1 NAME OF PROJECT DATE SUBMITTED TO FM GLOBAL COMPLETED BY 2016 FM Global. All rights reserved. 1 of 10
2 THE INSURED 1. Name of Principal 2. Name of Main Contractor 3. Name and details of any other parties required to be insured THE PROJECT 4. Full Description of the Project 5. Full Address of the Project Site 6. Is this Project Site a Greenfield site or an Existing location? Greenfield site Existing location 7. Full Estimated Contract Value of the Project The value of the Contract Works comprising the permanent works, Temporary Works and all materials to be incorporated therein (plus the value of any Free Issue Materials or Materials for Manufacturing or Processing Operations, if applicable) 8. Summary of Estimated Contract Value Civils (including Ground Works) - Buildings - Process Equipment - Mechanical & Electrical - Free Issue Materials (if applicable) - Materials for Manufacturing or - Processing Operations (if applicable) Is a detailed Breakdown of the Estimated Contract Value available? Yes - attached No 2016 FM Global. All rights reserved. 2 of 10
3 PERIOD OF INSURANCE 9. Construction Period inception date 10. Construction Period expiry date (anticipated date of practical completion) 11. Give details of any Operational Testing Period required 12. Give details of any Maintenance or Defects Liability Period required 13. Give details of any anticipated partial or phased handover, or any plans for taking over or taking into use by the Principal, or any Commercial Operations to be commenced before practical completion of the Project 14. Is a detailed Gantt Chart showing the Construction Program available? Yes - attached No PROJECT INFORMATION 15. Are Site Layout Drawings available? Yes - attached No 16. Any Used or second-hand equipment to be incorporated into the Contract Works? Yes No 17. Are Method Statements for carrying out the construction works available if required? Yes No 18. of Project Site security and access 2016 FM Global. All rights reserved. 3 of 10
4 19. of any Off-Site Storage expected (except while being manufactured, processed or stored at any manufacturer s, distributor s, processor s or supplier s premises prior to delivery to the Project Site) State value, location and security measures, plus fire and flood protection measures if known 20. of any Off-Site Fabrication expected (other than at any manufacturer's, distributor's, processor's or supplier's premises prior to delivery to the Project Site) State value, location and security measures, plus fire and flood protection measures if known 21. of any Inland Transit expected (not including transit for which marine or cargo insurance will be effective) 22. Have details of TEMPORARY FIRE PROTECTIONS during construction been submitted to FM Global Engineering? Yes No 23. Have details of proposed PERMANENT FIRE PROTECTIONS upon completion been submitted to FM Global Engineering? Yes No 24. Have details of any TEMPORARY FLOOD PROTECTION measures required during construction been submitted to FM Global Engineering? Yes No 2016 FM Global. All rights reserved. 4 of 10
5 25. Have details of any proposed PERMANENT FLOOD PROTECTION measures required upon completion been submitted to FM Global Engineering? Yes No 26. of Water Damage protection during construction Specifically in respect of loss or damage to the interior portion of any buildings under construction from rain, sleet or snow prior to the completion of the installation of the roof, walls and windows of any such buildings 27. Have details of any specific design codes for EARTHQUAKE been submitted to FM Global Engineering? Yes No 28. Have details of any specific design codes for WIND been submitted to FM Global Engineering? Yes No 29. Will the construction works involve any of the following special or hazardous operations? Blasting Bridge construction Dam construction Demolition 2016 FM Global. All rights reserved. 5 of 10
6 Dewatering Excavations deeper than 5 meters Existing or Surrounding Property works in, on, including or adjacent to (including but not limited to extensions, conversions, upgrades and refurbishments and for which insurance for any such Existing or Surrounding Property is required) High Rise Building construction Land reclamation Piling Pipe Laying Prototypical, Experimental or Unproven property, technology or processes Road or Railway construction Sewage or Water Supply Systems Tandem or multiple lifting using more than one crane Thrust Boring, Pipe Jacking, Directional Drilling Tunneling or shaft sinking Turbine installation We Works any works carried out in over or under tidal or non-tidal water (including but not limited to harbours, breakwaters, jetties, quays, piers, docks and cofferdams surrounded by tidal water) Give details GROUND CONDITIONS AND FOUNDATIONS 30. Give details of Ground Conditions at the Project Site Include soil type and details of any unusual characteristics that could impact on the construction works 31. Is a copy of the site Geotechnical Survey Report available? Yes attached No 32. Give details of the Foundation type to be used for major structures Include details of any specific methods or measures required to accommodate any unusual Ground Condition characteristics that could impact on the construction works CONTRACT CONDITIONS and ADDITIONAL INSURANCE REQUIREMENTS 33. Is a copy of the Conditions of Contract document between the Principal (the Owner) and the Main Contractor for this Project available? Yes - attached No 2016 FM Global. All rights reserved. 6 of 10
