JUN 2016 15 ENGM - NYE INSTRUMENTINNFLYGINGS-

More information

CHANGE TO AERONAUTICAL INFORMATION MANUAL TO INCORPORATE NEW ICAO FLIGHT PLAN FILING REQUIREMENTS PLANNED EFFECTIVE DATE 11/15/2012

CHANGE TO AERONAUTICAL INFORMATION MANUAL TO INCORPORATE NEW ICAO FLIGHT PLAN FILING REQUIREMENTS PLANNED EFFECTIVE DATE 11/15/2012 CHANGE TO AERONAUTICAL INFORMATION MANUAL TO INCORPORATE NEW ICAO FLIGHT PLAN FILING REQUIREMENTS PLANNED EFFECTIVE DATE 11/15/2012 1. PARAGRAPH NUMBER AND TITLE: 4-2-4. Aircraft Call Signs 4-6-1. Applicability

More information

The CREDOS Project. Human Machine Interface Design

The CREDOS Project. Human Machine Interface Design The CREDOS Project Human Machine Interface Design Abstract This deliverable presents the first stage of the design and development of a Human Machine Interface (HMI) to support CREDOS operations. This

More information

AD 2-LGML-1 GREECE 12 NOV 2015 LGML AD 2.1 AERODROME LOCATION INDICATOR AND NAME LGML - MILOS

AD 2-LGML-1 GREECE 12 NOV 2015 LGML AD 2.1 AERODROME LOCATION INDICATOR AND NAME LGML - MILOS AD 2-LGML-1 GREECE 12 NOV 2015 LGML AD 2.1 AERODROME LOCATION INDICATOR AND NAME LGML - MILOS LGML AD 2.2 AERODROME GEOGRAPHICAL AND ADMINISTRATIVE DATA 1 ARP coordinates and site at AD 364149N 0242837E

More information

EUROCONTROL Guidelines for Cold Temperature Corrections by ATS

EUROCONTROL Guidelines for Cold Temperature Corrections by ATS Guidelines Cold Temperature Corrections by ATS EUROCONTROL Guidelines for Cold Temperature Corrections by ATS DOCUMENT IDENTIFIER : EUROCONTROL-GUID- Edition Number : 1.0 Edition Date : 24.10.2014 Status

More information

Düsseldorf RG Airports

Düsseldorf RG Airports Düsseldorf RG Airports Note: Not for real navigation! Dortmund-Wickede ( / DTM) Elevation 419 ft Effective: 12 DEC 201 (Changes are marked yellow) NAVAIDS: Communication: Station Freq. 06 109.15 / 061

More information

a Brief Background DEFINITION

a Brief Background DEFINITION GNSS FOR AVIATION a Brief Background ANC informal briefing DEFINITION GNSS: A worldwide position and time determination ti system that t includes one or more satellite constellations, aircraft receivers

More information

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI - 110003

GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI - 110003 GOVERNMENT OF INDIA OFFICE OF THE DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP. SAFDARJUNG AIRPORT, NEW DELHI - 110003 CIVIL AVIATION REQUIREMENT SECTION 8 - AIRCRAFT OPERATIONS SERIES 'S',

More information

MSAS current status. Japan Civil Aviation Bureau S TSAT A ATELLITE-BASED S UGMENTATION. MTSAT Satellite-based Augmentation System

MSAS current status. Japan Civil Aviation Bureau S TSAT A ATELLITE-BASED S UGMENTATION. MTSAT Satellite-based Augmentation System MSAS current status Japan Civil Aviation Bureau Civil Aviation Bureau Ministry of Land, Infrastructure and Transport 1 Contents Overview of MSAS MSAS Status Process for MSAS Commissioning Results of OT&E

More information

VFR GUIDE FOR NORWAY - 2012. Copyright: Luftfartsttilsynet Civil Aviation Authority - Norway

VFR GUIDE FOR NORWAY - 2012. Copyright: Luftfartsttilsynet Civil Aviation Authority - Norway VFR GUIDE FOR NORWAY - 2012 Copyright: Luftfartsttilsynet Civil Aviation Authority - Norway Norway May 2012 1 INTRODUCTION. Welcome to Norway and Norwegian Airspace! This booklet is made for the purpose

