1 Concrete pre-cast post-tensioned water tanks J. Gavranic* and R. Premakumara** *Georgiou Group, 68 Hasler Road, Osborne Park, Perth, Western Australia, 6017, ( ** Parsons Brinckerhoff, 1 King William Street, Adelaide, South Australia, 5000 ( rpremakumara@pb.com.au) ABSTRACT Georgiou was appointed by the Water Corporation in to construct three tanks, with the capacity to hold vast amounts of water ranging from 15ML to 32ML that will enable adequate support for water infrastructure needs in Western Australia. Georgiou advised Water Corporation that concrete pre-cast post-tensioned tanks would provide greater resilience than steel tanks. With this, Georgiou worked with designers Parsons Brinkerhoff on all three projects. The basic philosophy behind a concrete post-tensioned tank is that the post-tensioning keeps the tank in. If the tank is in compression, it cannot crack and therefore there will be no leakage (i.e. no cracks no leaks). The pre-cast pre-stressed tanks are watertight and work with the natural durability of concrete (gets stronger when exposed to water over time). Bullabulling Tank is a 15ML ground level tank constructed to improve capacity for the Water Corporation s pipeline to Kalgoorlie. It is used to balance the demand of infrastructure in the area. Bullabulling was the first pre-cast post-tensioned tank constructed for Water Corporation and was completed in December Harvey Tank is a 32ML summit tank which has a storage capacity twice the size of Bullabulling and was the second tank constructed. Harvey stores water from the Southern Seawater Desalination Plant (SSDP) at Binningup. It was a critical component of the plant and needed to be fully commissioned before the SSDP could produce any water. Harvey was completed May Denmark Tank is a 15ML summit tank and almost identical in design to Bullabulling. The Denmark Tank was constructed to help meet water shortage demands and improve water infrastructure in the South West. Denmark was completed April 2011 This paper will discuss how Georgiou and Parsons Brinckerhoff provided Water Corporation with reliable long-term storage of large volumes of water in Western Australia.
2 INTRODUCTION Three recently constructed ground level tanks at Bullabulling, Denmark and Harvey in Western Australia have storage capacities between 15ML and 32 ML. The need for large and sustainable water tanks is becoming an increasing common demand in order to meet the population growth. Early prestressed tanks built in Australia prior to 1980 s were post-tensioned by winding galvanized high strength steel wires continuously around the tank from top to bottom and finished with sprayed concrete protection layer. This method of tank construction was adopted from United States where it is still being practiced. The Australian Standard AS 3735 for circular liquid retaining structures first published in 1988 requires bonded internal prestressing that meets durability requirements. Today, liquid retaining structures for water and waste water treatment plants have a choice of shape and can be designed as rectangular or circular. Furthermore, the owners of such key infrastructure expect it to be built cost efficiently, be an asset of low maintenance and have longer design life. Rectangular tanks are generally constructed in-situ using reinforced concrete and are therefore associated with higher construction costs. The wall height to length aspect ratio at each face is non-identical and analysis and design tools are available for determining stresses due to externally applied lateral hydrostatic load. Larger rectangular tanks consist of taller and thicker walls where temperature loading requires higher percentage of reinforcement. In contrast, a circular tank shape by nature is axi-symmetric and when subject to axisymmetric hydrostatic loading allows identical stress distribution and uniform thickness all around. Such tanks can be constructed either in reinforced concrete or post-tensioned where walls are symmetrically prestressed. Liquid retaining circular structures when prestressed allow the concrete to gain reserve compression capacity counteracting cracking. The prestressing option also provides the designer the ability to choose minimum wall thickness and accordingly reduce the impact of temperature loading. It is predominantly accepted by designers that prestressed circular tanks are the most efficient and the preferred shape for larger storage containers of present day treatment plants. Multi-cell circular donut shaped tanks under non-symmetrical loading conditions have been successfully designed and constructed using prestressed concrete in recent years. METHODS The three tanks discussed in this paper have been constructed to be cost effective through using horizontal prestressing of precast wall panels with in-situ wet-joint infill between them. The precast method provides faster construction and a higher level of quality control as the precast walls are fabricated in a controlled workshop environment. After prestressing, ducts containing the high strength steel strand wires are filled with cementicious grout acting as an additional layer of corrosion protection. Critical to the long term performance of the tank are the details of all vertical joints between precast