7 34. If no, are the Conditions of Contract based on a particular model form of construction contract, or variance thereof? State which model form (eg. JCT, FIDIC etc) plus give details of any amendments to the standard text Give details of the contractual requirements to procure construction insurance for the Project Include details on which party is responsible to purchase this insurance, which parties are required to be insured, the extent of cover required and any specific deductible requirements 35. Is specific marine or cargo insurance required? Yes please notify FM Global Cargo to discuss quotation No 36. Is insurance required for any Constructional Plant and Equipment? Yes No Give details Including values, ownership, type and use on the Project 37. Is insurance required for Temporary Huts or Buildings? Yes No Give details Including values, ownership, type and fire protection provisions SPECIFIC TO DELAY IN START-UP 38. Sum Insured and Indemnity Period required 2016 FM Global. All rights reserved. 7 of 10
8 39. Breakdown of Sum Insured value 40. Scheduled Date of Business Commencement 41. Is a Construction Program Critical Path analysis available? Yes - attached No 42. Are there any allowances in the Construction Program for delays, due to an Accident or otherwise? Yes No Give details 43. Is a Production Flow Diagram available for the facility to be constructed? Yes - attached No Give details of the anticipated effect on production or revenue earning of key machines / areas arising from loss or damage 44. Give details of Critical Equipment and associated Key Lead Times For each major item of machinery or key area of the facility, give details of the probable replacement period in the event of total loss, calculated as the date from placing an order to the date such item or area would be ready for use in connection with the business 45. Give details of any direct suppliers, manufacturers or processors including suppliers of component goods, materials, or services critical to the completion of the project including locations or Geographical Areas 2016 FM Global. All rights reserved. 8 of 10
9 ATTACHMENTS / ADDITIONAL INFORMATION 46. Detailed Breakdown of Estimated Contract Value 47 Detailed Gantt Chart showing the Construction Program 48. Site location map 49. Site Layout Drawings 50. Method Statements for carrying out the construction works 51. Site Geotechnical Survey Report 52. Conditions of Contract document between the Principal (the Owner) and the Main Contractor for this Project 53. Detailed Breakdown of Delay In Start-Up Sum Insured 54. Construction Program Critical Path analysis 55. Production Flow Diagram for the facility to be constructed 56. Other additional information, please give details 2016 FM Global. All rights reserved. 9 of 10
Construction Insurance Application
Construction Insurance Application Instructions Application for: Wrap-Up Liability Builders Risk Please complete General Information section for all projects and specific sections for Wrap-Up Liability
More informationPROPOSAL FOR CONTRACTORS ALL RISKS
PROPOSAL FOR CONTRACTORS ALL RISKS 1. Title of contract (If project consist of several sections, specify section(s) to be insured) 2. Location of site Country/Province/district City/town/village 3. Name
More informationConstruction Insurance Application Wrap-Up Liability Builders Risk
Construction Insurance Application Wrap-Up Liability Builders Risk Please complete GENERAL INFORMATION section for ALL PROJECTS and specific sections for WRAP-UP LIABILITY and BUILDERS RISK according to
More informationApplication for Builders Risk & Wrap-Up Liability Coverage
Application for Builders Risk & Wrap-Up Liability Coverage GENERAL INFORMATION 1. Name of Applicant: 2. Address of Applicant: 3. Name of Project: Postal Code: 4. Address/Location of Project: 5. Description
More informationRole in the project (e.g. Prime Engineering Consultant or Contractor), and summary of professional Duties : Name Professional Duties Contract Awarded?
PROPOSAL FORM FOR SINGLE PROJECT PROFESSIONAL INDEMNITY NOTE: THIS IS A PROPOSAL FOR A CLAIMS MADE POLICY Note : Please provide any necessary explanations or additional details by attachment to this Proposal
More informationContractors All Risks Insurance
Contractors All Risks Insurance Proposal Form ADNIC is a Public Joint Stock Company incorporated in the United Arab Emirates by Law No. (4) of 1972, and it is governed by the provisions of the UAE Federal
More informationSchedule 12 - Insurances
RFP Version There are two parts to this Schedule 12: Part A Insurances applicable to the D&C Phase; and Part B Insurances during the O&M Phase. [State Note: The State in its discretion may procure any
More informationForm C: Application for Construction Insurance
Form C: Application for Construction Insurance Broker Information: Broker: BFL CANADA Insurance Services Inc. Contact: Address: 200, 1177 West Hastings Street, Vancouver, BC, V6E 2K3 Phone Number: 604-669-9600
More informationSingle Project Professional Indemnity Insurance Proposal Form. Note: This is a proposal form for a claims made policy
Single Project Professional Indemnity Insurance Proposal Form Note: This is a proposal form for a claims made policy Please provide any necessary explanations or additional details by attaching separate
More informationBUILDERS RISK / WRAP-UP LIABILITY APPLICATION
BUILDERS RISK / WRAP-UP LIABILITY APPLICATION Please complete the General Information section for All Projects and specific sections for Wrap-Up Liability and Builders Risk for each coverage as required.