More information

Quality Assurance Manual for Flight Procedure Design

Quality Assurance Manual for Flight Procedure Design Doc 9906 AN/472 Quality Assurance Manual for Flight Procedure Design Volume 2 Flight Procedure Designer Training (Development of a Flight Procedure Designer Training Programme) Approved by the Secretary

More information

A Strategic Vision of Air Traffic Management in New Zealand to 2025

A Strategic Vision of Air Traffic Management in New Zealand to 2025 A Strategic Vision of Air Traffic Management in New Zealand to 2025 » contents Vision 4 Introduction 5 Stakeholders 6 Metrics 8 Hierarchy of documents 9 Air traffic enabling 10 Airspace management 16 ATM

More information

AD 2 LIRF 5-36 Path Terminator Waypoint Name Fly Over Track Mag Turn Direction Altitude Constraint (ft) Length (NM) Speed Limit (kt)/ Bank Angle Recommended Vertical Angle/ THR Crossing Height (ft) IF

More information

LOCAL OPERATING PROCEDURES FOR NORWAY ACC, OSLO

LOCAL OPERATING PROCEDURES FOR NORWAY ACC, OSLO 2015 LOCAL OPERATING PROCEDURES FOR NORWAY ACC, OSLO LoP Norway ACC, Oslo 1. Positions list VATSIM name Callsign Frequency Area of responsibility NOR_4_CTR Norway Control 118.875 All Oslo sectors. (S1-S8)

More information

You ll soon be arriving in Paris, thank you for choosing our airport for your arrival. This briefing was made to make your arrival as flawless and

You ll soon be arriving in Paris, thank you for choosing our airport for your arrival. This briefing was made to make your arrival as flawless and You ll soon be arriving in Paris, thank you for choosing our airport for your arrival. This briefing was made to make your arrival as flawless and fun as possible. We hope you will enjoy flying with us.

More information

IFR AERONAUTICAL CHART SYMBOLS

IFR AERONAUTICAL CHART SYMBOLS IFR AERONAUTICAL CHART SYMBOLS 42 IFR Enroute Low/High Altitude (U.S. & Alaska Charts) AIRPORTS............................................... 43 RADIO AIDS TO NAVIGATION................................

More information

INTEGRITY AND CONTINUITY ANALYSIS OCTOBER TO DECEMBER 2013 QUARTERLY REPORT FROM GPS. Integrity and Continuity Analysis 08/01/14 08/01/14 08/01/14

INTEGRITY AND CONTINUITY ANALYSIS OCTOBER TO DECEMBER 2013 QUARTERLY REPORT FROM GPS. Integrity and Continuity Analysis 08/01/14 08/01/14 08/01/14 INTEGRITY AND CONTINUITY ANALYSIS FROM GPS OCTOBER TO DECEMBER 2013 QUARTERLY REPORT Prepared by: M Pattinson (NSL) 08/01/14 Checked by: L Banfield (NSL) 08/01/14 Approved by: M Dumville (NSL) 08/01/14

More information

IFR AERONAUTICAL CHART SYMBOLS

IFR AERONAUTICAL CHART SYMBOLS IFR AERONAUTICAL CHART SYMBOLS 42 IFR Enroute Low/High Altitude (U.S. & Alaska Charts) AIRPORTS............................................... 43 RADIO AIDS TO NAVIGATION................................

More information

Understanding Compliance with Automatic Dependent Surveillance Broadcast (ADS-B) Out

Understanding Compliance with Automatic Dependent Surveillance Broadcast (ADS-B) Out Understanding Compliance with Automatic Dependent Surveillance Broadcast (ADS-B) Out White Paper Doc No.: WHTP-2013-14-05 Revised, October 2014 Safely guiding pilots and their passengers worldwide for

More information

REPUBLIK ÖSTERREICH. This AIC includes 2 pages and 3 Attachments. "FPL 2012"

REPUBLIK ÖSTERREICH. This AIC includes 2 pages and 3 Attachments. FPL 2012 AUSTRO CONTROL GmbH LUFTFAHRTINFORMATIONSDIENST Towerstraße Objekt 120 1300 Wien-Flughafen AUSTRIA Phone: +43 (0)51703/2051 Telefax: +43 (0)51703/2056 AFTN: LOWWYNYX REPUBLIK ÖSTERREICH e-mail: nof@austrocontrol.at

