222 NORTH COLUMBUS DRIVE (PARK MILLENNIUM) - Capital Reserve Study

Size: px
Start display at page:

Download "222 NORTH COLUMBUS DRIVE (PARK MILLENNIUM) - Capital Reserve Study"

Transcription

1 ANNUAL EXPENSE SCHEDULE Page 1 of 24 Date: 9/ (5 Years) Building Envelope Roofs Tower & Elevator Penthouse Roof (Maintenance) $5,000 Tower & Elevator Penthouse Roof (Replacement) Tower Terraces (47th Flr.) - Roofing (Maintenance) $5,000 Tower Terraces (47th Flr.) - Roofing (Replacement) Tower Terraces (47th Flr.- Pavers (Replacement) $500 Pool Roof (3rd Flr) - (Maintenance) $2,500 Pool Roof (3rd Floor) - (Replacement) 2nd Floor Terrace, Roofing (Maintenance) $10,000 2nd Floor Terrace, Roofing (Replacement) 2nd Floor Terrace, Pavers (Replacement) $1,500 Skylights Pool Skylights (Maint./Repairs) $10,000 Pool Skylights (Replacement) 2nd Floor Terrace (Sun Deck) Planters (Maintenance) $20,000 Planters (Replacement) Lighting (Replacement) Railings (Replacement) Landscaping/Site Furniture Exposed Concrete Tower (Concrete Repairs) $250,000 Tower (Concrete Painting) Balconies Concrete (Repairs) $50,000 Concrete (Coating) Railings (Maintenance) $5,000 Railings (Replacement) $5,000 Windows & Balcony Doors Windows (Limited Repairs & Hardware Maint.) $5,000 $5,000 $5,000 $5,000 $5,000 Windows (Sealant Replacement) $250,000 Screens (Maintenance) Building Base Exterior Lighting (Replacement) Granite Panels (Maintenance) $25,000 Storefronts (Maintenance) $3,500 Canopy (Maintenance) $10,000 Decorative Metals (Maintenance) $10,000 Exterior Plaster Ceilings and Soffits (Maintenance) $50,000 Miscellaneous Service Doors (Maintenance) $5,000 Garage Doors

2 ANNUAL EXPENSE SCHEDULE Page 2 of 24 Date: 9/ (5 Years) Louvers (Maintenance) $5,000 Lightning Protection (Maintenance) Glass Railings (Maintenance) $5,000 City Highrise Examination (Critical Exam.) $75,000 City Highrise Examination (Ongoing Inspection) $5,000 Site Decorative Paving (Maintenance) $10,000 Decorative Paving (Replacement) Plaza (Maintenance) $15,000 Plaza (Replacement) Paving (Plaza Waterproofing/Membrane Replacement) Lighting (Replacement) Stainless Steel Railings & Bollards (Maintenance) Landscaping/Site Furniture Irrigation System (Replacement) Underground Utilities (Repairs) Dock Paving (Concrete) (Maintenance) $5,000 Dock Paving (Concrete) (Replacement) Building Expansion Joints (Maintenance) $25,000 Garage (Levels G1-G6) G1 Pedway/Bike Room (Remodeling) G5 Compactor Room Compactor (Maintenance) $5,000 Compactor (Replacement) Compactor Room (Refinishing) Chute (Maintenance) $5,000 G5 Emergency Generator Room Emergency Generator System (Maintenance) $10,000 Emergency Generator System (Replacement) G5 Loading Dock (Refinishing) $5,000 G1-G6 Mech./Elec. Rooms (Painting) Commercial Areas G1-G6 Parking (Concrete Maintenance & Repairs) G1-G6 Parking (Traffic Membrane) G1-G6 Parking - Ceilings & Walls (Maintenance) G1-G6 Parking - Lighting & Signage (Maintenance) 1st & G1-G6 Elevator Lobbies (Remodeling) Interior Areas (1st Floor) Main Lobby w/ Doorman's Station (Remodeling) Elevator Lobby (Remodeling) Mail Room & Small Lounge (Remodeling)

3 ANNUAL EXPENSE SCHEDULE Page 3 of 24 Date: 9/ (5 Years) Business Center (Remodeling) Management Center (Remodeling) Laundry Center & Cleaners (Remodeling) Commercial Tenants (Remodeling) Interior Areas (2nd Floor) Media/Club Room (Remodeling) Exercise Room (Remodeling) Pool Metal Pool, Spa, and Gutter System (Maintenance) $5,000 Pool Liner (Replacement) $25,000 Tile walls and Flooring (Remodeling) Plaster Ceiling (Maintenance) $10,000 Special Lighting (Maintenance) Furniture (Replacement) North & South Corridors (Remodeling) Elevator Lobby (Remodeling) Shop & Doorman's Locker Room (Remodeling) Men & Women Locker Rooms (Remodeling) Interior Areas (Tower Floors 3-52) Elevator Lobbies & Corridors (Remodeling) Elevator Cabs (Remodeling) Trash Rooms (Refinishing) Electrical Rooms (Refinishing) Storage Closets (Refinishing) Elevators (3) High-rise Passenger (Remodeling) (3) Low-rise Passenger (Remodeling) (2) Garage (Remodeling) Control Upgrades Hoists/Equipment (Repairs/Maint.) $50,000 Interior Common Miscellaneous (2) Stairwells (Refinishing) Security & Safety Equipment Signage (Replacement) Mechanical, Electrical, and Plumbing Roof (54th Floor) 2 - Cooling Towers (Replacement) 2 - Chillers (Replacement) 9 - Exhaust Fans (Repairs) $15, Boiler Stacks (Repairs)

4 ANNUAL EXPENSE SCHEDULE Page 4 of 24 Date: 9/ (5 Years) Miscellaneous Repairs/Replacements $10,000 East Elevator Equipment Room (54th Floor) 3 - Thru Wall Air Conditioners (Replacement) $1,000 East Mechanical Equipment Room (53rd Floor) 3 - Hot Water Boilers (Repairs) $30, Domestic Hot Water Boilers (Repairs) $15, Domestic Hot Water Storage Tanks (Repairs) 1 - Lrg. Pressure Relief Tank (Repairs) 2 - Lrg. Hot Water Pumps (Repairs) $20, Overhead Pressure Relief Tanks (Repairs) 1 - Medium Pressure Relief Tank& Pump (Repairs) $2, Overhead Hot Water Pumps (Repairs) $15, Large Unit Heaters (Repairs) 3 - Small Fresh-air Louvers (Repairs) 1 - Large Fresh-air Louver (Repairs) 2 - Steel Canister Filters (Repairs) $5, Large Motorized Louver (Repairs) $5,000 West Mechanical Equipment Room (53rd Floor) 2 - Large Chilled Water Pumps (Repairs) $10, Medium Condenser Water Pumps (Repairs) $20, Water Treatment System (Repairs) 2 - Large Chillers w/ Compressors (Repairs) $250, Extra Large Air-handler (Repairs) $25, Medium Water Pumps (Repairs) $25, Large Pressure Relief Tank (Repairs) 3 - Large Unit Heaters (Repairs) 1 - Large Motorized Louver (Repairs) $5,000 Electrical Room (53rd Floor) Disconnects, Transformers, Panels, Switchboards Upper Elevator Equipment Room (40th Floor) 1 - Horiz. Fan Coil Unit (Repairs) $5,000 Elevator Equipment Room (39th Floor) 1 - Air-conditioner (Replacement) Shop/Breakroom (2nd Floor) 2 - Hot & Cold Water Pumps (Repairs) $10, Lobby Air-Handler (Repairs) $10,000 Mechanical Room (2nd Floor) 1 - Commercial Air-Handler (Repairs) $15, Unit Heaters (Repairs) Pool Roof 1- Pool Air-Handler with Dehumidifier (Repairs) $10,000 West Mechanical Room (1st floor) 1 - Hot Water Heater for Laundry (Replacement) 2 - Hot Water Pumps (Repairs) $10,000

5 ANNUAL EXPENSE SCHEDULE Page 5 of 24 Date: 9/ (5 Years) Pool & Spa Equipment (Repairs) $10,000 Pool & Spa Equipment (Replacement) Transformers and Switchboards (Repairs) Parking Area (G1 Level) 3 - Large Exhaust Fans (Repairs) $15, Medium Exhaust Fans (Repairs) $5,000 Fan Room (G1 Level) 1 - Pedway Air-Handler (Repairs) $5,000 Loading Dock (G5 Level) 2 - Large Exhaust Fans (Repairs) $10,000 Pump Room (G5 Level) 2 - Huge Water Service Valves (Repairs) 4 - Large Secondary Water Valves (Repairs) 2 - Large Fire Protection Pumps (Repairs) 7 - Large Fire Protection Valves (Repairs) 3 - Fire Protection Controllers (Upgrades) 1 - Large Fire Protection "Jockey Pump" (Repairs) $5, Large Water Pumps with Controllers (Repairs) $15, Small Electric Unit Heaters (Repairs) Common Plumbing Domestic Water Risers (Partial Replacement)* Sanitary System Risers (Partial Replacement)* Storm System & Sumps (Repairs) $10,000 Hose Bibs (Repairs) $2,500 Common Mechanical Common Ductwork (Repairs)* $500,000 Controls (Repairs/Balancing)* $10,000 Common Electrical Lamps (Replacement) Interior Lighting Fixture (Replacement) Exterior Lighting Fixture (Replacement) Electric Distribution Equipment (Repairs) $10,000 Emergency Generator (Repairs)- G5 Level $10,000 Fire Protection Distribution (Repairs) $5,000 Alarms & Detectors (Repairs) $5,000 Extinguishers Emergency Lighting (Repairs)