More informationConstruction Insurance
Construction Insurance Bridging Theory & Practice in Project Risks Manoj Kumar, Chartered Insurer ACII (UK), CPCU (USA), ARe (USA), ARM (USA), FIII (India). MBA Email: manoj@einsuranceprofessional.com
More informationCONTRACTORS ALL RISKS INSURANCE PROPOSAL FORM CONTRACTORS ALL RISKS INSURANCE PROPOSAL FORM
Allied Cooperative Insurance Group (ACIG) شركة املجموعة املتحدة للتاأمني التعاوين ) أ سيج( CONTRACTORS ALL RISKS INSURANCE Call us: 920012331 www.acig.com.sa CONTRACTORS ALL RISKS INSURANCE UCONTRACTORS
More informationQUESTIONNAIRE AND PROPOSAL FOR CONTRACTORS ALL RISK INSURANCE
GA Insurance House, Ralph Bunche Road, P O Box 42166-00100 Nairobi, Kenya. Telephone: 2711633 Fax 2714542 E-mail: insure@gakenya.com QUESTIONNAIRE AND PROPOSAL FOR CONTRACTORS ALL RISK INSURANCE AGENT:
More informationRESIDENTIAL COURSE OF CONSTRUCTION QUESTIONNAIRE
RESIDENTIAL COURSE OF CONSTRUCTION QUESTIONNAIRE Residential Course of Construction policies, also known as Builder s Risk, are designed to cover the property owner for potential loss while the property
More informationEXHIBIT 17 INSURANCE COVERAGE REQUIREMENTS
EXHIBIT 17 INSURANCE COVERAGE REQUIREMENTS 1. Builder s Risk Insurance During Construction At all times during the period from the Operating Commencement Date until the last Service Commencement Date and
More informationContract Works. Proposal Form
Proposal Form Contract Works Specified Contract Works and Legal Liability Arranged through ASR Underwriting Agencies Pty Ltd Underwritten by Certain Underwriters at Lloyd s IMPORTANT NOTES TM PLEASE READ
More informationUNIVERSITY OF CALGARY ALL RISKS COURSE OF CONSTRUCTION APPLICATION. Project Name:
UNIVERSITY OF CALGARY ALL RISKS COURSE OF CONSTRUCTION APPLICATION 1. Name and Address of Applicant: Project Name: Governors of the University of Calgary c/o Department of Insurance & Risk Management,
More informationBuilders Risk. Wrap-Up Liability CONSTR '!: N INSURANCE- =:] GENERAL INFORMATION
CONSTR '!: N INSURANCE- =:] Wrap-Up Liability Builders Risk Please complete general information section for all pro j ects and specific sections for wrap-up Liability and builders risk according to requirements.
More informationARCHITECTS AND ENGINEERS PROFESSIONAL INDEMNITY INSURANCE PROPOSAL FORM
ARCHITECTS AND ENGINEERS PROFESSIONAL INDEMNITY INSURANCE PROPOSAL FORM 1. General information 1.1 Name of the proposed : 1.2 Please provide a full description of your activities 1.3 Please provide details
More informationSACOS INSURANCE COMPANY LTD
SACOS INSURANCE COMPANY LTD P.O Box 636 Republic of Seychelles Telephone: 295000 Fax: 224495 E-mail: sacl@seychelles.net Website: www.sacos.sc YOU SHOULD FULLY AND FAITHFULLY GIVE THE FACTS YOU KNOW OR
More informationContract Works and What you need to Know
ACN 002 566 743 Brookvale Insurance Brokers Pty Ltd Contract Works and What you need to Know 1. The Need for Contract Works Insurance The growth of large-scale construction projects has been accompanied
More informationPROPOSAL FORM. TATA AIG General Insurance Co. Ltd.