More information

Título ponencia: GBAS Concept

Título ponencia: GBAS Concept Título ponencia: Organizado por: Index Introduction GBAS Overview GBAS CAT-I Services GBAS Implementation Introduction Subject These slides presents a brief introduction to the Ground Based Augmentation

More information

WHICH AIR TRAFFIC CONTROLLER TO CONTACT

WHICH AIR TRAFFIC CONTROLLER TO CONTACT WHICH AIR TRAFFIC CONTROLLER TO CONTACT 1. Introduction This article is written in order to explain to all beginners in the IVAO network the basics for any pilot to contact the correct air traffic controller.

More information

Transport Spectrum Tune-Up 2009. Aviation Spectrum Issues. Eddy D Amico, RF Spectrum Manager Airservices Australia. November 2009

Transport Spectrum Tune-Up 2009. Aviation Spectrum Issues. Eddy D Amico, RF Spectrum Manager Airservices Australia. November 2009 Transport Spectrum Tune-Up 2009 Aviation Spectrum Issues Eddy D Amico, RF Spectrum Manager Airservices Australia November 2009 Overview Background Importance of radio spectrum for aviation Communications

More information

Information on the Implementation of ICAO FPL 2012

Information on the Implementation of ICAO FPL 2012 BUNDESREPUBLIK DEUTSCHLAND FEDERAL REPUBLIC OF GERMANY DFS Deutsche Flugsicherung GmbH (German Air Navigation Services) Büro der Nachrichten für Luftfahrer (Aeronautical Publication Agency) Am DFS-Campus

More information

PF3 ATC at its best Version History

PF3 ATC at its best Version History The latest version of this document and the PF3 User Guide can always be found in the...\pf3\help folder after any update. 30 th May 2016 Version 3.1.18 FIXED a problem that could occur if an emergency

More information

NEFAB Project Initiative 9 Commonality of CNS/ATM Systems

NEFAB Project Initiative 9 Commonality of CNS/ATM Systems NEFAB Project Initiative 9 Commonality of CNS/ATM Systems Page 1 of 20 TABLE OF CONTENTS 1. EXECUTIVE SUMMARY... 3 2. DESCRIPTION OF THE INITIATIVE... 4 3. RATIONALE AND PURPOSE OF THE INITIATIVE... 5

More information

GSA: EGNOS Flight Event, 6-7 May, Toulouse

GSA: EGNOS Flight Event, 6-7 May, Toulouse GSA: EGNOS Flight Event, 6-7 May, Toulouse Text: Pavel Valenta, Foto: Pavel Valenta, GSA I have persuaded myself several times, that Toulouse is the capital city of aviation in Europe. Right here innovator

More information

Doc 9849 AN/457. Approved by the Secretary General and published under his authority. First Edition 2005. International Civil Aviation Organization

Doc 9849 AN/457. Approved by the Secretary General and published under his authority. First Edition 2005. International Civil Aviation Organization Doc 9849 AN/457 Global Navigation Satellite System (GNSS) Manual Approved by the Secretary General and published under his authority First Edition 2005 International Civil Aviation Organization AMENDMENTS

More information

BENCHMARKING AVINOR S EFFICIENCY A PRESTUDY

BENCHMARKING AVINOR S EFFICIENCY A PRESTUDY 1006 Rico Merkert and Romano Pagliari (Cranfield University), James Odeck, Svein Bråthen, Nigel Halpern and Jan Husdal BENCHMARKING AVINOR S EFFICIENCY A PRESTUDY Rico Merkert and Romano Pagliari (Cranfield

More information

CIVIL AVIATION REQUIREMENTS SECTION 9 AIR SPACE AND AIR TRAFFIC MANAGEMENT SERIES 'D' PART VI

CIVIL AVIATION REQUIREMENTS SECTION 9 AIR SPACE AND AIR TRAFFIC MANAGEMENT SERIES 'D' PART VI GOVERNMENT OF INDIA OFFICE OF DIRECTOR GENERAL OF CIVIL AVIATION TECHNICAL CENTRE, OPP SAFDARJANG AIRPORT, NEW DELHI CIVIL AVIATION REQUIREMENTS SECTION 9 AIR SPACE AND AIR TRAFFIC MANAGEMENT SERIES 'D'