6 ANNUAL EXPENSE SCHEDULE Page 6 of 24 Date: 9/ (5 Years) TOTALS $500,000 $80,000 $5,000 $10,000 $1,629,000 RESERVE EXPENDITURES ($500,000) ($80,000) ($5,000) ($10,000) ($1,629,000) RESERVE CONTRIBUTION $300,000 $300,000 $300,000 $300,000 $300,000 PREVIOUS YEAR BALANCE $1,200,000 $1,000,000 $1,220,000 $1,515,000 $1,805,000 LOAN YEAR END RESERVES $1,000,000 $1,220,000 $1,515,000 $1,805,000 $476,000 OPENING RESERVES BALANCE $1,200,000 $940,000 $1,100,000 $1,335,000 $1,565,000 RESERVE CONTRIBUTION $300,000 $300,000 $300,000 $300,000 $300, Reserve Contribution $200,000 Anticipated Loan Amount Recommended Reserve Changes 50% increase

7 ANNUAL EXPENSE SCHEDULE Page 7 of 24 Date: 9/ (10 Years) Building Envelope Roofs Tower & Elevator Penthouse Roof (Maintenance) $5,000 Tower & Elevator Penthouse Roof (Replacement) Tower Terraces (47th Flr.) - Roofing (Maintenance) $5,000 Tower Terraces (47th Flr.) - Roofing (Replacement) Tower Terraces (47th Flr.- Pavers (Replacement) $500 Pool Roof (3rd Flr) - (Maintenance) $2,500 Pool Roof (3rd Floor) - (Replacement) 2nd Floor Terrace, Roofing (Maintenance) $10,000 2nd Floor Terrace, Roofing (Replacement) 2nd Floor Terrace, Pavers (Replacement) $1,500 Skylights Pool Skylights (Maint./Repairs) Pool Skylights (Replacement) 2nd Floor Terrace (Sun Deck) Planters (Maintenance) Planters (Replacement) Lighting (Replacement) Railings (Replacement) Landscaping/Site Furniture Exposed Concrete Tower (Concrete Repairs) Tower (Concrete Painting) Balconies Concrete (Repairs) Concrete (Coating) Railings (Maintenance) $5,000 Railings (Replacement) Windows & Balcony Doors Windows (Limited Repairs & Hardware Maint.) $5,000 $5,000 $5,000 $5,000 $5,000 Windows (Sealant Replacement) Screens (Maintenance) Building Base Exterior Lighting (Replacement) Granite Panels (Maintenance) Storefronts (Maintenance) $3,500 Canopy (Maintenance) Decorative Metals (Maintenance) Exterior Plaster Ceilings and Soffits (Maintenance) Miscellaneous Service Doors (Maintenance) $5,000 Garage Doors

8 ANNUAL EXPENSE SCHEDULE Page 8 of 24 Date: 9/ (10 Years) Louvers (Maintenance) $5,000 Lightning Protection (Maintenance) Glass Railings (Maintenance) $5,000 Miscellaneous Minor Repairs/Replacements $25,000 City Highrise Examination (Critical Exam.) $75,000 $75,000 City Highrise Examination (Ongoing Inspection) $5,000 Site Decorative Paving (Maintenance) $10,000 Decorative Paving (Replacement) Plaza (Maintenance) $15,000 Plaza (Replacement) Paving (Plaza Waterproofing/Membrane Replacement) Lighting (Replacement) Stainless Steel Railings & Bollards (Maintenance) Landscaping/Site Furniture Irrigation System (Replacement) Underground Utilities (Repairs) Dock Paving (Concrete) (Maintenance) $5,000 Dock Paving (Concrete) (Replacement) Building Expansion Joints (Maintenance) $25,000 Garage (Levels G1-G6) G1 Pedway/Bike Room (Remodeling) G5 Compactor Room Compactor (Maintenance) $5,000 Compactor (Replacement) Compactor Room (Refinishing) Chute (Maintenance) $5,000 G5 Emergency Generator Room Emergency Generator System (Maintenance) Emergency Generator System (Replacement) G5 Loading Dock (Refinishing) $5,000 G1-G6 Mech./Elec. Rooms (Painting) Commercial Areas G1-G6 Parking (Concrete Maintenance & Repairs) G1-G6 Parking (Traffic Membrane) G1-G6 Parking - Ceilings & Walls (Maintenance) G1-G6 Parking - Lighting & Signage (Maintenance) 1st & G1-G6 Elevator Lobbies (Remodeling) Interior Areas (1st Floor) Main Lobby w/ Doorman's Station (Remodeling) Elevator Lobby (Remodeling) Mail Room & Small Lounge (Remodeling)

9 ANNUAL EXPENSE SCHEDULE Page 9 of 24 Date: 9/ (10 Years) Business Center (Remodeling) Management Office (Remodeling) Laundry Center & Cleaners (Remodeling) Commercial Tenants (Remodeling) Interior Areas (2nd Floor) Media/Club Room (Remodeling) Exercise Room (Remodeling) Pool Metal Pool, Spa, and Gutter System (Maintenance) $5,000 Pool Liner (Replacement) Tile walls and Flooring (Remodeling) Plaster Ceiling (Maintenance) Special Lighting (Maintenance) Furniture (Replacement) North & South Corridors (Remodeling) Elevator Lobby (Remodeling) Shop & Doorman's Locker Room (Remodeling) Men & Women Locker Rooms (Remodeling) Interior Areas (Tower Floors 3-52) Elevator Lobbies & Corridors (Remodeling) Elevator Cabs (Remodeling) Trash Rooms (Refinishing) Electrical Rooms (Refinishing) Storage Closets (Refinishing) Elevators (3) High-rise Passenger (Remodeling) (3) Low-rise Passenger (Remodeling) (2) Garage (Remodeling) Control Upgrades Hoists/Equipment (Repairs/Maint.) Interior Common Miscellaneous (2) Stairwells (Refinishing) Security & Safety Equipment Signage (Replacement) Mechanical, Electrical, and Plumbing Roof (54th Floor) 2 - Cooling Towers (Replacement) 2 - Chillers (Replacement) 9 - Exhaust Fans (Repairs)

10 ANNUAL EXPENSE SCHEDULE Page 10 of 24 Date: 9/ (10 Years) 3 - Boiler Stacks (Repairs) Miscellaneous Repairs/Replacements $20,000 East Elevator Equipment Room (54th Floor) 3 - Thru Wall Air Conditioners (Replacement) East Mechanical Equipment Room (53rd Floor) 3 - Hot Water Boilers (Repairs) 3 - Domestic Hot Water Boilers (Repairs) 6 - Domestic Hot Water Storage Tanks (Repairs) 1 - Lrg. Pressure Relief Tank (Repairs) 2 - Lrg. Hot Water Pumps (Repairs) 2 - Overhead Pressure Relief Tanks (Repairs) 1 - Medium Pressure Relief Tank& Pump (Repairs) 3 - Overhead Hot Water Pumps (Repairs) 3 - Large Unit Heaters (Repairs) 3 - Small Fresh-air Louvers (Repairs) 1 - Large Fresh-air Louver (Repairs) 2 - Steel Canister Filters (Repairs) 1 - Large Motorized Louver (Repairs) Miscellaneous Minor Repairs/Replacements West Mechanical Equipment Room (53rd Floor) 2 - Large Chilled Water Pumps (Repairs) 2 - Medium Condenser Water Pumps (Repairs) 1 - Water Treatment System (Repairs) 2 - Large Chillers w/ Compressors (Repairs) 1 - Extra Large Air-handler (Repairs) 4 - Medium Water Pumps (Repairs) 1 - Large Pressure Relief Tank (Repairs) 3 - Large Unit Heaters (Repairs) 1 - Large Motorized Louver (Repairs) Miscellaneous Minor Repairs/Replacements Electrical Room (53rd Floor) Disconnects, Transformers, Panels, Switchboards Upper Elevator Equipment Room (40th Floor) 1 - Horiz. Fan Coil Unit (Repairs) Elevator Equipment Room (39th Floor) 1 - Air-conditioner (Replacement) Shop/Breakroom (2nd Floor) 2 - Hot & Cold Water Pumps (Repairs) 1 - Lobby Air-Handler (Repairs) Mechanical Room (2nd Floor) 1 - Commercial Air-Handler (Repairs) 2 - Unit Heaters (Repairs) Pool Roof 1- Pool Air-Handler with Dehumidifier (Repairs) West Mechanical Room (1st Floor) 1 - Hot Water Heater for Laundry (Replacement) 2 - Hot Water Pumps (Repairs)

11 ANNUAL EXPENSE SCHEDULE Page 11 of 24 Date: 9/ (10 Years) Pool & Spa Equipment (Repairs) Pool & Spa Equipment (Replacement) Transformers and Switchboards (Repairs) Parking Area (G1 Level) 3 - Large Exhaust Fans (Repairs) 2 - Medium Exhaust Fans (Repairs) Fan Room (G1 Level) 1 - Pedway Air-Handler (Repairs) Loading Dock (G5 Level) 2 - Large Exhaust Fans (Repairs) Pump Room (G5 Level) 2 - Huge Water Service Valves (Repairs) 4 - Large Secondary Water Valves (Repairs) 2 - Large Fire Protection Pumps (Repairs) 7 - Large Fire Protection Valves (Repairs) 3 - Fire Protection Controllers (Upgrades) 1 - Large Fire Protection "Jockey Pump" (Repairs) 3 - Large Water Pumps with Controllers (Repairs) 1 - Small Electric Unit Heaters (Repairs) Common Plumbing Domestic Water Risers (Partial Replacement)* Sanitary System Risers (Partial Replacement)* Storm System & Sumps (Repairs) Hose Bibs (Repairs) $2,500 Common Mechanical Common Ductwork (Repairs)* Controls (Repairs/Balancing)* $25,000 Common Electrical Lamps (Replacement) Interior Lighting Fixture (Replacement) Exterior Lighting Fixture (Replacement) Electric Distribution Equipment (Repairs) Emergency Generator (Repairs)- G5 Level $10,000 Fire Protection Distribution (Repairs) $5,000 Alarms & Detectors (Repairs) $5,000 Extinguishers Emergency Lighting (Repairs)