PROPOSAL FORM TATA AIG General Insurance Co. Ltd. PROPOSAL AND QUESTIONNAIRE FOR CONTRACTOR'S ALL RISKS INSURANCE (The liability of the Company does not commence until this proposal has been accepted by
More informationBUILDERS RISK APPLICATION
45 Vogell Road, Suite 306, Richmond Hill, Ontario L4B 3P6 Tel: 905-305-0852 Toll: 1-888-489-2234 Fax: 905-305-9884 www.grouponeis.com BUILDERS RISK APPLICATION BROKERAGE: Broker contact: Email address:
More informationEXHIBIT V INSURANCE COVERAGE REQUIREMENTS FOR DESIGN-BUILD CONTRACTOR AND O&M CONTRACTOR
EXHIBIT V INSURANCE COVERAGE REQUIREMENTS FOR DESIGN-BUILD CONTRACTOR AND O&M CONTRACTOR Section 1 Insurance Coverages Prior to Project Completion Except as set forth below, the Developer will obtain and
More informationQBE CONTRACT WORKS Cover
To maintain the momentum of a project, contractors need responsive specialist insurance service. FC/QBEP082/03.09 1 of 6 The Problem Every engineering work, whether it is for a small building to massive
More informationMARKETFORM : SYNDICATE 2468 PROPOSAL FORM FOR DESIGN CONSULTANTS PROFESSIONAL INDEMNITY INSURANCE
MARKETFORM : SYNDICATE 2468 BROKER / INSURANCE AGENT PROPOSAL FORM FOR DESIGN CONSULTANTS PROFESSIONAL INDEMNITY INSURANCE PLEASE READ THESE GUIDANCE NOTES BEFORE COMPLETING THE PROPOSAL FORM. WHERE FURTHER
More informationSingle Project / Annual Projects Contract Works Application Form. Proposer's Details. Name of Insured. Broker E-mail Address* ABN (if applicable)
Single Project / Annual Projects Contract Works Application Form Proposer's Details Name of Insured Broker E-mail Address* ABN (if applicable) Client Address Clients Suburb State Client Postcode* Financial
More informationContractors. Policy Summary
Contractors Policy Summary 2 Contractors Policy Summary Contractors Policy Summary Your Tower Insurance Contractors Policy is an annual contract underwritten by Tower Insurance Company Limited which may
More informationA&E A&E. ProSurance TM. Application Form INSURANCE FOR ARCHITECTS & ENGINEERS
A&E INSURANCE FOR ARCHITECTS & ENGINEERS ProSurance TM A&E Application Form This is an application for an errors and omissions package policy designed specifically for architects and engineers. As well
More informationLOSS EXPERIENCE: Describe any losses having occurred in the past 5 years and state the date and value of each loss: Yes
[Construction Application] BUILDERS RISK / WRAP UP LIABILITY APPLICATION Providing detailed information and submission of all documents/plans requested will increase our efficiency and ability to obtain
More informationINSURANCE REQUIREMENTS FOR ALL CITY CONTRACTS
INSURANCE REQUIREMENTS FOR ALL CITY CONTRACTS 1. GENERAL PROVISIONS A. Indemnification. The Contractor shall indemnify and save harmless the City of Lincoln, Nebraska from and against all losses, claims,
More informationPROPOSAL FORM. All the questions to be answered completely. Incase of shortage of space kindly enclose the information as an annexure :
Bajaj Allianz General Insurance Company Limited Regd. Office & Head Office : GE Plaza, Airport Road, Yerawada, Pune - 411 006. CIN: U66010PN2000PLC015329 FOR CONTRACTOR S ALL RISKS INSURANCE PROPOSAL FORM
More informationCONTRACTORS INSURANCE SPECIFIC CONTRACT INSURANCE PROPOSAL
CONTRACTORS INSURANCE SPECIFIC CONTRACT INSURANCE PROPOSAL A FULL POLICY WORDING IS AVAILABLE ON REQUEST PLEASE COMPLETE IN CAPITAL LETTERS USING AN INK PEN AND TICK BOXES AS APPROPRIATE Where requested,
More informationSCHEDULE 5 INSURANCE TABLE OF CONTENTS 1. INTERPRETATION... 1. 1.1 Definitions... 1 2. CONSTRUCTION-RELATED INSURANCE REQUIREMENTS...
SCHEDULE 5 INSURANCE TABLE OF CONTENTS 1. INTERPRETATION... 1 1.1 Definitions... 1 2. CONSTRUCTION-RELATED INSURANCE REQUIREMENTS... 1 2.1 Wrap-Up Liability Insurance... 1 2.2 Course of Construction Coverage...
More informationEffective Date: Expiry Date: STATEMENT OF FACT
Page 1 of 7 Effective Date: Expiry Date: 05/10/2015 at 21:12 04/10/2016 at 23:59 STATEMENT OF FACT Agent: Agency Number: Agent Reference: Insured: Company Status: Address: General Details Your Insurance
More informationEDUCATION (K-12) OWNER INSURED CONSTRUCTION PROJECTS
EDUCATION (K-12) OWNER INSURED CONSTRUCTION PROJECTS Insurance and Indemnification Clauses (to be included in Supplementary Conditions to the CCDC 2 2008 Contracts for Education (K-12) projects insured
More informationCC-EVER001-16 Exhibit I: Insurance Page I-1 EXHIBIT I INSURANCE REQUIREMENTS
CC-EVER001-16 Exhibit I: Insurance Page I-1 EXHIBIT I INSURANCE REQUIREMENTS SEC. 1. INSURANCE REQUIREMENTS The Concessioner shall obtain and maintain during the entire term of this Contract, at its sole
More informationEMPLOYER S, PUBLIC & PRODUCTS LIABILITY PROPOSAL FORM CONTRACTING TRADES
V2 0 EMPLOYER S, PUBLIC & PRODUCTS LIABILITY PROPOSAL FORM CONTRACTING TRADES Please complete all details in BLOCK LETTERS. Where applicable indicate YES or NO Insurance will not be in force until proposal
More informationEXHIBIT Y INSURANCE COVERAGE REQUIREMENTS FOR DESIGN-BUILD CONTRACTOR AND O&M CONTRACTOR
EXHIBIT Y INSURANCE COVERAGE REQUIREMENTS FOR DESIGN-BUILD CONTRACTOR AND O&M CONTRACTOR Section 1 Insurance Coverages Required Prior to Final Completion of the Project Assets Except as set forth below,
More information7. Do you perform any out of state work?... If yes, in what states and provide details of work performed
Applicant s Name* (*If more than one entity, attach separate sheet with description of each entity s operations, relationship to each other and ownership.) Contractors Application Agent Applicant Mailing
More informationTHIS ADDENDUM IS TO BE READ WITH AND CONSTITUTES PART OF THE TENDER DOCUMENTS.
