1 COMPLIANCE / ENGINEERING / REMEDIATION Contact us: LT Environmental, Inc PROJECT DESCRIPTIONS COLORADO OIL AND GAS CONSERVATION COMMISSION (COGCC) PROJECTS PHASE II SEEP INVESTIGATION RATON BASIN, COLORADO LTE teamed with Apogee to complete a methane seep investigation for the COGCC. This project incorporated many of the same aspects as those defined Rule 608. Apogee conducted a mobile survey of the area using a truckmounted IRS to locate methane seeps and LTE analyzed the data and performed field verification of methane seeps. Approximately 3,200 miles of roads in the Raton Basin were surveyed and 59 methane seeps were identified. Of the 59 seeps identified, detailed mapping identified 55 sites for field investigation. LTE performed the detailed mapping of the methane seep sites where access was granted. The investigation identified 35 of the 55 sites mapped contained active methane seepage.
2
3 COGCC EMERGENCY RESPONSE FUND WELL INVESTIGATION SOUTHEAST AND SOUTHWEST COLORADO LTE was retained by COGCC to conduct soil gas surveys under the Emergency Response Fund for 48 orphaned plugged and abandoned (P&A) wells in the southeast region of Colorado and 38 orphaned P&A wells in the southwest region of Colorado. LTE researched the COGCC online database to review files for orphan well sites and any relevant information to the location and boundaries of the well site and/or associated wellhead. LTE also used aerial photography, interviews with landowners, COGCC databases, and field observations to identify and locate well sites. This information was incorporated into the GIS and used to develop a sampling grid for each well site. Results were sent to landowners and the COGCC summarized the findings of the investigations. LTE sent the data to COGCC in an electronic deliverable format.
4
5 METHANE SEEP INVESTIGATION RATON BASIN, COLORADO LTE and Apogee conducted independent methane seep investigations at the Primero High School in Weston, Colorado at the request of the COGCC. The purpose of the investigation was to determine if methane seeps were occurring in an area where several sensitive receptors (school and teacher residences) had been identified. Apogee conducted a mobile survey of the area using a truckmounted IRS to locate methane seeps and LTE inspected the interior structures at the school and residences for the presence of methane, define the extent of any methane seeps identified on the property, and assess potential risk to nearby receptors by collecting shallow soil gas samples using a slide-hammer and rod, hand-held field gas meter, and a GPS. Both the Apogee and LTE surveys detected methane gas in the vicinity of the bus barn at the site. A follow-up field mapping survey of the site was conducted by LTE. Results indicated that methane gas continues to seep in the area around the bus barn. This project demonstrates the ability of the LTE/Apogee team to work in tandem to efficiently and systematically identify, define, and assess methane gas seeps in the Raton Basin.
6
7 METHANE SEEP MAPPING AND MITIGATION RATON BASIN, COLORADO LTE was contracted by the COGCC to conduct an initial reconnaissance methane seep survey at two residences located in the Purgatoire River Valley in the Raton Basin, Colorado. The survey included the collection of approximately 30 subsurface gas measurements around and inside the residential structures, including the basement/crawlspace areas. A second survey included investigations of the entire property with the collection of more than 200 measurements on a grid system, mapping of vegetative features indicative of methane seepage, mapping of visible seeps in surface water bodies and additional gas sampling from within seep area. The survey identified several methane seep areas across the 55-acre parcel of land. The surveys identified the presence of elevated methane concentrations in the soil surrounding the structures as well as in the ambient air within the basement/crawlspace areas. Analytical results indicated the presence of thermogenic methane at the seep area. LTE designed and installed methane detection systems within the two residences to warn the occupants if and when methane gas concentrations in the ambient air approached the lower explosive limit. LTE designed and installed two active methane mitigation systems to ventilate the basement/crawlspace of each structure with ducting fans that were actuated by the previously installed detection system to prevent the accumulation of explosive vapors. To date, the systems have been effective at preventing the buildup of explosive vapors. This project incorporated extensive detailed seep mapping in compliance with Rule 608.
