1 LEED Green Building Rating System and Sustainable Sites By Steven Harrison, P.E., LEED AP and Jim Noll, P.E. November 2008

2 Professional Development Series LEED Green Building Rating System and Sustainable Sites By Steven Harrison, P.E., LEED AP and Jim Noll, P.E. Green building and construction increases the efficiency with which buildings and developments use resources while reducing impacts on human health and the environment. Many agencies and organizations recognize the importance of utilizing products and methods as green solutions to promote environmental, economic, health, and community benefits through better site selection and development, building design, construction, operation, maintenance, and pollutant removal. Various rating systems have been developed to certify green building and construction, including the U.S. Green Building Council s (USGBC) Leadership in Energy and Environmental Design (LEED) Green Building Rating System. LEED Green Building Rating System The USGBC created in 1993 recognized the need for a system to define and measure green buildings. In August 1998, the first LEED Pilot Project Program was launched. The pilot program, commonly referred to as LEED Version 1.0, was created by a USGBC committee comprised of architects, realtors, a building owner, a lawyer, environmentalists, and industry representatives. In 2000, a revised version was published, LEED Green Building Rating System Version 2.0. The current version is 2.2. LEED certification is a third-party validation of a building s performance and can lead to builders and developers receiving more lucrative projects, financial incentives/credits, and significant acknowledgments for their efforts. The LEED Green Building Rating System for New Construction and Major Renovation is organized into six different categories: Sustainable Sites, Water Efficiency, Energy and Atmosphere, Materials and Resources, Indoor Environmental Quality, and Innovation in Design. The LEED Rating System evaluates the overall performance of a green building project based on points. Within each of the six LEED credit categories, projects must satisfy particular prerequisites and earn points. The number of points earned determines the level of LEED certification the project receives (Certified, Silver, Gold, or Platinum). This article discusses several significant credits comprising the Sustainable Sites category. Sustainable site development A sustainable project starts with a sustainable site. Selecting the site and placing the building on the site are two of the most important steps in a green building project. Development on an inappropriate site can increase a building s water demands, transportation and energy impacts, ecosystem disturbances, and project costs. Where and how a building occupies a site has significant, long-term impacts on its efficiency and success. It is essential to analyze the building s relationship with its surrounding natural environment, including the sun, soil, wind, water, and trees, as well as the surrounding built environment, which includes other buildings, roads, and local transportation options. Continuing Education The Professional Development Series is a unique opportunity to earn continuing education credit by reading specially focused, sponsored articles in CE News. If you read the following article, display your understanding of the stated learning objectives, and follow the simple instructions, you can fulfill a portion of your continuing education requirements at no cost to you. This article also is available online at pg.asp?id=20. Instructions First, review the learning objectives below, then read the Professional Development Series article. Next, complete the quiz and submit your answers to the Professional Development Series sponsor. Submittal instructions are provided on the Reporting Form on page PDH 6. Your quiz answers will be graded by the Professional Development Series sponsor. If you answer at least 80 percent of the questions correctly, you will receive a certificate of completion from the Professional Development Series sponsor within 90 days and will be awarded 1.0 professional development hour (equivalent to 0.1 continuing education unit in most states). Note: It is the responsibility of the licensee to determine if this method of continuing education meets his or her governing board(s) of registration s requirements. Learning Objectives After reading this article, you should understand the general benefits, prerequisites, and specific credits required to satisfy the Sustainable Sites category of the U.S. Green Building Council s Leadership in Energy and Environmental Design (LEED) for New Construction. Professional Development Series Sponsors David Evans and Associates, Inc. CONTECH Construction Products Inc. 2 PDH Professional Development Advertising Section CONTECH Construction Products Inc.

3 The first category of credits in LEED for New Construction focuses on Sustainable Sites, which addresses the building site s impact on the community, local infrastructure, and environment. It encourages best management practices for everything on the exterior of the building, including construction techniques that protect undeveloped land and open spaces, contaminated site remediation, traffic reduction, and stormwater minimization and treatment. Using sustainable building locations and features in the building design minimizes environmental impacts both locally and globally. LEED for New Construction Sustainable Sites The Sustainable Sites category consists of the following prerequisite and credits: Prerequisite Construction Activity Pollution Prevention. This prerequisite requires projects to implement an Erosion and Sedimentation Plan to reduce pollution from construction activities by controlling soil erosion, waterway sedimentation, and airborne dust generation. Credit 1: Site Selection. When selecting a site, identify sites that do not have sensitive site elements or restrictive land types. Select a building design and location with the least environmental impact. Credit 2: Development Density and Community Connectivity. When selecting a site, give preference to urban sites with dense development and pedestrian access to services such as banks, libraries, day care facilities, grocery stores, post offices, and restaurants. Credit 3: Brownfield Redevelopment. When selecting a site, give preference to brownfield sites and then identify an appropriate remediation strategy. Credit 4.1: Alternative Transportation Public Transportation Access. Reduce pollution and land development impacts from car use by situating the building near mass transit facilities. Credit 4.2: Alternative Transportation Bicycle Storage and Changing Rooms. Reduce pollution and land development impacts from car use by encouraging bike commuting and designing a building with bicycle storage and changing rooms. Credit 4.3: Alternative Transportation Low-Emitting and Fuel-Efficient Vehicles. Reduce pollution and land development impacts from car use by providing amenities such as alternative fuel refueling stations or preferred parking for low-emitting and fuelefficient vehicles. Credit 4.4: Alternative Transportation Parking Capacity. Reduce impacts from single occupancy vehicle use by providing preferred parking for carpool vehicles, sharing parking facilities with adjacent buildings, or minimizing parking lot space. Credit 5.1: Site Development Protect or Restore Habitat. Protect or restore habitat by conserving existing natural areas or restoring areas to provide habitat and encourage biodiversity. Credit 5.2: Site Development Maximize Open Space. Design the building with a minimal footprint and maximize open space on the site to encourage biodiversity. Credit 6.1: Stormwater Management Quantity Control. Reduce impervious surfaces, manage stormwater runoff, and increase on-site infiltration to maintain natural stormwater flows to avoid disturbing natural water hydrology. Credit 6.2: Stormwater Management Quality Control. Manage stormwater runoff in order to reduce disruption and pollution of natural water flow. Credit 7.1: Heat Island Effect Non-Roof. Reduce heat island effect through the use of shaded surfaces, vegetated surfaces, and open-grid paving or high-albedo materials. Credit 7.2: Heat Island Effect Roof. Reduce effect of heat island by installing high-albedo and vegetated roofs (which reduce heat absorption). Credit 8: Light Pollution Reduction. The site s internal and external light levels should be minimized to reduce impact on nocturnal environments, improve nighttime visibility (through glare reduction), and avoid night-sky pollution. Prior to selecting a site, potential environmental disturbances that may occur as a result of the project need to be evaluated. Sustainable Sites Credit 1 (SSc1), which focuses on site selection, identifies the following six criteria that should be avoided when choosing your location: 1) prime farmland as defined by the U.S. Department of Agriculture; 2) previously undeveloped land with an elevation lower than 5 feet above the elevation of the 100-year flood as defined by the Federal Emergency Management Agency; 3) land identified as habitat for any species on federal or state threatened or endangered list; 4) land within 100 feet of any wetlands; 5) previously undeveloped land within 50 feet of a body of water which supports or could support fish, recreation, or industrial use, consistent with the terminology of the Clean Water Act; and 6) land which was public parkland. The Sustainable Sites category also focuses on developing a site in urban areas with existing infrastructure. The site location will influence many things, including whether people drive or use alternative transportation to reach the site. Also, if fewer individual cars are traveling to your site, fewer parking spaces are needed. According to the Natural Resources Defense Council, automobiles are responsible for approximately 20 percent of greenhouse gas emissions in the United States each year. Professional Development Advertising Section CONTECH Construction Products Inc. PDH 3