3 panels and wet-joints as well as horizontal joints at wall base and requires highperformance waterproof material. The design approach of all three tank walls is driven by the construction method. Precast wall panels are fabricated off site, delivered and then vertically positioned in a floor slab rebate. In the case of the Harvey Tank, which at 32ML is the largest of the three tanks mentioned in this paper, the tank consisted of: 60 standard precast panels which were 14 metres in height and weighed 20 tonnes; and 6 buttress panels which were 14 metres in height and weighed 47 tonnes. Figure 1. Buttress panels Once the precast panels were erected, the wet joints which stitch the precast panels together were poured in-situ to close up the tank structure. Following the completion of the tank wall erection, the entire wall is stressed in two stages: 1. During first stage of stressing where the walls are stressed to 50% capacity, the tank wall is free to slide within the footing rebate. At the completion of the first stage of stressing, the internal portion of the floor slab rebate is grouted to seal the gap between the wall and the floor slab. 2. The second stage of stressing where the walls are stressed to 100% capacity is applied only after the waterproofing and grouting of the internal portion of the floor slab rebate is complete. This places the internal grouting in compression to prevent cracking, and therefore leaking, through the wall / floor joint. The external portion of the floor slab rebate is then grouted to close out the wall / floor connection and this forms a pinned base condition. The level of prestressing and
4 wall base restrain conditions at each stage are modelled in the design and combined with other transient load effects that include temperature, swelling and shrinkage. Water Corporation s specification for three projects required the tank walls to be precast post-tensioned and designed to owners design manual DS61 which requires no residual tension in the tank wall under all loading conditions. Figure 2. Formwork and wet joint preparation works The design methodology for the three tanks is essentially a partial prestressed concrete design for horizontal stresses and a more conventional reinforced concrete design for vertical; but with a conservative approach to limits referred in AS 3735 to minimise risks. Under thermal load combination in hoop direction, the stresses remain well within allowable limits in the prestressed walls, with crack control over joints using normal reinforcements. The work on all three tanks incorporated a belts and braces approach to the wallfloor joint detail of the tank. In addition to the compression mechanical joint design mentioned above, the following was also incorporated: The use of hydrotite which was applied along the wall / floor joint; and The grout used at the wall / floor joint was enhanced with Xypex as an additional mechanism to prevent leakage through the joint. The two points above were also incorporated in the vertical wet joints. During the design phase of each of the three tanks, minor improvements were incorporated into each new design to improve both the cost efficiency and the constructability of the tank. This included:
5 Reduction of the post-tensioning duct sizes within the walls to prevent induced hairline cracking; Increasing the amount of reinforcement bar in the wet joints; and Installing localised wall thickenings within the wet joints to improve concrete placement and compaction. Figure 3. Harvey Water Tank - roof installation and panel completion works RESULTS AND DISCUSSION This paper describes design and construction aspects of three operational, large circular post-tensioned tanks which were successfully completed recently. The analysis and design of the tanks were driven by the construction method described in this paper and structurally modelled to represent wall boundary conditions at two stages of construction. Various loading conditions considered were hydrostatic pressure, prestressing, temperature, creep, shrinkage, wind and earthquake. The two dimensional models for axi-symmetric loadings and more accurate three dimensional finite element models for asymmetric loadings are most commonly used by engineers for similar tank design. All the three tank walls were horizontally prestressed and vertically reinforced. When concrete tanks are post-tensioned, they become more durable than reinforced concrete due to the presence of residual hoop compression. The design code requirements for crack width control are fulfilled by satisfying stresses in reinforcement steel to the specified limits.
6 The durability of prestressing strands is guaranteed by implementing best practice and high performance grouting procedures. The use of hydrotite sealants in combination with the Xypex admixture in grout for all in-situ joints have proven to be successful in waterproofing. For circular tanks with symmetrical load configuration, simplified analysis methods using 2-D software tools and design tables in Australian Standard AS 3735 have proven to demonstrate sufficient accuracy in comparison with more rigorous FEM analysis. The hoop stress and vertical bending moment plots are illustrated below in Figure 1 and 2. Figure 1: Harvey Tank - Variation in inside face hoop stress in full tank due to liquid, prestress, and positive temperature Figure 2: Harvey Tank - Variation in inside face hoop stress in full tank due to shortterm and long-term load combinations to AS 3735
7 Figure 3: Harvey Tank - Variation in vertical bending moment in full tank due to liquid, prestress, and positive temperature CONCLUSIONS The construction of pre-cast post-tensioned concrete tanks in Western Australia is proving to be a successful solution to the long-term water infrastructure requirements for the Water Corporation. The design has enabled the Contractor to provide tanks with a 100 year design life that need minimal maintenance due to the durable nature of concrete and the posttensioning to minimise the effects of concrete cracking. The examples at Bullabulling, Harvey and Denmark show that the design philosophy of no cracks no leaks is possible to construct through the use of a precast concrete system. REFERENCES 1. Australian Standard, Concrete structures for retaining liquids (AS 3735), Australian Standard, Concrete structures for retaining liquids commentary (supplement to AS 3735), 2001.