8 PRIVATE RESIDENCE EMERGENCY RESPONSE INVESTIGATION LAS ANIMAS COUNTY, COLORADO LTE was contracted by COGCC to investigate the cause of a house explosion in Las Animas County, Colorado, suspected to be the result of methane gas. In order to identify potential sources of methane gas, nearby water wells, coal outcrops, nearby producing gas wells, a mine core hole, and plugged and abandoned production wells were reviewed. As part of the investigation, a soil gas survey was conducted at a private residence, nearby plugged and abandoned production wells, and a mine core hole. The soil gas was characterized and analyzed. The horizontal extent of the seepage was investigated using a grid pattern to place borings. A follow-up survey was performed near plugged and abandoned wells to confirm the extent of the methane seepage. GPS data was used to log points and a four-gas meter was
9 used to collect subsurface methane, oxygen, carbon dioxide, and hydrogen sulfur gas concentrations. A mine core hole was also investigated as a potential source of methane gas. Survey methods and field confirmation did not suggest the presence of a methane source. Water well investigations, inspection of residences in close proximity of the private residence, a surface geology reconnaissance were also conducted as possible sources of methane gas.
10
WHAT YOU NEED TO KNOW ABOUT LIVING NEAR INDIANA COAL MINES
WHAT YOU NEED TO KNOW ABOUT LIVING NEAR INDIANA COAL MINES Who Should Read This Guide? Home Buyers/Owners Lending Institutions Landowners Developers Local Officials Construction Design Realtors Companies
More informationRural Residential Buildable Lands Inventory
The Dalles Periodic Review, May 2013 Rural Residential Lands Inventory Contents Introduction and Summary... 1 Concerns related to the 2007 Analysis... 2 Rural Residential Capacity Summary... 2 Methodology...
More informationWeed Survey and Mapping
Weed Survey and Mapping The primary objective of weed surveying and mapping is to accurately identify and delineate land with populations of invasive plants or noxious weeds. These surveys allow land managers
More informationAPPENDIX D RISK ASSESSMENT METHODOLOGY
APPENDIX D RISK ASSESSMENT METHODOLOGY There are numerous human-health and ecological issues associated with the construction and operation of any large coal-fueled electric power generation facility.
More informationJanuary 2014: Jeanne Briskin of the U.S Environmental Protection Agency (EPA)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 The Upstate New York Society for Risk Analysis Webinar Series, Scientific Studies on Impact of Natural Gas Extraction from
More informationCombustible Soil Gas Hazard Mitigation
ORANGE COUNTYFIRE AUTHORITY Planning & Development Services Section 1 Fire Authority Road, Building A Irvine, CA 92602 714-573-6100 www.ocfa.org Combustible Soil Gas Hazard Mitigation Guideline C-03 January
More informationTABLE OF CONTENTS. GENERAL PROJECT INFORMATION...3 Project Location... 3 Project Description... 3 STUDY OVERVIEW... 3 SITE EVALUATION TECHNIQUES...
App. P-2 TABLE OF CONTENTS GENERAL PROJECT INFORMATION...3 Project Location... 3 Project Description... 3 STUDY OVERVIEW... 3 SITE EVALUATION TECHNIQUES...4 SITE CONDITIONS... 4 Land Use and Zoning...
More informationSite Assessment for the Proposed Coke Point Dredged Material Containment Facility at Sparrows Point
Site Assessment for the Proposed Coke Point Dredged Material Containment Facility at Sparrows Point Prepared for Maryland Port Administration 2310 Broening Highway Baltimore, MD 21224 (410) 631-1022 Maryland
More informationSite Description and History
3130 Southwest 17 th Street Pembroke Park, Florida County: Broward District: Southeast Site Lead: EPA Placed on National Priorities List: July 22, 1987 HWC # 023 Site Description and History The Petroleum
More informationThe WOGCC has 41 full-time employees, an Assistant Attorney General, and a contracted hydrogeologist.
Wyoming Oil & Gas Conservation Commission Strategic Plan Update: January 1, 212 through December 31, 212 Quality of Life Result: Wyoming s natural resources are managed to maximize the economic, environmental
More informationTurning Brownfields into Clean Energy. Today s Discussion
Turning Brownfields into Clean Energy NOVEMBER 18, 2009 Today s Discussion Chesapeake Energy: Who are we? Barnett Shale overview What lead us to purchase Brownfields? Making a positive impact in Fort Worth
More informationRule 318A.f: Rule Description
COGCC OPERATOR GUIDANCE RULE 318A.f GROUNDWATER BASELINE SAMPLING AND MONITORING Document Control: Created Date: August 18, 2015 Last Updated Date: September 21, 2015 Last Updated By: Arthur Koepsell Review
More informationAESTHETIC AND NOISE CONTROL REGULATIONS
AESTHETIC AND NOISE CONTROL REGULATIONS 801. INTRODUCTION The rules and regulations in this section are promulgated to control aesthetics and noise impacts during the drilling, completion and operation
More information2011 Operations, Maintenance, Monitoring and Rehabilitation Plan
State of Louisiana Coastal Protection and Restoration Authority of Louisiana 2011 Operations, Maintenance, Monitoring and Rehabilitation Plan for East Marsh Island Marsh Creation State Project Number TV-21
More informationBLUE ISLAND NORTHEAST MIXED-USE COMMERCIAL PARK 119TH STREET & VINCENNES AVENUE BLUE ISLAND, COOK COUNTY, ILLINOIS
DRAFT ANALYSIS OF BROWNFIELDS CLEANUP ALTERNATIVES BLUE ISLAND NORTHEAST MIXED-USE COMMERCIAL PARK 119TH STREET & VINCENNES AVENUE BLUE ISLAND, COOK COUNTY, ILLINOIS PREPARED BY: Office of Sustainability
More informationGreenPlanIT LID Site Suitability Tool. Patty Frontiera, pattyf@sfei.org Pete Kauhanen, petek@sfei.org Marshall Kunze, marshallk@sfei.