4 LEED Green Building Rating System and Sustainable Sites Consider the proposed uses of the building and what services are located nearby. Locating the development near other common destinations and dense residential areas allows access through alternative modes of transportation such as walking, bicycling, or public transit, and the location can improve quality of life as commuters spend less time in their automobiles. Sustainable Sites Credit 2 (SSc2): Development Density and Community Connectivity focuses on reducing urban sprawl. There are two ways to earn this credit. A dense development is defined by LEED as property with an average density greater than or equal to 60,000 square feet per acre (sq.ft./acre), including the area of the project. Development density is calculated by dividing the total square footage of the building by the total project site area in acres (see Equation 1). The total project site area must remain consistent throughout LEED documentation. Development Density (sq.ft./acre) = Gross Building Square Footage (sq.ft.) Project Site Area (acres) (Equation 1) Once the development density is determined, convert the total site area from acres to square feet, then calculate the square root of this number and multiply the result by three to determine the density radius (see Equation 2). Density Radius (feet) = 3* (Property Area [acres]*43,560 [sq.ft./acre]) (Equation 2) To determine the density boundary, overlay the density radius on a map that includes the project site and center the circle over the project site. For all properties inside the boundary (or intersecting the boundary circle) determine the building square footage, the site area, and add the total for each. Divide the total building square footage by the total site area (not including public roads and right-of-way areas) in acres to find the average density (see Equation 3). Average Density (sq.ft./acre) = (Sq.ft. of buildings within density radius) (Total site area in acres) (Equation 3) Community connectivity can be achieved by locating a project within 1/2 mile of a residential zone with an average density of 10 units per net acre and at least 10 basic services with pedestrian access. LEED identifies a list of basic services that many people use on a regular basis and that meet the community connectivity criteria for SSc2. These services include banks, places of worship, convenience or grocery stores, pharmacies, post offices, senior care facilities, laundry facilities, day cares, fire stations, restaurants, fitness centers, libraries, schools, salons, hardware stores, medical/dental offices, public parks, theaters, and community centers. To document this credit, define a 1/2-mile radius circle centered around the site on a map. Then identify on the map each of at least 10 basic community services and the area with a residential zone having at least 10 units per net acre. Only one of each service, except restaurants which can count for two, can be used to attain 10 total. In addition to basic services, LEED prefers sites that are located near mass transit. Sustainable Sites Credit 4.1 (SSc4.1) requires the building to be within 1/2 mile (via pedestrian route) of an existing or planned and funded commuter rail, or within 1/4 mile of one or more stops for two or more public or campus bus lines usable by building occupants. To document achievement of this credit, submit an area map that indicates the project site location and the location of either a commuter rail stop or two bus stops. The map must also include a scale bar and a north arrow indicator. Stormwater management The intent of USGBC credits for stormwater management is to minimize the site development impact to the natural hydrology of the project site. SSc6.1 Stormwater Design: Quantity Control The intent of this credit is to avoid potential downstream flooding and excessive stream bank erosion by minimizing the rate and quantity of stormwater runoff. By promoting stormwater infiltration, this credit also attempts to keep the natural hydrology of the pre-developed site. The criteria for this credit are separated in two existing condition scenarios: Case 1 Existing imperviousness is less than or equal to 50 percent; and Case 2 Existing imperviousness is greater than 50 percent. When the project site existing surface conditions are equal to or less than 50 percent impervious, the design team must implement a plan that prevents the post-developed peak stormwater runoff rate and quantity from exceeding the pre-developed (existing condition) rate and quantity. If the stormwater design does not result in limiting the runoff rate and quantity to pre-developed conditions and the project is located near a stream or creek, the design team can implement a plan that protects the receiving channel from excessive erosion. A narrative must be written describing the strategies that have been implemented to reduce stormwater runoff and protect the stream bank from excessive erosion. If the project site existing conditions reflect Case 2 Existing imperviousness is greater than 50 percent, the design team must implement a stormwater management plan that reduces the post-developed stormwater runoff rate and quantity by 25 percent from the pre-developed condition. Documentation for this credit can be in the form of the Letter Template associated to this credit. A Letter Template is a standard LEED form provided by USGBC that outlines 4 PDH Professional Development Advertising Section CONTECH Construction Products Inc.

5 the specific requirements of the credit and provides direction as to how to explain or justify how the proposed strategies achieve the credit. Calculations must be submitted that show the preand post-development stormwater runoff rate and quantity for the two-year, 24-hour storm event. The Letter Template also provides space for a written narrative. Strategies for stormwater quantity control include green roofs, infiltration trenches or ponds, detention/retention facilities, or stormwaterharvesting facilities. Green roofs provide stormwater detention in the growing medium of the green roof and also provide evapotranspiration. Design considerations include additional structural load on the roof, and irrigation to allow the green roof plant material to establish. Infiltration and detention/retention facilities have several design factors, including the size of contributing areas draining to the facility, surface runoff characteristics, and soil infiltration rates. Stormwaterharvesting facility design factors also include the size of contributing areas draining to the site and surface runoff characteristics, but also consider average annual rainfall and necessary water demand for irrigation and toilet flushing. These facilities are typically supplemented with a domestic water supply during potentially dry summer months. The difficult part of this credit is meeting the stormwater runoff quantity criteria. The stormwater rate can be managed through the use of detention facilities and orifices that are designed to release at a specific rate. But, the quantity of stormwater runoff leaving the site is much more difficult to manage. The most effective and efficient way This flow-through planter, located at Clackamas Community College in Oregon City, Ore., provides stormwater quality control for the roof area and is an example of a water quality strategy. This water quality swale is another example of a water quality strategy. It provides stormwater quality treatment for all impervious areas on the project. This swale is located at the Nike Vivian Stringer Child Development Center in Beaverton, Ore. On this tight site in Baltimore, a manufactured stormwater filtration BMP is installed in combination with a swale to allow both stormwater management regulations and low impact development goals to be met. to achieve this is by using infiltration facilities. However, if the existing soils on the project site are not conducive to infiltration, the quantity of stormwater runoff must be managed by a retention or harvesting facilities. Retention facilities will allow gradual infiltration and evapotransporatation of stormwater. The stormwater harvesting facilities will utilize the stormwater for other uses such as landscape irrigation or toilet flushing within the building. Integrating the stormwater management facilities into the overall site plan can be challenging. Stormwater facilities may impact site grading, building plumbing, pedestrian and vehicular traffic, and landscape planting. Coordinated design teams can achieve multiple credits using one strategy. For example, a stormwater-harvesting facility utilizing stormwater to irrigate landscaping and flush toilets within the building can also assist in achieving Water Efficiency credits WEc1.1 and WEc1.2 for water-efficient landscaping, and credits WEc3.1 and WEc3.2 for potable water use reduction. Another example is to utilize a pervious pavement material to infiltrate stormwater, which may also have material characteristics to achieve Sustainable Sites credit SSc7.1 for reducing the heat island effect for non-roof areas. SSc6.2 Stormwater Design: Quality Control The criteria for this credit include implementation of a stormwater management plan that captures and treats 90 percent of the average annual rainfall. The treatment must remove 80 percent of the average annual post-development total suspended solids (TSS). Professional Development Advertising Section CONTECH Construction Products Inc. PDH 5