More information

Methods and Operational Procedures

Methods and Operational Procedures FROM NONPRECISION APPROACHES TO PRECISION-LIKE APPROACHES: Methods and Operational Procedures BY CAPT. ETIENNE TARNOWSKI Introduction The methods and operational procedures that have been defined by airframe

More information

Determination of ILS Critical and Sensitive Areas: A Comparison of Flight Measurement versus Simulation Techniques

Determination of ILS Critical and Sensitive Areas: A Comparison of Flight Measurement versus Simulation Techniques Determination of ILS Critical and Sensitive Areas: A Comparison of Flight Measurement versus Simulation Techniques S. Dale Courtney Senior Navigation Engineer US FAA, Air Traffic Organization Washington,

More information

AIP-SVERIGE/SWEDEN 8 APR 2010 AD 2 ESSA-4-23. Common to all SIDs: Unless otherwise specified, climb to 5000 ft.

AIP-SVERIGE/SWEDEN 8 APR 2010 AD 2 ESSA-4-23. Common to all SIDs: Unless otherwise specified, climb to 5000 ft. AIP-SVERIGE/SWEDEN 8 APR 2010 AD 2 ESSA-4-23 INITIAL CLIMB CLEARANCE Common to all SIDs: Unless otherwise specified, climb to 5000 ft. RWY 19 R Note 1. Note 2. Note 3. Note 4. Aircraft proceeding on SID

More information

STOCKHOLM/ARLANDA AERODROME FMS/RNAV SID

STOCKHOLM/ARLANDA AERODROME FMS/RNAV SID AIP-SVERIGE/SWEDEN 60 00 VAR 3.5-4.5 E 2005 KOGAV 017 30 STOCKHOLM/ARLANDA AERODROME KOGAV 2 L (KOGA 2L) 304 (308.1 T) < 30.8 > 018 00 RESNA 2 L (RESN 2L) 003 (006.6 T) < 15.8 > SA417 AD 2 ESSA 4 47 RWY

More information

Stephen D. Hammack Primus Apex. Pilatus PC-12NG Build 7.2 Updates

Stephen D. Hammack Primus Apex. Pilatus PC-12NG Build 7.2 Updates Stephen D. Hammack Primus Apex Pilatus PC-12NG Build 7.2 Updates The enclosed technical data is export classified as EAR99. Its export is being transmitted under U.S. Export Administration Regulations

More information

SBAS 2015 SPACE BASED AUGMENTATION SYSTEM WORKSHOP

SBAS 2015 SPACE BASED AUGMENTATION SYSTEM WORKSHOP THALES SBAS 2015 SPACE BASED AUGMENTATION SYSTEM WORKSHOP 24 & 25 MARCH 2015 PHILLIP REISS CURRENT DIRECTOR AND PAST PRESIDENT AIRCRAFT OWNERS AND PILOTS ASSOCIATION OF AUSTRALIA BENEFITS TO AVIATION Vertical

More information

AIRCRAFT PERFORMANCE Pressure Altitude And Density Altitude

AIRCRAFT PERFORMANCE Pressure Altitude And Density Altitude Performance- Page 67 AIRCRAFT PERFORMANCE Pressure Altitude And Density Altitude Pressure altitude is indicated altitude corrected for nonstandard pressure. It is determined by setting 29.92 in the altimeter

More information

LINK ROUTES Milano Malpensa (per/for STAR P-RNAV)

LINK ROUTES Milano Malpensa (per/for STAR P-RNAV) AIP Italia AD 2 LIMC 4-3 LINK ROUTES Milano Malpensa (per/for STAR P-RNAV) LUSIL 1Y LUSIL MC401 SRN VOR/DME. MEL: LUSIL MC401: FL 140; MC401 SRN VOR/DME: FL 100 IF LUSIL - - - - (1) - - TF MC401-242 -