ADDENDUM WSP Project No. 141-21285-00 Addendum No.: 2 Date: May 11, 2015 Contract No.: 13-006 Owner: Consultant: Number of Pages Project Name Hamilton International Airport WSP Canada Inc. 6 (including
More informationEXHIBIT V INSURANCE COVERAGE REQUIREMENTS FOR DESIGN-BUILD CONTRACTOR AND O&M CONTRACTOR
EXHIBIT V INSURANCE COVERAGE REQUIREMENTS FOR DESIGN-BUILD CONTRACTOR AND O&M CONTRACTOR Section 1 Insurance Coverages Prior to Project Completion Except as set forth below, the Developer will obtain and
More informationspecified contract works and legal liability proposal
W000001 specified contract works and legal liability proposal for building construction contracts Important Notices relating to this Proposal You should read the following comments and the Declaration
More informationAt minimum, Project Co will be required to ensure the following insurance coverage in relation to the D&C Phase:
Schedule 9 - Insurance Part A - D&C Phase insurance requirements Project Co will be required to effect or cause to be effected such appropriate insurances during the D&C Phase in accordance with Clause
More informationcontractors Policy Summary
contractors Policy Summary 2 Contractors Policy Summary Contractors Policy Summary This is an annually renewable Contractors Annual Insurance underwritten by Royal & Sun Alliance Insurance plc. The information
More informationCONTRACTORS ALL RISKS / PUBLIC LIABILITY / WORK INJURY COMPENSATION INSURANCE PROPOSAL FORM
CONTRACTORS ALL RISKS / PUBLIC LIABILITY / WORK INJURY COMPENSATION INSURANCE PROPOSAL FORM IMPORTANT NOTICE 1) Statement pursuant to Section 25 (5) of the Insurance Act (Cap. 142) (or any subsequent amendments
More informationCENTURY INSURANCE GROUP CONTRACTORS QUESTIONNAIRE AND WARRANTY General Agency
Notice: This application becomes part of the policy and must be signed in ink by the President or Owner of the Named Insured. Any coverage we issue is due to the reliance of the truth and accuracy of the
More informationSecurus Insurance Limited. Proposal Form. Engineers Professional Indemnity
Securus Insurance Limited Proposal Form Engineers Professional Indemnity Securus Insurance Limited Suite 3, Stafford House Strand Road Portmarnock Co Dublin Phone (01) 8464512 Fax (01) 8464522 Email info@securus.ie
More informationPROFESSIONAL INDEMNITY INSURANCE ARCHITECTS PROPOSAL FORM
PROFESSIONAL INDEMNITY INSURANCE ARCHITECTS PROPOSAL FORM THIS PROPOSAL MUST BE SIGNED BY A PARTNER OR DIRECTOR OF THE BUSINESS. ALL QUESTIONS MUST BE ANSWERED AND ADDITIONAL INFORMATION PROVIDED WHEN
More informationBusiness liability insurance
Business liability insurance Insurance Terms No. AA20 The insurance contract is governed by: The insurance policy including endorsements and special terms. These present Insurance Terms No. AA20. VÍS general
More informationSECTION 1.0 STATUTORY AUTHORIZATION AND PURPOSE
A local law for Flood Damage Prevention as authorized by the New York State Constitution, Article IX, Section 2, and Environmental Conservation Law, Article 36 1.1 FINDINGS SECTION 1.0 STATUTORY AUTHORIZATION
More informationNATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES
NATIONAL INSTITUTE OF GOVERNMENT PURCHASING (NIGP) DESIGN AND CONSTRUCTION CODES All searches and notifications on Bid4Michigan are based on National Institute of Government Purchasing (NIGP) codes. It
More informationNumber 34 of 2013 CONSTRUCTION CONTRACTS ACT 2013 ARRANGEMENT OF SECTIONS. 6. Right to refer payment disputes to adjudication.