12 ANNUAL EXPENSE SCHEDULE Page 12 of 24 Date: 9/ (10 Years) TOTALS $110,000 $5,000 $10,000 $5,000 $330,500 RESERVE EXPENDITURES ($110,000) ($5,000) ($10,000) ($5,000) ($330,500) RESERVE CONTRIBUTION $450,000 $450,000 $450,000 $450,000 $450,000 PREVIOUS YEAR BALANCE $476,000 $816,000 $1,261,000 $1,701,000 $2,146,000 LOAN YEAR END RESERVES $816,000 $1,261,000 $1,701,000 $2,146,000 $2,265,500 OPENING RESERVES BALANCE $476,000 $816,000 $1,261,000 $1,701,000 $2,146,000 RESERVE CONTRIBUTION $450,000 $450,000 $450,000 $450,000 $450, Reserve Contribution $300,000 Anticipated Loan Amount Recommended Reserve Changes 50% Increase

13 ANNUAL EXPENSE SCHEDULE Page 13 of 24 Date: 9/ (15 Years) Building Envelope Roofs Tower & Elevator Penthouse Roof (Maintenance) Tower & Elevator Penthouse Roof (Replacement) $500,000 Tower Terraces (47th Flr.) - Roofing (Maintenance) Tower Terraces (47th Flr.) - Roofing (Replacement) $500,000 Tower Terraces (47th Flr.- Pavers (Replacement) Pool Roof (3rd Flr) - (Maintenance) Pool Roof (3rd Floor) - (Replacement) $150,000 2nd Floor Terrace, Roofing (Maintenance) 2nd Floor Terrace, Roofing (Replacement) $750,000 2nd Floor Terrace, Pavers (Replacement) Skylights Pool Skylights (Maint./Repairs) $10,000 Pool Skylights (Replacement) 2nd Floor Terrace (Sun Deck) Planters (Maintenance) $20,000 Planters (Replacement) Lighting (Replacement) $25,000 Railings (Replacement) Landscaping/Site Furniture Exposed Concrete Tower (Concrete Repairs) $250,000 Tower (Concrete Painting) $250,000 Balconies Concrete (Repairs) $50,000 Concrete (Coating) $150,000 Railings (Maintenance) $5,000 Railings (Replacement) Windows & Balcony Doors Windows (Limited Repairs & Hardware Maint.) $5,000 $5,000 $5,000 $5,000 $5,000 Windows (Sealant Replacement) $250,000 Screens (Maintenance) $2,500 Building Base Exterior Lighting (Replacement) $150,000 Granite Panels (Maintenance) $25,000 Storefronts (Maintenance) $3,500 Canopy (Maintenance) $10,000 Decorative Metals (Maintenance) $20,000 Exterior Plaster Ceilings and Soffits (Maintenance) $50,000 Miscellaneous Service Doors (Maintenance) $5,000 Garage Doors

14 ANNUAL EXPENSE SCHEDULE Page 14 of 24 Date: 9/ (15 Years) Louvers (Maintenance) $5,000 Lightning Protection (Maintenance) Glass Railings (Maintenance) $5,000 Miscellaneous Minor Repairs/Replacements $25,000 City Highrise Examination (Critical Exam.) $75,000 City Highrise Examination (Ongoing Inspection) $5,000 Site Decorative Paving (Maintenance) $10,000 Decorative Paving (Replacement) Plaza (Maintenance) $15,000 Plaza (Replacement) Paving (Plaza Waterproofing/Membrane Replacement) Lighting (Replacement) Stainless Steel Railings & Bollards (Maintenance) Landscaping/Site Furniture Irrigation System (Replacement) Underground Utilities (Repairs) Dock Paving (Concrete) (Maintenance) $5,000 Dock Paving (Concrete) (Replacement) Building Expansion Joints (Maintenance) $25,000 Garage (Levels G1-G6) G1 Pedway/Bike Room (Remodeling) $100,000 G5 Compactor Room Compactor (Maintenance) $5,000 Compactor (Replacement) $25,000 Compactor Room (Refinishing) $5,000 Chute (Maintenance) $5,000 G5 Emergency Generator Room Emergency Generator System (Maintenance) Emergency Generator System (Replacement) $10,000 G5 Loading Dock (Refinishing) $5,000 G1-G6 Mech./Elec. Rooms (Painting) Commercial Areas G1-G6 Parking (Concrete Maintenance & Repairs) G1-G6 Parking (Traffic Membrane) G1-G6 Parking - Ceilings & Walls (Maintenance) G1-G6 Parking - Lighting & Signage (Maintenance) 1st & G1-G6 Elevator Lobbies (Remodeling) Interior Areas (1st Floor) Main Lobby w/ Doorman's Station (Remodeling) $325,000 Elevator Lobby (Remodeling) $40,000 Mail Room & Small Lounge (Remodeling) $50,000

15 ANNUAL EXPENSE SCHEDULE Page 15 of 24 Date: 9/ (15 Years) Business Center (Remodeling) $40,000 Management Office (Remodeling) $10,000 Laundry Center & Cleaners (Remodeling) Commercial Tenants (Remodeling) Interior Areas (2nd Floor) Media/Club Room (Remodeling) $125,000 Exercise Room (Remodeling) $50,000 Pool Metal Pool, Spa, and Gutter System (Maintenance) $5,000 Pool Liner (Replacement) $25,000 Tile walls and Flooring (Remodeling) $150,000 Plaster Ceiling (Maintenance) $10,000 Special Lighting (Maintenance) Furniture (Replacement) North & South Corridors (Remodeling) $75,000 North & South Corridors (Remodeling) $75,000 Elevator Lobby (Remodeling) $15,000 Shop & Doorman's Locker Room (Remodeling) $10,000 Men & Women Locker Rooms (Remodeling) $150,000 Interior Areas (Tower Floors 3-52) Elevator Lobbies & Corridors (Remodeling) $2,750,000 Elevator Cabs (Remodeling) $60,000 Trash Rooms (Refinishing) Electrical Rooms (Refinishing) Storage Closets (Refinishing) Elevators (3) High-rise Passenger (Remodeling) $30,000 Interior Common Miscellaneous (2) Stairwells (Refinishing) Security & Safety Equipment Signage (Replacement) Mechanical, Electrical, and Plumbing Roof (54th Floor) 2 - Cooling Towers (Replacement)

16 ANNUAL EXPENSE SCHEDULE Page 16 of 24 Date: 9/ (15 Years) 2 - Chillers (Replacement) 9 - Exhaust Fans (Repairs) $10, Boiler Stacks (Repairs) Miscellaneous Repairs/Replacements $20,000 East Elevator Equipment Room (54th Floor) 3 - Thru Wall Air Conditioners (Replacement) $1,000 East Mechanical Equipment Room (53rd Floor) 3 - Hot Water Boilers (Repairs) $30, Domestic Hot Water Boilers (Repairs) $15, Domestic Hot Water Storage Tanks (Repairs) 1 - Lrg. Pressure Relief Tank (Repairs) 2 - Lrg. Hot Water Pumps (Repairs) $20, Overhead Pressure Relief Tanks (Repairs) 1 - Medium Pressure Relief Tank& Pump (Repairs) $2, Overhead Hot Water Pumps (Repairs) $15, Large Unit Heaters (Repairs) 3 - Small Fresh-air Louvers (Repairs) 1 - Large Fresh-air Louver (Repairs) 2 - Steel Canister Filters (Repairs) $5, Large Motorized Louver (Repairs) $5,000 West Mechanical Equipment Room (53rd Floor) 2 - Large Chilled Water Pumps (Repairs) $10, Medium Condenser Water Pumps (Repairs) $20, Water Treatment System (Repairs) 2 - Large Chillers w/ Compressors (Repairs) $250, Extra Large Air-handler (Repairs) $50, Medium Water Pumps (Repairs) $40, Large Pressure Relief Tank (Repairs) 3 - Large Unit Heaters (Repairs) 1 - Large Motorized Louver (Repairs) $10,000 Miscellaneous Minor Repairs/Replacements $25,000 Electrical Room (53rd Floor) Disconnects, Transformers, Panels, Switchboards Upper Elevator Equipment Room (40th Floor) 1 - Horiz. Fan Coil Unit (Repairs) $5,000 Elevator Equipment Room (39th Floor) 1 - Air-conditioner (Replacement) $250 Shop/Breakroom (2nd Floor) 2 - Hot & Cold Water Pumps (Repairs) $10, Lobby Air-Handler (Repairs) $15,000 Mechanical Room (2nd Floor) 1 - Commercial Air-Handler (Repairs) $30, Unit Heaters (Repairs) Pool Roof 1- Pool Air-Handler with Dehumidifier (Repairs) $10,000 West Mechanical Room (1st Floor) 1 - Hot Water Heater for Laundry (Replacement) $500