8 Figure 3. Aerial view of the completed storage tank
Chapter 2 Basis of design and materials
Chapter 2 Basis of design and materials 2.1 Structural action It is necessary to start a design by deciding on the type and layout of structure to be used. Tentative sizes must be allocated to each structural
More informationThe minimum reinforcement for the stem wall is the placement of:
PolySteel creates an ideal insulated stem wall for concrete slabs that can make this part of your project easier and faster, in addition to making your finished project more energy-efficient. Figures 3.20
More information9.3 Two-way Slabs (Part I)
9.3 Two-way Slabs (Part I) This section covers the following topics. Introduction Analysis and Design Features in Modeling and Analysis Distribution of Moments to Strips 9.3.1 Introduction The slabs are
More information1.2 Advantages and Types of Prestressing
1.2 Advantages and Types of Prestressing This section covers the following topics. Definitions Advantages of Prestressing Limitations of Prestressing Types of Prestressing 1.2.1 Definitions The terms commonly
More informationTechnical Notes 3B - Brick Masonry Section Properties May 1993
Technical Notes 3B - Brick Masonry Section Properties May 1993 Abstract: This Technical Notes is a design aid for the Building Code Requirements for Masonry Structures (ACI 530/ASCE 5/TMS 402-92) and Specifications
More informationCONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION
CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION General 7 www.meadowburke.com 877-518-7665 MB1109 CONCRETE FLOOR SLAB AND CASTING BED CONSTRUCTION Quality Construction Begins at Ground Level Everything
More informationSIKA AT WORK THE KAENG KRACHAN ELEPHANT HOUSE AT ZURICH ZOO
SIKA AT WORK THE KAENG KRACHAN ELEPHANT HOUSE AT ZURICH ZOO SIKA SYSTEMS FROM BASEMENT TO ROOF BASEMENT TO ROOF SOLUTIONS FOR ELEPHANT HOUSE AT ZURICH ZOO PROJECT DESCRIPTION The Kaeng Krachan Elephant
More informationThe following sketches show the plans of the two cases of one-way slabs. The spanning direction in each case is shown by the double headed arrow.
9.2 One-way Slabs This section covers the following topics. Introduction Analysis and Design 9.2.1 Introduction Slabs are an important structural component where prestressing is applied. With increase
More informationDraft Table of Contents. Building Code Requirements for Structural Concrete and Commentary ACI 318-14
Draft Table of Contents Building Code Requirements for Structural Concrete and Commentary ACI 318-14 BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE (ACI 318 14) Chapter 1 General 1.1 Scope of ACI 318
More informationStrengthening of Large Storage Tank Foundation Walls in an Aggressive Environment by External Post-tensioning. May 7th 2013: Dominique Deschamps
Strengthening of Large Storage Tank Foundation Walls in an Aggressive Environment by External Post-tensioning May 7th 2013: Dominique Deschamps Scope of the paper Presentation of the project Cause of cracks
More informationFUTURE SLAB. PENETRATIONS and. DEMOLITION of POST-TENSIONED FLOORS
FUTURE SLAB PENETRATIONS and DEMOLITION of POST-TENSIONED FLOORS 1.0 INTRODUCTION Post-tensioned floor slabs in Australia and South East Asia are now universally regarded as the most cost effective form
More informationPRESTRESSED CONCRETE. Introduction REINFORCED CONCRETE CHAPTER SPRING 2004. Reinforced Concrete Design. Fifth Edition. By Dr. Ibrahim.