Number 34 of 2013 CONSTRUCTION CONTRACTS ACT 2013 Section 1. Interpretation. ARRANGEMENT OF SECTIONS 2. Construction contracts: exceptions, etc. 3. Payments under construction contracts. 4. Payment claim
More informationDesign and Construct. Professional Indemnity Insurance proposal form
Design and Construct Professional Indemnity Insurance proposal form Please complete all the questions in this proposal form in black ink, continuing your answers on page 7 where there is insufficient space.
More informationPlease provide details of your claims within the last 5 years Date Incident details Amount paid Amount reserved
Combined Liability Insurance Client name: Operating address: Company reg. number: Business description: Year business established: Current Insurer: Current Broker: Renewal date: Premium: Please provide
More informationTerms and Conditions for Legal Entity Liability Insurance VK109-2016 (valid as of 01.04.2016)
Terms and Conditions for Legal Entity Liability Insurance VK109-2016 (valid as of 01.04.2016) The terms and conditions shall apply to insurance agreements entered into at AAS Gjensidige Baltic Eesti filiaal
More informationRenewable Energy Insurance When You Need Specialist Advice
Renewable Energy Insurance When You Need Specialist Advice The Renewable Energy Industry is diverse and fast evolving, however, with advances in technology comes new risk. Insurance for the renewables
More informationbusiness key policy protecting your DReAMs
business key policy PROTECTING YOUR DREAMS Why A Business Key Policy? A standard business policy is fine for some businesses. But many businesses have unique needs that require specialized or supplemental
More informationCivil Construction Risk Engineering: An Insurance View
Civil Construction Risk Engineering: An Insurance View 20 February 2012 Paul Hampshire VP Civil Construction & Global Technical Member - CIREG Construction Insurance Risk Engineers Group Civil Construction
More informationSolar Photovoltaic (P.V.) Insurance Questionnaire
Solar Photovoltaic (P.V.) Insurance Questionnaire Solar P.V. Insurance Questionnaire This Proposal form and all materials submitted shall be held in confidence. All questions must be fully answered and
More informationCHANGES TO HOME INSURANCE
CHANGES TO HOME INSURANCE ESTIMATING REBUILDING COSTS FOR SUM INSURED POLICIES 25 JULY 2013 - PROPERTY INSTITUTE OF NEW ZEALAND WHAT S CHANGING? Home insurance in New Zealand is moving back from unlimited
More informationHow To Insure A Project In The Uk
Schedule 15A: Insurance Part 1 Required Insurances Sub-part 1 Design and Construction Phase The policies to be taken out by the Contractor, or caused to be taken out by the Major Sub-contractor, and maintained
More informationPART 4: SITE INFORMATION
TRANSNET PIPELINES TENDER NUMBER: PYP/W1/6/21/1646 DESCRIPTION OF THE WORKS: CONSTRUCTION OF THE FIRE PROTECTION SYSTEM UPGRADE FOR THE FUEL HANDLING AREAS OF THE TARLTON DEPOT AND IRP REFRACTIONATOR ONLY
More informationAttachment 12 Insurance
Attachment 12 Insurance PART A DESIGN/BUILD PERIOD INSURANCES PART A(I): RTD DESIGN/BUILD PERIOD INSURANCES 1. OWNER CONTROLLED INSURANCE PROGRAM 1.1 Eligibility and Enrollment RTD shall procure an owner
More informationAPPLICATION FOR ARCHITECTS AND ENGINEERS PROFESSIONAL LIABILITY INSURANCE
APPLICATION FOR ARCHITECTS AND ENGINEERS PROFESSIONAL LIABILITY INSURANCE NOTICE: THE POLICY FOR WHICH APPLICATION IS MADE APPLIES ONLY TO CLAIMS FIRST MADE DURING THE POLICY PERIOD. THE LIMITS OF LIABILITY
More information"I" INSURANCE CONDITIONS
"I" INSURANCE CONDITIONS I_insur_conditions.pdf Issued on July 16, 2009 I N D E X PART I GENERAL INSURANCE CONDITIONS (GIC)...1 GIC 1 INDEMNIFICATION...1 GIC 2 CONTRACTOR...1 GIC 3 INSURANCE PROCEEDS...1
More informationHow To Fill Out A Construction License Form
Applicant Instructions: CONTRACTORS GENERAL LIABILITY SUPPLEMENTAL QUESTIONNAIRE Answer all questions. If the answer to any question is NONE, please state NONE. Questionnaire must be signed and dated by
More informationPROPOSAL FORM FOR CONTRACTORS ALL RISKS INSURANCE
1 2 Name of Proposer (in full) Address PROPOSAL FORM FOR CONTRACTORS ALL RISKS INSURANCE 3 4 Trade or business Name and address of Principal for whom contract is to be undertaken 5 6 7 Description of Contract.