GreenPlanIT LID Site Suitability Tool Patty Frontiera, pattyf@sfei.org Pete Kauhanen, petek@sfei.org Marshall Kunze, marshallk@sfei.org GreenPlanIT TAC Meeting, 06/17/2014 LID Site Suitability Tool Talk
More informationRisk Based Inspections Implementation Plan. Operator Outreach August 19, 2014
Risk Based Inspections Implementation Plan Operator Outreach August 19, 2014 Overview Senate bill 2013-02. Directed to adopt a risk based approach for inspecting oil and gas locations. Focus on high risk
More informationA Guide to Understanding SBA Environmental Due Diligence for Commercial Properties
A Guide to Understanding SBA Environmental Due Diligence for Commercial Properties Partner Engineering and Science has prepared this guide to provide you with information that explains; Why SBA requires
More informationnumber 2) proposed well's type, location, elevation, total depth, etc. 3) site inspection, 2) assess the adequacy of the proposed engineering
APPENDIX 8 - FORMS USED IN THE OIL, GAS AND SOLUTION MINING PROGRAM Application for Permit to Drill, Deepen, Plug Back or Convert a Well Subject to the Oil, Gas and Solution Mining Law (185-12-5). - Applicant
More informationRequest for Proposals for Topographic Mapping. Issued by: Teton County GIS and Teton County Engineering Teton County, Wyoming
Request for Proposals for Topographic Mapping Issued by: Teton County GIS and Teton County Engineering Teton County, Wyoming Proposals due: 2:00PM MDT July 1, 2015 Proposals may be delivered to: Teton
More informationSoil and Materials Engineers, Inc. Mark J. Quimby Project Consultant
Soil and Materials Engineers, Inc. Mark J. Quimby Project Consultant Michigan Indiana Ohio www.sme-usa.com consultants in the environment, geosciences and materials OVERVIEW Site Description and History
More informationWHAT IS GIS - AN INRODUCTION
WHAT IS GIS - AN INRODUCTION GIS DEFINITION GIS is an acronym for: Geographic Information Systems Geographic This term is used because GIS tend to deal primarily with geographic or spatial features. Information
More information2500 Mandatory Setback from Oil and Gas Development
Colorado Oil & Gas Conservation Commission 2500 Mandatory Setback from Oil and Gas Development GIS-based assessment of impact proposed 2016 Colorado ballot initiative #78 would have on surface lands available
More informationN O T E S. Environmental Forensics. Identification of Natural Gas Sources using Geochemical Forensic Tools. Dispute Scenarios
Environmental Forensics N O T E S V o l u m e 2 9 Identification of Natural Gas Sources using Geochemical Forensic Tools By Paul Boehm, Ph.D. and Tarek Saba, Ph.D. F o r m o r e i n f o r m a t i o n o
More informationV. ENVIRONMENTAL IMPACT ANALYSIS E. Hazardous Materials
E. HAZARDOUS MATERIALS An Environmental Site Assessment Phase I Update was performed on the subject properties by California Environmental Inc. in March 2000 1. This report is included in Appendix E of
More informationExploration. Exploration methods
Exploration Activities related to establishing a mineral deposit through geological, geophysical and geochemical methods. It is preceded by Prospecting and followed by Planning & Development. Geological
More informationMITIGATION MONITORING PROGRAM (Accompanies the Van Nuys Fire Station 39 Initial Study/Mitigated Negative Declaration)
MITIGATION MONITORING PROGRAM (Accompanies the Van Nuys Fire Station 39 Initial Study/Mitigated Negative Declaration) Van Nuys Fire Station 39 W.O. E170094B The California Environmental Quality Act (CEQA)
More informationFINAL PLAN OF REMEDIAL ACTION
FINAL PLAN OF REMEDIAL ACTION 1000 FRENCH STREET SITE Wilmington, Delaware DE 1115 June 1999 Department of Natural Resources and Environmental Control Division of Air and Waste Management Site Investigation
More informationOn Site Sewage System Maintenance Inspections. March 2011. Building and Development Branch Ministry of Municipal Affairs and Housing
On Site Sewage System Maintenance Inspections March 2011 Building and Development Branch Ministry of Municipal Affairs and Housing Introduction The Building Code Act, 1992 and Building Code (Ontario Regulation
More informationRisk Management Procedure For The Derivation and Use Of Soil Exposure Point Concentrations For Unrestricted Use Determinations
Risk Management Procedure For The Derivation and Use Of Soil Exposure Point Concentrations For Unrestricted Use Determinations Hazardous Materials and Waste Management Division (303) 692-3300 First Edition
More informationRELEASE TRACKING NUMBER 4-19466 December 2010. Prepared For: New England Gas Company P.O. Box 911 Fall River, Massachusetts 02722.