CHAPTER REINFORCED CONCRETE Reinforced Concrete Design A Fundamental Approach - Fifth Edition Fifth Edition PRESTRESSED CONCRETE A. J. Clark School of Engineering Department of Civil and Environmental
More informationSettlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains
Settlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains Doug Jenkins 1, Chris Lawson 2 1 Interactive Design Services, 2 Reinforced
More informationSimplifying design and construction. Alan Tovey, Director The Basement Information Centre
Simplifying design and construction Alan Tovey, Director The Basement Information Centre Simplifying design and construction Grades of construction Construction options Design and waterproofing issues
More informationIssue of the Guidelines on Prevention of Water Seepage in New Buildings
graphic: Buildings Department Your REF 來 函 檔 號 :. OUR REF 本 處 檔 號 :.BD GR/1-55/173 FAX 圖 文 傳 真 :..28400451 TEL 電 話 :..2626 1717 www.info.gov.hk/bd To : All Authorized Persons 7 March 2005 Registered Structural
More informationJune 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL
7.0 7.1 GENERAL For the purpose of this manual, culverts are defined as structures that are completely surrounded by soil and located below the surface of the roadway parallel to the general direction
More informationHow To Build A Luxury Apartment Complex In London
Post Tensioning Awards 2009 Project Summary Type of structure Location Architects Structural Engineer Residential with leisure suites including Swimming pool, Cinema, Virtual Golf, Wine Cellars, and Parking
More informationDESIGN OF SLABS. 3) Based on support or boundary condition: Simply supported, Cantilever slab,
DESIGN OF SLABS Dr. G. P. Chandradhara Professor of Civil Engineering S. J. College of Engineering Mysore 1. GENERAL A slab is a flat two dimensional planar structural element having thickness small compared
More informationThe ACI 562 Repair Code
The ACI 562 Repair Code Code Requirements for Evaluation, Repair and Rehabilitation of Concrete Buildings by Keith Kesner 1 Chair ACI 562 Lawrence Kahn 2 Former Chair ACI 562 1. Associate WDP & Associates,
More informationWATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12
WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12 87 88 GOOD INDUSTRY PRACTICES 12 WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12.1 BACKGROUND Most roofs in Singapore are constructed using reinforced
More informationGuidelines for the Design of Post-Tensioned Floors
Guidelines for the Design of Post-Tensioned Floors BY BIJAN O. AALAMI AND JENNIFER D. JURGENS his article presents a set of guidelines intended to T assist designers in routine post-tensioning design,
More informationPrecast Concrete Parking Structures
Precast Concrete Parking Structures Durability starts at the joints BY DAVID C. MONROE AND JOSEPH L. WHITE Parking structures comprise the largest market segment for the structural precast, prestressed
More information8 EXTRA LIGHT GRC SANDWICH ELEMENTS FOR ROOFING IN INDUSTRIAL BUILDINGS
8 EXTRA LIGHT GRC SANDWICH ELEMENTS FOR ROOFING IN INDUSTRIAL BUILDINGS MARICA DELLA BELLA and DIEGO CIAN Precompressi Centro Nord S.p.A., Italy SUMMARY: Secondary roofing elements, complementary to the
More informationSikaProof A Technology
SikaProof A Technology The fully bonded waterproofing system Keep your basements durably and securely watertight What is SikaProof A? How does it work? Where can it be used? What are the advantages of
More information4B-2. 2. The stiffness of the floor and roof diaphragms. 3. The relative flexural and shear stiffness of the shear walls and of connections.
Shear Walls Buildings that use shear walls as the lateral force-resisting system can be designed to provide a safe, serviceable, and economical solution for wind and earthquake resistance. Shear walls
More informationWI LEY Blackwell. Multi-storey Precast Concrete Framed Structures. Colin K. Jolly MSc, PhD, CEng, MICE, FIStructE
Multi-storey Precast Concrete Framed Structures Kim S. Elliott BTech, PhD, CEng, MICE Colin K. Jolly MSc, PhD, CEng, MICE, FIStructE WI LEY Blackwell Contents Preface Notation Precast Concepts, History
More informationSECTION 33 05 16.13 PRECAST CONCRETE UTILITY STRUCTURES
SECTION 33 05 16.13 PRECAST CONCRETE PART 1 - GENERAL 1.01 SECTION INCLUDES A. This item shall consist of the construction of both sanitary and storm sewer precast concrete manholes in accordance with
More information16. Beam-and-Slab Design
ENDP311 Structural Concrete Design 16. Beam-and-Slab Design Beam-and-Slab System How does the slab work? L- beams and T- beams Holding beam and slab together University of Western Australia School of Civil
More informationWATERPROOFING SikaProof -A TECHNOLOGY
SikaProof -A TECHNOLOGY content What is SikaProof -A? 6 How does it work? 8 Where can it be used? 0 What are the advantages of SikaProof -A? 2 How should it be installed? SikaProof -A system components