More informationNATIONAL CONTRACTORS INSURANCE COMPANY
NOTICE: This policy is issued by your risk retention group. Your risk retention group may not be subject to all of the insurance laws and regulations of your State. State insurance insolvency guaranty
More informationLandlord Insurance. Summary of cover
Landlord Insurance Summary of cover March 2013 Why choose AXA s Landlord Insurance policy? The Landlord Insurance offers a range of covers and caters for a variety of customers, from individuals who own
More information1. Name of Firm: County: 2. Address: 3. Branch Office Address(es): 4. Phone: ( ) Fax: ( )
PERSONNEL THIS IS AN APPLICATION FOR A CLAIMS MADE AND REPORTED POLICY This Application for Professional Liability Insurance is intended to be used for the preliminary evaluation of a submission. When
More informationSCHEDULE 5 INSURANCE REQUIREMENTS TABLE OF CONTENTS 1. CONSTRUCTION-RELATED INSURANCE REQUIREMENTS... 1
i SCHEDULE 5 INSURANCE REQUIREMENTS TABLE OF CONTENTS 1. CONSTRUCTION-RELATED INSURANCE REQUIREMENTS... 1 1.1 Wrap-Up Liability Insurance... 1 1.2 Course of Construction Coverage... 2 1.3 Other Construction
More informationThe Guidance for the Management of Safety for Construction Works in Japanese ODA Projects
Contents The Guidance for the Management of Safety for Construction Works in Japanese ODA Projects September 2014 Japan International Cooperation Agency (JICA) i Contents ii Contents The Guidance for the
More informationLandlord Insurance. Summary of cover. October 2013. 35039_ACLD0520ZB_BRO_A5.indd 1 23/10/2013 16:20
Landlord Insurance Summary of cover October 2013 35039_ACLD0520ZB_BRO_A5.indd 1 23/10/2013 16:20 Why choose AXA s Landlord Insurance policy? The Landlord Insurance offers a range of covers and caters for
More information3. GC 25 WORKPLACE HEALTH, SAFETY AND COMPENSATION COMMISSION
1. GC17 INDEMNIFICATION Except as provided in the Contractor shall be liable for, and shall indemnify and hold harmless the Owner against all claims, demands, losses, costs, damages, actions, suits or
More informationCONTRACTORS COMBINED SUPPLEMENTARY PROPOSAL FORM THE RIGHT TOOL FOR THE JOB
CONTRACTORS COMBINED SUPPLEMENTARY PROPOSAL FORM THE RIGHT TOOL FOR THE JOB Introduction Clause 21.2.1 In the Joint Contracts Tribunal (JCT) Standard Form of Building Contract there are a number of clauses
More informationSolarEdge Technologies Ltd.
SolarEdge Technologies Ltd. GENERAL TERMS AND CONDITIONS 1. General. This document, entitled General Terms and Conditions (referred to herein as the Agreement ), forms an integral part of the quotation
More informationAPPLICATION FOR ARCHITECTS AND ENGINEERS PROFESSIONAL LIABILITY INSURANCE
APPLICATION FOR ARCHITECTS AND ENGINEERS PROFESSIONAL LIABILITY INSURANCE NOTICE: THE POLICY FOR WHICH APPLICATION IS MADE APPLIES ONLY TO CLAIMS FIRST MADE DURING THE POLICY PERIOD. THE LIMITS OF LIABILITY
More informationThe Cover. Additional Increase in Cost of Working. BIGRNP(SI)_7 Ace Package Policy 2013 ix.12
Section 2 - Business Interruption Fire and Specified Perils If any building or other property used by the Insured at the Premises for the purpose of the Business is lost, destroyed or damaged by any Specified
More informationThe Tradesmen policy is available for self employed persons and small businesses with up to 8 people and a turnover of 500,000 or less.
TRADESMEN Summary of Cover The Tradesmen policy is available for self employed persons and small businesses with up to 8 people and a turnover of 500,000 or less. Why choose AXA s Tradesmen policy? Tailor-made
More informationCONTRACTORS GENERAL LIABILITY APPLICATION Note: Throughout this questionnaire the words you and your include all entities seeking coverage
CONTRACTORS BEST INSURANCE SERVICES INC. 20335 Ventura Blvd., Ste 426, Woodland Hills, CA 91364 Phone No: 818-348-4900 FAX No: 866-309-9237 CA License #0F37560 CONTRACTORS GENERAL LIABILITY APPLICATION
More informationThe Yacht Harbour Association Berthing, Mooring and/or Storage Ashore Licence Standard Terms and Conditions
The Yacht Harbour Association Berthing, Mooring and/or Storage Ashore Licence Standard Terms and Conditions 1 DEFINITIONS Where the following words appear in these Conditions, the Licence and the Company
More informationRestoration Contractors Questionnaire
Restoration Contractors Questionnaire GENERAL INFORMATION: 1. Applicant: Years under this name: List all business names in which applicant has owned in the past: 2. Contractor s License No.: State(s) in
More informationAPPLICATION FOR ARCHITECTS/ENGINEERS PROFESSIONAL LIABILITY INSURANCE WITH CERTAIN UNDERWRITERS AT LLOYD S
APPLICATION FOR ARCHITECTS/ENGINEERS PROFESSIONAL LIABILITY INSURANCE WITH CERTAIN UNDERWRITERS AT LLOYD S THIS APPLICATION IS FOR A CLAIMS MADE INSURANCE POLICY APPLICANT S INSTRUCTIONS 1. ALL QUESTIONS
More informationExplanatory Notes on Accident/Incident Reporting for Construction Sites These notes are to be read in conjunction with the Flow Chart at Annex 2.