6 LEED Green Building Rating System and Sustainable Sites The criteria 90 percent of the average annual rainfall are defined for three different watersheds: humid, semi-arid, and arid. Humid watersheds are defined as those that receive at least 40 inches of rainfall in a year. Semi-arid watersheds are those that receive between 20 and 40 inches of rainfall in a year and arid watersheds receive less than 20 inches of rainfall in a year. For humid, semi-arid, and arid watersheds, 90 percent of the average annual rainfall is 1-inch, 3/4-inch, and 1/2-inch of rainfall, respectively. Documentation for this credit can also be in the form of the Letter Template associated to this credit. The Letter Template separates natural or non-structural best management practices (BMP) from black box or structural treatment facilities. The template also allows for multiple treatment facilities and calculates their total rainfall treatment volume by percentages automatically. The Letter Template also provides space for a written narrative. Natural treatment systems include green roof, biofiltration or grassy swales, infiltration basins or trenches, sand filters, filtration basins, or extended wet detention ponds. These treatment facilities will require a certain amount of property area on the site. The size of the area is dependent on the proposed facility and the amount of stormwater being treated. These facilities can also add an aesthetically pleasing component to the site by using appropriate landscape planting. There are also products on the market that can provide effective treatment of the stormwater without taking up potentially expensive real estate. These black box facilities are compact, located at specific points, and are typically below grade. Both the natural and black box treatment facilities require at least annual maintenance to ensure they are operating effectively. These types of treatment facilities are acceptable solutions to meeting the water quality credit if in-field performance exists for monitoring data demonstrating compliance with the listed criteria. Resources and the future of green building Although this article focuses primarily on several significant credits within the Sustainable Sites category, additional detailed information about all of the credits within the LEED Green Building Rating System can be found on USGBC s website ( The site also contains information about registering a project and the fees and certifications involved. Professional Development Series Sponsor: 9025 Centre Pointe Dr., Suite 400, West Chester, OH Phone: Fax: info@contech-cpi.com Web: CE News Professional Development Series Reporting Form Article Title: LEED Green Building Rating System and Sustainable Sites Publication Date: November 2008 Sponsor: CONTECH Construction Products Inc. Valid for credit until: November 2010 Instructions: Select one answer for each quiz question and clearly circle the appropriate letter. Provide all of the requested contact information. Fax this Reporting Form to (You do not need to send the Quiz; only this Reporting Form is necessary to be submitted.) 1) a b c d 6) a b c d 2) a b c d 7) a b c d 3) a b c d 8) a b c d 4) a b c d 9) a b c d 5) a b c d 10) a b c d Required contact information Last Name: First Name: Middle Initial: Title: Firm Name: Address: City: State: Zip: Telephone: Fax: Certification of ethical completion: I certify that I read the article, understood the learning objectives, and completed the quiz questions to the best of my ability. Additionally, the contact information provided above is true and accurate. Signature: Date: 6 PDH Professional Development Advertising Section CONTECH Construction Products Inc.

7 With architects, real estate professionals, facility managers, engineers, interior designers, landscape architects, construction managers, lenders, and government officials all taking a vast interest in helping to transform the built environment toward a more sustainable environment, the green design field grows and develops constantly. With the bar of sustainable living ever increasing and new technologies and products surfacing on the marketplace every day, there is infinite opportunity to effect change in the way buildings are designed, built, operated, and maintained. Steven Harrison, P.E., LEED AP, is a project manager for David Evans and Associates, Inc. He can be contacted at sdh@deainc.com. Jim Noll, P.E., is director of Engineering Services for CONTECH Construction Products Inc. He can be contacted at jnoll@ contech-cpi.com. Professional Development Series Quiz 1. The acronym LEED stands for: a) Lighting and Energy Efficiency Design b) Land, Environment, and Energy Demands c) Leadership in Energy and Environmental Design d) Leaders in Energy Efficient Design 2. All of the following credits pertain to the Sustainable Sites category of the LEED Green Building Rating System with the exception of: a) Development Density and Community Connectivity b) Alternative Transportation c) Stormwater Management d) Construction Waste Management 3. Identifying potential environmental impact due to construction of a new building is a key focus of the Sustainable Sites Credit. Criteria to be concerned with include: a) Land classified as habitat for any species included on the federal or state endangered species list b) Land set aside as a public park c) Any lands within 100 feet of a classified wetland d) Both (a) and (b) e) All of the above 4. The Community Connectivity Credit (SSc2) identifies key basic services needs for the local community that must be located within the following distance of the planned construction site being evaluated: a) 10 miles c) 1/2 mile b) 1 mile d) 2 miles 5. SSc2 criteria for identifying basic service needs of a community include all of the following businesses with the exception of: a) Restaurants d) Banks b) Fire stations e) Sports bars c) Laundromats 6. LEED Credit SSc6.1 Stormwater Design: Quantity Control permits the designer to exceed the pre-developed site runoff rate as long as the design includes: a) A plan to prevent excessive erosion of the banks of the stream channel receiving the site runoff. b) A pretreatment system for the site runoff. c) Sufficient green space on the site to maximize open space. d) A plan to provide habitat and encourage biodiversity. 7. The most efficient method of controlling the quantity of stormwater runoff from the building site is to: a) Collect and treat the water first. b) Incorporate detention ponds into the site design. c) Use infiltration or retention facilities. d) Use stormwater for irrigation. 8. Identify which of the following statements is most applicable to the Letter Template associated with SSc6.2: a) Enables the designer to incorporate multiple treatment facilities b) Incorporates stormwater harvesting facilities to control site runoff c) Separates natural best management practices from structural treatment facilities d) Both (a) and (c) e) None of the above 9. An important aspect of black box treatment facilities is: a) They must be located offsite. b) They can not be located within 100 feet of wetlands. c) They require annual maintenance to ensure operational effectiveness. d) They must incorporate both detention and infiltration capabilities. 10. Pertaining to LEED Sustainable Site Development, development of the wrong site can: a) Increase the cost of construction b) Result in excessive construction material waste c) Require longer lead times for design review and approval d) Increase the building s water demands and environmental impacts e) Both (a) and (d) Professional Development Advertising Section CONTECH Construction Products Inc. PDH 7

8 Enter #xxx at cenews.com/infodirect

A Developer s Guide: Watershed-Wise Development

A Developer s Guide: Watershed-Wise Development A Developer s Guide: Watershed-Wise Development Environmental Protection What is a watershed? It does not matter how far away you build from a creek, lake, or the ocean, you are in a watershed. Another

More information

Sika Sarnafil World Class Roofing and Waterproofing

Sika Sarnafil World Class Roofing and Waterproofing The following is a brief summary of the Leadership in Energy and Environmental Design program (LEED, Version 3) and the sections Sika Sarnafil s roofing systems can help contribute to obtaining LEED points.