RELEASE ABATEMENT MEASURE COMPLETION REPORT REGULATOR DECOMMISSIONING AND WATER SERVICE LINE REPAIR 120 CHARLES STREET FALL RIVER, MASSACHUSETTS RELEASE TRACKING NUMBER 4-19466 December 2010 Prepared For:
More informationSuccessful Management of Database Changes and Workflow. Chris Mickle Charles Richardson
Successful Management of Database Changes and Workflow Chris Mickle Charles Richardson International Conference for Environmental Data Management. May 14, 2014 Agenda > About Cardno > Overview DBTracker
More informationTreatment, Beneficial Use and Management of CBM Produced Water Industry Perspective
IP/BEC - Challenges and Opportunities of IP/BEC Challenges and Opportunities of Treatment, Beneficial Use and Management of CBM Produced Water Industry Perspective Forward-Looking Statements Except for
More informationE.2 Report of Methane Gas Assessment
E.2 Report of Methane Gas Assessment August 23, 2011 Via Electronic Mail Ms. Sharon Christenbury, Esq. SM 10000 Property, LLC 2200 Biscayne Boulevard Miami, Florida 33137 Re: Report of Methane Gas Assessment
More informationNegotiating Pipeline Easements
FACT SHEET Ohio State University Extension, 2120 Fyffe Road, Columbus, OH 43210 Introduction Shale Oil and Gas Development Fact Sheet Series Negotiating Pipeline Easements Peggy Kirk Hall Director, OSU
More informationDID YOU KNOW... THE IMPACT OF ON-SITE SEWAGE SYSTEMS AND ILLICIT DISCHARGES ON THE ROUGE RIVER
DID YOU KNOW... THE IMPAT OF ON-SITE SEWAGE SYSTEMS AND ILLIIT DISHARGES ON THE ROUGE RIVER by Barry Johnson, P.E., M.S., amp Dresser & McKee and Dean Tuomari, Wayne ounty Department of Environment The
More informationExcerpts for Rock Talk Vol 7 No.2 Colorado Geological Survey
Excerpts for Rock Talk Vol 7 No.2 Colorado Geological Survey Oil, petroleum, hydrocarbon words that have become popular in our modern-day vernacular, but what do they really mean to us? What is oil? How
More informationDrill-Right. best Oil & Gas Development Practices for Texas
EXAS Drill-Right Texas best Oil & Gas Development Practices for Texas Drill-Right Texas best Oil & Gas Development Practices for Texas P. O. Box 470567 Fort Worth, Texas 76147 940-389-1622 Texas Oil &
More informationDraft Environmental Impact Statement. PORT OF OSWEGO AUTHORITY Lead Agency, State Environmental Quality Review Act
CENTERSTATE NY INLAND PORT DRAFT SCOPING DOCUMENT FOR THE Draft Environmental Impact Statement PORT OF OSWEGO AUTHORITY Lead Agency, State Environmental Quality Review Act SEPTEMBER 30, 2015 INTRODUCTION
More informationAN AEM TOOL FOR THE EVALUATION OF UNDESIGNED WASTE STORAGE FACILITIES
AN AEM TOOL FOR THE EVALUATION OF UNDESIGNED WASTE STORAGE FACILITIES REFERENCE National Handbook of Conservation Practices Code NY313 Waste Storage Facility. INTRODUCTION CAFO permits require an Agricultural
More informationColorado Coal Mines Activity Status
Colorado Coal Mines Activity Status Bowie No. 2 Mine (Producing) C-1996-083 Delta County Company Name: Bowie Resources, LLC Bowie No. 2 2011 Production: 2,235,055 tons No. Miners 319 8,300.5 (3,998.0 BLM
More informationState of Colorado Oil and Gas Conservation Commission 1120 Lincoln Street, Suite 801, Denver, Colorado 80203 Phone: (303) 894-2100 Fax: (303) 894-2109
FORM INSP Rev 05/11 State of Colorado Oil and Gas Conservation Commission 1120 Lincoln Street, Suite 801, Denver, Colorado 80203 Phone: (303) 894-2100 Fax: (303) 894-2109 DE ET OE ES Inspection 04/24/2015
More informationTHE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION
THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION GROUP 867 ARCHITECTURAL, ENGINEERING AND OTHER TECHNICAL SERVICES Excerpt from CPCprov-en-Publication.doc - United Nation Statistic Division Group Class Subclass
More informationWyoming Idle and Orphan Well Draft Plan. Table of Contents
Wyoming Idle and Orphan Well Draft Plan December 9, 2013 Table of Contents Introduction... 2 How many idle and orphan wells are there?... 3 Recommendations... 4 Federal Orphan Wells... 5 Recommendation...
More informationDefence College of Technical Training. Former RAF Lyneham Geo-Environmental Report 32655 Appendix D: Preliminary Qualitative Risk Assessment
Item No. Area/ Building Pathway to 1 Identified areas of / (redevelopment Ingestion Inhalation Severe Likely High SKM Enviros desk study highlights several known areas of significant historical. Areas
More informationWhat Constitutes Environmental Due Diligence?
What Constitutes Environmental Due Diligence? Different Levels of Due Diligence for Different Types of Acquisitions: Green Fields, Brownfields, Operating Terminals and Leases By Gail A. Corrigan, Corrigan
More informationAlluvial Fan Mapping and Risk Assessment
Alluvial Fan Mapping and Risk Assessment Army Corps of Engineers: Webinar Week 12:30PM (MST) 08.21.2013 Silver Jacket Conference Idaho Department of Water Resources Boise, Idaho Overview PROJECT OVERVIEW
More informationSHOULD I PURCHASE MINE SUBSIDENCE INSURANCE?
SHOULD I PURCHASE MINE SUBSIDENCE INSURANCE? Understanding Mine Subsidence Determining Mine Locations Obtaining Mine Subsidence Insurance ILLINOIS MINE SUBSIDENCE INSURANCE FUND OVERVIEW This information
More informationThe Basics of Natural Gas
264 Natural Gas: What You Should Know Don MacBride Click to insert presenters Thursday, March 29, 1:15 to 2:15 p.m. Click to insert session day, date and time The Basics of Natural Gas Presented by: Don
More informationCity of Colleyville Community Development Department. Site/Landscape Plan Application Packet
City of Colleyville Community Development Department Site/Landscape Plan Application Packet Development Application Fees City of Colleyville 100 Main Street Colleyville TX 76034 817.503.1050 Zoning Zoning
More informationDocument Control: Created Date: December 17, 2015 Last Updated Date: December 17, 2015
COGCC OPERATOR GUIDANCE RULE 1001.c: RECLAMATION VARIANCES AND WAIVERS Document Control: Created Date: December 17, 2015 Last Updated Date: December 17, 2015 Last Updated By: Dave Kulmann Review Cycle:
More informationThink About Energy Summit
Think About Energy Summit Richard Wobbekind Senior Associate Dean Executive Director Business Research Division Leeds School of Business Mining GDP, Employment, and Wages Share of Colorado Economy GDP
More informationLand contamination Information requirements for planning applications Version 0.05
Land contamination Information requirements for planning applications Version 0.05 May 2015 Table of contents Introduction Outlines the intent of this guidance and defines key terms Required information
More informationMissouri Regions Shaped by Land Forms and Geology
Missouri Regions Shaped by Land Forms and Geology Lesson Abstract Summary: MO GLE: Subject Areas: The students will use various resources to compare and contrast the geology of each Missouri region to
More informationTEXAS: SAN ANTONIO San Antonio Protects Edwards Aquifer
TEXAS: SAN ANTONIO San Antonio Protects Edwards Aquifer Background San Antonio, the seventh largest city in the United States, covers approximately 515 square miles of Bexar County in south central Texas.