17 ANNUAL EXPENSE SCHEDULE Page 17 of 24 Date: 9/ (15 Years) 2 - Hot Water Pumps (Repairs) $10,000 Pool & Spa Equipment (Repairs) Pool & Spa Equipment (Replacement) $100,000 $10,000 Transformers and Switchboards (Repairs) Parking Area (G1 Level) 3 - Large Exhaust Fans (Repairs) $15, Medium Exhaust Fans (Repairs) $5,000 Fan Room (G1 Level) 1 - Pedway Air-Handler (Repairs) $10,000 Loading Dock (G5 Level) 2 - Large Exhaust Fans (Repairs) $10,000 Pump Room (G5 Level) 2 - Huge Water Service Valves (Repairs) 4 - Large Secondary Water Valves (Repairs) 2 - Large Fire Protection Pumps (Repairs) 7 - Large Fire Protection Valves (Repairs) 3 - Fire Protection Controllers (Upgrades) $15, Large Fire Protection "Jockey Pump" (Repairs) $5, Large Water Pumps with Controllers (Repairs) $15, Small Electric Unit Heaters (Repairs) ` Common Plumbing Domestic Water Risers (Partial Replacement)* Sanitary System Risers (Partial Replacement)* Storm System & Sumps (Repairs) $10,000 Hose Bibs (Repairs) $2,500 Common Mechanical Common Ductwork (Repairs)* Controls (Repairs/Balancing)* $25,000 Common Electrical Lamps (Replacement) Interior Lighting Fixture (Replacement) Exterior Lighting Fixture (Replacement) Electric Distribution Equipment (Repairs) $10,000 Emergency Generator (Repairs)- G5 Level $10,000 Fire Protection Distribution (Repairs) Alarms & Detectors (Repairs) $5,000 Extinguishers $5,000 Emergency Lighting (Repairs)

18 ANNUAL EXPENSE SCHEDULE Page 18 of 24 Date: 9/ (15 Years) TOTALS $35,000 $10,000 $4,040,750 $80,000 $4,472,000 RESERVE EXPENDITURES ($35,000) ($10,000) ($4,040,750) ($80,000) ($4,472,000) RESERVE CONTRIBUTION $675,000 $675,000 $675,000 $675,000 $675,000 PREVIOUS YEAR BALANCE $2,265,500 $2,905,500 $3,570,500 $204,750 $799,750 LOAN $3,000,000 YEAR END RESERVES $2,905,500 $3,570,500 $204,750 $799,750 $2,750 OPENING RESERVES BALANCE $2,265,500 $1,446,100 $3,570,500 $204,750 $799,750 RESERVE CONTRIBUTION $675,000 $675,000 $675,000 $675,000 $675, Reserve Contribution $450,000 Anticipated Loan Amount 50% Increase $3,000,000 Recommended Reserve Changes

19 ANNUAL EXPENSE SCHEDULE Page 19 of 24 Date: 9/ (20 Years) Building Envelope Roofs $5,000 Tower & Elevator Penthouse Roof (Maintenance) Tower & Elevator Penthouse Roof (Replacement) $5,000 Tower Terraces (47th Flr.) - Roofing (Maintenance) Tower Terraces (47th Flr.) - Roofing (Replacement) Tower Terraces (47th Flr.- Pavers (Replacement) $500 Pool Roof (3rd Flr) - (Maintenance) $2,500 Pool Roof (3rd Floor) - (Replacement) 2nd Floor Terrace, Roofing (Maintenance) $10,000 2nd Floor Terrace, Roofing (Replacement) 2nd Floor Terrace, Pavers (Replacement) $1,500 Skylights Pool Skylights (Maint./Repairs) Pool Skylights (Replacement) 2nd Floor Terrace (Sun Deck) Planters (Maintenance) Planters (Replacement) Lighting (Replacement) Railings (Replacement) Landscaping/Site Furniture Exposed Concrete Tower (Concrete Repairs) Tower (Concrete Painting) Balconies Concrete (Repairs) Concrete (Coating) Railings (Maintenance) $5,000 Railings (Replacement) Windows & Balcony Doors Windows (Limited Repairs & Hardware Maint.) $5,000 $5,000 $5,000 $5,000 $5,000 Windows (Sealant Replacement) Screens (Maintenance) Building Base Exterior Lighting (Replacement) Granite Panels (Maintenance) Storefronts (Maintenance) $3,500 Canopy (Maintenance) Decorative Metals (Maintenance) Exterior Plaster Ceilings and Soffits (Maintenance) Miscellaneous Service Doors (Maintenance) $5,000 Garage Doors

20 ANNUAL EXPENSE SCHEDULE Page 20 of 24 Date: 9/ (20 Years) Louvers (Maintenance) $5,000 Lightning Protection (Maintenance) Glass Railings (Maintenance) $5,000 Miscellaneous Minor Repairs/Replacements $25,000 City Highrise Examination (Critical Exam.) $75,000 City Highrise Examination (Ongoing Inspection) $5,000 $5,000 Site Decorative Paving (Maintenance) $10,000 Decorative Paving (Replacement) Plaza (Maintenance) $15,000 Plaza (Replacement) Paving (Plaza Waterproofing/Membrane Replacement) Lighting (Replacement) Stainless Steel Railings & Bollards (Maintenance) Landscaping/Site Furniture Irrigation System (Replacement) Underground Utilities (Repairs) Dock Paving (Concrete) (Maintenance) $5,000 Dock Paving (Concrete) (Replacement) Building Expansion Joints (Maintenance) $25,000 Garage (Levels G1-G6) G1 Pedway/Bike Room (Remodeling) G5 Compactor Room Compactor (Maintenance) $5,000 Compactor (Replacement) Compactor Room (Refinishing) Chute (Maintenance) $5,000 G5 Emergency Generator Room Emergency Generator System (Maintenance) Emergency Generator System (Replacement) G5 Loading Dock (Refinishing) $5,000 G1-G6 Mech./Elec. Rooms (Painting) Commercial Areas G1-G6 Parking (Concrete Maintenance & Repairs) G1-G6 Parking (Traffic Membrane) G1-G6 Parking - Ceilings & Walls (Maintenance) G1-G6 Parking - Lighting & Signage (Maintenance) 1st & G1-G6 Elevator Lobbies (Remodeling) Interior Areas (1st Floor) Main Lobby w/ Doorman's Station (Remodeling) Elevator Lobby (Remodeling) Mail Room & Small Lounge (Remodeling)

21 ANNUAL EXPENSE SCHEDULE Page 21 of 24 Date: 9/ (20 Years) Business Center (Remodeling) Management Office (Remodeling) Laundry Center & Cleaners (Remodeling) Commercial Tenants (Remodeling) Interior Areas (2nd Floor) Media/Club Room (Remodeling) Exercise Room (Remodeling) Pool Metal Pool, Spa, and Gutter System (Maintenance) $5,000 Pool Liner (Replacement) Tile walls and Flooring (Remodeling) Plaster Ceiling (Maintenance) Special Lighting (Maintenance) Furniture (Replacement) North & South Corridors (Remodeling) Elevator Lobby (Remodeling) Shop & Doorman's Locker Room (Remodeling) Men & Women Locker Rooms (Remodeling) Interior Areas (Tower Floors 3-52) Elevator Lobbies & Corridors (Remodeling) Elevator Cabs (Remodeling) Trash Rooms (Refinishing) Electrical Rooms (Refinishing) Storage Closets (Refinishing) Elevators (3) High-rise Passenger (Remodeling) (3) Low-rise Passenger (Remodeling) (2) Garage (Remodeling) Control Upgrades Hoists/Equipment (Repairs/Maint.) Interior Common Miscellaneous (2) Stairwells (Refinishing) Security & Safety Equipment Signage (Replacement) Mechanical, Electrical, and Plumbing Roof (54th Floor) 2 - Cooling Towers (Replacement) 2 - Chillers (Replacement)

22 ANNUAL EXPENSE SCHEDULE Page 22 of 24 Date: 9/ (20 Years) 9 - Exhaust Fans (Repairs) 3 - Boiler Stacks (Repairs) Miscellaneous Repairs/Replacements $20,000 East Elevator Equipment Room (54th Floor) 3 - Thru Wall Air Conditioners (Replacement) East Mechanical Equipment Room (53rd Floor) 3 - Hot Water Boilers (Repairs) 3 - Domestic Hot Water Boilers (Repairs) 6 - Domestic Hot Water Storage Tanks (Repairs) 1 - Lrg. Pressure Relief Tank (Repairs) 2 - Lrg. Hot Water Pumps (Repairs) 2 - Overhead Pressure Relief Tanks (Repairs) 1 - Medium Pressure Relief Tank& Pump (Repairs) 3 - Overhead Hot Water Pumps (Repairs) 3 - Large Unit Heaters (Repairs) 3 - Small Fresh-air Louvers (Repairs) 1 - Large Fresh-air Louver (Repairs) 2 - Steel Canister Filters (Repairs) 1 - Large Motorized Louver (Repairs) West Mechanical Equipment Room (53rd Floor) 2 - Large Chilled Water Pumps (Repairs) 2 - Medium Condenser Water Pumps (Repairs) 1 - Water Treatment System (Repairs) 2 - Large Chillers w/ Compressors (Repairs) 1 - Extra Large Air-handler (Repairs) 4 - Medium Water Pumps (Repairs) 1 - Large Pressure Relief Tank (Repairs) 3 - Large Unit Heaters (Repairs) 1 - Large Motorized Louver (Repairs) Miscellaneous Minor Repairs/Replacements Electrical Room (53rd Floor) Disconnects, Transformers, Panels, Switchboards Upper Elevator Equipment Room (40th Floor) 1 - Horiz. Fan Coil Unit (Repairs) Elevator Equipment Room (39th Floor) 1 - Air-conditioner (Replacement) Shop/Breakroom (2nd Floor) 2 - Hot & Cold Water Pumps (Repairs) 1 - Lobby Air-Handler (Repairs) Mechanical Room (2nd Floor) 1 - Commercial Air-Handler (Repairs) 2 - Unit Heaters (Repairs) Pool Roof 1- Pool Air-Handler with Dehumidifier (Repairs) West Mechanical Room (1st Floor)