More information

Using Compost BMPs for LEED Green Building Credits

Using Compost BMPs for LEED Green Building Credits Using Compost BMPs for LEED Green Building Credits by Britt Faucette, Ph.D., CPESC, LEED AP COMPOST based best management practices (BMPs) are a natural fit for green buildings and have been increasingly

More information

Use of Green Roofs to Meet New Development Runoff Requirements. Greg Davis Nov. 8, 2007

Use of Green Roofs to Meet New Development Runoff Requirements. Greg Davis Nov. 8, 2007 Use of Green Roofs to Meet New Development Runoff Requirements Greg Davis Nov. 8, 2007 Why green roof? Absorption of precipitation Increased insulation Reduced urban heat island effect Pollutant removal

More information

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010 Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010 Background What are permeable interlocking concrete pavements (PICP)?

More information

Sustainable Construction An Education and Research Perspective

Sustainable Construction An Education and Research Perspective Sustainable Construction An Education and Research Perspective Amit Bandyopadhyay, Ph.D.,PE, Orla LoPiccolo, RA, AIA, Bahar Zoghi, Ph.D., PE State University of New York College of Technology at Farmingdale

More information

Post-Construction Stormwater Management Checklist* (5,000 SF or Greater)

Post-Construction Stormwater Management Checklist* (5,000 SF or Greater) Applicability: Required for projects that create and/or replace 5,000 square feet or greater of impervious surface (i.e. asphalt roads, concrete structures, building area, sidewalks, etc.). Impervious

More information

City of Atlanta. Department of Watershed Management. Post-Development Stormwater Management Ordinance Summary of Revisions

City of Atlanta. Department of Watershed Management. Post-Development Stormwater Management Ordinance Summary of Revisions City of Atlanta Department of Watershed Management Post-Development Stormwater Management Ordinance Summary of Revisions Cory Rayburn, CPESC Environmental Program Manager crayburn@atlantaga.gov Stormwater

More information

A. General Information

A. General Information Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key. Massachusetts Department of Environmental Protection WPA Form 3 Notice of Intent

More information

Stormwater Design Guidelines Frequently Asked Questions:

Stormwater Design Guidelines Frequently Asked Questions: 525 Golden Gate, 11th Floor San Francisco, CA 94102 T 415.551.4694 F 415.934.5728 TTY 415.554.3488 Stormwater Design Guidelines Frequently Asked Questions: A. GENERAL INQUIRIES... 2 1. What projects are

More information

Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands Program Checklist for Stormwater Report

Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands Program Checklist for Stormwater Report Important: When filling out forms on the computer, use only the tab key to move your cursor - do not use the return key. A. Introduction A Stormwater Report must be submitted with the Notice of Intent

More information

10/4/2012. 40 slide sample of Presentation. Key Principles to Current Stormwater Management

10/4/2012. 40 slide sample of Presentation. Key Principles to Current Stormwater Management 40 slide sample of Presentation Please contact mhoalton@pacewater.com if you would like the complete presentation Key Principles to Current Stormwater Management Distributed Control Measures Integrated

More information

Permeable Interlocking Concrete Pavements

Permeable Interlocking Concrete Pavements Permeable Interlocking Concrete Pavements Program 000003 Revised 1-29-08 Permeable Interlocking Concrete Pavements This program is registered with the AIA/CES and ASLA CPE for continuing education professional

More information

Permeable Interlocking Concrete Pavements. The Stormwater Problem

Permeable Interlocking Concrete Pavements. The Stormwater Problem Permeable Interlocking Concrete Pavements The Stormwater Problem 1 Stormwater Management Objectives Water Quantity Accommodate water volumes & peak flows Water Quality Control pollutant levels A Low Impact

More information

Permeable Pavers. calstone.com. Permeable Interlocking Concrete Pavements (PICP s)

Permeable Pavers. calstone.com. Permeable Interlocking Concrete Pavements (PICP s) Permeable Pavers Permeable Interlocking Concrete Pavements (PICP s) CBC Title 24/ADA Compliant LEED Functional Optimum balance of surface infiltration and joint interlock Available in a 6 x 9 Quarry Stone

More information

3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN

3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN 3.4 DRAINAGE PLAN This section describes the existing onsite drainage characteristics and improvements proposed within this Specific Plan. Following this description, drainage plan development standards

More information

Computing Stormwater Runoff Rates and Volumes

Computing Stormwater Runoff Rates and Volumes New Jersey Stormwater Best Management Practices Manual February 2004 C H A P T E R 5 Computing Stormwater Runoff Rates and Volumes This chapter discusses the fundamentals of computing stormwater runoff

More information

Beaufort County s Sustainable Initiatives, LEED, Rainwater Harvesting,

Beaufort County s Sustainable Initiatives, LEED, Rainwater Harvesting, Beaufort County s Sustainable Initiatives, LEED, Rainwater Harvesting, & much, much more! Brian Devin Herrmann, CNU; LEED AP Community Planning & Design Beaufort County Planning August 6 th 2008 You never

More information

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE 1008 STORM DRAINAGE (3/24/05) 1008.01 PURPOSE To minimize the amount of stormwater runoff resulting from development utilizing nonstructural controls where possible, maintain and improve water quality,

More information

POMONA COLLEGE Sustainability Integration Office Facilities and Campus Services

POMONA COLLEGE Sustainability Integration Office Facilities and Campus Services POMONA COLLEGE Sustainability Integration Office Facilities and Campus Services May 200 Table of Contents NEW CONSTRUCTION/MAJOR RENOVATION Process... Design... 3 MINOR RENOVATIONS/PROJECTS Process...