More informationMeeting the Challenge of Pipeline Emergency Repair
Meeting the Challenge of Pipeline Emergency Repair Michael R. McReynolds, PE, SE 1 Tao Peng, PE, SE 2 ABSTRACTS The Metropolitan Water District of Southern California (MWD) is the nation s largest provider
More informationWaterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries
Waterproofing System for Wastewater Tanks in Petrochemical Industries and Refineries Introduction Wastewater of petrochemical industries and refineries contains high amounts of emulsified aliphatic or
More informationElevating Your House. Introduction CHAPTER 5
CHAPTER 5 Elevating Your House Introduction One of the most common retrofitting methods is elevating a house to a required or desired Flood Protection Elevation (FPE). When a house is properly elevated,
More information3 Masonry and Manufactured Stone (Interior and Exterior)
3 Masonry and Manufactured Stone (Interior and Exterior) 3.1 Efflorescence (a whitish crystalline powder) is present on masonry surfaces. Efflorescence commonly occurs on masonry surfaces. This is not
More informationConnex. Mortarless Masonry Block System
Connex Mortarless Masonry Block System Connex Mortarless block wall system from Boral The Boral Connex mortarless system comprises three modular components which key together eliminating the need for mortared
More informationCORROSION ENGINEERING RESIN-BASED POLYMER CONCRETES AND GROUTS
AN ERGONARMOR COMPANY TECHNICAL INFORMATION SPECIFICATION FOR INSTALLATION 07/11 SUPERSEDES 04/00 PAGE 1 OF 6 CORROSION ENGINEERING RESIN-BASED POLYMER CONCRETES AND GROUTS 1. SCOPE 1.1 This specification
More informationPRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE. By H P Gupta & D K Gupta
PRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE By H P Gupta & D K Gupta DIFFERENT TYPES OF DAMAGES 1.Minor cracks 0.5 to 5 mm wide in load or non-load bearing walls 2.Major
More informationDESIGN OF SLABS. Department of Structures and Materials Engineering Faculty of Civil and Environmental Engineering University Tun Hussein Onn Malaysia
DESIGN OF SLABS Department of Structures and Materials Engineering Faculty of Civil and Environmental Engineering University Tun Hussein Onn Malaysia Introduction Types of Slab Slabs are plate elements
More informationSECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)
SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains
More informationTECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE
TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE TECHNICAL SPECIFICATION PART 8000 - PRECAST CONCRETE TABLE OF CONTENTS Item Number Page 8100 PRECAST CONCRETE CONSTRUCTION - GENERAL 8-3 8101 General
More informationEmbedded Parts Introduction - Anchors
In the plant construction or process plants such as chemical, petrochemical, gas or power plants various disciplines are brought into contact and built on each other. Civil, mechanical, electro technical
More informationChapter 5 Bridge Deck Slabs. Bridge Engineering 1
Chapter 5 Bridge Deck Slabs Bridge Engineering 1 Basic types of bridge decks In-situ reinforced concrete deck- (most common type) Pre-cast concrete deck (minimize the use of local labor) Open steel grid
More informationFoundation Experts, LLC Specializes in Foundation Repair and Waterproofing
1 Most basements show some signs of leaking and cracking. Through the years, problems with water, poor soils, grading, drainage and possible settling affect the integrity of a basement. Being able to recognize
More informationHanson Building Products. precast basement solutions
Hanson Building Products precast basement solutions Hanson Building Products Basement Systems Add an extra dimension and combine the inherent flexible, structural and waterproof properties of concrete
More informationFORM DESIGN. easy to work with, and generally available.
Forms play a major role in concrete construction. They give the plastic concrete its shape and hold it until it hardens. Forms protect the concrete, assist in curing it, and support any reinforcing rods
More informationEAST LYME HIGH SCHOOL
Overview: 1971 N 1966 GYM 1966 CLASSROOM WING 1966 AUD. 1971 GYM 1998 1998 POOL EAST LYME HIGH SCHOOL Original 1966 Building: The original East Lyme High School was constructed in 1966 and was composed
More informationSLAB DESIGN. Introduction ACI318 Code provides two design procedures for slab systems:
Reading Assignment SLAB DESIGN Chapter 9 of Text and, Chapter 13 of ACI318-02 Introduction ACI318 Code provides two design procedures for slab systems: 13.6.1 Direct Design Method (DDM) For slab systems
More informationIf stepping is required, step at 180mm as seen in this picture.
Cast Foundations to standard building regulations requirements. Foundations must be cast completely level, 600mm wide by 230mm deep for single storey, double storey is not allowed by NHBRC. If stepping