More informationPIPELINE ROUTING PERMIT. For A NATURAL GAS PIPELINE DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY
PIPELINE ROUTING PERMIT For A NATURAL GAS PIPELINE IN DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY PUC DOCKET No. G002/GP-05-1706 In accordance with the requirements
More informationOil and Gas Exploration and Production Oil and gas exploration and production... 22a-472-1
Department of Environmental Protection Sec. 22a-472 page 1 (4-97) TABLE OF CONTENTS Oil and Gas Exploration and Production Oil and gas exploration and production... 22a-472-1 Department of Environmental
More informationFDIC ENVIRONMENTAL CHECKLIST OF. FDIC Asset Number 88310023. Multi-Family Residence 2120 South Fairfield Avenue Chicago, Illinois
FDIC ENVIRONMENTAL CHECKLIST OF FDIC Asset Number 88310023 Multi-Family Residence 2120 South Fairfield Avenue Chicago, Illinois ATC Project Number 301.75462.0102 September 29, 2012 Prepared by: Prepared
More informationATTACHMENT F ONSHORE PIPELINES DECOMMISSIONING GUIDELINE 1. INTRODUCTION
ATTACHMENT F ONSHORE PIPELINES DECOMMISSIONING GUIDELINE 1. INTRODUCTION After concession is expired or at the end of its economic life, pipeline network and all associated structures are due for decommissioning
More informationMAPPING MINNEAPOLIS URBAN TREE CANOPY. Why is Tree Canopy Important? Project Background. Mapping Minneapolis Urban Tree Canopy.
MAPPING MINNEAPOLIS URBAN TREE CANOPY Why is Tree Canopy Important? Trees are an important component of urban environments. In addition to their aesthetic value, trees have significant economic and environmental
More informationConfined Space Entry Procedure Worksheet
1. Location Exact name and location of space to be entered. Confined Space Entry Procedure Worksheet 2. Hazard Identification & Determination - (circle all that apply) a. Tasks to be performed. Welding/Cutting
More informationThe Water Cycle Now You See It, Now You Don t
The Water Cycle Now You See It, Now You Don t Unit: Salinity Patterns & the Water Cycle l Grade Level: Elementary l Time Required: Introduction - 30 min. - Activity as groups 45min Wrap Up 20 min l Content
More informationPreliminary Assessment
Preliminary Assessment Bonebrake Theological Seminary Site Dayton Unit III Dayton, Ohio Prepared by: U.S. Army Corps of Engineers Buffalo District 1776 Niagara Street Buffalo, NY 14207-3199 September 5,
More informationBritish Columbia s Clean Energy Vision
British Columbia s Clean Energy Vision Innovative Technologies and Green Energy Solutions National Environmental Conference Brunei Darussalam July 1, 2010 Profile of British Columbia Overview British
More informationComanche Trail Pipeline Project. September 2015
Comanche Trail Pipeline Project September 2015 2 Comanche Trail Pipeline Project The Comanche Trail Pipeline is a Texas intrastate pipeline (1) designed to transport 1.1 billion cubic feet per day of clean-burning
More informationHazardous Materials in Project Development
Hazardous Materials in Project Development Environmental Documentation TxDOT Environmental Affairs Division Release Date: 2/2014 510.01.DS Version 1 Table of Contents Overview... 3 Assessment Type and/or
More informationDescription of Simandou Archaeological Potential Model. 13A.1 Overview
13A Description of Simandou Archaeological Potential Model 13A.1 Overview The most accurate and reliable way of establishing archaeological baseline conditions in an area is by conventional methods of
More informationProposed Wireless Telecommunications Facility
Attachment 5 Visual Resource Evaluation Report Proposed Wireless Telecommunications Facility AT&T Site ID: SR1038 National Guard Armory 284 New Canaan Avenue (Route 123) Norwalk, Connecticut Prepared for
More informationGeologic Criteria for Eastern Kentucky Permanent CO 2 Storage (Saline reservoir test)
Geologic Criteria for Eastern Kentucky Permanent CO 2 Storage (Saline reservoir test) Stephen Greb Warren Anderson Kentucky Geological Survey House Bill 1 $5 million appropriated to research use and storage
More informationSTATEMENT OF SHARON BUCCINO SENIOR ATTORNEY NATURAL RESOURCES DEFENSE COUNCIL WASHINGTON, DC
STATEMENT OF SHARON BUCCINO SENIOR ATTORNEY NATURAL RESOURCES DEFENSE COUNCIL WASHINGTON, DC Good morning. My name is Sharon Buccino. I am an attorney with the Natural Resources Defense Council (NRDC).