More information

URBAN STORMWATER GUIDELINES AND BEST MANAGEMENT PRACTICES FOR PROTECTION OF FISH AND FISH HABITAT DRAFT DISCUSSION DOCUMENT

URBAN STORMWATER GUIDELINES AND BEST MANAGEMENT PRACTICES FOR PROTECTION OF FISH AND FISH HABITAT DRAFT DISCUSSION DOCUMENT URBAN STORMWATER GUIDELINES AND BEST MANAGEMENT PRACTICES FOR PROTECTION OF FISH AND FISH HABITAT DRAFT DISCUSSION DOCUMENT Contacts: Barry Chilibeck (666-3765) or Megan Sterling (666-2322) Revision 4

More information

LEED CANADA FOR NEW CONSTRUCTION AND MAJOR RENOVATIONS 2009 LEED CANADA FOR CORE AND SHELL DEVELOPMENT 2009 RATING SYSTEM

LEED CANADA FOR NEW CONSTRUCTION AND MAJOR RENOVATIONS 2009 LEED CANADA FOR CORE AND SHELL DEVELOPMENT 2009 RATING SYSTEM LEED CANADA FOR NEW CONSTRUCTION AND MAJOR RENOVATIONS 2009 LEED CANADA FOR CORE AND SHELL DEVELOPMENT 2009 RATING SYSTEM PREFACE FROM THE CAGBC The built environment has a profound impact on our natural

More information

Los Angeles Union Station, CA Sustainable Neighborhood Assessment. April 22-23, 2014

Los Angeles Union Station, CA Sustainable Neighborhood Assessment. April 22-23, 2014 Los Angeles Union Station, CA Sustainable Neighborhood Assessment April 22-23, 2014 Sustainable Neighborhood Assessment Through the Sustainable Neighborhood Assessment Tool developed by Global future development

More information

Challenging Sustainable Goals for Landscape Architects

Challenging Sustainable Goals for Landscape Architects Challenging Sustainable Goals for Landscape Architects By Barrett L. Kays 11, FASLA Sustainable goals need to challenge landscape architects, our clients, and the public to incrementally solve major environmental

More information

Storm Water Runoff. Managing. A Self-Assessment Guide for Wisconsin Businesses. Storm water runoff is coming. This guide provides businesses

Storm Water Runoff. Managing. A Self-Assessment Guide for Wisconsin Businesses. Storm water runoff is coming. This guide provides businesses Managing Storm Water Runoff A Self-Assessment Guide for Wisconsin Businesses Storm water runoff is coming under increasing scrutiny as both a source of pollutants to our lakes and streams, and as a cause

More information

1.7.0 Floodplain Modification Criteria

1.7.0 Floodplain Modification Criteria 1.7.0 Floodplain Modification Criteria 1.7.1 Introduction These guidelines set out standards for evaluating and processing proposed modifications of the 100- year floodplain with the following objectives:

More information

Sustainable Drainage Systems (SUDS) A guide for developers

Sustainable Drainage Systems (SUDS) A guide for developers Sustainable Drainage Systems (SUDS) A guide for developers We are the Environment Agency. It s our job to look after your environment and make it a better place for you, and for future generations. Your

More information

LEED Green Building Rating System For Core & Shell Development Version 2.0

LEED Green Building Rating System For Core & Shell Development Version 2.0 LEED Green Building Rating System For Core & Shell Development Version 2.0 July 2006* For Public Use and Display *Revised EA section for projects registered after June 26, 2007. Disclaimer and Notices

More information

SUSTAINABLE URBAN DRAINAGE SYSTEMS

SUSTAINABLE URBAN DRAINAGE SYSTEMS overflow can lead into a permeable conveyance system to increase further the benefit and reduce the need for pipe systems. Pollutant removal rates have been shown to be high, with some pollutants being

More information

City of Colleyville Community Development Department. Site/Landscape Plan Application Packet

City of Colleyville Community Development Department. Site/Landscape Plan Application Packet City of Colleyville Community Development Department Site/Landscape Plan Application Packet Development Application Fees City of Colleyville 100 Main Street Colleyville TX 76034 817.503.1050 Zoning Zoning

More information

CITY OF FERNDALE EAGLE Checklist

CITY OF FERNDALE EAGLE Checklist CITY OF FERNDALE EAGLE Checklist Purpose of the Checklist: The City of Ferndale has adopted EAGLE, an indicator-based program intended to provide the citizens of Ferndale, the applicant, and the City with

More information

1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan, Governor Boyd

1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan, Governor Boyd ENVIRONMENTAL SITE DESIGN (ESD) REDEVELOPMENT EXAMPLES OCTOBER 2010 1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan,

More information

LEED for New Construction & Major Renovations

LEED for New Construction & Major Renovations LEED for New Construction & Major Renovations Version 2.2 For Public Use and Display October 2005 Table of Contents Introduction 4 Sustainable Sites 8 SS Prerequisite 1: Construction Activity Pollution

More information

Policy GRN-1.1.2. The City will adopt a Go Green Initiative to implement strategies to reduce greenhouse gas emissions within the City s borders.

Policy GRN-1.1.2. The City will adopt a Go Green Initiative to implement strategies to reduce greenhouse gas emissions within the City s borders. Vision Statement: Provide goals, objectives, and policies that preserve, improve, and promote responsible use and protect the City s natural and built environment. Goals, Objectives and Policies: Goal

More information

How To Amend A Stormwater Ordinance

How To Amend A Stormwater Ordinance Regulatory Alternatives to Address Stormwater Management and Flooding in the Marlboro Street Study Area Alternative 1: Amend Existing Local Regulations This proposed alternative provides an incremental

More information

GREEN ROOFS. Location. Design SMALL COMMERCIAL GUIDE CITY OF ATLANTA, GEORGIA DEPARTMENT OF WATERSHED MANAGEMENT

GREEN ROOFS. Location. Design SMALL COMMERCIAL GUIDE CITY OF ATLANTA, GEORGIA DEPARTMENT OF WATERSHED MANAGEMENT SMALL COMMERCIAL GUIDE CITY OF ATLANTA, GEORGIA DEPARTMENT OF WATERSHED MANAGEMENT GREEN ROOFS A green roof is a system consisting of waterproofing material, growing medium, and vegetation, and is used

More information

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 NAME LOCATION Audubon Properties, LLC. 4700 & 4960 Dauphin Island Parkway West side of Dauphin Island Parkway, 580

More information

Retention/Irrigation. Design Considerations. Soil for Infiltration Area Required Slope Environmental Side-effects

Retention/Irrigation. Design Considerations. Soil for Infiltration Area Required Slope Environmental Side-effects Description Retention/irrigation refers to the capture of stormwater runoff in a holding pond and subsequent use of the captured volume for irrigation of landscape of natural pervious areas. This technology

More information

Los Angeles Mission College Facilities Master Plan Draft Program Environmental Impact Report 3.5 ENERGY CONSERVATION AND SUSTAINABILITY.