Explanatory Notes on Accident/Incident Reporting for Construction Sites These notes are to be read in conjunction with the Flow Chart at Annex 2. (0) Introduction 0.1 The explanatory notes outline the
More informationQBE PROFESSIONAL INDEMNITY CONSTRUCTION CONSULTANTS PROPOSAL FORM
QBE Insurance (International) Limited Unique Entity No. S16FC00047K 60 Anson Road #11-01 Mapletree Anson Singapore 079914 Tel: 65-6224 6633 Fax: 65-6433 3270 www.qbe.com.sg QBE PROFESSIONAL INDEMNITY CONSTRUCTION
More informationHow To Insure A Nuclear Plant
SCHEDULE 5 INSURANCE REQUIREMENTS TABLE OF CONTENTS 1. INTERPRETATION... 1 1.1 Definitions... 1 2. CONSTRUCTION-RELATED INSURANCE REQUIREMENTS... 1 2.1 Construction Wrap-Up General Liability Insurance...
More informationJUA Underwriting Agency Pty Ltd
JUA Underwriting Agency Pty Ltd Engineers & Architects Professional Indemnity Proposal Form Please answer every question fully, incomplete answers will not be accepted, and may result in a delay in terms
More informationIndemnity & Insurance
Indemnity & Insurance All contracts must contain terms and conditions that ensure adequate insurance coverage by contractors. (Financial Administration Manual, Directive 3301, Section 3.7.2) This directive
More informationSAMPLE 1. GC17 INDEMNIFICATION. (a) (i) (ii) -1-6sgc.doc
1. GC17 INDEMNIFICATION Except as provided in the Contractor shall be liable for, and shall indemnify and hold harmless the Owner against all claims, demands, losses, costs, damages, actions, suits or
More informationContractors' Combined Liability Insurance Summary
Contractors' Combined Liability Underwritten by a member of the QBE Insurance Group (QBE) This insurance is an annual contract unless stated otherwise in the quotation or renewal documentation and as confirmed
More informationJames River Insurance Company 7130 Glen Forest Drive, Suite 210 Richmond, VA 23226 804-289-2700 CONTRACTORS SUPPLEMENTAL APPLICATION
James River Insurance Company 7130 Glen Forest Drive, Suite 210 Richmond, VA 23226 804-289-2700 Supplemental Application for Contractors MANUFACTURERS & CONTRACTORS Division Email to MC@jamesriverins.com
More informationArchitects Professional Indemnity Proposal Form
Please answer all questions leaving no blank spaces. If you have insufficient space to complete any of your answers, please continue on your headed paper. This form must be signed and dated by a Partner,
More informationDelivering Engineering Services to UK Infrastructure through our branded businesses nationwide
Delivering Engineering Services to UK Infrastructure through our branded businesses nationwide Renew provides multidisciplinary engineering services to maintain and develop UK infrastructure focused in
More informationWhat can I do with a major in Engineering Technology?
Lewis-Clark State College offers one and two year certificates, A.A.S. and B.A.S Degrees in Engineering Technology through the Technical and Industrial Division. You can learn more about the Technical
More informationQBE Professional Indemnity Proposal Form Construction Consultants
Notice to the Proposed Insured QBE Professional Indemnity Proposal Form Your duty of disclosure If a proposer does not fully and faithfully give the facts as he knows them or ought to know them, he may
More information5. Firm is Corporation Partnership Sole Proprietorship Joint Venture Other
THIS IS AN APPLICATION FOR A CLAIMS MADE AND REPORTED POLICY This Application for Architects and Engineers Professional Liability Insurance is intended to be used for the preliminary evaluation of a submission.
More informationThe Tradesmen policy is available for self employed persons and small businesses with up to 8 people and a turnover of 500,000 or less.
TRADESMEN Summary of Cover The Tradesmen policy is available for self employed persons and small businesses with up to 8 people and a turnover of 500,000 or less. Why choose AXA s Tradesmen policy? Tailor-made
More informationAPPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT
APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT City of Swartz Creek 8083 Civic Drive Swartz Creek, MI 48473 810-635-4464 Fee Received: $ Date: / / Receipt No: Demolition Permit (including Right of
More information5047P Architectural and Engineering Services for the Cambie Fire Hall and Ambulance Station Project- Addendum #2
January 23, 2013 Business and Financial Services Department Finance Division Telephone: 604-276-4218 Fax: 604-276-4162 Attention: To All Proponents Dear Bidders: Re: 5047P Architectural and Engineering
More information