More informationSECTION 7: C - STRUCTURAL ENGINEERS SPECIFICATIONS
SECTION 7: C - STRUCTURAL ENGINEERS SPECIFICATIONS SITE C SHOPPING CENTRE, KHAYELITSHA PROJECT NO 2369 Project Specification Refer all queries to: John Meiring Tel: +27 21 425 0065 REVISION P01 E-mail:
More informationExternal Wrapping of Steel Riser Pipe. Case Study HJ3 CS200902
External Wrapping of Steel Riser Pipe Case Study HJ3 CS200902 Introduction Refineries process a wide variety of petroleum products. As part of the process, they rely on cooling towers, which recycle water
More informationLAYING BLOCK AND BRICK
LAYING BLOCK AND BRICK Products highlighted in this section: SAKRETE Type N Mortar Mix SAKRETE Type S Mortar Mix Brick And Block Laying Basics The first step in building a brick or block wall is to construct
More informationPrestressed Concrete Pipe Fitness for Service and Repair
Prestressed Concrete Pipe Fitness for Service and Repair Rasko Ojdrovic rpojdrovic@sgh.com 781-907-9231 IAEA - EPRI 15 October 2014 www.sgh.com SGH Pipeline Experience More than 25 years of research, analysis,
More informationSeismic Analysis and Design of Steel Liquid Storage Tanks
Vol. 1, 005 CSA Academic Perspective 0 Seismic Analysis and Design of Steel Liquid Storage Tanks Lisa Yunxia Wang California State Polytechnic University Pomona ABSTRACT Practicing engineers face many
More informationWorld energy use is shifting from a primary focus
Development of large-scale precast, prestressed concrete liquefied natural gas storage tanks Kåre Hjorteset, Markus Wernli, Michael W. LaNier, Kimberly A. Hoyle, and William H. Oliver Conventional technology
More informationWATERPROOFING OF WET ROOMS
WATERPROOFING OF WET ROOMS Waterproofing under tiles For longterm enjoyment of a wetroom area a complete and resistant waterproofing system is an important precondition. Most tiles are by themselves waterproof
More informationDESIGN OF BLAST RESISTANT BUILDINGS IN AN LNG PROCESSING PLANT
DESIGN OF BLAST RESISTANT BUILDINGS IN AN LNG PROCESSING PLANT Troy Oliver 1, Mark Rea 2 ABSTRACT: This paper provides an overview of the work undertaken in the design of multiple buildings for one of
More informationARCHITECTURAL TECHNOLGY 4 ADVANCED CONSTRUCTION TECHNOLOGY BASEMENT CONSTRUCTION YEAR 3 SEMESTER 1 AIDAN WALSH R00060057. Lecturer: Jim Cahill
ARCHITECTURAL TECHNOLGY 4 ADVANCED CONSTRUCTION TECHNOLOGY BASEMENT CONSTRUCTION YEAR 3 SEMESTER 1 AIDAN WALSH R00060057 Lecturer: Jim Cahill 29 th November 2011 TABLE OF CONTENTS SUMMARY 1 MAIN BODY SECTION
More informationDetailing of Reinforcment in Concrete Structures
Chapter 8 Detailing of Reinforcment in Concrete Structures 8.1 Scope Provisions of Sec. 8.1 and 8.2 of Chapter 8 shall apply for detailing of reinforcement in reinforced concrete members, in general. For
More informationGuide for SOLID CONCRETE BLOCK SEALS
Guide for SOLID CONCRETE BLOCK SEALS July, 2006 Mine Safety and Health Administration SOLID CONCRETE BLOCK SEAL Formersection 30 CFR 75.335(a)(1) specifies requirements for seals constructed using solid
More informationconstructive solutions Fosroc total waterproofing protection of below-ground structures
constructive solutions Fosroc total waterproofing protection of below-ground structures Our profile Since the company s beginnings over 50 years ago, Fosroc has developed into an International leader in
More informationThe Strength of Concrete
Chapter The Strength of Concrete.1 The Importance of Strength.2 Strength Level Required KINDS OF STRENGTH. Compressive Strength.4 Flexural Strength.5 Tensile Strength.6 Shear, Torsion and Combined Stresses.7
More informationSTAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM
STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM Installed in Pre-engineered Steel Buildings Provides Lowest Cost Construction Method for CORROSIVE AND WET Environments PREFERRED SOLUTIONS, INC.
More informationCAUSES, EVALUATION AND REPAIR OF CRACKS IN CONCRETE
3.0 Causes and control of cracking: 3.1 Plastic Shrinkage Cracking: It occurs within 1 to 8 hours after placing, when subjected to a very rapid loss of moisture caused by a combination of factors, which
More informationPrestressed Storage Tanks
Prestressed Storage Tanks Mike Harper Regional Manager mike.harper@dntanks.com / 714 767 1313 Kevin Peacock Regional Manager kevin.peacock@dntanks.com / 949 698 2740 DN Tanks overview Construction Procedures
More informationThe Impact of Market Demands on Residential Post-Tensioned Foundation Design: An Ethical Dilemma
The Impact of Market Demands on Residential Post-Tensioned Foundation Design: An Ethical Dilemma Bart B. Barrett, B.S., P.E.1 Kerry S. Lee, M.B.A., P.E., M. ASCE2 Erik L. Nelson, Ph.D., P.E., M. ASCE3
More informationTechnical handbook Panel Anchoring System
1 Basic principles of sandwich panels 3 Design conditions 4 Basic placement of anchors and pins 9 Large elements (muliple rows) 10 Small elements (two rows) 10 Turned elements 10 Slender elements 10 Cantilevering