Los Angeles Mission College Facilities Master Plan Draft Program Environmental Impact Report 3.5 ENERGY CONSERVATION AND SUSTAINABILITY. 3.5 ENERGY CONSERVATION AND SUSTAINABILITY As a result of the analysis undertaken in the Initial Study 1 for the Los Angeles Mission College Facilities Master Plan, the LACCD determined that the proposed

More information

URBAN DRAINAGE CRITERIA

URBAN DRAINAGE CRITERIA URBAN DRAINAGE CRITERIA I. Introduction This division contains guidelines for drainage system design and establishes a policy for recognized and established engineering design of storm drain facilities

More information

Total Criteria Score Out of a possible 6

Total Criteria Score Out of a possible 6 Toronto, Ontario, Canada A Case Study of How Green Infrastructure is Helping Manage Urban Stormwater Challenges Types of green infrastructure used: Green roofs, blue roofs, rain barrels/cisterns, permeable

More information

Summary and Description of 2014 Enhancements to New Jersey Model Stormwater Control Ordinance for Municipalities

Summary and Description of 2014 Enhancements to New Jersey Model Stormwater Control Ordinance for Municipalities Summary and Description of 2014 Enhancements to New Jersey Model Stormwater Control Ordinance for Municipalities This document summarizes and provides explanation for the purpose and intent of major recommended

More information

Making San Francisco a Water Sensitive City. Sarah Minick SFPUC Urban Watershed Management Program June 2009

Making San Francisco a Water Sensitive City. Sarah Minick SFPUC Urban Watershed Management Program June 2009 Making San Francisco a Water Sensitive City Sarah Minick SFPUC Urban Watershed Management Program June 2009 OUTLINE Stormwater in San Francisco Water Sensitive Cities Low Impact Design Policies and Programs

More information

Pervious Pavers. By: Rich Lahren. Hebron Brick & Block Supply

Pervious Pavers. By: Rich Lahren. Hebron Brick & Block Supply Pervious Pavers By: Rich Lahren Hebron Brick & Block Supply Stormwater Management and Control Issues Past emphasis was on flood control Today s emphasis is also on pollution More impermeable areas are

More information

SITE PLAN REVIEW APPLICATION

SITE PLAN REVIEW APPLICATION SITE PLAN REVIEW APPLICATION 405 Martin Luther King Jr. Blvd phone (919) 968-2728 fax (919) 969-2014 www.townofchapelhill.org Parcel Identifier Number (PIN): Date: Section A: Project Information Section

More information

Presented by Dani Wise Johnson Vanasse Hangen Brustlin, Inc.

Presented by Dani Wise Johnson Vanasse Hangen Brustlin, Inc. Incorporating LID Stormwater Management Practices and Ecological Restoration on Redevelopment Properties Presented to LID Conference Philadelphia, Sept 2011 Presented by Dani Wise Johnson Vanasse Hangen

More information

Green Building Rating System For Existing Buildings Upgrades, Operations and Maintenance

Green Building Rating System For Existing Buildings Upgrades, Operations and Maintenance Green Building Rating System For Existing Buildings Upgrades, Operations and Maintenance Version 2 Updated July 2005* October 2004 *Revised EA section for projects registered after June 26, 2007. *Disclaimer

More information

Chapter 3 SENSITIVE AREAS AND VEGETATED CORRIDORS

Chapter 3 SENSITIVE AREAS AND VEGETATED CORRIDORS Chapter 3 3.01 General Provisions 3.01.1 Introduction 3.01.2 Application and Interpretation of Chapter 3.01.3 Unbuildable Lots 3.01.4 Other Permits 3.01.5 Prohibited Activities 3.02 Service Provider Letter

More information

Exhibit A-7.III. Water Quality Management Plan (WQMP) Checklist

Exhibit A-7.III. Water Quality Management Plan (WQMP) Checklist Exhibit A-7.III Water Quality Management Plan (WQMP) Checklist Water Quality Management Plan Checklist The purpose of this checklist is to provide a format for uniform, comprehensive, and welldocumented

More information

TTU Green Standards. TTU Green Standards

TTU Green Standards. TTU Green Standards For our rapidly expanding on-campus student residence halls, Texas Tech University felt strongly that LEED guidelines and practices would be employed. This new 457 bed, 234,500 square foot residence hall

More information

Recommendations for future developments

Recommendations for future developments C Recommendations for future developments C.1 Reducing flood risk through site layout and design C.1.1 C.1.2 Flood risk should be considered at an early stage in deciding the layout and design of a site

More information

STORMWATER POLLUTION PREVENTION PLAN TEMPLATE. 1.0 SITE DESCRIPTION 1.1 Project Name and Location Date

STORMWATER POLLUTION PREVENTION PLAN TEMPLATE. 1.0 SITE DESCRIPTION 1.1 Project Name and Location Date STORMWATER POLLUTION PREVENTION PLAN TEMPLATE Disclaimer: This template was developed for guidance purposes only in an effort to assist Construction Storm Water permit applicants in meeting state and local

More information

CITY OF CHARLOTTE STORM WATER SERVICES CREDIT APPLICATION INSTRUCTION MANUAL

CITY OF CHARLOTTE STORM WATER SERVICES CREDIT APPLICATION INSTRUCTION MANUAL CITY OF CHARLOTTE STORM WATER SERVICES CREDIT APPLICATION INSTRUCTION MANUAL March 2008 A note to recipients of the Charlotte-Mecklenburg Storm Water Services Credit Application Manual: This is the second

More information

DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS

DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS Phase I MS4 permits require continuous updating of the stormwater system inventory owned and operated by the MS4. They also include inspection

More information

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth

More information

Stormwater Credit Open House Q&A

Stormwater Credit Open House Q&A Stormwater Credit Open House Q&A Stormwater Charge Project GENERAL INFORMATION AND APPLICATION PROCESS FOR STORMWATER CREDITS Question: What is the response time for an application - 30 business days or

More information

STATEMENT OF RON HUNTSINGER NATIONAL SCIENCE COORDINATOR BUREAU OF LAND MANAGEMENT U.S

STATEMENT OF RON HUNTSINGER NATIONAL SCIENCE COORDINATOR BUREAU OF LAND MANAGEMENT U.S STATEMENT OF RON HUNTSINGER NATIONAL SCIENCE COORDINATOR BUREAU OF LAND MANAGEMENT U.S. DEPARTMENT OF THE INTERIOR BEFORE THE HOUSE APPROPRIATIONS SUBCOMMITTEE ON INTERIOR, ENVIRONMENT AND RELATED AGENCIES

More information

Sustainable Landscaping RFP Language City of Long Beach, CA

Sustainable Landscaping RFP Language City of Long Beach, CA Sustainable Landscaping RFP Language City of Long Beach, CA I. PROJECT DESCRIPTION Design and landscaping techniques for [PROJECT NAME] shall conform to the intent of the City of Long Beach s Green Building

More information

Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans

Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans APPENDIX IV Version: February 2, 2015 Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans Please fill in all blanks and please reference the plan sheets/pages where the information may

More information

Series 2016A-2 (Green Bonds) Final Proceeds Allocation April 2016

Series 2016A-2 (Green Bonds) Final Proceeds Allocation April 2016 Series 2016A-2 (Green Bonds) Final Proceeds Allocation April 2016 James L. McIntire Washington State Treasurer Summary The State of Washington offered green bonds to investors in September 2015, with approximately

More information

Introduction to the Envision Sustainability Rating System

Introduction to the Envision Sustainability Rating System THE ENVISION RATING SYSTEM Introduction to the Envision Sustainability Rating System Russell Moore, PE, ENV SP Richard Gomez, PE, MSEM, ENV SP test APWA Public Works Conference Richmond, CA November 2015