23 ANNUAL EXPENSE SCHEDULE Page 23 of 24 Date: 9/ (20 Years) 1 - Hot Water Heater for Laundry (Replacement) 2 - Hot Water Pumps (Repairs) Pool & Spa Equipment (Repairs) Pool & Spa Equipment (Replacement) $5,000 Transformers and Switchboards (Repairs) Parking Area (G1 Level) 3 - Large Exhaust Fans (Repairs) 2 - Medium Exhaust Fans (Repairs) Fan Room (G1 Level) 1 - Pedway Air-Handler (Repairs) Loading Dock (G5 Level) 2 - Large Exhaust Fans (Repairs) Pump Room (G5 Level) 2 - Huge Water Service Valves (Repairs) 4 - Large Secondary Water Valves (Repairs) 2 - Large Fire Protection Pumps (Repairs) 7 - Large Fire Protection Valves (Repairs) 3 - Fire Protection Controllers (Upgrades) 1 - Large Fire Protection "Jockey Pump" (Repairs) 3 - Large Water Pumps with Controllers (Repairs) 1 - Small Electric Unit Heaters (Repairs) ` Common Plumbing Domestic Water Risers (Partial Replacement)* Sanitary System Risers (Partial Replacement)* Storm System & Sumps (Repairs) Hose Bibs (Repairs) $2,500 Common Mechanical Common Ductwork (Repairs)* Controls (Repairs/Balancing)* $25,000 Common Electrical Lamps (Replacement) Interior Lighting Fixture (Replacement) Exterior Lighting Fixture (Replacement) Electric Distribution Equipment (Repairs) Emergency Generator (Repairs)- G5 Level $10,000 Fire Protection Distribution (Repairs) $5,000 Alarms & Detectors (Repairs) $5,000 Extinguishers Emergency Lighting (Repairs)

24 ANNUAL EXPENSE SCHEDULE Page 24 of 24 Date: 9/ (20 Years) TOTALS $40,000 $5,000 $80,000 $5,000 $275,500 RESERVE EXPENDITURES ($40,000) ($5,000) ($80,000) ($5,000) ($275,500) RESERVE CONTRIBUTION $675,000 $675,000 $675,000 $675,000 $675,000 PREVIOUS YEAR BALANCE $2,750 $137,500 $307,500 $402,500 $572,500 LOAN (Payment) ($500,000) ($500,000) ($500,000) ($500,000) ($500,000) YEAR END RESERVES $137,750 $307,500 $402,500 $572,500 $472,000 OPENING RESERVES BALANCE $2,750 $137,750 $307,500 $402,500 $572,500 RESERVE CONTRIBUTION $675,000 $675,000 $675,000 $675,000 $675, Reserve Contribution $675,000 Anticipated Loan Amount $500K/Year Payment Recommended Reserve Changes No Change END SCHEDULE

Arizona Health Care Association DISASTER PLANNING AND EMERGENCY MANAGEMENT GUIDE POST INCIDENT DAMAGE ASSESSMENT CHECKLIST

Arizona Health Care Association DISASTER PLANNING AND EMERGENCY MANAGEMENT GUIDE POST INCIDENT DAMAGE ASSESSMENT CHECKLIST It is essential to perform a Basic Damage Assessment (BDA) following an adverse event to help ensure the safety of building occupants as well as prevent additional losses from occurring. This checklist

More information

OFFICE SPACE FOR LEASE THE WEST MALL TORONTO, ON

OFFICE SPACE FOR LEASE THE WEST MALL TORONTO, ON BO N $1 US.2 0 P CO M SF M /A I NN SIO UM N OFFICE SPACE FOR LEASE Up to 40,000 sf contiguous available Building under new ownership and management Currently undergoing building upgrades For more information,

More information

Estimated Useful Life (EUL) Tables

Estimated Useful Life (EUL) Tables 3900 Wisconsin Avenue, NW Washington, DC 20016-2892 INSTRUCTIONS FOR PERFORMING A MULTIFAMILY PROPERTY CONDITION ASSESSMENT (Version 2.0) APPENDIX F ESTIMATED USEFUL LIFE TABLES These Estimated Useful

More information

Mechanical, Plumbing, and Fire Protection Conditions

Mechanical, Plumbing, and Fire Protection Conditions Mechanical, Plumbing, and Fire Protection Conditions Mechanical Conditions The mechanical systems within the building consist of a combination of the original 1926 systems and renovations that occurred

More information

Building Description Project Description Estimated Cost Notes Total Deferred

Building Description Project Description Estimated Cost Notes Total Deferred Building Description Project Description Estimated Cost Notes Total Deferred Athletic Fields & Grounds Baseball dugouts 125,000 Surface level/inground? Relamp Baseball field 16,000 Relamp Softball field

More information

costs and billing Facilities Services State-Funded and Billable Services Centrally Funded Services for State Supported Spaces Billable Services

costs and billing Facilities Services State-Funded and Billable Services Centrally Funded Services for State Supported Spaces Billable Services Facilities Services State-Funded and Facilities Services receives funding to provide maintenance in eligible state-supported areas. State-supported areas, equipment, and facilities are those that are utilized

More information

Nominal Life Expectancy for Building Components

Nominal Life Expectancy for Building Components Nominal Life Expectancy for Building Components Building System Page A. HVAC 2 B. Elevator/Escalator 6 C. Plumbing 7 D. Roofing 8 E. Electrical 10 F. Fire/Life/Safety/Security System 11 G. Interior Finishes

More information

www.citiesinspection.com October 5, 2015 Dear Client,

www.citiesinspection.com October 5, 2015 Dear Client, www.citiesinspection.com October 5, 2015 Dear Client, On 9/14/2015, Cities Inspection Service, Inc. completed a building inspection of the property located at 123 Oak Street, Someplace, Minnesota for you.

More information

Braselton Bros. Store Redevelopment 5134 HWY 53 BRASELTON, GA 30548 LEVEL 0 - DEMO & NEW PLAN. Room. Room. Room. Room. Room. Room. Room. Room.

Braselton Bros. Store Redevelopment 5134 HWY 53 BRASELTON, GA 30548 LEVEL 0 - DEMO & NEW PLAN. Room. Room. Room. Room. Room. Room. Room. Room. 1.d 2.d 3.d 4.d 1.d 2.d 3.d 4.d REMOVE, REPAIR, & REPLACE EXISTING STOREFRONT SYSTEMS D.1 D.2 REMOVE, REPAIR, & REPLACE EXISTING STOREFRONT SYSTEMS D.1 D.2 REMOVE STAIR & INFILL WALL C.1 REMOVE DOOR &

More information

APPENDIX E: CAPITAL NEEDS SUMMARY

APPENDIX E: CAPITAL NEEDS SUMMARY APPENDIX E: CAPITAL NEEDS SUMMARY Building A Foundation Hall Building to be replaced ARCHITECTURAL Roof Repair North Structural Wall Repair Flooring Repairs Ceiling Repairs Lighting Repairs Lighting Repairs

More information

NYC Department of Education Building Condition Assessment Survey 2014-2015 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 10004

NYC Department of Education Building Condition Assessment Survey 2014-2015 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 10004 School: InspectionId Asset Data Inspection Type Building Assessment Survey 204-205 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 0004 Time In Last Edited 255 MECHANICAL 205-05-8 09:00AM

More information

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT SAMPLE SCHEDULE OF S 1.00 General Conditions 1.01 Project Management 1.02 General Superintendent 1.03 Superintendents 1.04 Safety Engineer 1.05 Scheduling 1.06 Field Engineering 1.07 Bonds 1.08 Trailer

More information

Crawford Inspection Services C.C.B. # 76914 www.crawfordinspections.com

Crawford Inspection Services C.C.B. # 76914 www.crawfordinspections.com Crawford Inspection Services C.C.B. # 76914 www.crawfordinspections.com Portland Area PO Box 665 West Linn, OR 97068 Ph: (503) 650-6957 Salem Area 5434 River Rd. N; #192 Keizer, OR 97303 Ph: (503) 362-5809

More information

Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year

Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year Printed On: 2003/04/03 St Patrick CES, 7932 Study [03.3-050 Plumbing Piping Systems] Study condition, remaining service

More information

Solicitation Items Report

Solicitation Items Report Solicitation Items Report Solicitation 91036-12295-208 Title: M/R of Air Conditioning Units & Split A/C Units Estimated Total Value: Description: Delivery Terms: Free On Board Destination Payment Terms:

More information

Building Condition Assessment Report

Building Condition Assessment Report C2 - Nurses Resident (aka Administration) Building Condition Assessment Report Asset Address Address Construction Year Size (Gross Floor Area) Asset Type Floors Above Ground Inspection Date C2 - Nurses

More information

Town of Sandwich Facilities Department Summary of Building Repairs from Prior 5 7 Years List Updated August 7, 2015

Town of Sandwich Facilities Department Summary of Building Repairs from Prior 5 7 Years List Updated August 7, 2015 Town of Sandwich Facilities Department Summary of Building Repairs from Prior 5 7 Years List Updated August 7, 2015 Town Hall Complete building restoration (state historic preservation award) High efficiency