More informationFormwork for Concrete
UNIVERSITY OF WASHINGTON DEPARTMENT OF CONSTRUCTION MANAGEMENT CM 420 TEMPORARY STRUCTURES Winter Quarter 2007 Professor Kamran M. Nemati Formwork for Concrete Horizontal Formwork Design and Formwork Design
More informationNCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)
NCMA TEK National Concrete Masonry Association an information series from the national authority on concrete masonry technology CONCRETE MASONRY FOUNDATION WALL DETAILS TEK 5-3A Details (2003) Keywords:
More informationIntroduction. Eurocodes. Specification. Cost
Introduction Eurocodes Specification Cost Structural Eurocodes BS EN 1990 (EC0): BS EN 1991 (EC1): Basis of structural design Actions on Structures BS EN 1992 (EC2): BS EN 1993 (EC3): BS EN 1994 (EC4):
More informationCOPYRIGHT. Dincel Construction System Pty Ltd
WATERPROOF WALLS Dincel Construction System Pty Ltd 101 Quarry Road Erskine Park NSW 2759 PO Box 104, St Clair NSW 2759 Phone: (612) 9670 1633 Fax: (612) 9670 6744 Email: construction@dincel.com.au COPYRIGHT
More informationChapter 3 DESIGN AND CONSTRUCTION FEATURES IMPORTANT TO SEISMIC PERFORMANCE
Chapter 3 DESIGN AND CONSTRUCTION FEATURES IMPORTANT TO SEISMIC PERFORMANCE To satisfy the performance goals of the NEHRP Recommended Seismic Provisions, a number of characteristics are important to the
More informationDesign and Construction of Cantilevered Reinforced Concrete Structures
Buildings Department Practice Note for Authorized Persons, Registered Structural Engineers and Registered Geotechnical Engineers APP-68 Design and Construction of Cantilevered Reinforced Concrete Structures
More informationSIKABIT W-15 WET-BONDED WATERPROOFING MEMBRANE
SIKABIT W-15 WET-BONDED WATERPROOFING MEMBRANE BASEMENT WATERPROOFING INTRODUCTION Many different products are available for basement waterproofing. Considering ideal jobsite conditions (perfect substrate
More informationWORK SCOPE. Domains in which we work:
WORK SCOPE Engineering consulting, technical office, assistance and supervision in industrial works. We specialize in structures, civil works and industrial equipment. Domains in which we work: Industrial
More informationInvestigation of Foundation Failure. Step 1 - Data Collection. Investigation Steps
Foundations on Expansive Clay Soil Part 3 - Investigation of Failed Foundations Presented by: Eric Green, P.E. Structural Engineer Slide 1 Copyright Eric Green 2005 Investigation of Foundation Failure
More informationFire and Concrete Structures
Fire and Concrete Structures Authors: David N. Bilow, P.E., S.E., Director, Engineered Structures, Portland Cement Association 5420 Old Orchard Road, Skokie, IL 60077,Phone 847-972-9064, email: dbilow@cement.org
More informationRehabilitation Strategies for Bonded Concrete Overlays of Asphalt Pavements
University of Pittsburgh Rehabilitation Strategies for Bonded Concrete Overlays of Asphalt Pavements Authors: J. M Vandenbossche S. Sachs August 2013 1. Introduction Bonded concrete overlays of asphalt
More informationSafe & Sound Bridge Terminology
Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries
More informationAlways. Reliable. Tight. Wall sleeves Versatile solutions for building entries. cablepipebuildingentry+
Always. Reliable. Tight. Wall sleeves Versatile solutions for building entries. cablepipebuildingentry+ The wall sleeve The wall sleeve a largely unnoticed but very important sealing part. Wall sleeves
More informationHow to Identify, Evaluate & Repair Shrinkage Cracks in Poured Concrete
How to Identify, Evaluate & Repair Shrinkage Cracks in Poured Concrete What is concrete shrinkage cracking, how and where does it occur? Are concrete floor cracks a structural problem? How to recognize
More informationAluminium systems profile selection
Aluminium systems profile selection The purpose of this document is to summarise the way that aluminium profile selection should be made, based on the strength requirements for each application. Curtain
More information6 RETROFITTING POST & PIER HOUSES
Retrofitting Post & Pier Houses 71 6 RETROFITTING POST & PIER HOUSES by James E. Russell, P.E. 72 Retrofitting Post & Pier Houses Retrofitting Post & Pier Houses 73 RETROFITTING POST AND PIER HOUSES This
More informationVOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10
VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10 SECTION B1: PREPARATION GUIDE B1.1 INTRODUCTION... B1-1
More informationCode of Practice for Structural Use of Concrete 2013
Code of Practice for Structural Use of Concrete 2013 The Government of the Hong Kong Special Administrative Region Published: February 2013 Prepared by: Buildings Department 12/F-18/F Pioneer Centre 750
More informationSuccessful Approach to the Repair of Reinforced Concrete Support Structures in Delayed Coking Units