More information

CWSRF Project Descriptions and Examples for Green Project Reserve

CWSRF Project Descriptions and Examples for Green Project Reserve CWSRF Project Descriptions and Examples for Green Project Reserve I. Water Efficiency a. Water efficiency is the use of improved technologies and practices to deliver equal or better services with less

More information

SouthShore HILLSBOROUGH COMMUNITY COLLEGE

SouthShore HILLSBOROUGH COMMUNITY COLLEGE SouthShore HILLSBOROUGH COMMUNITY COLLEGE The opening of Hillsborough Community College s fifth campus, the SouthShore Center, marks an exciting milestone for the college and will open an exciting new

More information

Haynes Recreation Center, Laredo, TX. Data Matrix and Sustainability Benchmarks

Haynes Recreation Center, Laredo, TX. Data Matrix and Sustainability Benchmarks Haynes Recreation Center, Laredo, TX Data Matrix and Sustainability Benchmarks (Updated Spring 2010) 1 Standard Benchmarks BENCHMARKS UNITS PRE PROJECT GOAL Property value (pre/post) Assessed or redevelopment

More information

Permeable Paving System with StormAbsorb Technology

Permeable Paving System with StormAbsorb Technology Permeable Paving System with StormAbsorb Technology The water management solution. ideal for LEED projects 2 a better way to solve water management issues Increasingly, water management is an important

More information

Innovative Site Design to Protect Water Quality (Density CAN be Green) Community Design + Architecture Nelson\Nygaard

Innovative Site Design to Protect Water Quality (Density CAN be Green) Community Design + Architecture Nelson\Nygaard Innovative Site Design to Protect Water Quality (Density CAN be Green) Community Design + Architecture Nelson\Nygaard Alameda Countywide Clean Water Program. 2007 New Development Workshop, February 13,

More information

4.3 Cisterns and Rain Barrels

4.3 Cisterns and Rain Barrels 4.3 Cisterns and Rain Barrels Rain barrels, cisterns, and tanks are structures designed to intercept and store runoff from rooftops. Rain barrels are used on a small scale while cisterns and tanks may

More information

NYCIDA PROJECT COST/BENEFIT ANALYSIS June 5, 2014

NYCIDA PROJECT COST/BENEFIT ANALYSIS June 5, 2014 NYCIDA PROJECT COST/BENEFIT ANALYSIS June 5, 2014 APPLICANT Skyline Restoration Inc. CGI Northeast, Inc. Spring Scaffolding LLC Metropolitan Northeast LLC 11-20 37 th Avenue Long Island City, NY 11101

More information

Anne Arundel County s Watershed Protection and Restoration Program STORMWATER REMEDIATION FEE CREDIT POLICY AND GUIDANCE (Multi-Family,

Anne Arundel County s Watershed Protection and Restoration Program STORMWATER REMEDIATION FEE CREDIT POLICY AND GUIDANCE (Multi-Family, s Watershed Protection and Restoration Program STORMWATER REMEDIATION FEE CREDIT POLICY AND GUIDANCE (Multi-Family, Non-Residential and/or Residential Properties with an Inspection and Maintenance Agreement

More information

User s Manual for the BMPTRAINS Model

User s Manual for the BMPTRAINS Model User s Manual for the BMPTRAINS Model Prepared By: Marty Wanielista, Mike Hardin, Przemyslaw Kuzlo, and Ikiensinma Gogo-Abite STORMWATER TREATMENT ANALYSIS: STEP 1: Specify pre- and post-development watershed

More information

APPROVAL AMENDMENT HISTORY

APPROVAL AMENDMENT HISTORY Prepared by: Aurecon South Africa (Pty) Ltd STORMWATER MANAGEMENT PLAN TOKAI ESTATE (DRAFT 1) Submission date: 11 January 2013 Contact Person: Francois du Toit T: +27 21 526 6950 F: +27 21 526 9500 E:

More information

Scheduling Maintenance for Infiltration Basins and Trenches

Scheduling Maintenance for Infiltration Basins and Trenches Visual Inspection for Infiltration Practices Visual inspection is a rapid assessment procedure for qualitatively evaluating the functionality of a stormwater best management practice (BMP). Visual inspections

More information

United States Environmental Protection Agency. EPA 841-B-09-001 December 2009 www.epa.gov/owow/nps/lid/section438

United States Environmental Protection Agency. EPA 841-B-09-001 December 2009 www.epa.gov/owow/nps/lid/section438 United States Environmental Protection Agency Office of Water (4503T) Washington, DC 20460 EPA 841-B-09-001 December 2009 www.epa.gov/owow/nps/lid/section438 Technical Guidance on Implementing the Stormwater

More information

BASSETT CREEK VALLEY MASTER PLAN OPEN HOUSE

BASSETT CREEK VALLEY MASTER PLAN OPEN HOUSE BASSETT CREEK VALLEY MASTER PLAN OPEN HOUSE February 23, 2006 PROJECT INTRODUCTION Project Area 230 acres $50 million estimated market value (approximately) 50 acres parkland 100 residences (estimated)

More information

Green Infrastructure in Arid and Semi-Arid Climates

Green Infrastructure in Arid and Semi-Arid Climates Green Reserve The American Recovery and Reinvestment Act (ARRA), Green Project Reserve of 2009, through the State Revolving Fund, provided funding for a wide variety of qualifying projects in the categories

More information

understanding Sustainable Landscaping & Tree Preservation Standards

understanding Sustainable Landscaping & Tree Preservation Standards understanding Sustainable Landscaping & Tree Preservation Standards Purpose To promote landscaping around development that is compatible with the existing environment, and which reduces greenhouse gas

More information

Stanford Graduate School of Business Knight Management Center Campus

Stanford Graduate School of Business Knight Management Center Campus Stanford Graduate School of Business Knight Management Center Campus Mathew Bamm, P.E. LEED AP courtesy: boora architects Overview Introductions Design Team and Project Overview Regulatory Framework and

More information

Electronic Signature and Fee Payment Confirmation

Electronic Signature and Fee Payment Confirmation Jeff Levine, AICP, Director Planning & Urban Development Department Electronic Signature and Fee Payment Confirmation Notice: Your electronic signature is considered a legal signature per state law. By

More information

Introduction to Rainwater Harvesting. Department of Biological and Agricultural Engineering Texas A&M University

Introduction to Rainwater Harvesting. Department of Biological and Agricultural Engineering Texas A&M University Introduction to Rainwater Harvesting Department of Biological and Agricultural Engineering Texas A&M University Rainfall in your watershed What is a watershed? An area of land that drains to a common point

More information

Development proposals will require to demonstrate, according to scale, type and location, that they:-

Development proposals will require to demonstrate, according to scale, type and location, that they:- Appendix 2 : Relevant Development Plan Policies Angus Local Plan Review 2009 Policy S1 : Development Boundaries (a) Within development boundaries proposals for new development on sites not allocated on

More information

How To Calculate Cost Of An Eco-Friendly Building

How To Calculate Cost Of An Eco-Friendly Building THE ECONOMICS OF LEED FOR EXISTING BUILDINGS FOR INDIVIDUAL BUILDINGS 2008 EDITION A WHITE PAPER BY LEONARDO ACADEMY INC. Revised February 2, 2009 APRIL 21, 2008 THIS WHITE PAPER SPONSORED BY JOHNSON CONTROLS