More informationThe total mine drainage flow in the Mahanoy Creek watershed is 84.32 MGD. Of the thirty-one discharges in the watershed, only twelve discharges
POLLUTION SOURCES There are two major sources of pollution in the study area. These sources are coal mine drainage and raw sewage. Two additional sources of pollution, silt content in streams and leachates
More informationDRAFT SOUTH FORK SKYKOMISH RIVER
DRAFT SOUTH FORK SKYKOMISH RIVER 9 levees and revetments / Approximately 1.1 miles of river bank are armored Revetments provide limited, localized erosion protection, but impact habitat Frequent and costly
More informationA Guide to Development of Land over Natural Gas Pipeline Rights-of-Way
A Guide to Development of Land over Natural Gas Pipeline Rights-of-Way 1 Introduction Q uestar Corporation is an integrated natural gas company headquartered in Salt Lake City, Utah. Through subsidiaries
More informationSite No 17 Former Weston Vinyls Site, Frome Location
Location Former Weston Vinyls site is situated on the A362 Vallis Road in the Western Part of Frome. The surrounding uses are primarily residential with residential to the North East and West. The Vallis
More informationGAO OIL AND GAS BONDS. Bonding Requirements and BLM Expenditures to Reclaim Orphaned Wells. Report to Congressional Requesters
GAO United States Government Accountability Office Report to Congressional Requesters January 2010 OIL AND GAS BONDS Bonding Requirements and BLM Expenditures to Reclaim Orphaned Wells GAO-10-245 January
More informationCHAPTER X GAS LEAKAGE CONTROL GUIDELINES FOR PETROLEUM GAS SYSTEMS
CHAPTER X GAS LEAKAGE CONTROL GUIDELINES FOR PETROLEUM GAS SYSTEMS SCOPE These guidelines provide criteria for the detection, grading and control of gas leakage and for related records for systems handling
More informationENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS
ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS PREPARED BY: DEPARTMENT OF ENVIRONMENT AND LANDS INDUSTRIAL ENVIRONMENTAL ENGINEERING DIVISION APRIL 16, 1992 - TABLE OF
More informationGREEN DEVELOPMENT PLAN Developer Name: Project Name: Address (Street/City/State) Description of Process. Goals. Design & Development Team Members Name
GREEN DEVELOPMENT PLAN Developer Name: Project Name: Address (Street/City/State) Description of Process A description of the process that was used to select the green building strategies, systems and materials
More informationTMDS Smart Monitor. Solutions for transformer life-cycle management. Answers for energy.
TMDS Smart Monitor Solutions for transformer life-cycle management Answers for energy. TMDS Smart Monitor Selecting a transformer monitoring solution is a critical step in achieving your company s Smart
More informationBASIN MANAGEMENT OBJECTIVES CHEROKEE SUBINVENTORY UNIT
BASIN MANAGEMENT OBJECTIVES CHEROKEE SUBINVENTORY UNIT Butte County Water Advisory Committee Member John Scott Contact Information Phone Number: (530) 533-8394 Email Address: john_lewis_scott@msn.com Description
More informationVapor Intrusion in New York City Greenpoint: The Tip of the Iceberg
Vapor Intrusion in New York City Greenpoint: The Tip of the Iceberg Lenny Siegel February 2009 For years New York State s environmental agencies have been conducting highprofile vapor intrusion responses
More informationCommercial Real Estate Loans: Environmental Due Diligence for Lenders
Commercial Real Estate Loans: Environmental Due Diligence for Lenders Robert W. Whetzel and Todd A. Coomes, Richards, Layton & Finger, P.A. with PLC Real Estate This Practice Note provides an introduction
More informationChecklist for Reviewing Technical Programs and Procedures
Checklist for Reviewing Technical Programs and Procedures Attachment 9 to KQAP A. Soil Survey 1) Does the official soil survey meet the needs of the internal and external customers? 2) Is there a method
More informationGarry Kaufman Colorado Air Pollution Control Division May 14, 2014
Garry Kaufman Colorado Air Pollution Control Division May 14, 2014 Colorado emissions data by sector Greenhouse gas emissions (GHG) Nitrogen oxides (NO x ) Volatile organic compounds (VOC) Past efforts