More information

Cherokee Trail High School 25901 East Arapahoe Road Aurora, Colorado 80016

Cherokee Trail High School 25901 East Arapahoe Road Aurora, Colorado 80016 Cherokee Trail High School 25901 East Arapahoe Road Aurora, Colorado 80016 Year Opened 2003 Current Square Footage 391,000 Site Acreage 86.22 cherokeetrail.cherrycreekschools.org $279,200 Asphalt and concrete

More information

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY Cost Code # Description Cost Code # Description 01 00 00.001 General Requirements 02 00 00.001 Existing Conditions 01 31 19.13.001 Preconstruction Meetings 02 21 00.001 Surveys 01 32 33.001 Photographic

More information

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities Division 1 Requirements Design and Construction Quality Campus Master Plans Texas Tech University System Operating and Building Maintenance Project Administration Historically Underutilized Business (HUB)

More information

PLAN SUBMITTAL INFORMATION

PLAN SUBMITTAL INFORMATION PLAN SUBMITTAL INFORMATION APPLICATION FOR A BUILDING PERMIT Prior to drafting construction drawings, please check with the North Miami Beach Community Development Department concerning the following:

More information

KIEWIT CM/GC Enabling/Utilities

KIEWIT CM/GC Enabling/Utilities South Terminal Redevelopment Program KIEWIT CM/GC Enabling/Utilities Contract Value $50 million M/WBE Goal 20 percent Contact John Todd, LEED AP Project Manager 303.930.9046 john.todd@kiewit.com General

More information

VOLUME I PROCUREMENT AND CONTRACTING DOCUMENTS GROUP

VOLUME I PROCUREMENT AND CONTRACTING DOCUMENTS GROUP 11044 1 VOLUME I PROCUREMENT AND CONTRACTING DOCUMENTS GROUP DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS 00 31 32 Geotechnical Data 00 70 00 General Conditions 00 73 00 Supplementary Conditions

More information

ADDENDUM NO. 1. DATE: February 10, 2015 INVITATION FOR BID: IFB K150015033 1801 Commerce Road Renovations Project DATED: February 9, 2015

ADDENDUM NO. 1. DATE: February 10, 2015 INVITATION FOR BID: IFB K150015033 1801 Commerce Road Renovations Project DATED: February 9, 2015 ADDENDUM NO. 1 DATE: February 10, 2015 INVITATION FOR BID: IFB K150015033 1801 Commerce Road Renovations Project DATED: February 9, 2015 RECEIPT DATE: March 17, 2015 at 2:30 p.m. OPENING DATE: March 18,

More information

Schedule B to By-law 33-2009

Schedule B to By-law 33-2009 Amended by By-law 8-2016 Note: This consolidation is prepared for convenience only. For accurate reference the original by-laws should be reviewed. Floor Area Calculation Floor area shall: Schedule B to

More information

LITITZ MUTUAL INSURANCE COMPANY 2 North Broad Street Lititz, Pennsylvania - MAIN OFFICE -

LITITZ MUTUAL INSURANCE COMPANY 2 North Broad Street Lititz, Pennsylvania - MAIN OFFICE - The original section of this building was constructed in 1941. The exterior walls are built of good quality stone. In the early 1980 s a similar addition was added to the north elevation. The exterior

More information

November 3, 2015 Bond and District Additional Assistance Election Information

November 3, 2015 Bond and District Additional Assistance Election Information November 3, 2015 Bond and District Additional Assistance Election Information Proposition 432 - $22 million General Obligation Bond 150+ facility projects across all schools Building renovations and improvements

More information

Milestones Primary. Early Start. Orig Dur. Early Finish. Act ID. Description NOTICE TO PROCEED START CONSTRUCTION

Milestones Primary. Early Start. Orig Dur. Early Finish. Act ID. Description NOTICE TO PROCEED START CONSTRUCTION Milestones Primary M1500 NOTICE TO PROCEED 0 11/01/ * M1510 START CONSTRUCTION 0 01/02/ * M1550 SUBSTANTIAL COMPLETION [ALL WORK IN PLACE] 0 04/15/ M1600 CERT OF OCCUP 0 04/15/ M1650 FINAL COMPLETION /

More information

HOMEOWNER S PERMIT GUIDE

HOMEOWNER S PERMIT GUIDE HOMEOWNER S PERMIT GUIDE WHEN IS A PERMIT REQUIRED? Department of Development and Permits 306 Cedar Road, City Hall 2 nd Floor P.O. Box 15225 Chesapeake, VA 23328 Phone: (757) 382-6018 Fax: (757) 382-8448

More information

EXPECTED USEFUL LIFE TABLE

EXPECTED USEFUL LIFE TABLE SITE SYSTEMS FAMILY ELDERLY ACTION = REPLACE Basketball Courts 15 25 Built Improvements (playgrounds/site furniture) 20 20 Catch Basin 40 40 Cold Water and Sewer Lines 40 40 Compactors 15 15 DHW/Supply/Return

More information

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS Los Angeles, CA Project Manual and Specification DIVISION 1 GENERAL CONDITIONS 01 01 10 STATEMENT OF WORK 01 11 00 SUMMARY OF THE WORK 01 14 05 METRO (OWNER) - DIRECTED STOPPAGES 01 20 00 PRICE AND PAYMENT

More information

Estimating Database Checklist

Estimating Database Checklist Estimating Database Checklist If you are creating a new estimating database for projects, the following list offers a thorough listing of Main and Sub Categories. You can also use it as a checklist to

More information

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage Property Address: Company Name: Contractor Name: Contractor Address: City: State: Zip: License Number: Phone Number

More information

How To Check For A Deficiency

How To Check For A Deficiency UPCS in Pictures The following pictures are not all inclusive nor does it cover every deficiency. The pictures, however are some of the most commonly cited deficiencies on REAC inspections. Erosion The

More information

Information Bulletin No. 4 What happens over the life of a building?

Information Bulletin No. 4 What happens over the life of a building? Information Bulletin No. 4 What happens over the life of a building? This series of Building Asset Management bulletins form part of a 3-year research project for corporations and managers. The bulletins

More information

Print Shop/Mail Room

Print Shop/Mail Room Chapter XVIII Print Shop/Mail Room Page 110 CHAPTER XVIII Print Shop/Mail Room ARCHITECTURAL/STRUCTURAL A. BUILDING EXTERIOR 1.0 EXTERIOR WALLS The exterior walls are comprised of stone veneer. There were

More information

STATE OF FLORIDA HOME INSPECTION STANDARDS OF PRACTICE:

STATE OF FLORIDA HOME INSPECTION STANDARDS OF PRACTICE: STATE OF FLORIDA HOME INSPECTION STANDARDS OF PRACTICE: 61-30.801 Standards of Practice, General. (1) Home inspections performed to these Standards of Practice are intended to provide the client with information

More information

17,280 square feet Overview:

17,280 square feet Overview: CENTRAL OFFICE Located at 167 Boston Post Road, East Lyme, Connecticut, the Central Office was built in 1916 as the original Flanders Elementary School and remains connected to the current school. The

More information

Building Condition Assessment Report

Building Condition Assessment Report Building Condition Assessment Report Asset C3c - Oak Terrace Cottage 121 Address Riverview Lands, 2601 Lougheed Highway, Coquitlam, BC. V5C 4J2 Construction Year Size (Gross Floor Area) 1920. 2,553 Sq.Ft.

More information

Does Wall Township require an inspection by the building department on resale of a home?

Does Wall Township require an inspection by the building department on resale of a home? Selling your home Does Wall Township require an inspection by the building department on resale of a home? No. We do not require a Certificate of Continued Occupancy on the resale of home. A Smoke Detector,

More information

Maryland. American Recovery and Reinvestment Act. 158 DoD Projects ($ 65.8M) Completed or Under Way by August 31, 2009

Maryland. American Recovery and Reinvestment Act. 158 DoD Projects ($ 65.8M) Completed or Under Way by August 31, 2009 Maryland American Recovery and Reinvestment Act 158 DoD Projects ($ 65.8M) Completed or Under Way by August 31, 2009 Project Title Component Installation Repair Building 316 Electrical, HVAC, Plumbing,

More information

SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request

SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request SECTION 00 0110 PROCUREMENT AND CONTRACTING REQUIREMENTS 1.1 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS A. 00 0101 - Project Title Page B. 00 0105 - Certifications Page C. 00 0110 - Table

More information

Notice to Property Owners

Notice to Property Owners Modification or Repair of your Flood Prone Property Notice to Property Owners Rebuilding or Remodeling Your Home If your home or business sustained damage, or if you are making improvements to the structure

More information

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components Infrastructure Facility Condition Summary Weighted Avg Condition Score Facility Components Systems Surveyor/ Date Done Comments G Sitework.9 Site Improvements Parking Pedestrian Paving Site Development

More information

Open House and Home Tour Checklist

Open House and Home Tour Checklist 1 The House Address: Number of floors: Listing price: Basement? Property tax: Outdoor space? Eugh closet space? Style: Eugh storage space? Square footage: Room for expansion? Number of bedrooms: What appliances

More information

Property Condition Assessment

Property Condition Assessment Property Condition Assessment Business, Wisconsin Inspection Date: 8/2009 Prepared For: Business Owner Report Number: TD999909 Prepared By: Shamrock Building Inspection Consultants LLC N29 W29951 Shel-Mar

More information

Board Seminar Facilities. School Year 2012-2013. Submitted by Joseph L. Lisa-Director of Facilities

Board Seminar Facilities. School Year 2012-2013. Submitted by Joseph L. Lisa-Director of Facilities Board Seminar Facilities School Year 2012-2013 Submitted by Joseph L. Lisa-Director of Facilities High School Installed new fence for Pre-K activities by weight room. Installed new rails and side walks