More information

DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods

DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES. Run-off Analysis Methods DOÑA ANA COUNTY DESIGN STORM CRITERIA GUIDELINES FOR COMMERCIAL AND RESIDENTIAL SITES Run-off Analysis Methods This document sets forth the minimum design, technical criteria and specifications for the

More information

LEED for Schools. for New Construction and Major Renovations

LEED for Schools. for New Construction and Major Renovations LEED for Schools for New Construction and Major Renovations First Edition Updated November 2007 Table of Contents Introduction 4 Sustainable Sites 6 SS Prerequisite 1: Construction Activity Pollution Prevention

More information

C.3 Workshop Track 2: Sizing Calculations and Design Considerations for LID Treatment Measures

C.3 Workshop Track 2: Sizing Calculations and Design Considerations for LID Treatment Measures C.3 Workshop Track 2: Sizing Calculations and Design Considerations for LID Treatment Measures Jill Bicknell, P.E., EOA, Inc. Santa Clara Valley Urban Runoff Pollution Prevention Program Presentation Overview

More information

CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE

CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE The following template may be used as a general guide for development of a Stormwater Pollution Prevention Plan (SWPPP) for construction activities.

More information

City of Beverly Hills Construction Stormwater Requirement Checklist

City of Beverly Hills Construction Stormwater Requirement Checklist City of Beverly Hills Construction Stormwater Requirement Checklist Construction activities are required to retain sediments, non-stormwater runoff and all constructionrelated materials, wastes, spills,

More information

Implementing Green Infrastructure in Atlanta

Implementing Green Infrastructure in Atlanta City of Atlanta Mayor Kasim Reed Department of Watershed Management Implementing Green Infrastructure in Atlanta SESWA Southeast Regional Stormwater Seminar April 9, 2014 Jo Ann J. Macrina, P.E. Commissioner

More information

Fiberglass Storage Tanks for Green Building Applications

Fiberglass Storage Tanks for Green Building Applications Fiberglass Storage Tanks for Green Building Applications www.zcl.com www.xerxes.com Fiberglass Tanks for Green Building Applications Water Storage Tanks and Green Building When people think of green building,

More information

2010 LEED Application Guide for Multiple Buildings and On-Campus Building Projects (2010 AGMBC)

2010 LEED Application Guide for Multiple Buildings and On-Campus Building Projects (2010 AGMBC) 2010 LEED Application Guide for Multiple Buildings and On-Campus Building Projects (2010 AGMBC) For Use with 2009 LEED Rating Systems for Design and Construction and Operations and Maintenance Published

More information

Storm Water Management Requirements for Construction Projects Less than One Acre

Storm Water Management Requirements for Construction Projects Less than One Acre Storm Water Management Requirements for Construction Projects Less than One Acre Purpose: UC Irvine s Phase II Small MS4 Storm Water Permit requires construction projects less than one acre in size to

More information

A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems.

A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems. 19. STORMWATER MANAGEMENT A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems. The majority of the approximately ±500 acre Property

More information

Comprehensive Plan for the National Capital DRAFT Federal Environment Element Policies

Comprehensive Plan for the National Capital DRAFT Federal Environment Element Policies Comprehensive Plan for the National Capital DRAFT Federal Environment Element Policies SECTION A: Climate Change 1. Ensure that climate change impacts are addressed in long range plans and in the review

More information

Carlton Fields Memorandum

Carlton Fields Memorandum Carlton Fields Memorandum TO: FROM: RE: DAN WEEDE FRED RUSHING RIPARIAN BUFFER DATE: JULY 26, 2013 BACKGROUND Both the state of Georgia and the city of Atlanta 1 have certain guidelines that must be followed

More information

Civil Engineering and Architecture (CEA) Detailed Outline

Civil Engineering and Architecture (CEA) Detailed Outline Civil Engineering and Architecture (CEA) Detailed Outline Unit 1: Overview of Civil Engineering and Architecture (23 days) Lesson 1.1: History of Civil Engineering and Architecture 1. Many features of

More information

LEED 2009 FOR NEW CONSTRUCTION AND MAJOR RENOVATONS ACP DOCUMENTATION GUIDANCE FOR PROJECTS OUTSIDE THE U.S.

LEED 2009 FOR NEW CONSTRUCTION AND MAJOR RENOVATONS ACP DOCUMENTATION GUIDANCE FOR PROJECTS OUTSIDE THE U.S. LEED 2009 FOR NEW CONSTRUCTION AND MAJOR RENOVATONS ACP DOCUMENTATION GUIDANCE FOR PROJECTS OUTSIDE THE U.S. October 2011 This is a draft document and can be used only in the interim until LEED Online

More information

PRIVATE TREATMENT CONTROL BMP OPERATION AND MAINTENANCE VERIFICATION FORM BIORETENTION FACILITIES, VEGETATED SWALES & HIGHER RATE BIOFILTERS

PRIVATE TREATMENT CONTROL BMP OPERATION AND MAINTENANCE VERIFICATION FORM BIORETENTION FACILITIES, VEGETATED SWALES & HIGHER RATE BIOFILTERS BIORETENTION FACILITIES, VEGETATED SWALES & HIGHER RATE BIOFILTERS Check here for Address or phone number change the fiscal year (July 1 June 30), and date(s) maintenance was performed. Under Inspection,

More information

APPENDIX B DESIGN GUIDELINES FOR APPROVED TREATMENT METHODS

APPENDIX B DESIGN GUIDELINES FOR APPROVED TREATMENT METHODS APPENDIX B DESIGN GUIDELINES FOR APPROVED TREATMENT METHODS PLANTER BOXES 1. Determine the impervious area contributing flow to the planter box (see Chapter 4.2). 2. Assumption: Typical soil infiltration

More information

Preliminary Plan Application and Checklist

Preliminary Plan Application and Checklist ALL APPLICATIONS ARE DUE AT 12:00 NOON ON THE FILING DATE Office Use Only PRELIMINARY / REVISED PRELIMINARY PLAN $300.00 Fee Paid: $ Date Paid: ALL FIELDS HIGHLIGHTED IN RED ARE REQUIRED FIELDS Case No.:

More information

MODULE 2 RULES RELATING RULES RELA

MODULE 2 RULES RELATING RULES RELA MODULE 2 RULES RELATING TO STORM DRAINAGE STANDARDS MODULE 2 RULES RELATING TO STORM DRAINAGE STANDARDS 1 RULES RELATING TO STORM DRAINAGE STANDARDS Sections that underwent revision 1-11 PURPOSE 1-2 MODIFICATIONS

More information

Clean Water Services. Ecosystems Services Case Study: Tualatin River, Washington

Clean Water Services. Ecosystems Services Case Study: Tualatin River, Washington Viewed broadly, the concept of ecosystem services describes the many resources and services provided by nature. Typically, traditional planning and development practices do not adequately represent the

More information