More information

CAAP 89W-1(0) Guidelines on provision of obstacle information for take-off flight planning purposes

CAAP 89W-1(0) Guidelines on provision of obstacle information for take-off flight planning purposes Civil Aviation Advisory Publication This publication is only advisory. It gives the preferred method for complying with the Civil Aviation Regulations (CAR 1988). It is not the only method, but experience

More information

PBN Operational Approval Application and Documentation. ICAO PBN Operational Approval Course

PBN Operational Approval Application and Documentation. ICAO PBN Operational Approval Course PBN Operational Approval Application and Documentation ICAO PBN Operational Approval Course Application Phases Step 1 Step 2 Step 3 Step 4 Step 5 Pre-Application Formal Application Document Evaluation

More information

Remote Tower Operations

Remote Tower Operations UNPACKING SESAR SOLUTIONS REMOTE TOWER SERVICES 12-13 JUNE 2014, DUBLIN AIRPORT Remote Tower Operations The Remote Tower Operational Concept SESAR Solution Development Operational Experiences Programme

More information

SESAR Air Traffic Management Modernization. Honeywell Aerospace Advanced Technology June 2014

SESAR Air Traffic Management Modernization. Honeywell Aerospace Advanced Technology June 2014 SESAR Air Traffic Management Modernization Honeywell Aerospace Advanced Technology June 2014 Honeywell in NextGen and SESAR Honeywell active in multiple FAA NextGen projects ADS-B Surface Indicating and

More information

GENERAL INFORMATION ON GNSS AUGMENTATION SYSTEMS

GENERAL INFORMATION ON GNSS AUGMENTATION SYSTEMS GENERAL INFORMATION ON GNSS AUGMENTATION SYSTEMS 1. INTRODUCTION Navigation technologies with precision approach and landing systems, for civilian and military purposes, enable aircrafts to perform their

More information

Título ponencia: Guidance for GBAS Operations Implementation

Título ponencia: Guidance for GBAS Operations Implementation Título ponencia: Guidance for GBAS Operations Implementation Organizado por: Index Introduction Guidance for GBAS Operations implementation Decision Making Inception Phase case example Introduction AmethodologyhasbeendefinedbyPildoLabsinordertosupportStakeholdersintheprocessof

More information

SUP 42/15 (AD 2 EPWA)

SUP 42/15 (AD 2 EPWA) OGRANICZENIE DOSTÊPNOŒCI LOTNISKA KRAKÓW/BALICE Z POWODU PRAC REMONTOWYCH NA RWY 07/25 LIMITED AVAILABILITY OF KRAKÓW/BALICE AERODROME DUE TO HAUL WORKS ON RWY 07/25 STRONA 1-1 PAGE 1-1 POLSKA AGENCJA

More information

Item 5.2. 3 rd International Transport Forum. Big Data to monitor air and maritime transport. Paris, 17-18 March 2016

Item 5.2. 3 rd International Transport Forum. Big Data to monitor air and maritime transport. Paris, 17-18 March 2016 3 rd International Transport Forum Paris, 17-18 March 2016 Item 5.2 Big Data to monitor air and maritime transport DG EUROSTAT - Anna Białas-Motyl, Transport statistics & TF Big Data Content Big Data at

More information

GAGAN-FOP/PMR-05. Indian SBAS System - GAGAN

GAGAN-FOP/PMR-05. Indian SBAS System - GAGAN GAGAN-FOP/PMR-05 Indian SBAS System - GAGAN GAGAN GPS Aided GEO Augmented Navigation (GAGAN) is India s regional Satellite Based Augmentation System (SBAS) India is working towards attaining APV 1 capability

More information

Tuesday, March 18, 2014 4:00 p.m. 5:30 p.m. MODERATED BY: Carey Miller Universal Avionics Systems Corp.

Tuesday, March 18, 2014 4:00 p.m. 5:30 p.m. MODERATED BY: Carey Miller Universal Avionics Systems Corp. Avionics Tuesday, March 18, 2014 4:00 p.m. 5:30 p.m. MODERATED BY: Carey Miller Universal Avionics Systems Corp. International Operators Conference Tampa, FL March 17 20, 2014 Previous NBAA IOC s 2013

More information