More informationPolk Commerce Centre CRA Spine Road Alignment Study
Polk Commerce Centre CRA Spine Road Alignment Study Florida Polytech Pace Road (LIMIT) Berkley Road Williams DRI Proposed Alignment Polk Commerce Centre CRA Boundary Braddock Road (LIMIT) Lake Myrtle Sports
More informationOntario Fire Code SECTION 5.13 DIP TANKS. Illustrated Commentary. Office of the Ontario Fire Marshal
Ontario Fire Code SECTION 5.13 DIP TANKS Illustrated Commentary Office of the Ontario Fire Marshal Dip Tanks Illustrated Commentary 1 5.13.1. Location 5.13.1.1. Dip tank operations involving flammable
More informationDOCUMENTATION OF ENVIRONMENTAL INDICATOR DETERMINATION
DOCUMENTATION OF ENVIRONMENTAL INDICATOR DETERMINATION Interim Final 2/5/99 RCRA Corrective Action Environmental Indicator (El) RCRIS code (CA725) Current Human Exposures Under Control Facility Name: Formosa
More informationRESIDENTIAL ON-SITE WASTEWATER TREATMENT SYSTEM (OWTS) INSTALLATION PERMIT (New or Repair) Instructions and Application Form
DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT 1555 North 17 th Avenue Greeley, CO 80631 Web: www.weldhealth.org Health Administration Vital Records Tele: 970.304.6410 Fax: 970.304.6412 Public Health & Clinical
More informationCLIFTY CREEK PLANT MADISON, INDIANA
2015 DAM AND DIKE INSPECTION REPORT GERS-15-018 CLIFTY CREEK PLANT MADISON, INDIANA PREPARED BY GEOTECHNICAL ENGINEERING AEP SERVICE CORPORATION 1 RIVERSIDE PLAZA COLUMBUS, OHIO Annual Dam and Dike Inspection
More informationExploration for natural gas
FACT SHEET NO. 42 Exploration for natural gas Quick facts QGC holds licences from the Queensland Government called Authorities to Prospect that allow us to explore in areas known as tenements We work with
More informationSUBDIVISION AND DEVELOPMENT REGULATION
Province of Alberta MUNICIPAL GOVERNMENT ACT SUBDIVISION AND DEVELOPMENT REGULATION Alberta Regulation 43/2002 With amendments up to and including Alberta Regulation 119/2014 Office Consolidation Published
More informationCIVL451. Soil Exploration and Characterization
CIVL451 Soil Exploration and Characterization 1 Definition The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally
More informationUnconventional Gas in Italy: the Ribolla Basin*
Unconventional Gas in Italy: the Ribolla Basin* Roberto Bencini 1, Elio Bianchi 2, Roberto De Mattia 2, Alberto Martinuzzi 2, Simone Rodorigo 2, and Giuseppe Vico 2 Search and Discovery Article #80203
More informationANSI/BPI-1200-S-2015:
Guidelines for Home Energy Professionals Project Standard Work Specifications (SWS) Update to Align SWS with the Combustion Appliance Section of ANSI/BPI-1200-S-2015: Standard Practice for Basic Analysis
More informationConducting a Hazard Risk Assessment
Workplace Safety and Health Focus on Prevention Conducting a Hazard Risk Assessment Risk Analysis Probability High Medium Low Low Medium Severity High Department of Health and Human Services Centers for
More informationRobert D. Trimborn Airport Director Santa Monica Airport
Robert D. Trimborn Airport Director Santa Monica Airport Association of California Airports Conference - September 18, 2009 Noise Air Emissions Ground Support Equipment Alternative Fuels and Green
More informationCertificate Programs in. Program Requirements
IHRDC Online Certificate Programs in OIL AND GAS MANAGEMENT Program Requirements IHRDC 535 Boylston Street Boston, MA 02116 Tel: 1-617-536-0202 Email: certificate@ihrdc.com Copyright International Human
More informationCHECKLIST FOR FILING AN APPLICATION FOR A GROUND AND/OR SURFACE WATER WITHDRAWAL PROJECT IN THE DELAWARE RIVER BASIN
CHECKLIST FOR FILING AN APPLICATION FOR A GROUND AND/OR SURFACE WATER WITHDRAWAL PROJECT IN THE DELAWARE RIVER BASIN PLEASE COMPLETE CHECKLIST AND ENCLOSE WITH THE APPLICATION. If you need assistance,
More informationNatural Gas Emergencies
Natural Gas Emergencies Purpose To protect the personnel within the department, and citizens from the hazards involved in a natural gas emergency. The Incident Commander is to use his/her best judgment
More information