More information

Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule

Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule Homestead HS Sept.'15 Oct'15 Nov'15 Dec'15 Jan'16 Feb'16 Repair Asphalt @ Main Garage Replace Exterior Hollow Metal

More information

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES ADDRESS: Somewhere, FL CLIENT: GAIA GC ID No: 2015000 DATE: 12/31/2015 INSPECTION OR ASSESSMENT BY: GAIA CONSTRUCTION INC. CGC 1516136 FLORIDA HI-2792 FLORIDA

More information

Inspection Report Atlanta Strip Mall Commercial Building Property Address:

Inspection Report Atlanta Strip Mall Commercial Building Property Address: Page 1 of 25 Inspection Report Atlanta Strip Mall Property Address: Smyrna GA 30082 Page 2 of 25 South East Building Consultants Ray Thoroman Serving the entire State of Georgia 6 678-410-3005 Page 3 of

More information

SCHEDULE A BY-LAW B-6 CLASSES OF PERMITS AND FEES

SCHEDULE A BY-LAW B-6 CLASSES OF PERMITS AND FEES 1. CALCULATION OF PERMIT FEES SCHEDULE A BY-LAW B-6 CLASSES OF PERMITS AND FEES Permit fees shall be calculated based on the formula given below, unless otherwise specified in this schedule: Permit Fee

More information

SPECIFICATIONS FOR VASWANI BRENTWOOD PROJECT. RCC Framed Structure confirming with zone II seismic detailing. Reinforced Cement Concrete

SPECIFICATIONS FOR VASWANI BRENTWOOD PROJECT. RCC Framed Structure confirming with zone II seismic detailing. Reinforced Cement Concrete SPECIFICATIONS FOR VASWANI BRENTWOOD PROJECT 1. CONSTRUCTION: Foundation Super Structure Internal Walls External Walls Roof Retaining Walls RCC footing RCC Framed Structure confirming with zone II seismic

More information

Depreciation Report The Palisades Strata Corporation LMS 2472

Depreciation Report The Palisades Strata Corporation LMS 2472 FINAL Depreciation Report The Palisades Strata Corporation LMS 2472 1200/1288 Alberni Street, Vancouver, BC Presented to: The Owners of The Palisades Strata Corp. LMS 2472 c/o Jaclyn Jeffrey, Strata Manager

More information

Schedule B to By-law 33-2009 Part A Fees Payable for Permits

Schedule B to By-law 33-2009 Part A Fees Payable for Permits Floor Area Calculation Floor area shall: Part A Fees Payable for Permits (Effective January 1, 2015) a) be calculated by measuring to the outer face of exterior walls and to the centre of party walls or

More information

Holz Choices & Specifications

Holz Choices & Specifications March 21, 2011 0. SALES AND DESIGN 1. UTILITIES AND PERMITS Holz Choices & Specifications 2. EXCAVATION AND LOT PREPARATION Job Beginning date of Monday May 2 nd, 2011 ALTERNATE: Garage walls as drawn

More information

CONSERVATION MAINTENANCE WORKSHEET Universal Checklist

CONSERVATION MAINTENANCE WORKSHEET Universal Checklist 3.1 SITE 1 Concrete curbs Check for cracks, spalling, growth from joints X 2 Stone curbs Check for cracks, spalling, growth from joints X 3 Concrete walkways Look for uneven surfaces, ponding, growth from

More information

MURCH ELEMENTARY SCHOOL

MURCH ELEMENTARY SCHOOL INITIAL YEAR BUILT 1929 BUILDING AREA 47,700 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 491 WARD 3 PROPOSED PROGRAM CAPACITY 500 Site Plan MURCH - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

Element D Services Plumbing

Element D Services Plumbing Medical Vacuum and Gas PART 1 - GENERAL 1.01 OVERVIEW A. This section addresses medical vacuum, waste anesthetic gas disposal, compressed air, oxygen, nitrous oxide, nitrogen and carbon dioxide systems.

More information

Code Enforcement Inspection Manual. City of Virginia Beach Department of Housing and Neighborhood Preservation Code Enforcement Division

Code Enforcement Inspection Manual. City of Virginia Beach Department of Housing and Neighborhood Preservation Code Enforcement Division Code Enforcement Inspection Manual City of Virginia Beach Department of Housing and Neighborhood Preservation Code Enforcement Division LIVING ROOM 304.15 EXTERIOR DOOR(S) Check door(s) and trim for condition,

More information

BUNKER HILL ELEMENTARY SCHOOL

BUNKER HILL ELEMENTARY SCHOOL INITIAL YEAR BUILT 1970 BUILDING AREA 98,200 SF CURRENT PROGRAM CAPACITY 332 ENROLLMENT 2008 387 WARD 5 PROPOSED PROGRAM CAPACITY 750 Site Plan BUNKER HILL - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS NOTICE TO BIDDERS BID FORM INSTRUCTIONS TO BIDDERS CONTRACTOR S BID FOR PUBLIC WORK - FORM 96 MINORITY AND WOMEN S BUSINESS ENTERPRISE PARTICIPATION

More information

Invesco Advisers, Inc. Minimum Vendor / Contractor Insurance Requirements and Risk Category Schedule

Invesco Advisers, Inc. Minimum Vendor / Contractor Insurance Requirements and Risk Category Schedule Invesco Advisers, Inc. Minimum Vendor / Contractor Insurance Requirements and Risk Category Schedule All Vendors should demonstrate the following minimum insurance coverage: Commercial General Liability:

More information

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal. 2.02 DESIGN DEVELOPMENT PHASE GENERAL The Architect shall prepare the Design Development Documents from the approved Schematic Design. The Design Development Documents shall consist of drawings and other

More information

COST OF WORK FORM. Abbreviations: ea = each, LF = linear feet, SF = square feet, HSF = square feet of living area (including garage conversion space)

COST OF WORK FORM. Abbreviations: ea = each, LF = linear feet, SF = square feet, HSF = square feet of living area (including garage conversion space) COST OF WORK FORM All costs shown are estimates using base grade materials, taxes, and labor. For houses where a higher quality is indicated, the costs should be increased for work requiring upgraded materials.

More information

School Construction Authority Architecture & Engineering

School Construction Authority Architecture & Engineering SCOPING GUIDELINES 1.0 GENERAL GUIDELINES 2.0 BUILDING ENVELOPE SCOPING GUIDELINES 3.0 CATEGORIES AND COMPONENTS: The Flood Elimination/Below Grade Capital Category may include some or all of the following

More information

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES

PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES PROPERTY INSPECTION OR ASSESSMENT OF DAMAGES ADDRESS: 123 MAIN ST MIAMI, FL CLIENT: BUYER ID No: 2014193 DATE: 5/13/2014 INSPECTION OR ASSESSMENT BY: GAIA CONSTRUCTION INC. CGC 1516136 FLORIDA HI-2792

More information

CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING DEPARTMENT SUBSTATION & EQUIPMENT SECTION

CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING DEPARTMENT SUBSTATION & EQUIPMENT SECTION CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING DEPARTMENT SUBSTATION & EQUIPMENT SECTION SPECIFICATION EO-5023 REVISION 3 MARCH 2003 REQUIREMENTS FOR

More information

South Carolina Home Inspector Standards of Practice

South Carolina Home Inspector Standards of Practice South Carolina Home Inspector Standards of Practice The following Standards provide guidelines for the Residential Home Inspector and outline what the Residential Home Inspector should observe, identify,

More information

BOROUGH OF NATIONAL PARK APPLICATION FOR A CERTIFICATE OF OCCUPANCY FOR CHANGE OF OCCUPANCY ADDRESS OF PROPERTY FOR INSPECTION CURRENT OWNER

BOROUGH OF NATIONAL PARK APPLICATION FOR A CERTIFICATE OF OCCUPANCY FOR CHANGE OF OCCUPANCY ADDRESS OF PROPERTY FOR INSPECTION CURRENT OWNER BOROUGH OF NATIONAL PARK APPLICATION FOR A CERTIFICATE OF OCCUPANCY FOR CHANGE OF OCCUPANCY ADDRESS OF PROPERTY FOR INSPECTION # BLOCK LOT VACANT YES NO CURRENT OWNER NAME ADDRESS TELEPHONE # PROSPECTIVE

More information

Quality Assurance Calendar Maintenance Responsible Party Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Quality Assurance Calendar Maintenance Responsible Party Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Generator fire up Generator 1 hour load test Generator 4 hour load test Fire extinguisher integrity checks Fire extinguisher certification Fire drills Fire door integrity Fire signage lighting Fire alarm

More information

BILL OF QUANTITIES Part No.: Part Description

BILL OF QUANTITIES Part No.: Part Description Page 1 of 5 A. REMOVAL OF STRUCTURES 801 Demolition of Existing Structure lot 1 in words in words B. MASONRY WORKS 506(1)a Masonry Units (CHB) sq.m. 58.80 in words in words C. FABRICATED MATERIALS & HARDWARE

More information

The fees listed below are stand-alone fees. Additional Developemnt Review or Stormwater fees may apply. 1.0. Fee Activity

The fees listed below are stand-alone fees. Additional Developemnt Review or Stormwater fees may apply. 1.0. Fee Activity MINOR & MISCELLANEOUS PERMITS The fees listed below are stand-alone fees. Additional Developemnt Review or Stormwater fees may apply. 1.0 Fee Activity Fee Description Fee 50% REDUCED FEES FOR SINGLE FAMILY

More information

BUILDING ASSESSMENT QUESTIONNAIRE. B. TENANTS Is there more than one tenant in the building? YES