Successful Approach to the Repair of Reinforced Concrete Support Structures in Delayed Coking Units Thomas Kline Director- Concrete Repair Solutions STRUCTURAL TECHNOLOGIES, LLC Houston, Texas USA November
More informationDesign Manual to BS8110
Design Manual to BS8110 February 2010 195 195 195 280 280 195 195 195 195 195 195 280 280 195 195 195 The specialist team at LinkStudPSR Limited have created this comprehensive Design Manual, to assist
More informationSIMPLE SAVER SYSTEM DESIGN MANUAL
SECTION 5: BAR JOIST CONSTRUCTION DETAILS SIMPLE SAVER SYSTEM DESIGN MANUAL Call Toll-free: 1-800-255-0776 Fax: 1-402-454-2708 E-mail us at: custserv@thermaldesign.com SIMPLE SAVER SYSTEM DESIGN MANUAL
More informationConcrete Waterproofing Systems. Integral Protection. www.tritonsystems.co.uk
Concrete Waterproofing Systems Integral Protection n Type B Integral Protection in accordance with BS 8102 (2009) n Unique chemical admix for waterproofing and protection of concrete n A complete and permanent
More information1.054/1.541 Mechanics and Design of Concrete Structures (3-0-9) Outline 1 Introduction / Design Criteria for Reinforced Concrete Structures
Prof. Oral Buyukozturk Massachusetts Institute of Technology Outline 1 1.054/1.541 Mechanics and Design of Concrete Structures (3-0-9) Outline 1 Introduction / Design Criteria for Reinforced Concrete Structures
More informationConstruction. SikaProof A-08 Edge, A-12 Edge. Fully bonded FPO sheet membrane in L-shape for the SikaProof A waterproofing system. Product Description
Product Data Sheet Edition 15/10/2014 Identification no: 02 07 04 10 300 0 000002 SikaProof A Edge SikaProof A-08 Edge, A-12 Edge Fully bonded FPO sheet membrane in L-shape for the SikaProof A waterproofing
More informationThe bonded waterproof membrane, which can be verified by non destructive means DENSARE -2002. 18/14 IHö/JP/KK
The bonded waterproof membrane, which can be verified by non destructive means DENSARE -2002 18/14 IHö/JP/KK The bonded waterproof membrane, which can be verified by non destructive means DENSARE -2002
More informationFire Preventive and Fireproof Performance Test and Evaluation Procedure Manual
BR BO-01-02 Effective from June 1, 2000 Revision: March 26, 2002 Fire Preventive and Fireproof Performance Test and Evaluation Procedure Manual (Unofficial Manual) Technical Appraisal Department, Building
More informationDesign of Steel Structures Prof. S.R.Satish Kumar and Prof. A.R.Santha Kumar. Fig. 7.21 some of the trusses that are used in steel bridges
7.7 Truss bridges Fig. 7.21 some of the trusses that are used in steel bridges Truss Girders, lattice girders or open web girders are efficient and economical structural systems, since the members experience
More information4.3.5 - Breakaway Walls
4.3.5 - Breakaway Walls Elevation of a structure on a properly designed foundation reduces the potential for water damage from flooding. When the space below the lowest elevated floor is maintained free
More informationFigure A. Maximum load testing of new precast concrete floor plank system
Load Testing of Precast Concrete Plank By Peter Gorgas, E.I.T. Figure A. Maximum load testing of new precast concrete floor plank system Overview Testing was performed in July 2012 at Northeast Precast
More informationStructural use of concrete
BRITISH STANDARD Incorporating Amendments Nos. 1, 2 and 3 Structural use of concrete Part 1: Code of practice for design and construction ICS 91.080.40 This British Standard, having been prepared under
More informationCCU Engineering Specifications. Section 003300 PRECAST CONCRETE PRODUCTS
CCU Engineering Specifications Section 003300 Effective Date: Nov. 1st, 2011 Page 1 of 5 PRECAST CONCRETE PRODUCTS PART 1 - GENERAL The following specification is intended for use for the design, selection
More informationHIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS
BSW HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS BSW is a fully reinforced Pre-Applied system membrane designed for horizontal and vertical external blind-side
More information7. Installation. installation 7.1.1. CAST-IN WINDOW SYSTEM 7.1. INSTALLATION OF WINDOW MAIN FRAME
7. Installation Window involves the fixing of window frame at an earlier construction stage and subsequent of the window sashes. This is a highly workmanship dependent process. Only trained and approved
More informationComposite Panel Firewall Systems
Composite Panel Firewall Systems part of the Protecting more than your business Insulated mineral fibre panels have excellent thermal and acoustic properties, ideal for factory and office partition walls.
More informationIndex 20010 Series Prestressed Florida-I Beams (Rev. 07/12)
Index 20010 Series Prestressed Florida-I Beams (Rev. 07/12) Design Criteria AASHTO LRFD Bridge Design Specifications, 6th Edition; Structures Detailing Manual (SDM); Structures Design Guidelines (SDG)
More information