BUILDING ASSESSMENT QUESTIONNAIRE. B. TENANTS Is there more than one tenant in the building? YES Department of Health and Human Services, Division of Public Health Occupational and Environmental Epidemiology Branch 1912 Mail Service Center, Raleigh, North Carolina 27699-1912 BUILDING ASSESSMENT QUESTIONNAIRE

More information

Designing Schools To Reduce On-Going And Future Maintenance and Repair Costs

Designing Schools To Reduce On-Going And Future Maintenance and Repair Costs Designing Schools To Reduce On-Going And Future Maintenance and Repair Costs Charles H. Johnson, Consultant School Facilities Planning Division California Department of Education March 7, 2001 1 Designing

More information

EAST STROUDSBURG BOROUGH RESIDENTIAL RENTAL INSPECTION CHECK LIST

EAST STROUDSBURG BOROUGH RESIDENTIAL RENTAL INSPECTION CHECK LIST DATE TIME EAST STROUDSBURG BOROUGH RESIDENTIAL RENTAL INSPECTION CHECK LIST INSPECTOR: LICENSE # ADDRESS: PROPERTY OWNER: SINGLE: DOUBLE: MULTI-UNIT # OF UNITS POINT OF INSPECTION Sanitation IPMC 302.1

More information

Exterior Condition Report

Exterior Condition Report Scope of Work for Property Located at: 3918-20 West Cherry Street Date: 3/10/2014 Property is: Single Family Duplex Below is the minimum requirement to meet health and safety issues. The City of Milwaukee,

More information

INVOICE. DATE: May 11, 2005. DESCRIPTION Inspection and report on a property located at OF SERVICES: Perfect Street, Sarasota, Fl.

INVOICE. DATE: May 11, 2005. DESCRIPTION Inspection and report on a property located at OF SERVICES: Perfect Street, Sarasota, Fl. INVOICE DATE: May 11, 2005 CLIENT: The Buyer DESCRIPTION Inspection and report on a property located at OF SERVICES: Perfect Street, Sarasota, Fl. TOTAL FEE: $ See Schedule Tom Villani Hallmark Inspection

More information

Facility Assessment for. 11801 East Main Street, Huntley, IL

Facility Assessment for. 11801 East Main Street, Huntley, IL Facility Assessment for 11801 East Main Street, Huntley, IL July 12, 2012 Prepared by: Dewberry Architects Inc. 25 S. Grove Avenue, Suite 500 Elgin, IL 60120 (847) 695-5840 The Village of Huntley requested

More information

NOVEMBER 2010 Photo 1 Floor fitout is now substantially completed up to level L34, and plantroom installations are also near completion. Internal Inspections and de-snagging are in progress up to level

More information

B-1 Buildings & Service Maintenance

B-1 Buildings & Service Maintenance B-1 Buildings & Service Maintenance B-1 Buildings & Service Maintenance SAFETY, HEALTH AND ENVIRONMENTAL POLICY: B-1 DATE OF ISSUE: AUGUST 1994. BUILDINGS AND SERVICES MAINTENANCE 1. Introduction It is

More information

INDUSTRIALS COLD STORAGE FACILITIES

INDUSTRIALS COLD STORAGE FACILITIES CAL 98 INDUSTRIALS COLD STORAGE FACILITIES AVERAGE CLASS C LOW/AVERAGE CLASS S OCCUPANCY DESCRIPTION: Cold storage facilities are designed to keep stored commodities at various temperature levels. Some

More information

PARKVILLE HIGH SCHOOL LIMITED RENOVATION

PARKVILLE HIGH SCHOOL LIMITED RENOVATION PARKVILLE HIGH SCHOOL LIMITED RENOVATION DESIGN BRIEFING For Dr. Joe A. Hairston BALTIMORE COUNTY PUBLIC SCHOOLS August 11, 2009 Smolen 3 Emr + Associates Architects 1355 Piccard Drive, Suite 200 Rockville,

More information

SITE OVERALL CONDITION COMMENTS

SITE OVERALL CONDITION COMMENTS PROPERTY INSPECTION A complete property inspection should be done at the beginning of the academic year, during the holiday break, and at the end of the academic year. Work to prioritize the list of needed

More information

Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals

Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals Les Butler Associate Commissioner for Business and Regional

More information

U.S. Department of Housing and Urban Development Office of Public and Indian Housing. A Good Place to Live!

U.S. Department of Housing and Urban Development Office of Public and Indian Housing. A Good Place to Live! U.S. Department of Housing and Urban Development Office of Public and Indian Housing A Good Place to Live! Introduction Having a good place to live is important. Through your Public Housing Agency (or

More information

Element D Services Plumbing

Element D Services Plumbing PART 1 - GENERAL 1.01 OVERVIEW A. This section addresses domestic cold, hot and hot water return distribution systems within and to five feet beyond building perimeter. PART 2 - DESIGN CRITERIA 2.01 GENERAL

More information

How To Get A Building Permit In Florida

How To Get A Building Permit In Florida MIAMI-DADE COUNTY BUILDING DEPARTMENT PERMIT EXEMPTIONS Please note that the exemptions listed in this section are from Florida Building Code requirements only. Other State and County regulatory departments

More information

Inspection Tech. (330) 310-6559 http://www.inspectiontech.us a_westerburg@inspectiontech.us Inspected By: Aaron Westerburg

Inspection Tech. (330) 310-6559 http://www.inspectiontech.us a_westerburg@inspectiontech.us Inspected By: Aaron Westerburg Inspection Tech (330) 310-6559 http://www.inspectiontech.us a_westerburg@inspectiontech.us Inspected By: Aaron Westerburg Inspection Tech Home Inspection Report Prepared For: Mr. & Mrs. Homebuyer Property

More information

VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10

VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10 VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10 SECTION B1: PREPARATION GUIDE B1.1 INTRODUCTION... B1-1

More information

Scope of Work Class I Contractor s Licenses. Putnam County Ordinance 2004-13. Section 17. Types of Authorized Contractor Licenses.

Scope of Work Class I Contractor s Licenses. Putnam County Ordinance 2004-13. Section 17. Types of Authorized Contractor Licenses. Scope of Work Class I Contractor s Licenses Putnam County Ordinance 2004-13 Section 17. Types of Authorized Contractor Licenses. A. Class I Contractors: The Class I Contractors are listed in this subsection

More information

CHARLOTTE COUNTY Community Development Department

CHARLOTTE COUNTY Community Development Department CHARLOTTE COUNTY Community Development Department Building Construction Services Division 18400 Murdock Circle, Port Charlotte FL 33948 Phone: 941.743.1201 Fax: 941.764.4907 www.charlottecountyfl.gov 50

More information

COMPREHENSIVE PROPERTY INSPECTIONS

COMPREHENSIVE PROPERTY INSPECTIONS COMPREHENSIVE PROPERTY INSPECTIONS Thank you for selecting CPI for your Deficiency Observation. A full home inspection was not performed on this property at the buyers request. This inspection is a limited

More information

SECTION.1100 - NC HOME INSPECTOR STANDARDS OF PRACTICE AND CODE OF ETHICS

SECTION.1100 - NC HOME INSPECTOR STANDARDS OF PRACTICE AND CODE OF ETHICS SECTION.1100 - NC HOME INSPECTOR STANDARDS OF PRACTICE AND CODE OF ETHICS.1101 DEFINITIONS The following definitions apply to this Section: (1) Automatic safety controls means devices designed and installed

More information

The City of Basehor, Kansas

The City of Basehor, Kansas The City of Basehor, Kansas Residential and Miscellaneous Permits This list provides general information regarding permit requirements for various residential construction and maintenance activities. The

More information

48. AQUARIUM. Aquarium. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle. Total Area: No.

48. AQUARIUM. Aquarium. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle. Total Area: No. Classification: Cluster: Location: Total Area: No. of Stories Aquarium Acreage Owned: Acquired: 1904 Most Recent Improvements: THE AQUARIUM Close to junction of Inselrhue and Loiter Way, Belle Isle Two

More information

Repair Project for April 7, 2009

Repair Project for April 7, 2009 Repair Project for April 7, 2009 Scope of the Project HVAC Upgrades Roof Replacement Window Replacement/Exterior Openings Science Lab Renovations New Fire Alarm/Electrical AAB (accessibility) Upgrades

More information

How to report a repair

How to report a repair How to report a repair for repairs to your home? We are committed to making sure your home is in a good state of repair. To meet our legal responsibilities we will: Keep the exterior (eg roof, walls, doors,

More information

The main steam enters the building in the basement mechanical room; this is where the condensate line also leaves the building.

The main steam enters the building in the basement mechanical room; this is where the condensate line also leaves the building. MSV: Square Footage: 24,844 No. of Floors: 1 Year Built: 1963 Type of Use: Lounge and dining area open all night for snacks Steam Water-cooled condenser, 50-Ton York unit with a 6 cylinder-reciprocating

More information

8629 S. Kimbark, Chicago, IL PROJECT SPECIFIC SCOPE:

8629 S. Kimbark, Chicago, IL PROJECT SPECIFIC SCOPE: 8629 S. Kimbark, Chicago, IL PROJECT SPECIFIC SCOPE: General: Remove existing base molding and install new 4-1/4 base molding throughout and spray white Remove existing window and door trim and install

More information

We ve got you covered.

We ve got you covered. Mechanical & Plumbing We ve got you covered. Energy Savings Maintenance Contracts Cooling Towers Re-piping Air-conditioning Building Automated Systems Boiler Retrofits Sewer Cleaning Drain Systems THE ONLY

More information